environmental dust assessment report · 2019-11-22 · environmental dust assessment report ade...
TRANSCRIPT
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us: ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email: [email protected]
Phone: 1300 976 922
Page 1 of 16
1.1.1.1.1 IAQ1 /v1. final
Environmental Dust Assessment Report
Tweed Valley Hospital Project
Prepared for: Delta Group
DLT-01-Q1013 / EDM1 v1. final 6th September 2019
Prepared for:
Delta Group
Environmental Dust Assessment Report
Tweed Valley Hospital Project
Report No: DLT-01-Q1013 / EDM1 v1. final
Date: 6th September 2019
Written By:
B. Sc. (Environment) Occupational Hygienist
Reviewed By:
MSC (OHP) Senior Occupational Hygienist
Version Details Date
v1 final Written by 6th September 2019
This report is copyright. No part of this publication may be reproduced or transmitted in any form or by
any means, electronic or mechanical, including photocopying without permission in writing from ADE
Consulting Group Pty Ltd.
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 3 of 16
ENVIRONMENTAL DUST ASSESSMENT REPORT ADE Report No. DLT-01-Q1013/ EDM1 v1. final
1 INTRODUCTION
1.1 General
ADE Consulting Group Pty Ltd (ADE) was commissioned by Delta Group (DLT) Pty Ltd to measure the levels of dust within the Tweed Valley Hospital Project, located at 771 Cudgen Road, Kingscliff NSW hereafter referred to as ‘The Site’. At the time of the dust monitoring, Delta Group are conducting earthworks preparing the site for soft mobilisation. Real time dust monitoring was carried out to determine and quantify the levels of dust created during the days in which the contractors/employees are undertaking the earthworks. Table 1 – Summary of site information and project information.
Site and Project Details
Client: Delta Group
ADE Project No: DLT-01-Q1013
Site location: 771 Cudgen Road, Kingscliff
Monitoring time and dates:
Wednesday 31st July – Saturday 30th August (continuous) - Day shift from 07:00 to 19:59 - Night Shift from 18:00 to 06:59
Date of report: 6/09/2019
Monitoring parameters:
Particulate Matter Total (PMTotal) Data recording frequency: 15 minutes
Exposure Standard SafeWork Exposure Standard for PM Total Dust 5mg/m3
1.2 Scope of Work
The scope of work involved the following:
• Completion of a Safety, Health & Environment Work Method Statement prior to undertaking any works;
• Real time continuous monitoring of PMTotal in three locations along the boundary of the site adjacent Cudgen Road; and
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 4 of 16
• Preparation of an Environmental Dust Assessment Report outlining the site data and conclusions and recommendations.
1.3 Whole Report
No one section or part of a section, of this report should be taken as giving an overall idea of this report. Each section must be read in conjunction with the whole of this report, including its appendices and attachments.
1.4 Monitoring locations
The site is located at 771 Cudgen Road, bounded by Tweed Coast Road to the West, Turncock Street to the East and Cudgen Road to the South at Kingscliff, NSW as per the Figure 1 below. The DustTrak monitoring locations are indicated by the blue dots in figure 1, all within the confines of the construction barriers. Dust levels are recorded at these locations to determine the dust levels at the eastern and southern boundaries of the project during the alterations on site. The dust monitoring stations have been operational 24 hours a day since 31st July 2019.
1.5 Exposure limits
ADE has adopted the SafeWork exposure standard for PMTotal to be 5mg/m3 for works on-site. If this standard is exceeded, cease works immediately and review controls and relevant practices listed in the Lendlease Air Quality Management Plan (2019). An action limit of 2.5mg/m3 has been implemented to minimize the likelihood of an exceedance.
1.6 Bureau of Meteorology (BOM) Climate Data
Summary of climate data for Coolangatta has been included in Table 2 below.
Table 2 – Summary of climate data at Coolangatta, QLD.
Date Wind direction (km/h)
Highest wind gusts
Maximum time of wind gust
Minimum temperature
(°C)
Maximum temperature
(°C)
Rain (mm)
01/08/19 SSE 44 16:47 13.0 20.6 0
02/08/19 SSE 37 14:09 13.4 21.4 0
03/08/19 E 28 13:47 9.6 22.0 1.2
04/08/19 ESE 28 13:43 7.0 21.9 0
05/08/19 NNE 24 15:44 9.5 21.7 0
06/08/19 N 28 10:21 8.6 22.1 0
07/08/19 N 37 16:02 10.9 23.1 0
08/08/19 WNW 46 15:50 14.5 26.1 0.3
09/08/19 WNW 56 15:30 6.4 25.9 0.2
10/08/19 W 59 13:55 11.3 22.9 0
11/08/19 W 43 9:52 2.9 20.4 0
12/08/19 SSW 37 9:57 5.6 19.9 0
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 5 of 16
13/08/19 ESE 33 14:14 7.8 21.5 0
14/08/19 NE 20 11:08 10.3 21.4 0
15/08/19 NNE 31 12:49 8.3 22.3 0
Table 2 – Continued…
Date Wind direction (km/h)
Highest wind gusts
Maximum time of wind gust
Minimum temperature
(°C)
Maximum temperature
(°C)
Rain (mm)
16/08/19 N 39 12:48 13.7 23.7 0
17/08/19 N 33 13:12 11.5 25.9 0
18/08/19 SSW 24 0:01 13.1 22.3 0
19/08/19 NNW 46 11:05 15.2 27.6 0
20/08/19 SSW 41 2:22 11.6 20.2 0
21/08/19 NE 24 13:48 2.7 22.0 0
22/08/19 SSE 52 19:59 6.0 24.9 0
23/08/19 S 39 10:03 13.5 21.5 0
24/08/19 N 35 16:02 7.5 21.4 0
25/08/19 N 39 12:54 13.6 24.2 0
26/08/19 NE 24 11:09 10.3 23.7 0
27/08/19 NE 26 14:29 13.2 22.9 0
28/08/19 WNW 24 9:08 14.7 22.4 0
29/08/19 E 17 14:02 10.7 20.8 4.8
30/08/19 SE 35 12:19 13.1 21.5 0
31/08/19 SE 44 13:02 11.4 22.1 0
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email: [email protected]
Phone: 1300 976 922
Page 6 of 16
Figure 1. Aerial photograph of the DLT works area at 771 Cudgen Road, Kingscliff NSW.
Tweed Valley Hospital Site
LEGEND
Site Boundary Monitoring locations
003 – Eastern End of Site
002 – Central Location
001 – Adjacent Car park
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email: [email protected]
Phone: 1300 976 922
Page 7 of 16
2. SAMPLING METHODOLOGY
2.1 Air Monitoring Samples
The implementation of continuous dust monitoring using a light scattering instrument (Dust Trak™ DRX Aerosol Monitor) as a supplemented analysis technique for dust deposition and directional dust analysis techniques. This supplemental technique is used as a guide and first response to allow change to dust control measures to be implemented to avoid exceedances within deposition and directional dust analysis techniques. The Dust Trak™ DRX continuous dust monitor was used to determine the concentration of the dust that has been created by the earthworks. Two Dust Trak™ DRX continuous dust monitors were installed on the 31st July 2019 and one was installed on the 2nd August 2019. 2.2 Controls
As per Lendlease Air Quality Management Plan (2019): “Works must be undertaken in accordance with the Lendlease GMRs, the Project EHS Plan, this Sub Plan and the Lendlease Building WDC. These documents detail Lendlease’s approach and commitment to pro-active and responsible site management. The following site-specific controls have been implemented to prevent or minimise the impacts of construction related air emissions on the environment and community. These may include but are not limited to:
• Use of water cart to dampen work areas and exposed soils to prevent the emission of excessive dust;
• Installation of a wheel shaker grid and/or wash down facilities at the vehicle egress point;
• Ensuring trucks transporting materials to and from the site use covers to prevent windblown dust or spillage;
• Ensuring truck tailgate locking mechanisms are operational and in use;
• Periodic inspection of surrounding roads to ensure no construction contamination and initiation of road sweeping if required;
• Careful selection of materials for temporary road surfacing;
• Watercarts/water trucks will be in permanent use on site during excavation and civil works.
• Temporary stockpiles that are not required for imminent use will be stabilised with spray grass or appropriate fabric.
• Continuous monitoring of weather forecast to stop dust generating activities in case that high winds are expected.
• Before extended breaks (e.g., Easter, Christmas), areas will be treated with spray grass.
• Only those areas where immediate structures are to be build will be stripped. Areas will be stripped at the latest possible date to comply with the program.
• Construction haul roads and temporary carparking will maximise the use of permanent infrastructure. These roads/carparks will have a sacrificial seal to minimise dust generation.
• Subcontractors to maintain equipment / machinery to ensure exhaust emissions comply with relevant legislation and guidelines;
• All waste material to be sorted, collected and removed from site (for recycling where possible);
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 8 of 16
• If rock crushing is assessed to be safe and feasible (i.e. cost effective and meets noise restrictions) the following management provisions will be in place:
o rock crushers will have a water attachment for dust suppression at the source. The water is sprayed at the face of the crusher before, during and after the crushing.
o Crushers will be located as far as practicable from Cudgen Road and immediate neighbours (i.e., on the north-west area of the site).
o All crushed rock suitable for re-use will be recycled on site as fill, sediment control, pavements, hardstands, construction exits and pipe bedding materials.
o Where possible, the oversize material from hard rock projects is also reused for vehicle entry shake downs and erosion control.
• Air quality monitoring;
• Dust screens and airlocks to be utilised with interior works;
• Controlling dust close to its source by installing sprays and sprinkler systems to prevent off-site migration; and
• Maintaining the site access to prevent dust generation and tracking off-site.
• No blasting will be performed as part of the proposed construction works program.”
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 9 of 16
3. DATA
Table 3 – Summary of results from the real time monitoring at location 001 – Adjacent the carpark.
DATE PERIOD
PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
31/07/2019 Wednesday 07:00 to 17:59 0.011 0 0.0002
01/08/2019 Thursday 18:00 to 06:59 0 0 0.0000
01/08/2019 Thursday 07:00 to 17:59 0 0 0.0000
02/08/2019 Friday 18:00 to 06:59 0 0 0.0000
02/08/2019 Friday 07:00 to 17:59 0.04 0 0.0034
03/08/2019 Saturday 18:00 to 06:59 0.022 0.002 0.0047
03/08/2019 Saturday 07:00 to 17:59 0.069 0.001 0.0052
04/08/2019 Sunday 18:00 to 06:59 0.027 0.005 0.0129
04/08/2019 Sunday 07:00 to 17:59 0.015 0.003 0.0066
05/08/2019 Monday 18:00 to 06:59 0.062 0.006 0.0116
05/08/2019 Monday 07:00 to 17:59 0.022 0.003 0.0064
06/08/2019 Tuesday 18:00 to 06:59 0.023 0.006 0.0145
06/08/2019 Tuesday 07:00 to 17:59 0.023 0.006 0.0095
07/08/2019 Wednesday 18:00 to 06:59 0.035 0.005 0.0130
07/08/2019 Wednesday 07:00 to 17:59 0.037 0.004 0.0103
08/08/2019 Thursday 18:00 to 06:59 0.062 0.007 0.0145
08/08/2019 Thursday 07:00 to 17:59 0.04 0.004 0.0085
09/08/2019 Friday 18:00 to 06:59 0.047 0.006 0.0158
09/08/2019 Friday 07:00 to 17:59 0.093 0.004 0.0142
10/08/2019 Saturday 18:00 to 06:59 0.022 0.002 0.0103
10/08/2019 Saturday 07:00 to 17:59 0.421 0.002 0.0125
11/08/2019 Sunday 18:00 to 06:59 0.886 0.005 0.0240
11/08/2019 Sunday 07:00 to 17:59 0.236 0.001 0.0079
12/08/2019 Monday 18:00 to 06:59 0.032 0.003 0.0098
12/08/2019 Monday 07:00 to 17:59 0.142 0.001 0.0133
13/08/2019 Tuesday 18:00 to 06:59 0.059 0.011 0.0389
13/08/2019 Tuesday 07:00 to 17:59 0.081 0.008 0.0320
14/08/2019 Wednesday 18:00 to 06:59 0.069 0.026 0.0405
14/08/2019 Wednesday 07:00 to 17:59 0.032 0.003 0.0129
15/08/2019 Thursday 18:00 to 06:59 0.027 0.009 0.0178
15/08/2019 Thursday 07:00 to 17:59 0.137 0.004 0.0095
16/08/2019 Friday 18:00 to 06:59 0.047 0.01 0.0164
16/08/2019 Friday 07:00 to 17:59 0.138 0.011 0.0158
17/08/2019 Saturday 18:00 to 06:59 0.038 0.011 0.0154
17/08/2019 Saturday 07:00 to 17:59 0.031 0.011 0.0161
18/08/2019 Sunday 18:00 to 06:59 0.029 0.009 0.0156
18/08/2019 Sunday 07:00 to 17:59 0.031 0.005 0.0096
19/08/2019 Monday 18:00 to 06:59 0.031 0.006 0.0122
19/08/2019 Monday 07:00 to 17:59 0.215 0.009 0.0206
20/08/2019 Tuesday 18:00 to 06:59 0.042 0.004 0.0119
20/08/2019 Tuesday 07:00 to 17:59 0.03 0.002 0.0059
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 10 of 16
Table 3 – Continued…
DATE PERIOD PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
21/08/2019 Wednesday 18:00 to 06:59 0.03 0.004 0.0092
21/08/2019 Wednesday 07:00 to 17:59 0.133 0.002 0.0091
22/08/2019 Thursday 18:00 to 06:59 0.029 0.003 0.0090
22/08/2019 Thursday 07:00 to 17:59 0.112 0.002 0.0099
23/08/2019 Friday 18:00 to 06:59 0.351 0.005 0.0279
23/08/2019 Friday 07:00 to 17:59 0.039 0.007 0.0128
24/08/2019 Saturday 18:00 to 06:59 0.372 0.009 0.1320
24/08/2019 Saturday 07:00 to 17:59 0.35 0 0.0527
25/08/2019 Sunday 18:00 to 06:59 0.022 0.006 0.0096
25/08/2019 Sunday 07:00 to 17:59 0.053 0.005 0.0103
26/08/2019 Monday 18:00 to 06:59 0.108 0.006 0.0165
26/08/2019 Monday 07:00 to 17:59 0.146 0.006 0.0335
27/08/2019 Tuesday 18:00 to 06:59 0.029 0.004 0.0075
27/08/2019 Tuesday 07:00 to 17:59 0.13 0.004 0.0105
28/08/2019 Wednesday 18:00 to 06:59 0.018 0.004 0.0071
28/08/2019 Wednesday 07:00 to 17:59 0.03 0.007 0.0105
29/08/2019 Thursday 18:00 to 06:59 0.019 0.008 0.0132
29/08/2019 Thursday 07:00 to 17:59 0.132 0.008 0.0170
30/08/2019 Friday 18:00 to 06:59 0.025 0 0.0169
30/08/2019 Friday 07:00 to 17:59 0.131 0.004 0.0094
31/08/2019 Saturday 18:00 to 06:59 0.025 0.004 0.0111
31/08/2019 Saturday 07:00 to 17:59 0.052 0.002 0.0056
Table 4 – Summary of results from the real time monitoring at location 002 – Central Monitor.
DATE PERIOD
PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
31/07/2019 Wednesday 07:00 to 17:59 0.016 0 0.0027
01/08/2019 Thursday 18:00 to 06:59 0.01 0.001 0.0019
01/08/2019 Thursday 07:00 to 17:59 0.023 0.001 0.0035
02/08/2019 Friday 18:00 to 06:59 0.008 0.002 0.0036
02/08/2019 Friday 07:00 to 17:59 0.015 0 0.0039
03/08/2019 Saturday 18:00 to 06:59 0.011 0.002 0.0047
03/08/2019 Saturday 07:00 to 17:59 0.068 0.002 0.0074
04/08/2019 Sunday 18:00 to 06:59 0.022 0.005 0.0122
04/08/2019 Sunday 07:00 to 17:59 0.032 0.003 0.0076
05/08/2019 Monday 18:00 to 06:59 0.016 0.004 0.0109
05/08/2019 Monday 07:00 to 17:59 0.016 0.003 0.0064
06/08/2019 Tuesday 18:00 to 06:59 0.034 0.006 0.0162
06/08/2019 Tuesday 07:00 to 17:59 0.109 0.005 0.0085
07/08/2019 Wednesday 18:00 to 06:59 0.036 0.007 0.0138
07/08/2019 Wednesday 07:00 to 17:59 0.066 -0.05 0.0064
08/08/2019 Thursday 18:00 to 06:59 0.022 0.007 0.0114
08/08/2019 Thursday 07:00 to 17:59 0.085 0.004 0.0084
09/08/2019 Friday 18:00 to 06:59 0.041 0.007 0.0157
09/08/2019 Friday 07:00 to 17:59 0.454 0.004 0.0193
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 11 of 16
Table 4. Continued…
DATE PERIOD
PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
10/08/2019 Saturday 18:00 to 06:59 0.043 0.003 0.0108
10/08/2019 Saturday 07:00 to 17:59 1.21 0.002 0.0337
11/08/2019 Sunday 18:00 to 06:59 0.731 0.005 0.0254
11/08/2019 Sunday 07:00 to 17:59 0.156 0.002 0.0076
12/08/2019 Monday 18:00 to 06:59 0.056 0.003 0.0099
12/08/2019 Monday 07:00 to 17:59 0.287 0.001 0.0172
13/08/2019 Tuesday 18:00 to 06:59 0.06 0.012 0.0399
13/08/2019 Tuesday 07:00 to 17:59 0.111 0.012 0.0331
14/08/2019 Wednesday 18:00 to 06:59 0.06 0.034 0.0414
14/08/2019 Wednesday 07:00 to 17:59 0.054 0.003 0.0134
15/08/2019 Thursday 18:00 to 06:59 0.028 0.008 0.0184
15/08/2019 Thursday 07:00 to 17:59 0.036 0.004 0.0095
16/08/2019 Friday 18:00 to 06:59 0.048 0.01 0.0164
16/08/2019 Friday 07:00 to 17:59 0.136 0.011 0.0161
17/08/2019 Saturday 18:00 to 06:59 0.025 0.011 0.0154
17/08/2019 Saturday 07:00 to 17:59 0.022 0.01 0.0161
18/08/2019 Sunday 18:00 to 06:59 0.039 0.01 0.0157
18/08/2019 Sunday 07:00 to 17:59 0.021 0.005 0.0101
19/08/2019 Monday 18:00 to 06:59 0.034 0.008 0.0124
19/08/2019 Monday 07:00 to 17:59 0.45 0.01 0.0239
20/08/2019 Tuesday 18:00 to 06:59 0.053 0.004 0.0123
20/08/2019 Tuesday 07:00 to 17:59 0.217 0.002 0.0083
21/08/2019 Wednesday 18:00 to 06:59 0.016 0.005 0.0093
21/08/2019 Wednesday 07:00 to 17:59 0.604 0.002 0.0120
22/08/2019 Thursday 18:00 to 06:59 0.027 0.003 0.0093
22/08/2019 Thursday 07:00 to 17:59 0.302 0.003 0.0169
23/08/2019 Friday 18:00 to 06:59 0.037 0.005 0.0179
23/08/2019 Friday 07:00 to 17:59 0.058 0.007 0.0132
24/08/2019 Saturday 18:00 to 06:59 0.4 0.01 0.1407
24/08/2019 Saturday 07:00 to 17:59 0.385 0.005 0.0528
25/08/2019 Sunday 18:00 to 06:59 0.024 0.006 0.0098
25/08/2019 Sunday 07:00 to 17:59 0.055 0.005 0.0113
26/08/2019 Monday 18:00 to 06:59 0.135 0.006 0.0178
26/08/2019 Monday 07:00 to 17:59 0.157 0.006 0.0350
27/08/2019 Tuesday 18:00 to 06:59 0.057 0.004 0.0165
27/08/2019 Tuesday 07:00 to 17:59 0.073 0.004 0.0166
28/08/2019 Wednesday 18:00 to 06:59 0.018 0.004 0.0081
28/08/2019 Wednesday 07:00 to 17:59 0.084 0.006 0.0120
29/08/2019 Thursday 18:00 to 06:59 0.024 0.009 0.0150
29/08/2019 Thursday 07:00 to 17:59 0.352 0.009 0.0181
30/08/2019 Friday 18:00 to 06:59 0.029 0 0.0195
30/08/2019 Friday 07:00 to 17:59 0.066 0.004 0.0095
31/08/2019 Saturday 18:00 to 06:59 0.029 0.004 0.0129
31/08/2019 Saturday 07:00 to 17:59 0.069 0.003 0.0065
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 12 of 16
Table 5 – Summary of results from the real time monitoring at location 003 – Eastern end of site.
DATE PERIOD
PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
02/08/2019 Friday 07:00 to 17:59 0.074 0.003 0.0066
03/08/2019 Saturday 18:00 to 06:59 0.022 0.005 0.0099
03/08/2019 Saturday 07:00 to 17:59 0.095 0.003 0.0073
04/08/2019 Sunday 18:00 to 06:59 0.039 0.004 0.0137
04/08/2019 Sunday 07:00 to 17:59 0.123 0.006 0.0115
05/08/2019 Monday 18:00 to 06:59 0.032 0.004 0.0116
05/08/2019 Monday 07:00 to 17:59 0.422 0.004 0.0159
06/08/2019 Tuesday 18:00 to 06:59 0.038 0.006 0.0098
06/08/2019 Tuesday 07:00 to 17:59 0.25 0.003 0.0147
07/08/2019 Wednesday 18:00 to 06:59 0.062 0.008 0.0154
07/08/2019 Wednesday 07:00 to 17:59 0.839 0.003 0.0230
08/08/2019 Thursday 18:00 to 06:59 0.025 0.002 0.0098
08/08/2019 Thursday 07:00 to 17:59 0.221 0.002 0.0095
09/08/2019 Friday 18:00 to 06:59 0.068 0.004 0.0200
09/08/2019 Friday 07:00 to 17:59 0.043 0.001 0.0051
10/08/2019 Saturday 18:00 to 06:59 0.124 0 0.0100
10/08/2019 Saturday 07:00 to 17:59 0.234 0.001 0.0194
11/08/2019 Sunday 18:00 to 06:59 0.074 0.012 0.0359
11/08/2019 Sunday 07:00 to 17:59 0.107 0.012 0.0338
12/08/2019 Monday 18:00 to 06:59 0.068 0.025 0.0399
12/08/2019 Monday 07:00 to 17:59 ND ND ND
13/08/2019 Tuesday 18:00 to 06:59 ND ND ND
13/08/2019 Tuesday 07:00 to 17:59 0.112 0.003 0.0127
14/08/2019 Wednesday 18:00 to 06:59 0.044 0.009 0.0147
14/08/2019 Wednesday 07:00 to 17:59 0.369 0.01 0.0233
15/08/2019 Thursday 18:00 to 06:59 0.026 0.01 0.0139
15/08/2019 Thursday 07:00 to 17:59 0.024 0.007 0.0147
16/08/2019 Friday 18:00 to 06:59 0.03 0.009 0.0145
16/08/2019 Friday 07:00 to 17:59 0.024 0.005 0.0095
17/08/2019 Saturday 18:00 to 06:59 0.046 0.007 0.0116
17/08/2019 Saturday 07:00 to 17:59 0.713 0.01 0.0358
18/08/2019 Sunday 18:00 to 06:59 0.054 0.004 0.0117
18/08/2019 Sunday 07:00 to 17:59 0.521 0 0.0099
19/08/2019 Monday 18:00 to 06:59 0.118 0.005 0.0087
19/08/2019 Monday 07:00 to 17:59 0.815 0.001 0.0166
20/08/2019 Tuesday 18:00 to 06:59 0.05 0.003 0.0086
20/08/2019 Tuesday 07:00 to 17:59 1.22 0.002 0.0231
21/08/2019 Wednesday 18:00 to 06:59 0.207 0.005 0.0173
21/08/2019 Wednesday 07:00 to 17:59 0.126 0.007 0.0136
22/08/2019 Thursday 18:00 to 06:59 0.351 0.009 0.1222
22/08/2019 Thursday 07:00 to 17:59 0.331 0.005 0.0463
23/08/2019 Friday 18:00 to 06:59 0.029 0.005 0.0088
23/08/2019 Friday 07:00 to 17:59 0.056 0.005 0.0107
24/08/2019 Saturday 18:00 to 06:59 0.142 0.005 0.0156
24/08/2019 Saturday 07:00 to 17:59 0.566 0.005 0.0370
25/08/2019 Sunday 18:00 to 06:59 0.05 0 0.0145
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 13 of 16
Table 5. Continued…
DATE PERIOD
PMTotal
MAXIMUM [mg/m3]
MINIMUM [mg/m3]
AVERAGE [mg/m3]
25/08/2019 Sunday 07:00 to 17:59 0.064 0.003 0.0148
26/08/2019 Monday 18:00 to 06:59 0.018 0.004 0.0071
26/08/2019 Monday 07:00 to 17:59 0.566 0.005 0.0370
27/08/2019 Tuesday 18:00 to 06:59 0.05 0 0.0145
27/08/2019 Tuesday 07:00 to 17:59 0.064 0.003 0.0148
28/08/2019 Wednesday 18:00 to 06:59 0.018 0.004 0.0071
28/08/2019 Wednesday 07:00 to 17:59 0.03 0.007 0.0109
29/08/2019 Thursday 18:00 to 06:59 0.019 0.008 0.0132
29/08/2019 Thursday 07:00 to 17:59 0.075 0.009 0.0144
30/08/2019 Friday 18:00 to 06:59 0.031 0 0.0202
30/08/2019 Friday 07:00 to 17:59 0.024 0 0.0081
31/08/2019 Saturday 18:00 to 06:59 0.031 0.003 0.0121
31/08/2019 Saturday 07:00 to 17:59 0.042 0.002 0.0068
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 14 of 16
Figure 2 - Summary of PMTotal from the real time monitoring at location 001 – Adjacent the carpark.
Figure 3 - Summary of PMTotal from the real time monitoring at location 002 – Central location.
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 15 of 16
Figure 4 - Summary of PMTotal from the real time monitoring at location 003 – Eastern end of site.
4. CONCLUSIONS
It should be noted that there was a peak in PMTotal dust on the 24th of August 2019, this is evident across all monitoring locations and did not exceed 0.5mg/m3. This peak is a subject of a minor dust storm in the region. As you can see in the figures above this peak is still below the SafeWork exposure standard of 5mg/m3.
5. RECOMMENDATIONS
Continuous monitoring of PMtotal for the duration of the project. If the action limit of 2.5mg/m3 is exceeded, cease works and review and implement controls listed in the Lendlease Air Quality Management Plan (2018).
Sydney Office: Melbourne Office: Newcastle Office: Brisbane Office: Contact Us:
ADE Consulting Group Pty Ltd
Unit 6 / 7 Millennium Court
Silverwater, NSW 2128
ADE Consulting Group Pty Ltd
Unit 4 / 95 Salmon Street
Port Melbourne, VIC 3207
ADE Consulting Group Pty Ltd
Unit 9 / 103 Glenwood Drive
Thornton, NSW 2322
ADE Consulting Group Pty Ltd
Unit 3 / 22 Palmer Place
Murarrie QLD 4172
Site: www.ADE.Group
Email:
Phone: 1300 976 922
Page 16 of 16
6. LIMITATIONS
This report has been prepared for use by the client who has commissioned the works in accordance with the project brief only and has been based on information provided by the client. The advice herein relates only to this project and all results, conclusions and recommendations made should be reviewed by a competent and experienced person with experience in environmental investigations, before being used for any other purpose. ADE Consulting Group Pty Ltd accepts no liability for use or interpretation by any person or body other than the client who commissioned the works. This report should not be reproduced or amended in any away without prior approval by the client or ADE and should not be relied upon by any other party, who should make their own independent enquiries. ADE’s professional opinions are based upon its professional judgment, experience, training and results from analytical data. In some cases, further testing and analysis may be required, thus producing different results and / or opinions. ADE has limited investigation to the scope agreed upon with its client. ADE has used a degree of care and skill ordinarily exercised in similar investigations by reputable member of the Environmental Industry within Australia. No other warranty, expressed or implied, is made or intended.