X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Legend NORTH 1 2 4 3 2 1 3 4 5 5 Visitor Check-in The existing main entry will be renovated to include a secured vestibule and visitor-check in area. Cafeteria Addition A new, adequately sized cafeteria and multipurpose fitness room will be constructed. Classroom Addition A new classroom wing that includes nine classrooms and two restrooms will be constructed. Covered Play Area A covered play area will be constructed outside the new classroom wing. Fire Access Lanes Programa de los fondos del bono del 2018 salemkeizer.org/eyre-bond ARQUITECTO: CONTRATISTA: PRESUPUESTO TOTAL DEL PROYECTO*: COMIENZO DE LA CONSTRUCCIÓN: TERMINACIÓN SUBSTANCIAL: AC + Co Pence 12.2 millones de dólares Junio, 2020 Septiembre, 2021 Espacio adicional o ampliaciones Mejoras Nueva cafetería y cocina Nueve aulas nuevas Nuevas áreas cubiertas de juego en el patio La Escuela Primaria Eyre será ampliada para aliviar las condiciones actuales de superpoblación y se realizarán mejoras a las instalaciones. Gimnasio Sistema HVAC de calefacción y ventilación Actualizaciones al sistemas de intercomunicación Reemplazo de las paredes divisorias Remoción de las aulas portátiles Aula de usos múltiples para las actividades físicas y recreativas Reemplazo del techo Actualización del sistema de acceso con tarjeta electrónica Ampliar la capacidad de conexión inalámbrica Creación de un vestíbulo seguro en la entrada principal Mayo 2020 Escuela Primaria Eyre salemkeizer.org/projects-status *Incluye los fondos del bono y de la subvención

Upload: others

Post on 27-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Escuela Pimarr ia Eyre Mary Eyre Elementary School | Site Plan...Aula de usos múltiples para las actividades físicas y recreativas • Reemplazo del techo • Actualización del

Mary Eyre Elementary School | Site Plan

10.22.2019

S A L E M - K E I Z E R P U B L I C S C H O O L S

X

X X X X X X X X XX

X

X

X

X

X

X

X X X X X X X X X X X X X

X

X

X

X X X X X

��������

X

X

X X X X

X X

X

X

X

X

X

X

X X

X X

X X

X X

X X X X X X X X X

X

X

X X

X X

CAFETERIAADDITION

CLASSROOMADDITION

COVEREDOUTDOOR PLAYAREA ADDITION

NEW FIREACCESS

VISITOR CHECK-INREMODEL

Legend NORTH

1

2

4

3

2

1

3

4

5

5

Visitor Check-inThe existing main entry will be renovated to include a secured vestibule and visitor-check in area.

Cafeteria AdditionA new, adequately sized cafeteria and multipurpose fitness room will be constructed.

Classroom AdditionA new classroom wing that includes nine classrooms and two restrooms will be constructed.

Covered Play AreaA covered play area will be constructed outside the new classroom wing.

Fire Access Lanes

Programa de los fondos del bono del 2018salemkeizer.org/eyre-bond

ARQUITECTO:

CONTRATISTA:

PRESUPUESTO TOTAL DEL

PROYECTO*:

COMIENZO DE LA CONSTRUCCIÓN:

TERMINACIÓN SUBSTANCIAL:

AC + Co

Pence

12.2 millones de dólares

Junio, 2020

Septiembre, 2021

Espacio adicional o ampliaciones

Mejoras

• Nueva cafetería y cocina• Nueve aulas nuevas• Nuevas áreas cubiertas de juego

en el patio

La Escuela Primaria Eyre será ampliada para aliviar las condiciones actuales de superpoblación y se realizarán mejoras a las instalaciones.

• Gimnasio• Sistema HVAC de calefacción y

ventilación• Actualizaciones al sistemas de

intercomunicación• Reemplazo de las paredes

divisorias

• Remoción de las aulas portátiles• Aula de usos múltiples para las

actividades físicas y recreativas

• Reemplazo del techo• Actualización del sistema de

acceso con tarjeta electrónica• Ampliar la capacidad de conexión

inalámbrica• Creación de un vestíbulo seguro

en la entrada principal

Mayo 2020

Escuela Primaria Eyre

salemkeizer.org/projects-status*Incluye los fondos del bono y de la subvención