FINANCE & RESOURCES REPORT TO ERC 24 OCTOBER 2011

Upload: others

Post on 20-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

FINANCE & RESOURCES REPORT

TO ERC

24 OCTOBER 2011

Page 2: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

INFORMATION SERVICES REPORT

TO ERC

24 OCT 2011

Page 3: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

PROJECTS COMPLETED SINCE JUNE 2011

Application Upgrade: Millennium (Library)

Online payments by instalments

Junior music management system

Desktop services consolidation - College of Business

Admissions via Campus IT

Upgrade to Voice network

Mobile Framework

Page 4: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

Planning

Initiation

Customer-centred

service

Compliance with

legislative & reporting

requirements

Completed

Student Administration

Introduction of e-Recruit

application

Admissions via

Campus IT

Execution

Provision of self-service

machines in Bolton &

Kevin St libraries

Application Architecture

(incl. Internal & external

hosting)

Expansion of the office of

the future principle in DIT

Online payments by

installmentsApplication Upgrade:

Millennium (Library)

Desktop services

consolidation in College of

Business

Webcourse to managed

service

Call Management Web

service

Junior music

management system

Introduction of

procurement cards for

small value purchasing

Student email &

collaboration

Millenium – staff records

interface

Millenium: Encore

implementation

Development Programme 2011 – Q3 2012

Learning &

Teaching Support

Organisation of

DITInformation Security & infrastructure

Migration and upgrade of

all applications off

alpha platform (incl TLT)

Physical environment

(DC, Computer rooms,

wiring centres)

Replace security

infrastructure (Firewall &

load balancer)

Network equipment

upgrade (Phase 3 -

reliable staff

connectivity)

Financial System

(Route 66) upgrade

Network equipment

upgrade (Phase 4 -

reliable student desktop

connectivity)

Research Information

system Agresso, Core HR

interface

New Institute reports

(assume small selected

shortlist)

Upgrade to Voice

network

Mobile Framework

Part time PRSI & hourly

timesheets (HPALS)

Page 5: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

Student/Academic Sub-Programme Approach

Ensure that all stakeholders have the opportunity to state their requirements with respect to all applications that support services to students and the related academic processes

Identification of where the requirements interlink “businesswise & technologywise”

One programme governance structure linking to the One DIT/ERC programme

Inputs Plans & approach of all approved 2011/12 projects e.g. Banner 8, CMIS

Upgrade, Coursewise

Identification of other development requirements e.g. Admissions, HEA

Outputs One integrated Student/Academic programme of work running to 2012

An approach and plan for a development programme taking into account items not satisfied by June ‟12 and which will incorporate our needs to 2013/14

Page 6: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

Administration & Research Sub-Programme

Approach Ensure that all stakeholders have the opportunity to state their needs with respect to

all applications that support services in two main areas – Administration and Research

Identification of where the requirements interlink “businesswise & technologywise”

One programme governance structure linking to the One DIT/ERC programme

Inputs Plans & approach for all approved 2011/12 projects

Identification of other development requirements

Outputs One programme of work running to end 2012 for each area

An approach and plan for a development programme taking into account items not satisfied by June ‟12 and which will incorporate our needs to 2013/14

Page 7: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

BUDGET FOR 2011-12 PROGRAMME

Expenditure plan presented March 2011

Budget required 2011: €1,134k

Budget required 2012: €1,301k

Total: €2,435k

Total ERC budget allotted for 2011: €1,215k

Budget allocated to projects: €670k

Budget in PMO holding account: €545

Page 8: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

PROPOSALS FOR 2012-2013

1. Webcourses upgrade & Banner integration

2. Online version of Student Feedback Survey (Q6a)

3. Review and develop a strategy for DIT web presence

4. Library System migration to Sierra

5. Library Services on Mobile Devices

6. Library Laptops and iPads for Student Loan

7. Library Student Group Study and AV Facilities

8. Library PC Replacements – for Student and Staff Use

9. Sentry Entry/Exit Gates @ Bolton Street Library

10. Student & Staff Centric Services

11. Current programme expansion

Page 9: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

CIRCULAR 2/09

DIT to submit ICT expenditure for 2012 by 30 Nov

All Colleges/Functions contacted for details

Where no details provided, use 2011 figures (less 10%)

Page 10: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

BUILDINGS REPORT

TO ERC

- UPDATE ON DIT BANNOW ROAD

- 2011, 2012 BUILDINGS PROJECTS

24 OCT 2011

Page 11: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

UPDATE ON DIT BANNOW ROAD

BRIAN GORMLEY

MANAGER, CAMPUS LIFE

ERC - OCTOBER 2011

Page 12: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

STATUS OF SITE

Purchase & Handover complete

Surveys Complete

Masterplan options developed

Site being treated as all other DIT Sites Clean Up Complete

Safety Issues dealt with (fencing, filling in „pits) etc.

Security coverage in place

Public Transport Plans – positive noises

Page 13: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

TRANSPORT LINKS

Page 14: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

CURRENT ISSUES

Consultation with Local Community Need to engage with local community regarding proposals

Plan being developed with Ms. Melda Slattery (Residents, Sports Clubs, Schools, Elected Representatives)

Security on Site Regular break ins (valuable cables etc. removed from site)

Significant Security Costs – on an ongoing basis, (until site becomes a construction site – and responsibility of contractor), without full time staff in situ (contractor only)

DIT Student Sports Clubs Hiring Facilities to Train and Play

Page 15: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

WHAT IS BEING ASKED OF ERC

To make a recommendation that: -

the Bannow Road Project be progressed to

Planning Permission and Tender stage

Consultation in the local area can get underway

Page 16: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

WHY?

Site has been purchased & ownership transferred

Finance is in place to develop floodlit all weather playing & training pitch (Student Development Fund – project approved)

Vacant site is attracting anti social behaviour, (risk of site become more unattractive) demanding security issues

Playing fields in Grangegorman will be out of Use by Dec 2012 (progression of GG project)

Playing/ training facilities are required (DIT Students, Staff and the Local Community Schools & Clubs)

Studio – uses need to be clarified and planned for

Potential other uses on wider site need to be investigated – exams etc.

Page 17: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

PROPOSAL FOR PLANNING

PERMISSION Facilities Proposed

1 Large All weather floodlit pitch (1 GAA, 2 Soccer, 1 Rugby)

Indoor playing / training areas

Ancillary changing accommodation

Studio/ rehearsal space

New entrance

Parking

Page 18: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

ANY QUESTIONS?

Page 19: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

2011 PROJECTS

Bolton Street Campus Space Rationalisation.

Linenhall.

Phase 1

Conversion of underused workshop space on the ground floor to open plan

office accommodation to relocate staff from the second floor.

Complete

Phase 2

Second floor refurbishment to accommodate 5 new architectural studios.

Commenced.

Phase 3

Third floor refurbishment to allow for the decampment of the Green Street Building.

Christmas 2011

Beresford Street.

Roof replacement and the relocation of Transport Engineering from the Zivargo building.

Commenced, completed by Christmas 2011

Bolton Street.

Remaining occupants of the Zivargo Building relocated to Bolton Street. (area vacated by Architecture)

Easter 2012.

Page 20: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

2011 PROJECTS

F.O.C.A.S Roof Extension.

Contractor Appointed and works to commence on site on Tuesday 1st of

November.

Works will take approx six months, with an expected completion date of mid-

May.

Kevin Street Sports facilities up-grade.

Planning Approval granted with no objections.

Design team appointed and tender documentation prepared.

A funding shortfall has been identified between the available budget

and the projected budget.

The Sports office is currently seeking additional funding before going to tender.

Page 21: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

2011 PROJECTS

Summer Works Schedule update

46 Projects undertaken

37 Completed

4 Due for completion by December

5 Awaiting decisions

Page 22: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

2012 PROJECTS

To enable the Building’s Office to comply with legislation in both Health & Safety and

Procurement, construction codes of practice, and ever increasing regulations, further

advanced planning is required for any proposed projects.

Project Planning Cycle’s can be divided into 3 separate groups.

Planning Cycle A

For a small works project that do not require either a design team or planning approval

(typically refurbishments with no structural alterations).

A planning period of 2 months minimum is required.

Planning Cycle B

Construction Project without Planning Approval requirement

A planning period of 4 months minimum is required.

Planning Cycle C

Construction Project with Planning Approval requirement

Depending on pre planning design approval work, and planning objections / appeals:

A planning period of 6 to 8 months is required.

Page 23: F & RESOURCES REPORT ERC · WHAT IS BEING ASKED OF ERC To make a recommendation that: - the Bannow Road Project be progressed to Planning Permission and Tender stage Consultation

EXECUTIVE RESOURCES COMMITTEE:

24 OCT 2011

2012 PROJECTS

These time scales are for projects which to fall within the Buildings Office

Construction Frame Work Agreement. (FWA)

Timescales for projects which require E-Tender or OJEU notification will be

significantly longer due to pre-qualification requirements.

In the Kevin Street Campus (Summer 2011) the last exams were held on June

14th and repeat exams commenced on August 22nd , which left a window of 9

weeks.

The Building’s Office would therefore request that projects proposed for

completion during the 2012 summer break, and that fall into category B or C to

be agreed at the latest by the December ERC.