at&t fiber distribution frame interbay management panel cross-connect procedures … · 2019. 12....
TRANSCRIPT
-
23821-A
ADCP-95-007Rev B
January 2019
ADCP-95-007 Rev B
AT&T Fiber Distribution FrameInterbay Management PanelCross-Connect Procedures
95007rB.fm Page 1 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 2
1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2. Recommended Jumper Lengths. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3. Cross-Connecting Procedures for Lower Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
4. Multibay Cross-Connecting Procedures for Lower Route
• Between Adjacent Bays in a Multibay Lineup
– Connecting Ports on the Outside Edge of Adjacent Bays . . . . . . . . . . . . . . . .9
– Connecting Ports on the Same Side of Adjacent Bays . . . . . . . . . . . . . . . . 10
– Connecting Ports on the Inside Edge of Adjacent Bays . . . . . . . . . . . . . . . . 11
5. Cross-Connecting Procedures for Upper Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
6. Multibay Cross-Connecting Procedures for Upper Route . . . . . . . . . . . . . . . . . . . . . 15
7. Fiber Optic Terminal (FOT) Jumper Routing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
8. Cross-Aisle Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Content Page(s)
95007rB.fm Page 2 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 3
1. Introduction
This routing guide is intended for AT&T for the best cable management within bay lineups using CommScope FDF with an upper and lower trough. Minimum jumper length in all cases is 2m (approximately 6 ft.) to prevent intermodule noise. Do not use this procedure if upper trough is not present or for non-ADC FDF bay configurations.
CommScope Assistance
http://www.commscope.com/SupportCenter
95007rB.fm Page 3 Tuesday, January 15, 2019 3:26 PM
http://www.commscope.com/SupportCenter
-
ADCP-95-007 • Rev B • January 2019
Page 4
Bay Zoning Map
1. Locate Origination and Destination points on Zone Map.
2. If EITHER Origination OR Destination is in a lower zone (1L, 1R, 2L, 2R, 3L, 3R, 4L, 4R, 5L, 5R), use procedure on page 6, Cross-Connecting Procedures for Lower Route.
3. If BOTH Origination AND Destination is in an upper zone (6L, 6R, 7L, 7R, 8L, 8R, 9L, 9R), use procedure on page 12, Cross-Connecting Procedures for Upper Route.
23822-A
8L 8R
7L 7R
6L 6R
5L 5R
4L 4R
3L 3R
2L 2R
1L 1R
BAY 1 BAY 2 BAY 3 BAY 4
FOT OSP FOT OSP
TOPTROUGH
UPPERZONE
LOWERZONE
LOWERTROUGH
8L 8R
7L 7R
6L 6R
5L 5R
4L 4R
3L 3R
2L 2R
1L 1R
8L 8R
7L 7R
6L 6R
5L 5R
4L 4R
3L 3R
2L 2R
1L 1R
8L 8R
7L 7R
6L 6R
5L 5R
4L 4R
3L 3R
2L 2R
1L 1R
95007rB.fm Page 4 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 5
2. Recommended Jumper Lengths
Lower Trough
Upper Trough
NUMBER OF LOWER
TROUGHS1 2 3 4 5 6 7 8 9 10 11 12
REQUIRED PATCHCORD LENGTH (M)
4 5 5 6 7 8 9 9 10 11 12 13
NUMBER OF UPPER
TROUGHS1 2 3 4 5 6 7 8 9 10 11 12
REQUIRED PATCHCORD LENGTH (M)
3 4 4 5 6 7 8 8 9 10 11 12
95007rB.fm Page 5 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 6
3. Cross-Connecting Procedures for Lower Route
31
32
33 39
19
20
21
25
26
27
PULL DOWN TO
OPEN
1
13093-A
TERMINATE one end of the patchcord at the appropriate port.
1
ROUTE the patchcord through the vertical cable guides to the lower trough.
2
5
6
11
12
17
18
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
PULL DOWN TO
OPEN
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
PULL DOWN TO
OPEN2
26830-A
PLACE the patchcord in the lower trough.
3
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
PULL DOWN TO
OPEN
26831-A
3
95007rB.fm Page 6 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 7
3. Cross-Connecting Procedures for Lower Route, continued
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
88
89
90
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
22
23
24
28
29
30
4
12019-A
ROUTE the unterminated end of the patchcord to the second connection port.
NOTE: Be sure to leave the extra patchcord slack in the lower trough.
4
31
32
3339
19
20
21
25
26
27
PULL DOWN TO
OPEN
5
13095-A
TERMINATE the second end of the patchcord to the appropriate port.
5
ROUTE the second end of the patchcord through the vertical cable guides to the lower trough.
6
5
6
11
12
17
18
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
PULL DOWN TO
OPEN
4
5
6
10
11
12
16
17
18
34
35
36
40
41
42
46
47
48
22
23
24
52
53
54
28
29
30
PULL DOWN TO
OPEN 6
26832-A
95007rB.fm Page 7 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 8
3. Cross-Connecting Procedures for Lower Route, continued94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
26833 A
7
CORRECT ROUTING
DO NOT WRAP PATCHCORD MULTIPLE TIMESAROUND SAME SPOOL
DO NOT WEAVE PATCHCORD AROUND
SPOOLS
LOOP the patchcord slack, located in the lower trough, over the appropriate interbay management spool.
NOTE: See appropriate application drawing located within this user manual for recommended specific cable routings.
7
95007rB.fm Page 8 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 9
4. Multibay Cross-Connecting Procedures for Lower Route
23823-A
Connecting Ports on the Outside Edgeof Adjacent Bays
Between Adjacent Bays in a Multibay Line Up
95007rB.fm Page 9 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 10
4. Multibay Cross-Connecting Procedures for Lower Route, continued
23824-A
Between Adjacent Bays in a Multibay Line Up
Connecting Ports on the Same Sideof Adjacent Bays
95007rB.fm Page 10 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 11
4. Multibay Cross-Connecting Procedures for Lower Route, continued
23825-A
Between Adjacent Bays in a Multibay Line Up
Connecting Ports on the Same Sideof Adjacent Bays
95007rB.fm Page 11 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 12
5. Cross-Connecting Procedures for Upper Route
21
PULL DOWN TO
OPEN
1
13098-A
TERMINATE one end of the patchcord at the appropriate port.
1
PULL DOWN TO
OPEN
13099-A
2
ROUTE the patchcord through the vertical cable guides to the upper trough.
2
PLACE the patchcord in the upper trough.
3
4
5
6
94
95
96
64
65
66
10
11
12
70
71
72
16
17
18
34
35
36
40
41
42
46
47
48
76
77
78
22
23
24
82
83
84
52
53
54
28
29
30
58
59
50
88
89
90
PULL
DOWN TO
OPEN
PULL
DOWN TO
OPEN
4
5
6
10
11
12
16
17
18
26834-A
3
95007rB.fm Page 12 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 13
5. Cross-Connecting Procedures for Upper Route, continued
PULL DOWN TO
OPEN
13101-A
4
ROUTE the unterminated end of the patchcord to the second connection port.
NOTE: Be sure to leave the extra patchcord slack in the upper trough.
4
21
PULL DOWN TO
OPEN
5
13102-A
TERMINATE the second end of the patchcord to the appropriate port.
5
PULL DOWN TO
OPEN
13103-A
6
ROUTE the second end of the patchcord through the vertical cable guides to the upper trough.
6
95007rB.fm Page 13 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 14
5. Cross-Connecting Procedures for Upper Route, continued
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
46
47
48
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
94
95
96
64
65
66
70
71
72
76
77
78
82
83
84
52
53
54
58
59
50
88
89
90
PULL
DOWN TO
OPEN
7
CORRECT ROUTING
DO NOT WRAP PATCHCORD MULTIPLE TIMESAROUND SAME SPOOL
DO NOT WEAVE PATCHCORD AROUND
SPOOLS
LOOP the patchcord slack, located in the upper trough, under the appropriate interbay management spool.
NOTE: See appropriate application drawing located within this user manual for recommended specific cable routings.
7
95007rB.fm Page 14 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 15
6. Multibay Cross-Connecting Procedures for Upper Route
23826-A
Between Adjacent Bays in a Multibay Line Up
Connecting Ports on the Outside Edgeof Adjacent Bays
95007rB.fm Page 15 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 16
7. Fiber Optic Terminal (FOT) Jumper Routing
13365-A
FOT
TO FOTEQUIPMENT
OSP
Rear View
PATCHCORDBUNDLE (ALLTO THE SAME
MODULE)
ROUTEBEHINDSPOOLS
PATCHCORDCHANNEL
NOTE:Work from the top down. Arrangebundles inside to outside in channel.
LEAVE SERVICELOOP BELOW
SPOOL
BUNDLE TOOTHER MODULE
ROUTE THROUGHFANNING TREE LOOPCORRESPONDING TO
ROW POSITION
95007rB.fm Page 16 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 17
8. Cross-Aisle RoutingJumpers may be routed from an FDF frame to another FDF frame on the other side of an aisle using an CommScope overhead X-aisle trough system. When using such a system, take up slack at the termination frame, as shown. Routing may be from front to front, front to rear, or rear to rear. (Rear routing is not shown, but the same prinicple applies.) For overhead routing details, see the reverse of this card.
23962-A
TAKE UP SLACKON TERMINATION
SIDE
OVERHEADROUTING
(SEE DETAIL)
95007rB.fm Page 17 Tuesday, January 15, 2019 3:26 PM
-
ADCP-95-007 • Rev B • January 2019
Page 18
8 Cross-Aisle Routing (Continued)
Within the overhead trough, route the jumpers so as to minimize sharp bends. Always take the route with the least sharp bend.
Ensure that radius limiters have been installed correctly at the inside and outside corners shown in the illustration.
5/16" STAR WASHER (3)
NYLOCK NUT (3)
RADIUS LIMITER INSTALLEDON OUTSIDE SURFACE
OF WIDER TROUGH
PEM STUDS (3)
23597-A
INSIDECORNER
INSIDECORNER
OUTSIDECORNER
OUTSIDECORNER
INSTALL RADIUSLIMITER TAB
UNDER TROUGHS
NOTE: ALWAYS TAKE THEROUTE WITH THE LEASTSHARP BEND.
NOTE: USE RADIUSLIMITERS IF A BENDBACK IS REQUIRED.
95007rB.fm Page 18 Tuesday, January 15, 2019 3:26 PM
Front Page1. Introduction2. Recommended Jumper Lengths3. Cross-Connecting Procedures for Lower Route3. Cross-Connecting Procedures for Lower Route, continued3. Cross-Connecting Procedures for Lower Route, continued4. Multibay Cross-Connecting Procedures for Lower Route5. Cross-Connecting Procedures for Upper Route6. Multibay Cross-Connecting Procedures for Upper Route7. Fiber Optic Terminal (FOT) Jumper Routing8. Cross-Aisle Routing8 Cross-Aisle Routing (Continued)