f urnace impr ovement s services - eplptx.comeplptx.com/brochures/furnace improvements -...
TRANSCRIPT
F
Furna1
Furn
ace Improv600 HighwSugar Lan
Tel: (28Fax: 1-8
Increas
Longer
nace ILet
vements Seway 6, Suitnd, TX 7781)980-032877-395-07
sed Cap
r Run Le
ImprUs Coo
ervices Incte 480 7478 25 760
Email: iWeb: w
acity
engths
rovemol Your
c. A.G. F
mentHot Tu
Furnace ImK-3
New DTel 1: 91Tel 2: 91
flux.com
flux.com
Higher
Lower
s Serubes!
mproveme33, Kalkaji
Delhi – 1101-11-405 8 1-11-262-8
r Efficie
r NOx E
rvices
ents Pvt. Li 019 8696 6775
ency
Emission
s
Ltd.
ns
©Furnace Improvements Services 2014
All rights reserved. No reproduction of this material is allowed without the express written consent of FIS.
OU
UR COMOUR CFurnace mission ifor fired saw a nestarted orevampe
For over services help redValero, Cin New Dultimate
Our ExpFIS can dreformerthe desigeconomiand heat
MPANYCOMPAImprovemeis to improvheaters thaeed for trainoffering heaed its first he
18 years noto improve uce refineryConocoPhillipDelhi, India. technology
pertise design and rr, hot oil, cogn, engineercal, efficientters perform
Y ANY ents Servicese the perforat recommenning engineeter training eater in 2000
ow, FIS has bthe performy NOx emissps, Alon, FroWe have beprovider for
revamp all toker heater ring, and supt, and reliab
m to their full
s (FIS) was rmance of finded solutioers and opercourses. Pr
0 and subseq
been helpingmance and esions. FIS haontier, and Teen growingr fired heate
ypes of refiand CO boilpply of new ble. We ensul capacity fro
establishedired heatersons to custorators on horogressing fquently supp
g end users efficiency of as performedTOTAL. FIS cug at the rateers and boile
nery fired hers. FIS alsofired heaterure that key om day one.
d in March s. FIS beganomers with oow to operatrom consultplied its first
and ownerstheir fired d over 400 urrently hase of 35% peers.
heaters incluo provides crs to end usdesign para.
1996 in Sugproviding eoperational te fired heating and trat new heater
s with desigheaters andstudies for s offices in Ser year with
uding crude,complete tursers. Our desameters are
gar Land, Tngineering sproblems. Fters optimaaining servicr in 2002.
gn and engind boilers as wclients like Cugar Land, Ta vision to
vacuum, carn‐key servicsigns are thenot compro
TX. Our studies FIS also lly and ces, FIS
neering well as CITGO, TX, and be the
atalytic ces for e most omised
OU
UR COMREVAMRevampistrategy downtim
Above
MPANYMPED Hng fired heafocuses on
me are minim
e Photo: NOxPhillips
Y HEATERaters is a prworking wit
mized.
Abo
x Reduction in66 Wood Rive
RSractical and th existing c
ove Photos: #Before (
n Alky Heaterer
effective wcomponents
4 Platformer (Left) and Aft
r
way to impros, and as a r
Heater Citgoter Revamp (R
Above PhP
ove heater result, capit
o Corpus ChrisRight)
hoto: NOx RePremcor/Hus
performancal investme
sti
eduction in Crky Lima Refin
e. This nt and
rude Heaternery
NEW H
Above engine
HEATER
Photos: Newering, procur
RS
w hot oil heement, and f
ater at Philliabrication se
ips 66 Woodrvices on this
d River; FIS ws project.
was responsiible for the design,
New
FIS’ PATENTED TECHNOLOGIESFurnace Improvements patented four technologies for improving the performance of fired heaters. These patented technologies are aimed at overcoming existing limitations in the capacity and efficiency of heaters as well as resolving operational problems.
Technology Application
Split Flow Technology Increases capacity with limited process side pressure drop
Flue Gas Injection Reduces coking & tube metal temperatures
Inclined Firing System Reduces flame impingement and high tube metal temperatures
Spider Gas Tip Shorter flame gas burners
Two of these technologies are highlighted below.
Inclined Firing System Most tube failures in fired heaters occur due to high tube metal temperatures (TMTs). Flame impingement due to long burner flames results in higher TMTs and coking that affect the performance of the heater. Furnace Improvements developed the patented Inclined Firing System (IFS) to reduce flame impingement on heater tubes. With this burner arrangement, a heater will have the following advantages:
Elimination of hot spots
Longer tube life
Increased heater run lengths
More uniform heat transfer along the tubes’ lengths
Lower coking rates of internal tube surfaces
Base Case Inclined Firing System Base Case Inclined Firing System
Clients report 200‐250 °F lower TMTs with the Inclined Firing System.
Above: CFD Modeling illustrates how IFS reduces flame impingement by angling the flame away from the heater tubes.
New
FIS’ PATENTED TECHNOLOGIES
Split Flow Technology When refiners wish to increase the capacity of their fired heaters, “Split Flow” aims to improve the utilization of thermal energy for process heating. This objective is achieved by splitting the process fluid into two parallel streams: Main Stream: The fluid in the first stream
is heated predominantly by the convective and radiant heat transfer mechanism.
Split Stream: The fluid in the second
stream is heated predominantly by the convective heat transfer mechanism.
The streams are then combined at the heater outlet. This technology has been used very successfully for capacity increase revamps of fired heaters particularly in Platformer heaters. It is suitable for increasing the capacity of a heater by 15‐30%. Other advantages of the Split Flow Technology include:
Higher heater efficiency
Lower process pressure drop
Lower firing rate
Lower firebox temperatures
Lower radiant heat fluxes
Lower TMTs
Lower installation costs
Typical Reformer Heater
Split Flow Reformer Heater
New
CFD M At Furnamodelingsolutionsthe exconditionrecommedifficultieover othpresentaand prfollowingused this
1. F
2. M
fl
d
3. C
d
4. T
5. H
Howeverexplore i
MODELI
ce Improveg to analyze s. This tooisting desns of heaendations es. CFD giveher analysetion of theroposed mg are a fews tool effecti
low maldistr
Mixing (amm
ue gas re
esign)
ombustion
esign)
ube failures
Heat transfer
r, the CFD ats varied ap
NG
ments, we uproblems anl enables uign and ters and for solv
es a competes due to e observed modificationsw areas whevely:
ribution
monia injecti
ecirculation
(burner &
r
applications plications an
CFD
utilize CFD nd provide s to study operating determine ving any titive edge its visual conditions s. The re FIS has
ion grid &
mix box
& heater
are not limnd use this p
D Modeling oWR
mited to thespowerful too
CFD Mod
of U40 Boiler RB Refinery
se items. Fol if and whe
deling of FlowEconomiz
Turbine Fan
FIS is makingen it is requir
w Distributionzer Coil
g every effored.
n in an
ort to
New
FIS EN FIS uses order thaand explmodel th
(A) Cut aFiring TeNaphtha
GINEE
3D modelinat details maoded viewshe entire hea
(A)
away model oechnology apa Splitter Reb
(D)
RING S
ng software ay be more to increase
ater for a “b
of typical burpplied to an 8oiler Heater (
SERVICE
to model boeasily visuae the undersig picture” v
rner (B) Cut a burner syste(F) Compress
(B)
ES
oth existing lized. It is pstanding of view.
away model dem (D) Modeled Air Heater
(E)
and propospossible to ethe smaller
displaying Spil of vertical cyr.
sed designs employ the ur pieces of a
ider Gas Tip bylindrical hea
for customeuse of cut ala fired heat
burner (C) Mater with a co
(C)
(F)
ers in lways ter or
odel of Inclinommon stack
ned (E)
New
FIS EN
Revam
CFD Mo
HeaterOptimi
Heater New H
and Su
For m
Tel: Malex
Momichael
GINEE
mping Servi
odeling
r Tuning and
ization
r Re‐rating
eater Design
pply
more infor
KUWAlex A
965.248.2obile: 965x@alzahem
GERMMichael STel: 49.210obile: 49.1.steingen@
FURN
RING S
ices T
d
n
GeTr
O M
CuCo
mation on
WAIT Ambi 29160 ext.1.338.4171mgroup.co
MANY Steingen 02.33616 72.353533@csg‐edels
NACE
SERVICE
Training Se
eneral Fired
raining
perator Trai
Maintenance
ustom Train
ourses
n our servic
TADoug
Tel: 886Mobile: 8China.abc
126 2 om
37 stahl.de
IMPRO
ES
ervices
d Heater
ining
Training
ing
ces, visit o
AIWANglas [email protected]
d
T
Ko
OVEM
Trou
Energy Safety aAudits
TurnkeyWork
Ongoin
our website
N g 544 69.827 et.net
FDid
Tel: 33Mobile:
didier.dela
THAILAJo
orea & WoThailanJskk9
MENTS
bleshootin
Surveys
and Furnace
y Execution
g Combustio
e www.he
FRANCdier Delalan3.0.1.60.7633.0.6.83.4alande@ex
AND/Koon Sik Kimrld Tel: 82d: 668.505999@gmail
GLOB
ng Services
e Reliability
of Mainten
on Optimiza
eatflux.com
E nde 6.16.95 46.40.94ximtrade.fr
KOREAm 19.269.5956.3630 l.com
AL
s
ance
ation
m.
r
A
38
Furna1ce Improv1600 Highw
Sugar LaTel: 28Fax: 1.8
O
vements Seway 6, Suitand, TX 77481.980.032877.395.07
ur C
ervices Incte 480 478 25 60
Clie
c. A.
ents
G. Furnace
NewTel 1Tel 2
s
e ImproveK‐33, Kalkw Delhi ‐ 1: 91.11.40: 91.11.26
ments Pvtkaji 110019 58.8696 28.6775
t. Ltd.
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Air Products Location La Porte, TX Scope of Work Review and Inspection of Feed Preheaters Field Survey/Recommendation for Oxygen Analyzers in Feed Preheaters Location Pasadena, TX Scope of Work Development of Steam Reformer Plant Handbook Client Alon USA Location Big Spring, TX Scope of Work Hydrogen Heater Efficiency and Capacity Increase (77H-001) Project
Capacity and Efficiency increase project for Naphtha Stabilizer Reboiler Heater (77-H002)
Increasing Capacity project for Reactor Charge Heater (080-H-001) NOx Reduction and Mechanical Rerating of a Crude Heater NOx Reduction in FCC Unit Charge Heater
Capacity and Efficiency increment for HDS and Reformer Depentanizer Reboiler Heaters
Client Belgian Refining Corp. Location Belgium Scope of Work Engineering Study for tube vibration in Vacuum Feed Heater (B-0702)
Client Bechtel Location Houston, TX
Scope of Work Fired Heaters Design and Documentation Review for Reliance Jamnagar Refinery
Client Burns & McDonnell Location Philadelphia, PA Scope of Work Engineering Services for Specifications and Supply of Process Furnaces Location Philadelphia, PA Scope of Work Simulation for Vacuum Heater with new tube MOC Location Ponca City, OK Scope of Work Design Evaluation of Fired Heater Location Ponca City, OK Scope of Work Evaluation of two existing Heaters for new Operating Conditions
Client Chevron Location Kapolei, HI Scope of Work Simulation Runs of Vacuum Heater Supply of Knock out Drum and Filtering System for Fuel Gas Burner Testing of Crude Heater Supply of New Oil Tips for Crude Heater Burners
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Chevron Location Pascagoula, MS Scope of Work Review of Vacuum Heater Coking Problem
Client Citgo Location Corpus Christi, TX Scope of Work Engineering Study for Improving Efficiency of Crude and Vacuum Heaters Turnkey supply of GHT Charge Heater Field Survey and Study of Excess Air Reduction in (2) Unibon Heaters Performance Improvement Study for CO Boiler
Efficiency Improvement and Cost Estimate Study for No. 4 Platformer Heater along with Stripper Reboiler and Stabilizer Reboiler Heaters
Design, Engineering and Project Management for Efficiency Improvement for No. 4 Platformer Heater
Engineering Study to Improve Performance of Stabilizer Reboiler
Efficiency Improvement , NOx reduction, and Study of Isostripper Reboiler Heater
Project Design Basis for Capacity Improvement and NOx Reduction for No.5 Platformer Charge Furnace
Modeling and NOx Estimation for No. 5 Platformer Heater Engineering Study for Platformer Heater
Engineering Study for Improving Performance and Capacity of Crude and Vacuum Heaters
Engineering Services for Installing New Burners for Platformer Heater CO Boiler Rerating Report as Flue Gas Cooler Engineering Study of Crude heater (11-F-1)
Client Citgo Location Lake Charles, LA Scope of Work Engineering Study of Vacuum Heater for Naphtha Service CFD Modeling of Air Ducting of Platform Heater
Inspection and Recommendations for Performance Improvements of B-6 Heater
Mechanical Inspection of New Crude and Vacuum Heaters
Basic Design and Specifications of Crude and Vacuum Heaters Including Transfer Lines
Performance Improvement study of (5) Unicracker Heaters with Air Preheating System
Client Citgo Location Lemont, IL Scope of Work Engineering study on CO Boiler
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client
Phillips 66
Location Belle Chasse, LA Scope of Work Crude Heater SCR NOx Reduction Project
NOx Reduction in Heaters 1391-H-4, 1791-H-1 and 291-H-2 Engineering Study
NOx Reduction & Efficiency Improvement for Reboiler Heaters (491-H-1/2)
Client Phillips 66 Location Borger, TX Scope of Work Conversion of Unit No. 40 CO Boiler to Fuel Gas Fired Boiler
Feasibility Study for SCR Installation Downstream Steam Methane Reformer
Engineering Study for Reducing Coking in a Crude Heater Client Phillips 66 Location Ferndale, WA Scope of Work Efficiency Improvement Study for Depropanizer Reboiler Heater
Client Phillips 66 Location Humber, UK Scope of Work Fired Heater Training School
Client Phillips 66 Location Linden, NJ Scope of Work CFD Modeling of Feed Water Distribution in CO Boiler Economizer Coils
Client Phillips 66 Location Los Angeles, CA Scope of Work Performance Improvement Study for Vacuum Heaters H-33/34
Client Phillips 66 Location Mont Belvieu, Texas Scope of Work Engineering Study of Boilers (B0-202)
Client ConocoPhillips Location Ponca City, OK Scope of Work Performance Analysis, Engineering and Project Services for NOx Reduction Client ConocoPhillips Location Rodeo, CA Scope of Work Capacity Improvement Study of Crude and Vacuum Heaters
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
(B-601 & B-602)
Client Phillips 66 Location Roxana, IL Scope of Work Design, Fabricate and Deliver a New Natural Draft Box Vacuum Heater Engineering Study of Boiler Design and Engineering Services for new 165 MMBtu/hr Hot Oil Heater CCU1 & CCU2 Steam Drums Re-Rate Study CO Boiler Tuning Engineering Study for Vacuum Heater and Transfer Line Rerating Engineering Drawings for Steam Methane Reformer Heater Rerating to Hydrotreating service using S-Zorb Process CR-3 Heaters (H4 &H5) –NOx Reduction and Capacity Increase Project Engineering Study for Rerating Reformer Heaters with Low NOx Burners Burner Rerating and Analysis for Hydrocracker Charge Heater
Design of new Convection Section and Recommendations for Improved Performance of CFHT Heater
Engineering Study for CCU1 CO Heater (H-1) Convection Section
Detailed Engineering & Project Services for Burner Replacement in CFHT Heater
Energy Audit of (4) Fired Heaters Engineering Study to Increase the Capacity of CO Heater Engineering, Procurement & Supply of HCU/CR1 Ducts Supply of Peep Doors for Heaters Training for Operators on H-4 and H-5 Heaters Process design package for a waste heat boiler for an SCR installation Engineering Study of Coker Preheater (H-36) Modeling Study on H1 and H2 Heater
Client ConocoPhillips Location Santa Maria, CA Scope of Work Field Survey of Crude Heaters
Client ConocoPhillips Location Trainer, PA Scope of Work Engineering Study to Increase Capacity of Isocracker Charge Heater Engineering Study of Fractionator heater Engineering Study – Burner Replacement
Client ConocoPhillips Location Wilhelmshaven, Germany Scope of Work Field Optimization of Three Fired Heaters (B1402, B1901 and B1201)
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Engineering Study on Crude Heater B-1101 and B-1102 Client
CountryMark CO-OP
Location Mt. Vernon, IN Scope of Work Vacuum Heater Capacity Increase Revamp Project Capacity Increase project for Naphtha Splitter Reboiler Capacity Increase Revamp for Reactor Charge Heater (210-H-100) Engineering Study of Unifiner Heater (400-H5) Engineering Study of Crude & Vacuum Heater (200-H2)
Client Devon Energy Location Riverton, WY Scope of Work Turnkey Supply of New Hot Oil Heater
Client Exxon Mobil Location Chalmette, LA Scope of Work Field Survey of Atmospheric Heater F-5
Client Foster Wheeler Location Port Arthur, TX
Scope of Work Engineering Study for Identifying Shortfall in Performance of First Stage Charge Heater
Client Frontier Oil Location El Dorado, KS Scope of Work Engineering Study for Performance Improvement of (2) Fired Heaters Engineering Study for Performance Improvement of Crude Furnace
Engineering and Specifications for New Air Preheater and Burner Replacement
Engineering Study of Kerosene Hydrotreater (HTU1) Change Heater ( B-2031)
Client Frontier Oil Location Cheyenne, WY Scope of Work Engineering Study of Charge Heater
Client Georgia Gulf Location Pasadena, TX Scope of Work Engineering Study for Hot Oil Heater
Client Hovensa LLC Location St. Croix, USVI Scope of Work Engineering Study and Evaluation of Air Preheater Systems
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Cost Estimation and Specifications for Stack Damper Actuators Efficiency Improvement Study of No.2 Platformer Heater Best Practices Manual for Air Preheaters
Client HPCL Location Visakhapatnam, India
Scope of Work Capacity Increase Project for CDU2 Crude (11-F-01) and Vacuum (12-F-01) Heaters
Client HPCL Location Mumbai, India Scope of Work Capacity Increase project for FRE APS (31-F-01) and VPS (32-F-01) Capacity Improvement Study for P.D.A. Heater Engineers and operators Training Program, August 2010 Client IOCL Location Bongaigaon, India Scope of Work CDU Heater Study Client IOCL Location Vadodara, India Scope of Work Fired Heater Training School, April 2010
Client IOCL Location Gujarat, India Scope of Work Fired Heater Training School, November 2009 Performance Improvement study of Visbreaker Furnace Client IOCL Location Panipat, India Scope of Work Fired Heater Training School, August 2010 Client Jacobs Engineering Location Baton Rouge, LA
Scope of Work Design and Engineering of CCU-2 CO Heater (H-2) Stem Coils and Header Box Modification
Structural Analysis and Design for CCU-1 Heater
Client KNPC Location Ahmadi, Kuwait Scope of Work Engineering Study for Eocene Crude Heater (39-H-001)
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Koch Industries Location Rotterdam, Netherlands Scope of Work Increase Run Length Engineering Study for Crude Heater
Client Koch Refining Location Corpus Christi, TX Scope of Work Engineering Study of Fractionator Reboiler Heater and Reactor Engineering Study of Atmospheric Heater Engineering Study of First Stage Hydro Cracker Heater Client KTI BV Location Erdol Chemie, Köln, Germany Scope of Work Burner Test for Ethylene Furnaces
Client Lion Oil Location El Dorado, AR Scope of Work NOx Reduction Revamp Project for six Heaters
Client Lyondell/Citgo Refining Location Pasadena, TX Scope of Work Tuning of (8) Fired Heaters for NOx Emissions
Fired Heaters Training of More Than 300 Operators for Safe Engineering Services for Improving the Performance of Fired Heaters
Rerating of Convection Section and Performance Improvement Study Client Mitchell Gas Location Anderson, TX Scope of Work Review of Instrumentation and Control Scheme for Thermal Oxidizer Engineering Assistance for Installation of a Thermal Oxidizer Efficiency Improvement of Hot Oil Heater Supply of New Gas Tips
Client Mitchell Gas Location Tricounty, TX Scope of Work Servicing of Hot Oil Heater
Client Mitchell Gas Location Seven Oaks, TX Scope of Work Review of Inquiry and Bids for Regeneration Gas Heater
Client Mobil Oil Location Beaumont, TX Scope of Work Engineering Study of B-2 and B-3 Vacuum Heaters and APH
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Motiva Enterprise Location Convent, LA Scope of Work Participation in a RCA Study to Improve the Performance of H-Oil Heater
Client Murphy Oil Location Meraux, LA Scope of Work Field Survey of Crude Heater
Client Orion Refining Location Norco, LA Scope of Work Performance Improvement Study for Coker Heaters Client Paramount Petroleum Refining Location Paramount, CA Scope of Work Heater Simulation for Re-run Tower Heater H-301
Client Pasadena Refining Location Pasadena, TX Scope of Work Engineering Study for Naphtha Hydrotreater Reactor Charge Heater
Client Petrozuata Location Puerto La Cruz, Venezuela Scope of Work Field survey and analysis of (6) Crude Heaters Client
Reliance Industries Limited
Location Mumbai, India Scope of Work Fired Heater Training School, February 2010 Fired Heater Training School, April 2010 Client Raytheon Engineers & Contractors Location Equatorial Guinea Scope of Work Review of Reformer Inquiry Specifications
Client Samsung Engineering America Inc. Location Houston, Texas Scope of Work Consulting and Design Services for fired Heaters
Client Shell Location Deer Park, TX Scope of Work Engineering Study to Restore and Improve the Capacity of Hot Oil Heater
with APH
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Specified Fuels and Chemicals Location Channelview, TX Scope of Work Tuning of (2) Hot Oil Heaters for Efficiency Improvement
Client Star Enterprise Location Port Arthur, TX
Scope of Work Design, Engineering and Supply of Intermediate Tube sheets, Tube sheet Sleeves and Header Boxes
Field Survey and Modeling of (4) Heaters, Infrared Thermograph of (9) Fireboxes
Client Sunoco Inc. Location Philadelphia, PA Scope of Work Engineering Study of Crude and Vacuum Heater –Tube Replacement Engineering Study of Air Supply duct for Air Flow Distribution
Client Targa Resources Location Mont Belvieu, TX Scope of Work Engineering Study of HRSG Boiler
Client Thermax Ltd., India Location India Scope of Work Thermal Design
Client Texaco Location Port Arthur, TX Scope of Work Modeling of Crude, Vacuum, and Naphtha Reboiler
Client Total Location Antwerpen, Germany Scope of Work Efficiency Improvement Study for Crude Oil Furnace B-5301 Engineering Study for tube vibration in Fractionator feed heater Client Total Location Normandy, France Scope of Work Performance Improvement Study for Hydrocraker Furnaces
(90-F-101, 90-F-102) Client Valero Location Ardmore, OK Scope of Work Feasibility Study of (10) Fired Heaters for Increasing Capacity of the Units Engineering Study for Efficiency Improvement of (3) Crude Heaters
Furnace Improvements Building Green Fired Heaters- Highest Efficiency- Lowest Emissions- Longest Run Length
Revamping – Training – Troubleshooting
www.heatflux.com
Client Valero Location Houston, TX Scope of Work Survey of Burners during Shutdown Client
Valero
Location Lima, OH Scope of Work Engineering and Project Services for Capacity Increase and NOx Reduction Engineering Study of Crude Furnace
Client Valero Location Norco, LA
Scope of Work CCR Platformer Heater Capacity Increase with Proprietary Split Flow Technology
Client Valero Location Port Arthur, TX Scope of Work Reactor Charge Heater Capacity Increase Project NOx Reduction Study for Boilers 34 & 35 Capacity, Efficiency & Reliability Improvement of (3) Platformer Heaters
Engineering Study for Determining the Cause of Back Firing in Fractionators Feed Heater
Client Valero Location Texas City, TX
Scope of Work Engineering Study of Crude and Vacuum Heaters (H-16 & H-17) Capacity Increase
Engineering and Project Services for Capacity Improvement of Platformer and NHT Heaters
Topper Heater Air Preheating System Engineering Study CDHDS Reboiler Efficiency Improvement Project Engineering Study of Alky Heater Performance Improvements
Client Valero Location Three Rivers, TX Scope of Work Engineering Study for Efficiency Improvement of Crude Heater Client Western Refining Location El Paso, TX Scope of Work Fired Heater Training School