SECON 2013
Final Presentation
![Page 2: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/2.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 3: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/3.jpg)
THE TEAM
Jackson KnottElectrical Engineer• Hardware Packaging• Navigation
Brian LampkinElectrical Engineer• PCB Design• Vision
Ian TurnipseedElectrical Engineer• Hardware
Packaging• Vision
Matt WilliamsElectrical Engineer• Hardware Packaging• Website
John MorrisonElectrical Engineer• Hardware
Packaging• Navigation
Matt WattsElectrical Engineer• PCB Design• Navigation
Dr. Robert ReeseAdvisor
![Page 4: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/4.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 5: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/5.jpg)
THE COURSE
1) Starting Zone2) Loading Zone3) Sea Delivery Zone4) Rail Delivery Zone5) Air Delivery Zone
![Page 6: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/6.jpg)
COMPETITION FORMAT
Qualifying RoundDrive One Foot Forward
Preliminary RoundsThree 5 Minute RunsScore will be Sum of the Three
RunsTop 8 Teams Advance
Final RoundsSingle-Elimination BracketSeeding based on Preliminary
Standings
![Page 7: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/7.jpg)
QUALIFYING ROUND
Four Available Practice Courses
![Page 8: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/8.jpg)
SCORING
Rail Cargo (Six Blocks) 50 Points: Correct Size 100 Points: Correct Color
Sea Cargo (Six Blocks) 50 Points: Correct Size 100 Points: Correct Color
Air Cargo (Two Blocks) 350 Points: Correct Size 100 Points: Correct Color
Deductions 20 Points: Wrong
Zone
![Page 9: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/9.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 10: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/10.jpg)
Type Name
Manufacturability Modular Design
Sustainability Battery Life
DESIGN CONSTRAINTS - PRACTICAL
![Page 11: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/11.jpg)
MANUFACTURABILITY
Modular Design PCB
LayoutPopulation
ChassisLayout Optimization
![Page 12: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/12.jpg)
MANUFACTURABILITY
PCB Layout and Population PIC24 Breakout Board Headers/Locking Connectors
![Page 13: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/13.jpg)
MANUFACTURABILITY
Chassis Layout Optimization
Battery Compartment
Molex Battery Connection
![Page 14: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/14.jpg)
MANUFACTURABILITY
Chassis Layout Optimization Battery Terminal Strip
![Page 15: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/15.jpg)
MANUFACTURABILITY
Chassis Layout Optimization Cable Tray for Routing
![Page 16: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/16.jpg)
MANUFACTURABILITY
Chassis Layout Optimization Wheels Grippers
![Page 17: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/17.jpg)
SUSTAINABILITY
Maximum Battery Life Average Current draw for the
system is 2.3 A Battery Rating is 4400 mAh Therefore, Overall Battery
life is about 2 hours.
![Page 18: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/18.jpg)
SUSTAINABILITY
Through testing, we found that the battery performance dropped after 20-30 minutes of use.
To obtain the highest possible performance throughout the SECON Hardware Competition, the battery packs were charged following each run.
![Page 19: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/19.jpg)
Name Description
Multiple Block Carrier
The robot must carry the maximum allowed number of blocks.
Navigation The robot must navigate the course autonomously.
Detection The robot must detect color and size of blocks and spaces.
Speed The robot must travel at a speed of 0.4 feet/second.
Size The robot must be no larger in size than 12”x12”x16”[1]
DESIGN CONSTRAINTS - TECHNICAL
![Page 20: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/20.jpg)
MULTIPLE BLOCK CARRIER
Two Claws Two Servo Motors for Each
GripperArm Upright/Arm LoweredClaw Opened/Claw Closed
Same Side Alignment for Each Gripper
![Page 21: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/21.jpg)
MULTIPLE BLOCK CARRIER
Arm UprightPeriod High = 1400
µs
Arm LoweredPeriod High = 2350
µs
![Page 22: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/22.jpg)
MULTIPLE BLOCK CARRIER
Gripper Opened
Period High = 1800 µs
Gripper Closed
Period High = 600 µs
![Page 23: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/23.jpg)
NAVIGATION
Autonomous Infrared Distance Sensing Encoders
![Page 24: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/24.jpg)
NAVIGATION
Infrared Distance Sensor Testing
0 0.5 1 1.5 2 2.50
2
4
6
8
10
12
14
f(x) = − 1.18497448028744 x³ + 6.93058969354016 x² − 14.7408192713436 x + 13.2485638848871
Voltage
Dist
ance
to W
all
![Page 25: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/25.jpg)
NAVIGATION
Encountered Issue
![Page 26: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/26.jpg)
NAVIGATION
Design Improvement Extra IR Sensors Added for Precise
Navigation
![Page 27: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/27.jpg)
DETECTION
Mini-ITX and Camera Camera Ignores White and Black Detect Size and Color of
Blocks/Zones Serial Communication with
PIC24
![Page 28: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/28.jpg)
DETECTION
Size: 2 RGB: 231,123,99
![Page 29: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/29.jpg)
DETECTION
Brown and Green Filters
![Page 30: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/30.jpg)
DETECTION
Sliders to control detection zones
![Page 31: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/31.jpg)
DETECTION
Design Improvement Camera Mount
Locking 5 Degrees of
Freedom Light Source
Illuminates Blocks/Zones
Servo-Deployed Hood
Blocks Ambient Light
![Page 32: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/32.jpg)
SPEED
Minimum Speed of 0.4 feet/sec. At 12 Volts, motors perform at 150 RPMWheel Diameter (d) = 90 mm.Circumference (c) = πd = 282.6Distance per Minute = c*RPM = 42,390
mm/min.Distance per Second = 706.5 mm/sec. =
2.32 ft/sec.
![Page 33: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/33.jpg)
SPEED
Drive Motor TestingFor a Speed of 0.4 ft/sec, motors must run at
17.2%
Required for Task Completion Fast Speed (40% Duty Cycle)
![Page 34: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/34.jpg)
SIZE
Robot must fit within a 12”x12”x16” Volume
12”
16”
![Page 35: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/35.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 36: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/36.jpg)
SYSTEM TESTING
Integration of all Subsystems Ensure that the Robot can do the
following: Avoid Walls Detect a Block Pick Up/Set Down a Block Match a Block with Correct Loading
Zone
![Page 37: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/37.jpg)
SYSTEM TESTING
Calibration for Competition Courses
![Page 38: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/38.jpg)
SYSTEM TESTING
Preparing for Preliminary Run
![Page 39: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/39.jpg)
SYSTEM TESTING
Vision System Preparation
![Page 40: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/40.jpg)
SYSTEM TESTING
Round Beginning
![Page 41: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/41.jpg)
SYSTEM TESTING
Approaching the Drop Zone with Blocks
![Page 42: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/42.jpg)
SYSTEM TESTING
Preparing for Delivery
![Page 43: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/43.jpg)
SYSTEM TESTING
The Delivery
![Page 44: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/44.jpg)
PRELIMINARY RESULTS
1) Western Carolina University – 4950 Points2) University of Alabama – 1700 Points3) University of Evansville (IN) – 1440 Points
4) Mississippi State University – 1150 Points
5) FAMU/FSU – 840 Points6) UNC-Asheville – 800 Points7) North Carolina A&T – 710 Points8) Tennessee Tech University – 650 Points
![Page 45: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/45.jpg)
FINAL RESULTS
T5) Mississippi State
![Page 46: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/46.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 47: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/47.jpg)
January February March April
PCB Population
System Testing
Packaging
Debugging & Optimization
Competition
TIMELINE
![Page 48: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/48.jpg)
OUTLINE
The Team Competition Overview Design Constraints &
Improvements System Testing Timeline Bill of Materials
![Page 49: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/49.jpg)
BILL OF MATERIALS
![Page 50: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/50.jpg)
BILL OF MATERIALS
![Page 51: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/51.jpg)
BILL OF MATERIALS
Item Cost
Computer ~$270
14.8V/4400mAh Battery ~$80
(2) 67:1 Metal Gearmotors w/ Encoders & Wheels
~$75
(6) Servo-Motors (Arm, Claw, Hood) ~$180
(5) Infrared Distance Sensors ~$75
(4) Robotic Claws ~$40
(2) Front Wheel Casters ~$10
Camera w/ Telescoping Rod ~$70
Lights ~$5
Fan Cables ~$30
Printed Circuit Board w/ Fabrication ~$200
Course Construction ~$150
Miscellaneous Hardware Materials ~$50
![Page 52: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/52.jpg)
BILL OF MATERIALS
Unit Subtotal: ~$1235 Spares & Other Necessities: ~$365 Final Project Cost: ~$1600
![Page 53: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/53.jpg)
[1] IEEE SoutheastCon 2013 Hardware Competition. Final Version. 11 Sep. 2012. http://ewh.ieee.org/reg/3/southeastcon2013/documents/Final_SECON_2013_Hardware_Rules.pdf
REFERENCES
![Page 54: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/54.jpg)
Questions
![Page 55: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/55.jpg)
IAN TURNIPSEED
YEE-HAW
RIDE ‘EM Cowboy
![Page 56: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/56.jpg)
PREPPING FOR THE FINALS
Crack is
Whack
Watch out for
that seagull
![Page 57: Final Presentation. The Team Competition Overview Design Constraints & Improvements System Testing Timeline Bill of Materials](https://reader036.vdocuments.us/reader036/viewer/2022062519/5697bfe21a28abf838cb42cc/html5/thumbnails/57.jpg)
AT THE BANQUET
Shhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh
hhhhh
We’re all
adults now