film budget format

Upload: lisaconnolly

Post on 31-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 film budget format

    1/26

    Details

    Page 1

    #

    Production Budget Details:

    Format: 16 mmLength: min.

    Shooting ratio: :1 Title:Producer:

    complete length 0 ft. Company:rolls needed 0 rls. Director:

    rushes length 0 ft. Budget by:Prep: days Date Prepared:

    Shoot: daysPost: weeks

    Equip PU:Equip Return:

    Test Day:

    Only complete fields with a pink background on this page

  • 8/14/2019 film budget format

    2/26

    Details

    Page 2

    3-Jun-08

  • 8/14/2019 film budget format

    3/26

    "Title" DATE PREPARED 06/03/2008

    Page No.3

    1 STORY AND SCRIPT SUPPLIER

    STORY RIGHTS

    WRITER AND SCREENPLAY

    TYPING AND DUPLICATION

    TOTAL STORY AND SCRIPT

    2 PRODUCER & DIRECTOR NAME

    EXECUTIVE PRODUCER

    PRODUCER

    DIRECTOR

    EXPENSES

    TOTAL PRODUCER AND DIRECTOR

    3 PERFORMERS NAME

    PERFORMERS

  • 8/14/2019 film budget format

    4/26

    "Title" DATE PREPARED 06/03/2008

    Page No.4

    EXTRAS

    STUNTPERSONS

    UNION FEES

    OTHER

    TOTAL PERFORMERS

    4 PRODUCTION STAFF NAME

    PRODUCTION MANAGER

    ASSISTANT DIRECTOR

    PRODUCTION SECRETARY

    SCRIPT SUPERVISOR

    PRODUCTION ASSISTANTS

    DIRECTOR OF PHOTOGRAPHY

    CAMERA ASSISTANT

    GAFFER

    BEST BOY

    KEY GRIP

    DOLLY GRIP

    SOUND MIXER

    BOOM OPERATOR

    PROD DESIGNER/ART DIRECTOR

    ASSISTANT ART DIRECTOR

    PROPERTYMASTER

  • 8/14/2019 film budget format

    5/26

    "Title" DATE PREPARED 06/03/2008

    Page No.5

    WARDROBE SUPERVISOR

    MAKEUP ARTIST

    SPECIAL EFFECTS

    DRIVERS

    STILL PHOTOGRAPHER

    CASTING DIRECTOR

    TOTAL PRODUCTION STAFF

    5 LOCATIONS & STUDIO SUPPLIER

    TRANSPORTATION

    PER DIEMS

    PETTY CASH

    CATERING

    LOCATION FEES AND PERMITS

    TRAVEL EXPENSES

    STUDIO RENTAL

    SET CONSTRUCTION/SUPPLIES

    TOTAL LOCATIONS AND STUDIO

    6 Quantity PRODUCTION EQUIPMENT SUPPLIER

    CAMERA PACKAGE0 Arriflex SR II Body, Magazine & Battery0 Additional Magazines0 Additional Battery0 Extension Viewfinder 0 Digi-Tach

  • 8/14/2019 film budget format

    6/26

    "Title" DATE PREPARED 06/03/2008

    Page No.6

    0 3x3 Matte Box0 4x4 Matte Box with Hard Mattes0 Arri Bridge Plate0 Follow Focus Kit

    0 Light Weight Follow Focus & Rods0 Zeiss 10-100 T2.0/Chroiziel MF 5'0 Canon 8-64 T2.0/Chroiziel MF 2'0 Cooke 9-50 T2.5/Chroiziel MF 18"0 5.9mm Angenieux T2, Shade & 85 Filt.0 9.5mm Zeiss T1.3 MF 10"0 12mm Zeiss T1.3 MF 8"0 16mm Zeiss T1.3 MF 8"0 25mm Zeiss T1.3 MF 10"0 50mm Zeiss T1.3 MF 2'4"0 85mm Zeiss T1.3 MF 3'0 300mm Canon F2.80 Sachtler Studio, Legs & Spreader 0 Sachtler Horizon, Legs & Spreader 0 Sachtler Video 20, Legs & Spreader 0 Baby legs0 Dolly Adaptor 0 High Hat

    Filters (3x3):0 85's: (85), 85N3, (85N6), 85N9

    0 ND's:N3, N6, N90 Pol's: 85 Pol, (Pol)0 Double Fogs: 1/8, 1/4, 1/2, 1-50 Fogs: 1/8, 1/4, 1/2, 1-50 Black Frosts: 00, (00+), (0), 0+, 1, 1+, 20 White Frosts: 00, 00+, 0, 0+, 1, 1+, 20 Diffusion: 1/8, 1/4, 1/2, 1-50 Black Dot Diff: 1/2, 1, 2, 3, 4, 50 Corals: 1/8, 1/4, 1/2, 1-70 ND Grads: N3, N6

    0 Color Enhancer

    SOUND PACKAGE1 Nagra IVL, Headsets, Battery & Electric Slate0 Senheisser Shotgun 8050 Sony ECM-50 Lav0 Micron Wireless Transmitter 0 Fishpole

  • 8/14/2019 film budget format

    7/26

    "Title" DATE PREPARED 06/03/2008

    Page No.7

    0 Microphone Cables 25'

    LIGHTING PACKAGE0 12K HMI

    0 6K HMI0 4K HMI0 2500W HMI0 1200W HMI0 575W HMI0 200W HMI0 2500W HMI PAR0 1200W HMI PAR0 4K HMI Xenon0 2K HMI Xenon0 2000W IANIRO BLONDE with scrims0 1000W IANIRO REDHEAD with scrims0 2000W FRESNEL with doors, scrims0 1000W FRESNEL with doors, scrims0 500W Arri, doors & snoots0 300W Arri, doors & snoots0 2000W SOFTLIGHT with grid0 1000W SOFT with grid0 Zoom Lekolite0 4x2 Fluorescent Fix 48"lamps0 Sungun, 200W HMI & Extra Batteries

    0 Sungun, Tungsten & extra battery0 Dedo light0 Mini-Cool Kit0 Stick Up Kit0 Portable Location Kit:4-650W,Stands, AC0 Light Weight Stands0 2K Stands0 5K Senior Sky High Stands0 Wind Up Stand0 750 Hangers

    0 2K Hangers0 Gaffer Grip0 Mafer Grip0 Extension Chords 25'0 2K Dimmer 0 60 KVA AC Blimped Generator 0 6.5K Honda Generator

    Tie-In, Seaway, Boxes, etc.

  • 8/14/2019 film budget format

    8/26

    "Title" DATE PREPARED 06/03/2008

    Page No.8

    DOLLY & GRIP PACKAGE0 Cinejib Crane with Dolly0 Chapman Pee Wee

    0 Elemack0 La Grue Crane0 Straight Tracks 8'0 Curved Tracks0 Grip Stands/Head0 Sky-High Grip Stand and Head0 Grip Box (18x24)0 Grip Box (24x30)0 6x6 Butterfly Set0 12x12 Butterfly Set0 12x12 Black Cloth0 4x8 Bamboola0 Ianiro Pole Cat, Long0 Ianiro Pole Cat, Short0 Sandbags0 Wedges (box)0 2-4-6 (box)0 Full Apple Boxes0 Half Apple Boxes0 Quarter Apple Boxes0 Step Ladder (6')

    0 Step Ladder (10')0Fan0 Fog Machine

    CAMERA, LIGHTING & GRIP PURCHASES0 Gaffer Tape 2"0 White Camera Tape 1"0 Black Camera Tape 1"0 Exposed Film Tape0 Arri Eye Cup

    0 Dulling Spray0 Foamcore Large0 Tracing Paper roll 48"0 Clothes Pins0 Camera Reports0 Cans & Bags0 Cleaning Fluid & Lens Tissue0 Dust Off

  • 8/14/2019 film budget format

    9/26

    "Title" DATE PREPARED 06/03/2008

    Page No.9

    0 Markers, Sharpies0 Light Gel Rolls & Sheets:0 Black Scrim #3421 roll0 Black Wrap 24"x25" roll

    0 RoscoSun 85/34010 RoscoSun 1/2 CTO/34080 Light Bastard Amber/010 Tough MT2/31020 Golden Amber/210 Pale Amber Gold/090 Straw/120 Deep Straw/150 Full Blue/32020 Half Blue/32040 Tough White Flame Green/31100 Opal Tough Frost/30100 Light Tough Spun/30070 Rosco N6/34030 Fire/190 Broadway Pink/3390 Lavender/570 Primary Blue/800 Kelly Green/94

    TOTAL PRODUCTION EQUIPMENT

    7 RAW STOCK

    16MM NEGATIVE

    1/4" AUDIO STOCK

    PROMO STILLS35mm Stock & Lab

    TOTAL RAW STOCK

    8 LABORATORY

    PROCESSING

    WORKPRINT

  • 8/14/2019 film budget format

    10/26

    "Title" DATE PREPARED 06/03/2008

    Page No.10

    SOUND TRANSFERS

    TOTAL LABORATORY

    9 MISCELLANEOUS

    SET DRESSING PURCHASES & RENTALS

    PROPS PURCHASES & RENTALS

    WARDROBE PURCHASES & RENTALS

    OFFICE AND PHONE

    POSTAGE AND COURIERS

    ACCOUNTING/LEGAL/INSURANCE

    AUDITION EXPENSES

    TESTS & RETAKES

    PUBLICITY

    TOTAL MISCELLANEOUS

    10 SOUND AND MUSIC

    COMPOSER

    STOCK MUSIC AND SOUND EFFECTS

    STUDIO COSTS

    FOLEY/ADR

    ADD'T SOUND TRANSFERS

    SOUND MIXMixing Theatre35mm Sound Stock

  • 8/14/2019 film budget format

    11/26

    "Title" DATE PREPARED 06/03/2008

    Page No.11

    TOTAL SOUND AND MUSIC

    11 EDITING AND FINISHING

    EDITING STAFFEditor Assistant Editor Sound Editor

    CUTTING ROOM RENTAL

    SUPPLIES, FILL, LEADERS

    EDGE NUMBERS AND CODING

    MAIN/END TITLES

    OPTICALS

    VIDEOS & SCRATCH PRINTS

    NEGATIVE CUTTING

    PRINTINGAnswer Print (includes B roll)

    IntermediateOptical Sound (transfer & stock)

    REELS, CANS AND CASES

    FILM TO TAPE TRANSFERLow Con Print1" Video Transfer 1" Video Tape

    TOTAL EDITING AND FINISHING

  • 8/14/2019 film budget format

    12/26

    "Title" DATE PREPARED 06/03/2008

    Page No.12

  • 8/14/2019 film budget format

    13/26

    "Title" DATE PREPARED 06/03/2008

    Page No.13

    No. days/weeks Rate Total

    0.00

    No. days/weeks Rate Total

    0.00

    No. days/weeks Rate Total

    0.00

    0.000.000.000.000.000.000.000.000.000.00

    0.000.000.000.000.000.000.00

  • 8/14/2019 film budget format

    14/26

    "Title" DATE PREPARED 06/03/2008

    Page No.14

    0.00

    No. days/weeks Rate Total

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

  • 8/14/2019 film budget format

    15/26

    "Title" DATE PREPARED 06/03/2008

    Page No.15

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0 0.00

    0.00

    No. days/weeks Rate Total

    0.00

    0.00

    No. days/weeks Rate Total

    0 285.00 0.000 55.00 0.000 30.00 0.000 50.00 0.000 125.00 0.00

  • 8/14/2019 film budget format

    16/26

    "Title" DATE PREPARED 06/03/2008

    Page No.16

    0 30.00 0.000 55.00 0.000 25.00 0.000 60.00 0.00

    0 45.00 0.000 225.00 0.000 225.00 0.000 275.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 225.00 0.000 135.00 0.000 105.00 0.000 70.00 0.000 25.00 0.000 10.00 0.002 5.00 0.00

    0 6.00 0.00

    0 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 10.00 0.000 6.00 0.000 8.00 0.00

    0 10.00 0.00

    0 50.00 0.000 25.00 0.000 20.00 0.000 55.00 0.000 17.00 0.00

  • 8/14/2019 film budget format

    17/26

    "Title" DATE PREPARED 06/03/2008

    Page No.17

    0 2.50 0.00

    0 550.00 0.00

    0 490.00 0.000 285.00 0.000 190.00 0.000 150.00 0.000 100.00 0.000 75.00 0.000 300.00 0.000 175.00 0.000 600.00 0.000 300.00 0.000 44.00 0.000 30.00 0.000 55.00 0.000 36.00 0.000 32.00 0.000 32.00 0.000 40.00 0.000 23.00 0.000 20.00 0.000 15.00 0.000 160.00 0.00

    0 65.00 0.000 30.00 0.000 20.00 0.000 35.00 0.000 100.00 0.000 3.00 0.000 3.00 0.000 6.00 0.000 20.00 0.000 1.50 0.00

    0 2.50 0.000 2.50 0.000 2.50 0.000 1.00 0.000 10.00 0.000 550.00 0.000 75.00 0.00

    0.00

  • 8/14/2019 film budget format

    18/26

    "Title" DATE PREPARED 06/03/2008

    Page No.18

    0 650.00 0.000 300.00 0.00

    0 200.00 0.000 150.00 0.000 12.00 0.000 15.00 0.000 6.00 0.000 12.00 0.000 40.00 0.000 55.00 0.000 48.00 0.000 70.00 0.000 22.00 0.000 10.00 0.000 7.50 0.000 5.00 0.000 1.00 0.000 5.00 0.000 5.00 0.000 1.00 0.000 1.00 0.000 1.00 0.000 8.00 0.00

    0 12.00 0.000 30.00 0.000 60.00 0.00

    12.00 0.0010.00 0.0010.00 0.0010.00 0.00

    3.00 0.00

    10.00 0.0015.00 0.0030.00 0.00

    3.00 0.000.00 0.000.00 0.006.00 0.00

    14.00 0.00

  • 8/14/2019 film budget format

    19/26

    "Title" DATE PREPARED 06/03/2008

    Page No.19

    5.00 0.000.00 0.00

    150.00 0.0040.00 0.00

    8.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.00

    0.00

    Quantity Rate Total

    0 135.00 0.000

    0 10.00 0.00

    0.00

    No. feet Rate Total

    0 0.184 0.00

    0 0.315 0.00

  • 8/14/2019 film budget format

    20/26

    "Title" DATE PREPARED 06/03/2008

    Page No.20

    0 0.160 0.00

    0.00

    Quantity Rate Total

    0.00

    Quantity Rate Total

    365.00 0.000.180 0.00

  • 8/14/2019 film budget format

    21/26

    "Title" DATE PREPARED 06/03/2008

    Page No.21

    0.00

    No. days/weeks Rate Total

    0.000.000.00

    0 300.00 0.00

    0 0.020 0.00

    0 0.730 0.00

    0 0.520 0.00450.00 0.00

    4.50 0.00

    0.00

    0.00

  • 8/14/2019 film budget format

    22/26

    "Title" DATE PREPARED 06/03/2008

    Page No.22

  • 8/14/2019 film budget format

    23/26

    estimated BUDGET SUMMARYfor 0

    project title 0producer 0

    director 0

    budget by 0approved byprepared 30-Dec-99

    prep period: 0 daysshoot period:0 days

    post period: 0 weeks

    format: 16mmlength (min): 0

    NO. DESCRIPTION

    1 STORY AND SCRIPT

    2 PRODUCER AND DIRECTOR

    3 PERFORMERS

    4 PRODUCTION STAFF

    5 LOCATIONS AND STUDIO

    6 PRODUCTION EQUIPMENT

    7 RAW STOCK

    8 LABORATORY

    9 MISCELLANEOUS

    Sub Total

    10 SOUND AND MUSIC

    11 EDITING AND FINISHING

    Sub Total

    Total

  • 8/14/2019 film budget format

    24/26

    Contingency 10%

    Grand Total

  • 8/14/2019 film budget format

    25/26

    Totals Totals

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

  • 8/14/2019 film budget format

    26/26

    0.00

    0.00