Page 1: Erp md report

1

P/L (IT) HOD DIRECTOR MD

PROD MAT QC DEVP TECH FIN HR ADMIN GP

Page 2: Erp md report

ERP OVERVIEW

1. CUSTOMER PLAN

2. DISPATCH

3. RECEIPTS

4. TAXATION

• QR Barcode Invoice

• Customer trim in based auto invoicing

• FG & SFG Inventory

• PDA based POP

• Sales Return

SALES

• Multi level BOM

• Model wise - car value analysis

• Introducing LTP & STP

• D+2 Planning

• Automatic purchase schedule by STP

• Kanban & Lean Management

BOM

PPC

• Inventory Levels - R/M, LP, CKD,

• Automated PO schedule

• Lean Inventory through Purchase scheduling

• Systemised CKD costing

• Barcode (PDA) based Material Transfer

MATERIALS/ PURCHASE

• Cost History

• Internal Cost/Management Accounting

• WIP STOCK Monitor

• Statistical Process Control (SPC)

• 4M Calculation

COSTING/ PRODUCTION

• Kiosk based Quality POP

• DCR & CounterMeasure

• Inline, Incoming & Customer PPM

• Vendor Performance Rating

QUALITY CONTROL

• Employee Portal

• Reporting Portal

•Budgeting

•Online Reports and Approval

• Supplier Portal Like VAATZ

PORTALS

KE

Y F

UN

CT

ION

AUGPROTO AUGDEMO

1. CAR BOM

2. MATERIAL BOM

3. DLY/ MTHLY/ YRLY PLAN’G

4. EASIER PLANNING MODEL

JUNPROTO JULDEMO

1. PURCHASE REQUEST

2. PURCHASE PLANNING

3. WAREHOUSE

4. CKD SUB MODULE

JULPROTO JULDEMO

1. COST CENTERS

2. PRODUCT COSTING

3. WIP STOCK

4. PRODUCTION PLAN’G - 4M

JULPROTO SEPDEMO

1. INLINE QC

2. INCOMING QC

3. FINAL INSPECTION

4. PPM CALCULATION

5. VENDOR QC

JULPROTO SEPDEMO

1. WORK FLOW

2. APPROVAL SYSTEM

3. VENDOR QC

4. VENDOR PO & PAYMENT

OCTPROTO NOVDEMO

Page 3: Erp md report

3

CFT MEETING SCHEDULE & SCOPE

CFT Meeting Schedule

BOM Production Material Purchase Costing Quality TM Sales HR Reporting Vendor MIS

Meeting 1 11-Jun 18-Jun 25-Jun 09-Jul 02-Jul 16-Jul 23-Jul 30-Jul 06-AugRequirement will be

collected during the

discussion with CFT on

other Modules

Meeting 2 13-Jun 20-Jun 27-Jun 11-Jul 04-Jul 18-Jul 25-Jul 01-Aug 08-Aug

Meeting 3 15-Jun 22-Jun 29-Jun 13-Jul 06-Jul 20-Jul 27-Jul 03-Aug 10-Aug

Meeting 4 20-Jun 27-Jun 04-Jul 18-Jul 11-Jul 25-Jul 01-Aug 08-Aug 16-Aug

Meeting 5 06-Jul 06-Aug 31-Jul 31-Jul 03-Sep 12-Sep 27-Sep 30-Aug 16-Oct 15-Oct 19-Oct 08-Nov

Level Meeting Scope

1 • Application Flow Confirmation

• Requirement Collection templates will be shared

• Process Function and Activity Identification

• Risk Area Identification

• 1st level BR Identification

• Master Data Identification

2 • Data Element Identification

• Integration BR Identification

• Master Data Confirmation

• New Process Changes Identification

3 • Proposed Model Presentation

• Feedback Session

4 • Feedback Incorporation

• Final Proto Type Presentation

5 • Application Module Demo

Page 4: Erp md report

CFT Meeting Schedule & Methodology

A SNAPSHOTA Snapshot

Application flow

Confirmation

Req. Collection Templates

sharing

Process Function &

Activity Identify

Risk Area Identify

1st Level Business

Risk Identify

Master Data

IdentifyMeeting 1

Proposed Model

Presentation

Feedback Session

Incorporation of feedback

Final Proto type

presentation

Application Module Demo

Data Element Identification

Integration Business

Rules

Master Data Conformation

Identifying New Process

ChangesMeeting 2

Meeting 3

Meeting 4

Meeting 5

Page 5: Erp md report

Milestones

Jan Feb March April May June July August Sep Oct Nov Dec

2012

2013

CALENDAR – MODULE DEMOMILESTONES AT A GLANCE

EXAMPLE TEXT

MILESTONES – MODULE WISE DEMO

Page 6: Erp md report

6

CALENDAR – CFT SCHEDULEJune 2012

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

WEEK 1 1 2 3

WEEK 2 4 5 6 7 8 9 10

WEEK 3 11 12 13 14 15 16 17

WEEK 4 18 19 20 21 22 23 24

WEEK 5 25 26 27 28 29 30

WEEK 6

AS IS – SYSTEM STUDY and REAL TIME GAP ANALYSISby Leiten Team

Execution Plan for All ModulesProject

Kick Off

Meeting

BOM, PPC

CFT Meet

BOM ,PPC

FLOW CONFIRM

BOM ,PPC

TO BE

PRESENT

PRODUCTION

CFT MEET

PRODUCTION FLOW CONFIRM

BOM, PPC -PROTO

PRODUCTION

TO BE

PRESENT

MATERIAL

CFT MEET

MATERIAL

FLOW CONFIRM

PRODUCTION PROTO

MATERIAL

TO BE PRESENT

Page 7: Erp md report

7

CALENDAR - CFT SCHEDULEJuly 2012

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

WEEK 1 1

WEEK 2 2 3 4 5 6 7 8

WEEK 3 9 10 11 12 13 14 15

WEEK 4 16 17 18 19 20 21 22

WEEK 5 23 24 25 26 27 28 29

WEEK 6 30 31

COSTING FLOW CONFIRM

MATERIAL- PROTO

SALES

CFT

MEET.

COSTING

CFT MEET

TM

CFT MEET

QUALITY

CFT MEET

PURCHASE

CFT Meet

PURCHASE

FLOW CONFIRM

COSTING- PROTO

QUALITY FLOW CONFIRM

PURCHASE -PROTO

TM

FLOW CONFIRM

QUALITY -PROTO

PURCHASE

TO BE

PRESENT

QUALITY

TO BE

PRESENT

TM

TO BE PRESENT

COSTING

TO BE

PRESENT

CALENDAR – CFT SCHEDULEJuly2012

Page 8: Erp md report

8

CALENDAR - CFT SCHEDULEAugust 2012

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

WEEK 1 1 2 3 4 5

WEEK 2 6 7 8 9 10 11 12

WEEK 3 13 14 15 16 17 18 19

WEEK 4 20 21 22 23 24 25 26

WEEK 5 27 28 29 30 31

WEEK 6

SALES FLOW CONFIRM

TM - PROTO

HRM

CFT MEET

HRM FLOW CONFIRM

SALES - PROTO

HRM- PROTO

REPORTINGVENDOR PORTALTO BE

HRM

TO BE

PRESENT

CALENDAR – CFT SCHEDULEAugust 2012

Page 9: Erp md report

ERP – DATA FLOW

Page 10: Erp md report

MANUFACTURING

BOM MANAGEMENT

PPC/MRP

COSTING

PRODUCTION / SHOP FLOOR

TECHNICAL AND MAINTANENCE

Page 11: Erp md report

11

BOM TFT

A Permanent Task Force Team (TFT) is necessary to maintain BOM in ERP.

Director

Development

I/C Person

Daimler

I/C Person

HMI

I/C Person

AL Nissan

Production(Routing)

Purchase(Purchase Price)

Finance(Ledger Code)

Approver

Initiator

Supporter

Creator IT Person& TL

Re

qu

est to

Cre

ate

Ma

ste

r, BO

M

Info

rmatio

n to

oth

ers

afte

r cre

atin

g B

OM

B.O.M.

Page 12: Erp md report

12

A Bill of Materials (BOM) is a detailed list of all parts and subassemblies that are required to build a specific product, including the quantity necessary for each unit produced.

Bill of Material - Definition

BOM Data Entry Screen BOM Tree View

B.O.M.

Page 13: Erp md report

B.O.M.

BOM Creation Process

Development Person

& Manager

Master & BOM

Person (IT)IT Team Leader Process Description Output

Responsibility &

Approval

1.Deliver information about new

development or new ECO

(Developer delivers sourcing list, BOM

application form to IT person in-charge of

Master)

BOM Change

Application

&

Sourcing List

Developmen

t Member

& Manager

2.Check for Consistency and

Completeness after receiving BOM

application form and sourcing list.

If errors are found, Return the paper to

developer,

Sourcing list and BOM change application

form must have Material details & other

required information about that.

BOM Change

Application

Master

Person (IT)

3. IT Team Leader verifies BOM

application form and sourcing list.

IT Team

Manager

4.In accordance with BOM application

form, Create Material Master & BOM

BOM Change

Information

IT Team

Member

(Master)

5.The IT member is responsible to

create Master and BOM informs to related

teams about the creation / change in

BOM.

Other team members should check the

BOM Module that the BOM is updated as

requested

IT Team

Member

Concerned

Team

Members

Information of New

Development /EO Change

NO

1

Yes

Rewritie sourcing list/Check BOM & Educate

Error

NO

MASTER & BOM Creation

InformCompletion of BOM Creation

[Development,Materials,Sales,Cost

]

2

45

3

Invalid Sourcing List

[Return]

Receive inquiry of

BOM creation & Approval

Review BOM Change

Application Form &

Approval

Yes

Page 14: Erp md report

BOM & PPC / MRP

Page 15: Erp md report

Key Functions

1. YEARLY PLAN ( JAN – DEC)

2. MONTHLY PLAN (QUARTERLY)

3. DAILY PLAN (D+2)

Features

PPC / MRP

Introducing LTP & STP

Improved D+2 Planning

Automatic Purchase Schedule through STP

Kanban, Lean Production & Lean Inventory

Yearly Material Procurement Planning

Yearly Capacity Planning

Yearly Sales Planning

Page 16: Erp md report

Delivery

PRODUCTION

Page 17: Erp md report

Key Functions

1. PROCESS MASTER

2. MACHINE MASTER

3. PRODUCTION ROUTING MASTER

4. PRODUCTION PLANNING -4M CALCULATION

5. WIP STOCK

Features

PRODUCTION

WIP Stock Monitor

Statistical Process Control (SPC) at all shops

Daily Production Planning through D+2 System

Mould History Card (ISO, 5-Star requirement)

Shop-Line-Machine concept for effective costing

Calculation of Capacity Plan, Productivity, OEE

Integration with Tech Maintenance for 100% uptime

Machine wise UPH, UPMH calculation

4M Calculation

Page 18: Erp md report

PRODUCTION

Page 19: Erp md report

Key Functions

1. COST CENTERS

2. COST ELEMENTS

3. COST ESTIMATION

4. PRODUCT COSTING

Features

COSTING

Manages Internal Cost/Management Accounting

Activity based Costing

Cost History

Automation of Supplementary/ Retro Invoicing

Page 20: Erp md report

Key Functions

1. MAINTENANCE SCHEDULE

2. ASSET MANAGEMENT

3. SPARES MAINTENANCE

4. ENERGY MANAGEMENT

Features

TECHNICAL & MAINTANANCE

Maintenance Scheduling & Reminders

Preventive and Predictive Maintenance

Reducing MTBF through Continuous alerts

M/C Breakdown Analysis

Spares maintenance

Asset Tracking

EB Reading, Diesel Accounting

Page 21: Erp md report

Key Functions

1. MATERIAL PURCHASE PLANNING

2. PURCHASE REQUEST & APPROVALS

3. SUPPLIER MANAGEMENT

4. WAREHOUSE MANAGEMENT

5. CKD SUB MODULE

Features

MATERIALS & PURCHASE

Inventory Levels - R/M, LP, CKD, BO

Vendor Rating / Performance

Calculating ITR and Purchase/Sales ratio

Barcode (PDA) based Material Transfer

Crate / Trolley Accounting

Automated PO schedule

Rate Master creation through Approval system.

Lean Inventory through Purchase scheduling

Vendor Stock Monitoring

Automated GR (GR through Vendor Portal)

Systemised CKD costing

Systemised billing process for Transporters

Control on Purchase Returns (Qty, Payment)

Page 22: Erp md report

CKD

MATERIALS & PURCHASE

Calculating ITR

Automatic Material Costing system

Automatic PO as Per Production Planning

Online PO Approval

Vendor Stock Monitoring System

Automatic Data Upload to SAP

Automated CKD Costing System

Direct Link with Korean HO & Downloading Packing List

FIFO based

CKD Issue

Automatic GR through Vendor

Portal

Barcode Based GRN

Trolley & Pallet Accounting System

Automatic BOM based Material

Scheduling

Barcode (PDA) based Material Issue

Centralized Stock Monitoring System

Flaw less Stock Transfers

PURCHASE

MATERIALS

WAREHOUSE

Page 23: Erp md report

MATERIALS & PURCHASE

Page 24: Erp md report

MATERIALS & PURCHASE

Page 25: Erp md report

Key Functions

1. INLINE QC - REWORK, REJECTION

2. INCOMING QC - REWORK, REJECTION

3. FINAL INSPECTION -REWORK, REJECTION

4. PPM CALCULATION.

5. VENDOR QC MANAGEMENT

Features

QUALITY

Inline, Incoming & Customer PPM calculation

Kiosk based Quality POP

Online SPC to send SMS for production quality issues

Defect Content Report & Countermeasure from Vendor

Systemised Debit Advice for rejection

Interlink with Vendor Portal for Rework / Rejection PPM

Vendor Performance Rating

Page 26: Erp md report

Key Functions

1. CUSTOMER PLAN

2. DISPATCH SUB MODULE

3. RECEIPT SUB MODULE

4. TAXATION SUB MODULE

Features

SALES

QR Barcode – Sales Invoice

Trim – in based Auto Invoice

PDA based POP

Effective D+2 planning system to avoid customer line stop

Proper accounting of Sales Return

Complete capturing of Warranty claim, Cost of Poor Quality

Systemised working of Transport Billing

Crate/ Trolley Accounting

Page 27: Erp md report

SALES

SHOPFLOOR

Page 28: Erp md report

Key Functions

1. ATTENDANCE SYSTEM

2. PAYROLL SUB MODULE

3. TRAINING SUB MODULE

4. APPRAISAL SUB MODULE

5. EMPLOYEE DATA BANK

Features

HUMAN RESOURCE

Centralized Attendance monitoring system

Integrated Pay Roll system

HR Training History Module

Audit compliances

All EIS Reporting

Leave Approval thru Reporting Portal

Page 29: Erp md report

Key Functions

1. APPROVAL SYSTEM

2. WORK FLOW SYSTEM

Features

REPORTING AND APPROVAL PORTAL

Budgeting ( Needs integration with Finance Module)

Integrated Online Report Approval with All Modules in ERP

Leave Application Approval

Purchase Rate Master Approval

Sales Rate Master Approval

New BOM creation Approval

BOM Modification Approval

Business Trip Approval / Report

Other Approvals

Sharing Company Policy / Process

Page 30: Erp md report

Key Functions

1. QUALITY

2. PURCHASE

Features

VENDOR PORTAL

Advance Shipment Notice (ASN) with Barcode

Purchase Order and Delivery Schedule

GR Inward and Payment Tracking

Quality Tracking, DCR and Counter Measure Action

PPM Status

Performance Rating

Page 31: Erp md report

Key Functions

1. INTEGRATED WITH ALL MODULES

2. DASHBOARD REPORTING

3. GRAPHICAL REPORTS

4. TRENDS

5. PLANNING

Features

EXECUTIVE INFORMATION SYSTEM

Direct on-line access to relevant information

Timely and Accurate

Dashboard Reports, Analysis and Graphs

Identifies Trends

Measures Performance

Daily Manpower Summary

Daily Absent Ratio

OT Analysis

ITR Trend

Purchase/Sales ratio

Planning Analysis

PPM Status

Top 10 - Worst parts

Sales Trend

Purchase Trend

Page 32: Erp md report

SALES

HUMAN RESOURCE

• Integrated Attendance Monitoring

• Integrated Pay Roll System• Training History • Appraisal Sub Module• Employee Data Bank

QUALITY

• Customer Plan• Item Configuration• Delivery Schedule• PDA based POP• Sales Return• Crate/Trolley

Management

• Incoming QC• Inline QC• Final Inspection (FG)• PPM Calculation• Vendor Quality

Management

MANUFACTURING

• BOM Management• PPC/MRP• Costing• Quality Control – Inline• Production Control• Capacity Planning• Technical and

Maintenance

MATERIALS

• Warehouse Management• Movements & Transactions• Costing• Quality Control – Incoming• PDA based Inventory

Management• CKD Management

PURCHASE

• Purchase Scheduling• Purchase Orders• Sub Contracting• Costing• Goods Receipt• Accounts Payable

ERP INTEGRATION MODELCORE MODULES - SNAPSHOT

ERP (EIS)

Page 33: Erp md report

VENDORPORTAL

Reporting & Approval Portal

QC

QUALITY

PRProduction

PPCProductionPlanning &

Control

BOM

HRHuman Resource

MPSMaterials, Purchase &

Stores

COCosting

SDSales

TMTech & Main

EISExecutive Information System

FI

IL

IC

EMPLOYEEPORTAL

ERP INTEGRATION MODEL