fiata world congress 2011 main forum - speach mr ahmed ... · prepared by: ahmed raafat air freight...

16
CAIRO AIRPORT COMPANY Cairo Airport YOUR SECURE HUB Prepared by: Ahmed Raafat Air Freight Department

Upload: others

Post on 17-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

CAIRO AIRPORT COMPANY

Cairo Airport

YOUR SECURE HUB

Prepared by: Ahmed RaafatAir Freight Department

Page 2: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Overview

Mai 2005 2

Part 1 : Egypt Location

Part 2 : Infrastructure Projects

Part 3 : Cargo Figures CAC

Part 4 : Current Safety & Security Measures

Part 5 : Future Safety & Security Measures

Page 3: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 3

Part 1: Unique Location = Great opportunity

Egypt’s strategic location between Asia and Africa on the route between theMediterranean basin and India and China made it an important hub of international trade.

Page 4: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Egypt Is The Natural Gate To Africa

Mai 2005 4

Unique market synergy between

Europe / Africa / Asia

using Cairo / Suez as gateway

From East to West and South, AND...

From South to West and East, AND...

From West to East...

Using the services and facilities of

WIN / WIN PARTNERS

Page 5: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Part 2 : Infrastructure Projects

Mai 2005 5

Constructionwill start

2012

Project Duration 36

month with a cost of 450 Million USD

Capacity 8.5 Million passenger/

yr

Connects main Terminals

and Supports Hub-Process

2000 Passenger/hr

In operation from 2012

Automated People Mover:

New Terminal 2:

Page 6: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Infrastructure Projects

Mai 2005 6

Real Estate Development (AeroCity)

• Entertainment• Shopping• Hotels • SEZ / Logistic

City

Approximately 10 million sqm

for Development

Seasonal Terminal:

• In Operation

Status

• 1200 pax/hr

• 3.5 Million/yr

Capacity• Cost 24

Million USD

Cost

Page 7: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 7

Y 2006 Y 2007 Y 2008 Y 2009 Y 2010Total 254'782 279'319 278'578 285'839 310'903

200'000

220'000

240'000

260'000

280'000

300'000

320'000 Total

Cargo Tonnage 2010 vs 2009:

• For 2010 the total traffic without transit is (310,903) Tons which is 8.8% higher than 2009 (285,839) tons.• Exports increased by 1.01% compared to 2009, Imports increased by 23.73 % compared to 2009

Page 8: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 8

Main Commodities

Major Export Commodities:

The air cargo industry in Egypt still almost exclusivelyrelies on perishables as a main commodity.

Perishable exports represent 60% to Europe ( AMS – LHR – FRA )Textile exports 30% mainly to USA ( JFK – LAX )Miscellaneous represent 10% ( Handicrafts – Equipments & Personal effect )

Major Import Commodities:

Mainly the received traffic for import comes from Europe ( Equipment – Foodstuff – Vaccine & Medicine )

Page 9: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 9

Cargo Traffic forecast

Page 10: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 10

Page 11: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 11

1 • EGYPT Air Terminal

2 • Cairo Airport Co.

3 • Cairo Airport Cargo Co.

4 • SV Terminal

5 • AF/ KLM Terminal

6 • Perishable terminal

Part 4: Current Safety & Security Measures

Page 12: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 12

100 % Screening

• After the Yemen incident of Nov. 2010, it has been decided by the governmentthat all exports shipped from Cairo Airport should 100% X-rayed.

• We have managed to provide some more X-ray machines to some Cargo warehouses to accelerate the security process.

• Our main aim is to ensure safe Cargo operation and protecting our global market share & follow the international updatesespecially in the security.

Page 13: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 13

New Cargo Terminal

AF/

KLM

Cargo Area

Page 14: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 14

Page 15: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

Mai 2005 15

Fenced Area 2.5M/h

CCTV surveillance

Special cargo storage facilities

Security guards

Screening

Secured access

Radioactive check gates

Yellow line Concept

Page 16: FIATA World Congress 2011 Main Forum - Speach Mr Ahmed ... · Prepared by: Ahmed Raafat Air Freight Department. Overview Mai 2005 2 Part 1 : Egypt Location Part 2 : Infrastructure

CAIRO AIRPORT COMPANY

Thank youAir Freight department