Page 1: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

0 Copyright Fujitsu Technology Solutions, Release September 2011

ETERNUS DX60 S2

Hardware and Software Installation

Hardware and Software Installation ETERNUS DX60 S2

Page 2: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Hardware Installation

Package Contents Rack Mounting Power Cabling Backend Cabling Power On and Power Off Procedures

Hardware and Software Installation ETERNUS DX60 S2 Copyright Fujitsu Technology Solutions, Release September 2011 1

Page 3: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Package Contents (1) Controller Enclosure Kit Installation poster Documentation CD Rack mount kit Controller Enclosure Front bezel 2 X power cord Safety Manual

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 2

Page 4: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Package Contents (1) Drive Enclosure Kit Installation poster Rack mount kit Drive Enclosure Front bezel 2 X power cords 2 X SAS cables Safety Manual

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 3

Page 5: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Rack Mounting (1) Rack mount kit

Rack mount installation overview

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 4

Page 6: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Rack Mounting (1) Attach the 2U Bracket to the

left rear rack pillar Insert the pins of the left hand

side slide rail in the 1st and 3rd hole counting from the bottom of the 2U Bracket

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

M5 Centering screws (10 mm)

2U Bracket

Base line of the Controller Enclosure

5

Page 7: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Rack Mounting (2) Push the M5 cage nut into the

2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left hand side slide

rail to the front pillar using the M5 centering screw and M5 pan head screws

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

M5 Centering screw (10 mm)

M5 Pan head screw (10 mm)

M5 Cage nut

Base line of the Controller Enclosure

6

Page 8: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Rack Mounting (3) For the right hand side rail, insert the pins in the holes of the

rear pillar, and secure the other side of the slide rail to the front pillar in the same way as with the left slide rail

Base line of the Controller Enclosure

M5 Cage nut

Base line of the Controller Enclosure

M5 Pan head screw (10 mm)

M5 Centering screw (10 mm)

7

Page 9: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Rack Mounting (4) Front view of rack installation

8

Page 10: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Rack Mounting (5) Fit the Controller Enclosure and/or Drive Enclosure to the rack For better stability, a rack is to be filled starting from the bottom

9

Page 11: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Power Cabling Connect the rack PDUs (Power Distribution Units) to

independent AC power phases Make sure that the AC

power switches on each Enclosure are turned off before connecting their power cables

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Always follow the local power cabling regulations!

10

Page 12: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Backend Cabling (2) The Controller Enclosure and Drive Enclosures are connected

using proprietary SAS cabling The IN and OUT ports and connectors are coded with symbols and are

mechanically coded to prevent incorrect cabling • SAS (IN) port connector

• Plug for SAS (IN) port

• SAS (OUT) port connector

• Plug for SAS (OUT) port

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 11

Page 13: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Backend Cabling (1) Connect SAS (OUT) ports of the Controller Enclosure with the

SAS (IN) ports of the Drive Enclosure

1 3

2 4

12

Page 14: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Power On Procedure Power on ETERNUS from Controller Enclosure Push the Power Switch If everything is OK, the READY LED will go green in about three minutes

LEDs

POWER • Green when the power is turned on READY • Green when the system is available for use FAULT • Steady orange when a malfunctioning system

component has been detected • Blinking orange when a preventive replacement of

a system component is required IDENTIFY • Blinking blue when turned on from the

management software CACHE • Steady green when the cache is in use • Blinking green when a power failure has occurred

and the cache data has been stored in the CompactFlash memory

13

Page 15: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Power Off Procedure Power off the ETERNUS by pressing the Power switch of the

Controller Enclosure for 4 seconds You can power off also using the ETERNUS Web GUI

• Select menu [Utilities] [Shutdown/Restart System] The power supply of the device will shut down in 30 seconds

• If a reboot is chosen, the device will be rebooted after shutdown

Before shutting the system down Ask customer to confirm that all

Server I/O is stopped Check that the CACHE LED on

the Operation Panel is off

Make sure the CACHE LED of the Controller Enclosure is off

14

Page 16: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Software Setup

Initial Configuration Initial Configuration Web GUI Initial Configuration for Expansion Drive Enclosure ETERNUS SF Express

Hardware and Software Installation ETERNUS DX60 S2 Copyright Fujitsu Technology Solutions, Release September 2011 15

Page 17: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Initial Configuration (1) Basic connection guidelines and parameters for a connection

between the management computer and ETERNUS DX IP-address/Subnet mask ETERNUS MNT Port

• Default 192.168.1.1 / 255.255.255.0 Set a fixed IP address for the computer to be connected to ETERNUS

• Needs to within the same IP address subnet with the ETERNUS MNT Port (for example 192.168.1.2)

Connect the LAN port of the computer to the ETERNUS MNT Port • Direct connection with normal or crossed cable

Web browser • Internet Explorer 6.0, 7.0 or 8.0 • Mozilla Firefox 3.0.x, 3.5.x and 3.6.x

Web browser settings • Do not use a proxy server or cache (Temporary Internet Files) • Enable Java Scripting, Style Sheets and Cookies

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 16

Page 18: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration (2) ETERNUS has one MNT port on each CM, but only the port

with the green Master LED on is enabled The LAN cable must go to the MNT port with the Master LED on

MNT Port CM #0

Master LED CM #0

MNT Port CM #1

Master LED CM #1

17

Page 19: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (1) To start the installation procedure, logon to ETERNUS DX60

S2 Web GUI using one of the default User Accounts User name: root, Password: root User name: f.ce, Password: <Check Code><System Serial Number>

18

Page 20: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (2) Opening screen after logon to ETERNUS DX60 S2 Web GUI

Initial configuration steps

General status of the system

19

Page 21: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (3) General status of the system

Indicator Color Description Green Each component is in normal status Orange Component is under maintenance Yellow Preventive maintenance is required for some components

Yellow Pinned data is detected Administrator User and General User can not see this status

Red This symbol is displayed in the following conditions Component failure is detected Loop Down is detected

Red

This symbol is displayed in the following conditions Abnormal status is detected at power-on Abnormal status is detected at power-off, the device has not

started up normally Failed to restore the operating environment at power-on The device is abnormal

20

Page 22: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (4) Status of each component

Indicator Color Description

Green The component is in normal status

Blue Some components are installed but unused. (For example, A disk which is not assigned to a RAID group or as a hot spare.)

Orange The component is under maintenance

Yellow Preventive maintenance is required for a component

Red A component failure is detected

21

Page 23: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (5) Set Date and Time

22

Page 24: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (6) Set Machine Name (optional)

23

Page 25: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (7) Change the password if needed (need customer approval)

24

Page 26: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Initial Configuration Web GUI (8) Set Network Environment (if needed)

25

Page 27: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Configure Expansion Drive Enclosure (1) Choose tab "Maintenance" Select "Add Drive Enclosure"

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 26

Page 28: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Configure Expansion Drive Enclosure (2) This is also a Wizard driven procedure Start with Next

27

Page 29: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Configure Expansion Drive Enclosure (3) This step is to verify that the Drive Enclosure is properly

installed in the rack

28

Page 30: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Configure Expansion Drive Enclosures (4)

The Software Wizard scans automatically for new Drive Enclosures

29

Page 31: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Configure Expansion Drive Enclosure (5) This step is for verifying that the Auto Power Switch is set to

"Off" The switch is located in the Operation Panel

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 30

Page 32: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

Configure Expansion Drive Enclosure (6) The Expansion for the Drive Enclosure is finished

31

Page 33: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2

End of Initial Configuration Before logging off from the ETERNUS DX60 S2 Web GUI,

verify that all components have a condition "Normal" General status of the system in the Web GUI is "Normal" i.e. green All system LEDs are showing normal system status

32

Page 34: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

ETERNUS SF To use the DX60 S2 with ETERNUS SF software, patch

v14.2A needs to be installed on the software server ETERNUS SF Express ETERNUS SF AdvancedCopy Manager ETERNUS SF Storage Cruiser

DX60 S2 starts shipping with SF Express v14.2 that will be replaced by v15.0 as soon as it becomes available

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 33

Page 35: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left

Additional Reading Instructions for Rack installation, initial Setup and initial

configuration ETERNUS DX60 S2 Disk Storage System, User's Guide, Site Planning

• P3AM-5492-03ENZ0 • Link to document

ETERNUS Web GUI, User's Guide, ETERNUS DX60 S2 • P2X0-1120-01ENZ0 • Link to document

ETERNUS DX60 S2 Disk Storage System, User's Guide, Installation • P3AM-5502-02ENZ0 • Link to document

ETERNUS documentation in Fujitsu PRIMEWEB Link to Fujitsu PRIMEWEB

Please note that accessing the above links require a Fujitsu Partner user account

Copyright Fujitsu Technology Solutions, Release September 2011 Hardware and Software Installation ETERNUS DX60 S2 34

Page 36: ETERNUS DX60 S2 - Fujitsu · PDF fileRack Mounting (2) Push the M5 cage nut into the 2nd hole of the front rack pillar above the base line of the Controller Enclosure Secure the left