  • 8/7/2019 ERKE Group, The VL18 Vibrolance mounted free hanging for a stone column application in Saudi Arabia.

    1/3

    The VL18 Vibrolance mounted freehanging for a stone columnapplication in Saudi Arabia.

    150 km North of Dammam in Saudi Arabia, the Raz Al Zawr industrial city is beingbuilt .

    The Raz Al Zawr - Ryad water transmission system is in construction.On site PS1, I.C.C . ( International Cooperation Company for Soil Foundation)located in Al Khobar has been awarded the ground treatment for a main pumphouse.

    203 stone columns (6.0 m deep and 800 mm nominal diameter) are to be installedto support the building.

    JOB REPORT

    The Vibrolance is mounted free hangingon a crawler crane of 50 t capacity.

  • 8/7/2019 ERKE Group, The VL18 Vibrolance mounted free hanging for a stone column application in Saudi Arabia.

    2/3

    These columns have a triangular grid of 1.75 x 1.75 m. (See hereunder)

    222 stone columns of 80 cm diameterwill be achieved .

    1.95 m

    1.75m 1.75m

    Scope of supply : PTC VL18 Vibrolance. 45 m hose bundle. PTC 220 JD Power pack of

    138 kW. PTC Water jetting pump

    WJ70 of 68 kW. Vibcorder. Two 5 m extension pipes. One spare Vibrolance head.

  • 8/7/2019 ERKE Group, The VL18 Vibrolance mounted free hanging for a stone column application in Saudi Arabia.

    3/3

    The VL18 PTC Vibrolance is powered by a PTC 220 JD Power pack of 242 kWis working with success in this application.

    A standby Vibrolance head is on the spot for rapid replacement.(no working time is lost ; wear parts can be replaced)

    A PTC Water jetting pump WJ70 with its power pack is providing a jettingflow of 70m3 /h pressure.A water tank is providing the necessary water to the jetting pump.

    The present treatment depth is 8 m. The Vibrolance can work with two 5 m extension pipes allowing a maximumtreatment depth of 17 m.

    Thanks to the PTC Vibcorder, if after compaction a high pressureof 200 bars is measuredIt corresponds to a SPT of 20 to 25 in between the columns.

    During tests the 800 mm diametercolumns of 6 m depth have beenachieved.

    The 100 mm dia. crushed stones arebrought to the hole by a wheel loader.

    25 to 40 mm dia. crushed stones will be