April 9, 2019Revised August 20, 2019
Feasibility Study for Town of Ballston Carpenter’s Acres
Sewer Project
Town of BallstonSaratoga County, New York
Prepared for:
Town of Ballston PO Box 67Burnt Hills, NY 12019
Prepared by:
C.T. MALE ASSOCIATES50 Century Hill Drive
Latham, New York 12110(518) 786-7400
FAX (518) 786-7299
C.T. Male Associates Project No: 19.9020
Unauthorized alteration or addition to thisdocument is a violation of the New York State Education Law. © Copyright 2019 C.T. MALE ASSOCIATES ENGINEERING, SURVEYING, ARCHITECTURE, LANDSCAPE ARCHITECTURE & GEOLOGY, D.P.C.
C.T. MALE ASSOCIATES
FEASIBILITY STUDYTOWN OF BALLSTON
CARPENTERS ACRES LOW PRESSURE SANITARY SEWER (LPSS) PROJECT
TABLE OF CONTENTSPage
1.0 INTRODUCTION............................................................................................................1
2.0 PROJECT DESCRIPTION .............................................................................................12.1 Option 1: North and West Portion ...........................................................................12.2 Option 2: North Portion Only ...................................................................................2
3.0 ESTIMATE OF PROJECT COST ..................................................................................33.1 Option 1 Cost Estimate...............................................................................................33.2 Option 2 Cost Estimate...............................................................................................43.2 Summary ......................................................................................................................5
Figures:
C-101, C-102, C-103 and C-104
Appendices
Appendix A: E-One LPSS Report
C.T. MALE ASSOCIATES
1.0 INTRODUCTION
This feasibility study has been prepared for the Town of Ballston to outline the proposed low-pressure sewer project in the northern portion of the Carpenter’s Acres neighborhood. Prior studies were performed for the entire Carpenter’s Acres neighborhood, with the costs per homeowner being considered not favorable. The portion of the neighborhood being studied in this report contains residents generally in the northern and western portion of the neighborhood who have expressed interest in public sewer and may have issues with failing on-site septic systems. Two options for a sewer service area are provided in this report. Option 1 includes the North and West portions of the neighborhood and Option 2 only includes the North portion of the neighborhood.
2.0 PROJECT DESCRIPTION
2.1 Option 1: North and West Portion
Option 1 will provide sewer access, provided by the Saratoga County Sewer District, to approximately 50 homes within the Carpenters Acres subdivision, see sheets C-101 and C-102 in Figure 1. The remaining residences in the study area either declined connection or did not provide a response and are not included in the sewer district for this study. Each dwelling is assumed to generate a flow of 250 gallons per day (gpd).
The proposed low pressure sanitary sewer system for Option 1 consists of 2” and 3” SDR 11 HDPE piping and extends from the southwest corner of the subdivision, running north along Moonlight Drive, then west on Cindy Lane and west on Robert Drive, then south on Reita Street and east to the roundabout on Cindy Lane.
Originally, the objective was to connect the neighborhood to the existing 2” LPSS located in Cornerstone Condos, the newer development off Route 50 to the east of Cindy Lane. However, Environment One calculated that this 2” line does not have capacity to receive additional flows generated from Carpenters Acres. Therefore, the installation of a new sewer parallel to the existing sewer would be required to convey sewage from Cindy Lane to Route 50. Calculations from Environmental One can be found in Appendix A.
The 3” force main from Carpenters Acres runs 300 feet west of the Cindy Lane cul-de-sac on private property, where an easement would need to be obtained, to the roundabout in Cornerstone Condos. From this point, the main runs in parallel with the existing force main
C.T. MALE ASSOCIATES
in Cornerstone Condos south to the existing forcemain manhole on Route 50 where it ties into the 4” dry line previously constructed for future use. The proposed route through Cornerstone Condos can be seen on sheet C-103 in Figure 1. This existing 4” dry sewer was proposed during the 2008 Cornerstone Condominium development specifically for future development. The dry line runs parallel to the 3” SDR9 force main on Route 50 used to convey flows from the Cornerstone Condos. The dry line is 4” SDR 9 and then expands to 6” SDR 9 as it travels further south on Route 50.
2.2 Option 2: North Portion Only
Option 2 will provide sewer access, provided by the Saratoga County Sewer District, to approximately 48 homes within the Carpenters Acres subdivision for the northern most homes in the neighborhood. Every residence that has the sewer passing by the property will be in the sewer district under this option. Each dwelling is assumed to generate a flow of 250 gallons per day (gpd).
The proposed low pressure sanitary sewer system consists of 2” and 3” SDR 11 HDPE piping and extends from the northwest corner of the subdivision, running north along Moonlight Drive, then west on Robert Drive, then south on Reita Street and east to the roundabout on Cindy Lane. Maps of the proposed layout within Carpenters Acres can be seen on sheet C-104 in Figure 1.
As with Option 1, Environment One calculated that the 2” line in Cornerstone Condos does not have capacity to receive additional flows generated from Carpenters Acres. Therefore, the installation of a new sewer parallel to the existing sewer would be required to convey sewage from Cindy Lane to Route 50.
C.T. MALE ASSOCIATES
3.0 ESTIMATE OF PROJECT COST
3.1 Option 1 Cost Estimate
A budget level cost estimate was developed for Option 1 and is included in Table 1.
Table 1- Budget Level Cost Estimate for Option 1
Description Quantity Units Unit Cost Cost Contractor Mobilization & Admin 1 LS $ 75,000 $ 75,000 Maintenance & Protection of Traffic Control 1 LS $ 25,000 $ 25,000 Road Restoration 510 SY $ 170.00 $ 86,700 Air/Vacuum Release Valves 1 EA $ 9,000 $ 9,000 Clean Out 9 EA $ 2,500 $ 22,500 Service Connection to Force Main 50 EA $ 300 $ 15,000 1-1/4" Lateral Pipe 2500 LF $ 32 $ 80,000 2" SDR 11 HDPE Pipe 2338 LF $ 36 $ 84,869 3" SDR 11 HDPE Pipe 5123 LF $ 40 $ 204,920
Subtotal $ 602,989 Contingency (25%) $ 150,747 SUBTOTAL CONSTRUCTION $ 753,737 ENGINEERING & OTHER SOFT COSTS (25%) $ 188,434 TOTAL PROJECT COSTS $ 942,171 Cost per Linear Foot $ 126.28
Number of EDUS 50Annual Debt Service (30 yrs, 2.25%) $ 43,217 Annual Cost per EDU $ 864
The total estimated cost for Option 1 is $942,171. The project cost includes a 25% contingency due to the schematic level of the project design. The road restoration factored into the estimate includes all laterals in Carpenters Acres that cross the right-of-way and existing roadway restoration in Cornerstone Condos. The remainder of the sewer will be installed off the road shoulder. This estimate assumes excavated trenches and no rock removal.
For the purposes of the financial analysis presented here, the project cost will be assumed to be bonded over 30 years at a 2.25% annual interest rate and a straight-line principal
C.T. MALE ASSOCIATES
repayment schedule. At this rate, the cost to the average user is approximately $864 per year. In addition to the cost for the bond associated with the infrastructure in the right-of-way, each homeowner would be required to pay to connect to the sewer. The estimated cost for the grinder pump and connection to the main varies depending on the length of sewer but is in the range of $3,500 to $5,000. The annual O&M cost for the Saratoga County Sewer District is $240. The capital cost plus the O&M costs for Option 1 are estimated at $1,104.
A general “litmus” test for the cost formation of special districts is guidance from the NYS Office of the Comptroller. The Comptroller provides guidance on Town and County Special Districts proposing to issue debt to finance a special district. For 2019, the special district average estimated cost threshold for sewer project is $845, which includes both capital cost and O&M costs.
3.2 Option 2 Cost Estimate
A budget level cost estimate was developed for Option 2 and is included in Table 2.
Table 2- Budget Level Cost Estimate for Option 2
Description Quantity Units Unit Cost Cost Contractor Mobilization & Admin 1 LS $ 75,000 $ 75,000Maintenance & Protection of Traffic Control 1 LS $ 25,000 $ 25,000Road Restoration 480 SY $ 170.00 $ 81,600Air/Vacuum Release Valves 1 EA $ 9,000 $ 9,000Clean Out 9 EA $ 2,500 $ 22,500Service Connection to Force Main 50 EA $ 300 $ 14,4001-1/4" Lateral Pipe 2400 LF $ 32 $ 76,8002" SDR 11 HDPE Pipe 36 LF $ 36 $ 26,4993" SDR 11 HDPE Pipe 3425 LF $ 40 $ 137,000
Subtotal $ 467,799Contingency (25%) $ 116,950SUBTOTAL CONSTRUCTION $ 584,749ENGINEERING & OTHER SOFT COSTS (25%) $ 146,187 TOTAL PROJECT COSTS $ 730,936 Cost per Linear Foot $ 175.92
Number of EDUS 48
C.T. MALE ASSOCIATES
Annual Debt Service (30 yrs, 2.25%) $ 33,527.64Annual Cost per EDU $ 698
The total estimated cost for Option 2 is $730,936. The project cost includes a 25% contingency due to the schematic level of the project design. The road restoration factored into the estimate includes all laterals in Carpenters Acres that cross the right-of-way and existing roadway restoration in Cornerstone Condos. The remainder of the sewer will be installed off the road shoulder. This estimate assumes excavated trenches and no rock removal.
For the purposes of the financial analysis presented here, the project cost will be assumed to be bonded over 30 years at a 2.25% annual interest rate and a straight-line principal repayment schedule. At this rate, the cost to the average user is approximately $698 per year. In addition to the cost for the bond associated with the infrastructure in the right-of-way, each homeowner would be required to pay to connect to the sewer. The estimated cost for the grinder pump and connection to the main varies depending on the length of sewer but is in the range of $3,500 to $5,000. The annual O&M cost for the Saratoga County Sewer District is $240. The capital cost plus the O&M costs for this sewer area are estimated at $938.
A general “litmus” test for the cost formation of special districts is guidance from the NYS Office of the Comptroller. The Comptroller provides guidance on Town and County Special Districts proposing to issue debt to finance a special district. For 2019, the special district average estimated cost threshold for sewer project is $845, which includes both capital cost and O&M costs.
3.2 Summary
The above analysis is theoretical and is meant to be indicative of the financial impacts of the project. It is not meant to provide exact numbers. Many factors will affect the exact impacts which will not be determined for several years. These include the length of the bond repayment term, the interest rate which is bid by investors at the time of bond letting and the type of bond repayment selected by the Town’s Fiscal Officer.
C.T. MALE ASSOCIATES
Prepared by:
C. T. MALE ASSOCIATES
Kathryn C. Serra, P.E.Project Manager
C.T. MALE ASSOCIATES
Figure 1Sewer Maps
C-101, C-102, C-103 and C-104
22.1
C
IN
D
Y
L
A
N
E
C
IN
D
Y
L
A
N
E
M
O
O
N
L
IG
H
T
D
R
IV
E
H
A
R
O
L
D
S
T
R
E
E
T
N
O
R
T
H
A
V
E
N
U
E
R
E
IT
A
S
T
R
E
E
T
M
O
O
N
L
IG
H
T
D
R
IV
E
R
EITA
S
TR
EET
R
O
B
E
R
T
D
R
IV
E
W
W
W
W
W
W
W
W
51
1
37
38
39
40
41
42
35
3
4
5
6
7
8
17
16
15
9
10
11
12
13
14
15
14
81
12
11
10
9
8
7
6
5
4
25
24
23
22
21
20
19
18
27
43
44
45
29
49
48
47
46
34
33
32
31
30
1
3.2
3.1
79.112
79.113
79.12
79.114
66
79.3
48
79.2
65
49
45
18
19
20
21
82
47
46
80
44
23
24
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
S
S
EASEMENT REQUIRED
3
"
L
P
S
S
3
"
L
P
S
S
3
"
L
P
S
S
2
"
L
P
S
S
3" LPSS
FMH3
FMH4
3
"
L
P
S
S
3
"
L
P
S
S
2" LPSS
2
"
L
P
S
S
APPR.REVISIONS RECORD/DESCRIPTION
5
7
9
8
6
3
4
2
1
DATE DRAFTER CHECK
:DRAFTED
CHECKED
PROJ. NO
SCALE :
DATE :
:
:
UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DOCUMENT IS A
VIOLATION OF THE NEW YORK STATE
EDUCATION LAW.
C.T. MALE ASSOCIATES
:
c
DWG. NO:
SHEET OF
PROJECT NUMBER:
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 CENTURY HILL DRIVE, LATHAM, NY 518.786.7400
www.ctmale.com
COBLESKILL, NY · GLENS FALLS, NY · POUGHKEEPSIE, NY · JOHNSTOWN, NY
LITTLE FALLS, NY · RED HOOK, NY · SYRACUSE, NY
19.9020
10.____
19-0190
CARPENTERS ACRES SEWER FEASIBILITY
TOWN OF BALLSTON SARATOGA COUNTY, NEW YORK
2019
APRIL 2019
4
XREFS:
CAD
D
WG
. FILE N
AM
E:
CAD
D
WG
. FILE N
AM
E:
APPROVED
Sew
er_Feasibility.dw
g
K:\Projects\199020\Civil\D
raw
ings-M
aps\01_Concept D
raw
ings\Sew
er_Feasibility.dw
g
OPTION 1; NORTH SEWER LAYOUT
KCS
JLG
KCS
1" = 100'
C-101
1
NONE
BAR SCALE
1 inch = ft.
LEGEND:
= POSSIBLE SEWER AREA
= LOW PRESSURE SANITARY
SEWER
= LATERAL TO PROPERTY
LINE
MATCHLINE SEE SHEET C-102
MATCH
LIN
E SEE SH
EET C-103
SS
60
72
73
74
75
22.1
M
O
O
N
L
IG
H
T
D
R
IV
E
M
O
O
N
L
IG
H
T
D
R
IV
E
P
IN
E
G
R
O
V
E
A
V
E
N
U
E
S
U
N
S
E
T
A
V
E
N
U
E
P
IN
E
G
R
O
V
E
A
V
E
N
U
E
M
O
O
N
L
IG
H
T
D
R
IV
E
H
A
R
O
L
D
S
T
R
E
E
T
H
A
R
O
L
D
S
T
R
E
E
T
N
O
R
T
H
A
V
E
N
U
E
R
E
IT
A
S
T
R
E
E
T
R
E
IT
A
S
T
R
E
E
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
15
14
81
12
11
10
9
8
7
6
5
4
1
3.2
3.1
79.112
79.113
79.12
79.114
78
77
66
79.3
48
79.2
65
49
45
18
19
20
21
82
47
46
80
76
67
68
50
44
23
24
64
63
69
70
62
71 61
51
52
53
54 40
41.2
41.1
42
43
29
28
27
26
25
35
3433
32
31
30
39
37
36
38
55
56
57
58
59
P
IN
E
G
R
O
V
E
A
V
E
N
U
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
3
"
L
P
S
S
2
"
L
P
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2
"
L
P
S
S
4
"
S
D
R
9
E
X
I
S
T
I
N
G
F
O
R
C
E
M
A
I
N
APPR.REVISIONS RECORD/DESCRIPTION
5
7
9
8
6
3
4
2
1
DATE DRAFTER CHECK
:DRAFTED
CHECKED
PROJ. NO
SCALE :
DATE :
:
:
UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DOCUMENT IS A
VIOLATION OF THE NEW YORK STATE
EDUCATION LAW.
C.T. MALE ASSOCIATES
:
c
DWG. NO:
SHEET OF
PROJECT NUMBER:
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 CENTURY HILL DRIVE, LATHAM, NY 518.786.7400
www.ctmale.com
COBLESKILL, NY · GLENS FALLS, NY · POUGHKEEPSIE, NY · JOHNSTOWN, NY
LITTLE FALLS, NY · RED HOOK, NY · SYRACUSE, NY
19.9020
10.____
19-0190
CARPENTERS ACRES SEWER FEASIBILITY
TOWN OF BALLSTON SARATOGA COUNTY, NEW YORK
2019
APRIL 2019
4
XREFS:
CAD
D
WG
. FILE N
AM
E:
CAD
D
WG
. FILE N
AM
E:
APPROVED
Sew
er_Feasibility.dw
g
K:\Projects\199020\Civil\D
raw
ings-M
aps\01_Concept D
raw
ings\Sew
er_Feasibility.dw
g
OPTION 1: SOUTH SEWER LAYOUT
KCS
JLG
KCS
1" = 100'
C-102
2
NONE
BAR SCALE
1 inch = ft.
LEGEND:
= POSSIBLE
SEWER AREA
= LOW PRESSURE
SANITARY
SEWER
= LATERAL TO
PROPERTY LINE
MATCHLINE SEE SHEET C-101
SS
22.1
C
IN
D
Y
L
A
N
E
S
U
N
S
E
T
A
V
E
N
U
E
P
IN
E
G
R
O
V
E
A
V
E
N
U
E
R
E
IT
A
S
T
R
E
E
T
R
E
IT
A
S
T
R
E
E
T
W
W
W
5
6
7
8
17
16
15
9
10
11
12
13
14
15
14
81
12
11
18
19
20
21
82
23
24
29
28
27
26
25
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
EASEMENT REQUIRED
3
"
L
P
S
S
CONNECT TO EXISTING
4" SDR 9 AT FMH2
S
S
S
S
S
S
S
S
S
S
S
S
S
S
FMH2
FMH3
FMH4
3
"
L
P
S
S
3
"
L
P
S
S
3
"
L
P
S
S
4
"
S
D
R
9
E
X
I
S
T
I
N
G
F
O
R
C
E
M
A
I
N
APPR.REVISIONS RECORD/DESCRIPTION
5
7
9
8
6
3
4
2
1
DATE DRAFTER CHECK
:DRAFTED
CHECKED
PROJ. NO
SCALE :
DATE :
:
:
UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DOCUMENT IS A
VIOLATION OF THE NEW YORK STATE
EDUCATION LAW.
C.T. MALE ASSOCIATES
:
c
DWG. NO:
SHEET OF
PROJECT NUMBER:
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 CENTURY HILL DRIVE, LATHAM, NY 518.786.7400
www.ctmale.com
COBLESKILL, NY · GLENS FALLS, NY · POUGHKEEPSIE, NY · JOHNSTOWN, NY
LITTLE FALLS, NY · RED HOOK, NY · SYRACUSE, NY
19.9020
10.____
19-0190
CARPENTERS ACRES SEWER FEASIBILITY
TOWN OF BALLSTON SARATOGA COUNTY, NEW YORK
2019
APRIL 2019
4
XREFS:
CAD
D
WG
. FILE N
AM
E:
CAD
D
WG
. FILE N
AM
E:
APPROVED
Sew
er_Feasibility.dw
g
K:\Projects\199020\Civil\D
raw
ings-M
aps\01_Concept D
raw
ings\Sew
er_Feasibility.dw
g
OPTION 1: EAST SEWER LAYOUT
KCS
JLG
KCS
1" = 100'
C-103
3
NONE
BAR SCALE
1 inch = ft.
LEGEND:
= POSSIBLE SEWER AREA
= LOW PRESSURE SANITARY
SEWER
= LATERAL TO PROPERTY
LINE
MATCH
LIN
E SEE SH
EET C-101
SS
M
O
O
N
L
IG
H
T
D
R
IV
E
C
IN
D
Y
L
A
N
E
R
O
B
E
R
T
D
R
IV
E
22.1
C
IN
D
Y
L
A
N
E
H
A
R
O
L
D
S
T
R
E
E
T
N
O
R
T
H
A
V
E
N
U
E
R
E
IT
A
S
T
R
E
E
T
M
O
O
N
L
IG
H
T
D
R
IV
E
R
EITA
S
TR
EET
W
W
W
W
W
W
W
W
51
1
37
38
39
40
41
42
35
3
4
5
6
7
8
17
16
15
9
10
11
12
13
14
15
14
81
12
11
10
9
8
7
6
5
4
25
24
23
22
21
20
19
18
27
43
44
45
29
49
48
47
46
34
33
32
31
30
1
3.2
3.1
79.112
79.113
79.12
79.114
66
79.3
48
79.2
65
49
45
18
19
20
21
82
47
46
80
44
23
24
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
EASEMENT REQUIRED
3
"
L
P
S
S
3
"
L
P
S
S
FMH3
3
"
L
P
S
S
3" LPSS
FMH4
2" LPSS
3
"
L
P
S
S
2
"
L
P
S
S
S
S
S
S
S
S
S
S
S
S
SS
APPR.REVISIONS RECORD/DESCRIPTION
5
7
9
8
6
3
4
2
1
DATE DRAFTER CHECK
:DRAFTED
CHECKED
PROJ. NO
SCALE :
DATE :
:
:
UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DOCUMENT IS A
VIOLATION OF THE NEW YORK STATE
EDUCATION LAW.
C.T. MALE ASSOCIATES
:
c
DWG. NO:
SHEET OF
PROJECT NUMBER:
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 CENTURY HILL DRIVE, LATHAM, NY 518.786.7400
www.ctmale.com
COBLESKILL, NY · GLENS FALLS, NY · POUGHKEEPSIE, NY · JOHNSTOWN, NY
LITTLE FALLS, NY · RED HOOK, NY · SYRACUSE, NY
19.9020
10.____
19-0190
CARPENTERS ACRES SEWER FEASIBILITY
TOWN OF BALLSTON SARATOGA COUNTY, NEW YORK
2019
AUGUST 2019
4
XREFS:
CAD
D
WG
. FILE N
AM
E:
CAD
D
WG
. FILE N
AM
E:
APPROVED
Sew
er_Feasibility_O
ption2.dw
g
K:\Projects\199020\Civil\D
raw
ings-M
aps\01_Concept D
raw
ings\Sew
er_Feasibility_O
ption2.dw
g
OPTION 2: NORTH SEWER LAYOUT
KCS
AJB
KCS
1" = 100'
C-104
4
NONE
BAR SCALE
1 inch = ft.
LEGEND:
= POSSIBLE SEWER AREA
= LOW PRESSURE SANITARY
SEWER
= LATERAL TO PROPERTY
LINE
MATCHLINE SEE SHEET C-102
MATCH
LIN
E SEE SH
EET C-103
SS
C.T. MALE ASSOCIATES
Appendix A
E-One LPSS Analysis
Environment One Corporation
Pressure Sewer Preliminary
Cost and Design Analysis
For
Carpenter Acres, NY
rev. 1
Prepared For:
C.T. Male Associates
50 Century Hill Drive
NYLatham US
Tel: 518-786-7400
Fax:
Prepared By: N. Shafarzek
March 18, 2019
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 1 ideal.EOne
Carpenter Acres, NY
rev. 1
On:Prepared by : March 18, 2019N. Shafarzek
Notes :
Analysis based on drawings and data provided. Station recommendations preliminary.
GPD values effect retention times only, not line sizing or hydraulics.
Elevations taken from google earth - no elevation on drawings received.
Please note: Running flow for 50 homes through the 2" and 3" line will not work well, if at
all. The friction losses are simply too high in combination with the large static head due to
the elvation spike at the beginning of zone 11 (TDH values rise to almost 400 ft if we attempt
to use existing pipe sizing).
We highly recommend using new SDR11 HDPE pipe to serve this subdivision. I noticed
SDR 9 was used for the previous installation - This is overkill and the pipe IDs are smaller
for the same nominal size which will increase TDH unnecessarily.
<<<<< E N D O F N O T E S >>>>>
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 1 ideal.EOne
March 18, 2019
Budgetary Low Pressure Sewer System Costs
Carpenter Acres, NY
rev. 1
Quantity Sub TotalDescription Unit Cost Installation
Valves 1 Air/Vacuum Release Valve $0.00$0.00 0.00
9 Clean Out $0.00$0.00 0.00
$0.00
Pumps 50 DH071-93 $0.00$0.00 0.00
50 Pump/Panel Installation $0.00$0.00 0.00
50 Lateral (Boundary) Kits $0.00$0.00 0.00
50 Lateral (Boundary) Installation $0.00$0.00 0.00
2,500 linear feet of 1-1/4" lateral pipe $0.00$0.00 0.00
$0.00
Piping 2,338 2.00" Pipe $0.00$0.00 0.00
5,123 3.00" Pipe $0.00$0.00 0.00
1,281 4.00" Pipe $0.00$0.00 0.00
$0.00
Total Per Connection Total (w/o other) >>>>>>>>>>>> $0.00$0.00Grand Total Per Connection Grand Total (including other) >>>>>>>>>>>> $0.00$0.00
Number of Connections 50
Note: The System Costs above are based on piping sized for, and Grinder Pumps manufactured by Environment One Corporation.
Page 1 M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 1 ideal.EOne
PRELIMINARY PRESSURE SEWER - PIPE SIZING AND BRANCH ANALYSIS
Prepared By: Carpenter Acres, NY
March 18, 2019rev. 1N. Shafarzek
Max Main
Elevation
Minimum Pump
Elevation
Zone
Number
Connects
to Zone
Number
of Pumps
in Zone
Max
Sim Ops
Accum
Pumps
in Zone
Length of Main
this Zone
Pipe Size
(inches)
Max Flow
Per Pump
(gpm)
Gals/day
per Pump
Max
Velocity
(FPS)
Friction Loss
Factor
(ft/100 ft)
Friction
Loss This
Zone
Accum Fric
Loss (feet)Max Flow
(GPM)
Static Head
(feet)
Total
Dynamic
Head (ft)
Friction loss calculations were based on a Constant for inside roughness"C" of:This spreadsheet was calculated using pipe diameters for: SDR11HDPE 150
1.00 1.19 3.42 71.63 424.00 353.00 71.00 142.632.00 288.002.0022.00 2.3823 3 11.00250
2.00 2.52 19.27 68.21 424.00 347.00 77.00 145.213.00 765.002.0033.00 3.5736 9 11.00250
3.00 0.65 4.06 48.94 424.00 349.00 75.00 123.946.00 625.003.0044.00 2.1944 13 11.00250
4.00 1.19 4.58 53.77 424.00 338.00 86.00 139.775.00 385.002.0022.00 2.3823 3 11.00250
5.00 2.52 4.31 49.19 424.00 344.00 80.00 129.196.00 171.002.0033.00 3.5732 5 11.00250
6.00 0.98 11.65 44.88 424.00 347.00 77.00 121.8810.00 1,186.003.0055.00 2.74511 29 11.00250
7.00 1.19 3.38 56.11 424.00 340.00 84.00 140.118.00 284.002.0022.00 2.3823 3 11.00250
8.00 2.52 11.21 52.73 424.00 338.00 86.00 138.739.00 445.002.0033.00 3.5736 9 11.00250
9.00 0.65 8.29 41.52 424.00 341.00 83.00 124.5210.00 1,276.003.0044.00 2.1946 15 11.00250
10.00 1.38 16.02 33.23 424.00 357.00 67.00 100.2311.00 1,163.003.0066.00 3.2966 50 11.00250
11.00 1.38 6.79 17.21 424.00 400.00 24.00 41.2115.00 493.003.0066.00 3.2960 50 11.00250
15.00 1.38 5.23 10.42 361.00 353.00 8.00 18.4216.00 380.003.0066.00 3.2960 50 11.00250
16.00 0.41 1.70 5.19 361.00 361.00 0.00 5.1917.00 420.004.0066.00 1.9960 50 11.00250
17.00 0.41 3.49 3.49 361.00 361.00 0.00 3.4917.00 861.004.0066.00 1.9960 50 11.00250
1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One.
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 1 ideal.EOne
PRELIMINARY PRESSURE SEWER- ACCUMULATED RETENTION TIME(HR)
Carpenter Acres, NYPrepared By:
N. Shafarzek March 18, 2019rev. 1
Length of Zone Average Retention
Time (Hr)
Accumulated
Retention Time (Hr)
Connects to
Zone
Zone
Number
Average Fluid
Changes per Day
Accumulated
Total of Pumps
this Zone
Pipe Size (inches) Gallons per 100
lineal feet
Capacity of Zone Average Daily Flow
This spreadsheet was calculated using pipe diameters for: SDR11HDPE 250Gals per Day per Dwelling
288.00 44.36 750 16.91 1.42 8.201.00 2.00 3 2.00 15.40
765.00 117.83 2,250 19.10 1.26 6.782.00 3.00 9 2.00 15.40
625.00 209.17 3,250 15.54 1.54 5.533.00 6.00 13 3.00 33.47
385.00 59.30 750 12.65 1.90 6.394.00 5.00 3 2.00 15.40
171.00 26.34 1,250 47.46 0.51 4.495.00 6.00 5 2.00 15.40
1,186.00 396.91 7,250 18.27 1.31 3.986.00 10.00 29 3.00 33.47
284.00 43.74 750 17.15 1.40 7.537.00 8.00 3 2.00 15.40
445.00 68.54 2,250 32.83 0.73 6.138.00 9.00 9 2.00 15.40
1,276.00 427.03 3,750 8.78 2.73 5.409.00 10.00 15 3.00 33.47
1,163.00 389.22 12,500 32.12 0.75 2.6710.00 11.00 50 3.00 33.47
493.00 164.99 12,500 75.76 0.32 1.9211.00 15.00 50 3.00 33.47
380.00 127.17 12,500 98.29 0.24 1.6015.00 16.00 50 3.00 33.47
420.00 232.32 12,500 53.81 0.45 1.3616.00 17.00 50 4.00 55.31
861.00 476.25 12,500 26.25 0.91 0.9117.00 17.00 50 4.00 55.31
1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 1 ideal.EOne
Environment One Corporation
Pressure Sewer Preliminary
Cost and Design Analysis
For
Carpenter Acres, NY
rev. 2
Prepared For:
C.T. Male Associates
50 Century Hill Drive
NYLatham US
Tel: 518-786-7400
Fax:
Prepared By: N. Shafarzek
August 19, 2019
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne
Carpenter Acres, NY
rev. 2
On:Prepared by : August 19, 2019N. Shafarzek
Notes :
Analysis based on drawings and data provided. Station recommendations preliminary.
GPD values effect retention times only, not line sizing or hydraulics.
Elevations taken from google earth - no elevation on drawings received.
Please note: Running flow for 50 homes through the 2" and 3" line will not work well, if at
all. The friction losses are simply too high in combination with the large static head due to
the elvation spike at the beginning of zone 11 (TDH values rise to almost 400 ft if we attempt
to use existing pipe sizing).
We highly recommend using new SDR11 HDPE pipe to serve this subdivision. I noticed
SDR 9 was used for the previous installation - This is overkill and the pipe IDs are smaller
for the same nominal size which will increase TDH unnecessarily.
rev. 2 - adjusted layout per Andrew Bailey @ CT Male. While the service area was reduced
in size more stations were added so the overall flow is about the same as in rev. 1. (48 accum.
pumps vs. 50) Using existing 2" line is still a no-go due to high number of stations and
elevation spike in zone 11.
<<<<< E N D O F N O T E S >>>>>
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne
August 19, 2019
Budgetary Low Pressure Sewer System Costs
Carpenter Acres, NY
rev. 2
Quantity Sub TotalDescription Unit Cost Installation
Valves 1 Air/Vacuum Release Valve $0.00$0.00 0.00
9 Clean Out $0.00$0.00 0.00
$0.00
Pumps 48 DH071-93 $0.00$0.00 0.00
48 Pump/Panel Installation $0.00$0.00 0.00
48 Lateral (Boundary) Kits $0.00$0.00 0.00
48 Lateral (Boundary) Installation $0.00$0.00 0.00
2,400 linear feet of 1-1/4" lateral pipe $0.00$0.00 0.00
$0.00
Piping 1,498 2.00" Pipe $0.00$0.00 0.00
3,277 3.00" Pipe $0.00$0.00 0.00
1,281 4.00" Pipe $0.00$0.00 0.00
$0.00
Total Per Connection Total (w/o other) >>>>>>>>>>>> $0.00$0.00Grand Total Per Connection Grand Total (including other) >>>>>>>>>>>> $0.00$0.00
Number of Connections 55
Note: The System Costs above are based on piping sized for, and Grinder Pumps manufactured by Environment One Corporation.
Page 1 M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne
PRELIMINARY PRESSURE SEWER - PIPE SIZING AND BRANCH ANALYSIS
Prepared By: Carpenter Acres, NY
August 19, 2019rev. 2N. Shafarzek
Max Main
Elevation
Minimum Pump
Elevation
Zone
Number
Connects
to Zone
Number
of Pumps
in Zone
Max
Sim Ops
Accum
Pumps
in Zone
Length of Main
this Zone
Pipe Size
(inches)
Max Flow
Per Pump
(gpm)
Gals/day
per Pump
Max
Velocity
(FPS)
Friction Loss
Factor
(ft/100 ft)
Friction
Loss This
Zone
Accum Fric
Loss (feet)Max Flow
(GPM)
Static Head
(feet)
Total
Dynamic
Head (ft)
Friction loss calculations were based on a Constant for inside roughness"C" of:This spreadsheet was calculated using pipe diameters for: SDR11HDPE 150
1.00 1.19 1.53 60.29 424.00 338.00 86.00 146.292.00 129.002.0022.00 2.3823 3 11.00250
2.00 2.52 12.35 58.76 424.00 340.00 84.00 142.763.00 490.002.0033.00 3.5736 9 11.00250
3.00 0.65 2.96 46.41 424.00 338.00 86.00 132.414.00 456.003.0044.00 2.1949 18 11.00250
4.00 0.98 10.08 43.45 424.00 341.00 83.00 126.456.00 1,026.003.0055.00 2.74512 30 11.00250
5.00 2.52 4.56 37.93 424.00 347.00 77.00 114.936.00 181.002.0033.00 3.5734 4 11.00250
6.00 1.38 12.70 33.37 424.00 357.00 67.00 100.3711.00 922.003.0066.00 3.29614 48 11.00250
11.00 1.38 6.79 20.67 424.00 400.00 24.00 44.6715.00 493.003.0066.00 3.2962 50 11.00250
12.00 1.19 2.53 25.38 438.00 416.00 22.00 47.3814.00 213.002.0022.00 2.3822 2 11.00250
13.00 1.19 1.53 24.38 426.00 397.00 29.00 53.3814.00 129.002.0022.00 2.3822 2 11.00250
14.00 2.52 8.97 22.85 416.00 416.00 0.00 22.8515.00 356.002.0033.00 3.5730 4 11.00250
15.00 1.83 6.96 13.88 361.00 353.00 8.00 21.8816.00 380.003.0077.00 3.8371 55 11.00250
16.00 0.54 2.27 6.92 361.00 361.00 0.00 6.9217.00 420.004.0077.00 2.3270 55 11.00250
17.00 0.54 4.65 4.65 361.00 361.00 0.00 4.6517.00 861.004.0077.00 2.3270 55 11.00250
1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One.
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne
PRELIMINARY PRESSURE SEWER- ACCUMULATED RETENTION TIME(HR)
Carpenter Acres, NYPrepared By:
N. Shafarzek August 19, 2019rev. 2
Length of Zone Average Retention
Time (Hr)
Accumulated
Retention Time (Hr)
Connects to
Zone
Zone
Number
Average Fluid
Changes per Day
Accumulated
Total of Pumps
this Zone
Pipe Size (inches) Gallons per 100
lineal feet
Capacity of Zone Average Daily Flow
This spreadsheet was calculated using pipe diameters for: SDR11HDPE 250Gals per Day per Dwelling
129.00 19.87 750 37.75 0.64 5.751.00 2.00 3 2.00 15.40
490.00 75.47 2,250 29.81 0.81 5.112.00 3.00 9 2.00 15.40
456.00 152.61 4,500 29.49 0.81 4.313.00 4.00 18 3.00 33.47
1,026.00 343.37 7,500 21.84 1.10 3.494.00 6.00 30 3.00 33.47
181.00 27.88 1,000 35.87 0.67 3.065.00 6.00 4 2.00 15.40
922.00 308.56 12,000 38.89 0.62 2.396.00 11.00 48 3.00 33.47
493.00 164.99 12,500 75.76 0.32 1.7811.00 15.00 50 3.00 33.47
213.00 32.81 500 15.24 1.57 4.3512.00 14.00 2 2.00 15.40
129.00 19.87 500 25.16 0.95 3.7313.00 14.00 2 2.00 15.40
356.00 54.83 1,000 18.24 1.32 2.7714.00 15.00 4 2.00 15.40
380.00 127.17 13,750 108.12 0.22 1.4615.00 16.00 55 3.00 33.47
420.00 232.32 13,750 59.19 0.41 1.2416.00 17.00 55 4.00 55.31
861.00 476.25 13,750 28.87 0.83 0.8317.00 17.00 55 4.00 55.31
1Page Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One
M:\SSB\SSB Engineering Data\AE Projects\Carpenters Acres, NY\Carpenter's Acres, NY EOne LPS Analysis rev. 2 ideal.EOne