at&t fiber distribution frame interbay management panel cross-connect procedures … · 2019. 12....

18
23821-A ADCP-95-007 Rev B January 2019 ADCP-95-007 Rev B AT&T Fiber Distribution Frame Interbay Management Panel Cross-Connect Procedures

Upload: others

Post on 28-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 23821-A

    ADCP-95-007Rev B

    January 2019

    ADCP-95-007 Rev B

    AT&T Fiber Distribution FrameInterbay Management PanelCross-Connect Procedures

    95007rB.fm Page 1 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 2

    1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

    2. Recommended Jumper Lengths. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5

    3. Cross-Connecting Procedures for Lower Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . .6

    4. Multibay Cross-Connecting Procedures for Lower Route

    • Between Adjacent Bays in a Multibay Lineup

    – Connecting Ports on the Outside Edge of Adjacent Bays . . . . . . . . . . . . . . . .9

    – Connecting Ports on the Same Side of Adjacent Bays . . . . . . . . . . . . . . . . 10

    – Connecting Ports on the Inside Edge of Adjacent Bays . . . . . . . . . . . . . . . . 11

    5. Cross-Connecting Procedures for Upper Route. . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

    6. Multibay Cross-Connecting Procedures for Upper Route . . . . . . . . . . . . . . . . . . . . . 15

    7. Fiber Optic Terminal (FOT) Jumper Routing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    8. Cross-Aisle Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    Content Page(s)

    95007rB.fm Page 2 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 3

    1. Introduction

    This routing guide is intended for AT&T for the best cable management within bay lineups using CommScope FDF with an upper and lower trough. Minimum jumper length in all cases is 2m (approximately 6 ft.) to prevent intermodule noise. Do not use this procedure if upper trough is not present or for non-ADC FDF bay configurations.

    CommScope Assistance

    http://www.commscope.com/SupportCenter

    95007rB.fm Page 3 Tuesday, January 15, 2019 3:26 PM

    http://www.commscope.com/SupportCenter

  • ADCP-95-007 • Rev B • January 2019

    Page 4

    Bay Zoning Map

    1. Locate Origination and Destination points on Zone Map.

    2. If EITHER Origination OR Destination is in a lower zone (1L, 1R, 2L, 2R, 3L, 3R, 4L, 4R, 5L, 5R), use procedure on page 6, Cross-Connecting Procedures for Lower Route.

    3. If BOTH Origination AND Destination is in an upper zone (6L, 6R, 7L, 7R, 8L, 8R, 9L, 9R), use procedure on page 12, Cross-Connecting Procedures for Upper Route.

    23822-A

    8L 8R

    7L 7R

    6L 6R

    5L 5R

    4L 4R

    3L 3R

    2L 2R

    1L 1R

    BAY 1 BAY 2 BAY 3 BAY 4

    FOT OSP FOT OSP

    TOPTROUGH

    UPPERZONE

    LOWERZONE

    LOWERTROUGH

    8L 8R

    7L 7R

    6L 6R

    5L 5R

    4L 4R

    3L 3R

    2L 2R

    1L 1R

    8L 8R

    7L 7R

    6L 6R

    5L 5R

    4L 4R

    3L 3R

    2L 2R

    1L 1R

    8L 8R

    7L 7R

    6L 6R

    5L 5R

    4L 4R

    3L 3R

    2L 2R

    1L 1R

    95007rB.fm Page 4 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 5

    2. Recommended Jumper Lengths

    Lower Trough

    Upper Trough

    NUMBER OF LOWER

    TROUGHS1 2 3 4 5 6 7 8 9 10 11 12

    REQUIRED PATCHCORD LENGTH (M)

    4 5 5 6 7 8 9 9 10 11 12 13

    NUMBER OF UPPER

    TROUGHS1 2 3 4 5 6 7 8 9 10 11 12

    REQUIRED PATCHCORD LENGTH (M)

    3 4 4 5 6 7 8 8 9 10 11 12

    95007rB.fm Page 5 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 6

    3. Cross-Connecting Procedures for Lower Route

    31

    32

    33 39

    19

    20

    21

    25

    26

    27

    PULL DOWN TO

    OPEN

    1

    13093-A

    TERMINATE one end of the patchcord at the appropriate port.

    1

    ROUTE the patchcord through the vertical cable guides to the lower trough.

    2

    5

    6

    11

    12

    17

    18

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    PULL DOWN TO

    OPEN

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    PULL DOWN TO

    OPEN2

    26830-A

    PLACE the patchcord in the lower trough.

    3

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    PULL DOWN TO

    OPEN

    26831-A

    3

    95007rB.fm Page 6 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 7

    3. Cross-Connecting Procedures for Lower Route, continued

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    88

    89

    90

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    22

    23

    24

    28

    29

    30

    4

    12019-A

    ROUTE the unterminated end of the patchcord to the second connection port.

    NOTE: Be sure to leave the extra patchcord slack in the lower trough.

    4

    31

    32

    3339

    19

    20

    21

    25

    26

    27

    PULL DOWN TO

    OPEN

    5

    13095-A

    TERMINATE the second end of the patchcord to the appropriate port.

    5

    ROUTE the second end of the patchcord through the vertical cable guides to the lower trough.

    6

    5

    6

    11

    12

    17

    18

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    PULL DOWN TO

    OPEN

    4

    5

    6

    10

    11

    12

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    22

    23

    24

    52

    53

    54

    28

    29

    30

    PULL DOWN TO

    OPEN 6

    26832-A

    95007rB.fm Page 7 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 8

    3. Cross-Connecting Procedures for Lower Route, continued94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    26833 A

    7

    CORRECT ROUTING

    DO NOT WRAP PATCHCORD MULTIPLE TIMESAROUND SAME SPOOL

    DO NOT WEAVE PATCHCORD AROUND

    SPOOLS

    LOOP the patchcord slack, located in the lower trough, over the appropriate interbay management spool.

    NOTE: See appropriate application drawing located within this user manual for recommended specific cable routings.

    7

    95007rB.fm Page 8 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 9

    4. Multibay Cross-Connecting Procedures for Lower Route

    23823-A

    Connecting Ports on the Outside Edgeof Adjacent Bays

    Between Adjacent Bays in a Multibay Line Up

    95007rB.fm Page 9 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 10

    4. Multibay Cross-Connecting Procedures for Lower Route, continued

    23824-A

    Between Adjacent Bays in a Multibay Line Up

    Connecting Ports on the Same Sideof Adjacent Bays

    95007rB.fm Page 10 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 11

    4. Multibay Cross-Connecting Procedures for Lower Route, continued

    23825-A

    Between Adjacent Bays in a Multibay Line Up

    Connecting Ports on the Same Sideof Adjacent Bays

    95007rB.fm Page 11 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 12

    5. Cross-Connecting Procedures for Upper Route

    21

    PULL DOWN TO

    OPEN

    1

    13098-A

    TERMINATE one end of the patchcord at the appropriate port.

    1

    PULL DOWN TO

    OPEN

    13099-A

    2

    ROUTE the patchcord through the vertical cable guides to the upper trough.

    2

    PLACE the patchcord in the upper trough.

    3

    4

    5

    6

    94

    95

    96

    64

    65

    66

    10

    11

    12

    70

    71

    72

    16

    17

    18

    34

    35

    36

    40

    41

    42

    46

    47

    48

    76

    77

    78

    22

    23

    24

    82

    83

    84

    52

    53

    54

    28

    29

    30

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    PULL

    DOWN TO

    OPEN

    4

    5

    6

    10

    11

    12

    16

    17

    18

    26834-A

    3

    95007rB.fm Page 12 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 13

    5. Cross-Connecting Procedures for Upper Route, continued

    PULL DOWN TO

    OPEN

    13101-A

    4

    ROUTE the unterminated end of the patchcord to the second connection port.

    NOTE: Be sure to leave the extra patchcord slack in the upper trough.

    4

    21

    PULL DOWN TO

    OPEN

    5

    13102-A

    TERMINATE the second end of the patchcord to the appropriate port.

    5

    PULL DOWN TO

    OPEN

    13103-A

    6

    ROUTE the second end of the patchcord through the vertical cable guides to the upper trough.

    6

    95007rB.fm Page 13 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 14

    5. Cross-Connecting Procedures for Upper Route, continued

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    46

    47

    48

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    94

    95

    96

    64

    65

    66

    70

    71

    72

    76

    77

    78

    82

    83

    84

    52

    53

    54

    58

    59

    50

    88

    89

    90

    PULL

    DOWN TO

    OPEN

    7

    CORRECT ROUTING

    DO NOT WRAP PATCHCORD MULTIPLE TIMESAROUND SAME SPOOL

    DO NOT WEAVE PATCHCORD AROUND

    SPOOLS

    LOOP the patchcord slack, located in the upper trough, under the appropriate interbay management spool.

    NOTE: See appropriate application drawing located within this user manual for recommended specific cable routings.

    7

    95007rB.fm Page 14 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 15

    6. Multibay Cross-Connecting Procedures for Upper Route

    23826-A

    Between Adjacent Bays in a Multibay Line Up

    Connecting Ports on the Outside Edgeof Adjacent Bays

    95007rB.fm Page 15 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 16

    7. Fiber Optic Terminal (FOT) Jumper Routing

    13365-A

    FOT

    TO FOTEQUIPMENT

    OSP

    Rear View

    PATCHCORDBUNDLE (ALLTO THE SAME

    MODULE)

    ROUTEBEHINDSPOOLS

    PATCHCORDCHANNEL

    NOTE:Work from the top down. Arrangebundles inside to outside in channel.

    LEAVE SERVICELOOP BELOW

    SPOOL

    BUNDLE TOOTHER MODULE

    ROUTE THROUGHFANNING TREE LOOPCORRESPONDING TO

    ROW POSITION

    95007rB.fm Page 16 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 17

    8. Cross-Aisle RoutingJumpers may be routed from an FDF frame to another FDF frame on the other side of an aisle using an CommScope overhead X-aisle trough system. When using such a system, take up slack at the termination frame, as shown. Routing may be from front to front, front to rear, or rear to rear. (Rear routing is not shown, but the same prinicple applies.) For overhead routing details, see the reverse of this card.

    23962-A

    TAKE UP SLACKON TERMINATION

    SIDE

    OVERHEADROUTING

    (SEE DETAIL)

    95007rB.fm Page 17 Tuesday, January 15, 2019 3:26 PM

  • ADCP-95-007 • Rev B • January 2019

    Page 18

    8 Cross-Aisle Routing (Continued)

    Within the overhead trough, route the jumpers so as to minimize sharp bends. Always take the route with the least sharp bend.

    Ensure that radius limiters have been installed correctly at the inside and outside corners shown in the illustration.

    5/16" STAR WASHER (3)

    NYLOCK NUT (3)

    RADIUS LIMITER INSTALLEDON OUTSIDE SURFACE

    OF WIDER TROUGH

    PEM STUDS (3)

    23597-A

    INSIDECORNER

    INSIDECORNER

    OUTSIDECORNER

    OUTSIDECORNER

    INSTALL RADIUSLIMITER TAB

    UNDER TROUGHS

    NOTE: ALWAYS TAKE THEROUTE WITH THE LEASTSHARP BEND.

    NOTE: USE RADIUSLIMITERS IF A BENDBACK IS REQUIRED.

    95007rB.fm Page 18 Tuesday, January 15, 2019 3:26 PM

    Front Page1. Introduction2. Recommended Jumper Lengths3. Cross-Connecting Procedures for Lower Route3. Cross-Connecting Procedures for Lower Route, continued3. Cross-Connecting Procedures for Lower Route, continued4. Multibay Cross-Connecting Procedures for Lower Route5. Cross-Connecting Procedures for Upper Route6. Multibay Cross-Connecting Procedures for Upper Route7. Fiber Optic Terminal (FOT) Jumper Routing8. Cross-Aisle Routing8 Cross-Aisle Routing (Continued)