Explosive Site Plan
OPERATION AND MAINTENANCE OF SAND CREEK BARRIER SYSTEM
RAVENNA ARMY AMMUNITION PLANT
RAVENNA, OH 44266
MAY 2008
Prepared by
engineering-environmental, Management, Inc. 2751 Prosperity Avenue, Suite 200
Fairfax, Virginia 22031
and
PIKA International, Inc.
12723 Capricorn Drive, Suite 500 Stafford, Texas 77477
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page i
Table of Contents
1. Site ................................................................................................................................................. 1
2. Anticipated Dates ......................................................................................................................... 1
3. Purpose.......................................................................................................................................... 1
4. Site Background and Current Conditions................................................................................. 1
5. Executing Agencies ...................................................................................................................... 2
6. Scope of Investigative/Characterization Action........................................................................ 2
7. Safety Criteria .............................................................................................................................. 2
8. Methods of Disposal..................................................................................................................... 3
9. Maps .............................................................................................................................................. 4
Appendices
Appendix A: Figures.....................................................................................................................A-1
Appendix B: Fragmentation Calculation Sheets........................................................................ B-1
Appendix C: Ohio EPA MEC Demolition Notification.............................................................C-1
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page 1
1. Site
a. Name: Operation and Maintenance of Sand Creek Barrier System, Rocket Ridge Area of Open Demolition Area #2 (ODA2), Ravenna Army Ammunition Plant (RVAAP), Ravenna, Ohio. Under U.S. Army Corps of Engineers (USACE) Omaha District, see Figure 1.
b. State: Ohio
c. This O&M work is being performed under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and is part of a Time Critical Response Action (TCRA). If subsequent response actions are determined to be necessary, an ESS will be prepared and submitted for review and approval as necessary to support that response.
2. Anticipated Dates
a. Start: May 31, 2008
b. Complete: July 31, 2009
3. Purpose
a. To prevent the downstream movement of munitions and explosives of Concern (MEC) and Munitions Debris (MD) within Sand Creek.
b. Inspection and removal of Munitions and Explosives of Concern (MEC) and Munitions Debris (MD) accumulated on the screens.
c. MEC Storage at Earth Covered Magazine number 1501 located at ODA2, Disposal of MEC by blow in place (BIP), or at the ODA2 demolition site.
4. Site Background and Current Conditions
a. Rocket Ridge is a steep embankment approximately 500 feet long and 25 feet high located adjacent to Sand Creek within ODA2, approximately 2,700 feet upstream of the George Road Bridge.
b. ODA2 was used for munitions demilitarization, including detonation of large caliber munitions and off-specification bulk explosives that could not be deactivated or demilitarized by any other means. The Rocket Ridge slope was used for the disposal of demilitarized munitions, although not all munitions appear to have been completely demilitarized.
c. Munitions were transported from the demolition site to Rocket Ridge and dumped at the top of the slope. Sand Creek flows in an eastward direction along the northern boundary of the Rocket Ridge Area of ODA2, at the toe of the slope. Due to the steep slope of the disposal
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page 2
area and the stream bank erosion resulting from high water events, some of the munitions materials have reached Sand Creek.
d. On 18 June 2007, a rifle grenade containing white phosphorus exploded on the slope of Rocket Ridge. A survey conducted on 5-6 November 2007 upstream of the George Road Bridge identified a piece of munitions debris approximately 1,200 feet downstream of Rocket Ridge. Thirteen additional magnetometer anomalies from buried sources were found in the stream between the piece of munitions debris and the location of the barrier system. The sources of these subsurface anomalies have not been investigated.
e. In order to prevent the downstream movement of MEC within Sand Creek, the Army constructed a barrier system. The barrier system will be installed across Sand Creek approximately 2,700 feet downstream of Rocket Ridge and 40 feet upstream of George Road Bridge. The barrier location is downstream of the farthest visible piece of munitions-related material that may have migrated from Rocket Ridge.
5. Executing Agencies
a. U.S. Army Corps of Engineers, Omaha District
6. Scope of Investigative/Characterization Action
a. The O&M phase of the Sand Creek Barrier System is focused on inspecting and removing the debris accumulated on the screen and assessing the integrity of the construction. This will be on a monthly basis.
b. Inspection of any MEC and Material Potentially Presenting an Explosive Hazard (MPPEH) found on the screen.
c. Storage and disposal of MEC and MD found on the screen.
7. Safety Criteria
a. The MEC that has been discovered, or is expected to be on site is 75-millimeter (mm) and 105-mm projectiles, booster cups, three 500-pound bombs, white phosphorus rifle grenades, fuzes, and burster tubes. The MGFD identified is the 500 lb Bomb M64A1. During the course of this investigative action, if MEC with a greater fragmentation distance is encountered, the MSD will be adjusted in accordance with DDESB Technical Paper 16, operations will continue, and an amendment to this ESP submitted for approval expeditiously.
b. See Table 7-1 for Minimum Separation Distances.
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page 3
Table 7-1
Minimum Separation Distances (MSD) Area MSD (ft)1
For Unintentional Detonations For Intentional Detonations
MEC Team Separation Distance
(K40)
Hazardous Fragment Distance
(HFD)
Without Engineering
Controls
Using Sandbag
Mitigation
Using Water Mitigation
Carboys/Pool
Rocket Ridge area
of the ODA2
Sand Creek Barrier
RVAAP 500 lb Bomb
M64A12 293 680 2501 NA NA
Notes:
1. See Figure 2 for calculation sheets and documentation of MSD. 2. Denotes MGFD during intrusive operation within the area indicated.
c. Any occupied buildings or public roadways in the MSD areas will be evacuated and/or roadways blocked to prevent non-essential personnel from entering during the conduct of intrusive investigations. There are no occupied buildings or public roadways in the MSD areas, see Figure 2.
d. The accumulated debris will be inspected for MEC/MD. Those items that are unfuzed and safe to move will be collected and placed in Igloo 1501 located at OD-2. If an item is fuzed or otherwise unsafe to move, the item will be BIP.
e. If a smaller MEC item is identified, demolition operations will be conducted using sandbag mitigation in accordance with (IAW) HNC-ED-CS-S-98-7, August 1998 and the DDESB Fragmentation Database if permitted in the publications.
f. Prior to initiating any disposal activities at RVAAP, the Contractor will submit the MEC Demolition/Disposal Notification to the Ohio EPA, as provided in the MEC Notification Procedure dated March 8, 2005 (Appendix C).
8. Methods of Disposal
a. A portable ATF approved Type 2, Class ABC magazine has been previously sited for proper storage of explosives at RVAAP. The magazine is sited inside explosive storage igloo 7-C-1 in the RVAAP C-Block explosives storage area (Figure 3). The portable magazine is provided lightning protection by the existing lightning protection system intended to protect the earth-covered magazine 7-C-1. The portable magazine is approximately 44” tall, with the earth-covered magazine being approximately 10’ tall. The lightning system for 7-C-1 extends approximately 3’ above the earth-covered magazine, and the grounding system for the Type II magazine is connected into the earth-covered magazine.
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page 4
b. The portable magazine will be used for the storage of both 1.1 and 1.4 class explosives to be used for demolition operations. All 1.1 and 1.4 explosives stored in the main body of the magazine will be of compatible storage categories. Blasting caps and other initiators used for demolition operations will be stored outside the magazine in the attached 18” x 18” x 18” “cap” box that is welded to the outside of the magazine. The NEW for the demolition material magazine will be a maximum of 100 pounds NEW (Figure 3).
c. An existing Earth Covered Magazine number 1501 located at ODA2 will be used for the storage of MEC that have been inspected by UXO-qualified personnel and determined to be “acceptable to move” (Figure 3). The ODA2 is a restricted explosives storage area within the RVAAP. Access to the ODA2 area is controlled through RVAAP Post 1 Security. The magazine will be afforded a lighting protection system IAW Department of the Army (DA) Pamphlet (PAM) 365-64.
d. The ESQD arc for intentional detonations when conducting BIP or disposal at ODA2 is 2,501 feet and is depicted in Figure 4.
9. Maps
Figure 1 shows the regional location of the Sand Creek Barrier within the Ravenna Army Ammunition Plant. Figure 2 depicts the Hazardous Fragmentation Distance around each investigation area. Figure 3 identifies the Inhabited Building Distance and Public Traffic Route Distance for the explosive storage magazines. Figure 4 identifies the Maximum Fragment Range – Horizontal (MFR-H) distance each area for the munition with the greatest fragmentation distance (MGFD).
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page A-1
APPENDIX A
Figures
pond
2625242320
5321 4
1514181716
876
53
2827313029
464443
35343332383736
494847525150
60595864636261
676665
414039
56555457
706968
HINKLEYCREEK
ߧ
Sand Creek Barrier System
Rocket Ridge
281
770
431
676
711
614
599
752
85
427
683
92
778
747
428
632
186
637
687
763
232
662
110
213
429
430
741
612
432
234
626
713
679
664
650
759
661
266
215
426
722
129
694
425
742
142
12
214
90
267
38
34
670
21
645
139
280
792
791
104
268
436
137
108
789
655
131
787
91
83
269
793
646
187
121
424
140
235
136
790
93
95
100
11
788
776
707
264
211
185
22
96
237
89
94
282
631
435
14
188
138
786
141
433
647
709
98
97
99
270
372
127
126
39
124
123
122
37
128
84
111
373
105
371
118
132
125
117
130
134
146
163
212
165
107
115
119
275
148
151
157
113
153
758
120
273
103 116
112
155
272
160
276278
135
114
133 274
307
277
770
431
676
711
614
599
752
427
683
778
747
428
632
186
637
92
687
763
232
662
110
213
429
430
741
612
432
234
626
713
679
664
650
759
661
266
215
426
281
722
129
694
425
742
142
214
267
670
645
139
12
280
792
90
38
34
791
104
21
268
436
137
108
789
655
131
787
269
793
646
187
121 424
91
83
140
235
136
790
100
788
776
707
264
211
93
95
185
11
237
282
631
435
22
188
138
786
96
141
94
433
647
709
14
98
270
127 126124
123
122
128
99
111
39
105
37
84
118
132
125
130
146
163
212
165
115
119
107
275
148
113
151
157
153
758
120
116
112
155
160
117
134
135
114
273
103
133
274
272
307
277
276
278
PE-1
PE-23
PE-3
51-25
PE-10
PE-24
PE-7
PE-8
PE-6
PE-5
PE-4
10-51
PE-16
PE-15
PE-29
PE-9
PE-28
PE-21
PE-14
PE-19
PE-30
PE-13
PE-18
PE-11
PE-2
PE-20
PE-17
PE-22
PE-12
PE-32
PE-33
PE-31
PE-14A PE-26
PE-25
PE-27
Route 5
South Service Road
Geo
rge
Roa
d
Newton Falls Road
Patrol Road
Green
leaf R
oad
New Newton Falls Road
Sla
gle
Roa
d
Par
is-W
ind h
am R
oad
Smalley Road
Remalia Road
Blo
ckD
Roa
d1
Blo
ckD
Roa
d3
Blo
ckD
Roa
d5
South Patrol Road
Blo
ckD
Roa
d7
LL-1
Road
Ramsdell Road
Load Line 2 Road
LL-2 Road
LL-3 Road
Wilc
ox-W
ayla
nd R
oad
WP Lane E Butts-Kistler Road
Load Line 4 Road
Dor
mito
ry R
oad
FB Stor Road
Load Line 12 Road
Demolition Road
Storag
e Area
6 Roa
d
Geo
rge
Rd
B D Wye Road
Slagle Road
Gre
enle
af R
oadDemolition Road
LL-1 Road
0 2,200 4,400 6,600 8,8001,100Feet
PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477
Figure 1Regional Location of Rocket Ridgeand the Sand Creek Barrier System
Ravenna Army Ammunition PlantRavenna, OH
Drawn On: Drawn By: QX
N
5/21/2008
Legend
Water BodiesBuildingsWalkways
Railroads
Berms
Pond
Proposed Area
2625242320
5321 4
1514181716
876
53
2827313029
464443
35343332383736
494847525150
60595864636261
676665
414039
56555457
706968
ߧ
61A61
OD-2 Area
Hazardous Fragmentation Distance (HFD) 680 feet
146
163
472
165
466
160
469
146
163
472
165
466
160
469
0 410 820 1,230 1,640205Feet
Figure 2 - Hazardous Fragmentation Distance (HFD) at the Sand Creek Barrier
Ravenna Army Ammunition PlantRavenna, OH
Drawn On: Drawn By: QX
N
5/21/2008
Legend
Water BodiesBuildingsWalkways
Railroads
Berms
Pond
OD-2 Area
HFD 680 feet
PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477
20
5321 4
1514181716
876
2827313029
464443
35343332
494847
60595864636261
ߧMSD (500 ft Front, 250 ft Side and Rear)
PTRD (300 ft Front, 150 ft Side and Rear)
Igloo 7-C-1
Igloo 1501
MSD (500 ft Front, 250 ft Side and Rear)
PTRD (300 ft Front, 150 ft Side and Rear)
Sand Creek Barrier System
281
85
92
186
110
215
129
142214
90
139
280
104
137
108
131
91
83
187
140 136
93
95
100
185
96
89
94
282
188
138
141
98
97
99
372
127
126124
123
122
128
84
111
373
105
371
118
132
117
134
146
163165
107
115
119
275
148
151
157
113
153
273
103 116
112
155
272
160
276278
135
114
133 274
307
277
186
92
110215
281
129
142
214
139
280
90
104
137
108
131
187
91
83
140
136
100
93
95
185
282
188
138
96
141
94
98
122
128
99
111
105
84
118
132
146
163165
115
119
107
275
148
113
151
157
153
116
112
155
160
117
114
273
103
274
272
307
277
276
278
PE-1
PE-23
PE-3
51-25
PE-24
PE 7PE-6
PE-5
PE-4
PE-16
PE-15
PE-29
PE-28
PE-21
PE-14
PE-19
PE-13
PE-18
PE-2
PE-20
PE-17
PE-12
PE-32
PE-33
PE-31
PE-14A PE-26
PE-25
PE-27
Geo
rge
Roa
d
Newton Falls Road
Slagle R
oad
Green
leaf R
oad
Blo
ckD
Roa
d1
Blo
ckD
Roa
d2
Blo
ckD
Roa
d3
Blo
ckD
Roa
d4
Blo
ckD
Roa
d5
Blo
ckD
Roa
d6
Blo
ckD
Roa
d7
WP Lane A
WP Lane B
WP Lane C
WP
Lane
E
WP Lane D
South D Road
OD
-2 R
oad
Fuze and Booster RoadFu
ze a
nd B
oost
er S
pur R
oad
WS
Roa
d
Det
onat
or S
pur R
oad
Load
Line
9 Roa
d
Load Line 11 Road
Load Line 7 Road
Load Line 9
Pistol Range Road
Load Line 11
Slagle Road
Green
leaf R
oad
Slagle Road
Load Line 9
OD-2 Road
Slagle Road
WS
Roa
d
0 530 1,060 1,590 2,120265Feet
PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477
FIGURE 3 - Location of Storage Igloo1501 at OD-2 and 7-C-1
Ravenna Army Ammunition PlantRavenna, OH
Drawn On: Drawn By: QX
N
5/21/2008
Legend
Water BodiesBuildingsWalkways
Railroads
Berms
Pond
Proposed Area
2625242320
5321 4
1514181716
876
53
2827313029
464443
35343332383736
494847525150
60595864636261
676665
414039
56555457
706968
ߧ
61A61
OD-2 Area
Hazardous Fragmentation Distance (HFD) 680 feet
MSD 2501 ft
MSD 2501 ft
281
85
92
186
90
280
91
83
187
93
95
100
185
96
94
188
98
97
99
372
84
373
371
146
163
472
165
148
466
160
469
186
92
281
280
90
187
91
83
100
93
95
185
188
96
94
98
99
84
146
163
472
165
148
466
160
469
PE-23
51-25
0 820 1,640 2,460 3,280410Feet
Figure 4 - Minimum Separation Distanceat the Sand Creek Barrier System
Ravenna Army Ammunition PlantRavenna, OH
Drawn On: Drawn By: QX
N
5/21/2008
Legend
Water BodiesBuildingsWalkways
Railroads
Berms
Pond
OD-2 Area
HFD 680 feet
PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page B-1
APPENDIX B
Fragmentation Calculation Sheets
Munition Information and Fragmentation Characteristics
Theoretical Calculated Fragment Range
Minimum Thickness to Prevent PerforationOverpressure Distances
Required Sandbag Thickness Water Containment System and Minimum Separation Distance:
Fragmentation Data Review Form
Close Form
Category: HE Bombs
Munition: 500 lb Bomb M64A1
Primary Database Category: bomb
Secondary Database Category: 500 lb
Munition Case Classification: Non-Robust
DODIC:
Individual Last Updated Record: Crull
Explosive Type: Comp B
Explosive Weight (lb): 274.00000
Diameter (in): 14.2000
Max Fragment Weight (lb): 0.289082
Critical Fragment Velocity (fps): 8116
HFD [Range to No More Than 1 Hazardous Fragmentper 600 Square Feet] (ft): 680
MFR-V [Vertical Range of Max Weight Fragment] (ft): 1991
MFR-H [Horizontal Rangeof Maximum Weight Fragment] (ft): 2501
Inhabited Building Distance (12 psi), K40 Distance: 293
Inhabited Building Distance (09 psi), K50 Distance: 367
Intentional MSD (0065 psi), K328 Distance: 2406
4000 psi Concrete (Prevent Spall): 8.94
Mild Steel: 1.46
Hard Steel: 1.20
Aluminum: 3.05
LEXAN: 6.77
Plexi-glass: 5.12
Bullet Resist Glass: 4.24
Max Fragment Weight (lb)SB: 0.022120
Critical Fragment Velocity (fps)SB: 8116
Kinetic Energy 106 (lb-ft2/s2)SB: 0.7285
Required Wall Roof Sandbag Thickness (in)SB: NA
Expected Maximum Sandbag Throw Distance(ft)SB: NA
Minimum Separation Distance (ft)SB: NA
Max Fragment Weight(lb)W: 0.022120
Critical Fragment Velocity (fps)W: 8116
Kinetic Energy 106 (lb-ft2/s2)W: 0.7285
Water Containment System:
NA
Minimum Separation Distance (ft)W: NA
Date Record Created: 7/30/2004
Last Date Record Updated: 6/25/2007
Date Record Retired:
Print This Form
Database Revision Date 12/31/07
Time Critical Response Action (TCRA) Explosive Site Plan (ESP)
Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant
Ravenna, Ohio
Revision 0, May 21, 2008 Page C-1
APPENDIX C
Ohio EPA MEC Demolition Notification