Florida Department of Transportation
FDOT District Four Major Projects
Florida Department of
TRANSPORTATION
Robert Bostian, PEDistrict Consultant Project Management Engineer
Florida Department of Transportation
FDOT District Four Major Projects
• US-1 Bascule Bridge Replacement, Jupiter Inlet Palm Beach County – Bid Opening March 2021 – FM# 428400-2
• SR-710 Beeline Hwy Reconstruction/Widening Palm Beach County – Bid Opening July 2021 - FM# 419251-1
• SR A1A North Causeway Bridge Replacement St. Lucie County – Bid Opening Sept 2021 - FM# 429936-2
• SW 10th Street & I-95 Direct Connector Broward County – Bid Opening July 2022 – FM# 439891-1 & FM# 436964-2
Florida Department of Transportation
Project Locations
SR 710 (Northlake Blvd to Blue Heron Blvd)
SW 10th Street Connector
Jupiter US 1 Bridge (CR A1A to Beach Rd)
Not to ScaleSR A1A North Causeway Bridge
Project milestones reflected in the presentation are subject to change; they are based on current project schedules and funding.
Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge
• Bridge Length – 915 ft
• Roadway Reconstruction – 2,470 ft
• Full closure with detour
• Intersection improvements and ITS along detour route
• Innovations included Pre-detour work
Hybrid-phased construction – Commission half of new bridge during detour
Precast elements for bascule pier footing
Preassembly of bascule leaves
Simplified machinery and electrical installation
Location Map
Florida Department of Transportation
INTERSECTION IMPROVEMENT 1US 1 at Beach Rd/Alt A1A at Old Dixie Hwy
INTERSECTION IMPROVEMENT 3US 1 at SR 706
INTERSECTION IMPROVEMENT 2ALT A1A at SR 706
Intersection improvements along detour route
Mitigate community impacts during detour
New ITS features along detour route
SR 5/US-1 Federal Highway Bridge
Florida Department of Transportation
90’ between fenders
125’ between fenders
38’ @ fender
25’ @ Center21’ @ fender
42’ @ Center
7
40% reduction in bridge openings
SR 5/US-1 Federal Highway Bridge
Florida Department of Transportation
SR 5/US-1 Federal Highway BridgeProposed Typical Sections
Florida Department of Transportation
Twin Double Leaf Bascule SpanSR 5/US-1 Federal Highway Bridge
Florida Department of Transportation
Twin Double Leaf Bascule SpanSR 5/US-1 Federal Highway Bridge
Florida Department of Transportation
SR 5/US-1 Federal Highway Bridge
Project Status/Schedule
Initial Plans (30%)January 2018
Constructability Review(60%)November 2019
Biddability Preparation(90%)May 2020
Plans CompleteNovember 2020
Bid OpeningMarch 2021
Construction Phase beginsJuly 2021
• Design-Bid-Build Project• Current Estimate $133 Million• FDOT PM Bing Wang• Project Website: https://www.fdot.gov/projects/jupiterus1bridge/main
Florida Department of Transportation
Project Location Map
• SR 710 Roadway Reconstruction –3.1 miles
• Northlake Blvd Roadway Reconstruction - 4000 ft.
• Turnpike Bridge Length – 320 ft. 10 Lanes (180 ft. wide) Pre-Stress Concrete
• Lighting, Mast Arm Signalization, Closed Drainage System with Ponds, and Railroad Crossing
SR 710 Beeline Highway Reconstruction / Widening
Florida Department of Transportation
SR 710 / Beeline Highway
Florida Department of Transportation
Partial Continuous Flow Intersection
• The partial continuous flow intersection will direct vehicles turning left from SR 710 / Beeline Highway to Northlake Blvd. away from the main intersection to relieve congestion
• U-turn movements introduced for left turn movements:
o WBL from Northlake Blvd. to SB SR 710
o SBL from SR 710 to EB Northlake Blvd.
• Innovative drainage design
• Reduces RW impacts
Florida Department of Transportation
Partial Continuous Flow Intersection
Florida Department of Transportation
Partial Continuous Flow Intersection N
Florida Department of Transportation
Initial Plans (30%)March 2019
Constructability Review(60%)Feb 2020
Biddability Preparation(90%)Sept 2020
Plans CompleteMarch 2021
Bid OpeningJuly 2021
Construction Phase beginsNov 2021
Project Status/Schedule
SR 710 – Beeline Highway
• Design-Bid-Build Project• Current Estimate $107 Million• FDOT PM Donovan Pessoa
Florida Department of Transportation
SR A1A North Bridge Over ICWW
Location Map
18
Florida Department of Transportation
Channel Vertical Clearance
85ft
• Bridge Length – 4150 ft. o Replacement of structurally and functionally deficient Bridge. o 85 ft. Channel Clearance w/ 300 ft. Observation Deck
SR A1A North Bridge Over ICWW
Florida Department of Transportation
• Roadway Reconstruction • Juanita Ave Extension – 520 ft. – New Construction• Marina Access Rd. – 560 ft. – New Construction • Old Dixie Hwy – 2000 ft. – Reconstruction• Sunny Lane – 500 ft. – New Construction• Pedestrian Ramp for East Coast Greenway – 800 ft. – New Construction
• Lighting, Mast Arm Signalization, Drainage, and Railroad Crossing Gates
SR A1A North Bridge Over ICWW
Florida Department of Transportation
SR A1A North Bridge Over ICWW
Florida Department of Transportation
SR A1A North Bridge Over ICWW
Florida Department of Transportation
Initial Plans (30%)March 2019
Constructability Review(60%)Feb 2020
Biddability Preparation(90%)October 2020
Plans CompleteJune 2021
Bid OpeningSept. 2021
Construction Phase beginsJan 2022
Project Status/Schedule
SR A1A North Bridge
• Design-Bid-Build Project• Current Estimate $76 Million• FDOT PM Donovan Pessoa• Website: www.SRA1ANorthBridge.com
Florida Department of Transportation
SW 10th Street Connector
Regional Importance - 3 Adjacent Studies
Florida Department of Transportation
SW 10th Street History
Florida Department of Transportation
System Linkage Need
• Regional Weekday Daily Trip Flows• Long distance trips
• Broward, west of Turnpike to / from Palm Beach, east of I‐95 – 51,000 daily trips
• Palm Beach, west of Turnpike to / from Broward, east of I‐95 – 23,000 dailytrips
Source:2016 Origin-Destination Data
Streetlight Insight
Florida Department of Transportation
Looking West on SW 10th Street – Full Depressed Option for Connector Road
Connector Road
Century Village
Local Road
• SW 10th Street – 2 Miles (3 Alternative)• New construction of 4 lane divided local roadway• New construction of 4 lane high speed connector road• Ingress/Egress ramps between SW 10th and connector road
Florida Department of Transportation
Looking West on SW 10th Street – Partial Depressed: Depressed Eastbound and Westbound Connector Road
Connector Road
Century Village
Local Road
Florida Department of Transportation
Partial Depressed Alternative – Eastbound Connector Road Depressed
Century Village
Connector Road
Local Road
Florida Department of Transportation
Looking West on SW 10th Street – Partial Depressed: Depressed Westbound Exit Ramp
Connector Road
Century Village
Local Road
Florida Department of Transportation
Looking West on SW 10th Street – Non-Depressed / No Managed Lane Access Alternative
Connector Road
Local Road
Century Village
Florida Department of Transportation
I-95 and SW 10th Street
To local SW 10th StreetTo Connector
Road
To I-95
Military Trail
• Direct Connections to I-95• Connector Road goes over
Military Trail
• Widening to add an Express Lane ineach direction and accommodate direct connections
Florida Department of Transportation
SW 10th Street Connector
• Design-Build Project• Current Estimate $600 Million - $1 Billion• FDOT PM Robert Bostian• Website: www.SW10Street.com
Project Status / Schedule
Florida Department of Transportation
Florida Department of Transportation