 Environmentai Controi - Poiiution Controi, Sewerage, Drainage & Environmentai Heaith  Agency: National Environmental Agency/Public Utilities Board 

Upload: ks-chong

Post on 14-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 1/16

 

Environmentai Controi - Poiiution

Controi, Sewerage, Drainage &

Environmentai Heaith Agency: National Environmental Agency/Public Utilities Board 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 2/16

  Environment Control 

2

lntroduction on agency 

The Central Building Plan Unit (CBPU) of  NEA provides one-stop service for  clearance of  Industrial  Allocation/Landuse applications, Development Control (DC) Plans and 

Building/Detailed Plans (BP/DP) for development proposals on environmental matter s consisting of Pollution Control,  Envir onmental  Health, Sewerage/Sanitar y  and Drainage Matters.  

To ensure that Singaporeans continue to enjoy a quality  living environment, environmental

considerations and factors are incorporated at the land use planning, development  control

and building control stages so as to minimise pollution impacts to the environment, mitigate

nuisance impacts to surrounding land use and safeguard environmental health. CBPU screens and assesses the hazards and pollution impacts  of the proposed industries at the Industrial Allocation (IA) stage to ensure that they do not pose unmanageable health and saf ety  hazards and pollution problems, and do not generate wastes that cannot be safely managed and properly disposed off. A proposed factory will be allowed only if it is sited  inan appropriate industrial estate, is compatible with the surrounding land use and can

comply with the pollution control r equir ements. The siting requirements for  industries and pollution contr ol r equir ements ar e specif ied in the Code of  Pr actice on Pollution Contr ol. 

The Water Reclamation (Network) Department, PUB or  PUB(WRN) plans, operates and

maintains the public sewerage network and also regulates the provision of sewerage system and sanitary facilities in Singapore. The public sewerage network collects used water from

domestic and non-domestic (e.g. industr ial, commer cial, etc) sour ces.

The used wate  s channe edth ough a comb nat on of g av tysewe s pump ng stat ons anddeep tunne sewe age system tothe wate  ec amat on p antswhe e t s t eated to acceptab ente nat ona  standa ds bef o ethe t eated ef f uent s e theec a med fo use o d sposed to

the sea�  

The Catchment and Waterways  Department, PUB or  PUB(C&W) plans, develops and manages our reservoirs and waterways for water supply and flood control, and integratesthem with the sur r ounding envir onment in a sustainable manner . 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 3/16

  Environment Control 

What are the reguiations invoived?

Poiiution Contr oi 

The Environmental Protection and Management  Act (EPMA) & Regulations  provide for and regulate the installation, operation and maintenance of the industr ial  plant and pollution

control facilities. It also regulates the limits for emission of air impur ities into atmosphere, discharge of  wastewater  into watercourse and the factory boundary noise. The EPM Arequires a Clearance Cer tificate  to be obtained before the commencement of any industr ialplant work and a Compliance Certif icate to be obtained after satisfactory completion of any

industr ial plant work. 

Envir onmentai Heaith 

The Environmental Public Health Act and Regulations provides for and regulates  the installation,  operation and maintenance of the solid waste management  facilities in developments.

Sewerage 

The Sewerage and Drainage Act (SDA) provides for and regulates the constr uction, maintenance and improvement of  sewerage system. It also regulates  the discharge of 

sewage and tr ade effluent and f or matters connected therewith. The Sewerage and Drainage Act requires: 

a)  Clearance Certificate to  be  obtained before the commencement  of  any  sewerage and sanitary works

b)  Compliance Certificate to be obtained upon satisfactory completion of any sewerage and sanitary works

c)  Approval to be obtained before carrying out any building/str uctur e  works, piling works or temporary structure works over, across or adjacent to any sewer or 

sewerage system d)   Appr oval  to  be  obtained bef or e  the  dischar ge  of   any  tr ade   eff luent into  public 

sewers 

Drainage 

The construction, maintenance,  improvement and safeguard of land drainage systems are regulated under Sewerage and Drainage Act (SDA) and the Sewerage and Drainage (SurfaceWater Drainage). 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 4/16

  Environment Control 

4

The Sewerage and Drainage Act requires: 

a) Clearance Certif icate to be obtained before the commencement of any storm water  

drainage works, or to er ect or place any str uctur es or object  in, above or across any dr ain or  drainage reserve

b) Compliance  Certificate  to be obtained upon satisfactory completion of any storm water drainage works, erection or placement of any str uctures or ob ject  in, above or  across any drain or  dr ainage reserve

c)   Appr oval to be obtained bef or e carr ying out any tempor ar y str uctur e wor ks/ser vicesover, across or ad jacent to any dr ain or storm water drainage system 

d)   Appr oval to be obtained bef ore constr uction of  any wor ks f or taking or intercepting water f r om any place or sea, within the territorial limits of Singapore 

Who are the parties invoived?a) Developer appoints  a process consultant or Qualified Persons (QP- Registered

 Ar chitect or Professional Engineer) to prepare and submit the necessary applications to obtain Industrial  Allocation clearance, Development  Contr ol  clearance, Building Plan clearance certificates,  Temporary Occupation  Permit  clearance and Certificate for Statutory Completion clearance (Compliance Certificate)

b)  QP shall also supervise, inspect the building works and cer tify completion of buildingworks in accor dance to the environmental codes 

Requirements of submission Land Use and Deveiopment Pianning Stage

Industrial developments are generally incompatible with residential premises. Even with

pollution control f acilities to comply with emission standards, residual or f ugitive emissions of smell, dust and noise cannot be totally eliminated from industries.  Although these emissions are well within safe levels, they would cause nuisance problems if  industries are built too close to residential premises. 

To minimise nuisance from industries, adequate buffers are provided between  r esidential 

premises and industries. To guide land use planning, industries are classified in four  categories namely clean, light, general and special. Industr ial  estates  close to residential areas are designated for clean or light industr ies whilst those located sufficiently far away

from r esidential  areas such as Tuas and Jur ong Island are designated  for special industr ies which have the potential to cause serious pollution or  use large quantities of  hazardous chemicals. To minimise pollution of water catchments, limited land within water catchments is zoned f or  clean or light industr ial use that do not use large quantities of chemicals.

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 5/16

  Environment Control 

S

Land zoned for  industrial use will be allocated  to the industrial land developing agencies such as JTC Cor por ation  (JTC) and Housing Development Board (HDB) or tendered out for 

development by private sectors. JTC, HDB and private developers consult CBPU on the 

allocation of  industr ial pr emises.

 Any new development  or change in land use will result in the discharge or increase in the discharge of used water, which requires an adequate public sewerage system to convey to the water  reclamation plants f or treatment and disposal.

It is critical that developing agencies such as EDB, URA & JTC etc. inform/consult PUB, Water  Reclamation (Network) Department (WRN) at the earliest moment possible of  developments that are likely to take place to enable PUB (WRN) to assess the availability and adequacy of the public sewerage system to support the proposed developments. This isbecause some sewerage system upgrading works, if  necessary to support the pr oposed 

deve lopments, may take S years or more to implement. 

The following cr itical inf ormation on used water dischar ge from the pr oposed development/

land use shall be submitted to PUB (WRN): 

a) the timeframe for completion of  development upon making of  Final Investment Decision (FID) 

b)  the  timeline  f or  dischar ge  to public  sewer   and  the  estimated quantity  &  dischar ge r ates (average and peak) of used water dischar ge 

(Note: peak to average r atio should be kept to about 3} 

Singapore is a tropical country with annual rainfall of around 2400mm. Rain is f elt throughout the year but tends to be heavier  from November  to January.  Any new land

development  will result in the increase in surface storm r unoff s.  It is essential that an effective and adequate  drainage system be put in place to prevent flood and public health

risks.

Before proceeding with the design of a proposed development, developing agencies or QPshall apply to CBPU for the drainage information related to the development site. Drainage Interpretation Plan (DIP) indicates drainage reserves or land safeguarded for future drainage schemes and the Minimum Platf or m  Level (MPL) for effectual surface water drainage. The 

DIP may not show det

ails of the common drain at the development. Upon receipt of DIP,QP/deve loping agency shall conduct site surveys to verify the alignment and invert levels of  the dr ainage reserves, outlet drains and common dr ains (if any). 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 6/16

  Environment Control 

lndustriai Aiiocation (lA) 

 At this early stage of industr ial development, CBPU screens industries to ensure compliance 

with the f ollowing: 

a)  Sited in designated industr ial estates and compatible with the sur r ounding land use b) Adopt clean technology to minimise the use of  hazardous chemicals and the 

generation of wastes. They will also adopt processes which facilitate the recycling, r euse and recovery of wastes

c)  Do not pose unmanageable health and saf ety hazar ds and pollution pr oblemsd)  Install pollution contr ol equipment to comply with discharge or emission standar ds e)  Gener ate wastes which can be saf ely managed and proper ly disposed of  

The siting  requirements f or  industr ies and  pollution  contr ol  r equirements  are specified  in 

the Code of  Practice on Pollution Contr ol.

To facilitate evaluation,  pr ospective industr ialists shall complete the IA application form available online in CBPU s Industr ial   Allocation System (IAS) at website address http://ias.nea.gov.sg/Public Applicant/Homepage.aspx ,  and provide all necessary information on the company's activities, raw materials used, details of fuel burning equipment (if any), and types of waste generated (air emission, trade effluent & toxic waste) for CBPU's evaluation and approval. The developer shall engage a consultant to conduct and

prepare Quantitative Risk  Assessment/Pollution Control  Study  report for the proposed

industr ial deve lopment, if  required by CBPU.

Sewerage and Drainage lnf ormation

Before pr oceeding with the design of a proposed development, QP shall apply to CBPU f or  the following sewerage and drainage information related to the deve lopment site: 

a) Sewerage  Interpretation Plan (SIP) indicates the location and alignments of public

sewers or pumping mains in the vicinity of the development. The SIP may not show details of the existing sewer  connections at the development. QP should ascertain/verify details of the existing sewer connection on site 

b) Drainage Interpretation Plan (DIP) indicates drainage reserves or land safeguarded 

for future drainage schemes. The DIP may not show details of the common drain atthe development. QP should ascertain/verify details of the common drains on site 

c)  The Minimum Platform Level (MPL) f or eff ectual sur face water  drainage 

For  additions and alterations to existing developments which do not involve an increase in the existing building cover age area, QP need not apply for  SIP & DIP. 

QP can apply for  DIP/SIP  on-line (Internet) and make payment  online using cash card or  credit card. The fee charged is $20 for DIP and $20 per standard plan not exceeding A sizefor SIP.

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 7/16

  Environment Control 

QP shall f ur nish the f ollowing inf or mation for  the SIP/DIP application: 

a) site  information such as Mukim/TS No. and Lot No. and/or   road address; a site plan 

showing the location of  site if it is reclaimed land or  has recently been subdivided/amalgamated 

b)  an outline of the proposed development 

Upon r eceipt of SIP & DIP, QP shall conduct site surveys to verify the alignments and invert levels of the public sewer s/pumping  mains/sewer  connections and drainage reserves/common dr ains. 

QP shall also check  if the development site is ad jacent to Mass Rapid Tr ansit System (MRT) above gr ound tr acks and existing f actories.

For infrastructure pr ojects  (e.g. MRT/road tunnels, roadworks, MRT/road viaducts, etc.), QP shall submit the deve lopment plans directly  to PUB(Water Reclamation Network Dept) and PUB(Catchment & Waterways Dept)  for  clearance. DC/BP/TOP/CSC clearances from CBPU are not required. However, for MRT stations, depots, ventilation buildings/shafts, etc which

requires building plan approval from BCA, QP shall obtain clearance from CBPU at the DC/BP/TOP/CSC stage.

Deveiopment Contr oi 

Upon obtaining the IA clearance and planning clearance from URA, the developer  shall 

appoint a QP to design and submit DC plan to CBPU for clearance. At DC stage, CBPU checkslayout of  developments f or  compliance with the following r equir ements: 

a)   Adequate setbacks ar e pr ovided between the MRT  above gr ound tr acks, f actor ies or  public sewerage system and residential buildings 

b)  Buildings/str uctur es do  not encr oach  into  public sewer s,  pumping  mains, DTSS

tunnels, dr ainage reserves or common dr ainc)  Pr oposed  diversion of public sewer   affected by  development pr oposal  or 

pr ovision/extension of public sewer to serve the deve lopment d)  Platf or m  leve l  of   the  deve lopment  is r aised  above  the  minimum  platf or m  leve l  f or  

effectual land drainage

e)  Land is set aside f or 

the pr ovision of  holding 

tanks

/pump sump in areas where publicsewer is not available 

f) Minimum  crest level  for  the  underground  linkage  to  MRT  station/underground linkage to deve lopment having underground linkage to the MRT  station

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 8/16

  Environment Control 

For  pr oposals involving str uctures  overcrossing waterbodies with Drainage Reserve at least 7.Sm wide, QP shall seek clear ance f rom the Secretary, Waterbodies Design Panel c/o UR A. 

CBPU will re ject DC plans if QP has not applied f or SIP & DIP f or the development site.

QP consults CBPU on the pr epar ation of  layout plan of  the pr oposed deve lopment and seeks waivers if required upf r ont. 

QP submits the DC plans to CBPU. CBPU will check the DC plans for  compliance with environmental requirements mentioned above and clear the DC plans when the requirements are met. 

For infrastructure projects (e.g. MRT/r oad tunnels, roadworks, MRT/road  viaducts, etc.),

QPs shall apply to CBPU for SIP/DIP for information on sewerage and drainage infrastructure. 

Thereaf ter,  the QP shall submit their proposal dir ectly to PUB(Water Reclamation NetworkDept) and PUB(Catchment & Waterways Dept) for  clearance. DC/BP/TOP/CSC clearancesfrom CBPU is not required for  infrastr ucture  projects. However, for  MRT stations, depots,ventilation buildings/shafts,  etc. which requires building plan approval from BCA, QP shall

obtain clearance f rom CBPU at the DC/BP/TOP/CSC stage.

Buiiding Pian

 At building plan stage, QP shall prepare building plans (BPs) and detailed plans (DPs) of  buildings works as well as related building services such as solid waste, sewerage/sanitary, 

surface water drainage and pollution control systems to comply with environmental requirements stipulated  in the codes of pr actices and relevant regulations. CBPU will reject

building plans and detailed plans if  QP has not applied for SIP & DIP nor obtained the DC Clearance f or the deve lopment proposal.

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 9/16

  Environment Control 

For  a typical deve lopment, the QP shall prepare and submit to CBPU the following BPs and

DPs:

Type of Plans  Works Requirements 

BP on Env ronmentaHea th (EH) 

a Refuse storage and co ect onsystem ( nc ud ng for recyc ab es atStrata-t t ed propert es w th  res dent a un ts) 

b Pub c to et c Food Reta Out etd Food Factory e Market f. Sw mm ng Poo 

BP on EH s re ated to bu d ng des gn andsha be subm tted and reg stered w th CBPUbefore app y ng to BCA for  BP approva

BP on Po ut on Contro a Po ut on Contro Equ pmentb Wastewater treatment p ant

c Fue Burn ng Equ pment d Storage of o s and chem ca se nc nerators 

BP on PC s re ated to bu d ng des gn andsha be subm tted and c eared w th CBPU

before app y ng to BCA for  BP approva

DP on Sewerage/San tary Works 

DPs on Surface Water  Dra nage 

a nterna san tary p umb ng anddra nage system 

b M&E equ pment for sewerage nsta at ons

c M nor sewer  d On-s te sewerage system (ho d ng

tanks, pump sewerage system) f pub c sewer s not ava ab e 

e nterna surface water dra nagesystem 

f Pumped dra nage system for basements 

g Cu verts h Road S de Dra ns 

Reta n ng wa n the v c n ty of pub c dra ns 

These are deta ed p ans on san tary/sewerage serv ces wh ch do not affectbu d ng des gn and w be reg stered separate y w th CBPU ndependent of BCA s BP approva process 

These are deta ed p ans on surface water  dra nage systems wh ch do not affect bu d ng

des gn and w be reg stered separate y w thCBPU ndependent of BCA s BP approvaprocess QPs sha pre-consu t the Catchment & Waterways Department on the s z ng of  theentrance cu vert/roads de dra ns before subm tt ng the deta ed p ans to CBPU for reg strat on 

Submission pr ocedure for BPs and DPs as f ollows:

a)  QP  consults CBPU  on  the  pr epar ation  of   plans  and  seeks  waiver s  in  wr iting  f or  deviations, if required upfront before submitting the plans to CBPU f or reg istr ation 

b) QP submits plans with standard application  forms to CBPU via the CORENET e-Submission sysytem. These standard application f orms contain the latestendorsements on compliance with codes on environmental health, pollution control, sewerage and drainage matters 

c) CBPU will register  the BP on Environmental Health and DPs on Sewerage/SanitaryWorks and Drainage Works without checking based on QP's certification of  compliance  with the r espective envir onmental codes of  pr actices

For industrial deve lopments, which may have health & safety hazards and pollution impact,

CBPU will continue to check and clear  the BP on pollution contr ol. 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 10/16

  Environment Control 

40

Buiiding Constr uction Stage

Following  the issuance of Clearance Certificate  for sewerage/sanitar y  and drainage works,

QP shall submit the following via the CORENET e-Submission System  directly to PUB atvar ious stages of  the constr uction wor ks: 

PUB (Water Reclamation Depar tment [WRN])

a)  QP/Form A - to notify PUB (WRN) before commencement of the works

b) QP/For m B - to obtain the PUB (WRN)'s approval before allowing the workmen to enter the public sewer/manhole or other confined spaces to carry out any works or 

inspection

c)  QP/Form  C  -  to  cer tify completion  and  inspection  of  the completedsewerage/sanitary works and to arrange for spot checks by PUB(WRN) 

(The guidelines and pr ocedur es on f or m submission ar e published in the PUB's website at http://www.pub.gov.sg/gener al/Pages/Sewer ageandSanitar y.aspx) 

PUB(Catchment & Waterways Department [C&W]) 

d) The proposed erosion and sediment  control measures shall be submitted  by a Qualified Erosion Contr ol Professional (QECP) to PUB(C&W) before commencement

of ear thwor ks.  The ob jective  of the earth control measures (ECM) is to control the discharge of  silt into the watercourse due to r ainwater. Other wastewater  (slurry

water, bentonite etc) due to construction activities  such as piling, tunneling work should be separately  treated.  Effective erosion and sediment control measures shall

be provided by the developer/owner and the QP shall advise his developer /owner to pr ovide such  effective measures  and  f acilities with inputs  f rom  Qualified  Er osion

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 11/16

  Environment Control 

Contr ol Professional (including site management system and perimeter cut-off  drain, silt traps,  storage ponds, treatment plants, etc) to ensure clean discharge that

complies with the statutory requirement at all times during the construction period. 

 All affected watercourses shall be desilted and cleared until completion of the constr uction  works. QP can refer to PUB's website at address www.pub.gov.sg/ECM for more information on ECM 

e)  Cer tif icate of  Inspection for  Drainage  Wor ks to certify  completion  of   the dr ainage works and to arrange spot checks by PUB(C&W)

PUB (WRN) and PUB(C&W) will issue the Sewerage/Dr ainage Clearance for the completed

development when all requirements  pertaining to sewerage, sanitar y,  mechanical and

electr ical works for sewerage installations or drainage works have been complied with and cer tif ied by the QP to be in or der . 

Upon  obtaining PUB's Sewer age  and/or   Dr ainage  Clear ance  f or   the  completed  building works, the QP shall apply to CBPU for issuance of the TOP/CSC clear ance. 

TOP Ciear ance

The Qualified Person shall be fully responsible for the supervision and construction of the

building works in accordance to the approved building plans on pollution control and sewerage/sanitary works. Upon completion of the building works, QP shall apply to CBPUfor TOP clearance after he has inspected and conf irmed the f ollowing: 

a) The sanitar y/sewerage  works have been completed in accordance with the registered DPs on Sewerage and the Certificate of  Completion  and Inspection f or  Sanitary/Sewerage  Works has been submitted to PUB (Water Reclamation Depar tment) 

b)  The industrial plant  and related  pollution  contr ol  wor ks  have been   completed  in accordance with the BPs on PC

Upon r eceipt of the Certificate of Completion, PUB(WRN) may carry out spot checks on the

completed sanitary/sewerage works and inform CBPU if the sanitary/sewerage works have been constr ucted in accor dance with the r egister ed DPs. 

CBPU will also arrange with QP

to carry ou

t inspec

tion of  the completed industr ial plant and its related pollution control works. 

CBPU  will issue  the  TOP  clearance  af ter   the  pollution contr ol  measur es/equipment are in

order and PUB(WRN) has issued its clearance f or the sewerage/sanitary works. 

 Applications f or  the licence to discharge trade eff luent into watercourse/operate scheduledpr emises may be submitted af ter  building plan appr oval. 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 12/16

  Environment Control 

42

CSC Ciear ance

The Qualified Person shall be fully responsible for the supervision and construction of the

building works in accordance to the approved building plans on pollution control,environmental  health sewerage/sanitary  and drainage. QP shall apply to CBPU for the

Compliance  Certificate (CSC clearance) for the completed building works after  QP has inspected and confirmed the f ollowing:

a) Outstanding  sanitary/sewerage works, if any, have been completed in accordance with the registered DPs on Sewerage. The Certificate of Completion  and Inspection

for Sanitary/Sewerage  Works has been submitted  to PUB (WRN). This certificate is r equir ed only if the QP has not applied for TOP f or  the development 

b)  Outstanding pollution contr ol  works (f or  an  industr ial development),  if   any,  havebeen completed in accor dance with the BP on PC 

c) Building works related to environmental health have been completed in accordance with the registered BP on EH.  A Certificate of  Completion and Inspection of the related building works has been submitted to CBPU; and Surface water drainage works have been completed  in accordance with the registered DPs on Sur f ace Water  Drainage. The required Certificates on Inspection and Completion have been

submitted to PUB(C&W) 

CBPU, PUB(WRN)  and  PUB(C&W) may  arrange with  QP to  carry out  spot checks  on the completed building works. 

CBPU  will  issue  the  CSC clear ance  af ter   the  envir onmental  health,  pollution contr ol, 

sanitary/sewerage and sur face water  drainage works are in order. 

Licence

Once the TOP clearance/Compliance  Certificate has been obtained, the factory owner can occupy and start the production activities. The f actory owner shall ensure that all licences or  permits,  such as poison permit/licence, schedule premises, discharge of treated trade eff luent and etc are obtained pr ior to commissioning of  f actor y. 

Procedures 

Pr e-submission consuitation 

CBPU, PUB(WRN) and PUB(C&W) conduct walk-in consultation sessions every Monday to Friday morning from 9 am - 2 noon for QPs to consult on the preparation of plans as well asto seek clarification or waiver on the requirements specified in the envir onmental codes of  pr actices as well as on the protection and pr evention  of  damage to the public sewer age system. QPs may also pr e-consult  the PUB(C&W) on the sizing of the entr ance  culvert or  roadside drains before submitting the detailed plans to CBPU for registration. QPs shall bring along the sewerage interpretation plan or  drainage interpretation plan (SIP/DIP)pur chased f rom CBPU, the  pr oposed  development  plan,  reg istered sur vey plan,  etc 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 13/16

  Environment Control 

necessary  to  f acilitate the consu ltation session. There is  no need f or  QPs  to  make  prior  appointment to attend the consultation sessions.

 Alter natively, QPs could also make written consultations  to CBPU, PUB(WRN) or PUB(C&W) to seek advice or clarifications  on submission procedure or envir onmental requirements. The wr itten consultation shall be for warded thr ough the CORENET e-Submission System. 

Fiowchart & how to make the submission 

Star t 

Consultation on Land Use and Development Planning by Agencies

Industrial Allocation Application by Developer  (App cat on for approva of ocat on and type of ndustr a deve opment) 

 Application of Sewerage and Drainage Interpretation Plan (QPs app y for sewerage and dra nage nformat on re ated to the r deve opment s te) 

Submission of Development Control (DC) Plan,(QPs subm t DC p ans of  the r  deve opment for  c earance)

Submission of Building/Detailed Plans (BP/DP) on Pollution Control, Environmental Health,Sewerage/Sanitary and Drainage Wor ks 

(QPs prepare BPs/DPs and subm t the p ans w th standard app cat on forms n comp ance w th NEA s requ rements) 

Submission to PUB for commencement/completion of Sewerage/Sanitary works/Drainage works

 Application for TOP clearance and licence to discharge trade effluent into watercourse/operate scheduledpr emises 

(QPs app y for TOP once the san tary/ sewerage works and/or bu d ng works re ated po ut on contro s are comp eted QPs cana so app y for  cence to d scharge trade eff uent nto watercourse/operate schedu ed prem ses pr or to TOP app cat on 

 Application for CSC clearance (QPs app y for CSC once the san tary/ sewerage works, dra nage works and bu d ng works re ated to po ut on contro and

env ronmenta hea th matters are comp eted n acco rdance w th the approved p ans 

End  

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 14/16

  Environment Control 

44

Fees invoived

Currently,  CBPU

/PUB does  no

t  charge  any pr ocessing  f ees f or  

the  processing  of  development plan applications

 Authority's r esponse

The processing time will vary according to the complexity of the industr ial development. In

general, the processing time upon receipt of complete and accurate submission of all required inf ormation and documents are as f ollows:

 Applications Response time

Process ng of ndustr a A ocat on App cat on 7 work ng days

Process ng of Deve opment Contro P ans 7 work ng days

Process ng of Bu d ng P an on Po ut on Contro 7 work ng days 

Process ng of Bu d ng P an on Env ronmenta Hea th 1 work ng days (p an reg strat on w thout check ng based on QP cert f cat on) 

Process ng of Deta ed P ans on Sewerage/San tary and Dra nage Works 

Process ng of App cat on for Temporary Occupat on Perm t/Cert f cate of Statutory Comp ance 

1 work ng days (p an reg strat on w thout check ngbased on QP cert f cat on) 

7 work ng days (from date of c earance granted for sewerage (TOP), po ut on contro (TOP) or  dra nage(CSC) works, wh chever s ater) 

Process ng of Earth Contro Measures 7 work ng days 

Process ng of M&E P ans for Sewerage/San tary works 7 work ng days 

Process ng of QP s Forms and App cat on for Sewerage C earance upon comp et on of sewerage/san tary works 

7 work ng days 

Factory owner/operator has to ensure that all necessary licences/permits mentioned below

(where applicable) have been obtained prior to commissioning of factory. Information on the licences/permits can be obtained from the website at: http://app2.nea.gov.sg/licenses.aspx 

Necessary Per mits/Licences 

Licence to use scheduled premisesLicence to discharge trade effluent into Watercourse

 Approval for tr anspor t of toxic industrial waste Licence for toxic industr ial waste collector  Hazardous substances licence

Hazardous substances permit Ozone depleting substance licence Written permission to dispose asbestos waste at Semakau Landfill Written permission to dispose toxic industr ial waste at Semakau Landf ill Licence to set up and oper ate a waste disposal f acility 

7/27/2019 environmental control BCA.docx

http://slidepdf.com/reader/full/environmental-control-bcadocx 15/16

  Environment Control 

4S

Codes & standards 

The Code of Practice on Pollu

tion Contr ol specifies 

the pollu

tion contr ol requiremen

ts 

t

o be complied with for  industr ial plant wor ks. 

The Code of  Pr actice on Envir onmental Health (COPEH) pr ovides the guidelines to addr ess environmental health concerns in the design of buildings.

The  Code  of   Pr actice  on Sewer age  and Sanitar y  Wor ks  pr ovides the guidelines to  addr ess sewer age and sanitar y concer ns in the design of buildings. 

The Code of  Pr actice on Sur f ace Water  Dr ainage pr ovides the guidelines to addr ess sur f ace water  dr ainage concer ns in the design of  buildings.

The Code of Practice on Pollution Contr ol and  the Code of Practice on Environmental Health are available at CBPU's website at:http://app2.nea.gov.sg/env_ plan_ cbpu.aspx The Sewer age and Drainage Act (SD A), Code of Pr actice on Sewer age and Sanitar y Works, and Code of Practice on Surface Water Drainage are available at PUB's website at: http://www.pub.gov.sg/gener al/Pages/def ault.aspx  

Contacts

Central Building Plan Unit 40 Scotts Road # 2-00 Envir onment Building Singapore 2282 

NEA (CPBU)  Lee A k Beng  ee_a k_beng@nea gov sg  67319104  Landuse, ndustr a 

 A ocat on Mart n Ho  mart nn_ho@nea gov sg  67319648 

Chow Chee K ong 

chow_chee_k ong@nea gov sg  67319919 

Sa d Mahmat  sa d _mahamt@nea gov sg  67319432 

Joseph Foo   joseph_foo@nea gov sg  67319681  Bu d ng P an, TOP,CSC matters Long Han 

Boon ong_han_boon@nea gov sg  67319624 

Water Reclamation (Network) Department, PUB40 Scotts Road # 4-00 Envir onment Building Singapore 2282