EXISTING INFRASTRUCTURE BASELINE DATA
IMPERIAL/CRENSHAW AREA FOR INGLEWOOD PLANNING SERVICES FOR TRANSIT-ORIENTED DEVELOPMENT
The following is an analysis of the existing utilities within the Imperial and Crenshaw area based on information compiled from existing data supplied by the city of Inglewood, LACFCD and various utility purveyors. The following is a listing of the existing facilities within the limits of the project area boundaries.
EXECUTIVE SUMMARY
This report (TASK 3.1a Existing Conditions) is an analysis of the existing utilities / infrastructure within the for Transit Oriented Development (TOD) project areas based on information compiled from existing data researched and retrieved from City of Inglewood Public Works Department, Los Angeles County Flood Control District (LACFCD), private utility purveyors, as well as observations during site visits (Observations for this area are still pending).
The information in this report will assist City of Inglewood and the consultant team in realizing what opportunities and constraints exist for them while developing the vision for the Inglewood Planning Services for TOD
The project area is fully built-out with residential and commercial properties, public school, recreational park, and industrial and manufacturing zones. Thus, the available infrastructure (utilities and roads) have little or no constraints regarding future redevelopment and property usage plans. There are no major deficiencies observed for the existing condition by comparing the existing land use zoning to the utility infrastructure currently available to the area.
SITE DESCRIPTION
Project Location
The city of Inglewood (pop. 112,000) is a city in southwestern Los Angeles County, located just southwest of downtown Los Angeles. The city borders the San Diego Freeway (Interstate 405) to the west, the Century Freeway (Interstate 105) to the south, the city of Los Angeles to the east and north. The city is a developed urban area with the infrastructure necessary to sustain its population. This portion of the Inglewood Planning Services for TOD is for the Imperial and Crenshaw area (Task 3.1a) (See Exhibit G2)
![Page 2: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/2.jpg)
WATER SYSTEM
Service Provider: City of Inglewood
Contact Person (City of Inglewood): Barmeshewar Rai (Water Services) (310) 412-5333
The City of Inglewood owns and maintains the water supply network within the city. The city receives its water supply from two sources: City owned groundwater wells and imported water from Metropolitan Water District. Water lines are located in almost all streets and alleys within the project area. Almost all the existing water lines are older water pipes made of Asbestos Cement (AC), with some relatively new water lines that were installed in recent years, made of Cast Iron (CI) pipes, PVC pipes, Copper (Cu) Pipes, Corrugated Metal Pipe (CMP) and Steel (WS) pipes. The pipe diameter sizes range from 4” to 16”.
The existing water mains locations are listed below:
115TH STREET – There is an existing 6" CI water main
116TH STREET – There is an existing 6" CI water main
117TH PLACE – There is an existing 6" CI water main
117TH STREET – There is an existing 6" CI water main
118TH PLACE – There is an existing 8" PVC and 6" AC water main
118TH STREET – There is an existing 6" CI water main
CHERRY AVENUE. – There is an existing 6" CI and 12" CI water main
CHRISTOPHER AVENUE – There is an existing 6" CI and 2" Cu water main
CRENSHAW BLVD – There is an existing 12" PVC, 12" AC, and 8" AC water main
DEHN AVENUE – There is an existing 6" CI water main
IMPERIAL HWY – There is an existing 12" AC and 6" CI water main
LEMOLI AVENUE – There is an existing 2" Cu water main
LEMONLI AVENUE – There is an existing 6" CI water main
SIMMS AVENUE – There is an existing 6" CI and 2" Cu water main
YUKON AVENUE – There is an existing 6" AC water main
See attached Wet Utility Exhibit #1 for approximately location of water lines.
Water meter at 1144 Simms Ave.
![Page 3: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/3.jpg)
SEWER SYSTEM
Service Provider: City of Inglewood Public Work Department
Contact Person: Albert Mendoza (310) 412-4261
The existing sewer system in the city of Inglewood is owned and maintained by the city’s public works department. Currently, there is a comprehensive network of sewer lines in the project area. The existing sewer mains in the project are mostly 8” with a few 10”, 12” ,15”,18” and 21” Vitrified Clay Pipe (VCP) with a few Reinforced Concrete pipe (RCP).
The existing sanitary sewer locations are listed below:
115TH STREET – There is an existing 8" VCP sewer main
116th STREET – There is an existing 8" VCP sewer main
117th PLACE – There is an existing 8" VCP sewer main
117th STREET – There is an existing 8" VCP sewer main
118th PLACE – There is an existing 8" VCP sewer main
118th STREET – There is an existing 8" VCP sewer main
ALLEY W. OF CRENSHAW BETWEEN 116TH & 119TH – There is an existing 8" VCP sewer main
ALLEY W. OF CRENSHAW BLVD. – There is an existing 8" VCP sewer main
ALLEY BETWEEN SIMMS & CHERRY – There is an existing 8" VCP sewer main
ALLEY W. OF CRENSHAW BLVD & N. OF IMPERIAL HWY – There is an existing 8" VCP sewer main
ALLEY N. OF IMPERIAL HWY & E. OF CRENSHAW – There are two existing 8" VCP sewer main
ALLEY BETWEEN IMPERIAL AND E. OF CRENSHAW – There is an existing 8" VCP sewer main
ARBOR VITAE STREET – There is an existing 10" VCP AND 8" VCP sewer main
ARDATH AVENUE – There is an existing 8" VCP sewer main
CHRISTOPHER AVENUE. – There is an existing 8" VCP sewer main
CRENSHAW BLVD. – There is an existing 8" VCP sewer main
DEHN AVENUE – There is an existing 8" VCP sewer main
EASEMENT W. OF CRENSHAW – There is an existing 8" VCP sewer main
EASEMENT S. OF IMPERIAL HWY – There is an existing 8" VCP sewer main
![Page 4: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/4.jpg)
EASEMENT, REGENT ST. &OAK ST. – There is an existing 8" VCP sewer main
EASEMENT S. OF IMPERIAL HWY – There is an existing 8" VCP sewer main
IMPERIAL HWY – There is an existing 8" VCP sewer main
LEMOLI AVENUE – There is an existing 8" VCP sewer main
LEMON AVENUE – There is an existing 8" VCP sewer main
SIMMS AVENUE – There is an existing 8" VCP sewer main
YUKON AVENUE – There is an existing 8" VCP, 10" VCP, 18" VCP, and 21" VCP sewer mains
See attached Wet Utility Exhibit #2 for approximately location of sanitary sewer lines.
STORM DRAIN SYSTEM
Service Provider: Los Angeles County Flood Control District
Contact Person: Ramil (Plan Room) (626) 458-7997
The major “back bone” / main lines of the storm drain system in the project area are owned and maintained by the Los Angeles County Flood Control District (LACFCD) and the City of Inglewood. The storm drains main lines within the project area consist of Reinforced Concrete Pipe (RCP) and Reinforced Concrete Box (RCB). RCP diameter sizes in the project area varies from 24” to 96”.
See attached Wet Utility Exhibit #3 for approximately location of storm drain lines.
Sanitary Sewer Manhole at 11550 Simms Ave.
Storm Drain inlet with manhole at 3487 W. 117th St.
![Page 5: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/5.jpg)
ELECTRICAL SYSTEMS
Service Provider: Southern California Edison
Contact Person: Kim Gurule (714) 796-9932
The Southern California Edison Company is the electrical purveyor for the city of Inglewood. In the residential areas, the existing electrical facilities are mostly an overhead electrical system with poles carrying low voltage conduits. In the commercial / industrial areas, the existing electrical networks are underground electrical systems and the facilities exist in all the streets within the project area.
The existing overhead electrical line locations are listed below:
118th PLACE – There is an existing overhead electrical line located on the south side of the street.
ALLEY BETWEEN SIMMS & CHERRY – There is an existing overhead electrical line located on the south side of the alley.
CHERRY AVE. – There is an existing overhead electrical line located on the south side of the street.
CRENSHAW BLVD. – 118th PLACE – There is an existing overhead electrical line located on the west side of the street.
DEHN AVENUE – There is an existing 8" VCP sewer main
IMPERIAL HWY – 118th PLACE – There is an existing overhead electrical line located on the south side of the street.
LEMON AVENUE – 118th PLACE – There is an existing overhead electrical line located on the south side of the street.
SIMMS AVENUE – 118th PLACE – There is an existing overhead electrical line located on the south side of the street.
Power overhead lines along W. Imperial Hwy.
![Page 6: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/6.jpg)
GAS SYSTEM
Service Provider: Southern California Gas Company
Contact Person: Gale Etherly (310) 687-2020
The natural gas purveyor for the city of Inglewood is the Southern California Gas Company. The entire project area has an extensive natural gas facility network with good comprehensive coverage. Almost every parcel within the project area has access to natural gas. The existing gas lines within the project area ranges in size from 1” to 8.
TELECOMMUNICATIONS SYSTEMS
Service Provider I: Crown Castle
Contact Person: David Antol [email protected]
Crown Castle aerial and underground fiber optic lines are present along Imperial Hwy and South Van Ness. In addition, SUNESYS Fiber is also present along S. Cherry St.
Location of the underground fiber optic lines are shown in the attached as-built maps provided by Crown Castle (See telecommunications systems map #1)
Service Provider II: XO Communications Services LLC.
Contact Person: Matt Bergine (949) 417-7841
XO Communications Services LLC has a high-bandwidth networking line along Imperial Hwy.
Location of the high-bandwidth networking line is shown in the attached as-built maps provided by XO Communications Services LLC. (See telecommunications systems maps # 2-4)
CABLE TV SYSTEM
Service Provider: Time Warner Cable
Contact Person: Bryan Pulido (310) 216-3681
Time Warner Cable (TWC) is the cable television (TV) service provider for the city of Inglewood. Similar to telecommunication systems, the cable TV systems are mostly aerial facilities that share the power poles with the electrical system along with a few underground conduits within the subarea.
![Page 7: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/7.jpg)
112t
h S
t.
113t
h S
t.
118t
h P
l.
Simms Av.
Cherry Av.
Impe
rial H
wy.
Lemoli Av.
117t
h S
t.
117t
h P
l.
Crenshaw Bl.
Christopher Av.
119t
h S
t.
Imperial/Crenshaw
Plan
ning
Are
a
EXHI
BIT
G2
Gree
n Line
Inglew
ood C
ity B
ound
ary
Plan
ning A
rea
01,
000
2,00
050
0Fe
et
N2
min
ute
wal
k(4
80 ft
)
2 m
inut
e bi
ke (1
,760
ft)
City
of
Haw
thor
ne
City
of
Ingl
ewoo
d
1/2
mile
radi
us (1
0 m
inut
e w
alk)
2 m
inut
eho
verb
oard
(1,0
60 ft
)
![Page 8: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/8.jpg)
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri(Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
LEGEND:
STORM DRAIN LINE
SD STRUCTURE
![Page 9: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/9.jpg)
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri(Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
LEGEND:
SEWER LINE
SEWER STRUCTURE
![Page 10: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/10.jpg)
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri(Thailand), MapmyIndia, NGCC, © OpenStreetMap contributors, and the GIS User Community
LEGEND:
WATER MAIN
FIRE HYDRANT
![Page 11: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/11.jpg)
![Page 12: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/12.jpg)
![Page 13: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/13.jpg)
![Page 14: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/14.jpg)
JMC2 Engineering Project No. 20160081-HWY 105 Inglewood Los Angeles, CA UTR-1116-138
David Antol Utility Coordinator
2000 Corporate Dr. l Canonsburg, PA 15317
Crown Castle Aerial & UG Fiber IS PRESENT along Imperial Hwy & S Van Ness Ave; SUNESYS Fiber IS PRESENT along S. Cherry
Ave.
![Page 15: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/15.jpg)
![Page 16: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/16.jpg)
JMC2 Engineering Project No. 20160081-HWY 105 Inglewood Los Angeles, CA UTR-1116-138
David Antol Utility Coordinator
2000 Corporate Dr. l Canonsburg, PA 15317
![Page 17: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/17.jpg)
![Page 18: EXISTING INFRASTRUCTURE BASELINE DATA …inglewood.arroyogroup.com/wp-content/uploads/2017/... · The major “back bone” / main lines of the storm drain system in the project area](https://reader033.vdocuments.us/reader033/viewer/2022051807/60050f2cf68b344181343398/html5/thumbnails/18.jpg)
JMC2 Engineering Project No. 20160081-HWY 105 Inglewood Los Angeles, CA UTR-1116-138
David Antol Utility Coordinator
2000 Corporate Dr. l Canonsburg, PA 15317