environmental management and mainstreaming biodiversity · environmental management and...
TRANSCRIPT
Environmental Management and Mainstreaming
Biodiversity
National Biodiversity and
Business Indaba 2017
Presented by: Deidre Herbst
Planning,
Integration and
execution
2017/11/22 22
Mainstreaming biodiversity needs to
be Purposeful and Driven.
2017/11/22 3
Demand for Electricity
3
• The demand for electricity has slowed
this may create an opportunity for
transformation of supply options.
2017/11/22 4
Water Use
• Water availability is one of the most significant
threats to development in SA
• Eskom water use will decrease over the next two
decades as older plants shut down and the
energy mix transforms.
• The negative impact on wetlands due to coal
mining and power generation is likely to reduce
4
Considering a preparing for the future
22 November 2017 5
Continue to reduce the environmental footprint of Eskom
activities: Air quality, Water use, Waste Management,
Biodiversity and behavioral response.
Guide the Eskom of tomorrow from an environmental
perspective that leads to Eskom recognised as an
environmental responsible and sustainable organisation
The two strategic objectives of the Environmental Management Strategy
22 November 2017 6
The two strategic objectives
of the Environmental Management Strategy are:
Supporting environmental strategies and plans
22 November 2017 7
Strategies: Water, Biodiversity, Air Quality, Waste Mgt Standard
Action Plans and Standards: Water Implementation Plans, Biodiversity Action plans, Bird Mitigation Action plans, PCB phase out plan, Integrated Waste Mgt plans, Air
Quality Fleet Strategy, Environmental Impact Assessments, EMP’s, WULs
Policies: Water, Air Quality, Biodiversity,
Environmental Strategy and Departmental Ops plan
Corporate plan, SHEQ Policy, Socio Economic Dev Policy, Climate Change
Policy
8
UNDERPINNING BUSINESS PRINCIPLES OF ESKOM'S BIODIVERSITY IMPLEMENTATION PLAN
"The six C's"
1. Continuity of supply
- Minimise Txand Dx Dips / Trips related to wildlife incidents
- Prevent delays in EIA authorisations due to biodiversity
- Ensure the protection and life extension of Eskom plant
2. Cost to company
- Decrease maintenance related outage costs
- Decrease breaker / plant operations
- Decrease line faults
- Manage Offset recommendations
- Increase tax benefits through responsible stewardship land management
3. Conservation
- Develop Species action plans for Eskom sites
- Excel in the mgt of Eskom land for the protection of species and declared as a protected area
- Undertake research initiatives
4. Compliance
- International conventions
- South African Constitution and biodiversity legislation at governmental all levels
- Environmental Impact Assessment Authorisations
- Minimise biodiversity safety risk to Eskom staff during routine maintenance and repair of plant.
5. Corporate Image
- Promote Eskom as a responsible corporate citizen
- Participate in stewardship agreements, industry/NGO partnerships
- Encourage external comms and stakeholder engagement
6. Community
- Promote site biodiversity goals/solutions inclusive of community involvement
- Identify sustainable projects to uplift the community quality of life
Initiatives to achieve the objectives
Section 5.3
Development of objectives for the Biodiversity Implementation Plan
Section 4 Objectives
Implementation
Initiatives
Phasing and Integrating Biodiversity
Biodiversity
Policy
22 November 2017 9
EWT Partnership addressing the impacts of our infrastructure on biodiversity
and support in our journey to mainstreaming biodiversity
Our vision
The vision of the Partnership is for Ingula to become a world renowned,
sustainable conservation area
Behavioural Change
22 November 2017 11
2017/11/22 12
• The change in demand for electricity, the age of coal fired plants
provide an opportunity to transition to cleaner energy.
• Integration is the golden thread but being purposeful is key to
unlocking the potential for mainstreaming biodiversity
• Partnering is essential
• Leadership commitment behaviour and attitude are key
components of success
• If you don’t plan you plan to fail but once you have a plan make
sure you transition properly into execution