expo line maintenance facility

24
Expo Rail Operations and Maintenance Facility Expo Line Community Meeting Maintenance Facility Design Workshop January 23, 2012

Upload: sourcemetro

Post on 21-Apr-2015

7.071 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Expo Line Community Meeting Maintenance Facility Design Workshop

January 23, 2012

Page 2: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

• Meeting Purpose and Format

• Overview of Design Process and Timeline

• Overview of Site and Building Design Concept

• Next Steps

Meeting Agenda

Maintenance Facility Design Workshop

Page 3: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility Design Process

Overview of Final Design Process and Timeline

Design Kick-Off

Conceptual Design

Summer 2011

Design Development

Fall 2011

Final Design

Spring 2012

Regular updates to community and stakeholder groups on design progress

Construction Documents

Fall 2012

Construction Spring 2013 – Fall 2014

Page 4: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility

Overview of Community Input

• Community Meeting # 1: Community Design Considerations o Sound o Traffic o Visual o Safety

• Community Meeting #2: Scenario Presentation and Selection

Design Process

Page 5: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility Design Process

Site Plan

Page 6: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility

Principles of Design

• Operations

• Sustainability

• Building Materials

• Site Context

Design Process

Page 7: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

On-Site Traffic Flow

Operations

Olympic Blvd

Exposition Boulevard

Page 8: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Site Layout

Operations

Page 9: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility

Leed Certification

Sustainability

• Conditioned Space o Building HVAC

• Passive Ventilation o Operable office windows

• Water Management o Storm water tank

• Day Lighting

o Clear glass skylights

Page 10: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Benefits: • Durable and low maintenance

exterior and interior

• Effective thermal and moisture protection

• Ease of construction

Precast Insulated Concrete Panels

Building Materials

Page 11: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Storefront Glazing Benefits: • High performance insulated

glazing • Transparency

o Articulates south facade o Breaks down scale

• Properly shaded o Louvers and overhangs

block direct sun

Building Materials

Page 12: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Benefits: • Longevity and Durability

• Low Maintenance

o No paint required

• Sustainable o High recycled content

• Energy

o Low embodied energy

Metal

Building Materials

Page 13: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Exposition Boulevard View

Site Context

View from Exposition Boulevard looking Northwest

Page 14: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Northwest View

Site Context

Page 15: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Southwest View

Site Context

Page 16: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Yorkshire Avenue View

Site Context

View from Yorkshire Avenue looking North

Page 17: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility Site Context

Design Concept Aerial View

Page 18: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility

• Incorporate community input on design concept where feasible

• Continue design development

• Return for further input on specific design elements

Next Steps

Next Steps in the Design Process

Page 19: Expo Line maintenance facility

Expo Line Transit Project Expo Rail Operations and Maintenance Facility

Maintenance Facility Site

Design Process

Page 20: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Site Cross-Section

Site Context

Page 21: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Sustainability- Conditioned Space

Sustainability

Page 22: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Sustainability- Passive Ventilation

Sustainability

Page 23: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Sustainability- Storm Water Tank

Sustainability

Page 24: Expo Line maintenance facility

Expo Rail Operations and Maintenance Facility

Sustainability- Day lighting

Sustainability