final year project initial presentation title: solar powered battery charging system supervisor:...
TRANSCRIPT
![Page 1: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/1.jpg)
Final Year ProjectFinal Year Project
Initial PresentationInitial Presentation
Title:Title: Solar Powered Battery Charging System Solar Powered Battery Charging System
Supervisor:Supervisor: Maeve Duffy Maeve Duffy
![Page 2: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/2.jpg)
BackgroundBackground
The aim of this project is to design, build The aim of this project is to design, build and test and test a system that will control the a system that will control the
charging of multiple mobile phone charging of multiple mobile phone batteries simultaneously.batteries simultaneously.
![Page 3: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/3.jpg)
BackgroundBackground
Review output power levels of available Review output power levels of available solar panelssolar panels
Develop system to control the charging of Develop system to control the charging of multiple mobile phone batteriesmultiple mobile phone batteries
Consider how the circuit/system design Consider how the circuit/system design will change for larger panelswill change for larger panels
System will include power management System will include power management functions and information displayfunctions and information display
![Page 4: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/4.jpg)
Proposed Time Scale Proposed Time Scale
September/October:September/October:
Review of Solar Review of Solar PanelsPanels
Review Mobile Review Mobile Phone battery Phone battery chargerschargers
![Page 5: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/5.jpg)
Proposed Time ScaleProposed Time Scale
October/November:October/November:
Design DC/DC converterDesign DC/DC converter Suitable circuit Suitable circuit for range of source and load for range of source and load
voltage and power levelsvoltage and power levels Determine switch specificationsDetermine switch specifications Simulate in SPICESimulate in SPICE
![Page 6: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/6.jpg)
Proposed Time ScaleProposed Time Scale
November:November:
Build and test DC/DC converter:Build and test DC/DC converter: Build prototype circuit on strip boardBuild prototype circuit on strip board Test and debug circuitTest and debug circuit Test circuit using solar panel as sourceTest circuit using solar panel as source
![Page 7: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/7.jpg)
Proposed Time ScaleProposed Time Scale
January:January:
System and software interface designSystem and software interface design Specify system functionality Specify system functionality Build and test additional hardware elements Build and test additional hardware elements Implement user interface in LabviewImplement user interface in Labview
![Page 8: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/8.jpg)
Proposed Time ScaleProposed Time Scale
February:February:
System integration and developmentSystem integration and development Test complete systemTest complete system Design modifications required for larger Design modifications required for larger
panelspanels Estimate energy savings provided by DC/DCEstimate energy savings provided by DC/DC
![Page 9: Final Year Project Initial Presentation Title: Solar Powered Battery Charging System Supervisor: Maeve Duffy](https://reader036.vdocuments.us/reader036/viewer/2022072013/56649e635503460f94b5f5f3/html5/thumbnails/9.jpg)
Progress to DateProgress to Date
Review of Solar PanelsReview of Solar Panels
Review of Mobile-Phone battery chargerReview of Mobile-Phone battery charger
SPICESPICE