LITERATURE STUDY

•GALLERY•MINITHEATRE•AUDIOVISUAL ROOM•BLACKBOX ROOM

MelissaDeeptiShani

ShalakhaHelena

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 2/99

Kansas City ArtInstitute

INA ABRAMOVIC - GALLERY 1988

MARINA ABRAMOVIC - GALLER

Corcoran Gallery of Art

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 3/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 4/99

Galleries

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 5/99

1. exhibition rooms,

2. office

3. Auditorium

4. Storage space5. multiple-use event spaces

6. Spaces for refreshments, rest rooms etc(optional)

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 6/99

Leeds Art Gallery Exhibiton Room

Office space, AdvocateGallery, England

Guggenheim Museum, Bilbao Auditorium

Metropolitan museum of ar

Los Angeles CountryMuseum of Artrefreshment space

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 7/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 8/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 9/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 10/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 11/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 12/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 13/99

Berlins new national gallery by MiersVan de Rohe Stirling’s Staatsgalerie

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 14/99

Provide a central orientation space-anatrium

ate Modern, Herzog & de Meuron“so that people don’t feel lost”

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 15/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 16/99

• Words• Colour coding and

pictograms

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 17/99

National Soaring Museum, NYC

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 18/99

Research Store – with appropriateconditions like controlled

environments

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 19/99

Walls:•Uninterrupted surfaces•Fabric-covered or plasterboard-clad

hardboardFloors:•Quiet, comfortable, attractive, hard-wearing,light-reflective and capable of taking heavy

loads.•Wood, stone or carpet- most suitable.

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 20/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 21/99

Appropriate viewing level

Suitable light Presentation of information

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 22/99

Compatibility with the object

Backgrounds Innovations like screen systems

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 23/99

Hinged- side access Hinged-front access Top Hinged

Sliding front 2 Sliding panels Sliding upwards

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 24/99

Sliding downwards Lift-off front Demountable case system

Rear Access Hood case

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 25/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 26/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 27/99

working lights

emergencylighting

display lighting

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 28/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 29/99

1) Wall washing 2) Downlighting

3) Uplighting

4) Diffused5) Directional spot

6) Lighting of pale objects

7) Increased illuminatifor dark objects

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 30/99

office: 300 ambient, 500 task

demonstration theatre: seating area 300,

demonstration area 600

exhibition hall: 500/300/100 workshop:200/500/750

circulation areas 200, shop 600, toilets 150.

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 31/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 32/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 33/99

glare

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 34/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 35/99

Fire

Theft and damage

Water sprinkler system

Pulsing water mist

Barriers

Infra-red movement detectors

CCTV systems

Display cases

Deadlocks, non removable hinges

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 36/99

Vandalism•Shatterproof glass or Perspex should be

considered for casing valuable objects

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 37/99

NAPIER MUSEUM, KERALA

Case Study

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 38/99

History of Napier Museum

• Indo-Saracenic structure

• Built in 1857. Presently, 150 yearsold.

• In 1874, named after the Maharaja of  Travancore.

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 39/99

Architect and Influences

• Designed & overseen by a Britisharchitect, Chisholm.

• Chinese, Mughal, Kerala & Italianinfluences.

• Unique architectural style - gothicroof; minarets.

• Yellow scalloped arches, frieze &lattice work, beautiful carvedbalconies.

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 40/99

HVAC

• Natural A.C.

• Lush observatory gardens, in thestyle of Chinese & Mughal & Kerala'stradition.

• Blue, pink, yellow, red & white usedin roofs & minarets.

Obj di l i h

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 41/99

Objects on display in theMuseum

• Sculptures in bronze & stone

• Carvings of wood & ivory

Kuftgiri works• Traditional musical instruments

• Coins, lamps etc.

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 42/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 43/99

AUDITORIUM

Entrance

halls

Foyers

Boxoffice

Cloakroom

 Toilets

CorridorStairway

s

Mainseating

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 44/99

Main stage,wings,

backstage

OPTIONAL

Shop,restaurant

, bar

Exhibitionspace

Officespaces

Kitchen,staffroom

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 45/99

T= 800-1150 mmC1 = 60 mm

C2= 120mm

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 46/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 47/99

Special Effects in 5D cinema:•Lightning•Rain•Snow•Smoke•Bubble•Vibration•Spray• Jet•Leg sweep

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 48/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 49/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 50/99

Fixed,

seminar

 Jury room ,

courtroom

Faculty only,

modular

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 51/99

Screen Height = the furthestallowable viewing position/5.3

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 52/99

Connections –plugpoints

storage

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 53/99

Acoustic tile ceiling

Carpet for acoustics

Venetian blinds De-humidifiers

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 54/99

Of i d

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 55/99

FLOOR

Fireresistant,

non-reflectiive

Non-slippery,

 Trapdoors

LIFTS

Basement

Min. Headroom-2.5m

Easy access

StageRaised, tilted,

revolted

Often raised to1100mm abv.

Lvl of auditorium

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 56/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 57/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 58/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 59/99

- SHORNOOR – KALAMANDALAM

-GOA- KALA ACADEMY, GOA

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 60/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 61/99

Inaugurated by Shri G. Kathikeyan Hon. Minister for Cultural Affairs on 6th July,

2001

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 62/99

Steel posts- Barricades Ht. approx. 75 cm Concrete walls and one side top panelling

glass Source of light- 1 tubelight Upper window openings - lots of natural

light

Exhibits have sensor system Adjascent to the gallery- Cultural tourism

office and a beautiful courtyard

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 63/99

Outside the gallery – an area to showcasepictures of artforms and artefacts like chatti

A mini library showcase of books related tothe culture and traditoons of the exhibits in

art gallery Type of exhibits- Kathakali veshams and

various art forms (statues)

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 64/99

Various Kathakali

exhibits

Window openings

Barricades

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 65/99

Water SupplyMotor starting point- room behind gallery 10 HB motor pumping from bore wellWater tank capacity 1 lakh litersDistributed to various buildings namelyhostels, quarters , offices etc.Water used for all purposes. No separate

sources usedWater pumping lines laid undergroundSpecial inlets for waste water disposals

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 66/99

WaterDrainage

System

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 67/99

RainWaterDrainage

S stem

GuttersStorage tank 

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 68/99

Water Supply System

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 69/99

Direct connection from KSEB Hence no current..works on generator Generator room behind dance class Generator cables laid underground KSEB Transformers- 3 phase line- over

entire compund of kalamandalam Meters provided in evry building

Inside compund- approx- 31 electric posts Powercuts- Half and hour (morn. and eve)

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 70/99

Old Motor Shed

Generator Room

Generator room-inside

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 71/99

Main Electric Posts from

KSEB

Electric Circuit Boards-Gallery; Hostel

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 72/99

Fire extinguishers provided in Hostels Offices Koothambalam Rest – open buildings – less provocation of 

fire Airconditioning systems

Vice Chancellor’s room Computer room Guest room

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 73/99

Rest – offices have fans and teachingfacilities depend on natural ventilation

 Toilets- approx total 100 Septic tanks- covered with underground

slab Separate for respective buildings Rain water harvesting system – Tank with

chakari, stones, mannal

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 74/99

Tubelights

Floodlights

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 75/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 76/99

PLAN OF KALA ACADEMY, GO

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 77/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 78/99

Used for experimental productions Designed for music concerts, meetings,

amateur performances ,press functions Easy to change backgrounds Acoustically treated No backstage Entre black setting

Recording studio

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 79/99

PLAN

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 80/99

1. Seating capacity without chair …250seats

2. Seating capacity with chair …

170seats3. No. of green room/dressing room …1

4. General light arrangement with onehalogen/flood of 1000w with dimmer

Floor, ceiling ,wall -black

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 81/99

2Emergency exitLeft -small accessDoorRight- proper routeDefinedExtra door – not op

Led lighting

Pro ector oint Surveillance camer

2 sets of 41 chairs Thick foam, coir material

Behind area for storage-I piano, extra plastic-chairs

St

AC duct

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 82/99

V

Recording studio

Storage room

14 plugpoints

4 speakers1 emergency light2 spotlight1 surveillance camera1 sprinklers18 vents

5 alarm systems

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 83/99

• Height of room – varies from 2.9 to 4.5 m

• 24 lights- main area of the room• CFL lamps with transluscent glass• Behind area of the hall – different

coloured glass on CFL lighting• Curved wall for proper acoustics

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 84/99

Description

1.Running wall space for display - 51 runningmts

2.Carpet area of the Gallery approx. -165 sq.mts

3. Three mobile display panels to be used onboth sides(each having a space of 4 * 1.5 mts)

4.Height of the Eaves board

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 85/99

PLAN

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 86/99

Paintings- landscape and portrait andsculptures

Acrylic on canvas/paper Oil on canvas 0.6 to 1 m lengths in size 1 fire extinguisher

2 general floodlights with stan

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 87/99

Ceiling- normal concrete

with plastering

No proper barricades

Flooring-tile

Hooks and pipes – hanging exhibits

• 10 flood lights

for exhibits 

5 tubelights

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 88/99

Led light to help walk in d

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 89/99

6 light fixtures- CFL lamps 8 speakers Telephone systems 7 specially designed chairs 2 sprinklers 2 alarm systems Flooring soft – coirmat

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 90/99

Adjacent to preview room, working as a subsidiary

Water tank placed near theparking area – provided by waterdept

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 91/99

dept.Wells with inbuilt tanks

Incase of water supply shortage- tank

Fire hydrant supply

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 92/99

Surface drains- rainwater collection

Normal systems of water dispos

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 93/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 94/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 95/99

Electricity- municipality –electric dept

Water hydrants externally placed

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 96/99

Safety- smoke alarmsfire sprinklers

Fire Hydrant externally placed

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 97/99

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 98/99

3 floors- specified area for toilets

Server roomOperator lines 200 lines – intercoms placed

CCTV cameras

Spl. Guards (lady security also) Metal detectors Police forces for spl. Functions Bomb squad with dog sniffers

7/29/2019 FINAL Design Major-lit Study

http://slidepdf.com/reader/full/final-design-major-lit-study 99/99

 The Architect’s Handbook edited by Quentin Pickard RIBA

 Time savers http://www.lib.uchicago.edu/e/reg/using/facilities/avroom.html   http://www.cksc.edu.ph/facilities1.html http://kalyanaresort.com/gallery.php http://www.si.edu/mci/english/professional_development/past_courses_ 

And various sites from the net Thesis studies