Cabin Branch Stormwater ManagementStormwater Management
Retrofit Projects
Quail Valley Pond #1il ll dQuail Valley Pond #2
Strawberry Knoll Facility
Concept Design PresentationF b 11 2014February 11, 2014
![Page 2: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/2.jpg)
T d ’ A dToday’s Agenda
Sources of Water on Earth Montgomery County backgroundWh t i W t h d & R ff? What is a Watershed & Runoff?
Intro to Stormwater What the County is Doing to Protect Our Streams What the County is Doing to Protect Our Streams Goals of the Project Proposed Pond Retrofit p Questions/Comments
2
![Page 3: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/3.jpg)
Sources of Water
About 97% is salt water About 2% is frozen Only 1% is available for drinking water Only 1% is available for drinking water
Across the country, most potable water is from groundwater In Maryland, most is from surface water
Potential for greater impacts from runoff in Marylandg p y
3
![Page 4: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/4.jpg)
Montgomery County, MD 500 sq. miles 970,000 people
Second only to Baltimore City within Maryland in average people per Maryland in average people per square mile
184 languages spoken About 12% impervious surface overallp
About the size of Washington DC Over 1,500 miles of streams Two major river basins:
P Potomac Patuxent
Eight local watersheds District of Columbia
I i N t ll i t t
4
Impervious: Not allowing water to soak through the ground.
![Page 5: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/5.jpg)
What is a Watershed? A watershed is an area from which the water above and below ground above and below ground drains to the same place.
Different scales of watersheds:watersheds: Chesapeake Bay Eight local watersheds Neighborhood (to a storm drain)
5
![Page 6: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/6.jpg)
h ff?What is Runoff?Water that does not soak into the ground becomes surface runoff. This runoff flows over hard surfaces like rooftops, driveways and parking lots collecting potential contaminants and flows:
• Directly into streams• Into storm drain pipes, eventually leading to
streams• Into stormwater management facilities, then
streams
Two Major Issues:V l /Ti i f R ffVolume/Timing of Runoff
Water Quality6
![Page 7: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/7.jpg)
What is the County doing toprotect our Streams?
Must meet regulatory requirements Federal Clean Water Act permit program MS4 = MMunicipal SSeparate SStorm SSewer SSystem MS4 = MMunicipal SSeparate SStorm SSewer SSystem
Applies to all large and medium Maryland jurisdictions County programs
Restore our streams and watersheds Add runoff management
Meet water quality protection goals Reduce pollutants getting into our streams
Educate and engage all stakeholders Individual actions make a difference
Focus on watersheds showing greatest impacts
7
![Page 8: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/8.jpg)
MS4 P i Wh i i ?MS4 Permit: What is it? Montgomery County is responsible for:Montgomery County is responsible for:
• What goes into our storm drain pipes • What comes out of them• What flows into the streams
Requires additional stormwater management for 20 (percent of untreated impervious surfaces (4,292 acres =
6.7 square miles). That’s about three times the size of Takoma Park.
8
![Page 9: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/9.jpg)
O ll G l f h P jOverall Goals of the Project Provide water quality treatment and downstream channel Provide water quality treatment and downstream channel
protection to meet MS4 program requirements. Improve ecological value of existing stormwater
management facilities management facilities. Improve existing landscaping and plant diversity of
existing facilities. U d i ti f iliti t l ith f t d Upgrade existing facilities to comply with safety and
design standards. Utilize existing open space to provide stormwater
t management.
9
![Page 10: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/10.jpg)
P j t L tiProject Location
CabinBranch
10
![Page 11: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/11.jpg)
Quail Valley Pond # 1Q ySWM Retrofit
P j t O iProject Overview
11
![Page 12: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/12.jpg)
D i ADrainage Area 9.24 acre drainage 9.24 acre drainage area to pond
51% impervious
L d i l d Land cover includes roadway, sidewalks, manicured lawns/landscaping. a s/ a dscap g.
12
![Page 13: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/13.jpg)
Existing Conditions Constructed in the early 1980s
Fully developed drainage area
Does not provide water quality functions
High groundwater exists in bottom of facility
Does not meet current safety and design standards (materials and conveyance)
Sinkholes have recently developed in embankment
Maintenance access is inadequate
Minor sediment deposition from upstream erosion13
![Page 14: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/14.jpg)
E i ti Q il V ll P d # 1Existing Quail Valley Pond # 1
View of facility from Centerway Rd Bottom of facility showing base flowView of facility from Centerway Rd Bottom of facility showing base flow
14Existing substandard riser. Sinkhole resulting from riser
degradation.
![Page 15: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/15.jpg)
Grade bottom of pond and eastern bank
Retrofit Design Details Grade bottom of pond and eastern bank.
Create a 3.5’ deep wet pool.
Remove and replace existing riser and outflow pipe.
Reconstruct portion of existing embankment. p g
Remove small diameter trees within limits of work.
P id th f i t Provide access path for maintenance.
Re‐vegetate pond and plant additional trees.
15
![Page 16: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/16.jpg)
P d P d R t fitProposed Pond Retrofit
16
Plan View
![Page 17: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/17.jpg)
Proposed Pond Retrofit
Profile
17
![Page 18: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/18.jpg)
Quail Valley Pond # 2Qua a ey o dSWM Retrofit
P j O iProject Overview
18
![Page 19: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/19.jpg)
D i ADrainage Area 48.9 acre drainage area to pond
24% impervious
19
![Page 20: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/20.jpg)
Existing Conditions
Constructed in the early 1980s
Fully developed drainage areay p g
Dry detention pond constructed in a stream valley
Very few ecological or water quality benefitsVery few ecological or water quality benefits
Good condition, but riser is nearing end of service life
Maintenance access is inadequate Maintenance access is inadequate
Minor sediment deposition from upstream erosion
Degradation and incision of downstream channel Degradation and incision of downstream channel
20
![Page 21: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/21.jpg)
E i ti Q il V ll P d # 2Existing Quail Valley Pond # 2
21
![Page 22: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/22.jpg)
Enlarge the storage volume to treat 50% of the
Retrofit Design Details Enlarge the storage volume to treat 50% of the Water Quality Volume (WQv)
Add a sand berm to increase infiltration
Grade an additional storage basin in existing open space adjacent to stream banks
Safely pass larger storms, including the 100‐year Safely pass larger storms, including the 100 year storm
22
![Page 23: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/23.jpg)
Retrofit Design Details
Install a forebay at the top of the pond to improve maintenance
Remove existing risers and replace with cobble riffle structures
Restore downstream channel using step poolsRestore downstream channel using step pools
Revegetate pond with native plants
23
![Page 24: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/24.jpg)
P d P d R t fitProposed Pond Retrofit
24
![Page 25: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/25.jpg)
Proposed Pond Retrofit
Profile of Proposed Retrofitp
25
Cross‐Section of Proposed Retrofit
![Page 26: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/26.jpg)
Stormwater Pond RetrofitStormwater Pond RetrofitDuring Constructiong
26
![Page 27: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/27.jpg)
Stormwater Pond RetrofitStormwater Pond RetrofitWithin 1 Year After Construction
27
![Page 28: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/28.jpg)
Stormwater Pond RetrofitStormwater Pond RetrofitWithin 5 Years After Construction
28
![Page 29: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/29.jpg)
Strawberry KnollStrawberry KnollUnderground SWM Facility
Project Overview
29
![Page 30: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/30.jpg)
D i ADrainage Area 20.5 acre drainage20.5 acre drainage area to facility
37% impervious
L d i l d Land cover includes roadway, sidewalks, manicured lawns, open space, and ope space, a dlandscaping.
30
![Page 31: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/31.jpg)
Existing Site Conditions
Parcel is owned by the Flower Hill Central Corporation
Parcel provides open space for Flower Hill Communityp p p y
Two stormdrain systems connect under open space
Flow in existing stormdrain is not treated for Water Quality orFlow in existing stormdrain is not treated for Water Quality or Channel Protection
Space is available on site to provide an SWM facility
Site is accessible from Strawberry Knoll Road
31
![Page 32: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/32.jpg)
E i ti O SExisting Open Space
Location of Proposed SWM Facility. Open space south of proposed facility.
32
Location of proposed construction and maintenance access.
Existing inlet which SWM system will connect to.
![Page 33: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/33.jpg)
Underground gravity driven treatment system
SWM Design Details Underground gravity driven treatment system. Three components: pretreatment, storage, and treatmenttreatment. Pretreatment simplifies and reduces the need for maintenancemaintenance.
Storage System stores stormwater until filtered. Filter replaces natural functions depleted with development Filter replaces natural functions depleted with development.
Provide stable vegetated access path for future maintenancemaintenance.
33
![Page 34: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/34.jpg)
P d SWM D iProposed SWM Design
34
Plan View
![Page 35: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/35.jpg)
Proposed SWM Design
35
Profile
![Page 36: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/36.jpg)
Grass Pavers
UrbanGreen Grass Paver Detail
36
![Page 37: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/37.jpg)
Stormwater Treatment
Vortechs Pretreatment System Stormfilter System
![Page 38: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/38.jpg)
Underground SWM FacilityUnderground SWM FacilityDuring Constructiong
38
Storage system being installed Watertight joint being sealed
![Page 39: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/39.jpg)
Q il V ll P d # 1 C t ti AQuail Valley Pond # 1 Construction Access
��������� ���� ���������
������� ����������������
� ������� �� ���������������
� ���������� ����� ���� �� �� ����� ������ ������ ������ ��� ���
���������������� ��������� ������� ����� �� � ������ � ���� ��������
39
![Page 40: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/40.jpg)
Q il V ll P d # 2 C t ti AQuail Valley Pond # 2 Construction Access
Access from CenterwayRoad Cl id h ill lik l Clear width will likely require tree removal and gradinggrading
Tree protection where needed
Mulch placed on path and removed after
i
40
construction
![Page 41: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/41.jpg)
St b K ll C t ti AStrawberry Knoll Construction Access
Access from Strawberry Knoll Road
ll b b l d Access will be stabilized to prevent sediment transport to Strawberry Knoll RoadStrawberry Knoll Road
Curb ramp and grass pavers will be provided at final stages of Location of proposed construction and
construction. Location of proposed construction and maintenance access.
41
![Page 42: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/42.jpg)
Construction Access (Example)
During Construction After ConstructionDuring Construction After Construction
![Page 43: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/43.jpg)
Reforestation
Attractive native trees and shrubs trees and shrubs will be planted within the project area
43
![Page 44: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/44.jpg)
Schedule
Public meeting to discuss 30% designs 2/11/2014Public meeting to discuss 30% designs 2/11/2014
60% design – Summer 2014
90% design Winter 201490% design – Winter 2014
Permits issued – Spring 2015
C t ti S Construction – Summer 2015
44
![Page 45: Feb 11 2014 public meeting](https://reader035.vdocuments.us/reader035/viewer/2022062419/5598acfe1a28abd03f8b47f5/html5/thumbnails/45.jpg)
Q ti /C t ?Questions/Comments?
Darian Copiz, Montgomery County Department of Environmental Protection240‐777‐7774 / [email protected]
45
4 777 7774 / p @ g y y gwww.montgomerycountymd.gov/watershedrestoration
Click on “Stream Restoration” and “Stormwater Pond Retrofits”