PROJECT : Eskom Renewable Energy ProjectSere Wind Farm
Country : Republic of South Africa
___________LOCATION
Western Cape Province, 2 km off the coastline of
the Atlantic Ocean
2Sarjeevan Sainbhi
About Eskom____________________
• Eskom is a South African electricity public utility, established in 1923 as the Electricity Supply Commission by the government of South Africa.
• Eskom generates approximately 95% of the electricity used in South Africa and approximately 45% of the electricity used in Africa.
3Sarjeevan Sainbhi
Sere Wind Project Objective_______________
Increased renewable energy supply
Avoidance of greenhouse gas emissions
CTF-leverage investments in renewable projects
Job creation
4Sarjeevan Sainbhi
Project Description
TARGETS:
• 700 MW by 2013 & 3100 MW by 2019
• Job Opportunities: 140 direct jobs and 1371 indirect jobs
during construction and additional 10 jobs during operation.
• Reduction in 0.44 million tons of CO2.
• Increased Renewable Energy supply to 219 GWh
5Sarjeevan Sainbhi
Project Schedule
6Sarjeevan Sainbhi
7Sarjeevan Sainbhi
The estimated cost of the Sere wind project does not
include the forward cover. 8Sarjeevan Sainbhi
Unit of Account Unit by which value of a thing is accounted and compared.
1 UA = 1.5619 US Dollar
9Sarjeevan Sainbhi
African Development Bank (AfDB) : USD 45million
CTF through AfDB : USD 50 million
World bank (WB) : USD 90 million
CTF through WB : USD 50million
Agence Française de Développement (AFD) : USD 130 million
Eskom : USD 10 million
Total Cost : USD 375 million
Project Funding
10Sarjeevan Sainbhi
Funds Approval ProcessDue Diligence report by AfDB & IBRD in 2010
Application to CTF for Funding Approval in 2010
Committee Approval of CTF Allocation of USD 350 Million in 2011
The Agence Française de Développement (AFD) driven by CTF to leverage financing.
Late June 2011, AfDB will co-host the Climate Investment Funds 2011 Partnership Forum & showcasing Sere wind farm as flagship
projects 11Sarjeevan Sainbhi
BORROWER : Eskom Holdings SOC Ltd.
EXECUTING AGENCY : Eskom Holdings SOC Ltd
Project type : Investment loan.
12Sarjeevan Sainbhi
13Sarjeevan Sainbhi
14Sarjeevan Sainbhi
CONTRACTUAL PLANS
Implementation arrangements :
• Eskom, a wholly-owned government entity, will be solelyresponsible for implementing all components of theproject.
• Eskom will the sole beneficiary of the loan, which will beguaranteed by the Government of South Africa.
15Sarjeevan Sainbhi
CONTRACTUAL PLANS
Procurement arrangements
• Works, goods and consulting services will be procured inaccordance with the Bank's Rules.
• Jointly financed components and activities will beprocured in accordance with the IBRD’s procurementguidelines and the IBRD’s standard bidding documentswill be used.
16Sarjeevan Sainbhi
The EPC contracts proposed for joint financing are as follows:
– AfDB, jointly with the IBRD & the AFD will finance theprocurement of an EPC contract for the Sere WindFacility, consisting of the supply and installation of windturbines and generators, a tower and other equipment.Procurement will be carried out throughprequalification under International CompetitiveBidding.
CONTRACTUAL PLANS
17Sarjeevan Sainbhi
CONTRACTUAL PLANS Financial management, audit , reporting & monitering :
– The project’s financial transactions will be managedby the project implementing agency (Eskom) within itsexisting set-up: namely, the Finance Division and theGroup Capital Division, under the overall managementof Eskom’s Board of Directors
18Sarjeevan Sainbhi
Recommendations________________
• Waiver of the rule for Procurement of Goods & services as per Bank’s Rules and Procedures in connection with the EPC contract that are subject to joint financing arrangements.
• The estimated cost of the Sere wind project should include the forward cover.
19Sarjeevan Sainbhi
Thank you
20Sarjeevan Sainbhi