Page 1: FDOT District Four Major Projects

Florida Department of Transportation

FDOT District Four Major Projects

Florida Department ofTRANSPORTATION

Vanita Saini, PEDistrict Four Project Manager

Page 2: FDOT District Four Major Projects

Florida Department of Transportation

FDOT District Four Major Projects

• US-1 Bascule Bridge Replacement, Jupiter Inlet Palm Beach County – Bid Opening May 2021 – FM# 428400-2

• SR A1A North Causeway Bridge Replacement St. Lucie County – Bid Opening October 2021 - FM# 429936-2

• SR-710 Beeline Hwy Reconstruction/Widening Palm Beach County – Bid Opening March 2022 - FM# 419251-1

• SW 10th Street & I-95 Direct Connector Broward County – I-95 Bid Opening July 2023 - FM# 436964-2

SW 10th Bid Opening July 2024 – FM# 439891-1

Page 3: FDOT District Four Major Projects

Florida Department of Transportation

Project Locations

SR 710 (Northlake Blvd to Blue Heron Blvd)

SW 10th Street Connector

Jupiter US 1 Bridge (CR A1A to Beach Rd)

Not to ScaleSR A1A North Causeway Bridge

Project milestones reflected in the presentation are subject to change; they are based on current project schedules and funding.

Page 4: FDOT District Four Major Projects

Florida Department of Transportation

SR 5/US-1 Federal Highway Bridge• Bridge Length – 915 ft• Roadway Reconstruction – 2,470 ft• Full closure with detour• Intersection improvements and ITS along

detour route• Innovations included

Pre-detour work Hybrid-phased construction – Commission half

of new bridge during detour Precast elements for bascule pier footing Preassembly of bascule leaves Simplified machinery and electrical installation

Location Map

Page 5: FDOT District Four Major Projects

Florida Department of Transportation

INTERSECTION IMPROVEMENT 1US 1 at Beach Rd/Alt A1A at Old Dixie Hwy

INTERSECTION IMPROVEMENT 3US 1 at SR 706

INTERSECTION IMPROVEMENT 2ALT A1A at SR 706

Intersection improvements along detour route

Mitigate community impacts during detour

New ITS features along detour route

SR 5/US-1 Federal Highway Bridge

Page 6: FDOT District Four Major Projects

Florida Department of Transportation

Improved Navigational Clearances

90’ between fenders

25’ @ Center

Existing Bridge Navigational Clearances

21’ @ Fender

Proposed Bridge Navigational Clearances

125’ between fenders

42’ @ Center38’ @ Fender

Florida Department of Transportation

Page 7: FDOT District Four Major Projects

Florida Department of Transportation 7Florida Department of Transportation

SR 5/US-1 Federal Highway Bridge

Twin Double Leaf Bascule Span

Page 8: FDOT District Four Major Projects

Florida Department of Transportation 8Florida Department of Transportation

SR 5/US-1 Federal Highway BridgeTwin Double Leaf Bascule Span

Page 9: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

SR 5/US-1 Federal Highway BridgeProject Status/Schedule

Initial Plans (30%)January 2018

Constructability Review(60%)November 2019

Biddability Preparation(90%)May 2020

Plans CompleteDecember 2020

Bid OpeningMay 26, 2021

Construction Phase beginsJuly 2021

• Design-Bid-Build Project• Current Estimate $126 Million• FDOT PM Bing Wang• Project Website: https://www.fdot.gov/projects/jupiterus1bridge/main

Page 10: FDOT District Four Major Projects

Florida Department of Transportation

Project Location Map

• SR 710 Roadway Reconstruction –3.1 miles

• Northlake Blvd Roadway Reconstruction - 4000 ft.

• Turnpike Bridge Length – 320 ft. 10 Lanes (180 ft. wide) Pre-Stress Concrete

• Lighting, Mast Arm Signalization, Closed Drainage System with Ponds, and Railroad Crossing

SR 710 Beeline Highway Reconstruction / Widening

Page 11: FDOT District Four Major Projects

Florida Department of Transportation

Partial Continuous Flow Intersection• The partial continuous flow intersection will direct vehicles turning left from SR 710 / Beeline

Highway to Northlake Blvd. away from the main intersection to relieve congestion • U-turn movements introduced for left turn movements:

o WBL from Northlake Blvd. to SB SR 710o SBL from SR 710 to EB Northlake Blvd.

• Level of Service improvements for peak hour design year 2042• Reduces Right of Way impacts

Page 12: FDOT District Four Major Projects

Florida Department of Transportation

Partial Continuous Flow Intersection

Page 13: FDOT District Four Major Projects

Florida Department of Transportation

Partial Continuous Flow Intersection N

Page 14: FDOT District Four Major Projects

Florida Department of Transportation

Initial Plans (30%)March 2019

Constructability Review(60%)Feb 2020

Biddability Preparation(90%)April 2021

Plans CompleteNov 2021

Bid OpeningMarch 2022

Construction Phase beginsAugust 2022

Project Status/ScheduleSR 710 – Beeline Highway

• Design-Bid-Build Project• Current Estimate $117 Million• FDOT PM Donovan Pessoa

Page 15: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

SR A1A North Bridge Over ICWWLocation Map

15

SR A1A North Causeway Bridge

15

Page 16: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Channel Vertical ClearanceSR A1A North Bridge Over ICWW

New SR A1A Bridge length: 4152.5 ft

85 ft Channel Clearance

Replacement of structurally and functionally deficient bridge

85 ft

125 ft

85 ft

125 ft

25 ft

90 ft

85 ft

Page 17: FDOT District Four Major Projects

Florida Department of Transportation

• Roadway Reconstruction • Juanita Ave Extension – 520 ft. – New Construction• Marina Access Rd. – 560 ft. – New Construction • Old Dixie Hwy – 2000 ft. – Reconstruction• Sunny Lane – 500 ft. – New Construction• Pedestrian Ramp for East Coast Greenway – 800 ft. – New Construction

• Lighting, Mast Arm Signalization, Drainage, and Railroad Crossing Gates

SR A1A North Bridge Over ICWW

Page 18: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

SR A1A North Bridge Over ICWW

18

Observation Deck

Observation Deck Path

East CoastGreenway

Ramp

SR A1A Bridge

Indian River Lagoon

Page 19: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

SR A1A North Bridge Over ICWW

Observation DeckEast CoastGreenwayRamp

SR A1A Bridge

Indian River Lagoon

Page 20: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Project Status/ScheduleSR A1A North Bridge

Initial Plans (30% Complete)

March 2018

Biddability Submittal (90%

Complete)January 2021

Construction Complete

2026

Constructability Submittal (60%

Complete)May 2020

Plans CompleteJune 2021

Letting (Bid Opening)

October 27, 2021

Construction Begins

January 2022

• Design Bid Build Project• Current Cost Estimate: $79 Million• FDOT PM Donovan Pessoa, PE• Website: www.SRA1ANorthBridge.com

Page 21: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Project LocationSW 10th Street Connector

869

T O L L

Regional Linkage Need

Limited Access Highway System

Hillsboro Blvd

SW 10th Street Connector PD&E

Study

I-95 PD&E Study

Sawgrass / Turnpike InterchangePD&E Study Po

wer

line

Rd

PD&E Project FPIDs and Limits

FPID # 437153-1 – Sawgrass / Turnpike Interchange Study

FPID # 439891-1 – SW 10th Street

FPID # 436964-2 – I-95 from SW 10th

Street to Hillsboro Blvd

Page 22: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Connections to I-95SW 10th Street Connector

I-95 General Use Lanes

845

SW 10th St.

SW 12

thAv

e.

WB Sawgrass Expressway

EB Sawgrass Expressway

Powe

rline R

d.

LEGENDConnector LanesLocal/General Use LanesI-95 Express Lanes

Florid

a’s Tu

rnpik

e

Newport Center

Connector Lanes

Local SW 10th Street

I-95 Express Lanes

EB Egress

WB Ingress

EB IngressWB Egress

Two Alternatives:One with Ramps

One without Ramps, serving Powerline Road

EB Connector to BothI-95 General Use and

Express Lanes NB and SB

Both I-95 General Use and Express Lanes NB and SB

to WB Connector

Page 23: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

I-95/SW 10th St Connector – Direct ConnectionsSW 10th Street Connector

Page 24: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Program Delivery ApproachSW 10th Street Connector

Page 25: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Program Delivery ApproachSW 10th Street Connector

Page 26: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

TSM&O 7-Corridors Smart Work Zone/ATMSSW 10th Street Connector

Page 27: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Rendering Comparison – SW 10th StreetSW 10th Street Connector

Page 28: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

Project Status/ScheduleSW 10th Street Connector

• Design-Build Projects• Current Estimate $821 Million (all five projects)• FDOT PM Vanita Saini, PE• Website: www.SW10Street.com

PD&E StudyComplete –Fall 2021

I-95/SW 10th StInterchangeAdvertisement –Summer 2022

I-95/SW 10th StInterchangeLetting –Summer 2023

I-95/SW 10th StInterchangeBegin Construction –Spring 2024

Smart WorkZone EndConstruction –Summer 2025

Smart WorkZone ProjectAdvertisement –Spring 2022

Smart WorkZone Letting –Winter 2023

SW 10th StConnectorAdvertisement –Fall 2023

SW 10th StConnectorLetting –Summer 2024

Page 29: FDOT District Four Major Projects

Florida Department of TransportationFlorida Department of Transportation

SW 10th Street Video

Page 30: FDOT District Four Major Projects

Florida Department of Transportation

Thank YouQuestions?