emcoqatar.netemcoqatar.net/files/qms/_quality_formats.pdf · equipment description tag number: job...
TRANSCRIPT
QF / CPA - 01
CC: To Management Representative
Rev-3 01/07/2010
Internal Audit Customer Complaint
Material Rejection Job Non Conformity
Potential Problem
Prepared / Reported By : Name Signature :
Suggested and agreed
Immediate Action
Root Cause (s)
Proposed Corrective action:
Action By : Approved By:
Implementation Staus of the Corrective Action
Verified and Closed By: Approved By
Location
Nature of the
Nonconformity:
Sl No
Date
Name of the Job / Dept :
Job No / Other Ref
CORRECTIVE ACTION REPORT
QF / CPA - 02
CC: To Management Representative Rev-2 -01/07/2010
QF/CPA-01 Ref No:
Prepared / Reported By : Name Signature :
Suggested and agreed
Preventive Action
Action By : Approved By:
Implementation Staus of the Corrective / Preventive Action
Verified and Closed By: Approved By
Location
Description of
Potential Problem
Root Cause (s)
Sl No
Date
Name of the Job / Dept :
Job No / Other Ref
PREVENTIVE ACTION REPORT
QF/TOOLS-01
Rev.: 01, 25.09.2013
Sl No Equipment Description Tag Number JobPurchased
DateQty Condition Card No
Custodian Name
ORGINATOR
METHOD OF DISPOSAL :
DISPOSAL DATE :- AMOUNT COLLECTED :- NAME OF THE PURCHASER & CONTACT NO:-
Date of Entry: Doc No:Copy To : Emco,Accounts
ENGINEERING MAINTENANCE COMPANYTel : +974-44359181 - Fax : +974-44359188 - P.O BOX : 24125 - DOHA - QATAR
REPORT OF TOOLS & PLANT LOST/DAMAGED
REASON FOR SCRAPPING
GENERAL MANAGERMANAGER WORKSHOP IN-CHARGE
Date :
Price
Doc. No :
WORKSHOP IN-CHARGE
(WHERE APPLICABLE)
PURCHASE OFFICER ACCOUNTS MANAGER
ENTERED IN ASSET MASTER
QF/AT-01
Rev-01 25/01/2014
EMCO Tel.: +974 44359181 - Fax :+974 44359188, P.O.Box:24125 -Doha -Qatar
QHSE MR MEETING ATTENDANCE SHEETSubject No #
Venue : Page :
Date : Author :
Sl. No. Attendees
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Remarks :
Signature
QF/CALIBRATE-01
Rev-1 15/11/2009
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - DOHA, QATAR.
LIST OF MEASURING / TESTING EQUIPMENTProject Name : ……………………………………… Job # : ……………..
Date : ……………..SL. NO. NAME OF THE EQUIPMENT TAG NO. FREQUENCY OF
CALIBRATIONCALIBRATION DONE
ONCALIBRATION
DUE ON
Prepared By : ……………………… Checked By : ……………………
QF/CALIBRATE-02
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - DOHA, QATAR.
CALIBRATION RECORD FOR MEASURING / TESTING EQUIPMENT / INSTRUMENT
NAME OF INSTRUMENT TAG # LOCATION MASTER
EQUIPMENT REF
REEQUIRED ACCURACY
CALIBRATED ON DUE DATE CALIBRATED
ON DUE DATE CALIBRATED ON DUE DATE
VENDOR / SUB CONTRACTOR EVALUATION RECORD
QF/CAPACITY-01 S.No. V / S CODE
Evaluated By:
_______________________________ Purchase Officer / Project Manager
Approved By:
______________________________
GM / ADM Date Date
Rev-1 15/02/2012
A. INITIAL EVALUATION & ACCEPTANCE 1 Company Name
Address
Tel:
Mob: Fax :
Contact Person Email :
2 Type of Business
Supplier
Dealer
Manufacturer
Sub Contractor
3 Range of Product / Service
4 Manpower details and organisation structure
5 Ownership
Local
Sponsorship
(Attach Trade License / Chamber of Commerce Certificate copies)
6 Acceptable Mode of payment LPO/WSO + --------- Days Credit./…………………
7 Authorised Signatory Name: Signature:
8 Designation Date:
FOR EMCO USE ONLY
9 Qualification based on Criteria ( A-10, B- 8, C- 5 , D- 0) A B C D
9.1 ) Supplier / Sub Contractor Organisation ISO 9000 Certified
9.2 ) Supplier’s Sub-Contractor’s Past Performance
9.3) Visit to Supplier’s Sub-Contractor’s premises by our personnel
9.4) Warranty terms agreed
9.5) Payment Terms agreed
9.6) Delivery Terms agreed
9.7) OEM Vendor.
9.8) Client Approved Vendor.
Total Marks out of 80 ( 50 & Above Acceptable )
Conclusion Acceptable for Trial Order
Not Acceptable
VENDOR / SUB CONTRACTOR EVALUATION RECORD
QF/CAPACITY-01 S.No. V / S CODE
Evaluated By:
_______________________________ Purchase Officer / Project Manager
Approved By:
______________________________
GM / ADM Date Date
Rev-1 15/02/2012
B: Performance Evaluation for Final Acceptance to Approve the Vendor/Subcontractor. (*)
Performance Evaluation Very Good-A Good-B Average-C Poor-D
Price
Quality
Delivery
Service
Performance
Response to Enquiry
Total Marks out of 60 ( 40 & Above Acceptable )
Marks :…….. /60 Grade : A B C
Note : A – 10 , B – 8, C – 5, D – 0 , => 51 – Grade A , => 36 to 50 Grade B , =>30 to 35 C Grade.
Justification Remarks:
Conclusion Acceptable & Approved
Not Acceptable
System Approval Done By: Name : Date :
Note (*) : Vendor /Subcontractor must have executed minimum 2 trial orders successfully before the performance evaluation section B
QF/CCL-01
Rev-0 01/07/2008
DEPT____________________ Page _____ of _____
Yes No
CUSTOMER COMPLAINT LOG
Customer / Orginator Name and contact
numberJob No. & LocationDate StatusResponsibility
for CPANature of Problem Immediate action planned / takenC/P Action required
QF-CS-01
Rev-2 25/09/2013
Doc. No. : Date :
LPO / WSO : Unit :
Job No. : Qty :
Description :
Estimated Cost at Bid Stage :
Name of the Vendor / Subcontractor considered at Bid Stage :
Remarks :
V. Code
Vendor Name
Quotation Ref No.
Make / Origin
Delivery Period
Payment Terms
Validity of Offer
Unit Rate
Quoted Price
Discount
Net Price after Discount
Dept Manager Approved
Client Approval :
Dept Manager Asst. Divisional Manager General Manager
PRICE COMPARISON STATEMENT
QF/CSP-01
Rev-0 01/07/2008
RECEIPT ACKNOWLEDGEMENT FOR CUSTOMER SUPPLIED PRODUCT
Received the following materials / equipment from
Client / Customer
for Project (Name) Location
EMCO Job # Receipt #
Sl. No. Description Quantity Received Remarks
Delivered by (Name) Received by (Name) :
Signature :
Signature : Designation :
Date : Date :
Copy to : The Project Manager / Engineer
QF/CSQ-01 PO Box : 24125,Tel : 44359181 Fax : 44359188 , Doha, Qatar.
Rev-1 15/11/2009
Name Job Title
Company P.O.Box
City Tel
E- mail Fax
Please rate our service using the following scale: 5 = Very good 4 = Good 3 = Satisfactory 2 = Below expectations. NA = Not Applicable
Sl Service Description 5 4 3 2 NA
1 Man power mobilization
2 Project coordination support
3 Work completion against agreed schedule
4 Work Quality
5 House keeping standard
6 Safety practices followed
7 Flexibility in meeting your requirements
8 Your willingness to recommend us for the next project
Remarks:
Signature: ……………………………………………. Date: ………………
EMCO Customer Feedback Questionnaire - Projects.
QF/CSQ-01 PO Box : 24125,Tel : 44359181 Fax : 44359188 , Doha, Qatar.
Rev-1 15/11/2009
Name Job Title
Company P.O.Box
City Tel
E- mail Fax
Please rate our service using the following scale: 5 = Very good 4 = Good 3 = Satisfactory 2 = Below expectations. NA = Not Applicable
Sl Service Description 5 4 3 2 NA
1 Call Response time
2 Call Rectification Time
3 Repeat Calls
4 Preventive / Routine Maintenance Service
5 Technician Attitude
6 Technician Technical Skill
7 Quality & Delivery time of spare parts
8 Quality of Tools
9 Safety Consideration
10 Over all Performance
11 Your willingness to recommend us for the next project
Remarks:
Signature: ……………………………………………. Date: ………………
EMCO Customer Feedback Questionnaire - Maintenance.
QF/DA-01
Rev-0 01/07/2008
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha,Qatar.
DESPATCH ADVICECo. Code : D.A. No. : Date : Issued To :PLEASE RECEIVE THE FOLLOWING GOODS AGAINST YOUR S.R.F.
REQUESTED ISSUED
Remarks :
Issued by : Received by :
Date : Date :
JOBNo.Sl. No. UNIT QUANTITYDESCRIPTIONITEM
CODESRFNo.
Rev-0 01/07/2008
QF/DC-01
Sl. No. Name of Designer Designation Academic
Qualification Previous Work Experience Identified Areas of Work Allocation / Assignment
DESIGNER - SKILL MATRIX
EMCOTel.: 44359181 - Fax :44359188, P.O.Box:24125 - Doha,Qatar.
Rev-0 01/07/2008
QF/DC-02
Sl. No. Ref. No. (If any) Description Quantity Remarks
DETAILS OF DESIGN FACILITIES AS ON ………………………………..
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
Rev-0 01/07/2008
QF/DC-03
DESIGN INPUT:
JOB ORDER WITH SPECIFICATION
CUSTOMER DRAWING
EXTERNAL STANDARDS
OTHERS
DESIGN OUTPUT:
GENERAL ARRANGEMENT DRAWING
SUB ASSY. & COMPONENT DRAWING
INTERNAL ARRANGEMENT
SINGLE LINE DIAGRAMES
POWER & CONTROL DIAGRAMS
BILL OF MATERIALS
OTHERS
DESIGN REVIEW:
CONDUCTED THROUGH : TELEPHONE VERBAL MEETING OTHERS
CONDUCTED DATE :
PARTICIPATION : CLIENT SUPPLIER COMMERCIAL PROJECT MANAGER
OBSERVATION :
Prepared By : Reviewed by :
DESIGN INPUT & OUTPUT
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
Rev-0 01/07/2008
QF/DC-04
Job Reference :
Sl. No. Description Yes No Remarks
1 Are all Design inputs identified & adequate
2 List down the design outputs made:
- Drawings
- Calculations
- Others (To specify if any)
3 Are all the above design outputs meets the design inputs requirements
4 Are design ooutputs released to all concerned
Verified by : Reviewed by :
DESIGN VERIFICATION CHECKLIST
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
Rev-0 01/07/2008
QF/DC-05
Job No. : Project : Item :
Ref. No. Date Description of the Change Requested Decision / Action By Outcome / Decision Taken Incorporated
ByReviewed
By
DESIGN / DRAWING CHANGE CONTROL RECORD
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
QF/DN-01
Rev-0 01/07/2008
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
DELIVERY NOTE & RECEIPT ACKNOWLEDGEMENT
No.To : Stores - EMCO, Doha / ......................
Kindly receive the following materials : Date : ...................
Sl. No. Indent No. Description Tag No. Qty. Job No. Remarks
PURCHASE OFFICER RECEIVED BY Qatar STORES-IN-CHARGE
( ORIGINATOR )
Copy to : Site Engineer
QF/DUTY - 01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box : 24125 - Doha,Qatar.
STAFF - DUTY HANDING OVER REPORT
From To
Name : Name :
Staff No. : Department :
Department : Station :
Date :
Dear Sir,
In view of my vacation / transfer / Rejoining * from date ….…..…..…… onwards I am hereby
handing over my duties and responsibilities as detailed hereunder
The following are the outstanding works to be attended to by the releiver.(Attach separate sheet if necessary).
……………………………….Signature of Originator Accepted and taken over by
Attachments Name :
Department Manager Signature :
Name : Date :
Signature :
Copy to : GM / ADM / ADMIN * Delete as applicable
Yes No
QF/EQPMNT-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
EQUIPMENT HISTORY CARD
Name of the Equipment
Machine / Tag No.
Equipment Sl. No.
NATURE OF MAINTENANCE SPARES USED MAINT. STATUS & DATE COST OF REPAIR SIGNATURE
QF/EQUIPMENT-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
ISSUE REQUISITION FOR CONSTRUCTION EQUIPMENT
Site : .............................................
Job No. : ......................................... Date : ....................
SL.NO. DESCRIPTION TAG NO. QTY. REMARKS
REQUESTED BYPROJECT ENGINEER / SUPERVISOR APPROVAL ISSUED ON : ...........................
SIGNATURE : .....................................PROJECTS
NAME : ..................................... MANAGER STORES-IN-CHARGE
QF/EQDMNT-02
Rev-0 16/03/2013
:………………………… Model :…………………………
:………………………… Capacity :……………………………… Engine no: :…………………………
:………………………… Machine no: :…………………………
SLNO DATE VMR NO IRN NO/CASH KM/HR DESCRIPTION OF JOB SPARE PARTS/CONSUMABLES SUPPLIER NAMETOTAL
LABOUR HRSD.NOTE/INVOICE NO COST IN QR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Make
PNM CODE/TAG NO
Name of plant/Equipment
PLANT HISTORY CARD(EMCO-QATAR)
QF/ESQ-01
Rev-0 15/11/2009
: ______________________________________
Name of Customer Representative Contacted : ______________________________________
Date of Visit : __________________________ Time : _____________________
Customer Expectation:
Date :
ENGINEERING MAINTENANCE COMPANY Tel.: 44359181- Fax : 44359188, P.O.Box:24125 -Doha - Qatar
CUSTOMER EXPECTATION SURVEY
Customer (Organization Name)
Position : ______________________________
[NAME OF EMCO REPRESENTATIVE] [DESIGNATION]
[SIGNATURE]
QF/GMR - 01
Rev-0 01/07/2008
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar. No....................
GUARANTEE MAINTENANCE REPORT
Job No. : Date : ........................................
Project : Location : ............................................
Complaint Ref. : .................................. Originator : ...........................................
Nature of Complaint Materials Used
Civil : ...........................................
Electrical : ...........................................
Air Conditio: ...........................................
Mechanica : ...........................................
Others : ...........................................
CLIENT REMARKS (IF ANY)........................................................................................... ............................................................
........................................................................................... ............................................................
SIGNATURE
CHECKED BY : ........................ ATTENDED BY : ................................. JOB STATUS
PENDING
JOB STARTED ON : .................. COMPLETED ON .............................. COMPLETED
SUPERVISOR's REMARK :
........................................................................................... ...........................................................
........................................................................................... ...........................................................
SUPERVISOR / ENGINEER
QF/HR-01
1/1 Rev-0 15/11/2011
JOB CODE : DEPARTMENT:
JOB TITLE : PROJECT/CONTRACT TITLE:
NAME OF JOB HOLDER : JOB NO :
QUALIFICATION JOB LOCATION
YEARS OF EXP : DATE OF ISSUE :
LEVEL/GRADE : REPORTING TO:
PREPARED BY : HR EMPLOYEE NAME:
SIGNATURE : SIGNATURE :
DEPARTMENT INCHARGE: APPROVED BY DIVISIONAL HEAD
SIGNATURE : SIGNATURE :
JOB DESCRIPTION
Date :
Duties and Responsibilites :
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box : 24125 - Doha,Qatar.
QF/HR-O5
Rev-0 Date: 16/03/2013
SCALE 4-ABOVE REQUIREMENTS 3- MEETS REQUIREMENT2-BELOW REQUIREMENT
S.NO PARTICULARS 4 3 2 NA
1 COMPLIANCE WITH POLICIES,PROCEDURES AND STANDARDS
2 DUTIES AND RESPONSIBILITIES OF TASKS ASSIGNED
3 VEHICLE CLEANLINESS AND MAINTENANCE
4 PUNTUALITY IN DUTY
5 VEHICLE KNOWLEDGE
6 EMERGENCY WORK AFTER WORKING HOURS
7 FINES/PENALTIES/TRAFFIC VIOLATION
8 ATITUDE WITH PASSENGERS / WORKERS
9 DRIVING PERFORMANCE
10 UPDATING OF LOG BOOKS AND TRIP SHEETS
11 SAFETY VIOLATION / INCIDENT REPORTS
Date :
Sign :
Name :
Assesed by :
TOTAL MARKS
Reveiwed by :
Date :
Sign :
Name :
NA- NOT APPLICABLE
%
EMCO-QATARPERFORMANCE EVALUATION FORMAT (DRIVERS)
DOJ:
P.P: No.
Name:
QF/HR -06
TRADE
BMS Operator
A / C Technicians
Electricians
Drivers
TENTATIVE START DATE
ADMIN DEPT. ADM SIGNATURE
LOA REF NO.
SUPPLIER NAME
QUOTATION REF NO.
MOBILIZED ON
REQUESTED BY AUTHORISED BY APPROVED BY (SITE INCHARGE) (DEPT. MANAGER) (GM/ FD /ADM)
TO BE FILLED UP BY ADMIN DEPARTMENT
REQUEST RECEIVED ON
JUSTIFICATION FOR REQUIREMENT
__________________ __________________ _________________
Total Manpower Rqd. PERIOD
Scaffolder
D.Fabricator
Steel Fixers
TYPE OF MANPOWER (Please mention the numbers in the appropriate box)
NOS TRADE NOS NOS TRADE NOSTRADE
EMCO-QATAR Tel: 44359181 - Fax - 44359188, P.O. Box: 24125 - DOHA, QATAR, [email protected]
REQUEST FOR HIRING OF MANPOWER To DOC. REF NO: MPHR/
ADMIN DEPT DATE:
SITE JOB NO
F.Carpenter
S.Carpenter
Painter
Mason
Plumber
Helper
Rev - 0 Date : 01/04/2013
ENGINEERING MAINTENANCE COMPANY Tel: +974-44359181 - Fax : +974-44359188 - P.O BOX : 24125 - DOHA - QATAR
SATISFACTION SURVEY (RECRUITMENT & MOBILIZATION)
Employee Name : ……………………………………….. Employee Number : …………………….
Designation : ……………………………………….. Site : …………………….
1. How you were received at airport?
Extremely Satisfied Satisfied Dissatisfied Extremely Dissatisfied
2. For how long you waited at airport to meet the person who came to receive you (after coming out on completion of emigration formalities? 0 to 15 min 15 to 30 min 30 to 60 min More than 60 min
3. Please rate with regard to receiving of Salary Advance, Telephone Allowance, etc.?
Extremely Satisfied Satisfied Dissatisfied Extremely Dissatisfied
4. How you feel about facility provided in accommodation?
Extremely Satisfied Satisfied Dissatisfied Extremely Dissatisfied
5. Do you feel your situation was handled professionally in the Department of HR?
Yes No
6. Please rate your satisfaction with the HR Department’s interaction with you once you landed in Qatar till the time of your site allocation?
Extremely Satisfied Satisfied Dissatisfied Extremely Dissatisfied
7. What suggestions do you have for improving the new arrival?
Signature …………………………..
Date …………………………..
QF/HR-07
Rev:0, 25.03.2014
QF/ITS-01
ServiceRequired:Signature:________________________________Date:_______________
Date:
Rev-0 15/02/2013---------------------------------------------------------------------------------------------------------------------------------------
QF/ITS-01
ServiceRequired:Signature:________________________________Date:_______________
Date:
Rev-0 15/02/2013
From: __________________________________
S/C No____________________________ . Job No
To: IT Department Attn.: Mr. Sreelajith/Mr.Imran
Signature:Note:Anysystemchanges/PasswordrequesttohaveGMapproval. __________________________ GENERAL MANAGER
From: __________________________________
S/C No____________________________ . Job No
Note:Anysystemchanges/PasswordrequesttohaveGMapproval. __________________________ GENERAL MANAGER
To: IT Department Attn.: Mr. Sreelajith/Mr.Imran
ENGINEERING MAINTENANCE COMPANY P.O. Box: 24125 - DOHA, QATAR. TEL: 44359181 - FAX : 44359188
REQUEST FOR IT SERVICE
ENGINEERING MAINTENANCE COMPANY P.O. Box: 24125 - DOHA, QATAR. TEL: 44359181 - FAX : 44359188
REQUEST FOR IT SERVICE
Signature:
QF/JNCR-02
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
JOB NON CONFORMITY REPORT
Name of the Site :
Job No. : Date
Location :
Department :
Nature of Non Conformity Observed and Agreed:
Brief description of the Non Conformity (Please specify whether a major or a minor Non Conformity) and its impact on the overall job:
Suggested and Agreed Corrective Action
(OBSERVED BY) (AGREED BY) (APPROVED BY)
Implementation Status of the Corrective Action:
(REVIEWED BY) (APPROVED BY) DATE
QF/JOB-01
Rev-01, 25/09/2013
EMCOTel.: 44359181 - Fax :44359188, P.O.Box: 24125 - Doha, Qatar.
JOB COMPLETION REPORTJob # : Site :
Customer Name :
Address :
Contact Person :
Job Description :
Start Date : Completion Date : Guarantee Period : From To(If applicable)
Special Comments :
CUSTOMER ACCEPTANCE Comments, if any :
CUSTOMER'S SIGNATURE :
SUPERVISOR / ENGINEER DEPARTMENT MANAGER / PR0JECT ENGINEER
Copy to : Maintenance Department
Accounts Job File.
QF/JOB-02
Rev-0,15/12/2013
T&C Reports (If Applicable)
Response to Requirements /
Meet Requirements
Product Delivery
Name:
Designation:
Name:
Designation:
Signature:
WARRANTY & DOCUMENT SUBMITTAL
Signature: Signature:
O&M Manual (If Applicable)
Warranty Letter (As per Sub Contract Agreement)
Prepared By Verified by Approved by Dept.Head*
REMARKS IF ANY
Note: Please put a mark in the appropriate boxes (if applicable).* Dept. Head Approval requires for more than the order value of QAR 50,000/- QAR
Warranty Terms
Documents enclosed
Exceed Requirements
PERFORMANCE RATING
Description /Rating
QHSE ComplianceProduct Quality
Below Requirements
Not Applicable
Measurement Sheet (Mandatory for Measurable)
As Built Drawings (If Applicable)
Other Documents (If Applicable)
Name:
Designation:
Date of Completion (Actual date is inclusive of all snag works completion date)
Scope of Work
Date of Commencement Planned Actual
ENGINEERING MAINTENANCE COMPANY P.O.Box: 24125 - DOHA, QATAR. TEL: 44359181 - FAX : 44359188
Sub Contract Agreement No / WSO REF No:
SUB CONTRACTOR WORK COMPLETION CERTIFICATE
Date :Job Ref No /Description:
Sub Contractor Name & Address
Type of Sub Contract Lumpsum Measurable
QF / MA - 01
A1 Monitor response time to Customer Service Calls
A2 Monitor % completion of Maintenance Service Calls
A3 Monitor % of PPM completion
A4 Monitor Maintenance Budgets
B1 Monitor the safety tool box talk every week
B2 Monitor the A1 site safety Inspection
B3 Monitor the Equipment safety Inspection
B4 Monitor No of Audits Conducted against planned
B5 Monitor No of Suggestion/Nearmiss received
B6 Emphasis on safe working practices and accident prevention
B7 Emphasis on protection of environment by reducing the consumption of paper, fuel, electricity & water
C1 Monitor Materials & Documents submittals
C2 Monitor Projects progress
C3 Monitor Projects Budgets
C4 Monitor Projects Manpower utilization against Planned
Issue No. 4 Rev.5
Issue Date : 25/06/2014
B.
Emphasis on safe working practices, accident
prevention and protection of environment
C. Monitor Project Budget & Progress
Reviewed By: GM / AGM Issued By : MR - QHSE
Pers
onne
l
Safe
ty
Acco
unts
Com
mer
cial
Tran
spor
t
A. Enhance Customer Satisfaction.
QHSE Objective - Responsibility Matrix - Year 2014/2015 Page : 1 of 2
QHSE Objectives / Company Objectives Departmental Objectives
Elec
trica
l Pro
j
A / C
Pro
ject
s
Civ
il P
roje
cts
Mai
nten
ance
Purc
hase
QF / MA - 01
D1 Regular monitoring of our Vendors .
D2 Monitor Indent processing time for materials
D3 Monitor Vendor invoice processing time
E1 Monitor Client Project invoice processing time
E2 Monitor Client Maintenance invoice processing time
E3 Monitor Projects Budgets
E4 Monitor job booking
E5 Monitor receivables from clients
F1 Monitor workers are getting salary in time.
F2 Monitor Technicinas attended Training in a year
F3 Monitor Staff Management Training details
F4 Monitor English Training for identified Technicians to improve the communication skills
Reviewed By:GM / AGM Issued By : MR - QHSEIssue No. 4 Rev.5
Issue Date : 25/06/2014
Tran
spor
t
D. Monitor Purchase Dept.
E. Monitor Accounts & Commercial Dept.
F. Monitor Admin & HR Dept.
Mai
nten
ance
Purc
hase
Pers
onne
l
Safe
ty
Acco
unts
Civ
il P
roje
cts
Com
mer
cial
QHSE Objective - Responsibility Matrix - Year 2014/2015 Page : 2 of 2
QHSE Objectives / Company Objectives Departmental Objectives
Elec
trica
l Pro
j
A / C
Pro
ject
s
QF/MA - 02
1 of 2
Target Expectation
A1 Monitor response time to Emergency Service Calls
Monitor response time to Emergency customer calls = (# of calls attended within 'h' hours / total number of calls) x 100Service 'h' hours(I) Local Sites 2 hours *(ii) Remote Sites 6 hours *
85% 100%
A2Monitor % of Completion of Maintenance Service calls (CM/SO/WR/MWO/SR etc)
(No. of Mainteance Service calls (CM/SO/WR/MWO/SR etc) completed / total number of Service call received) x 100 75% 100%
A3 Monitor % of PPM completion % of PPM completion against Planned 100% 100%
A4 Monitor Maintenance Budgets Budget Utilized / budget allocated 85% 100%
B1 To Monitor the safety tool box talk every week
No of Tool Box talk conducted / No of Tool box talk planned in the Month 100% 100%
B2 To monitor the A1 site safety Inspection
No of A1 site safety Inspection carried out / No ofA1 site safety Inspection planned in the Month 100% 100%
B3 To Monitor the Equipment safety Inspection
No of Equipment safety Inspection carried out / No of Equipment safety Inspection planned in the Month 100% 100%
B4 To Monitor No of Audits Conducted against planned No of Audit conducted / No of Audit planned in the Month 100% 100%
B5 To Monitor No of Suggestion/Nearmiss received
No of Nearmiss/Suggestions Received per month / No of Manpower working at site X1 /12 100% 100%
B6 Emphasis on safe working practices and accident prevention
Accident Frequency Rate FR = No of LTI x 106/Total man hour Worked
1.2 Zero Accidents
Reduce the consumption of paper by 2% and A3 by 2% in year 2014 2% reduction 100%
Reduce the consumption of Fuel by 5% in year 2014 5% reduction 100%
Reduce the consumption of Electricity by 2% in year 2014 2% reduction 100%
Reduce the consumption of Water by 3% in year 2014 3% reduction 100%
B7
Emphasis on protection of environment by reducing the consumption of paper, fuel,
electricity & water
(* - As per contractual requirements where ever applicable)Issued By: MR - QHSE
Issue No. 4 Rev.5
Reviewed By : GM/AGM Issue Date : 25/06/2014
A Enhance Customer Satisfaction Project Manager
B
Emphasis on safe working practices, accident prevention
and protection of environment.
Project Manager / Safety
Officer/Admin Officer/ Manager
Plant & Asset
QHSE Objectives - Measures Matrix
QHSE Objectives/ Company Objectives Departmental / Process Objective Measure
PerformanceResponsibility
QF/MA - 02
2 of 2
Target Expectation
C1 To monitor Materials & Documents submittals Total submittals approved / Total submittals 60% 80%
C2 Monitor Projects progress To Monitor Project Planned Vs Actual Progress 80% 90%
C3 To monitor Projects Budgets Budget utilized / budget alloted 85% 100%
C4 To monitor Projects Manpower utilization against Planned Mandays worked / Mandays Planned 85% 100%
D1 Regular monitoring of our Vendors .
a. ( No of A/ Total No of Vendors)x100b. (No of B/Total No of Vendors)x100 A: Very good (60%) , B: Good (40%)
50% Average (a+b) 80%
D2 To monitor Indent processing time for materials.
Items Processed /Total items Indented (with in 4 days from indent date for Urgent & 8 Days Normal)
4-days-urgent 8-days- normal
2-days- urgent 5-days-normal
D3 To monitor Vendor invoice processing time
Vendor Invoice Processed with in 15Days/ No of Invoice Received during the period. 15 days 10 days
E1 To monitor Client Project invoice processing time
Client Invoice processed with in 7 Days/ No of Invoice request received. 7 days 5 days
E2 To monitor Client Maintenance invoice processing time
Client Invoice processed before 7th of month/ No of Maintenance Invoice per month . 75% 95%
E3 To monitor Projects Budgets Budget provided / budget alloted 85% 100%
E4 To monitor job booking Value of tenders awarded / value of tenders submitted 20% 15%
E5 To monitor receivables from clients
Total amount invoiced against total amount received with in due date (Maximum +20 Days ) 100% 100%
F1 To monitor workers are getting salary in time.
Record the date of workers salary distribution every month to be before 15th. 15th 10th
F2 To Monitor Technicinas attended Training in a year Record Training attended by each Technicinas 773 mandays 100%
F3 To Monitor Staff Management Training details Record Training attended by each Staff 550 mandays 100%
F4To monitor English Training for identified Technicians to improve the communication skills
Record English Training attended. (50 Nos) 50 Nos 100%
Reviewed By : GM/AGM Issued By: MR - QHSE Issue No. 4 Rev. 5
Issue Date :25/06/2014
E Monitor Accounts & Commercial Dept.
GM/ Accounts Executive
F Monitor Admin & HR Dept. Administration Dept.
C Monitor Project Budget & Progress Project Manager
D Monitor Purchase Dept. Purchase Officer
QHSE Objectives/ Company Objectives Departmental / Process Objective Measure
PerformanceResponsibility
QHSE Objectives - Measures Matrix
QF/MA - 03
1 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
Customer calls received date & time
Customer calls responded date & time
# Service call completed
Total No. of major Service call received
# PPM Task completed
Total No. of PPM Task Planned
A4 To monitor Maintenance Budgets
Budget Utilized / budget allocated Job Budgets Project
Manager
From EMPUROR
ReportMonthly 85% 80%
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
A Enhance Customer Satisfaction
A1Monitor response time to Emergency Service Calls
100% 100%
75% 100%
A3 Monitor % of PPM completion
% of PPM completion against Planned do PPM task
sheets Monthly
Monthly 85% 100%
A2
Monitor % of Completion of Maintenance Service calls (CM/SO/WR/MWO/SR etc)
(No. of Mainteance Service calls (CM/SO/WR/MWO/SR etc)
completed / total number of Service call received) x 100
do do Monthly
Monitor response time to Emergency customer calls = (# of calls attended within 'h'
hours / total number of calls) x 100
Service 'h' hours(I) Local Sites 2 hours *(ii) Remote Sites 6 hours *
Project Manager
Measurement Identification Work Sheet - 2
Process: Maintenance
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA Performance
Mainten-ance Work order
QF/MA - 03
2 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
B1 To Monitor the safety tool box talk every week
No of Tool Box talk conducted / No of Tool box talk planned in
the Month
No of Tool Box talk conducted per month
Project Manager
Tool Box talk Attdance Record
Monthly 100% 100%
B2 To monitor the A1 site safety Inspection
No of A1 site safety Inspection carried out / No ofA1 site safety Inspection planned in the Month
No of A1 site safety Inspectionconducted per
month
Project Manager
A1 Inspection Record Monthly 100% 100%
B3To Monitor the Equipment safety Inspection
No of Equipment safety Inspection carried out / No of Equipment safety Inspection
planned in the Month
No of Equipment safety Inspectionconducted per
month
Project Manager
Equipment safety
Inspection Record
Monthly 100% 100%
B4To Monitor No of Audits Conducted against planned
No of Audit conducted / No of Audit planned in the Month
No of Audit conducted per month
Project Manager Audit Reports Monthly 100% 100%
B5To Monitor No of Suggestion/Nearmiss received
No of Nearmiss/Suggestions Received per month / No of
Manpower working at site X1 /12
No of Nearmiss/Suggestions Received per month
Project Manager
Record of Suggestion/Nearmiss card
Monthly 100% 100%
B6Emphasis on safe working practices and accident prevention
Accident Frequency Rate FR = No of LTI x 106/ Total man hour Worked
Accident Frequency Rate Project Manager
Monthly HSE Performance
ReportMonthly Zero
AccidentsZero Accidents
To monitor the fuel consumption per vehicle as per
the capacity of vehicles (D/C pickup, 15 seater, 30 seater, 3 Ton pickup, 60 seater with ac &
without ac)
Total KM driven/ liters of fuel consume/ vehicle
Project Manager /
Manager Trans. & Asset.
Fuel consumption
and KM reading
Monthly 5% reduction in Year-14 100%
To monitor the consumption of electricity
Number of unit consumed per person Admin Officer Kahramaa
monthly bill Monthly 3% reduction in year-14 100%
To monitor the consumption of water
Consumption of water (m3) per person
Admin Officer/ Camp admin
Kahramaa monthly bill Monthly 3% reduction
in year-14 100%
No of reems/ month (A4) SF/FR-31 Monthly 2% reduction in year-14 100%
B
Emphasis on safe working practices,
accident prevention and protection of
environment
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
B7 Emphasis on protection of environment
To monitor the paper consumption
Project Manager
Measurement Identification Work Sheet - 2
Process: Safety
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA Performance
QF/MA - 03
3 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
C1 To monitor Materials & Documents submittals
Total submittals approved / Total submittals
Approval of submittals from client.
Project Manager
Documents transmittal
record.Monthly 60% 80%
C2 Monitor Projects progress
To Monitor Project Planned Vs Actual Progress
Actual Progress / Planned Progress
Project Manager
From Project Progress
Report ( 'S' Curve )
Monthly 80% 90%
C3 To monitor Projects Budgets Budget utilized / budget alloted Job Budgets Commercial
officer
From EMPUROR
ReportMonthly 85% 100%
C4To monitor Projects Manpower utilization against Planned
Mandays worked / Mandays Planned
Cumulative Manpower utilized
Project Manager
From EMPUROR
Report Manpower allocation
Monthly 85% 100%
C Monitor Project Budget & Progress
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
Measurement Identification Work Sheet - 2
Process: Projects
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA Performance
QF/MA - 03
4 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
D1 Regular monitoring of our Vendors .
a. ( No of A/ Total No of Vendors)x100b. (No of B/Total No of Vendors)x100 A: Very good , B: Good
Vendor & Sub contractor performance rating
Purchase Officers
Vendor Evaluation Half Yearly 60% 80%
D2To monitor Indent processing time for materials.
Items Processed /Total items Indented (with in 4 days from indent date for Urgent & 8 Days Normal)
Indent Process time for Urgent & Normal Indents.
Purchase Officers
From EMPUROR
ReportMonthly 50% 80%
D3 To monitor Vendor invoice processing time
Vendor Invoice Processed with in 15Days/ No of Invoice Received during the period.
Vendor Invoice Process time
Purchase Officers
From EMPUROR
ReportMonthly 75% 95%
D Monitor Purchase Dept.
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
Measurement Identification Work Sheet - 2
Process: Purchase
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA Performance
QF/MA - 03
5 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
E1To monitor Client Project invoice processing time
Client Invoice processed with in 7 Days/ No of Invoice request received.
Client Invoice process time
Commercial officer
From EMPUROR
ReportMonthly 75% 95%
E2To monitor Client Maintenance invoice processing time
Client Invoice processed before 7th of month/ No of Maintenance Invoice per month .
Client Invoice process time
Commercial officer
From EMPUROR
ReportMonthly 75% 95%
E3 To monitor Projects Budgets
Budget provided / budget alloted Job Budgets Commercial
officer
From EMPUROR
ReportMonthly 85% 100%
E4 To monitor job booking Value of tenders awarded / value of tenders submitted Job Booking Commercial
officer
From EMPUROR
ReportMonthly 20% 20%
E5 To monitor receivables from clients
Total amount invoiced against total amount received with in due date (Maximum +20 Days )
Monitor receivables Commercial officer
From EMPUROR
ReportMonthly 100% 100%
E Monitor Accounts & Commercial Dept.
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
Measurement Identification Work Sheet - 2
Process: Accounts & Commercial
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA Performance
QF/MA - 03
6 of 6
What Who Collects How Collected Frequency Current
Level Target Expectation
F1 To monitor workers are getting salary in time.
Record the date of workers salary distribution every month to be before 15th.
Monitor wages are paid in time ADMIN & HR
From EMPUROR
ReportMonthly 100% 100%
F2To Monitor Technicinas attended Training in a year
Record Training attended by each Technicinas Training record ADMIN & HR
From Training Attendance
sheetMonthly 50% 100%
F3To Monitor Staff Management Training details
Record Training attended by each Staff Training record ADMIN & HR
From Training Attendance
sheetMonthly 50% 100%
F4
To monitor English Training for identified Technicians to improve the communication skills
Record English Training attended. Training record ADMIN & HR
From Training Attendance
sheetMonthly 50% 100%
F Monitor Admin & HR Dept.
Performance
Reviewed By : GM/AGM Issued By: MR - QHSEIssue No. 4 Rev :5
Issue Date 25/06/2014
Measurement Identification Work Sheet - 2
Process: HR & Administration
QHSE Objectives/ Company Objectives
Departmental / Process Objective Measure
DATA
QF / MA - 04
Rev-2 11/05/2009
Check Sheet for the Month of ……………………….. Page …………
Process Name:
Sl RequirementsDAYS / WEEK
QF / MA - 05
Rev-2 11/05/2009
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
A1. Monitor response time to customer calls
A1. Monitor response time to customer callsService 'h' hoursa. Maintenance (I) Local Sites 2 hours* (ii) Remote Sites 6 hours*
PE 85%
A2. Monitor major breakdowns during service maintenance
(No. of major breakdowns attended within 3 days* of downtime / total number of major breakdowns) x 100
PE 90%
D1.To monitor Materials & Documents submittals
Total submittals approved / Total submittals
DM 70%
D2. Monitor Projects progress .
To Monitor Project Planned Vs Actual Progress
DM 80%
Date :
Process Name:
Page : Score card - Year
Reviewed By:
Actual Measured ValueObjectives Unit Owner TargetMeasure
QF/MAINT-01
Rev-1- 01/12/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
EQUIPMENT / VEHICLE MAINTENANCE REQUESTTo Doc.Ref No : VMR/……..
The Workshop in-charge Date : ........................
Name of the Machine/Equipment/Vehicle
Vehicle /Machine Identification No.
Job No :
Engineer Name/Signature Authorised Name/ Signature
Repairs required:-
Type of Service carried out : Type A/Type B/ Type C/ Type D
KM. reading on receipt of Vehicle :
Date of Delivery after servicing :
Details of Work Carried out:
Invoice No:- Labour ChargesSpares :Others :Total :
(WORKSHOP IN-CHARGE)
Received Vehicle After Maintenance
Receiver Sign :…………………………………... ID No:……………………………….
To be filled up by Workshop
Repair/Service Cost
QF/MANPOWER-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
MANPOWER ALLOCATION FORM
Job No : ............. Site ......................................... Period ............SL. NO.
NAME OF THE TECHNICIAN / PERSON CATEGORY BRIEF DETAIL OF THE WORK
ALLOTTED REMARKS
SUPERVISOR (APPROVED BY)
QF/MAT-01
Rev -0 15/06/2013
Sl No Category Name Item Code Material Name Specification Size Model Manufacturer Country of Origin
Unit
ENGINEERING MAINTENANCE COMPANY P.O. Box: 24125 - DOHA, QATAR. TEL: 44359181 - FAX : 44359188
Approved By :
ITEM CODING FORMATDate :
Prepared By :
QF/MW0-01
Rev-0 01/07/2008
MAINTENANCE WORK ORDER Sl. No.
JOB NO.
ORIGINATOR TELE. No. DATE TIME
EQPT. / TAG # : .................................................................................................... LOCATION : ...............................................
UNIT TYPE : ..................................MAKE : ............................................................ MODEL NO. : ..............................................
WORK TYPE : COMPLAINT BREAK DOWN PREVENTIVE
PRIORITY : URGENT NORMAL
NATURE OF WORK / COMPLAINT / BREAKDOWN
.........................................................................................................................................................................................................................................................
SAFETY REQUIREMENTS: 1. Use Safety Shoes, Coverall & Helmets 2. Refer relevant Risk Assessment / Check List
3. Use hand Gloves 4. Special Requirements [To Specify] : ___________________________________________ ___________________
_________________________________________________________________________________________________
DEFECTS FOUND ON INSPECTION .........................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................................
MATERIALS USED QTY REMARKS MATERIALS USED QTY REMARKS
................................................................................. ........................... ............................................................................................................................................
................................................................................. ........................... ............................................................................................................................................
................................................................................. ........................... ............................................................................................................................................
................................................................................. ........................... ............................................................................................................................................
................................................................................. ........................... ............................................................................................................................................
DETAILS OF WORK DONE :
.........................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................................
.................................................................................................................................................................... .....................................................................................
CLIENT / CUSTOMER'S REMARKS (IF ANY)
.........................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................................
CHECKED BY : ……………..…............................................ ATTENDED BY : ........………...…………………………….…..
JOB STARTED ON : .................……........…TIME : .................. COMPLETED ON : ........…………….......… TIME : ........….…..
SUPERVISOR's REMARK :..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
HOUSEKEEPING COMPLETED: Yes No
TECHNICIAN's SIGN. SUPERVISOR's SIGN. ENGINEER's SIGN. ORIGINATOR's SIGN./DATE
REQUEST FOR CURRENT DATED / POST DATED CHEQUE / DEMAND
DRAFT
S.No.
V / S CODE
No. PUR/DD/ . Date:_____________________ To Account Manager EMCO, Abu Dhabi
Please prepare a *Current Dated Cheque / *Post Dated Cheque payable
on…………………… / *Demand Draft for ………………………… in favour of
…………………………………………………………………………………..…….. towards
charges for ……………………………………………………………………………………...
…………………………………………………………………………………………………
…………………………………………………………………………………………………
JOB No.
INDENT No.
WSO / LPO No.
DATE
ORIGINATOR
NAME
SIGNATURE
Special remarks, if any: …………………………………………………………………………… ……………………………………………………………………………………………………..
____________________ PURCHASE OFFICER
Approved by:____________________________ ADM / GM
Delivered to Purchase Dept. on ……………..
Delivered to Accounts Dept. on ……………….
Copy 1. DC-3 2. Originator
Cheque / DD No. ……………………….. Received on …………………………
QF/PAYMENT-01
Rev-01, 25/09/2013
QF/PUR-01
Rev-0 01/07/2008
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box:24125 - Doha, Qatar.
INDENT FOR MATERIALS
To ............................. No.PURCHASE DEPARTMENT Date : ..........................
Sl. No. Job # Item Code Item Description Qty Remarks
Delivery Pattern / Location
Special Terms
...................................... ………………………………Site Engineer / Supervisor Project Engineer / Manager
For the Use of Purchase Department
QF/PUR-02
Rev-01, 25 /09/2013
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
LOCAL PURCHASE ORDER
Vender Code : L.P.O. No. : Date :
To : Attn. :Tel. :
Ref. : Fax :
Please supply the following materials :
Sl. No Job # Item Code Item Description Unit Quantity Rate Amount
1) Place of Delivery :2) Period of Delivery :3) Terms of Payment :4) This Order is subject to the General Terms & Conditions printed overleaf.5) All amounts printed are in local U.A.E. Dirhams unless specified.
"PLEASE SUBMIT YOUR INVOICE WITHIN 3 DAYS AS PER THE ABOVE LPO"
Yours Faithfully,A/c Description : For ENGINEERING MAINTENANCE COMPANY
Indent # :D.C. No. : GM/ADM/Sr. Purchase Officer
(ETA - ASCON GROUP)
TOTAL AMOUNT
QF/PUR-03
REV-01 Dtd : 25/09/2013
ENGINEERING MAINTENANCE COMPANY Tel.: 44359181- Fax : 44359188, P.O.Box:24125 -Doha - Qatar
INDENT FOR EQUIPMENT/INSTRUMENTS (ASSET'S)
No : ............................. Job No: ..........................To : PURCHASE DEPARTMENT Date : ..........................
Sl. No. QTY. ASSET CUSTODIAN NAME & S NO REMARKS
Justifications for the above requirement :
Remarks :
...................................... .......................................... ....................................... SITE MANAGER / ENGINEER DEPARTMENT MANAGER GENERAL MANAGER
MATERIAL DESCRIPTION / MAKE/SPECIFICATION
QF/Quot-01
Rev-01, 25/09/2013
( Sample Format )
[ To be typed on EMCO Letter Head ]
Ref : Q-0000/XXX/00/XXXX Date : …………... To . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Attn : Dear Sirs, Sub : Ref : With reference to your enquiry for the above mentioned project, we are pleased to submit our quotation for the above work with the following terms and conditions. 1.0 BASIS OF OFFER 1.1 SPECIFICATIONS : 1.2 DRAWINGS : 1.3 BILL OF QUANTITIES : 1.4 ASSUMPTIONS : 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 2.0 SCOPE OF WORK :
… 2
QF/Quot-01
Rev-01, 25/09/2013
Ref : Q-0000/XXX/00/XXXX
- 2 - 3.0 PROPOSED EQUIPMENT/ MATERIALS 3.1 3.2 3.3 3.4 3.5 4.0 CONTRACT VALUE
Our total contract price for …………………………… in accordance with the above basis of offer (1.0) and also in line with the other clauses of the offer shall be Dhs. …………… (Dirhams ……………………………………………………………..)
5.0 EXCLUSIONS / DEVIATIONS 5.1 5.2 5.3 5.4 5.5 6.0 FACILITIES TO BE PROVIDED BY CLIENT TO EMCO FREE OF COST 6.1 6.2 6.3 6.4 6.5
… 3
QF/Quot-01
Rev-01, 25/09/2013
Ref : Q-0000/XXX/00/XXXX
- 3 - 7.0 GUARANTEE Subject to all terms of payments punctually complied with, the equipment is guaranteed
by us against faulty materials and workmanship for a period of 12 months from the date of installation by repairing or at our option replacing free of charge, the faulty parts that may be found during such period.
This guarantee does not extend to consequential damage or losses; normal wear and tear
nor routine day-to-day maintenance and operation of the plant. Further, it is null and void if repairs and modification are carried out without our approval in writing.
8.0 COMPLETION OF WORK Minimum …………. weeks/months from the date of confirmed order on a mutually
agreed program of works. 9.0 QUALITY ASSURANCE EMCO is a certified ISO 9002 company and all our activities will be in line with our
quality system procedures. 10.0 FORCE MAJEURE No failure or omission by either party to carry out or observe any of the stipulations,
conditions or obligations to be performed hereunder shall give rise to any claims against such party or be deemed to be a breach of contract if such failure or omission arises from a cause or event reasonably beyond the control of such party. An event constituting such force majeure would include inter-alia war-whether declared or not, or any hostile act or by against a belligerent power, terrorism, explosion caused by either weapons or bombs stored in the vessel or in other premises.
11.0 TERMS OF PAYMENT The following terms of payment will be agreed upon : 12.0 CUSTOMS DUTY The prices quoted are based on the prevailing import duty. Any statutory variation in the
customs duty or new levies/ taxes by the Government would have to be paid extra.
… 4
QF/Quot-01
Rev-01, 25/09/2013
Ref : Q-0000/XXX/00/XXXX
- 4 - 13.0 VALIDITY Our offer is valid for a period of ………. days from date and is subject to satisfactory
agreement conditions. We hope you will find our offer competitive and in line with your requirements. If you need any clarifications, please do not hesitate to contact us. Thanking you and assuring you of our best attention at all times, Yours faithfully, for ENGINEERING MAINTENANCE COMPANY (EMCO) A.S REDDY GENERAL MANAGER
QF/Quot-02
( Sample Format )
Rev-01, 25/09/2013
Engineering Maintenance Company EMCO
TeleFax Message To : CC : From : Fax No. : Re : Q-0000/XXX/00/XXXX Tel. No. : Date : Pages :
Sub : Ref : With reference to your enquiry for the above mentioned project, we are pleased to submit our quotation for the above work with the following terms and conditions. 1.0 BASIS OF OFFER 2.0 SCOPE OF WORK 3.0 PROPOSED EQUIPMENT / MATERIALS 4.0 CONTRACT VALUE
Our total contract price for the subject work will be Dhs. …………… (Dirhams ……………………………………………………………..)
5.0 EXCLUSIONS / DEVIATIONS 6.0 FACILITIES TO BE PROVIDED BY CLIENT TO EMCO FREE OF COST
… 2
P.O.BOX: 24125, DOHA, Qatar. TEL.: 44359181, FAX: 44359188, EMAIL: [email protected]
QF/Quot-02
( Sample Format )
Rev-01, 25/09/2013
EMCO Ref : Q-0000/XXX/00/XXXX
- 2 - 7.0 COMPLETION OF WORK Minimum …………. weeks / months from the date of confirmed order on a mutually
agreed program of works.
8.0 TERMS OF PAYMENT The following terms of payment will be agreed upon : 9.0 VALIDITY Our offer is valid for a period of ………. days from date and is subject to satisfactory
agreement conditions. We hope you will find our offer competitive and in line with your requirements. If you need any clarifications, please do not hesitate to contact us. Thanking you and assuring you of our best attention at all times, Yours faithfully, for ENGINEERING MAINTENANCE COMPANY (EMCO) A.S REDDY GENERAL MANAGER
QF/QUOT-03
Rev-0 01/07/08
Ref. : Q-0000/XXX/00/0000 Date : M/s. ……………………………… …………………………………… …………………………………… Attn : Dear Sir, Sub : We thank you for inviting us to quote for the subject tender. Based on the tender documents and the subsequent site visit, we are pleased to submit our offer as detailed below. Scope of Work :
Price : Completion Period :
Terms of Payment :
Validity : We hope our offer is in line with your requirement and look forward to receive your valuable order. Thanking you and assuring you of our best attention at all times, Yours faithfully, for ENGINEERING MAINTENANCE COMPANY, ………………………… ……………………………
QF/REJECTION-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
MATERIAL REJECTION REPORT
Name of the Site : No
Job No. : Date
Department :
Customer Order Reference for Customer Supplied Material
Name of the Vendor :
Delivery Note Ref. of Customer/Vendor
SL. NO. MATERIAL DESCRIPTION QUANTITY
SUPPLIEDQUANTITY ACCEPTED
QUANTITY REJECTED REASON FOR REJECTION
1
2
3
4
5
REJECTED BY:Comments from Vendor / Customer (if any)
(VENDOR / CUSTOMER)To be filled by Purchase Department
LPO # DATEREMARKS
PURCHASE OFFICER
Copies - Purchase Department; Job File; Department Manager
QF/RET-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
CONSTRUCTION EQUIPMENT RETURN NOTE
Site : .............................................
Job No. : ......................................... Date : ....................
SL.NO. NAME OF THE EQUIPMENT TAG NO. QTY. REMARKS
Received the above items in good condition
Site Engineer Store-in-Charge
QF/RN-01
Rev-0 01/07/2008
EMCOTel.:44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
MATERIALS RETURN NOTEFrom Job # :
To : Stores - Doha
Sl. No. Item Code Description Qty. Unit Remarks
Vehicle No. : Driver Name :
Despatched by : Received By :
Date : Date :
Name : Name :
Signature : Signature :
Original - StoreCopy - Job file
No. 40001
QF/SCR-01
Rev-01, 25/09/2013
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
To
The Purchase Officer Date :
The following mateials returned from the site seems to be unservicable and need scraping. Pleasearrange inspection.
Signature of Store Keeper
Project Name : Job No. :
LIST OF MATERIALS
Sl. No. Item Code Description Remarks
Inspected by : (1) Date :
(2)
Inspection Remarks / Recommendations (Use space overleaf if needed)
Purchase Officer Dept. Manager General Manager
Inspection Remarks / Recommendations
QF/SERVICE-01
Rev-0 01/07/2008
EMCO Tel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar. No....................
SERVICE REPORT
Job No : Date : ...................................
Building: FLAT No. : .......................................
Complaint No. : .................................. Originator : ......................................
Nature of Complaint Materials Used
Plumbing : ...........................................
Carpentry : ...........................................
Electrical : ...........................................
Masonry : ...........................................
Painting : ...........................................
Others : ...........................................
CLIENT / TENANTS REMARKS (IF ANY)
............................................................................................... .......................................................
................................................................................................... .......................................................
SIGNATURE
CHECKED BY : ........................ ATTENDED BY : .................................JOB STATUS
PENDINGJOB STARTED ON : ........................COMPLETED ON .............................. COMPLETED
SUPERVISOR's REMARK :
................................................................................................... ........................................................
................................................................................................... ........................................................
TECHNICIAN's SIG SUPERVISOR's SIG ENGINEER's SIG ORIGINATOR's SIG/DATE
QF/STORES-01
Rev-0 01/07/2008
EMCOTel.:44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar. No.............
STORES REQUISITION FORMJob No..................... Date......................SL. NO. MATERIAL DESCRIPTION SIZE QTY
RQRDQTY
ISSUED REMARKS
(REQUISITION BY) (APPROVED BY) (ISSUED BY) (RECEIVED BY)SITE ENGINEER / PROJECT ENGINEER STORE KEEPER
QF/TEND-02
Date :
AItem
1
2
3
4
5
6
7
8
9
10
11
12
13
PROJECT COSTING SUMMARY
Over Heads @ % for item. (1 to 11)
Sub Contracts
Supervision + Conveyance
Labour
Description Remarks
Transport
Crane & Vehicle Hire
Vehicle Maintenance & Fuel
Other Expenses
Guarantee Maintenance
SRC & LRC @ % for item. (1 to 11)
Amount (QRS)
Fixed Assets
Direct Materials
Sundries - 2%
Client / Customer :
Project Name :
14
B
1 Yes No
2
3
4
5
6
Arithmetic Checked by Reviewed by Approved by G.M/ CEO*
Signature - DateC
1 Location : Rack No :
2 Verified by: ADM/GM Signature - DateNo.of Vol:
* Remarks: CEO approval is required for all > 10 Million (more than 10 million) tender/quote.
All materials/Subcontractors that can have a cost impact has been specified in the offer
Deviation from tender specifications is clarified in the offer.
Estimated by
Filing Records
File NO :
Tender/Quotation Review
Sub Contractor if any :
Total Manpower
Required / Not Required / Submitted
Total Cost
Gross Margin
Total Contract Value (QAR)
Technical Proposal :
Mobilization Time
Miscellaneous
YES NO
Rev-04, 25/03/2014
QF/TEND-01
Rev-01, 25/09/2013
(Revised on 01-09-2004)
JOB MASTER
Yes / No
Job No Division Location
Project Title:
Project Manager Project / Site Engineer Site Supervisor
Cust. CodeTel. :
Fax :
Contact Person
Customer Name & Address
Contract Period
Initial Contract From Date End Date
Variation 1
Variation 2
Contract Award Date Job Type
/ P / M / S / O /Retention %
Terms of Invoice
Invoice Maturity Period
Indenters Staff No. Purchaser
Contract Reviewed Yes / No
Power of Attorney Received Yes / No
Chamber of Commerce Certificate Received
Yes / No
GM/ADM PM
Commercial Registration Certificate Received
Yes / No
PAC Date.(Contr. compl. Date) FAC Date. (Final handing over) Job closing date
Staff - Manpower Allocated - Labour
SRC Factor LRC Factor
Trade Licence Received
Yes / No
SPO
SRC Factor2.5
K Factor LRC Factor45
K Factor
Budget Control Sheet Enclosed
COMR - QHSE
QF/TEND-03
Rev-0 01/07/2008
Job # : ………………… Date : ……………………
S. No. Name Designation Remarks
AUTHORISATION FOR INDENTING
PROJECT MANAGER……………………….
QF/TEND-05
Rev-01, 25/09/2013
CONTRACT REVIEW( To be filled up after award of contract )
Job No. Contract Value
Start Date Completion Date
Mobilization Date Manpower Required YES NO
Brief Scope of Work
All EMCO's and Customers requirement are completely specified in the contract / agreement.
YES NO
All deviations from tender/quotation are reviewed and resolved with the customer.
YES NO
Brief Scope of Sub-Contract Work (if any)
Sub-Contract Works Value (QR.)
EMCO has the capability to meet the contract requirements completely. YES NO
( mention if any constraints / cautions to be taken )
Project Manager / Engineer assigned for the project.
Remarks
Reviewed By Approved By
Date Date
QF/TEND-06
Rev-0, 05/05/2014
TENDER TITLE
TENDER REF NO.
CLOSING DATE
CONTACT ADDRESS
CLIENT
TEL NO.
FAX NO.
SITE VISIT DATE
SCOPE OF WORKS
GENERAL
Site office facilities
Site workshop
Dinning facility
Rest room facilities
Lay down area
Water & Electricity for worksTie connection for electrical, water, drainage and othersAccess equipment requirements
Design/Engineering/Drawing
DC1 and DC2 Approval
QCD Approval
Kahramaa Co-ordination and power connection
Type of equipment to be maintained
List of equipment available
Client representative at site and phone No.
CMMS Availability
Internet Available /Required
Site phone requirements
Transport requirements
Duty timings
Call duty requirements
Gate pass requirements
Manpower
Materials
Vehicle
PPE Requirements
HSE Trainings
Driving License
LIST OF PARTICIPATED CONTRACTORS
PREPARED BY
Other Requirements:
ENGINEERING MAINTENANCE COMPANYTel : +974-44359181 - Fax : +974-44359188 - P.O BOX : 24125 - DOHA - QATAR
SITE VISIT REPORT
QF/TEND-07
Rev-0, 25/04/2014
Sr.No Title
1 Closing Date
2 Site Visit
3 Tender Validity
4 Tender bond amount & validity
5 Contract duration
6 Performance bond amount & validity
7 Performance bond bank Charges
8 Insurance
9 Insurance charges
10 Invoicing schedule
11 Payment Terms
12 Penalty
13 Warranty/Maintenance Period
14 Retention
15 Advance Payment
16 Currency
Sign: Sign:
Reviewed by: Approved by:
DEPT: MEP ACM ACP FMC CLM CLP ELM ELP IAC Date : Date:
ENGINEERING MAINTENANCE COMPANYTel : +974-44359181 - Fax : +974-44359188 - P.O BOX : 24125 - DOHA - QATAR
Sign:
Prepared by:
Tender No :
EMCO’s Comments
Note:
Requirement
Tender Title:
Date :
Tender Document ReviewClient:
QF/TRANSFER-01
Rev-0 01/07/2008
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
JOB TRANSFER NOTEFrom To
Name : Name :
Department : Dept. :
Date :
Customer Details
Job Code : Job Title :
Customer Name :
Address :
Contact Person :
Job Description :
Start Date : Completion Date
Special Comments :
Supervisor Project Engineer / Manager Date :
Copy To : Accounts, Job File
QF/TRFN-01
Rev-0 01/07/2008
Date: ______________
Name of Custodian S/C No. Job No. Signature Name of Custodian S/C No. Job No. Signature
Entered in Asset Register :
Date : Workshop Incharge
Original to Workshop In-charge Copy to Dept. Manager
Date Received :Document No.
EMCOTel.: 44359181 - Fax : 44359188, P.O.Box: 24125 - Doha, Qatar.
CONSTRUCTION EQUIPMENT/INSTRUMENT TRANSFER / ACKNOWLEDGEMENT NOTE
Sl. No. Equipment Description Tag No.
Present Location New Location
QF/TRG-01
Rev-0 01/07/2008
Page No.
Sl.No. Remarks Reviewed by
Planned on Conducted on
Training Programme
ON THE JOB TRAINING NEED IDENTIFICATION & TRAININGATTENDED RECORD
Training needs : Team / Member
Name of Program :
Venue : Training Date :
Name & Signature of Trainer :
Name & Signature of Trainee : Employee No.:
Personal Action Plan :
Training Objectives that I have learnt from this program that I would like to implement in my day to day activity
1
2
3
Evaluaton Date : ____________________________
EVALUATON OF TRAINING EFFECTIVENESS
QF/TRG‐02&SF/FR‐22
Effectiveness of Training on job [after 60 days]
(Some Progress)
Justification for Assessment:
Signature : ___________________________ Name :
Designation :
Excellent(5)
Demonstrated)
Superior
(Good Progress) (Competency
Poor (1)
(No Progress)
Fair (2) Good (3) Very Good (4)
demonstrated)
Supervisor / Site Incharge
[Signature]
Entered in System Date : _____________________
Level of
Implementaton
Self
(Very well
QF/VMAINT-01
Rev-1 16/03/2013
Sl.No ACTION REMARKS1 R2 I3 I4 I5 I6 I/A7 I8 I9 L
10 L11 T12 L13 T14 I/A
Signature:
Date :
Workshop Incharge
Serviced By:
Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
Wheel Nuts
Water pump bearings
Front&Rear mounting bolts
Clutch pedal play
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"A" (Diesel) Every-5000kms]
Date:KMTR Reading:Job No:
Engine oil and filter
Oil Levels-Clutch,Brake,Transmission,Differential
Brake Pads,Discs
Tyre condition &Pressure Including Spare
Battery Terminals
Electrical wiring Harness and Gauges
Propellor shaft joints
Drive belts
Air filter
Locks,Hinges&Hood Larch
VMR No: Vehicle No: Driver Name:
CHECK ITEMS
QF/VMAINT-02
Rev-1 16/03/2013
Sl.No ACTION REMARKS1 R2 I/A3 I4 I5 I6 I/A7 I8 I9 I
10 Steering box&Linkages,axles,suspension,Propellor I11 Tyre condition &pressure including spare T12 Battery terminals I/L13 Brake,Clutch&Exhaust system for any leak I14 Foot brake,Hand brake&clutch for free play I15 Electrical wiring harnesses&Gauges I16 Wiper washer condition of wiper blades/Fill I17 A/C Function/All Speeds/Actings I18 Locks,Hinges&Hood Latch I19 Wheel Nuts T
Signature:
Date :
Workshop Incharge
Serviced By:
Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"B" (Diesel) Every-10,000kms]
Date:KMTR Reading:Job No:
Vehicle No: Driver Name:
Intake and Exhaust valve clearenceDrive belts
Engine oil and filter
Brake pads,Discs
CHECK ITEMS
VMR No:
Cooling systemAir filterFuel filter/water separatorOil Levels-Clutch,Transmission,DifferentialBrake fluid
QF/VMAINT-05
Rev-1 15/03/2013
Sl.No ACTION REMARKS1 R2 I/A3 I4 I5 R6 R7 R8 R9 R
10 R11 R12 Steering box&Linkages,axles,suspension,Propellor I/L13 Tyre condition &pressure including spare I/R14 Battery terminals I15 Brake,Clutch&Exhaust system for any leak I16 Foot brake,Hand brake&clutch for free play I17 Electrical wiring harnesses&Gauges I18 Wiper washer condition of wiper blades/Fill I19 A/C Function/All Speeds/Actings I20 Locks,Hinges&Hood Latch L21 Wheel Nuts T
Signature:Date :
Workshop Incharge
Intake and Exhaust valve clearence
Drive belts
Brake fluid
Engine oil and filter
VMR No: Vehicle No: Driver Name:
Cooling system
Air filter
Fuel filter/Drain water
Spark plugs
CB Point/Condencer
Differential Gear oil
CHECK ITEMS
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"D" (Diesel) Every 60,000kms(ANNUAL MAINTENANCE)]
Date:KMTR Reading:Job No:
Air conditioning filter
Serviced By:Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
QF/VMAINT-04
Rev-0 16/03/2013
Sl.No ACTION REMARKS1 Engine oil and filter R2 I/A3 I4 I5 I6 R7 R8 R9 I
10 I11 R12 Steering box&Linkages,axles,suspension,Propellor I/L13 Tyre condition &pressure including spare I14 Battery terminals I15 Brake,Clutch&Exhaust system for any leak I16 Foot brake,Hand brake&clutch for free play I17 Electrical wiring harnesses&Gauges I18 Wiper washer condition of wiper blades/Fill I19 A/C Function/All Speeds/Actings I20 Locks,Hinges&Hood Latch L21 Wheel Nuts T
Signature:Date :
Workshop Incharge
Air conditioning filter
Serviced By:Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"C" (Petrol)Every-30,000kms]
Date:KMTR Reading:Job No:
Intake and Exhaust valve clearence
Drive belts
Brake fluid
VMR No: Vehicle No: Driver Name:
Cooling system
Air filter
Fuel filter/Drain water
Spark plugs
CB Point/Condencer
Differential Gear oil
CHECK ITEMS
QF/VMAINT-06
Rev-1 15/03/2013
Sl.No ACTION REMARKS1 Engine oil and filter R2 I/A3 I4 I5 R6 R7 R8 R9 R
10 R11 R12 Steering box&Linkages,axles,suspension,Propellor I/L13 Tyre condition &pressure including spare I/R14 Battery terminals I15 Brake,Clutch&Exhaust system for any leak I16 Foot brake,Hand brake&clutch for free play I17 Electrical wiring harnesses&Gauges I18 Wiper washer condition of wiper blades/Fill I19 A/C Function/All Speeds/Actings I20 Locks,Hinges&Hood Latch L21 Wheel Nuts T
Signature:
Date :
Workshop Incharge
CHECK ITEMS
Air conditioning filter
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"D" (Petrol)Every 60,000kms(ANNUAL MAINTENANCE)]
Date:KMTR Reading:Job No:
VMR No: Vehicle No: Driver Name:
Intake and Exhaust valve clearence
Drive belts
Brake fluid
Cooling system
Air filter
Fuel filter/Drain water
Spark plugs
CB Point/Condencer
Serviced By:
Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
Differential Gear oil
QF/VMAINT-07
Rev-0 16/03/2013
Sl.No ACTION REMARKS1 R2 I3 I4 I5 I6 I/A7 I8 I9 L
10 L11 T12 L13 T14 I/A
Signature:
Date :
Workshop Incharge
Serviced By:
Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
Wheel Nuts
Water pump bearings
Front&Rear mounting bolts
Clutch pedal play
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"A" (Petrol) Every-5000kms]
Date:KMTR Reading:Job No:
Engine oil and filter
Oil Levels-Clutch,Brake,Transmission,Differential
Brake Pads,Discs
Tyre condition &Pressure Including Spare
Battery Terminals
Electrical wiring Harness and Gauges
Propellor shaft joints
Drive belts
Air filter
Locks,Hinges&Hood Larch
VMR No: Vehicle No: Driver Name:
CHECK ITEMS
QF/VMAINT-08
Rev-0 16/03/2013
Sl.No ACTION REMARKS1 Engine oil and filter R2 I/A3 I4 I5 I6 I/A7 I8 I9 I
10 I11 T12 Steering box&Linkages,axles,suspension,Propellor I/L13 Tyre condition &pressure including spare I14 Battery terminals I15 Brake,Clutch&Exhaust system for any leak I16 Foot brake,Hand brake&clutch for free play I17 Electrical wiring harnesses&Gauges I18 Wiper washer condition of wiper blades/Fill I19 A/C Function/All Speeds/Actings I20 Locks,Hinges&Hood Latch L21 Wheel Nuts T
Signature:Date :
Workshop Incharge
Intake and Exhaust valve clearence
Drive belts
Brake fluid
VMR No: Vehicle No: Driver Name:
Cooling system
Air filter
Fuel filter/Drain water
Spark plugs
Ignition timings
Oil Levels-Clutch,Transmission,Differential
CHECK ITEMS
ENGINEERING MAINTENANCE COMPANY PO BOX : 24125, DOHA QATAR, TEL : 44359181 FAX: 44359188
PERIODIC MAINTENANCE CHECK LIST - [TYPE -"B" (Petrol)Every-15,000kms]
Date:KMTR Reading:Job No:
Brake pads,Discs
Serviced By:Next Service Km Due:
Legend : T-Tighten I-Inspect/ Adjust R-Replace L-Lubricate
QF/VEH-02
Rev-0 16/03/2013
(SITE INCHARGE)
VEHICLE DRIVER
__________________
(WITH/ WITHOUT)
EMCO-QATAR Tel: 44359181 - Fax - 44359188, P.O. Box: 24125 - DOHA, QATAR
REQUEST FOR HIRING A VEHICLE To DOC. REF NO: HVR/..........................
PLANT DEPT DATE: ..............................................
TO BE FILLED UP BY TRANSPORT CO-ORDINATOR
FUEL TYPE
TYPE OF VEHICLE
JOB NOSITE
(GM / FD / ADM)
(PETROL/DIESEL)
REQUEST RECEIVED ON
MOBILIZED ON
SUPPLIER NAME
VEHICLE DETAILS
CONTRACT REF NO
TRANSPORT CO-ORDINATOR / SIGNATURE MANAGER - PLANT/ SIGNATURE
PERIOD
(DEPT. MANAGER)REQUESTED BY
__________________AUTHORISED BY
JUSTIFICATION FOR REQUIREMENT
APPROVED BY _________________