erik stromberg port management consultant 9 november · pdf file · 2011-11-17sits...

34
Erik Stromberg Port Management Consultant 9 November 2011

Upload: vuonghuong

Post on 28-Mar-2018

220 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Erik Stromberg

Port Management Consultant

9 November 2011

Page 2: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•What’s Strategic AM?

•Who’s doing it? Why?

•Approaches to SAM development; • AAPA Port Collaborative Approach

•Discussion

Page 3: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Financially, port authorities are on

their own as perhaps never before

• Public capital less available

• Private capital more careful

•Aging infrastructure, deferred

maintenance, inconstant demand

•Looming perfect storm—coming to

your port soon(er or later)?

Page 4: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•North American public ports are:

• Asset intensive public enterprises,

• Established to fulfill often diverse public mandates,

• Through self sustaining operations.

•Therefore, ports need to manage their assets in a manner that fulfills their role:

• As responsible stewards of public resources,

• Generating economic benefits to their communities,

• Maximizing ROI,

• At the lowest possible cost,

• Over the life of the asset,

• Within an acceptable risk regime.

Page 5: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•What it is:

• A business support process that assists port

managers prioritize capital planning decisions

based on the organization’s mission and goals,

through a systematic and functionally integrated

assessment across the entire enterprise,

supported by an improved understanding of asset

value, performance, cost and risk over the asset’s

life cycle.

•What it’s not:

• A maintenance program (necessary but not

sufficient).

Page 6: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

PHYSICAL INFRASTRUCTURE AND EQUIPMENT

Aging infrastructure

Increasing demands port’s asset base

Productivity and unplanned level of service declines

IT capabilities in place

SAM/EMS/ERM>Sustainable development

SUSTAINABLE BUSINESS PROCESS IMPROVEMENTS

Scarce capital and need for optimal investment strategies

Inadequate or unavailable information necessary for decisions:

inventory , condition assessment or asset classification

Suboptimal processes necessary to prioritize investments

Conscious linkage between existing facilities and future

demands

Run to failure leads to higher costs and longer down times

Retirements and the loss of ―institutional knowledge‖

GOVERNMENT OR COMMERCIAL REQUIREMENTS

US Federal Executive Orders 13327, 13423, 13514

FASB 34

Privatization due diligence

Page 7: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Corporate culture—‖we’ve got it covered‖

•Insufficient or ‖silo’d‖ knowledge base

•Other priorities (‖AM is on the front burner, and it sits there with 20 other front burner issues‖)

•―What I don’t know won’t hurt me….?‖

•Inertia—where to start?

•Up front commitment of time and money

•Consultants selling too much, or not the right stuff

•Lack of clear, feasible goals—why we doing this?

•Ain’t broke: North American ports faced for first time with generational, end of life-cycle condition for such a large percentage of asset base

Page 8: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•US federal agencies

USCG

USACE

FHWA

USN

USAF

GSA

National Park Service

NASA

FHWA

•US and Canadian municipalities, counties/provinces

•Utilities

•Railroads

•US and Canadian airport authorities

•International seaports

•North American seaports

Page 9: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Successful AM Program

•Codify Goals/Objectives •Review Legacy Systems •Incorporate Strategic and Master Plans •Develop Asset Risk to Mission Strategy

•Codify Business Processes

•Develop Change Management Plan

Business Process Analysis

• Real Property / Leasing

• Computerized Maintenance Management System

• Condition Assessment / Capital Investment Plng

• Equipment/Parts/Materials Purchasing

• Geographic Information Systems

• Building Information Modeling

• Record Drawings

Software System(s)

•Design Development Consulting

•Design Review / Constructability Review

•Sustainability Review

•Assessment Technical Support

•Cost Estimating

•Systems/Building Commissioning

Technical Support

• Inventory (Uniformat II, ASTM E1557)

• Condition Assessments (Requirement, EMS, Parametric Economic)

• Maintenance Forecasting

• System Failure Analysis

• Maintenance Action Plan / Long Range Maintenance Plan

• Asset Recapitalization Plan

Asset Assessments

En

terprise –w

ide A

sset M

anagem

ent P

rog

ram

Page 10: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Port Metro Van BC

•Port of Portland

•Port of Oakland

•Port of Houston

•NC State Ports Authority

•Maryland Port Administration

*NY/NJ, NYC EDC, Seattle, Tacoma, Great Lakes ports—U Wis

Page 11: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•What is the inventory and condition of port assets and related infrastructure critical to the port’s mission?

•How can the port improve the way it currently is managing its assets?

•Are current and planned initiatives and capital budgeting sufficient, or do they require modification, addition, or redirection?

•What approaches have worked well with other ports and other industries, and which are most appropriate for your port?

Page 12: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Lower long-term costs for infrastructure preservation;

•Improved performance and service to customers;

•Improved cost-effectiveness and use of available resources;

•A focus on performance and outcomes;

•Improved credibility and accountability for decisions and expenditures.

Page 13: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

13

Jean Banker

Manager, Finance/Admin

Maritime Division

AAPA Economic Development Seminar Strategic Asset Management

July 12, 2011

Page 14: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support
Page 15: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•From 1997-2007, focus investing in expansion and modernizing its container terminals and intermodal assets •Oakland is evolving from:

• Engineering focus to business development focus, • From developer model of business to a true

landlord model.

•Results over last three years: • Completed PPP with long-term business partner

who will bear the cost of bringing terminal to state-of-the-art facility

• Three new state-of-the-art cranes: Tenant owned • Negotiating with a private developer to develop a

former army base

Page 16: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Provide an inventory of assets

•Assess age, condition, replacement cost

•Develop a risk assessment strategy to upgrade, replace, and expand

•Provide a decision making tool for the board and senior management

Page 17: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Gary M. Tosh A.M. Coordinator

Engineering Dept.

July 12, 2011

Infrastructure Asset Management at Port Metro Vancouver

Page 18: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Largest, busiest and most diversified port in Canada

•Handled 118 million tonnes of cargo in 2010

•28 major marine cargo terminals and 3 Class 1 railroads

•600 km (373 miles) of shoreline, bordering on 16 municipalities

Page 19: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Prior to 2005, no AM program existed

•Infrastructure assets were inspected based on:

• Random observations

• Accident reports

• Intuition

•In 2005 an engineer with AM experience was hired with the secondary goal of starting an AM program

•Program started in 2008

Page 20: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Level 1 condition inspection.

High level visual inspection

682 assets to be inspected by end of 2012.

Level 3 condition assessments.

In-depth engineering evaluation

Yearly budget of $300,000/year

AM Directive

Levels of Service

Software needs analysis

Page 21: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Owns and manages a diverse range of infrastructure assets --current total replacement value : AU$1.8 billion.

•Asset renewals, rehab and mtce: $60–65 million (annual average)

•Maintenance dredging: $7 million annualised per annum (inc. capping)

•Actively building on its asset management processes since 2008.

Page 22: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

PoMC shall adopt the following principles for the development and implementation of a robust and sustainable tactical (basic) and advanced asset management strategy.

Maintain a computerised asset management system which incorporates a comprehensive register of all of PoMC’s infrastructure assets.

Maintain appropriate interfaces between the asset management system and other relevant corporate systems such as the property management system, the financial management system, the document management system and the Geographical Information System (GIS).

Develop a robust asset condition rating methodology framework and apply this to all relevant PoMC assets.

Maintain a structured inspection regime for PoMC’s infrastructure assets to facilitate the timely reporting of defects and the development of work plans.

Maintain a costing and valuation history for all PoMC infrastructure assets and develop an appropriate unit cost framework to enable the development of asset renewal profiles.

Ensure infrastructure assets are maintained in a fit-for-purpose state.

Develop Asset Management Plans (AMP’s) for relevant assets and asset classes.

Establish and manage scheduled and unplanned maintenance regimes and associated budgets so that assets are maintained in a condition suitable for their intended use.

Establish and manage appropriate performance or prescriptive based asset inspection and maintenance contracts with suitably qualified providers.

Ensure all relevant assets comply with appropriate Acts, Regulations, Standards and Guidelines.

Develop and maintain standard operational policies and procedures for PoMC assets where relevant.

Consider requests from users to apply special loads to assets, i.e. heavy mobile cranes on wharves, on a case by case basis.

Maintain appropriate backup systems for mission-critical assets.

Page 23: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•The key deliverables of the AM Strategy are to:

• Develop asset renewal forecasts based on age, condition, level of service and risk.

• Develop life cycle planning processes so as to understand and predict total cost of ownership.

• Understand asset risk exposure and its influence on maintenance and renewal forecasting.

• Develop optimized renewals decision-making processes so as to reliably determine optimal treatments and associated timings.

• Embed asset management as a core business discipline within the business.

STRATEGIC AM at POMC

Page 24: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

• Renewals Modelling

• Risk Management

• Life Cycle Planning

• Optimised Renewals Decision Making

Page 25: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Port of Melbourne Australia

Page 26: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Largest French container port

•Aging asset : facilities date from 2000 to

>100 years ago

•260 assets classes

•Needs:

• Vision of critical risks

• Maintenance

master plan

• Inspection

master plan

www.havre-port.fr

Page 27: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

-Safety of goods, people and the environment

-Asset availability

-Performance

Page 28: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

•Program concludes Spring 2012 with written report and individual port ―road maps‖ to SAM development

•SHARE with Port Industry: AAPA Best Practices Web site

•Continue to Monitor Global and AAPA Member Best Practices and Lessons Learned

•Facilities Engineering and Finance Cte Support

Page 29: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

• Don’t let best get in the way of the good!

• It’s not easy and sometimes intuition and tradition are not helpful--SAM at its core is a different way of doing business

• AM issues will not go away--solutions will neither get easier nor cheaper over time

• Pick a goal and a starting point and get started;

Page 30: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support
Page 31: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

ASSET LIFE CYCLE

0 5 10 15 20

YEARS

AS

SE

T C

ON

DIT

ION

Failed

Very poor

Poor

Fair

Good

Excellent

40% drop

in quality

75% of life

12% of life

40% drop

in quality

$1 for renovation here

Will cost $5 here

Page 32: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

0

1000

2000

3000

4000

5000

6000

0 7

14

21

28

33

41

48

55

62

69

76

83

90

97

10

4

$ m

illi

on

s

Years

Page 33: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support
Page 34: Erik Stromberg Port Management Consultant 9 November · PDF file · 2011-11-17sits there with 20 other front burner issues‖) ... •Systems/Building Commissioning Technical Support

Evaluation of Risk to Mission—

Business Case

2

4

6

8

10

$$$$$ $

Po

ten

tia

l fo

r

Op

era

tio

na

l Im

pac

t

Corrective Action Cost

Highly

Recommended

Not Recommended

Investment

Opportunity

Budget