    FIELD DEVELOPMENT PROJECT I (PCB 4032)15 JAN 2015

    Kick

    -

    off Briefing

    Berihun Mamo Negash (L-1-24)

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    2/17

    PRESENTATION OUTLINE

    Introduction1

    Objectives2

    Task3

    Proposed Milestone4

    Rules and regulations5

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    3/17

    PRESENTATION OUTLINE (CONT)

    Resources6

    Roles and responsibilities7

    Assessment8

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    4/17

    OBJECTIVES

    Is to carry out avolumetric calculationinpreparation for technical and economicstudy of a field focusing on the latest

    technology, economics, environmentaland political conditions.

    2

    The ultimate objective is to prepare asingle report to satisfy the requirementsof the panel of examiners.

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    5/17

    TASKSFDP

    FDP I

    (2 Cr. Hrs)

    Static Modelling &

    Volumetric calculation

    FDP II

    (3 Cr. Hrs)

    Dynamic Modeling

    Technical and economic evaluation

    Develop a static model for the Gulfaks field andPerform volumetric calculation using PETREL.

    Manually Calculate the volumetric and compare

    results. (Probabilistic and Deterministic)

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    6/17

    PROPOSED MILESTONE

    No Items Date (2015)

    1. FDP I BRIEFING AND DATA HANDOVER 15 JAN (WEEK 1)

    2. INTRO TO PETREL SEMINAR.

    G & G SEMINARS.

    21 JAN (WEEK 2)

    04 FEB (WEEK 4)

    3. PROGRESS REPORT SUBMISSION- PETREL 18 FEB (WEEK 6)

    4. PRESENTATION-PETREL (SUPERVISORS) (WEEK 7)

    5. PROGRESS REPORT SUBMISSION-MANUAL 27 MAR (WEEK 11)

    6. PRESENTATION-MANUAL (SUPERVISORS) (WEEK 12)

    7. FINAL G&G REPORT SUBMISSION 08 APR (WEEK 13)

    8. FINAL PRESENTATION 15 APR (WEEK 14)

    9. ONLINE TEST 16 APR (WEEK 14)

    10. PEER EVALUATION 15 APR (WEEK 14)

    3

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    7/17

    RULES AND REGULATIONSREPORT

    ALL REPORTS SHOULD BE SUBMITTED BY THE DEADLINE.

    INTERIM REPORTS WILL BE PRESENTED TO SUPERVISORS.

    FINAL REPORT WILL BE PRESENTED TO TWO OR MORE INTERNAL EXAMINERS.

    REPORT FORMAT

    THERE IS NO STANDARD FORMAT, EACH GROUP SHOULD DISCUSS WITH

    RESPECTIVE SUPERVISOR AND COME UP WITH THE BEST REPORT.

    SEMINARS

    ALL STUDENTS SHOULD ATTEND SEMINARS

    ANY ABSENTEE WILL BE PENALIZED (5 % OF TOTAL MARK FOR EACH DAY

    MISSED)

    LOGBOOK

    EACH STUDENT MUST PRODUCE A LOGBOOK FOR EACH WEEKS ACTIVITY

    AND GET ENDORSEMENT FROM THE SUPERVISOR.

    PEER EVALUATION HONESTLY EVALUATE YOUR GROUP MATE

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    8/17

    Final Poster Presentation (Sell Idea)--NEW!!!

    (FDP II)

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    9/17

    Available software for the project (Pocket C5 and Building 15)

    Petrel (Static Modelling)

    Eclipse (Dynamic Modelling)

    PipeSim

    PanSystem

    WellFlo (Well Performance)

    PEEP (Petroleum Economics)

    Questor (Facilities and Economics)

    Landmark (Drilling)

    Resources

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    10/17

    ROLE & RESPONSIBILITY

    StudentsTo produce report which clearly defines the objective (s) and the

    scope of project work

    To plan meeting schedule with their Supervisors

    To adhere to the meeting schedule with the Supervisor for the

    purpose of updating the progress and seeking advise on projectmatters

    To be responsible in finding alternative solution for problems

    encountered in order to complete the project

    To submit report on time

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    11/17

    ROLE & RESPONSIBILITY OF FDP PROJECT COMMITTEE

    ChairmanHead of Department

    Responsible for all final decision based on

    the committees recommendation

    To approve proposed field for the project

    To appoint Panel of Examiners

    To endorse Final Grades

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    12/17

    Coordinators To distribute guidelines

    To plan and manage the FDP Project Process

    To arrange FDP oral presentation according to the agreed schedule.

    To collect the final draft from students and forward it to the examiners for

    evaluation during oral presentation at the end of the semester.

    To compile the groups assessment marks

    To collect two hard cover copies of final project from each group

    To compile and retain all submitted forms for at least one year after

    graduation for auditing purposes

    Role & Responsibility of FDP Project

    Committeecont

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    13/17

    Supervisors

    To supervise students until the submission of the

    final report

    To assist student on the accessibility of the tools

    needed in the projectTo monitor and schedule progress of the students

    and their projects.

    To guide students on the project and the

    preparation of Final Report according to theapproved format.

    To assess students performance

    Role & Responsibility of FDP Project

    Committeecont

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    14/17

    PANEL OF EXAMINERS

    Examinerspeople from industry (external

    examiners) and the supervisors.

    The examiners will function as project

    evaluators who are responsible to evaluate

    the oral presentations and dissertations.

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    15/17

    ORAL PRESENTATION

    The presentation is to be made using acomputer driven projector.

    Each group will have 40min (30min

    presentation and 10min for Q and A).

    Tentative date: As per schedule

    8

  • 8/9/2019 FDP I Kickoff Briefing Jan 2015

    16/17

    ASSESSMENT9

    Assessment Supervisor Examiner Group Individual

    Interim Report-PETREL 20 10 10

    Interim Report-

    Manual20 10 10

    Final Report 25 25Final Oral

    Presentation20 10 10

    Test 10 10

    Individual Logbook 5 5

    Away day

    Presentation10

    Total 45 55 55 45