Ericsson Internal SUPPLEMENTARY INFORMATION 1 (20) Prepared (Subject resp) No. EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference EAB/GR/P [Stefan Kauffmann] 2013-04-18 E Fiber Network Supplementary List Instruction Fiber Network audits: To conduct a Fiber Network audit is considerably different from a RBS or Core audit. The main reason is that the Fiber Network audit will take place in different locations compared with audits of a RBS or Core nods where the audit will take place in only one location (one site). This is different because of the nature of a Fiber Network installation. The Supplementary Information for Fiber Network has for this reason been divided in five sections. The sections are; 1. Central Terminal Point (CTP) 2. Feeder and Distribution Network (FDN) 3. Drops and Premises Network (DPN) 4. SP/ASP self-check lists (common checkpoints) 5. Other areas if appropriate (common checkpoints) The auditor will be conducting an audit according to the checkpoints in section 1 or 2 or 3 together with the checkpoints in section(s) 4 and/or 5. One audit (in section 1 or 2 or 3) is considered as one site when the result is registered in QASIS database. When auditing section 1 shall self-check list, Indoor Installation checklist 177 66- FDG 103 91/7 (checkpoint 5.9 in section 4) also be used. When auditing section 2 or 3 shall also appropriate self-check list in section 4 be used (except 5.9 that is indoor). The civil works part that shall be audited together with the site is the route leading from the previous site to the audited site. That part of the civil works belongs to the audited site and shall be registered in QASIS database together with the site.

Upload: zinou19

Post on 16-Dec-2015

3 views

Category:

Documents


1 download

DESCRIPTION

Fiber Network Supplementary Information List Rev E

TRANSCRIPT

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    1 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    Fiber Network Supplementary List

    Instruction Fiber Network audits:

    To conduct a Fiber Network audit is considerably different from a RBS or Core audit. The main reason is that the Fiber Network audit will take place in different locations compared with audits of a RBS or Core nods where the audit will take place in only one location (one site). This is different because of the nature of a Fiber Network installation.

    The Supplementary Information for Fiber Network has for this reason been divided in five sections. The sections are;

    1. Central Terminal Point (CTP)

    2. Feeder and Distribution Network (FDN)

    3. Drops and Premises Network (DPN)

    4. SP/ASP self-check lists (common checkpoints)

    5. Other areas if appropriate (common checkpoints)

    The auditor will be conducting an audit according to the checkpoints in section 1 or 2 or 3 together with the checkpoints in section(s) 4 and/or 5. One audit (in section 1 or 2 or 3) is considered as one site when the result is registered in QASIS database.

    When auditing section 1 shall self-check list, Indoor Installation checklist 177 66-FDG 103 91/7 (checkpoint 5.9 in section 4) also be used.

    When auditing section 2 or 3 shall also appropriate self-check list in section 4 be used (except 5.9 that is indoor). The civil works part that shall be audited together with the site is the route leading from the previous site to the audited site. That part of the civil works belongs to the audited site and shall be registered in QASIS database together with the site.

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    2 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    Explanation of the five Sections:

    In a Fiber Network will it be different percentage of audits depending of which part of the installation that is audited. This is principle to follow:

    Section 1: Central Terminal Point (CTP). Typical product in this section is Optical Distribution Frame (ODF), Fiber Joint Closure (FJC) and Fiber Distribution Hub (FDH) in the CTP building.

    In Section 1, 50% of the installations in a project shall be subjected to QASIS audits. (This is comparable with a typical Core site audit).

    Section 2: Feeder and Distribution. Typical equipment in this section is Duct Joint Closure (DJC)/ Fiber Joint Closure (FJC) and Feeder Distribution Point (FDP)/Fiber Distribution Hub (FDH).

    In Section 2, 50% of the installations in a project shall be subjected to QASIS audits. (This is comparable with a typical RNC site audit).

    Section 3: Drops and Premises. Typical equipment in this section is Fiber Access Terminal (FAT) and Fiber Joint Closure (FJC).

    In Section 3, 20% of the installations in a project shall be subjected to QASIS audits. (This is comparable with a typical RBS site audit).

    Section 4: SP/ASP self-check lists. In section 4 shall the auditor check that the SP/ASP has filled in the different self-check lists for the Civil Works part of the scope of work. These check lists shall be checked together with the equipment it belongs to in section 1-3.

    Section 5: Other areas. In section 5 shall the auditor check Fiber Network Engineering, Fiber Network Test and Verification and Ecology Management. This shall be checked together with the equipment it belongs to in section 1-3.

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    3 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    The picture below describes a typical Fiber Network project. According to what already described shall this project be audited as follow; 50% audits for the equipment in Section 1, 50% audits for the equipment in Section 2 (1 separate audit per equipment if more than one), 20% audits for the equipment in Section 3 (1 separate audit per equipment). These audits can when registered in a project in QASIS database be divided in batches.

    If audit of equipment belonging to Section 1: Central Terminal Point (CTP). Follow the checkpoints in section 1 (and 4 & 5 if applicable)

    If audit of equipment belonging to Section 2: Feeder and Distribution. Follow the checklist section 2 (and 4 & 5 if applicable)

    If audit of equipment belonging to Section 3: Drops and Premises. Follow the checklist section 3 (and 4 & 5 if applicable)

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    4 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    SECTION 1: Inside plant

    Central Terminal Point (CTP) & Fiber Joint Closure (FJC)/Fiber Distribution Hub (FDH)

    1 Common Safety

    1.1 Fire Extinguisher or system

    Check that Fire extinguisher or system is located, inspected/recharged and that inspection tags are up-to-date. 1.1.1 Incorrect location of fire extinguisher Major 1.1.2 Fire extinguisher or system not inspected/recharged Major 1.1.3 Inspection tags not-up-to date Minor

    1.2 Safety Equipment

    Check that safety equipment is available when required. 1.2.1 Chemical handling safety equipment is not available when required Major 1.2.2 Safety eye glasses, hardhats, safety cones or tape is not used when required Major 1.2.3 First Aid kit not available Major 1.2.4 Emergency phone numbers not available on site Minor 1.2.5 Reflective vest not available when required Major

    1.3 Electrostatic Discharge (ESD)

    Check the ESD connection if applicable. 1.3.1 Not possible to connect ESD wrist strap to equipment Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    5 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    1.4 Material and Equipment handling

    Assure that new and existing equipment handling is correct. 1.4.1 Material or equipment handling incorrect Minor 1.4.2 Material or equipment is damaged Major

    1.5 All cabling equipment calibrated

    Check that all cabling equipment calibrated and in date. 1.5.1 True meters measuring wheels Major 1.5.2 Gas detectors Critical 1.5.3 Davy lamps / Torch Major 1.5.4 Fibre cable winches service dates Critical 1.5.5 Cable trailer service dates Major

    1.6 Other Defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 1.6.1 Other Critical defects Critical 1.6.2 Other Major defects Major 1.6.3 Other Minor defects Minor

    2 Assembling of the CTP Cabinets and & Fiber Joint Closure (FJC)/Fiber Distribution Hub (FDH)

    2.1 Cabinet correctly assembled and secured

    Check that cabinet is correctly assembled and secured. And sections are installed level and connected together by supplied plates. And that Cabinet / Frame / Rack / Units are marked. 2.1.1 Cabinet incorrectly assembled Major 2.1.2 Cabinet not aligned or not in level Minor 2.1.3 Cabinet, or internal units not marked Minor 2.1.4 Cover plates not installed Major 2.1.5 Horizontal and vertical cable trays not installed Major 2.1.6 Laser warning label missing when required Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    6 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    2.2 Scratches, Damages and Dirt on cabinet

    Check for scratches, damages, debris and dirt in or on cabinet. 2.2.1 Surface of cabinet or cabinet door damaged Minor 2.2.2 Cabinet dirty Minor 2.2.3 Dirt/Dust inside cabinet Minor

    2.3 Equipment grounding if applicable

    Check that the equipment grounding cable is crimped and connected correctly. Check nuts, washers/contact washers. If sheathed cable check grounding of sheathed cable

    2.3.1 Crimping of cable lug not acceptable Major 2.3.2 Grounding cable connected incorrectly Major 2.3.3 Grounding cable missing Critical

    2.3.4 Sheathed cables not connected to ground Major

    2.4 Equipment grounding cable connected to Main Earth Terminal (MET) if applicable

    Check that the equipment grounding cable is correctly attached to MET. 2.4.1 Cables not tightened to MET Major 2.4.2 MET attached incorrectly Major

    2.5 Internal Fibre Cabling

    Check that fibre links are correctly placed in the correct cassettes and has the internal/external strain reliever been installed correctly. Kinks and bends not allowed. 2.5.1 Fibre links not placed in the correct cassettes Major 2.5.2 Cassettes not closed/locked Major 2.5.3 Strain reliever not installed and tightened Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    7 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    2.6 External Fibre Cabling

    Check that cables are correct installed and not bent more than stated in the required specification. Check floor tiles, protection tubing, tie wraps and that the internal/external strain reliever been installed correctly . 2.6.1 External optic cables been not correctly installed and restrained Major 2.6.2 Bending radius on cable is incorrect Major 2.6.3 Has fibre cables over/under the cabinet been installed correctly on cable ladders Major 2.6.4 Are the external cable ladders installed in a proper way with radius limiters Major 2.6.5 Floor tiles have been cut and in assembly position Minor 2.6.6 Has protection tubing been placed over all exposed fibre cables Major 2.6.7 Tie wraps are used for bundling of fibre cables Major 2.6.8 Strain reliever not installed Major 2.6.9 Strain reliever not tightened Major 2.6.10 Cabling through walls not sealed if required Minor 2.6.11 Cabling through walls not sealed when required because of fire protection Critical

    2.7 Cable labels and markings inside/outside the cabinet

    Check cable labels inside the cabinet and at cable ends between different cabinets. Check markings on cabinet and cassettes inside the cabinet. 2.7.1 Cable markings with wrong information (from and to) Major 2.7.2 Cable markings are written by hand or incorrectly mounted Minor 2.7.3 Cable markings are dirty Minor 2.7.4 Markings inside cabinet or on cassettes are missing Minor 2.7.5 Markings inside cabinet or on cassettes are wrong Major

    2.8 Cables correctly attached to terminal point

    Check that the cables are correctly attached to the terminal point. 2.8.1 Cable connector incorrectly attached to terminal point Critical 2.8.2 Cables are stretched too much Critical 2.8.3 Termination and records not available Major 2.8.4 Spare termination ports in ODF/FJC not protected with protection plug Critical 2.8.5 Spare optical cables in ODF/FJC not protected with protection plug Critical

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    8 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    2.9 Cable fastening and laying

    Check that cable are properly secured and not in contact with sharp edges. Fibre cables are usually tied with Velcro straps and use of plastic or metallic ties not recommended. 2.9.1 Cable tied too tight or loose on cable Major 2.9.2 Cable ties missing Major 2.9.3 Protection tubing missing when required Major 2.9.4 Incorrect routing and placement of cables in cabinet Minor 2.9.5 The fibre within cassettes has not been correctly spliced and completed Major 2.9.6 Incorrect routing and placement of cables between cabinets Major 2.9.7 Cable damaged Major

    2.10 Equipment anchoring

    Check that equipments are anchored and tip protection mounted when required. 2.10.1 Tip protection for cabinet is missing when required Major 2.10.2 Cabinet anchored incorrect Major

    2.11 Other defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 2.11.1 Other Critical defects Critical 2.11.2 Other Major defects Major 2.11.3 Other Minor defects Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    9 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    SECTION 2: Outside plant

    Feeder and Distribution

    3 Fiber Network Installation

    3.1 Cable drums

    Check delivered optical cable drums for damages, markings and test records, storage and the accessibility at the site. 3.1.1 Damages on cable drums from handling and lifting Major 3.1.2 Missing or incorrect marking on drums Minor 3.1.3 Sufferance storage for drums and tools not available Minor 3.1.4 Site accessible for cabling vehicles not possible Major 3.1.5 Fibre drum tests not carried out and recorded prior to installation Major 3.1.6 End of cable ducts not sealed Major

    3.2 Joint boxes or man holes

    Samples of joint boxes or man holes to verify that required ironwork and cover is in place and appropriate to type of construction. Identification of joint box/man hole. If visible fibre splice units inspect that the installation is constructed in line with manufactures specification 3.2.1 Ironwork not in place Major 3.2.2 Wrong type of ironwork installed Minor 3.2.3 Joint box number missing Minor 3.2.4 Manhole cover not intact Major 3.2.5 Locking mechanism on manhole cover or joint box not working Major 3.2.6 Approved back fill methods not being carried out on site Major 3.2.7 Excavated materials remain on site MInor 3.2.8 Construction material left in manhole after completed installation Minor 3.2.9 Fibre splice not constructed in line with manufactures specification Major 3.2.10 Concrete ring around manhole damaged, cracked or loose Minor 3.2.11 Sealing of cable inlet to manhole or joint box not missing Major 3.2.12 Sealing of cable inlet to manhole or joint box not done according to regulations Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    10 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    3.3 Joints or Branch splicing sealing

    Optical Fibre Cables protected by cold or heat shrink. Necessary cable slack left in man hole for maintenance purpose. Apply for man hole, splice closure, FHD and FAD units. 3.3.1 Cold or heat shrink is missing Critical 3.3.2 Cold or heat shrink not installed in a proper way Major 3.3.3 Cold or heat shrink not installed in a proper way between layers of insulation Minor 3.3.4 Spare/expansion fibre tubes not stored according to manufactures specifications Major 3.3.5 Spare/expansion fibre tubes storage not installed Major 3.3.6 Necessary cable slack not left Major 3.3.7 End cap on spare micro duct cables missing Major

    3.4 Optical Fibre Cables

    Optical Fibre Cables to and from building, splice closure, FHD and FAD units labelled to approved standards 3.4.1 Optical Fibre Cables missing labels Minor 3.4.2 Optical Fibre Cable with wrong labels Major

    3.5 Other Defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 3.5.1 Other Critical defects Critical 3.5.2 Other Major defects Major 3.5.3 Other Minor defects Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    11 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    SECTION 3: Outside Plant

    Drops and Premises

    4 Arial Fiber and FAT Installation

    4.1 Arial cabling

    4.1.1 Down cable attached to the pole Major 4.1.2 Distances not installed between pole and down cable if required Major 4.1.3 Distances not correctly installed between pole and down cable if required Minor 4.1.4 Raiser guide/cable protection not installed from the ground level Major 4.1.5 Raiser guide/cable protection not correctly installed from the ground level Minor 4.1.6 Branches and twigs interfere with the avail cable Minor 4.1.7 Fiber cable sag not following sag of previously installed aerial cable Minor 4.1.8 Sag of fiber duct not according to specification for wind and temperature Major 4.1.9 Height of arial cable above street too low Critical 4.1.10 Height of arial cable above ground (not street) not according to requirements Major

    4.2 Arial Fiber Ducts and Joint Closure installation

    Check installation of fiber ducts in poles and joint closure installation 4.2.1 Anchoring clamp for duct cable incorrectly attached to pole and cable Major 4.2.2 Duct joint on Fiber ducts not installed in correct way Major 4.2.3 Bending radius of the duct too small Major 4.2.4 Fixing of the Joint Closure to the pole not correct (sometimes with a distance) Minor 4.2.5 Strength member of the duct not removed before entering the Joint Closure Major 4.2.6 Sealing of the cable inlet to the Joint Closure missing or incorrect Major 4.2.7 DJC for customer branch out placed too close anchoring clamp, min. 100mm Major

    4.3 Installation of Fiber Joint Closure (FAT) and Fiber Joint Closure (FJC)

    Check alignments, appropriate deep and obstacle markings on FAT 4.3.1 FAT/FJC not alignment Minor 4.3.2 FAT/FJC closure not installed at appropriate deep Minor 4.3.3 Obstacle/snow stick missing Minor 4.3.4 FAT/FJC closure not stabile because of improper back filling Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    12 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    4.4 Installation inside Fiber Joint Closure (FAT)

    Check installation of ducts and fiber cables inside of Joint Closure 4.4.1 Kinks on ducts inside Joint Closure Major 4.4.2 Arrangement of ducts inside Joint Closure not according to instructions Minor 4.4.3 Multi-duct cable gland not tighten Major 4.4.4 Microduct not installed in the cable holder Minor 4.4.5 Microduct end not sealed Major 4.4.6 Fiber cables not routed and fasten according to instructions in the cassettes Major 4.4.7 Strain reliever not installed Major 4.4.8 Strain reliever not tightened Minor 4.4.9 Strain reliever not installed for areal cable Critical 4.4.10 Strain reliever not tightened for areal cable Critical 4.4.11 Water inside the Arial Fiber Ducts and Joint Closure (FAT) installation Major

    4.5 Other defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 4.5.1 Other Critical defects Critical 4.5.2 Other Major defects Major 4.5.3 Other Minor defects Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    13 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    SECTION 4: Inside & Outside plant

    SP/ASP Self check lists

    5 Fiber Network Civil Works and Indoor

    5.1 Ariel Construction checklist 177 66-FDG 103 91/6 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Ariel Construction checklist is filled in.

    5.1.1 Installation check list not available Minor 5.1.2 Installation check list not filled in Major 5.1.3 Installation check list filled in but not signed Major 5.1.4 Installation check documentation not provided Critical

    5.2 Cable Installation checklist 177 66-FDG 103 91/8 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Cable Installation checklist is filled in.

    5.2.1 Installation check list not available Minor 5.2.2 Installation check list not filled in Major 5.2.3 Installation check list filled in but not signed Major 5.2.4 Installation check documentation not provided Critical

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    14 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    5.3 Directional Drilling checklist 177 66-FDG 103 91/3 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Directional Drilling checklist is filled in.

    5.3.1 Installation check list not available Minor 5.3.2 Installation check list not filled in Major 5.3.3 Installation check list filled in but not signed Major 5.3.4 Installation check documentation not provided Critical

    5.4 Ducting checklist 177 66-FDG 103 91/5 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Ducting Drilling checklist is filled in.

    5.4.1 Installation check list not available Minor 5.4.2 Installation check list not filled in Major 5.4.3 Installation check list filled in but not signed Major 5.4.4 Installation check documentation not provided Critical

    5.5 Excavation checklist 177 66-FDG 103 91/2 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Excavation Drilling checklist is filled in.

    5.5.1 Installation check list not available Minor 5.5.2 Installation check list not filled in Major 5.5.3 Installation check list filled in but not signed Major 5.5.4 Installation check documentation not provided Critical

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    15 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    5.6 Fiber Splicing checklist 177 66-FDG 103 91/9 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Fiber Splicing checklist is filled in.

    5.6.1 Installation check list not available Minor 5.6.2 Installation check list not filled in Major 5.6.3 Installation check list filled in but not signed Major 5.6.4 Installation check documentation not provided Critical

    5.7 Reinstatement checklist 177 66-FDG 103 91/4 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Reinstatement checklist is filled in.

    5.7.1 Installation check list not available Minor 5.7.2 Installation check list not filled in Major 5.7.3 Installation check list filled in but not signed Major 5.7.4 Installation check documentation not provided Critical

    5.8 Trenching checklist 177 66-FDG 103 91/1 (or equivalent local checklist) filled in and signed by the Service Provider http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that trenching checklist is filled in .

    5.8.1 Installation check list not available Minor 5.8.2 Installation check list not filled in Major 5.8.3 Installation check list filled in but not signed Major 5.8.4 Installation check documentation not provided Critical

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    16 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    5.9 Indoor Installation checklist 177 66-FDG 103 91/7 (or equivalent local checklist) filled in http://internal.ericsson.com/page/hub_globalservices/products/nro_delivery/sp/sp_quality_assurance.jsp

    Check that Indoor Installation checklist is filled in.

    5.9.1 Installation check list not available Minor 5.9.2 Installation check list not filled in Major 5.9.3 Installation check list filled in but not signed Major 5.9.4 Installation check documentation not provided Critical

    5.10 Photographs with geographical coordinate available.

    Photographs with geographical coordinate are available when required.

    5.10.1 Photographs without geographical coordinate Minor 5.10.2 Photographs not available Major

    5.11 Other Defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 5.11.1 Other Critical defects Critical 5.11.2 Other Major defects Major 5.11.3 Other Minor defects Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    17 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    SECTION 5:

    Other areas

    6 Fiber Network Engineering

    6.1 Site Investigation

    Check that Site Investigation is performed if required. 6.1.1 No Site Investigation is performed Major 6.1.2 Site Investigation Report (SIR) missing or incorrect Minor

    6.2 Site Installation Documentation

    Check the required documents in Site installation Documentation and that Equipments are situated according to the Floor plan. 6.2.1 ID number is missing Major 6.2.2 Site Engineering responsible Contact info missing Minor 6.2.3 Floor plan drawing is missing or incorrect Major 6.2.4 Equipment not situated according to Floor plan Major 6.2.5 Allocation table of Distribution Frame is missing or incorrect Major 6.2.6 Power allocation is missing or incorrect Major 6.2.7 Cable labels not produced Major 6.2.8 Site drawings does not contain appropriate information for fibre installation outdoors Major 6.2.9 Bore/drill allocation not available on customer drawings Major

    6.3 As built documentation and Test records

    Check as built documentation. 6.3.1 Floor plan indicating in red any changes Major 6.3.2 All test results of conducted tests available Major 6.3.3 Splice location correct geographically according to schematic drawing Major 6.3.4 Position measurement of fiber routes not updated in documentation Major 6.3.5 Fiber and duct spicing schema not updated according to as build changes Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    18 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    6.4 Other defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 6.4.1 Other Critical defects Critical 6.4.2 Other Major defects Major 6.4.3 Other Minor defects Minor

    7 Fiber Network Test and Verification

    7.1 Tests

    Check that the light source identification, Optical Time Domain Reflectometer (OTDR) and fibre power meter tests been carried out and recorded 7.1.1 Fibre light source identification not carried out Critical 7.1.2 Fibre OTDR test results not carried out for point to point Critical 7.1.3 Fibre OTDR (PON Enabled) test results carried out for GPON design Critical 7.1.4 Fibre power meter tests carried out and recorded Critical

    7.2 Other defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document. 7.2.1 Other Critical defects Critical 7.2.2 Other Major defects Major 7.2.3 Other Minor defects Minor

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    19 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    8 Ecology Management (EM)

    8.1 Waste from packages

    Check that the waste from packages has been treated according to the requirements Packing Waste Electrical and Electronic Equipment (WEEE) and batteries management. (See Ecology Management and End of Life treatment web site http://internal.ericsson.com/page/hub_globalservices/products/ecology/index.jsp ) 8.1.1 Packaging or paper waste are in the site or surroundings Major 8.1.2 Packages waste have not been returned according to the EM Major

    8.2 Waste from electrical or electronic equipment

    Check that the waste from electrical or electronic equipment WEEE (Cables, Lamps, Air Conditioner, Boards, Batteries) has been treated according to the requirements. (See Ecology Management and End of Life treatment web site http://internal.ericsson.com/page/hub_globalservices/products/ecology/index.jsp ) 8.2.1 WEEE are in the site or surroundings Critical 8.2.2 WEEE have not been managed according to the EM Major

    8.3 Ground contamination

    Check if it is any evidence of ground contamination (potential signs in the ground from power generators or diesel tanks leaking) is in the site or nearest surroundings. The potential soil contamination could be due to other activities/services, but it is important to aware the customer about the situation of its sites. 8.3.1 Soil contamination at the site has not been reported security manager (SIMS) Critical 8.3.2 Soil contamination not reported to the customer Major

    8.4 Optical fibre

    Check if all fibre cuts and residue been disposed correctly. 8.4.1 Fibre cuts not disposed correctly Major

  • Ericsson Internal

    SUPPLEMENTARY INFORMATION

    20 (20) Prepared (Subject resp) No.

    EAB/GR/P Stefan Kauffmann EAB-13:023754 Uen Approved (Document resp) Checked Date Rev Reference

    EAB/GR/P [Stefan Kauffmann] 2013-04-18 E

    8.5 Other defects

    This defect code has no defect characteristic. Use this code for a defect that is not described or specified in this document 8.5.1 Other Critical defects Critical 8.5.2 Other Major defects Major 8.5.3 Other Minor defects Minor