f*iilq*n-y ri$*'**xs - national highway...

110
GGYERNMENT OF PAKISTAN{ MI}HSTRY OF COMMUI\ICATIONS NATIONAL HIGHWAY AUTHORITY F*iilq*n-Y ri$*'**xs HAKLA(M-1) t T* *J-KHA}$ 1VIGTORWAY PACKAGS -EEts {RgHivrANI KHETT A, KST BALEAN } (v )o> ,lr,! b NOVEMBER' 2016 NATIONAL ENGINEERING SERVICES PAKISTA'N (Pv''T') LIMITED - NESpAK HOUSE 2ndFtoor.C.ttatuit lvenue,Sector G'5i'-2 I!-51aFa6' Pakistan' TENBER DRAWIT{GS r-.. frf

Upload: trinhkhanh

Post on 08-May-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

GGYERNMENT OF PAKISTAN{

MI}HSTRY OF C OMMUI\ICATIONS

NATIONAL HIGHWAY AUTHORITY

F*iilq*n-Y ri$*'**xs

HAKLA(M-1)t T* *J-KHA}$ 1VIGTORWAY

PACKAGS -EEts {RgHivrANIKHETT A, KST BALEAN }

(v

)o> ,lr,! b

NOVEMBER' 2016

NATIONAL ENGINEERING SERVICES PAKISTA'N (Pv''T') LIMITED-

NESpAK HOUSE 2nd Ftoor .C.ttatuit lvenue, Sector G'5i'-2 I!-51aFa6' Pakistan'

TENBER DRAWIT{GS

r-..frf

Page 2: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

Flr

LIST 0F DRAITINGS:

GE}TERAL I{OTES

ALL DIMENSIONS SHOWN ON PI.AN AND PRORLE DRAWINGS ARE IN ME|ERS WHEREAS ANGUI.AR MEASUREMENTSARE IN DEGREES, MINUTES ANO SECONDS (360' TO A CIRCLE).

EACH DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER DRAWINGS.

GRID CO-ORDINATES AND ELTVATIONS ARE BASED ON UTM ZONE 43-N.

MINOR CHANGES IN HORIZONTAL,/VERNCAL ALIGNMENT MAY BE CARRIED OUT AT SiTE WITH PRIOR APPROVALOF THE ENGINEER.

STRUCTURES SHOWN ON P|-AN/PROFILE ARE SYMBOLTC. FOR DEI',ATL OF STRUCTURES AND PROTECTION WORKSSEE RELEVANT DRAWING. HOWEVER DFI'AILED INVENTORY OF STRUCTURES SHALL BE PREPARED AS PER SITECONDITION/REQUIREMENTS AND SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR iO COMMENCEMENT OFCONSTMCT]ON ACTIVITES AT SITE.

FOR PAVEMENT MARKING AND ROAD SIGNS, CONTMCTOR SHALL SUBMII DETAILED PI-ANS DMWINGS FORAPPROVAL OF THE ENGINEER.

LOCATION OF UNDER GROUND CABLES/UTTUTIES SHOWN ON P|jNS ARE APPROXIMATE. EXACT LOCAT]ON SHALLBE Dtr'ERMINED BY THE CONTMCTOR AT HIS OWN COST.

ANY DAMAGE DONE TO THE UT1UTIES DURING EXCAVATION/EXECUTION OF WORK/S SHALL BE IMMEDIA"IELY REPAIREDBY THE CCNTMCTOR AT HIS OWN COST TO

'IF{E SAT1SFACT1ON OF CONCERNED DEPARI\,IENT/S.

THE IMPROVED SUBGMDE MATERIAL SitALL HAVE A MINIMUM SOAKED C.8.R. OF 25% N 95% M.D.D. AASHTO T_i8OFOR BOTH FILL AND CUT SECTIONS.

,IO. THE LENGTHS, SIZES, SLOPES, INVERT LF/ELS AND OTHERS GIVEN DEIAILS REGARDING CULVERTS, AS SHOWN IN

SCHEDULE OF STRUCTURES ARE TENTATIVE. THE CONTMCTOR SHALL PREPARE SHOP DRAWINGS OF EACH CULVERTLOCATIONS WI'IH THE REQUIRED SKEW ANGLE AS PER SITE REQUIREMENTS AND SHALL SUBMIT THE SAME TO THE

ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION EXECUTION.

1 1. THE CONTRACTOR SHALL EE RESPONSIBLE TO CATER FOR ALL TEMPOMRY TRAFFIC DIVERSIONS BEFORE STARIOF CONSTRUCT]ON OF THE ROAD TO THE SATISFACTION OF THE ENGiNEER INCLUDING DEIOUR ROAD AND'ITS

MAINTENANC1 SPRINKLING OF WATER, GRADING AND COMPACTTON WHEN AND WHERE REQUIRED AT HIS OWN COST.

12. RF|'A|NING/BREAST/TOE WALL, GUARD RAIL, CoNCREIE CURB SIONES, FOOTPATH, RoAD SIGNS, GANTRY SIGNS,

PAVEMENT SIUDS AND OTHER ANCILI-ARY ITEMS SHALL BE PROVIDED AS PER THE BOQ ITEMS , AS PER S|TEREQUIREMENT OR AS DIREC'IED BY THE ENGINEER. CONTRACTOR SHALL PREPARE THE SHOP DRAWINGSFOR FACH AC'IIV|TY/ LOCAI1ON ALoNG WITH MET'HODoLoGY AND SHALL SUBMII FOR APPROVAL rrc THE

ENGINEER PRICR TO SIARI OF CONSTRUCTION.

1-r TWO COATS OF BlTUMEl.l PAINT SHALL BE APFUED 0N CONCREI'E FACES lN CCNTACT wlTH THE SOIL. COST OF]HIS ITEM iS DEEMED TO BE INCLUOED IN THE REI.EVENT 8OQ ITEM RATES AND NO SEPMTE PAYMENT SHALLBE MADE FOR THIS I'IEM OF WORK.

14. REI'AINING/DRAINAGE STRUCTURES FOUNDATION SHALL BE PI.ACED ON FIRM,HARD AND ROCK./ STRATA,OR ASDIRECTE9 BY ENGINEER.

15. ROADWAY EXCAVATION MATERIAL SHELL BE UTILIZED IN MOST EFFECT1VE MANNER IN THE EMBANKMENT F/EN

wtTH BLEND|NG /MtxtNG wlTH THE SUPERIOR MATERIALS (lF REOUIRED, WIHTOUT AT ANY EX|RA coST). RoADWAY

SXCAVATION SHALL NOT BE OISPOSED OFF OUTSIDE RIGHI OF WAY, IT IS MANDATORY TO UTILIZE IN THE PROJECI

16. DRAINAGE CHUTES SHALL BE PROVIEDED ON HIGH NLL (flLL>2M) AT FACH sOM INTERVAL.

17. IN SUPERELEVATION REACHES FVC WEEP HOLES WITH PIPE DIA 4 INCH SHALL BE PROVID€D IN NJB AI AN JNTERVAL

OF 1M TO DMIN. OUT SURFACE WATER OR AS DIRECTED BY THE ENGINEER.

TENDER DRAWING

1 .

2.

6-

I

8.

>!'1;'.;n.r?,'

TITLE OF DRAWING DRAWING No' TOTAL NOntr q!.rtrtrTqS. NO.

1/ rn / r n ^6na

LIST OF DRAWINGS AND GENEML NOTES JIJI / IUZ' I IUIU9UVI

2 KF/ MAP 3737/1O2/1D/RMOO2 0 1

0 1LOCATION MAP 3737/1O2/1D/LFOO2

5 SYMBOLS AND ABBRF/IA]]ON5 J737 /1O2fiD/SAOO2B

TYPICAL CRoSS SECTIoNS 3737/1O2/7OITC003*30 n 6

0 17 SCHEDULE OF STRUCTURES 3737/1O2fi0lSS004

8 DESIGN PAMMEIERS FOR BOX CULVERT 3737/1O2/1DISSOO5 0 1

Y rvpfcAl Box CULVERT (GENEML ARRNGMENT) 3737/1O2/1DIBCG006 01

021 0 8OX CULVERT REINFORCEMENT OEIAILS 3737/1O2/ID/ECRSSI'/A

1 1 TyptcAL wlNG IVALL UYOUT DEl'AlL 3737 /102/TDIWI{R008'8A

12 TyplcAL PLUM ccNcREIE RETAINING wALL DFlAlLs 3737/1o2/1DlRwP009' ./-^\ \0 1

I J nplcAL Rc-c nElAltlltlc wALL DElAlLs 3737/1o2fiDlRRw0010'10A /'| .,.v 1

TyplcAL Rcc EREAST IvALL DEIAILS 3737/102/1DlRBw0011'1141 +

1 F GENERAL NOTES FOR STRUCTURES (BRIDGE. UNDERPASS) 3737/1O2/1DIGNS0012 01

08t o

a '7

GENERAL ARRANGEMENT UNDERPASSES 3737/1o2/rDluPsorJ-rrtt

BR1D6ES, GfRDERS, ABUTMENT 3737/1o2/1Dl8R014 1 0

0 11 8 i nEsan sHApE coDE 3737/1g2/'n)/Ksuurs

IL

iTp. onerN.oucrs,coNcRfiE BARRTER AND cuRB sfoNE DErAlE73l/1o2/1D/00016-168 n ?1 o

TYPICAL CoNCREIE CHUTE DglAlL 3737/1O2/1D/Doo17-17Aa i

21 rvpteAr supERELF/ATloN DEI"AILS 3737/1o2lTDlTSoo16'164

rvpa,cL ROAD SIGN ,GANTRY SIGN & PROTECTION DEI'AILS 3737/102/TDIRS0019-31E 1 822

23 pF,vEi,tENi MARKnrc AND RoAD sTuos 3737/1o2/TDlPMso032 0 1

z+ RA|L 373i/1A2/1DlGRo33' 034

& PROFILE DRAWINGS 3737/102frD/Pt-&PR 001-03'ME|AL GUARD

DE,TAIL PLANJ Io 6

ROAD DRAWINGS AT KM 23+J00

000].AYOUT PI-AN DRAWING 3737 /1o2/1D/P 01

26

HAKLA (M-1)TO D.I KIIAN UOTORTAY

PACI(AGE-U (REmIAI.I KHEIL TO KOT BALiAN)(sEcnoN - uB)

.TIONAL ENGINEERING SERYICES

AKISTAN (PlrI.) tTD.IN ASSOCIATTON MTH

MM PAKISTAII (PVT.) LfD.

GOVERNMENT OF PAKISTANMINISTRY OF' COM},fUNICATIONANONAL HIGI{WAY AUTHORITY

ORAWNG NO.

3737 /102/1D/t-DGOO1

Page 3: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

LEGEND

}.|/\1IOl.lAL CAPIIA *

PROVINCIicL CAPITAL A

IMPORTANT CIIY O

INTERMTIO}.IAL BOUNDARY

PROr'INCIAL BOUNDAR/ROADS

PRqJEsr AREA @

h:,{:, Y CHiNA

N+tnAFGHANISTAN

INDIA

iR,AN

ARAtsIANT SEA TENDER DRAWING$

TIAKI,A (M-1)

TO D.i KIIAN MOTOR]TAYPACKAGE-Ii (REHMAM KHEIL TC KOT

(sEcrIoN - UB)BAUAN)iDAl:,r.t:r t:,r G0YERNMENT OF PAKiSTAN- lrrr"-"

r \*r'' .,r,rrd6na, F rtnr^rrTrTTn ^,'n\TciFlJr'ucst'lN -9: tP;..Ii.I MINISTRY OF COMMUNICATIONSI-

--_. N ASSoCIATIoN TITH I UZ I I i]{IT

,*'*, d;;;it; it**ot AurHoRIrYiW** ;^d;*'-it*.i-ito ##lcHD.^Ef.. BY I November, 201 6 3737/1O2/TD/ KMOAZ

I oRAWNG NC.

Page 4: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

PR,OFOSED'\d- i (}IAKLA) D.I KI{ANI VICTORVTAY

LENGTH-I (55 Km) LENGTH-ll (7O.OO Km)! LENGTH-lll (52'5 Km LENGTH-IV (50 Km)

Km)

LENGTH-V (63 Km)

P,ROPOSED. AJJGNiltEMfj

TENDER DRAWING$

?

PACKAGES:." :1,, ::l ' r , - . r . . r ,i , . ,_.r i%.+,*+.,1ji jjr ..y_"_,.. ll

IIniI$lrlL[:

z1

, , . I P-l YARIK To REiIMANI KHEL (55 KM)

i p-r REHMANI KHEIL To Kor BALIAN (70 KM)

.f- i (SeCriOru - llB) L = 25'40 KM4

".,., " i P-lll TARAP TO KOT BELIAN (52.5 KM), ' - . : : . :, ,. .i p-lv PINDIGHEB To rAnlP (50 KM)

. "

. i p-v HAKLA io ptNDtcHEB M-1 (03 KM) S:. ' i

"i: _. _

:ti

II

i LEGEND:-I

-| trurcncHANGEs

__s-<l* i N-55j. I N-eOr 1

j N-s1i M-2

I t

-r-

-r-

Ir-l

PROPOSED ALIGNMENT -r

ROADS -I

iTEE-

I{AKL,A (M-1)

TO D.I KI{AN MOTORTAYPACKAGE-U (REHI{AM KIIEIL TO KOT BAIJAN)

(sEcrIoN - tls)

I t B

LOCATION MAPSCAI-E

0R m{ a/ RAJA SIIAFIQ

,;'r;.,. GOVERNMENT 0F PAKISTANNI,F"I,*/E

L.]# uixrsrnY oF coMMUNIcATIoNS,*.**^'" NATIoNAL HIGHTIAY AUTHoRITY

ffi,ffip;**ESMu* PAK'.TAN (Pw') LrD'

04SIJEUfITED BT

03 l:rb*r.f,

02 l l j @ 9 | 4 7 - \r - . . 6 . 1 r . : r i . i 1

-ii..r,i: r. '*"OATE

November, 2O16

ORAWING NO,

3737 /tO?/TD/LPQO?ARer'.

CHD.AE& Ei01

RAr'.

e,T1?. .'-{,j.iili+e

DATE-nEffi

APPRO'E! APPROVED AY

i"t: '

Page 5: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

AEEF'EVIATICI'r SSY},TEOTS

{ r { r s{r .{t d} g

+ +t A i

L1rr-- lL - - J

/ 1 / 1 / 1n n l a / 1

MANHOLE

NUL!\H

6ULVERT ,/ 9RIDGE

T&T 80X

HAND PUMP

AUe

AREA

AIGNTIEHT PC

PCL

F. t .

PI

PR

FT

R

R.C

RENF.

R6r.

RHS.

R.O.W.

x t .

R^

m

S.B.P

sfiu)

E.m

oFFSEf oF TAI,IGENT UNE .io Pc oF SHIFTED clRcl€ cuR\'€

POINf oF HofrZol,ttA- cURv TURE (SfAFf oF HoRIZOMIL CURVE)

REI{fORCED COI{CREIE PIPE CUL\ERT

PROFILE GRADE UNE

PllsllctfY INDO(

PONT OF HORIZONTAL IMERSECIION

POINT OF ROTAIbN

Fohn OF rcRZOtltAL TANGENCI (END OF HoRIZONTA c1,Rl€)

RAAUS OF I€RZONTA CURVE

RANfORCED COI{CREIE

RENFORCEIIENT

RE1ISON

RG}IT I-UNO SIDE

RIGHf OF WAY

RIGHI

RETANIi{G .'YILL

REU)C{TED WAIER COURSE

sulP€ GRA0€NT (PERCENT)

SUPERELF"{NOH

${@LDER SREA]K POII{T

sua cul\€RrSFIR^L fO-CUilE SIJ{' C1JL\GFf

SHCIJIDER

SQIJAR€ METER

sttOFT IAT€EM

DESIGN CB'ITER UNE

L{ND ACQUTSMON

tKEF

gUSHE5

MOSQUE

PER}TANENT HOUSE // 'IEMPORARY

n A AtJ L' L'n n 1 \U t J U

--(

B SREA TH

8C 8OX CULYEFT

A.U SENCH |,.Aft(

SOP BECI!{NIiIG OF PROJECT

C CIIORO LENCIH

c.B.R cruFoF[rlr 8€ARINC RAIIO

c/c CENTER TO CENIER

CHD. CHEE<ED

C/\4. CENTER UN€

cltlm CENilUEIER

coNc. cot{cREIE

coNsr^r coNslRJgnoilJolM

cs cuRv€ TO $lR^|.

CUL CUL\ERT

Cu.m CUBC UEIER

ClrRtE rfN \€RnCAL CUFIVE LENGIH

OC DEPIH OF CUT

oq OEGf,EE oF cURtE (Br ARC)

0e 0EGREE oF cuRvE (Fi cHoRo)

T&TF7L/'\

HPa

tn-,7"

GRAVES / GRAVE YARD

]ELEPHONE POLE

ELSSTRIC & TUT UNE

DIRT]RACK

METALLED ROAT)

SLECIRIC POLE

HIGH TENSION UNE PYLON

HORIZONTAL CURIE DATA .

GRID NORTH

]RAVERSE /BM POINTS

POIiIT OF INTERSECNON

FgNCE

SUI GAS & WA1ER PIPE UNE

1UBE WELL

CAt.lAL / DRAIN

UNED WA1ER COURSE

UNUNED WAGR COURSE

SPUR SIRUSTURE

GRID UNE

SHRINE

sPOf LEVEL (T/P.)

RoAo slGN (N Pl,{N)

EXTSTTNG GROUND L-EvEL (PROFll€)

RNISHED GMDE UNE

c/lYAYs lN PROFILE

CULVERT IN PRORLE

OEG

DlA

ottt.

0/s

ORG.

DEGREE

ONH€ER

unorsoNOOInlSIREAI

DOUET $JRFTC€ TREAIUETT

0M|lli.|G

EilD OF PROECT

OGAflsloN JOlltlT

CAVANEED IROI'I

HORIZOMAL

Hrclr IENSOI{/LOIS IENSIOI{

iIEIGHT CF FIIJ.

HIGTI FI'OO LEI/EL

HIGHTAY

oEFtgcTlot{ rfiGLE (HORdOr{tA- ArflE)

CIRC1JIJR D€FI.ECTION AtgI

F{v€Rt 1.8/6-

$$olt{il6 FTC'OR (N cAsE oF\ERflC{ CURVE)

KI'GRAI

KILOUETER

E!{GIH OF HORTZONTIL CIJR/E/SPIRA-

UI.IE,IR ITEIER

IfFT MNO $OE

LOM; TIrIGTNT

UEIER

UIOOI€ ORDII{AIE

rxmauuu N HOt!

r,ff{rHUra

CIRCULAR CURVE PARAMEIERS

s asnilG , EJSI , ofiERfl^L olsra{ct (sHlFo

E!-E.,/EL EIEV IION

5r SFRAL tO t^ilGElrt

srA/srA 5r noN (cHffuGS)

STRUCT TRt'gruRE

SJPERE- 9JPERE.EVANOil

s"rvru( sDE 1{AXaoP

exPftl

H/Hffi.

tlJ/LI

F F

HFL

Hft

I

I .L

K

Kq-

KU/Kn

L

UN.U

I T

Y/m

L

tilx.

M,tl

Mlt{,

mm

N,S.L

t{

NO.

N.T5

t

t < t

Trfi.

I E

lR

TYP.

u/s

VIR.

\iEt!

\PC

\FI

\FT

It

{.8.tt

{c

s

TANGENf IT}| TH OF HORUONT{ CUR\'€

TATTICEXT iO SPIRAL

]RIPP|.E SURfICE iRE\T'€NT

T I'IGENT

ll{tcKftEsi'rRA€moil

nflc{-

UFSIREAT

\EF'ICIL

v^fl^g€

\i€RRED

\€RIlC,lr. POINT CF CIJFT TURe (SrARr OF \GRnCJL CURr'E)

\€RNC[ POINT OF INGFS€CNON OF PROfIIE CR^OE.

\ERnCAL PONI OF lAfleENCf (END OF \€Rncrl. clJRvE)

'rr€sf. 'r$gftl oF ROAOYI Y

YATER SOUNO MTCADAIf,

WA1ER COURSE

OFTANCE PERPANDICI'LIR TO fi€ IIfiGENT. FROM EECINNINE TO ftE AND OF SPIRAL

OtsTAilCE PERP€NOICTJI,AR 10 ]H€ IIfiCEI{I, FROU SEG|ilTTING ]D THE ANO CF SPIRAL

$(at AIGI-E

itfr

T P , / \

c r I

I NUIIE€R

NOT TO SCJTE

- - -'-clTYAYS-lN-

{aF

-----[trc3]

4J

X nl l

\ roo.oo

/,-RO{S SIGN NUUEER

MruRA slJRFrcE ru^ tto"r ,-;r1;t;li!,iNORlHll{G, l{oRltl

TO D.I KIIAN UOTORTAYPACTqGE-U (RSHMA}TI KHEIL TO KOT BAIIAN)

(sEcTIoN - UB)

ENGINEERING SERVICES

PAKISTAN (PW.) tTD.IN ASSOCTATION TTTH

MM PAKISTAI'{ (PW') LTD.MINiSTRY OF COMMIINICATI

NATIONAT HIG}IIfAY AUTHORITY

ORAWING NO.

3737/1O2/1D/ SAOo2B

BOUNDARY UNE

Page 6: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

TVDTf',\ iI { i f \ - / 1 1 r l CROSS SECTIO}{ rlLLthl

rmo adq rmo_Tff-l t l

e l q1 4 x

6 l Fa l a

nu su)PE AES€RVED FOR TREEi2-ljltE ClfiftAGEllAY

iOR OEIAIL REF.

ofc io. 5ttll02nDl00o16

ROW )'AiI(ER

\*'

l < ?

W.EJI

SU88'S€ -

100

1g}

KATCHA DRAIN

nSiFdH'$ff'TftIEP-(Y *'oi 150

SUBGRAOE = Jff)1$N.)

SIBANKMENT

ALL DIMENSIONS ARE IN MILLIMEIERS UNLESS NOTED OTHERWISE.

IMPROVED SUBGRADE MATERIAL SHALL BE CCMPACTED N 95% M.D.D, MSHTO i-1EO AND Si'IALL HAVE

A MINfMUM SOAKED C'B.R OF 25% A't 95% M:D'D' MSFITO i-180'

ROAOWAY EXCAVATION MATERIAL SHALL BE UI1LIZED IN MOST EFFECTIVE MANNER IN IHE EMFANKMENT

EVEN WITH BLENDTNG /MtXtNG W|TH SUPERTOR MATERIAL (lF REQUIRED, WIHTOUT At'iY EXTM CoST)-

ROADWAY EXCAVATION SHALL NOT BE DISPOSED OFF OUTSiDE RIGHT OF WAY. IT IS MANDATORY TO

UTIUZE ROADWAY EXCAVAT]ON IN ftT PRo}!JECT,OR AS DIRECTED BY THE ENGINEER'

PITCHING STONE ON EMBANKMENT SLOPE SHALL BE PROVIDED IN ITIE REACHES WHERE NULI'AH/RAIN

WATER MAY DAMAGE.THE EMBANKMENT SLOPES AS DIRECIED BY THE ENGINEER.

W-BEAM GUARD RAIL TO BE PROVIDED IN REACHES WHERE HE|GHT OF FILL IS MORE THAN 4M'AT

BOX CULVERT LOCA'I]ONS, AT ANY HAZARDOUS LOCATION SHOWN ON PISN AND / OR AS DIRECTED BY

THE ENGINEER. FoR HEtcHT oF FILL EXCEEDING 7m, GUARD RAIL SHALL BE REPI-ACED WITH coNcRETE

BARRIER. (REFER DRAWING NO DOO16A)

SUBEASE COURSE

isf',roclffiesE couRsg

SUB EASE COURSE 3.

HAKI,A (M_1)

TO D.i IGIAN UOTORYAYPA$(AGE-U (RSISIAM IGiEIL TO KOT BAIIAN)

(sEcTioN - nB)

I{IUOTIII. ENGINEERING SERVICES

AKISTAN (PW.) LTD.iN ASSOCIATION IVITTI

MM PAKISTtu\ (PVI.) LTD.

GOVERNMENT OF PAKISTAN

MINISTRY OF COMMUNICATION

NATIONAL HIGH1YAY AUTHORITY

DRAWING NO.

3737/1o2/1D/ rcoas

Page 7: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

TYFICAL CRCSS SECTIO}'IIhJ FARTIAl-,CUT & FARTIAL F'I]-,L

RCC SflEAST flAT(wfCR€ REXJIRED)

DETAIL 0F a:-FOR COMMON IXCAVATION n = 1

FOR MEDIUM ROCK EKCAVATION n = (2 - 3)

FOR HARD ROCK EXCAVA1ON n = +

NOTE:-P R o V | S | o N o F B E N C H S H A L L o N L Y B E P R o V I D E D I N H A R D / M E D I U M R o c K D ( C A V A T I o N .

' 1 .

-qb

E

S&8"tr#'TffI[g* oP 'coSUBBASE COURSE

IMPRdGD SUBGRA)E(c8R 25: VlNt

- 150

cof{cRElE 'fixL

M{ENE RECI}RED)

L*^*, o**,€FHAL1C \{EARING COURSE - 50

SASE couRs€ - 160!-i6CREGAIE 8 sE CoUft€ - 2so

SUEBASE CCURSE : tSOSUBGRAOE - 3ff1VINJ

NOTES:-ALL DIMENSIONS ARE IN MILLJMFIERS UNLESS NOTED OTHERWISE.

SUBGRAOE MATER1AL Si{ALL 8E COMPACTED AT 95% M.D.D, MSHTO T_180 AND SiIALL HAVE A MINIMUM

soAKED .C.B.R 0F 25% A'r 95% M.D.O' MSHTO i-180.

RoAowAi g(cAVATloN MAIERIAL sHALL BE unuzEo tN'MosI EFFEcrivE MANNER lN Tl{E EMBANKMENT

aVEN wffH BLEND1NS ,/MtXtNG wrH SUPERIOR MATERIAL 0F REOUIRED, W|HTOUT ANY eKlRA COST)'

ROADWAY IXCAVATION IS MANDATORY TO UTIUZE IN THE PROJEC1OR AS DIRECTED BY THE ENGiNEER.

PITCHING STONE ON TMtsANKMENT SLCPE SHALL B€ PROVIDED IN TT]E REACHES WHERE NULI-AH/RAIN

WA'IER MAY DAMAGE lHE EMBANKMENT SLOPE AS DIREC1ED 91/ THE ENCINEER.

W-tsEAM GUARD RAIL TO SE PROVIDED IN REACHES WIiERE HEIGHT OF FILL IS MORE THAN 4M' AT

BOX CULVERT LOCATIONS, Af ANY HAZARDOUS LOCAT]ON SHOWN ON P!-AN ANO / OR AS DRICIED BY

THE ENGINERR. FOR HE|GHT OF FILL EXCEEDING 7M, GUARD RAIL SHALL BE REPI.ACED WITH CONCREiE

BARRIER.6, Rcc BREAsf WALL SHALL BE PROVIOED WHERE HEIGHT OF CUT > 6M, OTHERWISE AT LE€T 2M HIGH

PLUM CONCRSTE TOE WALL SHALL BE PROVIDED AT ALL CUT REACHES WITH DRAIN. DRAIN IS

MANDATOR/ IN CUT REACHES.7. - IN CUT REACHES EKCAVATION LINE IS UFTO SUBGRAOE TOP, CHECK SUI'I-ABIUTY OF SUBGRADE MAJERIAL

TO QUAUF/ REQUIREMENT OF IMFROVED SUBGRADE MATERIAL. IN CASE IF QUAUFY FOLLOW

SPECIF|CAT|ON 109.2.3 PARA-2 0R109.2.4, O-THERWISE FOLLOW 109.2-J PAM-J.

SERUCA ROTD$HEff ReuRED)

I

R DRAWIHGE

TY?ICAL CROSS SECTIONHAKLA (M-1)

TO D.I KHAN UOTORTAYPACKAGE-U (REHMAM KIIEII TO KOT BAIJAN)

(sEcrIoN - uB)

NISTOI'TII. ENGB'TEERING SERVICES

AKISTA}I (PW.) LTD'

B.I ASSOCIATION YITII

MM PAICSTAN (P\rr.) LTD.MINISTRY OF COMMUNICATIONANONAL I{IGTTWAY AUTI{O

DRAI$NG NO,

3737/1O2/TO/ l0oo3A

Page 8: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

TVpTe ar nDnrsstIrIU@ SECTlCN Ci-TT1N

l*r*" -l- - - - - - - * - " n -

cI

----*-1' - '--w- --*-I

RCC gG,,€r { l!{*€nE iECPnED)

ncc eftusT l||&OHST R€IIJIRED)

t ? q ! l

2

IMPRO/ED S1JEGRAOEicSR 25r YN.)

lt

NOTIS:-' t .

a

t

- r1r F--

$5'Ed#'#?T"ffi*'ry+30SUBBASE COURS€

{F &{Tr?€ 1b dfF oRt v, 000t6

IIEAR|NG COURSE* 50'

ASPttALIlC EISE COURST ' 16O

iccREGAlE 8 SE COURS€ ' 25O

SIJBaTSE C0URSE - 15O

SUBGRAO€ - 300MrN.)

ALL DIMENSIONS ARE IN MILLIMfiERS UNLESS NOTED O'ITIERWISE.

suBcRADE MATERTAL SFIALL BE ccMPAcTED Ar 95%' M.0.0, APSHTO T-180 AND SHALL HAVE A MINIMUM

soAKED C.8.R OF 25% A'l 95% M.D'D' Msitro T-180.

ROAD!{AY E{CAVAIION MATERTAL SHALL BE UNUZED IN MOS| EFFECNVE MANNER IN T}IE EMBANKMENI

EYEN WMH ELENDING /MIXING WITH SUPERIOR MATERIAL (IF REQUIRED, WIHTOUT ANY EfiRA COST)'

ROADWAY EXCAVATION SHALL NOT BE DISPOSED OFF OUTSIOE RIGHT OF WAY. IT IS MANDATORY TO

UTIUZE IN THE PROJEC',OR AS DIRECTED g/ THE ENGINEER.

PITCHING SIONE ON EMBANKMENT SLCPE SHALL AE PROVIDED IN THE REACHES WHERE NULI'AH/RAIN

WATER MAY DAMAGE TIIE EMBANKMENT SLOPE r''S DTRECTED 8tf lHE ENGINE:R.

W_BEAM GUARD RAIL TO BE PROVTDED IN REACHES WHERE I'IEIGHT OF FILL IS MORE THAN 4M'

BOX CULVERT LOCATIONS, AT ANY HAZARDOUS LOCAT]ON SHOWN ON PLAN AND / OR AS DRICTED BY

THE ENGINERR. FoR HEIGHT- OF FILL EXCEEDING 7M, GUARD MIL SHALL BE REPLACED WITH CONCREIE

BARRIER.Rcc BREAST WALI. SHALL BE PROVIDED WHERE HEIGHT OF CUT > 6M, OTHERWISE AT LFAST 2M HIGH

PLUM CONCRETE IOE WALL SHALL BE PROVIDED AT ALL CUT REACHES WII}I DRAIN. ORAIN SHALL BE

PROVIOED IN CUT RFNCHES.IN CUT REACHES EXCAVATION LINE IS UFIO SUBGRADE TOP, CHECK SUITABIUTY OF SUBGMDE MAIERIAL

TO QUALIFY REQUIREMENT OF IMPROVED SUBGRADE MATERIi\L IN CASE IF QUAUF/ FOLLOW

spEctFlcATtON 109.2.3 PAM-2 0R109.2.4, OTIIERWISE FOLLOIY 109.2.3 PAM-3.

DETAIL 0F n;-FOR COMMON EKCAVATION n = 1

FOR MEDIUM ROCK EKCAVATION n = (2 - 3)

FOR HARD ROCK EXCAVATION n = 4

NOTE:-

, PR-olllslot! 9! -B-ENQIi-9!14LL-' g-!!LI BE PROVIDED

1 .

tN MRD/MEDIUM RoCK EXCAVATIoN'

i::iJrtl'

{:fj

l. i ' i i*ietf tltUf

TYPICAL CROSS SECTIONI{AKia (u-l)

TO D.I KIIAN MOTORTAYPACT(AGE-U (REHI{AM KIIEIL TO KOT BAI.IAN)

(sEcfloN - uB)

ENGINEERING SER\NCES

AKISTAN (PYI.) LTD.IN ASSOCIATION TIEI

MM PAKISTAN (PlrI.) LTD.

VERNMENT OF PAKISTAN

MIN]STRY OF COMMUNICATIO

NATIONAL HIGI{WAY AUTHONovember, 2016 | stst/toztlol Tcco3B

Page 9: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

TRIPPLE SURFACE 1RE\1VENIACGRECA'IE EASE COURSESUB 8ASE COURSE

SUBGRADE(cBR 8r illN.)

o(EnNo 2 lllN ROAD

I

3.65n I a656I

I

I

I

I

I

I

INTERSECTIONYm{ qlsfl}rc

DETAILROAD

tu

l . AI,! OIHEilS1ONS AR€ IN MITUMETERS UNLESS NOTED OIHERWISE

ROIDWAY EKCAVAIION ITAIER|AL ${AU 8€ IJIIUZED IN MOST EFFEqIT€ TIANNER IN .IHE

EitBA!{otB{t' Evg1{ wlnt BLf,NDtNc /UtxNC \IIIH SIJPER1OR x ElhL {lF,REaUlR€D. wlHI6UT rff/eirne cosl. RoowAY qcrvAlloN srull Not 8E 0lsPosED oFF otfisloERIGHT OF \YAY.

EXISTiNG ROAD TO TOLL PI,AZA

NOTES:-

iiaKLA (U-1)

TO D.J KTI}N MOTORTAYpAclGGE-U (REHUAM KI{EIL TO KOT BALIAN)

(sEcrIoN - llB)

IT.ITTON T, ENGINEERING SERV]CES

PAKISTA.'\ (PW.) LTD'

IN ASSOCIATION TlTIl

MM PAKISTAN (P\rI.) LTD.

VERNMENT OF PAKISTAN

MINISTRY OF COMMUNICATIO

NATIONAT HIGIflTAY AUTHO

DRAWING NO.

3737/102/TD/ rc003c

Page 10: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

LOOPBET1[EE}{

CROSS SECTIONTOLL FLAZA & R,AfuIFS

TRIPPLE SURFACE TRE{TlvlENTAGGREGATE IASE CCURSE =150

ASPHALTIC WEARING COURSEASPHALTIC BASE COURSEAGGREGATE BASE COURSESUB EASE COURSESUBGRADE (CBR 8% MIN.)

= E O=zgu- 1 a nSUB BASE COURSE

SUB GRADE (CBR 8% =iOO

TENDER PfrA'dY$f-lG$

I

HAKL\ (M-1)

TO D.I KHAN MOTORTAYPACKAGE-II (REI{MAM KIIEIL TO I(OT BAI;IAN)

(sEcrToN - llB)

TI?iC.AJ. CROSS SECTION OFRAMPS & LOOPS AT INTERCHANGE

NAIIONAI. ENGINEERING SERYICES

PAKTST-$.I (PW.) LTD.IN ASSOCTATION WIIII

MM PAKISTAN (PlrI.) LTD.

GOVERNMENT OF PAKISTAN

MiNISTRY OF COMMUNICATIONATIONA]. HIGl{lfAY AUTHO

0i{'lENovember, 201 6

PCC CURB STONE, '8 , '

Page 11: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

NOTEADDITIONAL STRUCTURE (tF REQUIRED) SHATL SE PROVIDED AS PER SITE REQUIREMENT OR AS PER THE DIRECTON OF THE ENGINEER.

PROPOSED SCHEDULE OF STRUCTURES

Skew Anele Remarksx Culvefc

UnderPass

Box Culvert

Box Culvert

1Gl335

Box Culvert

x CulvefcBox CulvertBox Culvert

nderPassBox Culvert

UnderPass

1L+3 / J x CulvertUnderPass

x Culvert

Unde rPass

GOVERNMENT OF PAKISTANMINISTRY OT COMMUNICATIONSNATIONAI, HIGH]TAY AUTHORITY

AfiONAL ENGINEERING SERVICESAKTSTAN (PW.) LTD.

iN ASSOCIATION VTTHuM -'aicsru,r (P\II.) LTD.

r{AKr.A (M-1)TO D.I KHAN MOTORTAY

pAcKAcE-u (REmIANT KHErL To Kor-BALtaN)ioArE(sEcfioN - uB) i November. 2016

SCI{EDULE OF STRUCTURES

DRAWINO NC.

3737/1o2fiD/ SSoo4

Page 12: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

DESIGN PARAMETERS FOR BOX CULVERTS

BARREL SIZENO.OF CELLS

(Hmm)

4+224

6+575

0.3s I o.es0.3s I 0.3s10+880

3so I o.sst2+70Q l 1

13+4500.3s I 0.0700 | o.:s

0.3s | 0.3s

0.3s | 0.3st7 +730

t9+424

21+375

22+275

23+515

FACiSGg-lt {RErffAi€: .:g{gIL TC I{CT SAijAt{i{SECTIC}I - 1l3i

GOVERNilfENT OF PAKISTANMINISTRY OF COMMUNICATIONSNATICNAT HiGT{TTAY AUTHORITY

NATIONAI, ENGINEERING SERVICES

. rN -assoclAgroN -Ttrti I ot IMM PAKTSTAN (PW.) LTD.

Page 13: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

wal,/stl8

CONSTRUCTION JOINT DE. IA ILSCiIE l:10SECTION B-B

(FOR MULTI CELL)

SEE DENL 'A'

(sEE r€lE+)

7n r-Etaa corcfiEIE

*Is€-dttD FlJ.(sEE K,rE 5)

g:

\4 , .

l z z g l

DETAIL OF WATERSTOP

SECTION B-B(FOR SINGLE CELL)

T'rrdffifffi ffiffiAWgruui$

25mm EIA5I'OIERIC,JOINT SEALAI,IT

AARREL WAI-L

wl{G IYAI

PRATOULOM COMPRESSIET-EJOII{T FILLER

n r r ^ i l ' A 'rJ t_ | /1t L- /-.1

Se{.E l:10

X I A ? - At \ t t t t F \ ' -l \ v t L J .

1-ALL DIMENSIONS ARE IN UILLJMEIERS UNItrSS OTHERWSE NOTED.

2-RENFORCEMENT CONCREIE SHALL BE OEFORMED ROUND BARS OF GRADE SO Si'IEELCONFORMING TO AASI.fTO M31 ASTU A615 WITH MINIMUM YIELD STRENGITI OFoF 4200 kslsq.cm (60,000psi).

3_I{.L CONCRETE SURRIED FACESS IN SOIL SHALL BE PAINTED WMI TWO COATS OF HOTPOURED BITUMEN AS SPECIFIED WIHTOUT ANY DGRA COST.

4-1HE APPROACH SLAE SHALL tsE PROVIDED ONLY IF TTIE RLL ABOVE THE CULVERI ISLESS TT{AN 5OO.

s-WHEN COITPACTION OF M'IUR,AL GROUND UNDER THE BOTTOM SLAE SHALL NOT 8EACHIEVED, SELECTEO flLL SHALL BE PROVIDED IN A OEFIH OF 5OO,TO ACHIEVE THEREQUIRED COMPACNON

6-FOR O DEGRE SKEIV.CULVERT ANGLE OF WING WALLS SHALL BE +5 DECREE. FOR SKE]YO1HER ]HAN O DEGREE WINGWALL ANGLE SHALL 8E FIMUZED AS PER SfrE REAURE}IENTS.

, F.R.L

.SPROACfi t/A3(x! fttCA

vr8te3 10dt. :6, Trqr 1@lldo 7Io 3axF . rqx,. vmEtntl- st oP€ i--.,l{riti rt-iit € crf,ilc8lAYr rll 2-rl}G CfRfrrc8nYts idai n! enP€

cotctltf,rtFil Jor{t [Dr sltE toP a 1!o filP.)o@. Joilr [tH x lEi StoP o Jo,at OlP.)

SECTION A-A

i&tKLt iM-1)TO D.I IGICN I{OTORTAY

PAC!aAGE-$ {REli}&rNM{ErL TO {ct BAIJ.AN){sEcTrcN - llgi

GOYERNMENT OF PAICSTANMINISTRY OF COMMUNICATIONSNATIONAL HIGIITtrAY AUTHORITY

NATTONAL ENGINEERING SERYICESPAKISTAI.I (PW.) LfD.

IN ASSOCIA1JON TTriIMU PAKTSTAN (PvT.) LTD.

TYF:C.{! tsCX Clria''fgR?GEHEF.{I, ASF.A,rTGgldE$T

DRAWING NO.

3737/102/1D/ sccoo'

Page 14: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

@

*lu-l'

r)T

6 / J lip

Im(rYP)

@

x-sfcTlcN (TYP)(RETNFORCEMENT DETAIL)

irAr{,A i}d-L)TO D.I IG{AI\ UOTORYAY

pAff(AGE-lt {nEiSrANI iGEIt TO r(CIY BAUAN)isEcTlAN - nB)

TITLE Box cuLvERTREINTORCEIdENT DETAIL

ENGINEERING SERYICESPAKISTAI.I (PW.) LTD.

iN ASSOCIAfiON TTT$

MM PATCSTAN (PW.) LTD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUNICATIONNATIONAI HiGTIWAY AUTHO

Page 15: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

REINFORCEMENT DETAIL FOR BOX CULVERTS

s.No. RD

IKM)

NO.OF

CELLS

BARREL SIZE SKEW

6BAR 01 BAR 02 BAR 03 BAR 04 BAR 05 BAR 06 BAR 07 BAR 08 BAR 09 BAR 10 BAR 11 BAR 12 BAR 13 BAR 14 6A X l-f, BAR 16 BAR 17

(Bmm) (Hmm)

1 0+400 2 3000 3000 ^0LJ #5@15o #5@150 #5@150 #5@L50 #4@150 #4@1s0 #s@150 #4@150 #4@150 #4@150 #5@150 #4@150 #5@L50 #4@L50 #4@150 #5@15o #5@1"s0

2 L+600 2 3000 3000 400 #s@150 #s@1s0 #5@150 #5@1s0 #4@1s0 #4@150 #5@150 #4@150 f4@150 #4@LsO #s@150 #4@150 #5@150 #4@1s0 #[email protected] #5@1s0 #5@150

2+575 t_ 4000 4000 ^0 #6@150 #6@150 #s@1s0 #8@200 #4@2AO M@ZOA #5@1-s0 #4@200 #4@200 #4@2OO #8@150 #5@200 #6@150 #4@2OO #s@150 #8@200 #8@1s0

t+ 4+220 1, 3000 3000 ^0 #5@150 #5@150 #5@1s0 #5@1so #4@1so #[email protected] #5@1s0 #4@150 #4@150 #4@150 #5@1s0 M@1s0 #s@150 #4@150 #4@1s0 #5@150 #5@1_s0

5 6+575 L 3000 3000 ^0 #5@150 #s@1s0 #s@150 #5@1s0 #4@150 #4@150 #s@1s0 #4@150 #4@150 #4@150 #5@150 M@150 #s@150 #4@1"50 #4@L50 #5@150 #5@150

7+740 L 3000 2000 00 #5@150 #s@150 #[email protected] #5@1-s0 #4@1so #4@150 #5@150 #4@150 #4@150 #4@1s0 #5@150 #[email protected] #s@150 #[email protected] #4@150 #5@150 #5@150

7 J T L Z V 1 3000 3000 n0 #5@150 #5@150 fs@150 #5@1s0 #4@150 #4@150 f5@1s0 #4@150 #4@150 #4@L50 #s@1s0 #[email protected] #s@150 M@EA #4@150 fs@150 #5@1s0

10+880 2 3000 3000 ^0 #5@150 #5@150 #5@1s0 #5@150 #4@150 #4@150 #5@1s0 #4@150 #4@150 #4@150 #5@1s0 #4@150 #5@150 #4@L50 #4@1s0 F5@150 #5@r-so

J L2+7OO 1 4000 4000 . . 0 #6@150 #6@1s0 #s@150 #8@200 #4@ZOO #4@200 #5@1s0 #4@200 #4@2OO #4@2OO #8@150 #s@200 #6@150 #4@2OO #5@150 #8@2oo #8@1s0

10 12+895 1 3000 3000 ^0 #5@1s0 #5@1s0 #s@1s0 #5@1s0 #4@150 #4@150 #5@1so #4@150 #4@150 #4@1s0 ss@150 #4@150 #5@15o #4@150 #4@150 #5@1s0 #5@1s0

L1 13+450 2 3000 3000 ^^0 #5@150 #5@150 #s@150 #5@1s0 #4@1-s0 #4@L50 #5@ls0 #4@150 #4@1s0 #4@1s0 #5@1s0 #4@150 #s@1-50 #4@150 #4@150 #5@150 #5@1s0

L2 14+100 2 3000 3000 n0U #5@1s0 #5@150 #5@150 #s@150 #4@150 #4@1s0 #s@150 #4@1s0 #4@150 #4@150 #5@150 #4@1s0 #5@150 #4@150 #4@1s0 #s@150 #s@15o

l 5 15+500 2 4000 4000 r . 0 #6@150 #6@150 #5@1s0 #8@200 #4@200 #4@2OO ss@150 #4@2A0 #4@2OA #4@200 #8@1-s0 #5@2oo #6@L50 M@200 #s@1s0 #8@200 #8@150

14 1-5+830 2 2000 2000 300 #[email protected] #4@150 #s@L50 #5@150 #4@150 #4@150 #s@150 #4@1s0 #4@150 #4@t50 #5@1so #4@1s0 #4@150 #4@L50 #4@1s0 #s@L50 #5@1-50

15 L7+734 1 4000 4000 / c o #5@150 #6@150 #5@150 #8@200 #4@200 #4@200 #s@L50 #4@2N #4@200 #4@240 #8@150 #5@2oo #6@L50 #4@2OA #[email protected] #8@200 f8@150

16 t9+420 2 2000 2000 00 H4@150 #4@150 #[email protected] #s@1s0 #4@150 #4@150 f5@1s0 #4@L50 #4@1s0 #4@L50 #5@1s0 #4@150 #4@150 #4@150 #4@$A #5@150 #5@1so

17 20+765 2 3000 3000 n0 #5@150 #s@1s0 #s@1s0 #5@1so #4@150 #4@1s0 #s@150 #4@150 #4@150 fi4@150 #5@1so #4@1s0 #s@150 #4@150 #4@150 #5@1so #5@150

18 2l+375 1, 4000 4000 'tlQ [email protected] #6@1s0 #s@1s0 #8@2oo #4@200 #4@200 #5@150 #4@2O0 #4@200 #4@200 #8@1s0 f5@200 #5@150 M@200 #s@150 #8@200 #8@150

19 22+275 L 3000 3000 n0 #s@1s0 #5@1s0 #s@150 #s@150 #4@L50 #4@150 #5@1so #4@150 #4@1s0 #4@150 #s@1-50 #4@150 #s@150 #4@150 #4@150 #s@1s0 #5@1s0

20 23+515 1. 4000 4000 - n 0JU #6@150 #6@150 #s@1s0 #8@2 t4@2OO #4@2OO #5@150 #4@2AO #4@200 #4@200 #8@1s0 #5@200 #5@150 #4@2O0 #s@150 #8@200 #8@150

21 23+960 1 4000 4000 - - 0 #6@150 #6@150 #5@150 #8@200 M@2OO #4@2OO #5@L50 #4@200 M@204 #4@200 #8@150 #5@2oo #6@L50 M@200 #5@1s0 #8@200 #8@150

IIINATIONAI- ENGINEERING SER1NEESI O1 DR t||{ Er I RAA SIUROHAIC,A {U-L}

TC }.I FG:AN I{S?CRWAYF-qC:{AGErg {Rg3lM3$i Scigl: ?c KOT BALiAl.1-}

isECTIOiq - $Bj

]IILE Box cttLvERTsREINFORCEIIENT DETAIIS

sccle

N I' UT TAKlii'}'A.I\

OF COMMUNiCATIOTJTa:TJWir1l ATTTTJnPI

r--

PltPArfisrAN (Pw.) LrD._-IN ASSOCIATION TTTH.

tUmtrx

lHrylur,f PArcsrAN (PW.) LrD.

rl,i-::!;;/?:,, :. ii.r.l-:4ji'.iJ I IsJBurtTED 8{/. 1 4 4 ^ i '

RECIUXENDED A

or I I A: , i ; . i : l . i ; . , ,=r ' : I lcHD., / \ER.arv i I l l + ' . ! . q 1 B z r - \ . I l

aev. ion: I loescnrahon lrppnoco IAPPRc^E F/

DATE I DRAWNG No.

Novernoer. 2016 i 373r-/1&2/1nl BCR007A

Page 16: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

2 CTIATS I.IdT IITUI,IEN

l - e o l s r l r a l s { l o o o l

:

€(

a cIrATs Hrrt ilTu{sl

VING VALL-FENTiNG PLAN

NUTESI FtR GET€RAL I€TES REFER IRAVII{G NT! GNSOOIa

A ilE O€PTH [F S€LECT FILL SHA.L TI MCTOE TY ftE GESTECHE}ICO€ER AT SITE. 5OO I.IIN STII{L BE PRII\/IIED iN CAS€ FdINDANSItID N6r AcHrEwE 9lz corfmlmN

ILEVATINN VING VALL

SECTINN A-ASCI|-E Lt50

I sgto I rsso-asoo hoE ;ffi;;

SECTIEN B-BSCALC 1'50

SICTION A-ASCA.E tSO

SECTIEN B-BSCALE I5O

TE,id*'u.VALL_FEETlNG

!{AKLA (M-1)

TO D.i KHAN MOTORTAYPACT(AGE-II (REHI{AM IGTEIL TO KOT BAI.iAN)

(SECTION - IIB)

*Box cuLvERT nrNc rAIJs/i.AYourREINTORCEMENT DETAIIS

NATIONAT ENGiNEERING SER\ruCES

PAKTSTAN (PYT.) LID.IN ASSCCIATION TITTI

MM PAKISTAN (P1rr.) LTD.

GOYERNMENT OF PAKISTANMINiSTRY OF COMM1JMCATIONATIONAL HIGHWAY AUTHO

Page 17: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

Heigbt {a'}

Dli\[E![SlO1tlS {lnur}

Sr. No' B BH EI'? ] J L D2 ?1 T2

.100-+o0 200 2A* < l t a I

1200 - 1300 600 - 800i i , 00

+JU- / Jt-r 300 ).r1n 400-450') 2.(lo

'1 nrf 1800 - 2500 950 - i3co

1. JU-YtCt- / +oc 375 450-500':t l'.\al :L {ln 25CO - 3100 13i10 - l-550

+00 500-6c03100 - 3500 1650 - 1,300 950- i 100

tlT

i f / ln J . U U

1 L 0rl- 1:50 600 600-7scO , U U 3500 * 4 ioc i 800 - 2150

2l-50-2900 1250* iSco 650 500 700-800.^ 6.00 7.00 4too*32CO

i50o- 1700 7C0 600 800-900T n n 8.00 5200-6000 ]9UU-J+UU

REr$FsRctrEEs{T llFtar'

Sr, !Se' *ISIGIIT in'| Rc2 Ro4Fo3 RC5 Rc€ RC" RS8 RSg R10 R11Ro1

i 1@ ' i ' ) , 3 = - ? : L U L . : \ j + 5 ,A: ?CO = - i f t i ) l i t l l L r 1 1 . - - , n; + &.2CO

.r ,t ..;, aJfrlv --f t,Lb' -ivv

*4 i&2C0-l

I - ? i - t I # ; '1@i ?OO i: .t 12, ")r.\nf, -?

{4' :vv. t < ^ , . 1 n ^

i J i $ . J w

#5 iA2CO

+ +,& 2€)

J, ;l ti' '1 11lI'\1? - f i ( l l . ivv

#+ iA2OO # 4 t&: L25 v - - l t L u . L 3 J # 6,,@ 2OO #6 24O *+@ 150{} 2."3 # 6 :g lCA ++!@2OO

*6&2f , * # 6,.'@ 2CO #4a& 1sc, , ? ^ ' - ^ A

4 0 tqi iuu # 4 @,2*A, , - - . . - -i J i t u L i J

+ 3,.@ 2{,rO # 4 ,€ i i :5 * + t&, 125*l 3-+ ;6 r :@:OO #+i4200

i 3 r@L73 # +,@ i2 : r i : , { , t , ! , - ' 1 t: ' l . ' l : , W . L - 7 . ) #6 *2AA + 6.dl 2C0 = 4 i 1 t : l f t l

/l +-5 # 8,@1 l-75, , - r a - -

- a i 4 , i t 1t \ J . w . ! r u ; 6 ,@ l-73

- 4. r?, ,){ff\7 r J ' . 9 t v , r + 516,1 2OO +4@ 150

# J atz. lJtJ- \ / r ' . \ i 1 t f

;T v ' 1*: i uv: ! . 1 / ; - , 1 - =A - i i L l / ' . a t v #+i4 i?5

5-6, ! , 1 ^ j - n

; 6 i d , r c i j J \ ) t t # . r v v # 6.:@1 l-5O. , - / + . a - A

f \ - , l & : a v v

#5€ i i5o # 5 ,,.@,l isO r+Qj123 + +.:g i25 t a @,2D4 +6G2OO #4G 150, , - . ^ < - r 1

# b f r ' IJU T t r \u,

+ f , € :

l - l i

t30n 6""7 # 816 i -5O

. . - ^ i - n

+ J i4... Icu

# 5 ,@r i5O^ a - ^

; ? u . L L 1 l e v + +'Oj L2-;l r -: ' ,LU. L.L\) #6{A2OO + 6,& 2A0 #+@ i50I 7-8 . '8 iA ; 130 * 3 '& L 'O # 8.0 l-5O

ffiTT[3'O*,CE1YTETTT

BOX CULYERT ]?ING ]TAIJ.SREINT'ORCEMENT DETAIIS

HAKLA (M-1)

TO D.I KI{AN UOTORTAYPACIGGE-U (REHMAI{I KTTEIL TO KOT BAI,IAN)

(sEcfioN - uB)

,TIONAI. ENGINEERING SERWCES

AKISTAN (PW.) LTD.

IN ASSOCIATION TTEI

MM PAI{STAN (PW') LTD'

GOVERNMENT OF PAKISTAN

M]NISTRY OF COMMUNICA

NATIONAI HIGIIWAY AUTHORIIY

Page 18: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

SSE DETAIL 'A, SEE DETAIL ,|

PLUH CONCRSIE

TABLE:.

I Y r L - i

PLUU CONCREIE

F/C WEEP HOLE 1OO D!O2rn C/Q (SIACCERED).

RL1ER ITA1ERIAL200x200x200

Co}+CRETE 25omm

PVC {EEP HOLEozm c/c (SnG

/-SEE DEiAtL 't'

i RL1ER }IAIERIALt z.OOr2OOr2o[J

PLUM CCNCRETETrPE 2

coNcREIE 25omm

TYPICAL SECTION OF PLUM CONCRT|'E

'Rfi-AlNlNG ',tlALL TYPE 1

TYPICAL SECTION OFRETAINING 'rt/ALL

TYPICAL SECTICN OFRETAINING/BRFAST

PLUM CONCREIEWALL ryPE J

TYPE-2TYPE_Jo < 4 0 '

TYPE-3o > 4 0 '

a/c 100ult DtA

flLlER ilA'IERIAAT 'XEEP HOIIS

DFI'AIL "X,'

* . .

NOTES

1- ALL DIMENSIONS ARE IN MILUIiTFJERS UNLESS C1HERWISE NOTED.

2- WESO HOIJS F^/C PIPE 'IOOMM DI{ SHALL AE S'IAGGEREO AT AN INTERYAL OF 2M \€.iTICALANO HORIZONTAL.AND A.S ADOMOMLLY DIRECTED SY lHE ENGINEER.

J- ]HE SLOPE OF WEE.tr HOLE SHALL BE 1 tN 8 FRCM EACK OF lHE ''YAIL iO THE OUTER FACE

OR AS OIREC1ED SY THE ENGINEER.

4_ TYPE OF RETAINING WALL SHALL EE DECIOED AI TTIE SIGINEER AS PER SITE CCNDITIONS KEEPING

FOLLOWING IN VIEIII.S- PLUM CONCRETE (2:t CONCRETE

-|o S|ONE RATIO HAVING SrONE SIZE e{NGiNG EmVEEN 200-300)

EE LMUZED.

6- 'IYPE 1 REIAINING WAI]- SHALL BE PROVIDED WHERE lHE ROAO IS WE I AWAY FROM lHE NALIdII,

RIIER,/RMNE.7_ TYPE 2 RSTAINING WALL SHALL SE PROVTDED WI'IERE ]H€ ROAD IS IN CLCSE VICINMT OF THE

RIVER,/RMNE OR CUFF FACE.

8- l(PE J REtAlNrNc WAlr SHALL BE PROV|DED TO REIATN ]!rE SCREm MAIER|AL (BREASI- IYALL).*.\.r.--'. tI 9- stNGLE FAcE BARRISR sHAlr EE pRovlDED AT loP oF RErAtNtNc wALL AND AT orHER HAzARoous"\'l.h LocATloNs. GUARD RAL SHALL BE pRovlDED rF nLL HEIGH > 4m 0R As DIRECTED BY THE ENGINEER.

1 ::i: to- vERTIcAL sLope To THE oUTER F:AcE 0F THE REIAINING IvALL TYPE 2 cAt'l BE cHANcE uP

J i;'i To 1 lN 10../,..-:j' ii- payilENT FoR wEEp HoLEs AND RLTER MAIERIAL ts INcLU0ED rN THE ccsr oF 0IHER mMS Al.{D.i:.d; r 1- pAyltENT FoR wEEp HoLEs AND RL'TER MAIERIAL rs INcLU0ED rN THE cc$ oF otHER mMS A\D't';i

')t SHALL NOT BE PND SEPNRIT€LY.

I

rj99-rJ-?$1tuq*I l - f f i

coNcRgIE Cl,rss 'A1:.

00r

Frc WEEP ftotl IOO

n(m

B(m)n a n

0.80r ( n 001 r1n

a 6 n 1 i n

1 . 8 0

2.00t 1 r )

6.00 2.903.40

8.00 a q n

H(m)

3(m)

! l n c.80t n n 1 o i

3.00 1 .70

+.00 2.+02.701 n n

6.00 +.00+.70

8.009.00 O . U U

4 A n

1 1 . 0 0

7.80

H(m)

B(m)

1 ( n 0.80r n n 'i .00

2.30 1.40

" n n 1 . 7 A

4.c04.50 2.70

3.00i < r 1

o. uu a 7 n

6.50 4.00

7.00 4.407 ( n 4.70

8.00

n(m)

B(m)

1 .50 . 1 040

o q n .701 d n , n r l

? E N r . t n

+.00 2:7Q

4.50 J .UU

J . Y U

6.00a ( n +.707.00 q n n

SINGI,E FACE BARRGR

TYPICA], PLUU CONC.RSTAINING TAi.t DETAIIS

IIAKLA (U-l)

TO D.I KITAN MOTORTAYpAcr(AGE-u (REI{IIAM KHEIL TO KOT BAIIAN)

(SECTION - llB)

ENGINEERING SERYICES

PAKISTAN (PW.) LTD.

IN ASSOCIATION YNTi

MM PAKiSTAN (PVT.) LTD.

GOVERNMENT OF PAIOSTAN

NATIONAL HIG1IWAY AUTHORIW

DETAIL 'A,

Page 19: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

. .a

SHOULDER \: f

r- I i-lt tt l

IDII

1I

11ri

L INEH'e iqht

l -

II

WEEP HOLES @ 1.5MPVC PIPE i 00mm dio

H/v

-;--T--i l J e' -JuU------!

-

Exponsion

100 mm BL IND CON

TXPANSION JOIN_I DTTAIL

NOTES:

1. STEEL ASTM 6'15 GRADE 50 SHALL BE USED.

2. 28 DAYS COMPRESSIVE STRENGIH(CYLINDER S1RENGTH) OF CONCRETEsHouLD BE 280 KqlSq.cm.(4000 PSI)

3. PROVIDE CONSTRUCT]ON JOINT NOT FUR1|iER APART 15m.

+. ACTUAL LOCAIION, LENGTH, HEIGHT SHALL BE DEC:DED\APPRoVEDBY THE ENGINEER PRIOR TO CONSTRUCTICN AT SIIE. SHOP DRAWINGS AS PERNATURAL GROUND CONDI]ION SHALL 3E SUBMITED FOR APPROVAL.

5. WEEP HOLES (PVC PIPE 100mm dio) SHALL BE PROVIDED STAGGERED AT ANINTERVAL OF 1.5m VERTICAL & 1.5m HORIZONTAL OR AS DIRECTED 8Y THEENGINEER.

6. PAYMENT OF \tvEEP HOLES/FILTER MAIERIAL lS DEEMED TO BE INCLUDED

IN THE OTHER CONSTRUCTION ACTIVITIES OF RCC RETAINING WALLS &NO SEPARATE PAYMENT SHALL BE MADE.

TWO COATS BITUMEN PAINT SHALL BE APPLIED ON ALL CONCRE]E FACES IN CONTACT

WITH THE SOIL, NO SEPARATE PAYMENT SHALL BE MAD€ FOR THIS ITEM OF WORK.

ROCK FILLMATERIAL

FILTER MATERIAL

SEE DCTAIL'X,

@i .5m C /C

. N

1A

HAKLA (U-1)TO D.I KHAN MOTORTAY

P.{CKAGE-U (RSHUAM KTIEIL TO KOT BAJJAN)(sEcl5oN - 118)

ENGINEERING S8R\TICES

PAKTSTAN (PW.) trD.iN ASSOCIATION TTffi

MM PAKISTAN (PvT.) LTD.

GOVERNMENT OF PAKiSTAN

MIMSTRY OF COMMUNICANATIONAJ, HIGI{WAY AUTHO

DR{WING NO.

3737/102/tO/ RRW0o10

Page 20: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

ATIUOHIOV TYIIHCII{ TVNOI.TYNOI,IYSINO}II{OJ dO AUJSINiTT

NY&SDrVd,{0,LNSI'INUIAO9

'o,tr (',t d) NrusDrvd KnH.Iii[ NOLIYICOSSV NI

'sJ'I ('J.Ad) NYJSDircdsscftuss 9lirugslg9Ng wNoI.tvN

(sn - Hor.css)(Nvfiss ,rox o,r rrf,IDi INvnHgu) n-ec\rxcva

.tvauolot{ I'Ivfi}I I'q oI(i-n) r-orvn

'30vr f8 llvHs t-NlllAVd lrvuvdSs oNlvluSlvl rlj)cvE oNo-rv o3r']ddv 3E trvHs (srvoc z) cNil-voc N3v\nIlE

'Olvd 3E IIVHS lNSf'lAVd llVUVd3S ON

ry sl]vM cNrNrvl3u c3u Jo s=rll^llSv No[cnusNoS uSHIo lr{I NlclcnlcNt 38 01 ctl =!c sr lvtuStvr,i u3-L'ilJ'st-]oH dl3M Jo INlr{AVd

3Hr AE C3r3:UtC SV UO IVJNOZ|UOH urg'L ?S ]VCIU:A urg'r r. i=t=^!'3t\]NV rV CfU3OgVrS C3otAOUd 3E ttVHS (D!p uru.roor Sdtd CAd) S:-IOH dfl,!\

.-tv^ouddv uoj Q:Itr/\l8ns 3E -]-tvHS Nou_t0Noc CINnouc lvunl-vNU]d SV S9NIMVUO dOHS '3IIS -LV NO[3NUISNO3 OJ UOIUd USSNIONi fHl AE

cf^ouda'v\c30133c 3e :tvHS t-HcEH 'HJ-9N=-t 'NolJV3O-l -'lvnrSv

'rrJgt l_uvcv u3H..i-unj JoN rNton Nou_3nuISNo3 3ol^oud'SAVC gZ lV Hr9N3Ut_S CNIHSnUS U30Nl-lA3

n3l3) 0BZ fg ClnO'rlS :i-3UCN03 COU JO Hl-9NlUl-S 3AlSSlUdr{O3 r{nNlNll^

'c3sn 3g -r'rvFrs 09 SQVuc glg lrsv -l=3-ts

TTIYl$/

t-IIIIIII

To.

IIVI:C INICINC IS NV dX:

re+ltj +uorsuodx3 peurJoleJ6asoj tluD€:

'a:

?

.Z

't

eoDJ luoij Jo pssod

r__IE-+i*--21:S:ION

,9, SSVIC

-?'I l-_1

I __y

r,r..rur00 L ldld 3AdS:IOH d:]M

ocia5 ,rc al6uy

rn

=-1

\v

Page 21: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

RCC BREAST WALL DESIGI{ DETAILS ALOIVG WITH REII{FORCEIVIENT

Sr. No.Height

{rn}

DIMENSIONS

B BH BT D T1 *r2

i 2.00 3.00 1800 - 2500 700 - 1000 500 - 800 300 - 400 400 500 - 700

2 3.00 4.00 2500 - 3200 1000 - 1400 800 - 1000 400 - 500 450 700 - 800

4.00 5 .00 3200 - 3900 1400 - 1800 1000 - 1 100 500 - 600 500 8C0 - i000A-? 5.00 6.00 3900 - 4500 1800 - 2100 1 i00 - 1300 600 - 650 550 1000 - I 100

6.00 7 .00 4500 - 5000 2700 - 2300 1300 - 1400 650 - 700 600 i 100 - 1300

6 7.00 8.00 5000 - 5600 2300 - 2600 1400 - i500 700 - 800 600 1300 - i 500

REII{FO R.CEMEIIT DBTAIL

Sr. trfo.*teight

{sa)

REI]SFORCEMEST

1 2-3 # 6 @ 300 #+@2AA # 5 @ 300 #+@200 #+@200 #4 @ 300

2 3-4 1 6 G t a7 \' f v \ Y / a t v # 4 @2A0

t ! r n - t -a , r \ f n \ ) t 1i r v t 9 a t v # + @ 200 # 4 @ 200 #4 @ 2s0

r) +-5 #6@2s0 #+@2O0 #6@2s0 #+@200 #+@240 #s @ 2o0A.T 5-6 # 6 @,200 # 5 @200 #6@240 #5@200 #s@200 #s @ 200-1 6-7 #8@2s0 # 6 @2AA #8@250 #6@20O #6@2AA #6 @ 200A 7 -8 #8@204 #6@zOQ #8@20O #6@200 #6@20A #6 @ 20O

HAKT,A (U-1)TO D.I KI{AN MOTOilTAY

PACT(AGE-U (REHUAM KtrErL TO KOT EATJAN)(sEcrroN - ue)

RCC BREAST ilAtL TABLENATIONAI, ENGINEERA\IG SERVICESPAKTSTiN (PYI.) trD.

iN ASSOCIATION YITI{

MM PAKTSTAN (Pm.) LTD.

GOYERNMENT OF PA]GSTAJ.IMIMSTRY OF COMMUNICANATIONAL HIGHWAY AUTHORITY

DRAWNG NO.

3737/1O2/1D/ REW0011

Page 22: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

' j 4 .JL: \LKAL:

r,1 sPEOnC 'O '*Oraa, oNLY AND SHOi'LO aE.AEAD IN CON.JUNC]ION WlH ]HE PROJECT SPEORCA1IONA STRUC1IJRAL ENENEERINGone$xcg RELEVANT CONTRACT CONoITINS ND AneINEER',S it{SIRUCto|ls.

1.2 Alr 0RAWTNGS Stl^t! 9E CO-ORDINATED 'rillH O1HER sPqq !lI-.'- onrull,ics z DETAILs. ANY DtscfiEPANcY' ERRoR oR REcnRc roNlF REO{JIRED, STIAII. BE SROUGHT TO lHE NO1IC€ OF]HE E}IqNEERFOR NECESSARY APPROVAL

J.3 AtL OIITENSONS ARE IN MILUITEIRES ANO €LEYANOilS IN ME:TRESUNI€SS SPEOFIED OfiERI$SE

1.4 ALL EII\r'ATONS SHOTT'{ OI{ DRAITINGS ARE FINISHED SURTAC€r€\ds uNtIss NoIED OfiERlnSe

1.5 AI.! O(POSED CONCREIE CORNERE EDGES AND Ai{q.ES gilTJ- 8E'- ciilrffo

-- oR FlLrSrED 20mm x 20 mm UNTESS SFEORED

oTHERWtSg1.8 lHE CONTRACTOR $IAU SUBMIT. COMH TE UEIHOOOLOGY FOR OIFFERENT

YroRl( rElls uKE o(cAvATlo{/EACIOLlNq oEWAIERINC/DRAII9E' CONCRETNqurnr.io,lt lulcrmrc oF clRoERs, JONTS AND POST-'EN9oN|NG EICFOR APPROVAI OF ANSNEEN.

1.7 9,IfHAlE RESSIANT CA.ENT SfiAII BE US€D IN COI.ICRETE FOR ALL PIERS / PILES.

1.8 ^II FACSS OF CONCREIE IN A€U]UENTS AND tTtNG WALI.S II{COi|TACT'iT'H SOIL EJAII BE DAYP PROOfED \IIIH 1I{O COATS OF$N'MINOUS MATERTAL AT NO OflR^ COST.

1.9 AtL EXPOSED SIJRFACE:' S}IAII HA\E CI.ASS 1 SIJRfAC€ FORM FINISHUNttSS SECIRED OIHERTiSE.

DESIGN SPECIFICAIIONS: 6.21 AAS{TO STANDARD SPEqRCANONS FOR HIGHWAY SRIDGES -

2092-22 ''|EST PAKISTAN CODE OF PRACIICE FOR HIG[llV Y BRIDG€S -1967 (YflERE

APruCAEr-E)

LIVE LOADS:11 gNGr.E LANE of crAss 'M' (MIUTARY LoADING TANK 79 tr!) 9R-

Tr{hEE z ioun ulEs oF qJlss 'A' LoAolNG'oF \lEsl PAKISTAN coDEor pnicnce FoR HtcHwAY ERIDG€S- 1967 \ltllcHE\ER Go\ERNs

3.2 A SINGIE LOAD oF 95 kN (21 KIP) ON 3OOmmt6O0 mm AREA FOR lHEDESION OF DEd( SIIB ONLY.

MATERIALS: / '

+.1 AU lHE MAIERIA|.S AND IVORKIaANS'i|P sFlAtI 8q ACCOEDtI-C TO t]lE' iEr{To spEoncAtlotts AND Asllt STANDAFDS Ex@T \slEREriooriio eao'fl, oR lN 'PARllcul.rR gqgncA1toils ANDSPEOAL PROVTSONg OF ]ENO€R OOCUUENTS.

4.2 CONCREE

CONCREE CLAS€IRCATIO}I ANO STRENCfiS S}IALL 3E AS PER TABLE dlEN BELOIh

1'T------ ---T-sdWi#2a5 (3500 pc)

28o (4000 p.i)

- MATERIAL iOR CONCREG CO!€R

BAR SJPPORTS SIIALL BE PRECAST UORTAR qLOAqJ!4qc 0x^i'srel sup-ioRls. .voniln gloo<s sflArL BE cQil{Bqcco AtiDcriffi. +te liixuui coveness\€ slREt{cIH 0F !9ET^L99ioi-Eiocxs siiiu Eoun- IHE MINIMUM corPREsq\E sIEE1GIHbF'cotcn'Cre ron rHE sfiucruRc fiat ARE usq l!:,.y.ontrnsloo( srFionrs sliAlJ. 3E ATTAcIIED To lHE s4PoRIED.BARsiniANs oF ro-clucE

"sRE cAsr lN lHE c€NTER oF EAcH

8LOCK.

PRESTRESSED GIRDERS:

6.1 GIRDER TOP SttAtI SE ROUGTIENED TO A RJII AyPUTUDE oF {t mn'

6.2 CTRDERS SIIALL 9E INS?Atl.Eo lN .iH6R COf,RECI Poq!q!-of{-.-

iEXnics di Guuqrtxc ^ND sHltt. sE IBTPoRARILY BRACEDUNIIL CASTING OF OIAPHRAGIIS

6.3 rF UFnNG MSTHO0 lS USED, CTROERS SHALL BE gqED FlOr-- aonl' aios usNc urnuc Ho-es / s-ee\Es BY il€ANs APPRo\GDBY lHE S{SNEER.

6.* IF LAUNCHTNG IS USED THE M^XTUT' CAIIII.S€R O\ERHA{G SII^LLI{OT E(CEED J M.

POST-TENSIONING:7..' A IrULTI-SIRAND POST'IENSO{ING S}STEII SHALL BE USEO.

7.2 ALL cABtlS sflAtl- gE 9IRESSED. glrULrArlEOUSL-t- FRO* aOlH''- or5s, ru *e oRoER sPEclflED fi iHE oR.lHNGs.

7.3 CASE DfiENSON lNCl'lJ0ES A PULL-iN MARqN ff 6 mm AT EACHSIRESENG END.

THE JACXING FORCE CAEIE ELONG noil AND LOO(NG ! IPPAGE#iu-'sE N lctbRorlcE tntrt fiE oRAulNcs- AllY DEVAIoN - 0Riih'ifrton

- uiisr aE nsponmo to rxE ENqNEER BEFoRE

coilTlNUlNC SIRESSNC VTORK.

lHE CABI-E AXls vusT cgNooE "ill}l

IHE Al{ctloRAGE AXSqil-rND iHE rNcxbRAGE FoR A LENGTH 0F AT LEAsr 1o@nm 0R;nuupsr !5.rdrH, 'rilrlcHgvER Is GREAIER"

9JTTABLE STEEL CHAIRS/ FR$rES iO HOlo fiE PR€SIR-ESSINGfiiijElcrs ,+to na$ofrcamr rN TRUE Posran AT AoEau-AlEiliffi-v,r-s- in*rctxc rnou o.e io 1'2 MEIER) !iA[ EPROVIDED.

PROVISONS SHALL 3E MADE IN lHE END ANCHORAG€s FOfi GROIJTINGn'i---c-rbu

'oucrs- ,uiot,rrelv AFTER TENsoNtNq -{ry--

#dunnrli inE-ilro eNqroRActs. Alr cA&€s 9{Ar 3E -eREslulE&dl'itb- lii- nsn Ducls rt+ AcconoAflc€ \rrH IHESPESFICAIIONs.

INTEiHEDIATE CROuT vENTi SIIALL B€ FROV0ED NE/IR ilE Lll|ESrpihH'--oi

-fie - creg pnoRu AT Aso{rr vlo-i-EN9rH-oFJHE'cirirEs. -'cABLEs snru re cnoureo AF ER slREssNG LTH -ip--

ffililbu7-EorclelE-so on eouvnnrr As APmovql gY---fieiidiidinl'ixerbnAce-poq<Ers snAlr 8€ FllJiD \{tl---?!e[i7ib:cu i:orio ijti coNcREtE usNG 10 Mr/. oollil AGGREG^TErrim eRoultio tNo TRIMMING cAgl€s.

7.9 THE FOIIOTIING SHALL BE AS$JIIED]HEoRETICAL iL0NGAllON, Aq

- voouLlJs 0F !.,{9IIOTY, ! -- coEmqENT CF FRlgflofi- 'iYOBdl COEFF]OoIT. ORAII-iN CF NEDC€s FOR'

0.5' (1z7mn) SIRANo

7.1o UNLISS NOGD oilEFf,iSE lHE CYIJNDER STREllq!fl.g.cot{cRglE 't{"'- iFetsolteo qnoen r-t TRAttsF€R s{A'J aE ilor llss lHAt{

35O Kg/94;At (5.000 PdI

7.11 COyPLEIE PRESTRESSING IENDO{S OR CAHTS 9{^l!..-^c0t{s5r 0f""

iidi nirsu cABLEs it sFEoFlED rN oR4!trN€' a-grtcllllH coft€iiilx. trErAL *reerxs. coupuxc Ar AoEotrAlE qtlEqytLs!iiEiiiisstti-ANctloheeEs, Erurc rAPe MErAL *AcERsAND OfiER ACCESSORIES.

8. FOUNDATIONST&1 ALL lHE qcAVAlloN FOR OPA{ FOUNDA'Ilotls / Box C14!q1TS-*IALL-'

Eisiid.reciEb ro lxspecrotl sY lHE EileNEER Pfdffi ro PoTJRING

3.4 PILE '.OAO ]EST:lNEn'rvo IILES +lculD 3E CAST, .{S *lOV,t{ ]N tRAlltNG: .rNDAT LOCATION OIREC1ED BY I{E SNGIN€ER. iOR PILE I.OAO JEST. P[€J{AU- 8E iESlEo UFTO 25 nU€S 0F lHE oEgCFl LOAO. Plll LOAOlEsEi ${iTL 8E CARRIED OUT AS PER ASIM OEslq{ANON D 11€-A7 AND TE€T RE$JLTS SHAII 8E SUEMITTED TO IHE 9{qNEER iORAPPROV L CONSIRUCIIOI1 CF \rcRKNC Pll-85 SH,qLl- COlltlENC€AFIER COTfi€Iot.I ^ND IN'IERPRETAIIOII OF TEST RESIILTS.

8.5 PROOF LOAD IESN.IHE 'iloft$Ic PIIIS S}IAII 9E CONSIRTJCTED AS PER

'IHE fu{AL

OSIGN, AT IIAST ONE OF lHE 'flOR<ING PILES SSIA! SECJBJEC1EO TO PROf LOAD 1EST TI1H LOAD ON€ ANO A HAU: ]IMES]HE DESIGT{ LOAD.

&8 PI.ANNINC FOR LOAD TESI9 SIJPERVS1oi{. INIERPREfA1ION OFRESI.ILTS AND LOAO CARRYING CAPAqTY AflALlES STIALL 8ECARRIED O{JT BY'IH€ ENCN€ER,

8.7 B€HINO rHE AEJIIiENT At{o \ttt{G WAJ-S. COaFACTED CRANUIJ|R EAClGllJ-S}IALL BE fiJ{C@ IN LA1GRS OF ]HICKN€€6 APPROPRIAIE M fiE COT'PACTIOI{EqJlPuENt ENSIRINC A ulNluull lN SIU col/PACnON 0F 951 MOIRED PRoCTOR.

9. JOINTS:9.1 lHE COI{IRACT(N $AL! CJBMIT COTPISIE LAYOTJT AI{O DETAII.S OF ALL

COIiISIRUCNON JqNNi FOR APFROVAL OF fiE A{ONEER'

9.2 COI{CR6!E lN oEq( StlS StlAlI BE PLACED lN FULL "rDlH.

NO

CONSIRUCTIO{ JONT ${ALL 8€ PERI'ITTED. DIAPHRAGI/S AND OECKstl€ $lal. 9E CAST lrONOUlHlCAtlY. O(CEPT AS Sttollltl o.{ oRAV(NGAT LOCATION Fffi INSTAIIA1ION OF O(PANSON JdNTS

9.3 @NERTIE FOR 'IHE

E^RRIERS AND S1OEWAIJ<S SHAI.L 8€ FI-AC€D NOSOONES

'IHAN 20 OA)S ^FIER PUONC OF Cq{CRrIE IN 'IHE DECK S1AA.

9.4 UNI€SS SP€OFIED O1HERWSE e{ oRe ATOWABIE irOr/EltENT BgnrlEEN MAXIIUM

^NO MIN|IIIJM CAP AR€ 3ONM IN lHE DIRECIICI{ OF 1RAFNA OFANSIO{ JOINTSYS'IEU STIAI-L 9E INSTALI.SD AT IIAST ONE MOI{1H AFIER COMFTEIINC ]HE OEd<OR ACfIIEIING REO{JIRED COMPRESSV€SIFENCIH OF OECK SIA WHICTIEVER ISEAruER IN BLOq< OUT PROVIDEO AT'IIUE OF POTJRING DEO< SLA8. CSI1RACTORSIIA! SIJSMT NECESSARY INSTAU.AI|o|{ DEfALs FOR g\lqNEER,S APPROVAL

SEFORE STARTINC'IHIS ACTIVTY.

10. BAR BENDING SCHEDULEOEfAILED AAR SENDINC SCHEDULE SSIAIT BE PREPARED BY iHE

CfilRACI(N ,|r{O SJEHITIED FOR €NqNEER,S APPROVA.

LNP LENGIHS AND STANDARD HOO(S *IAI Sg AS d\EN EE.OTT

:0 nm

/5 mm

lO mm

SEAH 10 mm

3ARRIER;0P,

?ILES

PIER

APPROACfI SIAE9oTlox ..........,.,.....TOP

FOUNoAIIONTOPSoTTOtt & 5083....,,,.,.,.....'..'..'..

w lr-sUR IE JUg

O1HER EOE

30TT0M * :IDES .............SCAFFOLDING:

Ar.! scAFFd-orNG slrAr 3E DEgGilEO 3Y !]rE CoNIRACIoR &lHE tRAfFlC MOIEI{ENT UNDERNEiIH sljCll SCAFFoU)ING MAYREMAN UNO€SIRIJCIED.

LAUNCHiNG OF PRECAST GIRDERS:COI{IRACTOR E.IAII STJBITIT ITS '{IORK STA'IEUENT FOR UFnNG]HE GIROERS TO ftE ANCNEER FoR ITS APPROVAL UFNNG OFS@ER STIOIJLD 8E OONE DURINO NIS{T NilE AND OFF OAETo A\OO ]RAFFIC O|SruRBANCE.

METAL WORK:15.I MAIERIAIS TO 8€ IN TCCORDANC€ Hft]HE 5?ECIRCATIOilS.15.2 AtL .'Gt ED COilSTRTTCIOf{ UNTfSS oIHERHS€ NOTED.rs.J Au- stEEL To B€ pAt{tED oR cr-Vnrzgo As otREclED By tHe15.,+ AtL SI|EAR EDG€S TO 8E CfiOUNO $r0o1|{,15.5 l[ \TELDS SlAlt BE 6mm Coa{lINOiJS F1U€f ''GLD, FtO)(x

EI€CIROOE UNI.€SS O'IHERI{S€ NOIED ON ORAYNNG.

LIST OF SYMBOLS AND ABBREVIATIONS:

fil mn75 mn

1 7 .

50 mm75 mm

50 mml0 mn

2.

+.

Oa.H

0tA"e(P. ,Jr.

AJ.lli

rO

mmmN.FN.S.LP.GLSi'lt{.T

IrF.

- IHEOREICAL A$lCAllOf{ 0FPRESIRESSINC lEt{ooil

- BOTTOIIr 9oR€ llOLE- CONSIRJC1Io.{ lolilT- €NfiAJilE- €NIER 10 CENIER- DIAIIEJER- O(PANSOii i0NT- EACII FA€E- ELEVAII0N. FAR FACE- CALVAI{IZED lRd{= dJARANIEED ULTIMATE]ENSLESIRENG

(0F PRESTRESSM) cASr€S)r INT€FNAL DIAr|eGRr INNER FAC€. METERr VILUMEIERr NErR FA€€: NA1URAL SIJRFAC€ ll\EL- PROFILE GRAOE IfVEL- SIilMEIRCrL- iS- rHto(- RPICAL. g<E!f ANGI€ lN oEGREES

RENFORCED IA(CONCRSIE BARffER, APPROACH S|-AA)

RENFORC@ .A3(PILEs PIEnS 'ECK S-AB' DIAPHRAGII. \IING \YAI.]-qJatrrx wru- sftlEAR K8rs. COIIICREIE PAo..iEINFORCED CONCREIE BEAT'' JRANSO}''ABU]U8{T SEAT. WALLS CUL\ERTS.uNDEnPASsgs flg

r&{N- - -P R E S T R E S E € D - - - - - - D l

+.3 RANFORCSTAnT

RENFORONG SIEEL 3iAII 8E DEFORTIED ROUND BARS OF ]N]ERUEDIATE'dRAba'iGeADa eo) conron$xe ro rlstlro l+-J1 (N n! ^-,615)

rill uriivui netb srRarcfi oF d20o Kqls+cn {60'000 PJ).

+.+ $IRUCTURAL SlE

UAIN SIRUCTRAL STEE. SHArI CONFORU. iO- ASII* A-J8 H^VINGriiiiirun'ne-D *IRB.tem oF 2.5()o Kq,/.!q.cm,i$,q0q q"t). EoLT:i ANDriiji5-'snifcowoR* to Asi]t A-107 qR Ec\,lvALENT. 'tElos stlALLcor,rFonri ;o r-w.s (NTEREAN 'IILDING stANDARos)-

+.5 PRESTRES9NC JIESLpRES'lR€sSlNG SIEEL SHALL SE ilORUAL ^RAirX nqtf. S1RANDciiiFciRl{lNc ro 'rissro {2o3 (Asnr 4-41q)'-6n^0'-E ?0 HAVINGiiiiirillu-fturre mqst-E iIREliorH oF 1e'000 Kelsc'cn {no Kstl,

d8 EETFING PAOS

BEARING PADS S'{At! 8E ELASTOI'ERIC tND LAI'IiIAI@ CONFOR}iII{Cro iissro sPEclFlcA"lloNs FoR HIGHW Y tsRlDoEg

+.7 OUCTS FOR PRESIRESSNG--fOn CfaU 12-7mn. lD SflALL 8E > r ' 5f mm- rurj:i crlvmnm FERRous MEIAL sHEArx iHlcKNESs >

c - 0.5mn SfrtAtI 8g USED{8 SIEEL ]U8ES

AL! SIEEL ruBEs SHALL CONFORM TO iSlX A-S(}t HAVING lllMllUllvrStO-sTnA{dH oF 2.so0 KglSqCm (36.0@ p!l)'

5. CONCRE]E COVER:.IHE UINTIIUU CO!8 ]! RENFORCANENT SIIALL BE AS UNOER UNIESS

SPECIRED OIHERSISE.- oEo< siB

TOp....---------... ,19 mmBoTIoM ...............- 25 mtn

'!05 (1,500 pc)J50 (3.000 pd)

1 1

7,a

TABLE NO.1(t) sPuc€ LENGTH rN TENSON

([) sPUCt l_s{c1H rN CoMPRESSONlN. lH€ CALqJLA'llo{ 0F

1,968.700 Kqlsq.qn (28,OOO rd)o.2a / tidl6'0,oo33 /rndr.

tt mm.

1 ' 1

12.

PROTECT]ON WORKS:DRAN SDES SIAI 3E PROIESTED IXfi CLASS-A RIPRAP'15m lof,t{ STREATa as 1om UPSIREtra oF aROG€ AS sllotitr o{- DRAnNG

TENDER DOCUMENTS, DRAWNGS & CONSTRUCTION DRAWINGS:IZ1 TENOER DRAI{N6 ISS1JED {IltI 1ENOER OOGJI{ENT:i ARE TO T€PRASE lHE SIOOEiS OF

''HE €S{ERA-

ilAlURE & I'AIR IOg\ OF IHE IIOffl( KI PREPARS 3OQ & 1ENOEN DOdJMENTS.EHdNEER s{At ISSjE

lHE 0gtArLE' Cd{slRt cTlo{ DRAI{t{os & sJc+l FlEl-o SKEICH€S FROil. nl.E TO nU€'AS I{E€SSARY

FOR IHE EAS€ OF COaigIRUCnc|,|.

I22 THE CoIIITRACTOR SHALT ct€G< AIJ- CONSIRT'CIIO'{ DRA$IN6 ANO CCilIRACT OOCUilEilT:i CTREFUTLY

AS SOON AS PRACI|CAEI.E AFIER RECAPT fi88 Of, AIE SHATL PROIIP1LY ADVCE THE EI{6NER.S

REP OF ATIY ERROfiS fi OIITSgOIIS ]HERE IN PRIOR rc START OF ANY Cq{SIRUqNOII ACIVTIES.

(m) arBEDuanT LENGfi rN IENSq{

(o) -rOP EARS

OF CONCRE]E&2 THE LENSTH OF PIIIS ARE IENTAII\€, PII-E DESGII SflAT !E--

ofTHE a,rss oe soru ixPLofiAToiY BffiNc 8Y lHE csllRl

STIALL 8E RNAUZED AFIER.REJLTS f iHE PITE LOAD ]EST'

&3 ATL AEU1UENT PILES sfiAT! 8€ CAST AFIER CIN51RIJC]IONOF ROAD SIBANKUENT'

25 mm25 mm

' U180'

Bending dismeter :- STIRRUPS AND COLUMN llE EARS : D = 4d

F O R d < O R = 1 6 m m .- OIHER AARS HAVNG D < 0R = J2mm :

G R A D E 6 O : 0 - 8 x d

(o) ToP SARS

r{AKr.A (M-1)TO D.I IGTAN UOTORTAY

PACIGGE-U (REHMAM KIIETL TO KOT BAUAN)(sEcfloN - lrB)

TTILE GENERAL NOTES FoR

STRUCTURES (BRIDGE,UNDERPASSNANONAI. ENGINEERING SEilNCES

PAKTSTAN (PvT.) LTD.IN ASSOCIATION TT$'

MM PAKISTAN (PW.) LfD,

GOVERNMENT OF PAKISTANMINISTRY OF COMMUMCANATIONAT HIGITWAY AUTHO

ORAWING NO.

37s7/1o2/1D/ GNS0012

(b) oTl{ER SARS

f)K' SruC€ l.ENCltl mm

F # F +6 17 #r #l tto tt l210 5{:t 730 910 1osotsso t620 205C 2310280 +75 630 785 9,t:i t360 iE t t rg752190

J50 425 5€5 /05 ll,act 1215 139r 156! r7a5 r960

v g : t z t

r^>rSPUC€ LENGIH mflr

F 1+ F 18 {7 F GI tt0 ttl210 120 560 7(xt 8.(' 12:E 1,|{Xl r580 l77l !9702& J€5 {65 6oat 725 104!i 1 t95 t350 t52( 16€atJ50 325 {t5 5.ro 550 s3!i t076 r20! tSac r50€

Page 23: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

il

1 igl9;\ r I /<\tE Ill llt,q\j-l--1b,,'bi i l+I i, I l+',qilTT1l+,i I t I r I I

E,l ll l i*lSil I I l l l*ldlll l l+

8tl I l l t l l -cr irrrnrgnor'r.n lR l l i i l r l l / v r r u w l E R s r o P ( r y p . ) l

Irr i [|=----.--_T] i* | xoveurnr.,Fll {Ei , I tr i- I

s l l H i l l I . (€ ' l l i lz toruoro*rvrv;i f f i--,r r-------------=l

- - l | I l l I l l i , - ppno rcHsue lFll i ll------*------Ll Y w' Il l i i l==T==ili I

a

Id- | l I t t t l i l I : i l t " f t r l i l t t ll l l l * j4-1 L- I -J. l-t^,. I I l I Ill ii *'q/i i \p'ffir r+I . , I t- / / s1,oT** \

,1- I rs Il5i ldl t r\'€liF iI l*/ t \"'' 'r-- +r +H

IPLAN Lera^ilKua{r PRoIEcnoN

t lO-'2e\ \ t-.'#*l / r lt 2 2 5 1

DETAIL OF WATERSTOPSCr{.E l:5O

73OO , 3ooo ,loot)

r JO00

l l , r

(s€E MrrE 3)SECTICN A_A

fAsE st^8

I

^PPRo^cH +-FrP') \ *:*-l i ;l gl

sl A-- - l75 Afiott{c col{crRmJ ,- ,*u*J

l-1 L73 SUNOINC COI{CfiETE

DEIAIL ,8 ,SCA]8 l:5O

AppRo cH sl8.r 3l stoPEf m ! - -\ r r r r , l \ |

, @J-

7 0 1/ a r /7s SJNDTM! CONCREIH 7

TlYo co^Ts cF Hof BrruMsy'

r - - - - -1 l !L r--tTii-:z*-ld;i I (nP.) 'li

SCALE l:20OSHIL AE OCEHDED UFTO1500 itl6. FFOlt YINGYATL

CONTRACTION JOINTDETAILSCALE t:10

EL{STOuERIC -r , , 25 ilP. JOINT,jolNr sEAlrNT \

-Tr

\ " -P.v.c lv'IERstoP

r r \ Larnner- wAr{f-ll-ffwrfc w LL

+a-# +t n>[*

ftrcK BmJyrNolrsflBNE $IEET

EXP. JOINT DETAIL

T"'o

SCAE 1i75

aj::tl"€i.l

,5lir.r nl

i l 4 ' . I'{K'\"'

.l'-.'l-iili:i

/ i+r ilI t ! iI i i:'!;- - ' , . . . , ' - , : , ' . ta i '

.';' t-

:rt'

NOTES: -I-FOR c€NERAL N TES REFER OUG. NO. PIGT{SOOI2

z-RFirD IHE 0RAWINGS ffiIH ORG. I{O. PltllGOOt3-THe o€FtH oF SELECT FllL SIOII 8€ 0€g0ED 9t lHE G€gr€CH

EIGINEER AT gIE+-AJ. FIC€S OF @NCRSIE IN CONIACT V.II}I SOIL SHrLL AE OArP

PROOFED MIH 2 COATS OF trruT{NOUS IAIERIA-

IIIN-A-TrOI.I-A-! ENGINEERNG SEilICES

tllPArfisrAN (PW.) LrD.IN ASSOCIATION rITH

HWut PAKISTAN (PW.) LrD.

0+ nsdtutffi fiYz DMWN W RAJA S}UFIOHAKI"A, (U-1)

TO D.i KHAN MOTORTAYP.{CKAGE-U (REI{MA}II KrrErL TO KoT BALTAN)

(sEcTroN - nB)

]TILE EENEMI. ARRANGEUEN'TcoNcRcrE o(mJNE

ROAD UI{DERPASS (8000 X 5100)

SCATE

GOVERNMENT OF PAICSTANMINISTRY OF COMMT'NICATIONSNATIONAL HIGTTWAY AUTHORITY

Ge rterai rretP3,-i*S ^ < SIJBIfiTIED EI

02 E&'1li $tLriv{ RECOMIJENDED 8\

01-\-/

Ctlo.y',€R. W OATENovember. 201 6

DRAWING NO.

3737 /102/1D/P1UP0013REV.

REV. 0A1E 06cRmoN APPROTi@ APPRCIVE) 8I

I

^L,'/ R|ES r0oo, loo!, , 7300 loocfY:.roog 7300 , 3ooo ,ro0o l/ARrEqflLI 9 SHOULDR 2-ill{E CARRIAGEW Y 'l' 2-LAAE CIRRIAGEIY Y SHOUu)ER '

9 .ltl.s L o P € A ! o = s L o P E

3:=G ^ t q

g+

Page 24: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

asAL'^'

----\E'AL'c'

8T=l+-l,nl(uI=l

I

- i---rn'l

N l

1 n

nq

n l

d

IIi wALL ILEVATION

DETAIL- .A,SCALE 1:20

TOF SIIB Pt}N

RSNFORCEMENTSHOWN

f \ r - - r A I t . n ,U L I A I L _ U

SCALE 1:20

o o

X_SECTION

\ t t , ' 1i ' ? ' i :r r I

.ri it.tl"' ):.:-r t,

BCTTOM SLAB PLAN

TOP SLAB-SECTIONAT CONTRACTION JT.

NOTES:

1 FOR GENERCL NOTES

2READ TI{IS DR{WING

REFER DWG. NO. PGNSOO12

wtTH DIYG .NO.P1RS0015.

REINFORCEMENT SCHEDULE

BAR IIARK @ @ @ @ @ @ @ @ @ @ ( 1 1 ) @ @ @ @ @ @D€SIGNA1ION &SPACING #802so fEO25o #8o250 #8O2s0#so20o #so20o #80250 #80250 #802so #8o2s0 #so2oo #so200 #8o2s0 #EO25o #50200 #5O1 s0 #so200

r{AKr.A (U-1)TO D.I KI{AI{ MOTORTAY

P.A,CIqGE-U (REliMANr KriErL TO KOT BATJAN)(sEcfioN - uB)

AKTSTAN (PvI.) LlD.IN ASSOCIATION TTTI]T

ffiul,t PAKISTAN (Pw.) LrD.

ROAD UNDSRP.{SS (8000 X 5100)sr4B & rAlis (RETNFORCEilENT)Rf|irtfr G0VERNMENT 0F PAKISTtu\

F.':fri MINISTRY OF COMMUNICATIONS*9*', NATIoNAT HiclrwAY AuTHoRITY

Page 25: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

tr,liUOHInV iYitHgII{ TVNOIM "€3*usNollvclNoltltoc do ,\,u.tslNlfr ffino

NV,LSDIVd,{O TNEI{NSSAOC',t11t1'u

'oe1 ('J,Ad) lsfJ,sDrvd nnIITII NOITYICOSSV Ni

'(II'I ('J,Ad) NY,tsDrvdSSCNUSS 9Nn$SSNIENS WNOI.IVN

(sn - Noucss)(Nvnve J,ox or rIsrDI INwEIglg) n-scwcva

,wfuolon MruDI ro o,r(r-n) vurnr

(oool x oooe) ssvduscNn cvougNnmo gJ,f,8sNoc

$SDISCNVESV TnSINtrtr! ru.ll.

rrnEtvlt snoNnruIS l0 gAo3 ? t{ufi (EJooSddlMI 38 TilltS 'llos

Htr, ttfl}to3 Nt 3!t8Jt{oc J0 gJ/J TH-c!16 IV lE"NlOf€

tlCII03e 3HI AE GlOlC3O 3S TM.IS TIU .LltES .JO Ri.E}O :zu-ZzloosNo 'oN 'gtrc yrfu saoN mGhEtc uoj-r

_:S3ION

09:l SIrDS

.8, 'ltvi_3c

o$:t g}:!s

,v. llvl_3c

l-6-l

09rl tltos

lrvl:lcNOtJSSlCUd l-N3l XNVgl^3

-l-t-*'l I

o9rl 3lvts! rAr I A--t\tt,t lJ!\

ot:t tIrCS-ilvl3C

INION NOIICVUINOC

L-B gt ovDu ollllslE

v 'ilv lin ??Q

\ry3ISUCNOC CNloNnE

og:t 3.wcs

dCISU=IVM JO -IIVISC

TEIHS 388Hsnoilrftru!8 xoHr 9z

0T1-3'iv3s

l|VI3CrNron 'dx=

$sar€s tNtoro|E|no$YE

NV']d

Ilo

lo

TMSONIiI ftlOHJ 'uln OOgt

oldn G0NSDG 38 Tt$lSNout3llud $Efrxrflsrel

t'"0 |, -*'fl9NrONrE 9/

('d ololoUddr'

('d{)dolsEtvf,9A'd

l€nful8rOH .JO SIIDJ Olrti

!B

lololoI

EI

/. |! l\toru

BflS Finr'ouddY

lJSrISlitYd 3l8DgU

'rv.llElm Tlu tll:rEs09t:l tlff,s

NO[C=S

lllluJltoJ gMoNnB 9/\ bj

\. ('d l) \-BUnC 3t@'* ('d D ]rilJ ow'to

Page 26: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

- - - i - - 1 - - -

l l

o o

DTTAIL_.A'SCALE 1;20

r r ( s l

U L I A I L - 5SCALE 1:2o

TOP SLAB PI-AN

BOTTOM SLAB PLAN

II

o lN Io l{'|

Ii

REINFORCgTIENTSHOWN

n F T A r t I n ,

U L I A I L _ USCALE 1:20

TOP SLAB_SECTION

AT CONTRACTiON JT.

N OTES:1 FOR GENERAL NOT€S REFER OWC. NO. GNSOO122 REiO lHrS DRqWrNc WftH owc. NO. RSoO15

?- - - - F - - - - - - - -1-

hz

o l! - - +

I T

DE-iAlL-'Y'SCALE 1:20

X_SECT|ON

REINFORCEMENT SCHEDULE

BAR I'ARK @ @ @ @ @ @ @ ,@ @ @ (, @ (9 ( 1 4 ) @ @ ( 1 7 )

DESIGMTION &SPACING

#80300 #80300 #Eo3o0 #8O3OO#502s0 #50250 #8O300 #8o300 #8o300 #8o300 #so250 #sc2so#80300 #Eo30o #5o2so #5020O #s02so

ITAKLA (M-1)TO D.I KIIAN MOTORWAY

pAclqcE-ll (RSHMAM KtmIL TO KOT BALTAN)(sEc150N - UB)

ROA! UNDERPASS (6000 X 4OO0)sLAg & rArJs (REINFORCEUENT)

ENGINEERING SERVICES

PAKISTAN (PW.) LTD.IN ASSOCIATION WTTTI

MM PAKiSTAN (P\rI.) trD.

utiitr* GOYERNMENT 0F PAICSTAN

i€ YT:TT .o:.1?Yyu^Tl:11i1o#,fr" NATIoN.AL lllciilrAY AurHoDRAWINC NO.

w374o2/Tt/ uP0o13c

TENDER SRALffiNG$

Page 27: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

OHiNY AY.MHCIH WNOTIVNNoiwciNoltltoS,{0,tuJSiNII{

NV,tSDrYd d0 rNgytNuu 0c

'cffi (',t d) NvrsDw-d nnI{.lIt$. NOIJVICOSSY Ni

sEci uss cNr8gsNieNs

(srl - Nonrus)(Nsnvs rox o,r rrslDi lNrfirlgs) n-uculeva

.f,Yfuo,ton NVIII I'o 0r(l-n) rurru

Jt}

(pertnbeu ulftrvtlgXilr TXJ

!,Elu3flo3 9il[rNns

09rt rlrfs-ltvt_:c

NOIC]-LOUd JNfl XNVgl^S

*'Tl

'- ('d,\D tru eme

0lll gltos-ltvl3c

INICN NOICVU-LNOC

"l'u'J

oe:l tlns

dOJSUIIVM .JO ]IVIIC

ot:r r|vSs

l|VI=OrNtot' 'dx3

N\.1d

lrwMls .l}{rolAEfiOJSriE

ZlooSNC 'Olil 'Cflo IESIU EION mENP UOJ 'l

:S3ION

Ogit 3.lrls

,8, llvl_3c

tF:r tlss-lrvl3c

l0o/l

-i -l!l

I r:'

$sl*{lF-4vHfl H3SN3r

IEHS 3UAUsnoiltfirut8 xSHr 9Z

TIV,S

do.lstEtvfl

leloafFrrva

0+{r0Nn8 s/

Cdr.L)ltJtouddv

fd$dolslBlvfi C'A'd

fts .vp

:l!tololo

.-E-I

3#6 $

tolo

T-rutot9

ttoI

IIl-

+o

.fo '1-

+oTX

t- Il!

t-III

TCT-

Cd r)afls |'|Jtouddv

Ttv*3f{il. {togJ afi ooBioun (Bor€m 3E Tn Hsr{o!a3r(Hd *nr**l

t'.,.1 L -*'l-1

.MEIY'T 'TIU I.OSBS

,|El(rlnoHs,tEmnol€3duls 7il3

Page 28: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

TT------------iE::: -:::_l -r----

07

1 4

I

ilili lll

Il ll l

t ll l

III\

HEIAIL 'C'

n - - A t t I r I

U L - I A I L _ ASCALE 1:20

TENSER BR&FSIf\$S{i

n l - ^ r r ( 4 ,

U L I A i L _ 5SCALE 1:20

REINFORCS'ENTSHOWN

NOTES:

1 FOR GENEML NOTES REFER DWG. NO, GNSOO12

TOP SLAB PLAN

BOTTOM SLAB PI-AN

REINFORCEMENT SCHEDU LE

TOP SLAB_SECTIOI\IAT CONTRACTION JT.

r lr ltI

- - - - - - - - - - t

o4

! i o l

ii

ili--Tl i

01

DFI-AIL-'Y'SCAII 1:20

AAR MARK @ @ @ @ @ @ @ @ @ @ 1 1 1 ) @ @ @ @ @ @

DESIG|\IATION &SPACING

#6o2oo #60200 #6o200 #60200 #so2o0 #5o20o #6o200 #50200- #60200 #60200 #so20o #so2oo#60200 #60200 #s0200 #so1so#so20o

nAKr.A (M-1)TO D.I KTIAN MOTORTAY

PACIOGE_U (REHUAM KI{EIL TO KOT BAIIAN)(sEcnoN - 118)

ROAD UNDERPASS (8000 X 45OO)SLAB & {ALIS (REIN?ORCEUENT)

ENGINEERING SERYICES

ArcsTAlr (PW.) tID.IN ASSOCIATION TITH

MM PAKISTAN (PW.) LfD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUNiCATIONATIONAT HIGHWAY A

DRAWNG NO.

3137/7O2/T\/ UP0013E

Page 29: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

2 COAIS HOr ErUvEt{

I

I

l -I- FII

I

I2 COAni HOr EInnEr{

ELryATION WING WALL Ei-soo-aso

WING WA.LL_FOOTING PLAN

NOTES1. THE OEPTH Of SA.ESI Flr SHAI BE OECBED SI THE

ENGIII€ER AT SIIE

75 LEAT CONCREIE

JuL l r ru

(vhn.!qudd)

75 LEAta CONCf,ETE

SELECT flLL UATERTI(rhm €qurid)

l s o o l a r l u l e H l s o o ll B l

SECTION A_Ascll.E 1:50

l-lgry Fsr*ssq-+rq-50t :Cri:-5oo

SECTION B-tsSCcl-E 't:50

SECTION B-BSCrrLE l:5O

TENDER SRAbYIIdG$

.Lr*l

WALL_FOOTING

ltaKLA (M-1)TO D.I KI{AN MOTORTAY

PACTGcE-trl (REH!{AM KtrErL TO KoT BATJAN)(sEcTToN - uB)

ROAD U!{DERPASS (8X5.1, 6X4.5, 6X4)TING YAI.L CONCRSIE O(ITIJNE& REINFORCEUENT DETTII.S

NATIONAI, ENGINEERING SERIICESPAKTSTAN (PvT.) LTD.

IN ASSOCIATION rTH

MM PAKTSTAN (PvI.) LTD.

GOYERNMENT OT PAKISTANMINISTRY OF COMMUNICATINATIONAT HIGHiYAY AUTHO s737/1O2/rO/ UP0o15F

Page 30: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

RCC WING WALL DESIGN DETAILS ALONG WI?H REINFORCEMEIiIT

Sr. No.Height {m}

DIMENSIONS

New B tsli BT D1 D2 T1 t z

1 1.00 i .50 1200 - 1500 600 - 800 300-400 200 200 ? n n 300

2 2.00 3.00 1800 - 2500 950 - 1300 450-750 350 300 300 400-450

3.00 4.00 2500 - 3 i00 1300 - 16s0 - - n n - n/ D U - : / C U 400 373 350 450-500

.f 4.00 5.00 3100 - 3500 1650 - 1800 950- 1 1 00 550 450 +00 500-600

5 5.00 6.00 3500 - 4100 1800 - 2150 i 100-1250 600 500 425 600-700

Ar.J 6.00 7.00 4 100-5200 215A-2900 i250- i500 650 500 700-800

- 7.00 8.00 5200-6000 290C-3400 r - n n L - n A

i C U U - I / U U 7AO 600 550 800-900

RSI$F O RC EMEI'IT DT"f AIL

Sr. llo. IIEIGI{T {ar}

REII{F'ORCEMg$T

RG1 RO2 RO3 RO4 RO5 RO6 RO? RO8 RO9 R10 R11

I 1- i .50 + 5 @2AO # + @2AA # 5 ,@2AA # 4,@2OA il tL 'G: DOO * L 6; )Af i #+@, 12s #+@12s # 5 @,240 # 5 @,2AA #4@ 150

2 2-3 # 6 @2OA lt 4 Gi )oo # 6 @200 #+@2AA #+@2AA J 4 l i t ) O i #+@r2s ++@, 125 #6@2OO + A / ; , a1t \7 V t W , . a V V #+@154

- 3-4 # 6 @,24O + + @2OA # 6 @2A0 #+c4zaa * + ,@,2OO + i ,r;, onnf t Q W a W \ J #+@\23 #+@, 12s #6@2CO #6@2OA #+@75A

/ l 4-5 : f x ( n t | / - .' t v s 9 . , ' v tT \J tw, r t Jt r \ l l l t I t ' \j ' v t y , : I v i f \ J \ L U , L I 9 1T .) tLU, L t I

+ { / / Y l | / \V \) \tU, L I \J #[email protected] #+@,r2s #6@2AC # 5 @2AO #+@. 150

.1 * R l i r ' 1 5 O t t - ^ . - A

:7 U ILL' , f , \ - / \ - / #6@150 r r . - ^ r F n

iT J t.LU, L \) v+ ^ / / t t I \ t tT J \ L U , L ' V #[email protected] I A / ; , 1 4 < #6@2AA #6@2AO #+@L5A

6 6-7 # 8 @. 1s0 f f \ ) t L U L \ J \ J= h ( n l l : a l l

t t - 4 1 P

fr \J \w, L \) \)t t - ^ a -

:t 1 r 't l I ' \{ t : t 1 / r r ) l 5 l ) 4 4 O i t 1 9 4 #4@i2s #6@2AO #6@2AO #+@150

7 7-8 #8@130 i 7 \ , ( L Y a U v Jt x lrr) 1 _-\l I l f J \ L U , L ' \ J # s @ 1s0 * 4 6 t 1 ) S & 4 a h 1 ) ^ #6@2OO #6@2AO u4 rA1<n' r | , 9 , r v v

;'- lqi

i;:s. IJ

TEruDER SRA$'II{G$ili',;'66ttu-tlTO D.I KTIAN MOTORTAY

pAcr(AcE-u (REr{ilAM KrrErL To KoT BAIJAN)(sEcTroN - l1B)

'rTtLE s*c uu-s coNcRgtx l.*

UNDERPASS CONCRSTE (8t(5.1, 6X4, 8X4.5)& REI}{T'ORCEUENT DETAIIS

NATIONAT ENGINEERN'IG SER1NCESPA]<ISTAN (PYI.) LTD.

N.i ASSOCIATION ]VITH

MM PAICSTAN (PW.) LTD.NATIONAJ, HiGHWAY AUTHODMWNG NO.

s737/102/1D/ uP0013c

Page 31: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

LI ST OF ERIDGTS AND FLYOVTR

DESCRiPTION

1,GOYERNMENT OF PAKISTANMINISTRY OF COMMUNICATIONSNATIONAI HIGT{TfAY AUTHORIW

:ITNATIONAT" ENGINEERING SERTICES

DllPAIasrAN (PvT.) LrD.iN ASSOCIATION W1TH

ffiuu PAKISTAN (PW.) LTD.

0/t *L\__ OMffi ST RAA SMROHAKI,A (M-1)

TO D.I KTIAN MOTORTAYPACIGGE-U (REIIMAM KHEIL TO KoT BALIAN)

{sEcllON - UB)

*Ltsr 'oF BRTDGES & FLYovER it*tDRAWTNGS I

colEl' $J8MIIED ry

1".-,1. n:iil'*fcfl RECOUUENDED BI

01 hi:*:'r-rrsS CHD.AER At DATE I DRAWING N0, I R€v.

November, zot0 | 3737/1!z/m/enOt+ |RA/. I OATE 0€scRrmoN lppRcryED lAPPRoro By

Page 32: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

l i l ' !

-J-*r'm"tl, *'*'J i I_ ' \ l J

qE*T--ISEF sEcnoN c-cl:-:t-=-r-+ri*'* ^ffirTETD-LRffificsl -iffi;*-

| | f ',,o crr !i,.1/LU !i j(.,-t

SECTION D_D& m€ |.oAO TESI

.+. EZE OF g8tocE W tER!f,Ay, HFt_ PROIECITON 1VORK' t X -'.^ V.'1 .,t'rr/

75 -:i,... '-....,;.-,;;,

lRrtNlxc wOR( SCoUR pROIECnOfl, PROF|LS EIC. Wr[ B€\, ':

-'.i; :' :-.i Flt{rlJZED rFIER ImIRAUUCS/HIOROLOG? SIUO|E.

GOVERNMENT OF PAKISTANMiNiSfRY OF COMMUNICAfiONSNATIONAI, HIGHifAY AUTHORITY

TIINAnoNAL ENGINEERING SERyICES

?llPArasrAr{ (PW.) LrD.iN ASSOCIATION TTtr{

lm

lffiluu PAKTSTAN (Pw.) LrD.

04 ;a"Fi *3iblu 0R Ut{ 8/ RAA STOFIOirAKr"{ (M-1)

TO D.I KI{AN UOTORTAYPACKAGE-II (REHUAM rcmIL TO KoT BAI,IAN)

(sEcfioN - uB)

TITLE GENERAL ARRANGEMENTPLAN, ELEVATION AND SECTIONS

BRIDGE AT CH. 3+520

SCAI.E

03 \ ft-}ftl ],. .r1 :t',ir-l;;E{" . K su8[atfiED ar

02 \Y HT g'.,'l::' i l i -.* RECOT'HENDED SI

LiV;"P'-- clrD,'/aEn rr OATENovember, 2016

DRAWING NO.

3737/1o2/m/ BR1o1

REY.

RF', OAT€ 0EscRtFnoN APPRCIVED APPRCNED 8Y

Page 33: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 34: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 35: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 36: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

I.AI|I|I^IED €IISIOIIERICEAF1NG PAII (TY?.)

CONCREIECr{F.)

jrT-

EL

^h

FIFlv

,1OO C.I DM|N PIPE

PRESIRESSED dRDER

SHEAR KEI(rr".)o|AP'{RACU (m.)

NOTES:1. FoR cE{ERA NoIEi REFER owc. no. cltioore

2. rvoRK rHts oRAwrNG n{ coruuNcncN fitHoTfl ER REt-8/A{r 0RArINGS.

S. nOn r-e,lCIH OF a|f SHOWII ARE iENIII€ & \tIU- BEFIIIAJZED TFEN OSIAL CEOIECHNICAL IT{\ESNGANON& fitE ulAo Esr.

4. SZE 0F 8R|oCE W IERtAy. HFL pnglECnON WOft(IRAINING IIORK. SCOUR PROIECNON. PROFIIE ETC. I|rU 8ERMUZED IFT€R TmTRAIJUCS/HIOR0-OOr SruDES.

SC{E 1:l{Xt

SECTION C_CsCJI.E l:75

-aai't),'.::.

! , ' . . . j i '

!!:>^'/it )r* Iil"'. i,z

i 4 . . . " ' . "

AFPROTCH

C.OA15 OF

200 (oR EourvaElf|ro rH. 0FASPfiILTIC S|SE COURSO

2nd SIAC€STBANKU€XT(r|P.)

\YAl. 0rP.)

,A8UIilEM TA-2

lcL SIAGEAIBANKIIENT(ftP.)

.f.*-PtLES 1120025lt toNG 8Erc$ NStCTYP.)

xfntir cowRNMENT oF PAKISTAN'.lF UNNSTRY OF COMMUMCATIONS

'ffi",, NATIgNAL i{IGII11'A' AUTH.RIT'

ENGINEERING SERNCESPAKISTAN (PW.) LTD.

IN ASSOCIATION VITIIMM PAKTSTAN (PW.) LTD.

HAKLA (M-1;'if .'''.li-:,ii:.,;:;

TO D.I KT{AN MOTORTAYPACI{AGE-II (REISTAM KIIEIL TO KOT BALIAN)

(sEcnoN - llB)

TNLS GENERAL ARRANGEMENTPLAN, ELEVA]]ON AND SEC'IIONS

ERIDGE AT CH.16+995

ORAWNG NO.

3737/102/m/ Ailos

Page 37: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 38: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

10 / 12.7ffi lE}ilroiEl (Tf.)

ELCVATI0N (TENDON PROFILE) 30m GIRDER

+Y-

REFERENCE CO-ORDINATES

,150 ,nr-ff]

END V|E1,V 0F GIRDERSCllE l:15

S}IEIR KE/

sl

o to l4"rr_tolnl

Io |_D -o ls l

- l

" lI. l

@l

OUEN gDE OFato clFoER

ISECTION AT DIAPHRAGM

SCTLE 1115

DT-f'AIL OF ANCHORACE RECESSESSC I€ l :15

JACIff{G Ffi€€ - l5.l'la1

BURSTING REiNF. DF|'AILSCA€ l :13

TYPICAL DEiAIL(ANClioRrG€ R€CfS)

ANCHORAGERECESS DE-I'AILS

SECTION AT MIDSPANSCAE 1i1!

TABLE-1

L FOR GEN€R^L tlOIEi n€FER oRAfll,lc No cllgxlt22- REX' lHE oRAilrNO lN Clt{tUt{CItON ore.

3. lHE FOU-Oilt{C vatJES H rG 8EEil rSJlrED 0{ IHE cttcutlllo|{ 0F]HEoRETICAL ELot{GAllON/efiEI{S{N. (lo) oF IE{Do}$i:yolxJurs 0F tt sncfr. E-19:t.cx)0 upc (28,000) taa.COfFF!qE!II OF CUFYAIUFE Ffrg'IOI€.25 P€R RADIAITVOBeE FRgnON CXIEFFId€Ni-O.00:!:! PER yEIERrNY O€VIAIK)I* FROT IHE TSOVE VAIJES STIAII. E flEFORTEO TOrH€ O{GO{EER

4. SIRESSIilG S.|A.L E sTopp€D rS S00H lS O{E OF iHE fiXJ.OUilcCSO{nOffi lS tuLflLlEDl

-5InES REAO{Ei 0.73 Ill/€S CIrAR rfiEED UrimtAG }Et{il€STRENSTH (AfiS)

-fCIlj|L O-Ot{c TlOfl/DCa{gOtl Rgc{qi 1.10 io.-IF AT 0.75 GUIS |CN,AL 'LOI{GA'IrcN ls SIIII 8€U)T 0.95 AO

SIRESIIM; SHAII B€ PROCEEDEE UFTO II^)OTUX OF O.8O Ct'l:|.-N THE EVENT 6 NOTHOIIR)RIIA{CE OF A8O"E T}tE IEMNN $iAL

E REFI.ICED.5. ]E{OO{ D(IENSOil e0/B{ til Tf&.E tS FoR lH€ J&$G.END.5. $n€slM) oF sRffFs stout 8€ Dot{E FRora 80IH Eilos.

SQqLE l:25UNLESS OI}IERIYISE NOIED

ano REctssEs To tr cRoulEDAFTER STf,€SSIM)

-3Pgg1

l r o o l

D^TA FOR ERO€R ooENso{AT EACH END

(nn)

SEOIJEilCAf

STRESSN€NO, 1051 o'10L ,.151 r1751 r2g. I25L L30t L3!L oaol t +25LO,+51 0.5{L

I300 243 267 2!l 111 199 t6a t7a t6s t60 1*t 1a6 1,+l r36 132 129 t2:t 125

102Y 0 0 0 o 0

675 85 371 522 177 4+i 395 J57 123 E1 265 2S 83 192 1 E 1 5 9 117 137 t5r 126 125t(xt

Y g 0 0 o -+t -60 -80 -so -tt[ ' t20 -t30 -14{ -r50 -1gt

1050 E7+ 795 717 64t 578 51E {54 .to5 456 312 273 28 28 la2 146 13f 127 1259g

o 0 0 o o 0 JO 50 7D lxt tJ{, l,tO 150

+t+2 1304 fl87 'to92 993 9{X) ar5 732 588 525 168 a17 372 273 z5z 2Sl 2aE ZE

9Eo 0 o 0 0 0 0 -23 -50 - l ,L -r50 -150

't&to t6.t6 1501 1364 125:t l ' t11 9e7 8eo 701 sr9 54 1n ,+l 8 Jat 2aa zEO 2+1 229 ZE97 o

0 o 0 0 0 0 0 0 o 0 65 95 l5(, t.lti td)

TABLE-2Ar€roRra€ R€cEs:l fI TA

TENTX}INO.

|rrq€o<' (mm)

I r ' 2 0 ' 5 l '

f ld oiP 7

T s t 2 S

t 1{ 26' 't6

12 gf +2'

TFIIilHR *R.AUVII{GS

r{AKr,A (M-1.)TO D.I KI{AN MOTORTAY

PACTGGE-U (REH!{AM KTIEIL T0 I(OT BAIJAN)(sEcTroN - llB)

i l t E30m PRESIRESSED GIRDER

CONC. OUruNE & PRESTRESSING DETAILSTIONAJ, ENGINEERING SERYICES

AKISTAN (PW.) LTD.IN ASSOCIA1jON 1T1TI1

Mrd PAKISTAN (PlrI.) LTD.

GOVERNMENT OF PA]CSTANMiNISTRY OF COMMUNICATIONATIONAT HiGffiTAY AUTHORITY

DRAWING NO.

3737/102/|D/BR 107

Page 39: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

-t, { i, g t 4 ll , 613 I

tF4

REINFORCEMEIJT<alJtrnt il tr

NOTES:1. FOR CEI{ERA MIIEi REFER DtflG. NO. GI{SOOI22. READ IHEI ORAUING IN COITJUNCNON $IH OIIG. I{G.

3. rut PRESReiSED C!ilCREfE SHAL BE CttS '01..

+. AtL REI{FORCII{G STEEL STIA! SE D€FORUED ROUND AARS(Gtu8E e0) CTONFoRi{NG rO A S{IO U-31 0R ASnr A-615lt'IH MlNltaull Y€r-o SfREltCtH OF +,20O Kg,/cf,l (6o.Omp!i)

cTroSCALE

N A-A SECTION F-F(FCR EXTERTOR GTRDER)

SCAL€ 1:15

LONGITUDINAL SECTIONSCA|E 1:25

SECTION F-F(FOR tNTERTOR GTRDER)

SCJTIE 1:15

SECTIONAL P|jN E-E(FOR TNTERTOR GTRDER)

SECTION C-CSCA|E 1r t5

d8 DOllEUil , ,(TrP.) v //\/

SECTIONAL PI.AN E-E(FOR EXTERTOR GTRDER)

SCILE 1:'15

\V

I

MARKgAR DIA.

O SPAqNG*4{rroo

GOlA t&t751-#

G03 2fl{eF)60,t tr'otogC0/tA 1Lt75c05 il1EnGO6 J4{t3tX!c06A ,Ft75c07 6-#(enc08 #{1or00GOAA Ftt75

cog 11{en5-t6

ffi

ct lA #al50ct2 t+(EF)st3 1ffic13A '4!lsogt+ #.rcCii+A taar50cls 6-#(E')

cts.gl6A lOxT-t+,lOr9-t{c17 ,4Ct5{!618 1-1r4

Gl9 flarooc20 flqr,/l50

,&Zfi

ii${DtR u

,8 OorrElli-1 , ,(rYP.) xu,

t{:

HAKT.A (M-1)TO D.I ICIAN MOTORTTAY

PACIGGE-U (REIil{AM KIfirL TO KOT(sEcTroN - 1r8)

NATIONAL ENGI}IEERING SERVICESAKISTA}I (PW.) LTD.

IN ASSOCIATION WiTIIMM P.aKrSTAlr (PW.) LTD.

GOYERNMENT 0F PAKISTAI\MiNISTRY OF COMMUNICATIONSNATIONAT HiG}ilTAY AUTHORITY OA1E

November, 2016ORAIIING NO.

3737/102/1DIBR lOS

Page 40: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

t250 |F*1

75' r{Ott FORUFnM} PlN

OUPHRAGI'

--r-I f-11 /12.76m 4NmNs orP.)

SEC]ION AT MIDSPANSCA|I t:15

ELEVATION (TENDON PROFILE) 25m GIRDER

SECTION AT DIAPHRAGMSCAIE 1:15

BURSTING REINF. DETAILSCAI€ l:15

REFERENCE CO_ORDINA]ES

ANCiIORAGERECESS DETAILS

SECTIONAL PLAN B_BSCJIE 1315

NCTIS:l. FoR GENERII- MIIES RSFER OR $tfiC Nq Gil6012

2.'IH€ FOI.LCtrII{G VTLIES HA\€ SEEN TS6UI'SD IN iHE CALCUI.ATION OFIHEoREnC{- A-oNCATrcil/O(ENsOil (Ao) 0F lENoo{Si:UOOULLIS oF El^SIldTY, €-1,96a,70O Kq./Sqcm (28.000) u)coEmgE$ oF ailRVAll,R€ FRCnON-o:S P€R RADUI{WOBALE FRGtlOtl COEFFIOEN[-o.d):13 PER ITEIERAtf/ oEtr llo$t FRoil lHE r8ovE vAllEs $t U- 8E REP6IED TttTHE ANGNEER.

J. SIRESEi|{G SHAI €E SfOPP€D rS SOo|i .rS OilE OF lHE FCU_Orir{CcoflDnofis fi FULFil.tED:

-'REE REICHE O.73 IT'ES €IARINIEED ULII{ATE TBISTEs[Ra{crH (cljls)

-^cTrJA EtOt{G\1tO{/E0EttEtON RElc{et !.:o,ro.-lF AT 0.75 C[m rclll L ETONeAIOtt tS STIIL 8€LOW 0.95 Ao

srRsHc SHAL 8E PiOC€ED€D UFIO TUXUUU OF 0.80 C|,lS-lN IHE 8/Etfi 0F NCI{-CONFORTa Nce OF ,a8O,E, IH€ c aE IAY

E REPI.iAC€D.+. TENDON O(IEilSOTI GIIGN IN IAAIE 6 iDR lHE JACI{!.|G EM).5. STRESSII{G OF CROERS S{qJLD 8E OONE FROT 8On{ €NOS.

r--. ' I

(sEf, r a-E 2)

,l;' l '!

t-I

END VIEW OF GIRDERSCAI,.E'1r15

DETAIL OF

II

clol

ITABLE 1 SECTIONAL PI-AN A-A

SCll.E 1:15

TENDER DRAWINGS

tB l !

ANCHORAGE RECESSESSCAI.E 1:15

TABLE

RECESSES 1O 8E

J A{NC FonC€ - 151 ll lea

DATA FOR OIRDER ocENso{AT EACfI ENO

0rH)

SEQU€NC€0f

SIF€sSINGNC L05L 0.10t- r't251 t15L l;t7c t 20L o.2!L 27g,. IJOL t 3aL t4ol 0,,+51r+73 0.50-

J50 206 t95 t E 1 171 ! 6 1 I 4ai r39 13.t 130 1 A 7 t2a 1236C

0 0 0 n

, 802 42 3't3 277 | 215 2 1 7 155 142 127 r25 {t/+o 0 -20 -.4{l -55 - t05 -1,{5 -150

1 o!,{t 9@ a71 793 717 8.aat 576 3rE 4S8 103 35E 3r2 273 2tE 20E r6tt 182 145 l3+ ltl 12582 B

Y 0 1{t 8!l 1 1{t l4a 1 5{t

Ar,€flORlC€ RECESS 0AT

.IENDOII

N0.rNero<' (mm)

? 03' {,' 1 ' l

t t 52' 22' t7

1 1 ' , t l ' 0 1 ' 84

NATIONAI" ENGINEERING SERYICESPATSSTAN (PW.) LTD.

IN ASSOCIATION WITTIMM PAKTSTAN (PlrI.) LTD.

HAKLA (M-1)TO D.I KT{AN UOTOR]rAY

PACKAGE-U (REHrrANr KrrErL TO KOT BALTAN)(sEcfioN - llB)

GOYERNMENT OF PAKISTANMINISTRY OF COMMUNICATIONSNATIONAI, HiG}IIYAY AUTHORITY

.IITLE 25m PRESTRESSED GIRDER

CONC. OUruNE & PRESTRESSING DETAJLS

Page 41: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

IE:NFCRCEVEi':JT)L|1E.UULL#

LONGITUDINAL SECTION

0orEls

SECTIONAL PLAN D' -D'(FOR |NTERIOR GTRDER)

SC{.E 1:15

SECTION A-AScAl€ 1:15 SECTION B-B

(FOR EXTERToR GTRDER)(EXTERToR DTAPHRACM)

SECTION C-C(FOR EXTERToR GTRDER)(|NTERr0R DTAPHRAGM)

SCA|E l:15

SECTION E_F(FOR INTER|OR GTRDER)(EXTERToR DTAFHRAGM)'

SCALE 1:15

SECTION C-C(FOR INTER|OR GiRDER)(|NTER|0R DIAPHRAGM)

SCAI.E 1:15

SECTION D-DSCA€ 1:15

SECTIONAL P|jN i-E(FOR Er|-ERTOR GTRDER)

SECTIONAL PljN E-E(FoR TNTERTOR GTRDER)

i : * rg ffi ffi ffi il ffiAW A aq U$'dl'!*!-,?loll-S;*''SCALE I:.15

NOTES:I. FCR E€NERAL NOIES REFER DWG. NO, CilSc[}I2

Z T PRESIRESSED COI{CRET€ SIIAT! 8€ CLASS 01.

1 RANFORCSiAnf COf{CREIE s}t^|.t- E o€Ffir.ED RqJNDEAFfi OF(GRAOE 60) CSTFORMNC 10 AASltrc il-Jt(Asnr A-615)ulH M|NTHUM IELD SIREMI'H OF 42OO KsAq.On (OtjroOOeA),

HAKLA {M-1)TO D.I KFIAN UOTORTAY

PACTGGE-U (REI{uAM Kr{Ert TO KoT BATJAN)(sEcTroN - uB)

NATIONAJ" ENGINEERING SERYICESAKTSTAN (P\rT.) trD.

IN ASSOCIATION TNHMM PATCSTAN (PW.) LTD.

GOYERNMENT OF PAICSTANMINiSTRY OF COMMUNICATIONATIONAI, HIG}TITAY AUTHO

Page 42: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

i5*d glo f tGtlEal €flcdl 5qtoffi

sEur ,,a (Fs1E rgffi Ellr(! c f4tltlo(f c r lgff. rEa|l f m lt) r-ilet nScrEtt rcct aoaIF ffi ! fl.p a.oB cE|lEiltcl

t ot rft ftqerdL 4 t a l -

OIr:-4.Irr^3/ l 3 iV l ';ffiry,'* l$<--r-:=

fi'elolo+iEt adr dr'ls|dd

b, { t r ! -

iL_-R/lPl_

NOTES:

1- 'f rao 'd'rlG ltc iltEti 62- 'ir' S 1l€ nilJ3 t FO t. RtOOtG

l€.04

A - ffi.rd (b(m)

8 - Far cr'brftn)C - ild bdrr(nn)

i{AKr.,A (M-1)TO D.I KIIAN MOTOR]TAY

PACI$GE-U (RsirUAM TGTEIL TO KOT BAUAN)(sEcrroN - uB)

REBAR SHAPE CODETIONAL ENGINEERING SERYICES

AKiSTAr.i (PW.) LID.iN ASSOCIATION WITII

MM PAKISTAN (Pm.) LTD.

OYERNMENT OF PAKISTANMINISTRY OF COMMUNICATIONATIONAL HIG}IWAY AUTHORITY

DR,qHNG NO.

3737/102fiD/ RS001s

stEllt5 offint- crEl x saEul

5lo c !trriExt cr ag|. LEfll{ 6 :iln (u I qlril r,o ffi*x3 1E-oe urE|sxl! | 5tl|E fleo aqtEN.IEl t ffii x $Iorll

*l' l i

TENDER DRAWINGS

Page 43: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

iIII

l:

$A

,/

w(mm)

n(mm)

600 600

r000 0uu

1 000 600

1200 600

TABLE FORDRAIN TYPE-III

PLUM CONCRETErOE WALL

--JURB STONE

2OO THICK CONCRFI-E CLASS(25ooPSr)

A

CUT LINE

II

|,1l -

t >l v

t -

I

tI

LEAN CONCRETE 2OO

Trvlf 11lTi. \r r r ! \ r v l rrYPE(la)

, 2 0 0 , \ Y 1 2 0 0 , v A R l E s500(Min) ,

I

I

SHOULDER

, ,1O C/C 2OOt.10 C/C 2OO

I

N lI

o l

LEAN CONCRE'ETTPE_NI

V A R I E S

1.30m

2000 j 1000 r-r--_1I I

CCMPACTED EARIH

coNcRm cL4ss "3'(200)(uN€D PAT.TNELS ilOr

qCEEDS JOOO IN WIDTH)

TYPE_IV

NOTES: =1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIRED.

2 INVERT LS/EL OF DRAIN SHALL GENERALLY FOLLOW PROFILE GRADE ANDSHALL BE CCNNEC'IED TO AOJOINING CULVERTS/CHUIES.

3. SIDE DRAIN TYPE iII SHALL SE COVERED IN SUILT UP AREAS AT LOCA1ION WHEREACCESS IS REQUIRED FOR CROSSING OR WHERE SHOULDER IS EUMINA:IEDDUE TO UNAVAII-AEIUTY OF SPACE .

4. ACTUAL TYPE ,LOCATION, LENGTH, SLOPE AND INVERT LEVEL OF ORAIN SHALLBE AS APPROVED BY

'I}IE ENGINEER PRIOR TO CONSIRUCTION AT SITE.

5. ToE WALL ALONG DRAIN TYPE(1b) SHALL BE PRoVIDED wtTH PLUM coNcREIE.WHERE HEIGHT EXCEEDING 2M, THE BASE SHOULD BE FOLLOWED AS PERDwc 3737/|o2fDl RwPoos

HAKr*{ (U-1)TO D.I KHAN MOTOHTAY

PACI(AGE-U (REHMAM KI{ErL TO KOT BAUAN)(sEcfioN - nB)

TYPICA.L DRAIN DETAILNATIONA]. ENGINEERING

AKISTAN (PW.) LTD.iN ASSOCIAfiON Trtr]

Mld PATCSTAN (PW.) LTD,

GOYERNMENT OF PAKISTANMINISTRY OF COMMUNiCATIONSNAfiONA], HIGTIWAY AUTHORITY

Page 44: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

20mm CHAMFER

0120150

010o150 c,/c

coNcRfiE ct-Ass

500 1 trn trEt 7(t g v v v r / v

C\lr d

c\I

F,-

IIIi

I=

t

CCNCREI'ECLASS

012@150 C/C

8-012

f.)

DOUBI,E FACE BARRIER(IN lfNnIAN ONLY}

PCC CURB STONE

ASPHALT LEVEL

010o150 c,/crTYP \

80 LEAN CONCRFI'E

COI€REE CIJSS E

t€rr coracf,EE

4 - 1 2 Q

SINGIE FACE BARRIERiAtsOVE SETAINING YAI,L)

CONCREIE CUSS

50 CLEARCOVER

| / - |1 2 @ 1 s 0 C / C

SiiOULDER

ASPHALT|C CONCRETI

ASPHALTIC CONCR$E

-TI

rlII

NWEARING COURSEC'AJE. \-UUK>C.

AGG BASE COURSESUB BASE COURSE

SINGLE FACT

HAKLA (M-1)TO D.I KT{AN MOTOHTAY

pAcKAcE-ll (REHMAM rs{EIL TO KOT BATJAN)(sEcrroN - uB)

TIONAJ, ENGINSERING SERYICES

AKIST-{N (PW.) LTD.IN ASSOC1ATION TTTH

MM PAKISTAN (PW.) tTD.

GOVERNMENT OF PAKISTANMINiSTRY OF' COMMUNICATIONATIONAL HIGFfifAY AUTHORITY 737 /102/1D/ 00016A

Page 45: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

:25 225 225 ?25 )25,-

EYE FOR FIXING.T CHAMFERDRAW CORD \ 40. .10

.1-N INl

-h

Rt=i l 19

VARIES1 f - z

PREC,CSI MARKER2 5 0 x 2 5 O x 3 0 0

ri,.. ' i

PREC,{ST OUCT MARKER ON EOTII SIOES _.I(sEE DE-rArL) I

I

t \ lS l--7A---l

+%

TYPICAL CROSS SECTION OF SER\TICE DUCTS ACROSS E}FRESSTTAY

CONCREIESURROUNDcLAss '3'

5 D|A CS E./E FORRXING DRAW CORD.

.: if:

r 1 0 0 1 2 5 0 1 t 0 o r

EI,EVATIONPRECAST DUCT MARIGR

PI,ANPRECAST DUCT ilARI(ER

SECTION A-A{ruTURE DUCTS FORETECTRICAT CABIES)

00 t uF/c PIPE

SEE DETAIL A

I

| | I L I r l A . r | r ,

--lB b

lB-r- l"- - - - - f

PIdN

ffi

. . toxinh cr.os! 'q'..1t . : r : ' : : ' . , .

. . , 1 : . . . i ' . . _

,: .:a;\\ r 1\ l

' ! . . . .

DUCT FOR PROTSCTION OFEESTING SERYICES sgcTioN c-c

(FUTURE DUCTS FOR TATER IJNES)

ENGRAVING TO 3EPAINTED IN BLACK

PAINTED IN WHITE

SIZE OF DUCTS(As !{tD)

o t lo t l

o t to t l

Bl Bl- r 0 lo t lo t l

o t i

I

olql

III

nlII

JNl

o t

o l

o f

oio l

:irJl

ABDMOML UF/C PIPE

, 500

. roo.roo roo roo,roo.t-t-t-t-t-l

00 r uPvc PtFg

SECTION B-B(FUTURE DUCTS r0B

TETEPKONE CABLES 4 ]rAY)

SECTION B-B(FUTURE DUCTS FOR

TEI,EPIIONE CABTES TTfO ffAY)3OO O UPVC PIPE

R.O.W IARKER

ARRANGEMSNT OF UNDERGROUND DUCTS FOR RETOCATION OF OYEREEAD ETECTBIC UNES

NOTES1. ALL OIMENSIONS- AflE IN MILUMETERS, UNLESS NOTED OTHERWISE.2, SER/ICE DUCTS WILL BE PROVIDED AFTER ONE KILOMEIER INTERVAL OR REQUIREMENT.

SPACING & POSNON OF SER,/ICE OUCTS SHALL BE COORDINATED BY T}iECON'IRACTOR WITH THE CONCERNED AUTHORITY DURING CONSIRUC1ION WITHAPPROVAL OF THE ENGINEER'S REPRESENTATIVE.

J. CCST OF WOOOEN STOPPERS, DRAW CORD, GS EYE, SPLTTflNG OF PIPES,PROVISION AND WRAPPING OF POLYETHYLENE SHEEI, CUTflNG AND JOINING WITHExtsirNc Duc]s AND/OR ANy OTHER INC|0ENTAL WORK SHALL BE 0EEMED TO BEINCLUDED IN T}IE COST OF PIPES AND OTHER REI-ATED ITEMS IN THE BCQ,

+. ORAW CORD SHALL BE EXTENDED UPTO THE DUCT MARKER AND TIED TO THE GS FTE.TYPE OF CCRD SHALL BE AS APPROVED 8Y'IHE ENGINEER'S REPRESENTATIVE.

5. WRMNG ON PRECAST MARKERS SHALL BE ENGRAVED,6. orAMfiER (D) OF SPUT oUCT FOR pROTEfiON OF EX|STING SERVTCES AND THAT OF

ADDMONAL DUOT SI.{ALL BE AS DIREC'IED BY T]IE ENGINEER'S REPRESENTATIVE.7. FLEXIBLE JOINTS SHALL BE PROVIOED AT MAXIMUM OF 5OOO IN CONCRE]E

SURROUNDS.

MATERIAL LiST/M

DUCT TYPE NO. DIACONCRETE

(M9

ELECTRTCaL (2 IYAY) ) aaE 0.680

rrpHoNE(2 wAY) 2 100 n 1 a t

TELEPHONE(4 WAY) 100 0.219

WAIER (1 wAY) 1 1m 0.419

.?. . ' .&1 1 9

.':|

4

"lrj''i/t

1 5 0 9 . 1 5 0 D 1 5 OIffi

(sEE NO-IE NO. 3 & 4)

riAKr"a (M-1)TO D.I KIIAN MOTOilTAY

PACKAGE-U (REHUTM KlrErL TO KOT BAUAN). (sEcTroN - uE)

.TIONAI. ENGINEERING SERYICESArcsTAN (PW.) trD.

IN ASSOCIATION rITH

MM PAKISTAN (PVT.) LfD.

YERNMENT OF PAKISTANMINISTRY OF COMMUNICATINAfiONAL HIG1IWAY AUTHORITY

Page 46: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

SECTION A-A

PLANCHUTE TYPE (A)

ST]LUNG CHAMBER

I/PE-A

O{BION MATTRESS

PROTECfiON

01 012 {D 208 C/C

SECTION B-ts

sEcTlON C-C

NOTES1. ALL DIMENSIONS ARE IN MILUMETERS UNLESS CIHERWSE

NOTED.2. CONCREIE CHUT€S SHALL 8E PROVIOED AT AN INTERVAL OF

50M WH€RE RLL HEIGHT IS tvlORE THAN 2M OR ASDIRECTED BY THE ENGINEER'S REPRESENTATIVE.

3. CONCREIE FOR CHUTES COLLECTION & ST]LUNG CHAMB€RSSHALL BE CljSS ..A1 '"

4. RE-BAR SHALL BE GRADE 50 REINFORCEMENT STEEL5. CONCRETE CHUTE TYPE (A) SHALL BE USED AT OUTLEiS

OF MEDIAN OPENING AND AT O1HER LOCATIONS OR ASDIRECTED BY THE SNGINEER'S REPRESENTATIVE.

6. COI I FCTION CHAMBER TYPE-C SHALL BE US€D IN LIEU OFIYPE_B, WH€REVER LONGITUDINAL SLOPE OF ROADEXCEEDS 1.0% AND/OR AT o1HER LOCAT1ONS APPROVED ByT}IE ENGINEER'S REPRESENTATIVE.

IrI

3l Il r

FF, l

o , l' l l:-'t-

T-

SECTION D.Dfl AT

a121' 200 clc

' 0 302 Q12

450 DhPIPE

r{AKr,A (U-1)TO D.i KIIAN MOTORTAY

PACr(AGE-U (REITUAM KHEIT TO KoT BATJAN)(sEcTroN - itB)

ENGINEERING SERVICES.aKrsTAN (PW.) LTD.

IN ASSOCIATION MTHMM PAKTSTtu\ (PlrI.) LfD.

CoNCRETE CrruTE (1)GOYERNMENT OF PAKISTAN-MINISTRY OF COMMUNICATIONATIONAT HIGlrfAY AUTHORIW D&CWNG NO.

3737/102/1D/ DoA17

Page 47: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

t -T l| ,o.^ | 3tI

COT.T.HCTION CHAMBER TYPE-CSECTION B-B

WJ' l

n

-tll o ll o l

l ' li l

;l_Tl l o l1 t 6 lq l * l| | t1 t-Tt t o l

f t o l- l - i

o122oo c/c

L 0 8 0 1 2- 412 4 2OO C/C

SECTION C.Cnto'- a12

DD--TII

o l

III

rr l

SECTION

NOTES1 . ALL DIMENSIONS ARE IN MILLIME'IERS UNLESS OTHERWISA NOTED.

PLAN

SI'ILUNG CHAMBER/TVPtr-R]

GASION IHTfRESSPROTECTION

VARIES ACCORDING

TO FILL HBGHT

Irg

F

la.l

oF

g

J

HAIA"A, (M-1)TO D.I KHAN MOTORTAY

PACI{AGE-U (REHMAM KHEIL TO KOT BAIIAN)(sEclToN - UB)

coNcREfE CHUTE (2)ENGN.I"SERING SERVICES

ArcsrAN (Pw.) trD.IN ASSOCIATION ffiIH

MM PAKTSTAN (PvI.) LrD.

GOYSRNMENT OF PAKISTANMINiSTRY OF COMMUNICATIONATIONAL HiGHIYAY AUTHORITY

DRAWING NO.

3737/1O211O/ DOO17A

Page 48: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

:.\.tsL3-ir.EtirIrYE gpPr 3{)R srrPEEEEVXtp 3XtCE (StE)

o€srda $ED'fr / a,'r ur|E i l ur€ l2 Lin€i O I O i R A P I R A P

50 c .67 l o . s l l . cos [s

rqt a 4 5 l l

r20. q € l l

'{ua m E toflED ftn I{!t PRo€6.

pRoFrLE 6RlOg (PCL) & PoINT OF ROTAIoiT (PR)

ffiSIisF;rBSLT.iltS sEclto{ oF cuR!€

PtAi\i 0F frPlcAlSUPEREI,EVATION TRANSITION

1* A- -l[,4

, - : r , - F i g t

I - g

i g !

r i € t

1 € | -E

, . : r . ,

, "lt I q_

1-:€ I

, :5 l. rg_ l_r4 I

IIo66 6

@

@

6T

PROFILE OF TYPICAL EDGESUPERELEVATION TRANSITIONS

NOTES :-

1. ALL OIMENSIONS ARE IN MILUMETERS UNLESS OTHERWISE SHOWN.

2. AII SUPEREIS/ATION RATES ARg EXPRESSED IN UNITS PER HUNDR$ (Z).

3. PRORLE CRADE UNE {PCL) A}l0 POINT OF ROTAION (PR) SHAI aE A.ssHoiYN rN fig iYPlcnL cRoss s€cnoN.

4. FOLLO\flING SIGN CCi.iV€NTION FOR SUPSRELEVAflON RA'TE ARE APPUC{BLE(.) WHEN LEFT IDGE OF PAVETENT OR SHOULDER, IN DIREC,fION OF ]RAFRC

IS LOWER ]HAN RIGHT qDGA

(+) IYHEN LEFT EDGA CF PAVEMENT OR SHOULDEF, IN DTRECTION CF TRAFFIC'IS HIGHER ]HAN RIGHT EDGE.

5. CDGE PRORLES OF SUPER€I€VATED PAVEMET{T AIID SHOULDERS SHALL 3gFREE FROM IRREGUI.ARMES, ROUNDTNG AT POINTS A,C & E SHALL 8EACHIEVED USING A 20 UEIER MINIMUM VERNC.cL CUFVE.

6. lHE FORMULAE USED FOR CdLCUlnON OF INNER & OUTER TRs ARE AS UNDER:-

0. IING.IH CF TR X PAVE}iIENT .JVIDTH TO 8E ROTATED

(ll). 'S' FACTOR lS Ttl(EN FROM TABLE-|. THE LENGI?i cF TRs ARE INO|CATE0 oN PLAN

& PRORLE SHEEIS. WHICH MAY BE ATUUSIED AS PER SIIE CONDMONS AND/OR AS APPROVED SY ITIEENGINEER,S REPRESENTATT\E.

7. lHE MlE OF SUPERE-SYA]ION (S.C) 15 RESIRICTED TO A MAXIMUM OF 62.

rA

SHARP DEYIATION SIGN(oN SHARP CURYES)

SECTIONS OF TPICA],DISTRIBUTION OF SUPERETEVATION

HAKLA, (M-1)

TO D.I KHAN MOTORTAYPACI(AGE-U (REHITAM KI{EIL TO KOT BAI.IAN)

(sEcfioN - 118)

yERNMENT OF PAKiSTAN l5iil^*rrAN (pw.) rrD.MINISTRY OF COMMUNICATIONSI-

-- IN AssocIArIoN rrrn

NAflONA] HIGIIWAY AuTHoRi'rYlffiluu PAKISTAN (Pw.) LrD.f, $:::i;i:.i:t:

Page 49: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

Ii!II

I

ItI

I

!II

I

I

I!i

III{II

II!

IIiI

iIIIlIIIIi

!II

II

IIIiII

Ii1I

!iIII

iI

iII

!

I

ItIII

iI]I

I!III

IIII

sr.,\o , siadon ;"-r*'r*" , -;'"';ff" "'=;;:''-" -=1"::"' *'*L:ff'"" r:girtlsroe -:ne, t'-rl:il':i"

i ' - " ' - - ' - - '0096. -2.aA7o -Z.JQoio -2.OAr" ' ,zXC'

f f i1616r176 , .2 .01%i -Z.JUi ,o , -2 .0oo/o; -2 .CAo/ot -2 . )C%t .2 .0O,

----E{ffij

00"71 -2.00% l 0.00% i 00q/" 1 0-001

: : : : : : : : ; : i = : : ; : = : : ; : :

12 32+088.64m lEnd *

_i.2.0o% -!.0=9":6t -?"?-?v:t -2.00%t -2.00,

--ig-+iG-z5G-l#rormal Lrown -L.-i

--

-;

]J

t / 1/ o l

t l :/ o l

7;/ o i

t / :r o l

t / :. o l

4t/^ |_it /r o l-il / !l o l;Yoit / i7 0 l

t// o t7t, b i_.1

t6 i!l / t ,/ o l+\ i

t/^ i-t6 i;Yoi-.1u'/a I

t6i

uYo i+.-"€1zo ii ,:.?lr"ll;*F I--.,:t ' .'"t Il zo i l : : k l;1 , " ; ] js , lfn | | ..: ,:'* 1:i t ..'t Ir / i l " ' " q l| ' ^ i l - . . , , - l- r l r , . 1 ; l, , i t . . . ^ aY o i l i . . } l

7,1'; '"Plulli:..;l: t f l3 l

"ilir

1

l//o lffilI

34 LJ+856 .6bm Enci Normai Ci"own / .OUYol / - . { . JU7o l / . .UUYbl -L .VU' /o l - / - .UU- /o 'L.UUY/o

35 23+868.09m' Begin Fui l SuPer 2.60% 7.6A% 2.6A%l -2.60%l -Z.6Qn/o -?.1a%i r ' '

a h 74+5M.64m End Full Super 2.64% /-.'oQYo 1.6UYo '/-.oUYo i - /-.AUYI - 2 .oA% --:'-" "'"

ii 37 24+55L.87m Beein Niormai Crown 2.04% 2.00% 2.00%i -z.ao%i -L.aa% -2.C0%l:, '

38 74+587.64m Leve{ Crown Q.A0% 0.aa% 0.0070 -z.aa% | -7.0Q% -7.0594

24+6;13.4Lm Beein Normal Crown -z.aa% -2.00% -2.00%l -7.AOo/ai -2.0fr% -7.L4!'4'00% -400%

AN 25+&OZJ6n- Endilientr-e-nl- f,:vc,76

r1\'Eq'l)rTrl|1 qIlRVTa'llS 0+ I 0e{*r{ B" RA.IA SIiARQHAiAa (U-1)

TO D.I icf,{N UOTORT'AYPACKA,GE-U (REIni,${I ]G{EIL TO KoT BAIJ44\

(SECTION - UB)

IITLE

SUPERELE-f.dTION TASLE DETAII^SffiIGOVERNMENT OF PAJCST.L\it% lurritsrnv oF coMMmilcATloNS,#*"lNlfioNA-L HiclrttAy AurHoF.ilY

II=-"*'TlJpsasr-rN (Pvr. ) LrD.

SUSI{TTED AT

02 o.t'i'\, :'r'j'"i:cf :\-'U I REcorivB{D€D a

MM P"{KISTAN (PW.) LTD.01 :it. C'ID.y'ER. EY OA1E I ORAI|ING NO.

November, 2016 | t*ytoz1m1 TsoolEAaev. I s{TE oesc.ermoH ,IPPROVED ,IPPRO\@ i'Y

Page 50: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

ii

ii-t -

I!

Iol31

-T

- i

SERIES OF CURYES(FTRST To mrr)

NSION(cm

PARTSSGN SIZE

9Ocm 2om

s,7

J.U 4.0

A 35.0 44.0

a ! /+.0 1&7

8.0 10.7

9.3

h 2.7

il 4.5

DIME

r f r e r g l h r_1 _l-'.r_r

RIGHT. BEND

i h le l ' l f F

LEFT BENDSERIES OF CURYES(FTRST To RIGIIT)DIMENSION(cm

PARISstGN srzE

.-f-

90cm I 12Om

1.0

b

l.o ,+.0

14.0

t /+.0 18,7

f 8.O

sn Lo | 1.7

j 9 I + , t

+.5 6.0

DID

r 9 r h r f t g li--'fi-l-

r 9 r h r f t 9 r--1 -i---.'TT

IMENSION( cm

PARTSstcN srzE

9Oom I 2ocm

+.7

1.0

b

8.5

9.3

a.0

h 3,5

f1

MENSI0N(cm

PARTSslct{ SlzE

90'cn 120cm

8.7

4.0

d i5.3

I 9.3

8.0

b 4.7

rzs i '.a.7

IMENSION(cm

PARTS

gGN $ZE

9Om 1 20cm

( +.7

1.0

t

1.7

.t +.0

-g l

I

T-

I

I--T-

! I tgtfli - l r

T-" lIn- l

ol-

STEEP DESCEND

DIMENSION(clo)

Je lg!-

ROA.DWAY--}IA^RROWS(FR0M LEFT)

ROANWAY NABROWS

DIMENSI0N{cm)

PARTSSIGN gZE

eocm I t2ocm

+.7

1 . 0

8.1

10.0

t l , t 0 18.7

f

. 5.0

DUAL C^{RRLAGHTAY STARTS

DIMENSION(cm

PAFISsrc\ srzE

9Oqrl 120m

8.7

4,s

20.0

c

'18.0

9.J

t h h t h l: f f -

DUA], CARRIAGEWAY ENDS

PAFTSSIGN SIZE

90cm l20cm

f

b 8,7

t i l

I 41.O

IMENSION{cm

PAREisGl{ slzE

,o* l-tro*

q

)

10.0

14.0 18.7

I 5.0

DIMENSIO c:n

,if/,i;zp1'"i,'j."\

.'}'.r1i)l

PTTRISSGil gZE

-t06 I 120cm

L 1

1.0

b

+.o 5.J0

d 20.0

1 6.0

n 9J

TIILE RoAD SIGNS (1)(rNFonlraroRY srGN)

I1AKLA (M-l)

TO D.i KIiAN MOTORTAYPAC?GGE-U (REHUAM KHEIT TO KOT BA].IAN)

(sEcrIoN - uB)

AllONA], ENCINEERING SERVICES

PAKTSTAN (PW.) LTD.

iN ASSOCIATION TTET

MM P-{iflSTAN (PlrI.) LfD.

OfERNMENT OF PAKISTAN

MINISTRY OF COMMUNICANATIONAL HIGH1TAY AUTHORTTY

:*i:iiIj

3737/|ozfiD/ RSoo19

Page 51: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

I

o l6T-

I;-:l-q i

4 !

o l

Io--T

* lI

-Jo

T! l

I

5I

MINOR ROAD FROM I,EFT

DIMENSION{cmPARTS

Sign siE

90cm 206

1.0

b

+.0

r8.0

?.0 | 3.3

h

:t1,o 18.7

;;

MINOR ROAD FROM RIGI{T

DIMENSIONcm

PARfiiggn Sr2.

90cm 2Ocm

r ,0

8J

4.0

18.0

€15.0 20.0

9.J

n 14.0 r 8.7

i4.o

MINOR ROAD CROSSINGTITH AN OFFSET

TMENSIONcYn

PARIIi$9n gz€

90n 20cm

I

1.0

b

d 8.0 10,7

10.o

12.0

I e I e t € t-1 -T-r i-

MINOR ROAD CROSSING]?ITH fu\ OFFSET

IMENSIO cm.PARrs

gqn Siz€

9Ocm 120ffi

t . 0 1 1

5.5

8.0

t

r 9 r f r Q r- i

T- JUNCTION AIIEAI)

DIMENSION{ cmPAR':;

trgn Sizr-90m I 12t1,cm

l .o

7.O i 9.3

5.0 | a.7

g 1.o i 1+.7n 2.5 i J.i

I a | € | 6 l

- - f - r F

@@

I

- iO a---

I

- t

I

-ra l

q l

}4INOR ROADrROM LEFT

MINOR ROANFROM RIGIIT

r{AKr"A (M-1)TO D.i }GIA.N MOTOilTAY

pAcIqGE-u (REHI{AM KIIEIL TO KOT BAT.IA$)(sEcTroN - liB)

NAL ENGINEERING SERVICES

PAKISTAN (PW.) LTD.IN ASSOCIATION TTTII

MM PAKISTAN (PW.) LTD.

GOVERNMENT OF PAKISTANMiMSTRY OF' COMMUNiCATIONATIONAL HiGlilfAY A

DR,qWNG NO.

3737/1O2/1D/ RS0020

IMENSION( crt

PATTSSrgn Slz!

9Ocm 12ocm

o

+.0

.t r5.o

9.3

10.o

2"5

1MENSI0N( cm

PARTS5l9n Siz.

90cm l20cm

b 8.7

1.7

d J5.0 14.0

a' 9.J

t4.0 18.7

,+,0

IMENSIO1\cm

Prffss9n

g0cm

Slro

120ffi

r

5 5.5

+,7

d .{4.0

14.0 r t 7

h .t.0

IMENSION{ cnpiRis

Slgn sz!

gosn I l20sr

1 .0

b 6.5 6.7

A 39.0

a 27.0 J6.0

f

DTMENSIOIcm

PTRTSSign Sir!

9Oqn lzom

+,7

o 1.0

b a.7

L5

J9.0 52.0

f 13.0

Page 52: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

sott'iy'rT25)La+l1T231

II

! lII

-J-

J

I

o !

- i

;rr f l-1 T

Y-JUNCTIONGTVE ]YAY SLO.|r

U-TURN DANGER IfARNING

IMENSION(cm

PARTSsrgn Sizc

9Ocm 12ocm

8.7

d 9.5

D

DANIGER

DIMENSION{emPAF'S

Sign Sre

90m I 20cm

+.7

q 1,0

6.5 A ?

a

t7,o 227

DIMENSIOI\cm

PARTSSign Sizc

90cm 120cm

1.0

b

9.5

23.O

h ;-5 10.0

IMENSION( cm

PARI:'slgn Sizc

9ocfr 120m

1.0 1 1

d 1at.0 21.3

DIMENSION( cm

PTF':'Srgn $2.

90m 1zom

+.7

l .o

6.5

i6.0

@

TWO ]YAY TRAFFIC

DIMSNSIO cm

PARTSSlqn str.

9Ocm 1 2ocn

1.0

65 8J

4.O a.7

A 9.0 t r 1

19,0 t l 1

I 3.O 21.3

-2'1-+

ROUNDASOUT FAI,I,ING ROCKS

DiMENSION{ca.

PART:|siqn slz.

9Ocm l20qn

1.7

!

b

1,7

3a.o

t 18.0

LOlr FIYING iAIRCRA,4T

DIMENSION( cm

PIRTSStgn gzc

SOdtl 1 2oc{n .

+.7

8.7

27.5 J6.7

a 16.0 21.J

to.5 1+.0

TENDERtrRAb1Jifu{.,-iMENSION(cm

PART:Sqn 9zr

9Oem

f

1 2.0

r0.0

I{AKld, (M-1)TO D.I IG{AN UOTORTAY

PACKAGE.U (RETS{AI|I KHEA" TO KOT BAIIAN)(sEclToN - UB)

TIONAL ENGINEERING SERVICESAlssTAli (Pw.) tTD.

IN ASSOCIATION TITHMM PAICSTAN (PW.) LTD.

GOVTRNMENT OF PASOS?ANM]NISTRY OF COMMUNiCATIONATIONAL HIGTI1YAY

DRAWING NO.

3737/1o2/1O/ RS0021

Page 53: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

@

_t-L!'

!_I* l

i

l1-i1-l

Il '-t-l -I

I

r {

"-i--

STBAIGHT OR T,EFT ONI,Y SIGN

STRAIGST OR RTGSS ONI,Y SIGNcm

ilRtssct{ sEE

t .0

85 d7

ro0

Ilj 10.7

9! r2.!

I !4J asJto.5 1,+,0

as m

a.o roJ

l " i a o i 1 o . 7 !+i o l t . o | 1 2 - 3 1

i c i J z o i 4 z 7 li.#i f l 2 5 ! i J 0 . 7 l

! o i t 5 r & o l

ilI

+:- ^ - f ' d r l r

NO iEF? TT.IRN KSEP I,EFT KEEP RIGH?

P*T"Sg*llPAnIsl;;ft;frGEi

NO RIGET TURNctn

ffiIsSgl $.

tos" I 12osn

t ,0

b E,t

d 8.0 &0

I ro.0

I 2,B.0

5,o i a7

h JOn | 00

h i 2 ! 5 l J r l

@

"5

I-TV?p)t ,

}dIN. IIERTICAI CI,EARANCE I{AX. GROSS iTEICET UilITt r (cxo

Prt{ts3 F s

Fdtt 1zlcn

l l

b

tzt

r r5 t5JA

I 3!t.0 173

€.0 til,3

DTMNNSION

PrRl!;

uNtcraS t b

loqi 120qi

'll.5 t&o

125

35 I 11.5

4t.g

24.5

125 t s

DTMENSIO

rRniSan

' (cmEF

loert l20cF

l r l l J

&6'

t2.! 43.50

Jlo

22-s

t:2-'o

a.!o

i l r 0 . o i l J ' ! o

HAKLA (M-1)

TC D.I KTIAN MOTORIfATROAD SIGNS (4)

(REGULATORY SIGN).i RECoITMENDED BYI

ICHD./VEF" ff

7IN

fq9DIUENSION{cm

HAiISEgn St

locrr 12O6i

1 J 1 J

b s,.0 c5

d 20r

340

6-{lo120.o

.;;.lGCVERNMENT OF PAKISTAN II--'-'---___-l\LlA r- ^E AAi.lr?n,,^^-r^*rolFlJPAicsrAN-qT|^LP

o4

o.'

REv.

?i lutNtstRy 0F CoMMUNICA?IONSi- ----

nr AssocrArror\: wrri:NATIONAL HIGIIIvAY AUTHORITYFTry*MM P-{IflsrA-N (Pw.) LrD. lAppRovED IAPPRoED Er

Page 54: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

a t l/ ! a \

IIIi 'l_

IIII

-l

n l l: ' I rzoo I

BREAKDOWN SERVICE

BsFRE SHMENT/CArgrEsIA

@

TETEPlIONE

@

O l I r- 1 , 2 0 0 i

CAMPING SITE

E+UNI DO]TN MARKERS

r . . ^ ^ l

FILUNG STATION

@900

r . ^ ^ ^ {

MOSQIJE

t , " ^ ^ l

PARK]NG

e9

I r:oo l

P.{RifiNG ON LEFT(FoR cARs)

i r a a n 1

FIRST AiD STATION

q9

i 12oo I

P.{RKING ON RIGHT(FcR BUS /rBvcK)

i-"**| gso

' a

I

n l

I

| , t ^n I

- - l

LJUUTn I

,

7-,6,%'

@

I zccn.]

,

800

I r cc."]-1

DU I

r r aLL -.t

.TI

o ln lq l

I-:-TA I

o lN l

J

Tilj

UL

r, -L

HAKr.,A (M-1)TO D.I KIIAN MOTOilTAY

PACIAGS-U (RSHUAM KEIL TO KOT EAIIAN)(SECTION - UB)

ENGINEERING SERYICES

PAKSTAN (PW.) LTD.IN ASSOCIATION TTnI

MM PAIfiSTAI.I (PW.) LTD'

GOVERNMENT OF PAKISTAN

MINISTRY OF COMMUNICATIONSNATIONAL HIGH1YAY AUTHORIW

ORAWING NO.

373t/102/4D/ RS0023

Page 55: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

it .l

I1_rL

I

II

t-i

-] r

_l

Krnl

rL_rL

-lr

- lL-t

I

Krnl

DIST.{NCE SIGN

(After the junction)

2000 (Min.)

EXIT SIGN(At exit romP nose)

DISTANCE & DESTINATION SIGN(At '- Junction) TENtIER DRAWdlf'lGS

I

I

II

rLTL

I I (/'1

--T' ^ i

n l

, - lL - i -

.

. i -l l

J

L-tJ

FOR NOTES REFER DRAWING NO. 3737/1O2/TDIRS0O26.

HAKI,A' (M-1)

TO D.i KHAN MOTOilTAYPACKAGE-II (REI{MANI KI{EIL TO KoT BAIJAN)

(SECTION - UB)

SiOgI. SNGS.IEERSIG SERVICES

AKTSTAN (PW.) tTD.IN ASSOCIATION M$l

MM PAKISTAN (Pw') LTD.

GOYERNMENT OF PAKISTAN

MINISTRY OF COMMUNICANO

NATIONAL HiGHWAY AUTHO

ORAWING NO.

3737 /1c2/TD/RSoo24

Page 56: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

DRTYEUARKING

e9NOT

I,ANEDOON

,ll

I

P LAZA ]niK

r

L

-TN I It l i l l

L I \ J L L

rL

II

II

-.]

-J

I

l_rL

)-"1

I

1

J-"1

I

Lr

L

rLrL

NAME@

CHANNETTOLL PLAZA SIGN( 2 Km./'t Km' SHORT OF ToLL PI-cZA )

NAME OF CI iANNI

Io -N . -

I^ I

o lII

o -N -

o l0 ln l

o -N -

I TARNING S IGN

lzzsl vARrEs 'w2' I uoo | ;so lz;sl

DESTINATION SIGN( SOOm SHORT 0F O(IT RAIIP )

INFORMATORY S iGN

ilii

I" i

6 l

looo I-1

iR28l\-/

NO U-TURNMOTORWAY

NORTH BOUND CARRIAGEWAYMOTORWAY

SOUTH BOUND CARRIAGEWAY@tAi\

I N F O R M A T O R Y S I G N

1=idal

NO U_TURNO PARKING

HAKLA (M-1)TO D.I KIIAN MOTOR]TAY

pAcr(AcE-u (REHUAM KHEIL T0 KOT BAUAN)(sEcTIoN - ilB)

ROAD SIGNS (7),TIONAI. ENGINEERING SERVICES

PAKISTAN (P\ry.) LTD.IN ASSOCIATION TITT1

MM PAKISTAN (PvI.) LTD.

GOVERNMENT OF PA]OSTA}IMINiSTRY OF' COMMUNICATIONATIONAL }IIGHTAY AUTHO

ENTRY E AHEAD

Page 57: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

, 1200

SINGLE SIGNSSINGI,E SIGNS lTlTH ADDiTIONAJ, PL\TE

iII1II

-l- i ^ i ^ lal ot lr)l* l - l o i- r

II

SECTION

PBECAST CONCRETS TOUNDATION(rYPE-1)DETAI]. ,A'

DOUBTE SIGNS1- At BIMENS1ONS tRE IN MIL1JUEIERS UNLESS NO-T@ OTHER$SA

2- POST LSISIH AS SHOWN ARE iOR EXPRESSflAY SIGNS CF 12OOmm NCMI},IAL 3ZE .CRRAIIPS. POSf LENGIH SHTLL 8E ^q.,U5TED ACCORDI!{4Y.

J- PRECTSI CONCREIE FOUNDAIION ELOCKS SHALL BE CA.sT USING CITASS 3'CONCREIE

F SIGN PA{8-S SHAII 8E UADE OF ALIjMINUM AI-LOY PL{IES OF MINIMUU JMM THICKNESS.

5- FOR ALL IRIANGUIJR. CIRQUIJR STGNS At'lO INFORMAIIoN SIGNS OF LESS IHSI 1.5m Sq.mAREI USE INNER 0lA 75mm. J.2mm iHICK CIRCUIJR Gl POSI 'iYtTtl.

6- ALL SIGN POSIS SI{,ATI. BE PANIED WfT}I NON-RERfCIORISED SIICK AI{O WIITIE PAII{TSTRIPES 300mm rYlOE

7- AIJ. SION EACK PAI{EIs SHALL BE PATNIED WNH CRAY il.TilEL PANT.

8- AJ- POSIS St|A[f 8E Joomm SHORT OF SlGl{ TOP.

TENDHR IJffiAKVi*{{}$

HAKrd, (M-t)

TO D.I KTIAI.{ MOTORTAYPACIGGE_II (REHUAM KI{EIL TO i(OT BAI,IAN)

(sEc'IToN - llB)

TYPiCA.L PI,ACEMENTOF ROAD SIGNS

ENGINEERING SERVICESPAKISTAN (PvT.) LTD.

IN ASSOCIATION YIrIIMM PAKISTAN (PW.) trD.

GOV-ERNMENT OF PAICSTANMII,IISTRY OF COMMUNICATIONANONAL HIGHWAY AUTHORITY

Page 58: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

'{=.1C00 1TYP!CAL)

j w-rsooTz r lsoo | 'l-13oo/2

I,t t l J

ilt t

-i. ix l , 6 1L t IF l r |

t o lo i o lo I r e lm l IT l o l*l -l

l lli-l T-

Kl 3 l'l It lolo1.r".f

I. lN I' l

I

J-n l" l

I

J-n l

I

H- 100x1 00x6.0X9.5

5T. PL 120x220x12

i{- 100x100x6.0X9.5

SI. PL 120x220x12

H-1 00x1 00x6.0X9.5

WASHER T= 32mm.WASHER T= J2mm.

/ ron"** cLAss 'A1'

L.o*rr* crAss 'Ar'

8N 0 20x50

FILLEI WELD f=Emm.

frPE-2

t^

ir 1800 ,l s o o r 8 o o r 5 o o l

l l l l

J2mm.

I

-l"l-' l

I.]--i

l-l,l=1-1tlJ-l-l

Io lr l'iflLLgf WELD T=8mm.

BN C 20x50

it-2COx 125x6.0X9.5

ST. PL 145x320x12

3- I 00x1 0Ox6x6.0X9.5(L-eo0)

Ia

( l, I

!

I

200x 1 25x6.0X9.5

31. PL 145xi20x12 S1- P! 120x220x12c3NC. CIISS 'A1'

TPICAI SIGN DETAITS(FACE AREA <sm1)

WASHE,R T. TAEI,E- 1T= 32mm,

H-200x1 25r6.0X9.5

BN t2ox50{:'.,

: ' :a . .

'?.9' , . ,

r:i3;tD.{,.t

f

Z.o*"** crAss 'A1'

H-'1OOx100x6X9.5 '| 100x'l 100

5 < A<10

, . : \ . . : 1 . t i . . . . ; .

i lAKI"A. (M-1) ' ' : '-;- -

TO D.I KT{AN MOTOR]YAYPACIGGE-U (REHMAM KI{EIT. TO KOT BALIAN)

{sEcTroN - llB)

-ITILE R0AD SIGNS

FBATTON DETAiLS (2).TIONAL ENGINEERINE SERYICES

ATGSTAN (PltT.) LfD.IN ASSOCIATION TIT."1

MM PAKTSTAN (PW.) LrD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUNICANATIONAL HIGI{WAY AUTHORiTY

BN {20x50

Page 59: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

v=a000 iTYP!CAL)

H- I 50x 1 00x6.0X9.5(SS a1 )Bttl 0xa5

aN 06x15 (D 100

SEE DEIAIL ' {

S|.PLi5Ox12Ox1O1 20xl 20x10100x120x1O(ss 41)

I

I-J

ia t

- i - I. : l l

I l r li l N l

A.LUMIMJM CHfu\NEt DETAITS

i -!-o l l 1 o I

DETAIL 'C'

I . ^ t

l i:j-i-i

:'il J.'+"IEI-r l l 3 1 j , i , l*l--;-- I

ans ar rD(A d061 P-i6)

3N d10x45(s.T.s 104-a)

(s.T.s 304 Nr-3)

oo<T a! lp

(A 5061 P-i6)

BN d10x45

flASHER T=3.2mm.s.s.T 304 Nr-a)

BN t 10x45

AIUINNUM FOST CLIP DETAIL

G_r___l;j_i r L- --lr:t--J ,

F I N l | ! r r* l - l l i l i l i r it , . 1 | l l i l I

i I r r i r o l 1 r Il+_-i--]--j

(s.i.s 304-3)

'IIISHER

(s.T.s 30+ N1-A)

BN 06x15 {D 300(s.T.s Jo4 Nl-d)

l- 300x 150x6X9.5, . I 200x125x6X9.5n I tsox1oox6xg.5

Ll oox'l oox6x9.5(ss 41) ALUMINUM CHANNEL

(A 6063 g-Ts)

DETAIT

TENDER DRAWING$ 1 - ALL OIMENSIONS ARE IN MILUMEIERS

l l

ST. PL 120x1OOx1OH-150x100x6.0x9H- 1 00c100x6

I{AKr,A (M-1)TO D.i KIIAN UOTORTAY

P.{CKAGE-U (REHTTAM Kr{E& TO KoT BAUAN)(sEcnoN - liB)

nLE R0AD sIGNsFXATTON DETATLS (3)

NATIONA.L ENGINEERING SER\ruCESPAKISTAN (PW.) LTD.

IN ASSOCI.CfNON MTH

MM PAKISTAN (PW.) LTD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUNICATIONATIONAI HIGHWAY AUTHORITY

DETAIL ,8,

Page 60: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

1Oox'l 0Or10 oEtArL'01(RS0r!30)

SUPPOFNNC AIIGLELtftkto('x10150 LONG ON FROMsroE oNLY (m,)

TOP &

D€I'AL 'C' (RS00J0) Ll-rOOrtOO<ro

FRONT & REAR TRUSS . ELEVATIONSCAI€ l:5O

ELEYATIONOVSRHEAD INFORMATION SIGN TENDER DRAWING$

OETAL A.(nsoo30)

DETAL 'tr(Rsm30) SUPPOTMNG A{CLE

L1 00xl 0Ox1O150 LONG ON FRONTsroE oNLY (TYP.)

j-N l

I

OE AL ,i.

(RS@JO)

FOR 2 LA}IES

NOTES:1, AlL OTIIENSONS ARE IN MTUII'EIERS UNLESS OIHER{VISE SPECIRED.

2. LOO{ITON OF O$TF' SHTU 8E FIXED N/ THE SIGINEER.S REPRE5S{TAIIVE AT $TE

J. Oq}ITR' BEAII J{D COLUUNS STULL 8E I.IATCH - PAINIED IN BI,ICK A'ID Y€IJ.OW COI.oUR WfIH

-LUUII{OUS PTNT UNLESS OIH€ilIS€ OIRECED A' lHE S{ONEER.S REFRESA|IAIIV€.

4. UNT..ESS dftrERilSE NOIED, CONCAEIE SFILL BE CIISSIRED ,l.s FOtLOlrE.

cor€Rm clAss 28 oAYS (13xto Cil) C'UNo€R SIRS{SIH Kqrq. Cm

REINFORCED A 21O (3Oq' p.l )

^LL stRUouRAL SGEL ( PI-A?ES, SH€EI, Ctl NNES a'lD AI{GLES ltq SIIALL CONFOFil rO A$nA-36 OR EaUVAS{T Wmt xntuuX nEL SIRENGIH oF 248 Kg.,/Sq. CM' (35.000 pC)

xJ WEU)ING Sll lt CONFORU TO 'IHE APPUCARE PRCTVISIONS OF Alr'S ( /ul€RCAN lrELDlMi SOCIEIY)

cooE All. wElott{G Er.e6Ro0€s s,{ LL coNFoRll To AsIt{ NO. E 70)OL

HIMIUH SZE oF flUEf WELD SllAlI 8E 7mm. EXCEFf OTHEilEe NOIEo'

ALL IiAOCESSBI.E SIRUCruML 'EEL SEChONS SHAI 3E C|VEN 1I{O COAG| OF'RED-OXOE PANT

8€FORE FASRICTNON. ALL DdEROR FACEi S}IAL 8E PA$IED {TH lrYO COATS OF REHXID€ PAiTT 'AfTER

9. COiITRIC-tOf, SHAL SUSITI TO.]HE E}IGII{EER'S REPR€SEN'ATIVE IASRICA1ION ORATIT{G YItfHCOYPI.EI€ OETAI.S OF IATERUI. ALONG VIIH WEGI{T /TTD SIZ€S FOR APPROr'A. EEFOREPROCEEDTNC Wfllt CONSIRUCIION.

10. lllE lllNlluL COI{CREIE CO/ER oF 75mm. S+{! BE PfiWD€D 0N iEEL lN FOOnNG.

11. lHE S|SE P!\rE 0F IHE COLUI'|N Ei I aE EVELED A{O THEN OROUIE) 'NIftl t{ON SHRINK GROUTUSIM| SfAIOARO iPPRCTVED PROCEDURE

12. AJ. ATCHOR B(LTS SH lt 8E HOt 0|PPED CALVA{ZED.

13. JONT !N THE II^IN STEE. PIPE IAY BE OF iIII{GE Tt?E SUBJECT rc ftE ATGINER'SRERESEMATIIE APPRo,A-

l,t AL \lElrs SttA! 8E 8mm fird(

15. CONIR|CIOR UAY US€ AUMINUX PL{E (3nm lltlCK)FOR S(I{ FrCe

18- ilUEi & 8oLlsi rcR CrA{Pi:i Sr{ lJ. 8E SPOr WETOED iFTER nct{IEr{NA

m'oE]BOTTOM TRUSS - PIAN

SCil-E 1:5O

SUPPORNNG ANGLEL10or'l(xlxl0!50 LONG ON FRONTsrDE oNLY [tYP.)

<-s€E DEIAL 'f (RSOOSO) TL-t66xtoorlo ,z_?

60olc5{Xhl0

PI.AN

r{AKr.A (M-1)TO D.I ICIAN MOTORT.{Y

PACTAGE-U (REHMAM rG{ErL TO KOT BATI{N)(sEcTroN - uE)

TITII GANTRY SIGN TTPE _1TYPICAL DETAILS

NATIONAI. ENGII\'EERING SERYICESPAKTSTAT.I (P\rT.) LTD.

IN ASSOCIATION WTr}]

MM PAKTSTAN (PlrI.) LTD.

GOVERNMENT OF PAKISTANMINISTRY OF' COMMUNICATIONNATIONAL HiG}IWAY AUTHORITY

Page 61: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

A{LAROED VIE:WoEtArL'P'SUPPOFiING AI€LEI

L-1oox1mt10

VAN 1RUSS MEXBERL-65t6:ixa

f L-l0Or1OOr10

595x120r10

t 29S0x5Ox10WEL0ED tOPflIIMETER ATGLES]HROUGH SPACER EARS

I 96(}IJtlOxtl2

L-50r5(h5

I ;'tII

SIGN DETAIL-SECTIONSCAIE - 1:25

L-50x50x5

L-69x65r6

s$aa E R --\

ALUUINUM SfIEET3mm ClHlCx)

DETAIL..A' ELEVATTON(GUSSET PT.ATE NOr SHOWI{)

SCr'l-E r 1!10

DETAIL ,H,SCAIE - 1:10

L-1 O0x1Oox

L-lOOxlooxlO J

DETAIL .A,-PldNSC.AI€ r i:10

SIGN DETAIL-REAR YIEWSCAIE - 1:25

lOOxlOI OOrl0OrlO

L-lOOx10OrlO il-I_N

8 l N re r l 4Ho rES-l N l/'i fTl*ll , ; l -

SEC. K-KSCTLE - l:5

o !-r :io l

tK-SIIPPORTING ANGTE

scAE - 1:5

SECTIONAI, PIdN J.J(otz u-Bo[TS ARRANGEMENT)

SCAI.E - l:5

DETA]I .C,-PI,Ar\

SCALE - 1:'t0

SPACER BARSC{-E - 1:5

SECTION M-MSC.AI.E' - 1:lO

SECTION PI,AN O-O. SCAIE - 1:25

1 1219.1 I

DETAIL .8,-ELEVATIONSCltE z 1:10

50'fl€iRtNG COURSE

75 THICXauNoRc coilc.

DETAIL .F,

NOTES:1. ALL OIH€NSOI{S R€ IN IIT.rIMEIEFS UNIISS OTHERSSE SFECIflED.

2. FOR C€NERAL NOIES RfFER DI6.NO. J7t7,/1O2ADIRS0O29

DETAIL '8,-PI"ANSCll€ - 1:10

PERIMET€R!-5(h5ox5

SUPPOSNNG A}IGI.EL 10Ox1O0r(10

15O LONG

ENI.ARGED YIE'tr-.P,SC.{€ - lr5

L-100x1oox10-

t!6oorjooxlo

v SECTION L-LSCAE - l :1O

MI

DETAIL 'D'-PII\NSC'I(E - l;10

I'€DIAI BARflIER

. 8 0 . . 3 0

l_l lle 6ooxrloxloI t v

aori rz:affi, Fa-eoorsorrog e0<ht Ooxt O -{z-ft-6OOrEOx10

L-lOOtlOOxlOJ

SECTION N-NSCtt.E - 1310

DETAIL-.G,SCA|-E - l:lo

t12

HAKi,A (M-1)TO D.I KIIAN MOTORTAY

PACKAGE-U (RErilAlfi KIIEIL TO KOT BALIAN)(sEcfioN - ilB)

GANTRY SIGNTTPICAI. DETAII,S

NATTONAI ENGINEERING SER1NCESPAJCSTAN (PYr.) LTD.

IN ASSOCIATION WrrliMM PAKISTAN (Plrr.) LTD.

GOYERNMENT OF PAKISTANMINISTRY OF COMMUNICATINATIONAL HIGHWAY AUTHORITY

Page 62: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

F|PE 173.0

P|PE r219.1l-8.16

aPE 1219.1T-€.1E

DEfAL '9'

BOLTt3O x l(Xxl LONG

50(X,+O0r50

WEARIT{C COURSE

I

IIiIlIIIIII

I Ut 2

o l <, t -

s l N

l c

IiII

P|PE 12'19.1i-8.18

ij - - - - - - <

IIIII

IIIIIII

o cr)r-IIIII

IT-

III

"lo lo l"l

600x,t0(}x50

lfE^nNC

DEfAJL 'B'

BOLT,3O r l0OO l-Oi.lc

75 zuNOrMi COi{c"75 BllNDlM; CONC. 400{, I

SEC. PIAN Y_YSC,il-E - lr30

SEC. PLAI\ X-XSCJLE - l:20

FRONT VIEWSIDE YIE]TFRONT ViE"Tf

OVERHEAD POST(FOR 3 LANES)

SIDE YIEW

OVERHEAD FOST{FOR 2 LANES)

PIPE r219.1I-al..l 8

SAIll

AI{CHOR SOLTtJo r 10OO

cm.)

$Ot1soxl5

? 800x,1€0x50

SECTION S_SVS

...',.":.r{AKr"A, (M-1)

TO D.I ICIAN MOTORVAYPACKAGE-U (REHMAM KHEIL T0 i(oT BATJAN)

(sEcTIoN - 1lB)

]TIL€ GANTRY SiGNTYPICAL DET{LS

NATIONA]. ENGINEERING SERYICESPAKTSTAN (PW.) tID.

IN A^SSOCIATION Tlrti

MM PAKISTAN (P\rI.) LTD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUN]CATIONATIONAL HIGIIWAY AUTHO 737/ij2frD RS0O31

Page 63: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

8l-l

FRONT WEW

2400

O ozs ,-= z+se N=zo

@ czz L= 3ao0

@ oez L= .1450 N = 1 5

tO ozz L= 52oo N=e

f i n r : L= 900 N = l 2__ill=sig[. i_=_-1

| - e o J o o - 1 8 0 d i : o o

@ ors

i- l l

t t lo i l . , w J

L= 1519SECTION A-A

o t lo t . I) t I

{ r I

+Ftl l{

PIAN

SECTION B-B

N e t 2

| / I t

RE - BAR DETA]TS

1- ALL OIUE{SIONS AR€ IN MILII/EIEiS UNLESS NOTED OIHERilSA

2- IIAT'ER'^L AI{D REBAR USIE SHOWN A8O\E ARg FOR CUIDANCE ONLY.

t{AKLi\ (M-1)TO D.i iG{AN MOTORTAY

pAcr(acE-u iREr{uAM Kr{ErL ro KoT BATJAN)(sEcTIoN - uB)

GA]qfRY SIGNFOUI{DATTON DETAILS

NATIONA.L ENGiNEERING SERVICESPAKISTAN (P\rT.) LTD.

IN ASSOCHTION TFI{

MM PAKISTAN (PlrI.) LfD.

GOYERNMENT OF PAKISTANMII{ISTRY OF COMMUNICATIONATIONAT iIiGHiTAY AUTHORITY

ORAWING NO.

3737/1C2/1D RS0031A

Page 64: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

-ioxaoxd-1 0 1 ,s0 100 200 1 5 0 i 4

i i | + '-:uPPoRlrNc

PLATE i

i l * I :oox2ssoxlo( lP ' ) |

l id t iN t I-T l

l l; l 6 l- l ' l

l l__r Io t lg|

5 t :

P|jTE30Ox1 SOxl 8

SEC. PI,AN C_CSCALE ' 1:10

,167,2

PIJ'IE30Oxl 5ori 8

1-SUPPORnM] fl.A-t€iOOr23gOdOoro{xt c,f

STJPPORNNG ANGI€!--{or4Or5 (2oo LONG)YTELDED TO SIJPPARING A

(TY".)

f-{Ox{l:S

19x55 (2 SACHX4)

SEE OSTAL'D'

NE PIAIESOxlO

DETAIL ,D,(SGN PIATE NOT $O${)

scAtE rr5rl{CHOR gOLTt3Ox(10O0 LOiIG)BASE PIA1E

P. 85(h650,,oP oF _r'{arRNc IcouRsE

I-!z- I

Io lel

I

5IEEL HPEt157.2f-12.7

SEE OETA'L T'

ANCIIOR EOLTt3Or(10OO IONG)

FOUNOATIONsE oETAL-'1,{Rs0j7)

75 IH|CKEUNDllrlG CONC.

(cr"AMP PLATE DETAIL)SCILE -!t5

* TO AE AOJUSTED ^T SIIE

(Al.uutMux $'rEsI)

LAOLTS

SECTION E_ESq{€ rt :10

t157.21-t?-7

it8 PLArEi00x1 50x'|8

I1

iIASE PI.AIE6:,0x650

CUXP PTATESEE OgiAL ,*

SECTION J_JSCAI€ -l:2.5

DETAIL 'D,(s6r aJTe cE Ars)

SCAI.E 1:25

SUPPORNNG PI.AIE3O(h2390r1O (TYP.)

I-PIPE t?73r9.27v

ANGI,EBASE PI.ATE_--150x850 \1-36

, \

!C ;3=:

SUPPORTINGSC.AI€ -1:25

1-,:6IAl|- ri i,( ri"=1

i , i ii t s r il . ! It t t

i-T il * l lLI ,Ji=l-ii t lHii$i i

T--L]s

Ii*,,"i -i lt t

.S1JPPORNNC

tTrP.)

l t

i il*"" !lAi0_r4I I

g::F

---+i- - -ra+r- - - jq..f ; _ -- r t I i I i

i " - : - -

i : ir .--l -"-1

50d

|91 500 t 5 m noo

OVER IIANGER INFORMATION SIGN DETAIL .X,

€0x(10(X1 LOt€)

j iHtc( crP,r€ttEo ro PrP€

P1ftt27srt.271

Rl8 fliTe100x1or(ta10)

-il8 FI.{TEI 1O{lxr0xc25o)

I rRlS P|ITE| | 100x10r182

i i t- tuANGE PTATE| | | so&l8xsoo

DET.UI ,F,sC{€ r1:lo

fi.ATEl0&1OxlE2

i. sng- prpsI t1572II

ffi trtFF

167,2

RIB PliiIE1 ottx10x(a41onm)

] 1HICK CAFWEu)ED TO PIPE

DETAIL

ENIARGED VTEWNA{GE PUTE50011ar5oo

NOTES:

DETAIL 'A'

SCAI-E - 1:10

RIB DETNL (OF DETAIL. SCI,LE -1:'10

1. FOR GENERA NOIES REFER otE r{o. RS0O29,

2. ILL IXI{EI.'€IONS ARE IN UILIJIIEIERS UiIIISS OIHEfi1ISE SPEOR€D.J. T4 STRT'CTURA STEEL TTO A{diOR SOLTS STTAI S HOT OIPFED CAI.V|I{IZD

UNI'FqS OTHEII{ISE OIR€fiED A? fi€ EI{oNEERS REPR€SE}fiATN€4. uttl-ESS OlllER{lSE gtotitl, lHE LE!5 Sl{outt BE 8 fitCX CONnNUdJs FlU€f ',VEI-O.

5. rHE Slcfl Prr{IE $IOUU) 8E RMIE 10 sf€a xEraE€R 0F SUPPOFING FRrnE

HAKI,A (M_1)TO D.I Ki{AN UOTORTAY

PACT(AGE-U (REHUAM KitErL TO KoT BAITAN)(sEcTroN - uB)

NATIONAT ENGII{EERING SEmTICESPAKISTAN (PYI.) LTD.

IN ASSOCIATION {TTII

MM PAKTSTAN (PvT.) LTD.

''t%rrNrn,uvgn cANfRy sIGN TypE -trTYPiCAL DETAILS

GOYERNMENT OF PAKiSTANMINISTRY OF COMMUNICATIONNANONAT HiGHTAY AUTHORIIY

eallE.:!t]_o

Page 65: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

SIDE ITIEWSCAI€ - 1:20

SEC. PI,AN N-NSC'ALE - 1:20

SEC. PL'TN P-PSCILE - 190

SEC. PI.AN M_MSC,cLg - 1r5

-iII

, - l

Nl

75mm lHlC(BUNOiIC CON.

SEC. Pl,A"t\ L-LSC{I,E - 1:25

FRONT ViElfFOU-],|DATIQN DETA]L-' l' {nsors)

(RErNroR-CEMENT)NOTES:1. AL D0IEI|SONS tnE tN M|UHEiERS

UNIS OIHEffiSI SF€CIFIED.2. FON GEilERAL I{OTEi REFER OTYG. I€. RSOO2S

3. FOR Cr!{IRl OetAS Rer€n rO RELoTE{T O${IF/ ORAW|NCS.

FRONT VIEWFOUNDATION DETAIL-I'(nsore)

(coNc. ouTLiNE)SCrIE - 1:25

28{8

*/{''tqJ

_l: l

8 l=l

I{AKI"A (M-!.)TO D.I KIIAN MOTORTAY

PACrilcE-u (RS!SIANr KI{EIL TO KOT BALTAN)(sEcrroN - llB)

TITLE CANTE.EYER GA]ffRY SIGN

TYPICAI FOUNDATION DETAILS

.TIONAI ENGINEERING SERYICESAlssTAN (PW.) LTD.

BI ASSOCIAITON MT}IMM PAKISTAN (P\rI.) LfD.

GOYERNMENT OF PAKISTANMINISTRY OF COM}fUNICATIONATIONAI HIGHTfAY AUTHORITY 37/1o2/1D/ RS0031C

Page 66: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

zA !

7 r -

u / aI- .v- =d \o _ -

ROUNDING SHoULDER

STUBS AT 10m INTERVALS ANOAT THE ENDS OF PROTEC11ON(sEE NOTE - 2)

UMITS OF PROTECTION (SEE NOTE -5)

SPACING

END STUB

SPACING

EMBANKMENT

(s€E NolE-s)

r S O O r

SECTION A _ A..--.

EXCAVATE TO NEATr ^I r LINES' PI-ACE THEI OZqI STONES AND GROUT.

U EXPANSION JOINT(sEE NOrE-2)

INTERMEDIATESTUB

EMBANKMENT PROTECTION

TYPTCAL GABICN WALL DETAIL

5Ox5Or6 SIEEL nt{gt SIAI(ES25OO I-ONC AI 2O0O c,/c lN SSIH

orREc'iK}'{s (sEl nglE-J)

1. ALL OIMENSIONS ARE IN MILLiMEIERS UNLESS NCTED OT}iERWISE.

2. EXPANSION JOINI IN MORTARED RIPRAP SHALL BE PROVIDED AT AN MAXIMUM, INTERVALOF '10m. TYPE OF MATERIAL iO BE USED SHALL BE AS APPROVED BY THE ENGINEER.NO SEPMTE PAYMENT SHALL BE MADE FOR PROV{SION AND RXATION OF EXPANSIONJOINTS AND WEEP i.iOLES.

3. SUPPLY AND ERECTION OF STEEL ANGLE STAKES SHALL BE PROVIDED AS SHOWN ONDRAWINGS AT NO EXTRA COST TO TI'IE EMPLOYER.

4. IN CASE ROCK IS ENCOUNTERED DEPTH OF PROTECT]ON WORKS SHALL 8E ADJUSTEDAS OIRECTED BY THE ENGINEER (MINIMUM DEPII{ IN ROCK SHALL BE KEPT 3OOMM)

5. LOCATION & HEIGHT OF PROTECTION WORKS SHALL BE DECIDED 8Y THE ENGINEER ONCOMPLENON OF EMBANKMENT WORKS.

ITAKLA (M-1)TO D.I KIIAN MOTORTTAY

PACl(AGE-ll (RETOTAM KI{EIL TO i(O? BATIAN)(sEcnoN - l1B)

tirlE o^TE-

MISCELI-ANEOUS PROTECTION DEI'AILSNATIONAL ENGINEERING SERVICESPAKISTAN (PW.) LTD.

IN ASSOCIATION WITI1

MM PAKISTAN (PVT.) LTD.

GOVERNMENT OF PAKISTANMINISTRY OF COMMUNiCATIONATIONAT. HIGI{IfAY AUTHORITY

DRAWIHG r{O.3737/102frD RS0O3l

Page 67: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

-l'l AARBEDWIRE

HTENSION WIRE-2 STMNDS EACHOF 3.15 OIA GALVANIZED WIRESOF 3.15 OIA GALVANIZED WIRE:

A F r r r t n tJ L I A I L U

CONCRETE POST & WIRE MESH FENCE

r.#"*zED wtRE

,lJElalL-u-D I A N

PRESTRESS VERTICAL POSTSECTION AT A-A

R.C.C ''JTE,RAL POSTSECTION AT 3-8

(3000 Psi)

, 1 { '

oT-:Tl:l_l ,r^ l l < to t t r t

l ' 7 |: l - l

l l sd ll--*l-I Vt /| /-

/

NtrTAII

:MBOSSEOLE|TERING

t { nI

i !______t1-j___-.__1

3 l l o o l

L5TEEL (G,ILVANIZEO)21 0x50x5

2mrn -flEEt--!!8LE9BmNo cumNuNX Vesg

3x4mm t 270 KwiRF-Emt'at Es. iAcH

6mm 6 U.S J00 C/C

Tfif{SHffiffiffiAHdErd&$

ntrTAtl.y.4

HAKLA, (M-l)TO D.I KT{AN MOTORTAY

PACI{AGE-U (REHUAM KIIEIL T0 KOT BAT.IAN)(sEcnoN - uB)

WIRE MESH FENCEENGINEERING SERYICES

AKTSTAN (Plrr.) LrD.N.I ASSOCIATION ]TITII

MM PAKISTAN (PvI.) LTD.MINiSTRY OF COMMUMCANATIONAL HIGHTAY AUTHORITY

DRAWINC NO.

3737 /102fiD/ RSO031

Dfl'AIL ''8"

Page 68: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

P.{YEMENT MARICNC IJNESsclrE lzd'

FOR 0ITENSIONS L & w',l To w5 (sEE IA8LE-1)

L1 - BROKEN GUIDE UNE-WHITE

^T COnErul€ ot otgo€D (shE-q 2-{a* Hrr6 rr|o l.At€ sEP R^IFN 0F l',i',lo'D (DtlrQ }Hrs

I

ARROI'E'IT:TPE_I (SISAIGITT)

ARROrfr lYPE-tr (COXEINED)

IYIJ

I

IJ - COI.ITINUOUS UNE - WHITE^t cEilIEiUl€ N€rn N|'ER3€gIF|E rr€ AT l€ P^ssrF Zo|€

-n*l-- la '

L4 - COMNNUOUS EDGE UNE -YzuOWAl OGE oF PlVql.Xl oF A! lfftE

- - -

L5 - OASHSD UNE - \YHITE^l sEPEMttOia oF lHROrxH ur€lt FROilccalIn^lbt./D€cEIII/Vr't. ulE

OT-l F

r - - - - t - - - - - - - - 1 "

- _ t - - ' _ _

L6 - DOTTED UNE - WHiTEtDn o€rilF i.l!fit.t PlnB rtDiaa lXIEilllFtIl

, - i F

It

?

;3

€DCE

AI}DMONAI. DETAII FOR MEDTANAND CARRTACE ]rAY

dj|a EDCE 0F 5{di-0€R

iEt fifFt.sltlE sI$Gl AT h C,/CGlrGtE Ftaf)

IRAFRC |-ANE -c!-

E}fIRANCE NOSEscttE l€dt

ifD iEtr,Sltt€ SruF ir ro c/CGN'GIE FI'E)

YeDETAIT

EDG€ 6 SHOU.m

, i--l-]!!l (sE trar-t)

L2 -tsROKEN WARNING UNE -WHIIE

A? /PPnorcfle3 10 0 |€d (ca tqndd4b. ti.dd oFht d jt6'dil)

L7 - STOP UNE - WHTIE^l illtERsEgRlf{l lcAG PA'A-}{i

-.cL -a!I l t l ll l t i * r r . * r - r - f G D I I I l t - I a l - l - f t - -

1

LS - TMNS'VERSE YIELO UNE - WHITE11" ttEisgttol€ rrf,qls sra€t{t il T€ S l€ Pcgrl}t. /s l, u}€ ]o ilDrAlE S',€ aAY

$ - DOTTED UNE . YELLOIViDR tEa ur€ c|{R€ Prn{|r 6 :9 lit FR('F€D 0ut:t8€ lxE iJll€

L10 - Cor.iTlNuous UNE - wHmFDR o€U|€ritFN 0f tst:i 0F la&oc iA!3

ANROI:' IYPS.Itr (DEFI,ECTO$)

(FoR <so tblbr) (FoR >60 Kmlb)

LAI'{E SELECTION ARROYS - ]ISffS

TA3I,E - 1

"Y (Lll TRAFRC I.ANE

ffir }IOSE DET.{ILsfrr€ 1gm

PAVEMENT MARKING & ROAD STUDS OETAILS

NOTTS :-

1. ALL DIMENSIONS ARE IN MILUMETERS.

2. AT APPROACHES iO TNTERSESIIONS/ROUNDABOUIS, CENTER UNE

OR LANE SE9ARATON UNE (11) SECOMSS (II) FOR A LENSIH = 15OM

N.lD COI{.IINUOUS UNE (LJ) FOR IAST som.

3. LENSIH OF STORKE IN (II) = tENGlH OF GAP IN MATCHING (11).

t--(S:Qd {4 1 f i143I l / / - \ I

t ll l

Pf_'/fC=N.- "*"*t

q lElI tEtrtl

-l-- lEBl

PLAl{

REFIJCTORISED PAVSUSNTP.ROSII.E-TE

ls.l

SE(f,ION A_A

STTID

ROIDWAY SFEED L(m)

w1 vt2 \{3 w4 t{5

>l2O Kdlh. {@ 2S m 2g! 18 16

THruDTR ffiiqAbHIF{G$

PA\TEMENT UARKT.IG fu\D ROADHAKLA (M-1)

TO D.I ICiAN UOTORTAYPACKAGE-U (REIOT,ANI KTIETT TO KOT BA.LIAN)

(sEcrIoN - uB)

NATIONAL ENGSIEERING SERVICES

PATCSTAN (PW.) LTD.IN ASSOCIATION TTTH

MM PAKISTAN (PlrI.) LTD.

GOYERNMENT OF' PAKISTANMINISTRY OF COMMUNICATIONATIONAT HIGHTfAY AUTHORITY

DRAIYING NO.

3737/1O2/n/ PMS0032

Page 69: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

I

!

l

l

IIl .

- l

IIIt -

150 X 80 X 6mm IHK150 X 80 X 6mm lHK

TERMI}IAL ELEVATIO}I(SCA|E- 1:25)

HOI.T FOR M BLOCK OI'T

2

1l ^<.| -{ltt\>

CONCREIE DYKE

SPUCE BOLT SLOTS B0LT SL0TS (19 x

(SC{I-E:- 1:10)

IAP SPLICE DETAIL*&+

SECTION A_A(SCAIE- 1:10)

P*+

r{aKLA (}I-1)TO D.I KI{AN UOTORTAY

PACKAGE-U (REHIdAM IGIEIL TO KOT EAr,rAN)(sEcTroN - uB)

CUARD RAIL 'iXiNG DT,TAILS.NATIONAI, ENGINEERING SER\TICESPAKISTAN (PW.) LTD.

IN ASSOCIATION TT${

MM PAKTSTAN (PvT.) LTD.

GOYERNMENT OF PAKISTANMINISTRY OF COMIIUNICATIONAfiONA.L HIGffiTAY AUTHO

DRAWING NO.

J13,1/":zAiJDl CRCO3J

SECTION A-A

Page 70: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

SIDE(rurE- t5l

SIDE(SarlIJ- 15)

ftt--lililt__l

ELEVATIONilta- lo

BLOCK OUT PIECE

+++

:-*+

_1I

II

Pi"AN(sc.lrE- r{.1s)

VERTICAL POST

(SCrlE- 1:10J

* ++n-fHIll.iitj_T

E

(SCtt!- 1:5)

irAKra (r{-1)TO D.i lClAN MOTOffTAY

PACKAGE-U (RgrilAM IGIEIL TO KoT BAIJaX)(sEcTroN - uB)

A], ENGSIEERII.IG SER\TCESPAKTSTAN (PW.) trD.

IN ASSOCIANON WITI{MM PAKISTA.N (PW.) tTD,

GOVERNMENT OF P.AKISTANMINISTRY OF COMMUNICANATIONA]. HIGHTYAY AUTHORITY

OR,AWINO NO.

:i3t- ii20/TDi GRA}at

Page 71: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

S=TXJSTd

B

SNVId

Page 72: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

A

E

Page 73: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

gJ

m

F

?

Page 74: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

. ?

Page 75: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 76: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

U

:<

Page 77: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 78: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 79: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 80: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 81: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 82: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

I

m

=

mr

?

Page 83: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

i

?

-t,'

Page 84: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

uU=

2

U

=I

Page 85: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 86: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

J

F

zJU=

=

u

Page 87: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

rm

z

ln-?

Page 88: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 89: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 90: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

z.J

(D

-)<

?JU

Page 91: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 92: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

=

' t

Io

esf::L(g,uc"a,-oll u:t)

TO D.I KHAN MOTORWAYPACKAcE-ri (KUNDAJ TO KOT BALIAN)

(sEcTloN - IIB)

PLAN&PRoFTI,E iscALEKM: 14+000 -KM: 14+700 I 1:2000

I onr:I November, 201

I owc ttc.

37 /102/fA/P&P421

GOVERNMENT OF PAKISTANMIMSTRY OF COMMT.INICATTONSNATIONA; I{IGIIWAY AUTHORiT:-

Page 93: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 94: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

z)r!T

Y

Page 95: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

=

:=rrlr?

Page 96: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

- I(

O1

- BA

LIA

N

Page 97: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

I

rrl=

:=rrlr?

-

Page 98: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 99: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 100: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 101: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

z

m

?

-t'=

Page 102: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 103: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

ziodl?d/avzoL Iloz 'Jaqtle^oN(8II _ NOIJCSS)

(Nvr:ve JcI or ry{NrLy) ir-9f;\r}Ilvd_,tYj,tuoJol,r[ NVHX i'0 0,i

(T-n No vr:rru)

'c;,r (',ma)SECIAUES }NiUEgN]SNE

NV,ISDTVd,I,IIUOHJOV .IY,III{NIH TYNOITYNsNoILYCrNnnnoc,{o iu.tsrNln

:vYJSDIfci d0,iN[fiNasAOe

TVNOi.I.YN iH-Hd€##

-4-

Page 104: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

z^ - sJ

" f ;o

z

-

-\

\\

t'/ \/ / \

iI

. / t

J--._l-J

GOWRNMENT OF PAKISTANMIMSTRY OF COMMTINICATIONSNATIONAL HIGIIIfAT AUTHORITY

#€wF,€ffiNATIONAT, ENGJNEERINGPAKTSTAN (PW.) LTD.

SERVICES I cHD./vER.

(HAKLA ON M-1)TO D.I KHAN MOTORWAY

P,q,CXACN-II (KUNDAI TC KOT(sEcrroN - ile)

BA]JAN)

/1OzlmlPePo33

Page 105: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 106: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an
Page 107: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

e\q\

o| r ) -9 -

- r . . . . :J / ,

Page 108: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

e\

N=3614O63.6384E=71131 6.3883

+ _ _ + E t r E O E t r ! E C a ! ; ! t r ! O ! 3

ffiffiffiffi: -5't-'E'E- &F-NA?]ONAL.-EN GINEER1NGPAKTSTAN (PVT.) LTD.

(HAKI"{ 0N M-1)TO D.I KHAI{ MOTOR'ITAY

PACII,AGE-I] (KUNDAI TC KOT BAUAN)(sEcTroN - nB)

I oAT: i owc NC.r lI November, 2o16FT7/1oz/-rD/pepc,57

GOVERNMENT OF PAKISTAN

qIrP\N^I.C :I

Page 109: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

= NVI{3U=INil

Page 110: F*iilq*n-Y ri$*'**xs - National Highway Authoritynha.gov.pk/wp-content/uploads/2016/12/2467-02-B-IIB-TDWG.-1.pdff lr list 0f draitings: ge}teral i{otes all dimensions shown on pi.an

\rti \ i .. t 'T;\

. a\.\ \S

N/!{t

l

i t

tlI ' I

! l l t

I

I

1

!

I

LOO? -2

^<((\\ %

\.

LOOF - 1

ffiffiK NATIONAL ENGINEERING sERYIcESGoVERNMENT oP PAKTSTAN i .€"€.9 PAKTSTAN (pW.) rTD.

f^Tf,ffi; ?,i#i,HffH.Hff. i W il:.,.?Xffffi*,,ff ,*,

(HAI{."A, oN M-1)TO D.i KHAN MOTOR1YAY

PACKAGE-II lnfHrtrAni fcIEiL T0 KOT SAIJANI i-Dm----_(sEcrroN - irB) l;;,"*. 201 6 lszst 7toz/roTtwour