environment restoration plan changes:layout 1 · environment plan” as one of the highlights of...
TRANSCRIPT
APRILI07ENVIRONMENT RESTORATION
PLAN
“ E n v i ro n m e n t a l a c t i o n s f o r o u r f u t u re ”
CONTENTSEXECUTIVE SUMMARY 2
1 INTRODUCTION 3
2 LIVERPOOL DIRECTIONS 4
3 COUNCIL’S RESPONSIBILITY TO THE ENVIRONMENT 6
3.1 Council’s legal obligations 7
3.2 Council’s Corporate Plan 7
3.3 Other Council environmental plans and stratergies 7
4 LIVERPOOL’S NATURAL ENVIRONMENT 8
4.1 Environment defined 9
4.2 Current state of Liverpool’s natural environment 9
4.3 Our catchment area 9
4.4 Future pressures on Liverpool’s natural environment 10
4.5 Liverpool’s flora and fauna 10
5 THE ENVIRONMENT PLAN (2002-2007) 11
5.1 Environment Plan deliverables 12
5.2 Achievements of the Environment Plan 12
5.3 The site selection process 13
5.4 Environment Plan project sites 13
5.5 Environment Plan sites - before and after photos 14
5.6 Other Environment Plan work sites 18
5.7 Awards 19
5.8 Environment Plan review 19
5.9 The conclusion of the Environment Plan 19
6 THE ENVIRONMENT RESTORATION PLAN 20
6.1 What is the Environment Restoration Plan? 21
6.2 Why continue the Environment Plan? 21
6.2.1 Community involvement 21
6.3 How is it funded? 21
6.4 Consultation to develop the Environment Restoration Plan 21
6.4.1 The Environment Restoration Plan engagement strategy 21
6.4.2 Stage 1 22
6.4.3 Stage 2 22
6.5 Key deliverables of the Environment Restoration Plan 23
6.6 What will it deliver? 23
7 MONITORING, REPORTING, REVIEW AND MAINTENANCE 25
7.1 Monitoring 26
7.2 Reporting 27
7.3 Review 27
7.4 Maintenance 27
8 WHERE TO FROM HERE? 28
GLOSSARY 29
APPENDIX 1 30
1.1 Environment Advisory Panel 30
1.2 Environment Group Sub-committee 30
1.3 Environment groups 31
CONTENTS
2
EXECUTIVESUMMARYLiverpool forms part of both the Georges River
and Hawkesbury-Nepean River catchments and
has a unique natural environment that includes a
number of endangered ecological communities,
such as Cumberland Plain Woodland.
With the added pressures of large scale
development over the next three decades,
Liverpool Council needs to be even more proactive
in striving to maintain and conserve the natural
environment of Liverpool. As a result, Council
would like to continue the environment
restoration efforts of the Environment Plan in a
new environment levy program called the
Environment Restoration Plan.
Council’s current environment levy program, the
Environment Plan, was approved by the Minister
for Local Government for a five-year period
concluding in June 2007. The Environment Plan
has delivered a number of successful
environmental programs, including
environmental restoration projects,
environmental education and support for
community environmental activities. To ensure
these programs are continued and new initiatives
are implemented, Council is developing the
Environment Restoration Plan.
The Environment Restoration Plan is an outline of
the environmental projects, programs and plan of
on-ground works to be funded by the
environment levy. These projects, programs and
on-ground works aim to improve the natural
environment of Liverpool for the long-term
benefit of Liverpool and its community.
The Environment Restoration Plan is focused on
restoring Liverpool’s natural environment. For the
purposes of the Environment Restoration Plan the
natural environment will include ecosystems (and
their constituent parts) and natural resources.
Broadly this will include creeks, rivers and
waterways, riparian areas and other bushland
reserves and areas.
The program delivered by the Environment
Restoration Plan will depend on the amount of
the levy approved by Council and the Department
of Local Government. The broad projects included
in the Environment Restoration Plan to be funded
by the levy are:
# Bushland restoration and revegetation
# Environmental education
# Support for the Environment Advisory Panel,Environment Group Sub-committee andenvironment groups
# Community environmental activities andevents, including tree planting days, treegiveaways and Bloomin’
# Employment of staff to deliver the EnvironmentRestoration Plan.
It is proposed that the final Environment
Restoration Plan will be endorsed by Council in
April 2007. In May 2007, Council will apply to the
Minister for Local Government for the
continuation of the environment levy. If
approved, the Environment Restoration Plan will
commence from 1 July 2007.
3The Environment Restoration Plan
In 2006 the Department of Environment and
Conservation NSW completed a survey titled ‘Who
cares about the Environment in 2006?’. Results from
this survey showed that people value the environment
as part of their lives - 93% say it is important or very
important. Environment ranked third after family
and friends.
Research conducted by Liverpool Council, including
Liverpool Directions, Social Research and Focus groups,
has also shown a strong support from our community
to protect the environment. We are all concerned
about the state of our environment and the
Environment Restoration Plan shows Liverpool Council’s
commitment and support to protect and maintain our
local natural environment.
In 2002 the Department of Local Government approved
a five-year environment levy for the Liverpool Local
Government Area (LGA). The environment levy program,
known as the Environment Plan, commenced in July
2002 and will conclude in June 2007. As a result of the
many successes of the Environment Plan, Council is
proposing to continue the environment levy program.
This new levy, The Environment Restoration Plan?
Environmental actions for our future, aims to continue
the programs implemented as part of the current
environment plan and to develop new environmental
initiatives to be delivered in the Liverpool LGA.
It is proposed that the Environment Restoration Plan
will commence in July 2007 and run for a period
approved by the Department of Local Government. The
Environment Restoration Plan will provide a framework
for the delivery of key environmental projects for the
long-term benefit of Liverpool and its community.
This document will outline:
# Liverpool’s natural environment
# Council’s responsibility to the natural environment
# Council’s current environment levy program -
the Environment Plan (2002-2007)
# The continuation of the Environment Plan program.
Introduction
LiverpoolDirections
4
5The Environment Restoration Plan
Liverpool Directions was developed as a result of Council’s
Creating Our Future Together Partnership Project involving
more than 1,700 Liverpool residents, workers, students and
visitors. The Liverpool Directions document incorporates the
views and opinions of the local community on what they
want for Liverpool for the future.
A major component identified through the development of
Liverpool Directions is the natural environment of Liverpool.
Liverpool Directions includes two sections with an
environment focus, including:
# The land between two rivers where city and
country meet
# Sustainability.
These two sections outline the main focus of what the
community would like to see for Liverpool’s natural
environment in the future. The information below is taken
from Liverpool Directions and shows the actions the
Liverpool community would like taken to preserve its
natural environment.
LIVERPOOL DIRECTIONS SECTION:
The land between two rivers where city and
country meet
# The city’s natural areas, in particular, waterways such as
the Georges River, Nepean River and the Cabramatta
Creek system, will be cleaner, healthier and more widely
and responsibly enjoyed as places for recreation
# As significant urban development takes place, some of
the rural character of Liverpool will be maintained
# Agricultural land, open space and protected bushland will
be part of an inviting and attractive mix of land uses.
Role of Council
Natural systems do not fit within administrative boundaries,
therefore Council has a role to maintain working
relationships with government agencies and other parties in
the management of natural areas and waterways. Council
has a role to improve the appearance and health of
waterways through rehabilitation projects, including
partnerships with environmental groups and volunteers. As
part of its planning role, Council also influences the
protection of rural land uses.
Council’s Corporate Plan strategies are to:
# Review planning controls so they improve delivery of the
community’s aspirations, including (where appropriate)
the retention of rural character through precinct planning
and urban design policy
# Undertake bushland restoration and rehabilitation in
partnership with other agencies and the community
# Promote awareness and appreciation of natural assets
such as bushland and waterways
# Seek funding from government agencies for bushland
acquisition, restoration and rehabilitation projects
# Protect the environment through enforcement and
education programs
# Promote the responsible use of open space through
education programs
# Undertake, with the involvement of the community,
on-ground environment works at selected sites in
accordance with the Environment Plan.
LIVERPOOL DIRECTIONS SECTION:
Sustainability
# Community, business and governments will deliver
specific programs to make Liverpool more sustainable
# Reduced waste, pollution and water usage will be the
major noticeable results of future actions for sustainability
# There will be local or easily accessible education and
training for all ages, supported by well-equipped and
convenient libraries.
Role of Council
As part of its environmental leadership role, Council has
developed programs to improve the sustainability of its own
operations and services. It also promotes sustainable
development through its policymaking, education and
regulatory roles. Council has a role to establish and maintain
sound working relationships with government agencies in
their management of environmental pollution, water
conservation and energy usage. Through its planning roles
(zoning, infrastructure planning and urban design) Council
encourages business and industrial development.
Council’s Corporate Plan strategies are to:
# Improve the efficiency of water and energy use and
reduce greenhouse gas emissions through education,
incentive programs and programs that promote upgrading
with water saving devices
# Increase the community’s awareness of sustainability and
environmental issues through education programs.
Liverpool Directions shows that the Liverpool community
values their local natural environment and supports the
delivery of environmental projects. During the development
of Liverpool Directions, the community has shown support
for the improvement of the environment. The
implementation of the Environment Restoration Plan will
contribute to the improvement of the environment as
supported by Liverpool Directions.
6
Council’sresponsibilityto theenvironment
7The Environment Restoration Plan
3.1 COUNCIL’S LEGAL OBLIGATIONS
Council operates within the requirements of the LocalGovernment Act 1993 and other relevant legislation.
Section 8 of the Local Government Act sets out the 12
statutory objectives of the Council Charter. Objective 5
requires councils to:
“Properly manage, develop, protect, restore, enhance andconserve the environment of its area in a manner that isconsistent with and promotes the principles of EcologicallySustainable Development.”
For the purposes of Council’s projects, environmentally
sustainable development means:
# To enhance individual and community wellbeing and
welfare by following a path of economic development
that safeguards the welfare of future generations
# To provide for equity within and between generations
# To protect biological diversity and maintain essential
ecological processes and life-support systems.
3.2 COUNCIL’S CORPORATE PLAN
Each year, Liverpool City Council develops a Corporate Plan
which outlines Council’s main objectives and projects to be
implemented that year. The implementation of the
Environment Plan has been a major component in
the delivery of the objectives for Council from 2002-2007.
Council’s 2006-07 Corporate Plan incorporates planning to
continue the Environment Plan. Section 6 Sustainability
(pp10-11) includes “development of a new city-wide
environment plan” as one of the highlights of specific
actions for 2006-07. Once adopted, the Environment
Restoration Plan will become an integral part of Council’s
Corporate Plan.
3.3 OTHER COUNCIL ENVIRONMENTAL PLANSAND STRATEGIES
There are a series of natural environment related strategies
within Council which provide direction for Council in its
activities, the three most relevant in relation to the
Restoration Plan being:
Liverpool City Council Biodiversity
Management Plan
The Biodiversity Management Plan provides for the
conservation of native plants, animals, habitat and
ecological processes in the Liverpool LGA. It provides
priorities and guidance for Council in making decisions
relevant to managing these native plants and animals, and
the natural environment, guidance for the use, conservation
and enhancement of natural resources according to the
principles of Ecologically Sustainable Development and a
greater level of certainty for the community via a pre-
defined, transparent and accountable process.
Liverpool City Council Water Strategy
The Water Strategy is a document that updates and
consolidates Council’s Stormwater Management Plans and
the Regional Catchment Blueprints (a planning document
prepared by Catchment Management Boards that
constitutes an integrated regional catchment management
plan) into a single document to address all water related
issues of Council.
Liverpool City Council Water Quality Monitoring
Framework
The Framework will help Council monitor and sustain or
improve current, or likely future, environmental values for
Liverpool’s aquatic ecosystems.
Liverpool’snaturalenvironment
8
9The Environment Restoration Plan
4.1 ENVIRONMENT DEFINED
The word ‘environment’ can be defined in many ways. Atits broadest definition environment can include ecosystemsand their constituent parts, including people andcommunities; natural and physical resources; the qualitiesand characteristics of locations, places and areas; heritagevalues of places; and the social, economic and culturalaspects of everything mentioned above.
The Environment Restoration Plan is focused on restoringLiverpool’s natural environment. For the purposes of theEnvironment Restoration Plan the natural environmentwill include ecosystems and their constituent parts andnatural resources. Broadly this will include creeks, riversand waterways, riparian areas, other bushland reservesand areas.
4.2 CURRENT STATE OF LIVERPOOL’SENVIRONMENT
The Liverpool LGA has a total area of 306km2 (30,604ha)
and is made up of 39 suburbs. The south eastern portion of
Liverpool is controlled by the Department of Defence and is
a significant natural environment asset. The western half of
Liverpool is currently zoned for rural purposes, and supports
both small and large lot farming, some intensive plant and
animal agriculture and rural residential housing.
The Liverpool LGA has 69.8km2 (6,980.9ha) of bushland. This
includes pristine bushland, many kilometres of waterways
and areas of great natural beauty.
Above: Remnant Cumberland Plain woodland at Overett
Reserve, Kemps Creek
4.3 OUR CATCHMENT AREA
The Liverpool LGA lies within two significant river
catchments - the Georges River to the east and the
Hawkesbury-Nepean to the west. The Georges River forms
the eastern boundary with Bankstown Council and the
Hawkesbury-Nepean River forms the western boundary
with Wollondilly Council. The ridgeline separating the two
catchments falls within the western Sydney regional open
space corridor.
Significant tributaries of the Hawkesbury-Nepean River
traverse the Liverpool LGA, including South, Kemps and
Badgerys creeks. Much of the eastern portion within the
Georges River catchment of the LGA drains to the
Cabramatta Creek sub-catchment including Hinchinbrook,
Cabramatta, Maxwells and Brickmakers creeks. Liverpool’s
waterways form part of a larger ecological system entwined
with riparian vegetation and natural terrestrial bushland
areas.
10
4.4 FUTURE PRESSURES ON LIVERPOOL’SNATURAL ENVIRONMENT
Liverpool City is currently experiencing significant growth
and will continue to grow for the next 30-40 years. Twelve
per cent of the state’s future population growth is predicted
for Liverpool. This growth is a mixture of new land being
released for development and urban consolidation.
In order to achieve growth targets, residential suburbs
will be developed within the south west growth sector
and Liverpool’s established areas will increase in
population density.
As a result, Liverpool’s natural environment will be exposed
to more pressure from development and urban sprawl. It is
therefore essential that Council and the community
implement projects and programs to conserve and maintain
Liverpool’s natural environment.
Continuing pressure on our natural environment will
contribute to:
# Degradation of remaining bushland through
weed invasion
# Increased aquatic weed infestations
# Reduced native species diversity
# Local and regional extinction of native species
and communities
# Predation and competition from feral animals and plants
# Destruction of habitat, for example, bush rock removal,
removal of snags and logs from waterways
# Erosion and salinity
# Reduced soil quality and productivity
# Increased soil nutrient and soil contamination
# Reduced water quality
# Altered flow regimes and flooding behaviour
# Bushland clearance
# Loss of native animal and plant habitat.
4.5 LIVERPOOL’S FLORA AND FAUNA
A number of vegetation communities in the Liverpool LGA
are listed as endangered ecological communities. The
Cumberland Plain woodland, in particular, is recognised at
regional, state and federal levels as a significant
endangered ecological community. Before European
settlement, the Cumberland Plain woodland extended
across western Sydney, covering 122,000ha. Today, only
eight per cent of the original woodland area remains.
Numerous species of threatened flora and fauna occur
within the Liverpool LGA as well as many regionally
significant and vulnerable species including the population
of Dillwynia tenuifolia (small shrub) at Kemps Creek. Other
animal species such as the powerful owl and koala have
been found in our area.
To maintain and protect our local native flora, bushland and
waterways means we maintain and protect the homes of
our local native fauna.
11The Environment Restoration Plan
TheEnvironment Plan
(2002-2007)
12
The Environment Plan is a partnership between Council and
its community, including local environment groups,
volunteers, business and industry, to restore and rehabilitate
our local riparian vegetation and bushland.
The five-year Environment Plan was considered and
adopted by Council in May 2002 and approved by the
Minister of Local Government in June 2002. The
implementation of the Environment Plan commenced in
July 2002 and will conclude in June 2007.
More specifically, the Environment Plan is an integrated
program of restoration activities and on-ground works
designed to preserve and conserve the natural
environment of Liverpool. It aims to improve the health
of our natural environment, in particular the riparian
vegetation and waterways.
5.1 ENVIRONMENT PLAN DELIVERABLES
Outlined below is the list of key deliverable’s that were
adopted in the Environment Plan. These are the broad
objectives that Council aims to achieve with the
Environment Plan:
# Enhancement of existing and potential
ecological connectivity
# Cleaner waterways
# Revegetation of waterways
# Construction of access paths
# Fence waterways in rural areas where appropriate
# Protecting and expanding all endangered ecological
communities and other bushland
# Rehabilitation of urban and rural waterways
# Establishing green gateways into the city
# Improving the city Image
# Building community networks.
5.2 ACHIEVEMENTS OF THE ENVIRONMENT PLAN
In October 2006, a snapshot of some of the major
achievements of the Environment Plan included:
Number of trees planted
(total) 103,892
(those planted by volunteers) 37,200
Metres of creek line being restored 18,202m
Number of community members involved
(regular volunteers) 100
(community participants) 550
Number of tree planting activities completed 169
Number of environment groups 10
Total area regenerated or revegetated 546,368m2
Number of sites 31
Number of trees given away 37,600
Number of environmental workshops run 26
Length of pathways installed approx 222m
13The Environment Restoration Plan
5.3 THE SITE SELECTION PROCESS
Over the five years of the Environment Plan, more than 20
bush regeneration projects have been implemented. The
sites for these projects were selected using a site selection
process developed and adopted by Council in October 2003.
The site selection process was developed to provide some
rigour and scientific framework behind the selection of sites
for Environment Plan works. The process incorporates three
matrices using environmental, social and economic criteria
to prioritise sites for Environment Plan works.
Some parts of the site selection process could be refined
and improved to ensure the process produces the most
appropriate sites for Environment Plan works. The site
selection process will be reviewed and updated for works
under the Environment Restoration Plan.
The sites selected for Environment Plan works go through a
community consultation process and are then adopted by
Council. As part of this process the community has the
opportunity to provide suggestions for sites to be selected
for environment works. For further information on the
current site selection process please visit
www.liverpool.nsw.gov.au.
5.4 ENVIRONMENT PLAN PROJECT SITES
The list of sites across Liverpool selected for works during
the five years of the Environment Plan are outlined below.
Sites were selected for three rounds. Round 1 includes the
first four sites which were chosen prior to the
implementation of the Environment Plan. Round 2 includes
sites selected to commence in 2004-05, and the Round 3
sites were selected to commence in 2005-07 (Round 2 and
3 sites were selected using the site selection process).
ENVIRONMENT PLAN SITES 2002-07
Round 1
Amalfi Park, Lurnea
Collimore Park, Liverpool
Kelso Park, Moorebank
Overett Reserve, Kemps Creek
Round 2
McMillan Park, Moorebank
McGirr Park, Cartwright
Havard Reserve, Prestons
Lt Cantello Reserve, Hammondville
Clinches Pond, Moorebank
Overett Reserve - Area 2, Kemps Creek
Round 3
Ernie Smith Reserve - Area 1, Moorebank
Meere Park, Lurnea
Light Horse Park, Liverpool
Harris Creek Reserve, Holsworthy
Creekwood Reserve, Voyager Point
Cabrogal Park, Hinchinbrook
Miller Park, Cartwright
Bradshaw Park, Busby
Fassifern Park, Cartwright
Ernie Smith Reserve - Area 2, Moorebank
14
5.5 ENVIRONMENT PLAN SITES - BEFORE AND AFTER PHOTOS
Amalfi Park before
Amalfi Park after
15The Environment Restoration Plan
McMillan Park before
McMillan Park after
16
5.5 BEFORE AND AFTER PHOTOS CONTINUED
McGirr Park before
McGirr Park after
17The Environment Restoration Plan
Collimore Park before
Collimore Park after
18
5.6 PLAN WORK SITES
There are also a number of other sites across Liverpool
where Environment Plan works have been completed.
Works on these sites include Environment Group activities,
community tree planting days, grant funded projects and
workshop activities. The sites where other Environment
Plan works have been completed across Liverpool are
listed below:
# Elouera Bushland Reserve - Ireland Park, Ashcroft
# The Avenue, footbridge and lake area, Voyager Point
# Glen Regent Reserve - Leacocks Lane, Casula
# Glen Regent Reserve - Kylie Way, Casula
# Lt Cantello Reserve, Hammondville
# Amalfi Park, Lurnea
# Clinches Pond, Moorebank
# Remount Park, Holsworthy
# Rossmore Grange, Rossmore
# Weaving Garden, Casula
# Blamfield Oval, Ashcroft
# Wattle Grove Lake, Wattle Grove
# Tusculm Park, Wattle Grove
# Light Horse Park, Liverpool.
19The Environment Restoration Plan
5.7 AWARDS
The success of the Environment Plan has been reflected in
Council receiving a number of awards for its achievements.
In 2003 Council received first prize for “Playing our part in
sustaining Liverpool” in the National Parks and Wildlife
Services’ Metro Pride Awards category of the Urban Habitat
Restoration and Renewal Award.
On 1 December 2005 Council’s Sustainable Environment and
Health Unit received two awards at the Local Government
Excellence in the Environment Awards:
# The Environment Plan won the Division C* category of the
Urban Waterway Restoration Award
# Council’s Environment Volunteer Program won a Highly
Commended Award in the Division C* category of the
Environment Education Award.
* Divisions A, B and C represent the population size of
councils. Liverpool City Council is in Division C.
5.8 ENVIRONMENT PLAN REVIEW
In July 2005, the Environment Plan was reviewed. The main
aim of the Environment Plan Review was to:
# Conduct a mid-term review of the Environment Plan
programs against the deliverables defined in the
Environment Plan # Explore options and opportunities for the remaining
period of the Plan# Report review findings to Council and the Department of
Local Government.
Each program implemented under the Environment Plan
was reviewed and evaluated. The following factors were
considered for each of the programs:
# Program background# Strengths # Weaknesses # Recommendations.
The review showed the majority of programs being
implemented under the Environment Plan were successful
and should be continued as part of a new environment levy
program. The information from the Environment Plan review
has now been used to contribute to the development of the
Environment Restoration Plan. For further information please
visit www.liverpool.nsw.gov.au.
5.9 THE CONCLUSION OF THEENVIRONMENT PLAN
The Environment Plan will conclude at the end of June
2007. In accordance with Council’s resolution of 17 October
2005, Council will apply for a new environment levy
program called the Environment Restoration Plan. It is
intended that Council will seek approval for the levy to
continue indefinately. The Environment Restoration Plan will
continue the projects implemented under the Environment
Plan in addition to implementing some new environmental
initiatives and programs.
20
TheEnvironmentRestoration Plan .
21The Environment Restoration Plan
6.1 WHAT IS THE ENVIRONMENTRESTORATION PLAN?
The Environment Restoration Plan is an outline of the
environmental projects, programs and plan of on-ground
works to be funded by the environment levy. These
projects, programs and on-ground works aim to improve the
natural environment of Liverpool for the long-term benefit
of Liverpool and its community. It is proposed that the
Environment Restoration Plan continues the programs and
projects commenced under Council’s current environment
levy program, the Environment Plan.
6.2 WHY CONTINUE THE ENVIRONMENT PLAN?
As shown by the Environment Plan Review, environmental
awards received by Council and results from recent
consultation on the development of the new environment
levy program, the Environment Plan has facilitated a
number of excellent environmental projects. However, the
natural environment of Liverpool does need long-term
commitment to ensure projects are maintained until they
function as a natural ecosystem.
The current environment levy will conclude in June 2007
and Council would like to ensure the successful projects that
have commenced under the Environment Plan will be
continued.
The main reasons for retaining the environment levy
program are to:
# Continue to restore Liverpool’s natural environment# Continue environment projects commenced under the
Environment Plan between 2002-2007# Ensure the community has a funding mechanism to
support their environment groups and projects# Play our part in sustaining Liverpool.
6.2.1 COMMUNITY INVOLVEMENT
Importantly, the levy has also provided various avenues for
the Liverpool community to be directly involved in the
decision making processes and on-ground actions to
improve the natural environment of Liverpool, including:
# The Environment Advisory Panel# The Environment Group Sub-committee# Involvement in over 10 environment groups around the
Liverpool LGA# Participation in numerous tree planting activities
and workshops # Contribution to consultation on the Environment Plan and
development of the Environment Restoration Plan.
As a result, the community has been and will continue to
be an integral part of the development and delivery of the
Environment Restoration Plan.
6.3 HOW IS IT FUNDED?
The Environment Plan is funded by an ad valorem charge
per ratable property (this means that the charge for each
property is not a flat fee, but a percentage of the individual
property value). The Environment Restoration Plan and the
Environment Plan are funded in the same way. This method
is fair as it relates to property values. The property value
method of charging is defined under section 508(2) of the
Local Government Act (1993).
The amount available for environment restoration works will
be subject to the approval of the environment levy amount.
The amount approved will be one of the funding options
outlined in the matrix (see page 24).
The Environment Restoration Plan will be subject to ongoing
analysis and review and will include consultation with the
community.
6.4 CONSULTATION TO DEVELOP THEENVIRONMENT RESTORATION PLAN
6.4.1 THE ENVIRONMENT RESTORATION PLAN
ENGAGEMENT STRATEGY
One of the key components of the planning and
development process for the Environment Restoration Plan
is community engagement. The Liverpool community has
been involved in the development, facilitation and
monitoring of the current Environment Plan (2002-2007)
and has become an integral part of its delivery and success.
As part of the development of the Environment Restoration
Plan, an engagement strategy was developed. The aim of
the engagement strategy was to provide a comprehensive
outline, using Council’s Community Engagement Tool Kit, on
how Council will engage relevant stakeholders to contribute
to the development of the new Environment Levy program,
the Environmental Restoration Plan. For further information
please visit www.liverpool.nsw.gov.au.
To enable thorough community input to the Environment
Restoration Plan, the engagement will be undertaken in
two stages:
# Stage 1: Active participation to ascertain the Liverpool
community’s environmental and sustainability priorities and
their willingness to pay for an environment levy (the
Environment Restoration Plan)# Stage 2: Consult and inform to provide comments and
input on the draft Environment Restoration Plan.
22
6.4.2 STAGE 1
The main objective of Stage 1 of the consultation strategy
was to engage the community, Council staff and other
relevant stakeholders to provide fundamental information to
allow the development of the Environment Restoration
Plan.
This approach to community consultation is at the active
participation level of Council’s draft Community Engagement
Tool Kit.
The proposed outcomes of Stage 1 consultation included:
# Determining the willingness of the community to pay an
environment levy# Determining the amount the community will pay for an
environment levy# Identifying the participants’ main environmental
issues/concerns# Prioritising the participants’ main environmental
issues/concerns# Identifying specific environmental programs participants
would like included under the Environment
Restoration Plan # Determining the method of ongoing
community consultation.
The main component of Stage 1 was to conduct five focus
groups to provide the basis for the development of the
Environment Restoration Plan. The five focus groups were
conducted by an independent consultant in August and
September 2006. These findings contributed to the
development of the Environment Restoration Plan. For
further information please visit www.liverpool.nsw.gov.au.
RESULTS FROM STAGE 1 - FOCUS GROUPS
As outlined in the final report of the findings of the focus
groups (titled “Liverpool City Council CommunityConsultations for the new Environment Plan”), the five
focus groups enabled community members, Council staff
and other stakeholders to provide valuable input into the
new Liverpool City Council Environment Plan-The
Environment Restoration Plan (a copy of the full final report
is available on www.liverpool.nsw.gov.au). It was clear from
the responses of the group that environmental issues are
important to Liverpool residents and that they welcome the
opportunity to be consulted on future activities addressing
these issues.
In terms of the outcomes desired from the conduct of the
focus groups, the following conclusions can be made:
1) The willingness of the community to continue to
pay an Environment Levy
Despite prevailing economic pressures being experienced by
residents, such as increasing interest rates and petrol prices,
the focus groups indicated a general willingness of
community members to continue to pay an
Environmental Levy.
2) Determining the amount that the community are
willing to pay for an Environment Levy
There was general, but not universal, support for an
increase in the Levy amount. The results from the two
community focus groups suggest that a majority of
participants would be prepared for the average household
levy to increase from around $12 pa to $20 pa.
3) Identification of the participants main
environmental issues/concerns
Participant issues and concerns were diverse in scope, with
some probably falling outside the reach of Environment
Restoration Plan activities. Nine key themes were identified
through the focus groups.
4) Prioritisation of the participants main
environmental issues/concerns
The priority issues, expressed in terms of the key themes
were: Bush Protection, Repair and Regeneration;
Waterways; “Community Awareness and Education”; Parks
and Recreation Areas; and Developmental Planning.
5) Identification of specific environmental projects
participants would like included under the new
Environment Plan
A number of project ideas were generated in the focus
groups although many were short on details. The theme
“Community Awareness and Education” produced the most
project ideas.
6) Determining the method of ongoing consultation
with the community (community focus groups only).
Community representatives participated enthusiastically in
the focus groups and the vast majority (84%) indicated an
interest in further participation in the development of the
Environment Restoration Plan. Suggestions from the groups
on how this should be done were not generally
forthcoming, although some suggested that
“neighbourhood forums” were appropriate. Further focus
group based consultations - either run by Council staff or
independent facilitators - might also be appropriate.
6.4.3 STAGE 2
The main objective of Stage 2 of the engagement strategy
is to invite the community, Council staff and other relevant
stakeholders to make comments on and provide input into
the draft Environment Restoration Plan. This input will
enable the final document to be produced and final
adoption by Council, facilitating the application to the
Department of Local Government. This approach to
community engagement is outlined in Council’s draft
Community Engagement Tool Kit.
The proposed outcomes of Stage 2 engagement will
include:
# Provision of comments and feedback from the community
and other stakeholders in relation to the Environment
Restoration Plan
23The Environment Restoration Plan
# Incorporation of comments into the Environment
Restoration Plan, finalising the document# Enable the Environment Restoration Plan to be finalised
for adoption by Council.
RESULTS FROM STAGE 2 - PUBLIC EXHIBITION
Council endorsed the Draft Environment Restoration Plan on
18 December 2006 to go on Public Exhibition. The Draft
Environment Restoration Plan was placed on Public
Exhibition from 8 January to 23 February 2007. The draft
document was placed on Council’s website, and copies
were made available at Council’s Administration Centre and
Library for comment. The Public Exhibition period was
advertised in the Council page of the Liverpool Champion on
the 3, 10, 17, 24 and 31 January 2007, and 7 and 14
February 2007.
The Public Exhibition period concluded on 23 February 2007
with nine submissions being received.
All comments were considered and relevant comments
were incorporated into this document to finalise the
Environment Restoration Plan.
6.5 KEY DELIVERABLES OF THE ENVIRONMENT RESTORATION PLAN
The key deliverables Council aims to achieve from the
Environment Restoration Plan are outlined below. These key
deliverables have been derived from the Environment Plan
and have been reviewed and updated to include:
# Protecting and restoring Liverpool’s local endangered
ecological communities and other bushland# Building community networks and partnerships# Delivering environmental education to the
Liverpool community# Supporting environmental projects across Liverpool# Installing fencing and access paths (as required)# Improving the city image# Cleaner waterways.
At the conclusion of the Environment Restoration Plan,
Council will have achieved or contributed toward these
deliverables which will contribute to sustaining Liverpool.
6.6 WHAT WILL IT DELIVER?
The type and number of programs to be implemented
under the Environment Restoration Plan will depend on
funds generated through the environment levy.
The Environment Plan levy is approximately $12 per
household per annum (based on a 650m2 property) which
generated approximately $700,000 in the 2006-07 financial
year. The following matrix is based on this level of funding
as a minimum and projects outlined in the column for $12
pa is based on an annual budget of $700,000 per annum.
A matrix outlining the various programs that can be
delivered, depending on the amount approved for the new
environment levy, appears on the following page. The $12
pa column shows the proposed programs that can be
delivered based on an average environment levy of $12 per
property per annum (Amount for Environment Plan levy).
Other columns show what additional programs can be
delivered for additional amounts of $15, $18 and $20 per
property per annum.
24
PROJECT/PROGRAM $20 PA $18 PA $15 PA $12 PA
ON-GROUND WORKS/PROJECTS
Bush regeneration - four projects pa �
Bush regeneration - five projects pa �
Bush regeneration - six projects pa �
Bush regeneration - eight projects pa �
Matching funding for grant opportunities � � � �National Tree Day event � � � �Community tree planting program � � � �Community nursery � � � �Access paths and fencing � � � �Set up of no-mow zones(research, signage, fencing and advertising) � � � �
GOVERNANCE
Support of the Environment Advisory Panel � � � �Support Environment Group Sub-committee � � � �Support Environment Groups � � � �Support for Environment Volunteer Program � � � �EDUCATION
Sustaining Liverpool Newsletter � � � �Community engagement strategy � � � �Business engagement strategy � � � �Bi-monthly activity calendar � � � �Workshop series � � � �School education program � � � �Merchandise � � � �Bloomin’ � � � �Environmental Education Centre/Sustainable House � � � �STAFF
Environment Restoration Plan Coordinator � � � �Environment Restoration Plan/Projects Officer � � � �Environment Restoration Plan Education and Grants Officer � � �Two bush regeneration staff �Three bush regeneration staff �ENVIRONMENTAL INFORMATION MANAGEMENT
Environment Restoration Plan indicators � � � �Environmental audits � � �Fauna surveying � � �
25The Environment Restoration Plan
Monitoring,reporting, reviewand maintenance
26
7.1 MONITORING
7.1.1 GOVERNANCE STRUCTURE
A formal structure was set up to govern the Environment
Plan and its programs and enable a reporting mechanism to
Council. Figure 1 shows the governance structure. Over the
time of the Environment Plan the governance structure has
proved to operate effectively in its role and as a result will be
continued under the Environment Restoration Plan.
This structure includes two main committees and the
supporting environment groups that have been set up to
review and provide input into Environment Plan programs:
# The Environment Advisory Panel # Environment Group Sub-committee# Environment groups.
The main objective of this governance structure is to:
# Support our volunteers on an ongoing basis# Provide a formal mechanism within Council to canvass
environmental and sustainability issues# Help deliver the Environment Plan.
More information on the Environment Advisory Panel,
Environment Group Sub-committee and environment groups
can be found in Appendix 1.
Figure 1: The Environment Plan Governance structure
Liverpool City Council
Environment Advisory Panel
Environment Group Sub-committee
Group Representative Group Representative Group Representative Group Representative
Environment Group Environment Group Environment Group Environment Group
27The Environment Restoration Plan
7.1.2 ENVIRONMENT PLAN INDICATORS
The Environment Plan indicators, developed to assist in
evaluating the direction and status of the Environment Plan,
were adopted by Council on 28 July 2004. It has become
apparent, after using the Environment Plan indicators over
the period of the Environment Plan, that a number of
programs, processes and circumstances have evolved since
the development and adoption of the indicators in July
2003. Some of the criteria have now been exceeded or are
no longer appropriate. It is proposed that the Environment
Plan indicators be reviewed and updated and implemented
for the Environment Restoration Plan.
The Environment Plan indicators were developed to assist in
evaluating the direction and status of the Environment Plan.
In essence, an indicator is a simple measure of direction or
status in relation to reportable environmental trends. Once
reviewed, the indicators will measure the progress of the
Environment Restoration Plan. The results from the
indicators will be reported to the Environment Advisory
Panel, Council and the Department of Local Government
annually.
7.2 REPORTING7.2.1 DEPARTMENT OF LOCAL
GOVERNMENT REPORTING
In accordance with the Instrument of Approval under
Section 508(2) of the Local Government Act, Council will be
required to provide an annual report to the Minister for
Local Government on the progress of the Environment
Restoration Plan. This report includes details of Environment
Restoration Plan programs and a financial report.
7.2.2 STATE OF ENVIRONMENT REPORTING
Each year Council completes a State of Environment
Report including a section covering information on the
Environment Plan. Data calculated from the Environment
Plan Indicators are incorporated into the annual State of
Environment Report.
7.2.3 REPORTING TO THE ENVIRONMENT
ADVISORY PANEL (EAP)
The Environment Advisory Panel will be the main focus for
reporting of Environment Restoration Plan programs. All
programs implemented under the Environment Restoration
Plan will be reported to the panel in a six-monthly update
on programs. In accordance with the Environment
Restoration Plan governance structure, programs will then
be reported to Council for endorsement.
7.3 REVIEW
In accordance with the review process of the Environment
Plan, the Environment Restoration Plan will be regularly
reviewed and updated to ensure that all proposed projects
will be delivered.
It is proposed that the Environment Restoration Plan will be
adopted as a permonent levy. There will be major reviews
completed over five years. These reviews will:
# Ensure proposed projects are on track to be delivered# Provide an opportunity for community consultation
in relation to the progress of the Environment
Restoration Plan# Assess whether the proposed projects and on-ground
works are consistent with the Environment Restoration
Plan and Council’s Corporate planning process
In addition the Environment Restoration Plan will be under
constant review through the Environment Advisory Panel as
outlined in 7.2.3.
7.4 MAINTENANCE
One of the main aims of the Environment Restoration Plan
is to complete on-ground works to improve the natural
environment of Liverpool.
On-ground works completed under the Environment
Restoration Plan will mainly include bush regeneration and
revegetation. It is important that Council has long-term
maintenance programs in place to ensure that these works
will continue until they are able to function as natural
ecosystems. As a result, Council will employ qualified staff
to maintain all Environment Restoration Plan works,
including contracted primary bush regeneration works,
tree planting activities and assist in supporting Environment
Group site works.
28
The next stages of the process to facilitate the adoption and
implementation of the Environment Restoration Program
are outlined below. If approved, the Environment
Restoration Plan will commence in July 2007:
# Environment Restoration Plan adopted in principle by
Council for Public Exhibition 18 December 2006# Environment Restoration Plan on Public Exhibition 8
January-23 February 2007# Comments from Stage 2 consultation of Engagement
Strategy for Environment Restoration Plan incorporated
into final document after 23 February 2007# Final Environment Restoration Plan endorsed by Council
16 April 2007
# Application to Department of Local Government for new
environment levy including Environment Restoration Plan
developed March-April 2007# Application to Department of Local Government sent for
approval April-May 2007 (sent when applications are
requested by Department of Local Government)# Notification to Council of approval of new environment
levy and approval of Environment Restoration Plan May -
June 2007# If approval is granted commencement of environment
levy and implementation of the Environment Restoration
Plan 1 July 2007.
Where tofrom here?
29The Environment Restoration Plan
GLOSSARYAd valorem - in proportion to the value (e.g. duties on
imports that are fixed at a percentage of the stated value).
In relation to the Environment Restoration Plan the annual
levy on each rateable property is an ad valorem charge, i.e.
a small percentage of the value of the property.
Biodiversity - the variety of plants, animals and microscopic
organisms, the genes they contain and the ecosystems they
are part of.
Bush regeneration - the rehabilitation of bushland from a
weed infested or otherwise degraded plant community to a
healthy community composed of predominantly indigenous
species. This can include natural regeneration (encouraging
locally native seed in the ground to grow), weeding and
replanting of locally native plants.
Catchment - an area of land, bounded by hills or mountains
from which all runoff water flows to the same low point.
The low point could be a lake, dam, river or the mouth of a
river where it enters the ocean. As well as rivers, creeks,
lakes and dams, a catchment also includes groundwater,
stormwater, wastewater and water-related infrastructure
(source: Sydney Metro CMA website).
Ecologically Sustainable Development - using, conserving
and enhancing the community’s resources so that ecological
processes, on which life depends, are maintained, and the
total quality of life, now and in the future, can be increased.
Ecosystem - a dynamic complex of plant, animal, fungal
and micro-organism communities and associated non-living
environment interacting as an ecological unit.
Ecological community - an assemblage of species
occupying a particular area.
Habitat - an area or place occupied by a species, population
or ecological community. It may be occupied permanently
or occasionally.
Riparian vegetation - vegetation that occurs on the banks
of a waterway, river or creek or any lands which are in,
adjoin, directly influence or is influenced by a body of water.
Salinity - concentration of salts in soil or water.
Species - a group of organisms which are biologically
capable of breeding and producing fertile offspring with
each other but not with members of other species
Tributary - any watercourse that contributes its flow to a
larger watercourse.
Vegetation - the structure, cover and species composition
of the plants in an area.
Waterway - any stream, creek, river, wetland, lake or other
depression in the landscape that carries or contains water,
either constantly or intermittently. Waterways may be
natural or modified and are often characterised by a defined
bed and bank.
APPENDIX 11.1 ENVIRONMENT ADVISORY PANEL
The Environment Advisory Panel (EAP) is one of the main
committees that were set up to review and provide input
into Environment Plan programs. The EAP is a committee of
Council constituted under Section 355 of the Local
Government Act. The EAP reports directly to Council and
holds no delegations. Any reports requiring formal decisions
or expenditure of funds are referred to Council for
endorsement.
The EAP will be one of the main reporting mechanisms for
the Environment Restoration Plan and will ensure sufficient
input is provided for Environment Restoration Program. The
EAP will continue to function under the Environment
Restoration Program. The purpose of the panel is to:
# Consider key environmental issues facing Liverpool and
make recommendations to Council
# Provide input to Council with respect to the development
of environmental programs for Liverpool# Work in partnership with Council in terms of various
environmental initiatives# Provide input to the implementation of Council’s
Environment Plan, including the development of
performance indicators and monitoring of outcomes# Provide input to the development of future programs as
part of the ongoing implementation of the
Environment Plan# Provide advice, direction and support to environmental
groups within Liverpool City Council# Provide opportunities for meaningful community
participation.
The establishment of the EAP was a critical step in the
process of engaging the Liverpool community in
environment and sustainability issues. Table 1 represents
the membership of the panel. As outlined in Table 1, EAP
members come from a variety of organisations and also
from the community.
30
Table 1
REPRESENTATIVE NUMBER TERM METHOD OF APPOINTMENT
Community Two Two years Expression of interest
Councillors Two One year Resolution of Council (currently two staff representatives nominated by the Administrator)
Corporate Manager One Ongoing Position holder automatically assumes membershipCity Planning
Manager
One Ongoing Position holder automatically assumes membershipSustainableEnvironment and Health
Gandangara Land One Two years Nominated by the Land CouncilCouncil
Tharawal Land One Two years Nominated by the Land CouncilCouncil
Industry expert One Two years Expression of Interest
Department ofOne Two years Nominated by Department of Infrastructure, Planning andInfrastructure,
Natural ResourcesPlanning and Natural Resources
Local Environment Two Two years Nominated by the Environment Group Sub-committeeGroups
Landcare Regional/One Two years Nominated by LandcareDivisional
Representative
The Environment Plan team facilitates the EAP meetings,
which are held bi-monthly. Council staff provide reports on
Council environment projects and programs at these
meetings for consideration by the panel. At the meetings
the EAP provide comments and feedback on these reports
and ultimately forward any recommendations for
endorsement. Minutes, reports and recommendations
required by Council are then included in a Council report for
endorsement. All reports, minutes and correspondence can
be viewed on Council’s website. For more information vist
www.liverpool.nsw.gov.au.
# Environment Group Sub-committee# Environment groups# Regular consultation with community# Environment Restoration Plan Review every five years -
including extensive consultation.
1.2 ENVIRONMENT GROUP SUB-COMMITTEE
The Environment Group Sub Committee (EGSC) is the other
main committee set up under the Environment Plan
governance structure. The EGSC is also a committee of
Council constituted under Section 355 of the Local
Government Act. The EGSC reports to the EAP and holds no
delegations. Any reports or minuted items requiring formal
decisions or expenditure of funds are referred to the
Environment Advisory Panel for endorsement by Council.
The purpose of the Environment Group Sub-committee is to:
# Provide two representatives to act as members on the
Environment Advisory Panel, on behalf of the
Environment Group Sub-committee# Consider any issues relating to the formation and
operation of the environment groups operating in
Liverpool and make recommendations to the panel
regarding such issues.# Provide advice, support and networking opportunities to
environmental groups within Liverpool City Council# Work in partnership with Council and the Environment
Advisory Panel in various environmental initiatives# Provide opportunities for meaningful
community participation.
The linkages between the Environment Advisory Panel and
the Environment Group Sub-committee are designed to:# Facilitate support and provide structure and form to the
environmental groups within Liverpool# Provide a linear connection between Council and
environment groups in Liverpool.
The EGSC membership includes representatives from each of
the environment groups established under Council’s
Environment Volunteer Program. The chairperson of the
committee is an environment group representative elected
by the committee. The secretary of the committee is
Council’s Environment Plan Coordinator. Council’s
Environment Plan team facilitates the committee.
The EGSC meets bi-monthly, and on alternate months to the
EAP. At their meetings the EGSC discusses:
# Activities occurring at each of their sites# Issues that may arise as a result of these activities# The environment volunteer program processes
and programs.
1.3 ENVIRONMENT GROUPS
The environment groups are the other link in the
Environment Plan governance structure that will be
continued under the Environment Restoration Plan.
Each of the environment groups operate under the by-laws
of the Environment Advisory Panel constitution. The
environment groups hold no delegations.
Any items requiring formal decisions or expenditure of
funds are referred to the Environment Advisory Panel
through the Environment Group Sub-committee
for endorsement. The environment groups meet (usually
monthly) to complete environment restoration activities at
their sites. Activities include weeding, tree planting,
watering, bird watching, water testing and rubbish removal.
31The Environment Restoration Plan
Administration Centre
1 Hoxton Park Road
Liverpool NSW 2170
Customer Service Centre
Ground floor
Liverpool City Library
170 George Street
Liverpool NSW 2170
Postal Address
Locked Bag 7064
Liverpool BC NSW 1871
Customer Contact Centre1300 36 2170
Fax 02 9821 9333
TTY 02 9821 8800
Email [email protected]
Website www.liverpool.nsw.gov.au
MC
MA
RC
H 0
7 E
NV
rest
ora
tio
nP
LAN