EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL
Disposal of Spent Nuclear Fuel from NPP Krško
Tine LOGONDER
![Page 2: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/2.jpg)
BackgroundOperating time of NPP Krško (*1984 - †2023)
Long term management of radioactive waste and spent nuclear fuel from NPP Krško
Agreement between Croatia and SloveniaNecesarry to find technically acceptable and safe
permanent solution – DISPOSAL IN DEEP GEOLOGICAL FORMATIONS
![Page 3: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/3.jpg)
Model usedConcept of SF was never devloped in Slovenia
or CroatiaSwedish concept has been taken as a
referenceThe most devloped waste disposal conceptHas been allready adopted by FinlandVery avanced cost assessment methodology
Model is devloped on next persumptions:Operating of NPP will end in 2023Only disposal – no reprocessing of SFRespository in hard rock enviroment (depth 500m)Storage capacity of respository will be 1531 +/- 20 fuel
assemblies (620 tons)
![Page 4: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/4.jpg)
Respository (description)Buildigns which creates a
respository:
Operations buildingStorage buildingGarage buildingmaintenance and service
buildingventilation buildingproduction building for high-
pressure compacting of bentonite and preparation of backfill materials
office and workshop building information center rock stockpiles.
![Page 5: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/5.jpg)
Ways to undergroun levelFor personal: SERVICE SHAFT (5m in light
profile – 2 elevators)For waste and other cargo: SPIRAL RAMP
(15m curve radius and 10% slope)
![Page 6: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/6.jpg)
Canister DisposalDeposited into 1.8 m
diameter disposal bareholes
Sorrounded by 35cm of betonite
Spacing defined on the basis of thermal analysis
Disposal of canisters will start in second year after the start of operation
When disposal tunnel is full, it’ll be backfilled with compound of sand and betonite
34 or 20 disposal tunnels
![Page 7: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/7.jpg)
Cost EstimateInvestment costs: 207.2 mio €Backfilling/Decommissioning: 28.2 mio €Operating costs: 99.0 mio €Other costs: 124.4 mio €
TOTAL: 596.4 MIO €
![Page 8: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/8.jpg)
Alternatives
Export of spent fuel to Russia (storage/reprocessing) – possibility opened in 2001
Areas to be solved before considering acceptable:
Agreement on peaceful use of nuclear energyGet permmision from USA to export it (for ex-
Yugoslavian countries)
![Page 9: EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER](https://reader036.vdocuments.us/reader036/viewer/2022082422/5697c02c1a28abf838cd8e4c/html5/thumbnails/9.jpg)
We will see ;)
Thank You!
CONCLUSION