EQUIPMENT QUALIFICATION
MISS SYEDA RIMA ISHAQ
Atco Laboratories Limited
2
EQUIPMENT QUALIFICATIONS
Frequency:
Whenever it is planned to purchase/Install a new plant/machinery/equipment.
3
EQUIPMENT QUALIFICATIONS
There are four phases of Equipment Qualification
1. Design Qualification(DQ)
2. Installation Qualification(IQ)
3. Operation Qualification(OQ)
4. Performance Qualification(PQ)
4
DESIGN QUALIFICATION
It is the first phase of Equipment Qualification for the approval of Purchasing an equipment and selection of the vendor.
5
DESIGN QUALIFICATION
1. Concerned department shall establish the user requirement/specification.
2. Quotations will be collected from different manufacturer/supplier.
3. Vendor selection will be done.4. Concerned department will be
responsible for gathering all technical information in a file.
5. 5.Copy of Indent/requisition shall be attached.
6
CHECK LIST FOR DQ
Required specification/user requirementApproval from Concerned departments,Production,QC ,QA and Higher authorities.Comaparision data of quotations from different manufacturers/suppliers.Vendor selection CriteriaName of selected manufacturer/supplier and its quotation copy.
7
CHECK LIST FOR DQ
Correspondence related to technical discussion between company and manufacturer/supplier.
Copy of approved requisition
Copy of technical data regarding the equipment.
8
INSTALLATION QUALIFICATION
Installation Qualification consists of Instrument calibration/inspection to verify that equipment is ok and installation meets the design requirement.
9
INSTALLATION QUALIFICATION
Concerned department will collect the copy of purchase order and Material receiving note.
The installation area equipment and its requirement will be reviewed by the concerned department to verify that it is in accordance with the specifications
10
INSTALLATION QUALIFICATION
The physical condition of equipment at the time of receiving will be checked
Following documents will be collected from supplier
1.Service and operators manual
2.Recommended spare parts list
3.Calibration certificates of monitoring and measuring devices
11
INSTALLATION QUALIFICATION
Installation drawing shall be made
Concerned department/Engg. Department will review the spare parts list.
12
CHECK LIST OF IQ
Copy of purchase order and material receiving note.
Installation area and equipment review report
Physical condition of the unit at the time of receiving
Documents collected from the supplier:
Services and Operational Mannual
Recommended Spare parts list
Calibration Certificates
Installation Drawing
13
Installation Area & Equipment Review Report
Utilities and building services:
-Compressed air
-Electricity
-Electrical Back up system
-Plumbing and drains
Lighting
Steam
Vacuum
Ventilation air filtration
Pest Control
14
Installation Area & Equipment Review Report
Equipment Features:
Model No.
Serial No
Capacity /speed
Location
Name of constrction material of product contact surface
Utilization
Filters
Lubricants
15
OPERATION QUALIFICATION
It consists of tests and inspections to verify that the equipment,system alerts and controls are operating reliably
16
OPERATION QUALIFICATION
Concerned Department will make all the standard Operating Procedures related to operations such as Operation,Sanitation,preventive maintenance etc.
Log book for Preventive maintenance programme , cleaning and utilization shall be made.
17
OPERATION QUALIFICATION
All the operations will be checked and verified.
A list shall be made of all the critical operating parameters which have significant impact on the equipment’s ability, and their testing methods.
Sampling and testing schedule and acceptance criteria shall be agreed.
18
OPERATION QUALIFICATION
Concerned department shall make a list of all the instruments and their calibration record utilized to conduct test functions prescribed in the protocol.
A summary report shall be made with conclusion and the concerned department will issue acceptance report of equipment.
19
CHECK LIST OF OQ
1. SOPs and Log books2. Check list of Operations to be checked3. List the critical Operating Parameters and
its testing method4. Sampling and testing schedule and
acceptance criteria5. List of the instrument to be used for
testing and their calibration6.Testing results and summary report7.Acceptance report of Equipment Qualification
20
Performance Qualification
This qualification will allow the project to move close to final close out and transfer the entire project to the operating department
21
Performance Qualification
A performance qualification protocol will describe the detailed sample locations frequencies and acceptance criteria over an appropriate time period
Action and alert limit shall be mentioned.
22
CHECK LIST OF PQ
Validation Protocol
Alert and action limit
Testing results and summary report
Any recommendations and suggestions