equipment vehicle receiving inspection report - pm091

6
QATAR ENGINEERING & CONSTRUCTION COMPAN P.O. BOX 24491, DOHA QATAR EQUIPMENT/ VEHICLE RECEIVING INSPECTION R EQUIPMENT/ VEHICLE DETAILS EQUIPMENT DESCRIPTION FORKLIFT DATE RECEIVED FLEET NO. CR-77 HOURS/ KM READING MAKE TCM LAST PMS DATE MODEL FD50T9 NEXT PMS DUE DATE CAPACITY 5 TON INSPECTION FINDINGS/ DEFECTS FOUND 1 All hydraulic operations are slow, when operated under load. 2 Steering is Hard during LH & RH turn. 3 4 5 REMARK 6 Hydraulic pump need to dismantle & diagnose. 7 Control valve need to be checked. 8 9 10 11 12 13 14 15 16 17 18 19 20 INSPECTED BY: NOTED BY: NAME D.KOMALAN NAME SIGNATURE SIGNATURE P&M-091; REV-0 ORIGINATING SITE/ PROJECT LOCATION

Upload: nithin

Post on 11-Jul-2016

222 views

Category:

Documents


5 download

DESCRIPTION

vehucle

TRANSCRIPT

Page 1: Equipment Vehicle Receiving Inspection Report - Pm091

QATAR ENGINEERING & CONSTRUCTION COMPANY, WLL.P.O. BOX 24491, DOHA QATAR

EQUIPMENT/ VEHICLE RECEIVING INSPECTION REPORT

EQUIPMENT/ VEHICLE DETAILS

EQUIPMENT DESCRIPTION FORKLIFT DATE RECEIVED

FLEET NO. CR-77 HOURS/ KM READING

MAKE TCM LAST PMS DATE

MODEL FD50T9 NEXT PMS DUE DATE

CAPACITY 5 TON

INSPECTION FINDINGS/ DEFECTS FOUND

1 All hydraulic operations are slow, when operated under load.

2 Steering is Hard during LH & RH turn.

3

4

5 REMARK

6 Hydraulic pump need to dismantle & diagnose.

7 Control valve need to be checked.

8

9

10

11

12

13

14

15

16

17

18

19

20

INSPECTED BY: NOTED BY:

NAME D.KOMALAN NAME

SIGNATURE SIGNATURE

P&M-091; REV-0

ORIGINATING SITE/ PROJECT LOCATION

Page 2: Equipment Vehicle Receiving Inspection Report - Pm091

QATAR ENGINEERING & CONSTRUCTION COMPANY, WLL.P.O. BOX 24491, DOHA QATAR

EQUIPMENT/ VEHICLE RECEIVING INSPECTION REPORT

EQUIPMENT/ VEHICLE DETAILS

28-Dec-16

RASGAS SD

INSPECTION FINDINGS/ DEFECTS FOUND

All hydraulic operations are slow, when operated under load.

Steering is Hard during LH & RH turn.

REMARK

Hydraulic pump need to dismantle & diagnose.

Control valve need to be checked.

10-Nov-15

Page 3: Equipment Vehicle Receiving Inspection Report - Pm091

QATAR ENGINEERING & CONSTRUCTION COMPANY, WLL.P.O. BOX 24491, DOHA QATAR

HIRED EQUIPMENT/ VEHICLE RECEIPT INSPECTION REPORT

EQUIPMENT/ VEHICLE DETAILS

EQUIPMENT DESCRIPTION DATE

REGISTRATION/ FLEET NO. YEAR MODEL

MAKE EQUIPMENT S/N.

MODEL MODEL NO.

HOURS/ KM READING CAPACITY

SUPPLIER LOCATION

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

INSPECTED BY: NOTED BY:

NAME NAME

SIGNATURE SIGNATURE

INSPECTION FINDINGS/ DEFECTS FOUND (SUPPLIER NEEDS TO RECTIFY)

Page 4: Equipment Vehicle Receiving Inspection Report - Pm091

P&M-099; REV-0

Page 5: Equipment Vehicle Receiving Inspection Report - Pm091

QATAR ENGINEERING & CONSTRUCTION COMPANY, WLL.P.O. BOX 24491, DOHA QATAR

HIRED EQUIPMENT/ VEHICLE RECEIPT INSPECTION REPORT

EQUIPMENT/ VEHICLE DETAILS

(SUPPLIER NEEDS TO RECTIFY)

Page 6: Equipment Vehicle Receiving Inspection Report - Pm091

27-Jan-16