Environment Management Plan
Wastewater Treatment Component
Liuzhou Environment Management Project (LZEMP)
November 2004
Sino-Japan Friendship Center for Environment Protection
Liuzhou Urban Investment & Development Co., Ltd.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Content
GENERAL.......................................................................................................................................1
PURPOSE OF EMP: ......................................................................................................................1
1. INTRODUCTION.......................................................................................................................2
1.1 SIGNIFICANCE OF COMPONENT ................................................................................................2 1.2 COMPONENT DESCRIPTION AND TECHNICAL DATA...................................................................2
2. ENVIRONMENTAL PROTECTION TARGETS ...................................................................5
2.1 WATER ENVIRONMENTAL PROTECTION TARGETS....................................................................5 2.2 ECOLOGICAL ENVIRONMENTAL PROTECTION TARGETS ..........................................................5 2.3 AMBIENT AIR AND SOUND ENVIRONMENTAL PROTECTION TARGETS......................................6
3.ENVIRONMENT IMPACT ASSESSMENT...........................................................................10
3.1 INFLUENTIAL FACTORS OVER THE ENVIRONMENT .................................................................10 3.2 STANDARDS OF ASSESSMENT.................................................................................................10 3.3 SCOPE OF ASSESSMENT ..........................................................................................................12 3.4 ENVIRONMENT IMPACT ASSESSMENT.....................................................................................12
4. MANAGEMENT PLAN OF ENVIRONMENTAL PROTECTION....................................18
4.1 MANAGEMENT ORGANIZATION AND DUTIES ..........................................................................18 4.2 ENVIRONMENTAL MANAGEMENT PLAN DURING CONSTRUCTION ........................................21 4.3 ENVIRONMENT MANAGEMENT PLAN DURING THE OPERATION PERIOD ..................................30
5. ENVIRONMENTAL PROTECTION MONITORING PLANS...........................................33
5.1 MONITORING PURPOSE ..........................................................................................................33 5.2 MONITORING IMPLEMENTATION ............................................................................................33 5.3 MONITORING FACILITIES AND EXPENSE .................................................................................33
6. TRAINING FOR PERSONNEL..............................................................................................37
7. INTERCOMMUNICATION ...................................................................................................38
8. NOTE .........................................................................................................................................39
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
1
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
General
The Environment Management Plan prepared based on “Environmental impact assessment report for wastewater treatment component, Liuzhou Environment Management Project (LZEMP)”. The EMP is a separate document involving all activities for environment protection during phases of design, construction and operation. The EMP offers a guideline for pollution control, environment management and environmental monitoring. The EMP consists of:
* Introduction
* Potential environmental impact
* Management structure and duty
* Environment management plan
* Environmental monitoring plan
Purpose of EMP:
Well-balanced design and serious environment assessment have been made for the “Wastewater treatment component, Liuzhou Environment Management Project (LZEMP)” in order to minimize the adverse impact onto society and environment. Appropriate environment protection policies will be followed to solve the environment problems.
It is inevitable that the project will pose impact onto environment. One of the primary purposes of EMP is to identify potential impact so as to develop technically and economically feasible policies for environment protection in construction and operation phases. The policies were determined in environment assessment phase, are confirmed in EMP, and will be carried out in construction and operation phases.
The EMP includes the policies for environment protection during construction and operation, environmental monitoring measures and detailed activities to avoid or reduce the adverse impact onto environment. The EMP will be an important intermediate between environment protection policies and actual activities, which ensures the realization of environment protection objective.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
1
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Sino-Japan FrienLiuzhou
dship Center for Environment Protection Urban Investment & Development Co., Ltd.
Wastewater Treatment Component, Liuzhou Environment Management Project (LZEMP) consists of five parts, including river rectification, ecological recovery, wastewater collection and wastewater treatment etc. The Component will use land of 621.29 mu, improve river course of 10.8 km long, set up and rebuild drain pipes of 131.98 km long, establish 7 wastewater pump stations (total capacity 264 thousand m3/d), construct and reconstruct 4 wastewater treatment plants (addition of 400 thousand m3/d capacity). The construction location and specific data are shown in Figure 1-1 and Table 1-2-1.
1.2 Component description and technical data
Liuzhou municipal government has seriously recognized the significance of water pollution problem and water supply security. “Liuzhou master urban planning” points out, “Being a riverside city, Liuzhou should emphasize greatly on the water pollution control and water environment protection. Well-established municipal wastewater treatment system should be set up to reduce direct wastewater discharge into river as soon as possible. By 2010, the urban environment pollution and ecological destroy should be substantially controlled. By 2020, the urban environment quality should be greatly improved and a well-balanced ecological system should be established. Therefore, it is very important to implement the Wastewater Treatment Component, Liuzhou Environment Management Project (LZEMP) so as to achieve the water pollution control objective in “Liuzhou master urban planning”.
Liuzhou is a major industrialized city and a traffic hub in Guangxi. In recent 20 years, with the rapid industrialization and urbanization of Liuzhou, the environment has been seriously threatened by pollution, especially acid rain and water pollution. In 2001, the total discharge of industrial and domestic wastewater was 800 thousand m3/d. Today, only one wastewater treatment plant with 100 thousand m3/d capacity is in operation, which is able to treat merely 12.5% of the total discharge, much less than the average level (42.12%) of wastewater treatment percentage in China (data from “China Urban Construction Statistics 2003” issued by State Ministry of Construction). Because the Liuzhou’s domestic wastewater treatment facilities are much inadequate, large amount of untreated wastewater is discharged via Xigou Stream and other drains into Liujiang River, producing significant pollution onto Liujiang (reach in urban area). As a result, some pilot intake become unsuitable for water service, and source water have to be piloted far upstream Liujiang River. The water problem has significantly degraded citizen’s welfare and held back economic development. Water pollution is the most serious environment problem in Liuzhou.
1.1 Significance of component
1. Introduction
2
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Ta
ble
1-2-
1 M
ajor
eng
inee
ring
cont
ent o
f com
preh
ensi
ve fa
ther
ing
proj
ect f
or L
iuzh
ou a
quat
ic e
nviro
nmen
t Su
bpro
ject
na
me
Type
L
ocat
ion
Con
stru
ctio
n sc
ale
Proj
ect
inve
stm
ent(
104
Yuan
RM
B)
Serv
ice
rang
e
Inte
rcep
ting
syst
em
The
engi
neer
ing
lies
in H
exi
dist
rict
(Liu
xi
dist
rict)
of L
iuzh
ou c
ity,
com
pose
d of
nor
th
bran
ch a
nd so
uth
bran
ch.
13.8
54km
d3
00~
d150
0
Riv
er c
hann
el fa
ther
ing
Sout
h an
d no
rth b
ranc
h of
Zhu
exi c
reek
10
.8km
O
pen
ditc
h re
form
ing
Sout
h an
d no
rth b
ranc
h of
Zhu
exi c
reek
5.
002
km
C
ompr
ehen
sive
fa
ther
ing
engi
neer
ing
of
Zhue
xi c
reek
La
ndsc
ape
cons
truct
ion
Sout
h an
d no
rth b
ranc
h of
Zhu
exi c
reek
43
919.
41
Rai
lway
C
ulve
rt O
f R
egio
nal
Min
e M
otor
squa
dron
In
Sout
h B
ranc
h To
Jun
ctio
n O
f So
uth
And
Nor
th B
ranc
hes;
Liu
tie P
arty
Sch
ool
Of
Nor
th B
ranc
h To
Jun
ctio
n O
f So
uth
And
N
orth
Bra
nche
s; J
unct
ion
Of
Sout
h A
nd N
orth
B
ranc
hes
To S
ewag
e El
evat
ing
Pum
p St
atio
n O
f Zh
uexi
Cre
ek
Sew
age
colle
ctin
g sy
stem
Li
es
in
Liub
ei
peni
nsul
a of
Li
uzho
u ci
ty,
incl
ude
city
zon
e an
d Li
ubei
dis
trict
in
terc
epto
r:4.
085
km
othe
r sew
age
pipe
line:
10.2
km
W
aste
wat
er tr
eatm
ent p
lant
To
be
co
nstru
cted
in
no
rth
and
sout
h of
H
uilo
ng
villa
ge,
whi
ch
is
to
the
east
of
Q
ianx
iang
ro
ad,
en
clos
ed
by
4 pl
anni
ng
road
10X
104 m
3 /d
Up
Bai
sha
pum
p st
atio
n
End
of u
p B
aish
a tru
nk c
anal
1.
0 X
104 m
3 /d
B
aish
a se
wag
e tre
atm
ent
engi
neer
ing
Zinc
fact
ory
pum
p st
atio
n站
C
oal p
iling
site
of L
iuzh
ou Z
inc
fact
ory
0.4
X10
4 m3 /d
29
761.
01
Serv
ice
area
is H
ebei
pen
insu
la o
f Li
uzho
u ci
ty;
in a
dmin
istra
tion,
it
can
be d
ivid
ed i
nto
Liub
ei
dist
rict
and
peni
nsul
a se
ctio
n in
city
zon
e; m
ost
of t
he s
ervi
ce a
reas
are
old
city
zon
es;
plan
ning
ar
ea is
31.
5 km
2 ; pla
nned
pop
ulat
ion
in y
ear 2
020
is 3
2000
0.
Long
quan
san
was
tew
ater
tre
atm
ent p
lant
Was
tew
ater
trea
tmen
t pla
nt
Bes
ide
Lius
hi
trunk
ca
nal
to
the
east
of
Lo
ngqu
ansa
n in
Liu
nan
dist
rict,
enla
rgin
g ar
ea
to th
e so
uth
of e
xist
ing
sew
age
treat
men
t pla
nt
15
X10
4 m3 /d
1968
4.97
Lo
ngqu
ansa
n se
wag
e tre
atm
ent
plan
t m
ainl
y se
rves
wes
t of
the
city
and
sou
ther
n di
stric
t ;
it m
ainl
y in
clud
es L
iuna
n an
d Yu
feng
dis
trict
in
adm
inis
tratio
n; p
lann
ing
area
is 6
0 km
2 ; pla
nned
po
pula
tion
in y
ear 2
020
is 6
0000
0;
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
3
Subp
roje
ct
nam
e Ty
pe
Loc
atio
n C
onst
ruct
ion
scal
e Pr
ojec
t in
vest
men
t(10
4 Yu
an R
MB)
Serv
ice
rang
e
Sew
age
colle
ctin
g sy
stem
M
ainl
y H
edon
g di
stric
t in
Jin
glan
g dr
aina
ge a
rea;
H
edon
g di
stric
t is c
ompo
sed
by o
ld c
ity z
one
and
new
ci
ty
zone
; Ya
nhe
drai
nage
ar
ea
is
Yanh
e ne
w
deve
lope
d ar
ea.
69.9
km
(incl
ude
pres
sure
pi
pe 4
.215
km)
Was
tew
ater
trea
tmen
t pl
ant
Sout
h of
Yan
he d
evel
opin
g zo
ne,
east
of
Gui
bei
high
way
, Ya
nhe
villa
ge w
hich
is
to t
he n
orth
of
Liuj
iang
rive
r
12
.5 X
104 m
3 /d
Xia
ngqi
ao ro
ad p
ump
stat
ion
X
iang
qiao
road
1.
2 X
104 m
3 /d
Jinl
an p
ump
stat
ion
Wes
t of J
ingl
ang
flood
dra
in p
ump
stat
ion
10 X
104 m
3 /d(
rece
nt)
G
utin
gsan
pum
p st
atio
n B
injia
ng ro
ad
5.0
X10
4 m3 /d
Ya
nhe
sew
age
treat
men
t en
gine
erin
g
Dev
elop
ing
zone
pu
mp
stat
ion
N
orth
wes
t of Y
anhe
dev
elop
ing
zone
7.
0 X
104 m
3 /d
33
784.
98
Mai
nly
serv
es s
outh
east
of
the
city
, Li
udon
g di
stric
t and
Yan
he (i
ndus
trial
) dev
elop
ing
zone
; it
mai
nly
incl
udes
city
zon
e an
d Yu
feng
dis
trict
in
adm
inis
tratio
n;
plan
ning
ar
ea
is
58.3
2 km
2 ; pl
anne
d po
pula
tion
in y
ear 2
020
is 4
6000
0;
Sew
age
colle
ctin
g sy
stem
Li
es
in
Liuj
iang
La
bao
coun
ty,
cons
truct
ion
and
deve
lopm
ent a
long
bot
h si
des
of 3
32 n
atio
nal r
oad,
no
rth o
f Jiu
qu ri
ver
16.3
5km
(in
clud
e pr
essu
re
pipe
3.5
km)
Was
tew
ater
trea
tmen
t pl
ant
To
be c
onst
ruct
ed i
n Sh
angt
un
villa
ge
of L
abao
co
unty
, dow
nstre
am o
f Jiu
qu ri
ver
2.5
X10
4 m3 /d
La
bao
sew
age
treat
men
t en
gine
erin
g
Sew
age
pum
p st
atio
n Ji
long
vill
age
1.
8
95
30.2
5
Mai
nly
serv
e Li
ujia
ng
Laba
o co
untry
, i.e
. Li
ujia
ng
coun
ty;
plan
ning
ar
ea
is
25.9
3km
2 ; pl
anne
d po
pula
tion
in y
ear 2
020
is 1
2000
0.
Tota
l
13
6680
.62
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P) 4
Tabl
e 1-
2-1(
cont
inue
d)
Maj
or e
ngin
eerin
g co
nten
t of c
ompr
ehen
sive
fath
erin
g pr
ojec
t for
Liu
zhou
aqu
atic
env
ironm
ent
Sino
-Jap
an F
rien
Liuz
hou
Urb
an I
dshi
p C
ente
r for
Env
ironm
ent P
rote
ctio
n nv
estm
ent &
Dev
elop
men
t Co.
, Ltd
.
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
2. Environmental Protection Targets
According to on-the-spot investigation, in the planned project construction area, there are no important environmental protection targets such as antiques and rare and precious plants and animals. The main environmental protection targets in the assessed area will be as follows:
2.1 Water Environmental Protection Targets
(1) Environmental Protection Targets of Liujiang River
Environmental Protection Targets of river section from above 0.2km downstream of Liudong Water Works will be the control of water quality so as it can reach Standard Category II in GB3838-2002: Environmental Quality Standard on Surface Water; Environmental Protection Targets of river section from below 0.2km downstream of Liudong Water Works will be the control of water quality so as it can reach Standard Category III in GB3838-2002: Environmental Quality Standard on Surface Water;
(2) Environmental Protection Targets of Zhuexi creek
Environmental Protection Targets of this assessed area will be the control of water quality so as it can reach Standard Category III in GB3838-2002: Environmental Quality Standard on Surface Water;
(3) Environmental Protection Targets of Jiuqu River
Environmental Protection Targets of this assessed area will be the control of water quality so as it can reach Standard Category III in GB3838-2002: Environmental Quality Standard on Surface Water;
(4) Drinking water sources area of the city
Liudong Water Works and Liunan Water Works both locate in downstream of the outfall from Zhuexi creek to Liujiang River. Its environmental protection targets to control water quality so it can satisfy CJ3020-93: Water Quality Standard on Living Drinking Water.
2.2 Ecological Environmental Protection Targets
(1)Water ecological environment
Water ecological environment around the outlet of effluents from all Wastewater Treatment Plants.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
5
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Sino-Japan FrienLiuzhou
dship Center for Environment Protection Urban Investment & Development Co., Ltd.
The ambient air and sound environmental protection targets will be to protect living zones, enterprises and public institutions within or around the scope of land planned for use of this Project from being affected or to reduce the effects to lowest acceptable level. Main sensitive environment spots confer table 2-3-1 and table 2-3-2.
2.3 Ambient Air and Sound Environmental Protection Targets
Mainly farms, forests, grassland inside the construction area of the Project.
(2)Land ecological environment
6
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 2-
3-1
En
viro
nmen
t Pro
tect
ion
Targ
ets o
f Zhu
exi c
reek
Com
preh
ensi
ve C
ontro
l Pro
ject
Proj
ect
No
Prot
ectio
n ta
rget
sPo
pula
tion
insi
desc
ope
of a
sses
smen
t D
ista
nce
to t
he
side
line
of r
iver
(m)
Is t
he w
indo
w
faci
ng th
e ri
ver
Impa
ct a
spec
ts
Rem
arks
1 Lo
ngdu
nlu
Mid
dle
Scho
ol
1043
25
Ye
s N
oise
, rai
sed
dust
and
odo
r 2
Dor
mito
ry
of
Liut
ie
Sub-
bran
ch
of
Con
stru
ctio
n B
ank
225
10
No
Noi
se, r
aise
d du
st a
nd o
dor
3 D
orm
itory
of a
rmed
pol
ice
50
34
Yes
Noi
se, r
aise
d du
st a
nd o
dor
4 A
partm
ent o
f the
eld
erly
in w
est r
ing
50
34
Yes
Noi
se, r
aise
d du
st a
nd o
dor
5 D
orm
itory
of L
iuzh
ou P
last
ics F
acto
ry
242
38
Yes
Noi
se, r
aise
d du
st a
nd o
dor
Clo
sed
cond
uit
6 Li
ving
zon
e of
Xih
uanx
iaoy
uan
1230
133
fam
ilies
N
oise
, rai
sed
dust
7
Dor
mito
ry o
f pub
lic tr
affic
com
pany
14
4 17
Ye
s N
oise
, rai
sed
dust
8
Livi
ng z
one
in M
otan
road
81
0 15
21
fam
ilies
N
oise
, rai
sed
dust
9
No.
3 T
eam
in M
otan
92
25
Ye
s N
oise
, rai
sed
dust
10
B
eibe
ixin
g K
inde
rgar
tens
68
10
N
o N
oise
, rai
sed
dust
11
N
o 4
zone
in H
ongq
iao
Roa
d 39
6 10
N
o N
oise
, rai
sed
dust
12
N
o. 1
Rai
lway
Sch
ool
1100
25
N
o N
oise
, rai
sed
dust
Cha
nnel
cha
nge
Nor
th
bran
ch
of
Zhue
xi
cree
k
13
No.
1 z
one
in S
hang
you
Roa
d 26
72
Clo
sely
adj
acen
t 40
2 fa
mili
es
Noi
se, r
aise
d du
st a
nd o
dor
Ope
n ch
anne
l Su
btot
al
81
22
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
7
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 2-
3-1(
cont
inue
d)
Env
ironm
ent P
rote
ctio
n Ta
rget
s of Z
huex
i cre
ek C
ompr
ehen
sive
Con
trol P
roje
ct
Proj
ect
N
oPr
otec
tion
targ
ets
Popu
latio
nin
side
sc
ope
of a
sses
smen
t
Dis
tanc
e to
th
e si
delin
e of
riv
er(
m)
Is t
he w
indo
w
faci
ng th
e ri
ver
Impa
ct a
spec
ts
Rem
arks
1
D
orm
itory
4825
14 fa
mili
esN
oise
, rai
sed
dust
and
odo
r 2
Liuy
ilu M
iddl
e Sc
hool
90
0 10
Ye
s N
oise
, rai
sed
dust
and
odo
r 3
Dor
mito
ry
of
Gua
ngxi
M
ine
Con
stru
ctio
n C
ompa
ny
406
27
Yes
Noi
se, r
aise
d du
st a
nd o
dor
4 Li
angs
hui V
illag
e 27
0 10
Ye
s N
oise
, rai
sed
dust
and
odo
r
Ope
n ch
anne
l
5 Sh
anty
tow
n 11
0 C
lose
ly a
djac
ent
Yes
Noi
se, r
aise
d du
st a
nd o
dor
Ope
n ch
anne
l Te
ntat
ive
livin
g zo
ne fo
r alie
ns
6 Zh
ue V
illag
e 17
0 C
lose
ly a
djac
ent
Yes
Noi
se, r
aise
d du
st a
nd o
dor
7 K
angh
ua S
ub-z
one
260
Clo
sely
adj
acen
t 24
fam
ilies
N
oise
, rai
sed
dust
and
odo
r 8
Dor
mito
ry o
f the
Mac
hine
ry B
lade
s Fac
tory
70
20
Ye
s N
oise
, rai
sed
dust
and
odo
r 9
East
No.
4 Zo
ne o
f Yon
gqia
n 85
0 11
N
o N
oise
, rai
sed
dust
and
odo
r 10
Li
utie
Sub
-offi
ce E
mpl
oyee
’s tr
aini
ng sc
hool
22
Yes
Noi
se, r
aise
d du
st a
nd o
dor
11
Subz
one
of se
ed n
urse
ry
2000
10
N
o N
oise
, rai
sed
dust
and
odo
r 12
N
o. 1
zon
e of
Yon
gqia
n ro
ad
300
Clo
sely
adj
acen
t Ye
s N
oise
, rai
sed
dust
and
odo
r 13
C
aiyu
an C
un
1000
C
lose
ly a
djac
ent
Yes
Noi
se, r
aise
d du
st a
nd o
dor
14
No.
4 z
one
of N
anzh
an R
oad
90
10
Yes
Noi
se, r
aise
d du
st a
nd o
dor
15
No.
21
Mid
dle
Scho
ol
1437
25
Ye
s N
oise
, rai
sed
dust
and
odo
r 16
Run
he B
uild
ing
950
Clo
sely
adj
acen
tYe
s N
oise
, rai
sed
dust
and
odo
r 17
D
orm
itory
are
a of
Liu
tie
980
Clo
sely
adj
acen
t Ye
s N
oise
, rai
sed
dust
and
odo
r 18
C
hang
hong
Hot
el
40
N
o N
oise
, rai
sed
dust
19
D
orm
itory
bui
ldin
g of
No.
2 z
one
in E
gang
R
oad
1050
20
Ye
s N
oise
, rai
sed
dust
and
odo
r
Sout
h br
anch
of
Zh
uexi
cr
eek
20
No.
4 K
inde
rgar
ten
of L
iuzh
ou R
ailw
ay B
urea
u 40
0 30
Ye
s N
oise
, rai
sed
dust
and
odo
r
Ope
n ch
anne
l
Subt
otal
1129
1To
tal
1941
3
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
8
Impa
ct a
spec
ts
otec
tion
targ
ets
Popu
latio
n af
fect
ed
Dis
tanc
e to
str
uctu
res
emitt
ing
odor(
m)
D
irec
tion
Con
stru
ctio
n pe
riod
O
pera
tion
peri
od
Rem
arks
Bai
sha
Was
tew
ater
trea
tmen
t pro
ject
46
0 55
So
uth
side
R
aise
d du
st
and
nois
e N
oise
and
odo
r
1 H
uilo
ge
ng V
illa
310
8 21
Nor
th si
de
Rai
sed
dust
an
d no
ise
Noi
se a
nd o
dor
Floa
ting
popu
latio
n
onal
san
itatio
nsc
hool
24(
to b
ound
ing
wal
l of
play
grou
nd)
So
uth
side
R
aise
d du
st
and
nois
e N
oise
and
odo
r
Long
quan
shan
Was
tew
ater
trea
tmen
t pro
ject
1
e Ji
la V
illag
36
195
Sout
h si
de
Rai
sed
dust
an
d no
ise
Noi
se a
nd o
dor
Floa
ting
popu
latio
n
Laba
o W
aste
wat
er tr
eatm
ent p
roje
ct
1 B
acks
ide
of J
iand
u V
illag
e 20
11
1 N
orth
wes
t R
aise
d du
st
and
nois
e N
oise
and
odo
r A
djac
ent
to
com
preh
ensi
ve
build
ing
Mid
dle
side
of
Ji
andu
Vill
age
4656
Wes
t sid
e R
aise
d du
st
and
nois
e N
oise
and
odo
r
Tota
l 32
89
No
Pr
2 R
egi
17
98
2
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P) 9
Tabl
e 2-
3-2
En
viro
nmen
tal p
rote
ctio
n ta
rget
s of w
aste
wat
er tr
eatm
ent p
roje
ct
Sino
-Jap
an F
rien
Liuz
hou
Urb
an I
dshi
p C
ente
r for
Env
ironm
ent P
rote
ctio
n nv
estm
ent &
Dev
elop
men
t Co.
, Ltd
.
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
3.Environment impact assessment
3.1 Influential factors over the environment
Table 3-1-1 is to be referred to for the influential factors over the environment by the water treatment project
Table 3-1-1 Influential factors over the environment Activity Influential factor Impact on environment
Construction
(1)earth cutting (2)piling of site materials (3)machinery operation (4)dredging river bed
Soil and air pollution Dust pollution Noise and dust pollution Odor and waste disposal
Operation of the sewage treatment plant
(1)odor discharge (2)sludge storage (3)emission (4)machinery noise
Air pollution Soil, ground water and air pollution Surface water pollution Noise to residence
Sewage transport in pipeline (1)leak of sewage pipes (2)fresh sewage
Soil and ground water pollution Effect of sewage plant
Zhuexi,jiuquhe, liujiang banks input of sewage water Surface water pollution
Daily life of workforce (1)household sewage (2)household wastes
Sewage treatment plant, surface water, waste landfill
3.2 Standards of Assessment
3.2.1 Standards of Environment Quality
(1)Water Environment
River section from above 0.2km downstream of Liudong Water Works will observe Standard Category II in GB3838-2002: Environmental Quality Standard on Surface Water; River section from below 0.2km downstream of Liudong Water Works will observe Standard Category III in GB3838-2002: Environmental Quality Standard on Surface Water. GB/T14848-93 Standard Category III of <<Quality Standard of Ground Water>> will be observed for ground water environment.
(2)Ambient Air
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
10
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Ambient air will respect Class II Standard of Ambient Air Quality Standard (GB3095-1996)
(3)Noise
In accordance with Standard of Environmental Noise of Urban Area (GB3096-93), and Regulations on the Division of Regions Applicable to Standard of Environmental Noise of Urban Area of Liuzhou City, the sound environmental quality standards of the regions where every Wastewater Treatment Plants locate confer table 3-2-1。
Table 3-2-1 Sound environmental quality standards of the regions where the project is located
Standard value dB(A)
Name of project Regional division
Daytime Nighttime
Remarks
Baisha WWTP Category II zone 60 50 Longquanshan WWTP Category II zone 60 50
Yanghe WWTP Category III zone 65 55 Industrial development zone
Labao WWTP Category II zone 60 50
3.2.2 Standard of Pollutants Discharge
(1)Discharge Standard of Water Pollutants
Effluents from every Wastewater Treatment Plants shall observe Class I Category B Discharge Standard in Urban Wastewater Treatment Plant (GB18918-2002).
(2)Discharge Standard of Ambient Air Pollutants
For odor pollutants from all Wastewater Treatment Plants, Class II Standard (newly established) in Discharge Standard in Urban Wastewater Treatment Plant (GB18918-2002) shall be respected.
(3)Noise
Noise at boundary of Yanghe Wastewater Treatment Plants shall observe Category III in Standard of Noise at Boundary of Industrial Enterprises (GB12348-90), that is 65dB (A) for daytime and 55dB(A) for nighttime; Category II of <<Noise standard at Boundary of Industrial Enterprises>> (GB12348-90) will be observed for three other treatment plants, i.e. 60dB (A) for daytime and 50dB (A) for nighttime.
For noise produced on construction site, Noise Limits for Construction Site (GB12523-90) will be observed.
(4)Bottom sludge of rivers and sludge from Wastewater Treatment Plants
For pollutants in sludge from rivers and all Wastewater Treatment Plants, sludge control standard in Discharge Standard in Urban Wastewater Treatment Plant (GB18918-2002) shall be respected.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
11
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Identification for extraction procedure toxicity will adopt Identification Standard for Hazardous Wastes (GB5085.3-1996).
(5)Sanitation prevention and protection distance
In accordance with requirement of the Construction Standards for Urban Wastewater Treatment Engineering Project issued by the Construction Ministry, sewage and sludge disposal facilities emitting odors shall locate leeward to the summer dominant wind inside the auxiliary production zone of the WWTP, and shall be as far as possible from the living zones outside the plant area; provided this standard is not reached, the distance from the living zones outside the plant area shall be no less than 50~100 m from the production facilities emitting odors inside the WWTP.
3.3 Scope of assessment
Scope of assessment on water, ambient air, sound and ecological environment of this Project confers table 3-3-1。
Table 3-3-1 Summary Table of Scope of Assessment for Planned Project Project Scope of assessment
Liujiang River
River section totally 65km from 0.5 km upstream of outfall from the Lumber Mill to 10 km downstream of outfall of effluents from Yanghe WWTP(about 0.5km upstream of Honghua hydropower station)
Zhuexi creek
South branch: from railway culvert of regional mine construction autofleet to the converging point of south and north branch; north branch: from Liutie Party School to the converging point of south and north branch; and from the converging point of south and north branch to Zhuexi wastewater pumping station; River course length is 10.8km
Water Environment
Jiuqu River
River section totally 3.5 km from 0.5km upstream to 3 km downstream of the outfall of effluents from Labao WWTP
Ambient air Within 3~4km from boundaries of the plant of each sub-projects Sound environment Within 200 m from boundaries of the plant of each sub-projects
Ecological environment Same as scope of water environment assessment Desilting works Within 50 m from both sides along Zhuexi creek
3.4 Environment impact assessment
3.4.1Construction plan
Liuzhou Environment Management Project – wastewater treatment component will be completed by year 2008. Construction period is 2004-2008, in which 2003-2004 is preparation stage for the project. Implementation plan of each sub project is in table 3-4-1。
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
12
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Table 3-4-1 Planning table for engineering implementation
Type Major engineering content Construction
period Intercepting
system Construct sewage intercepting main for south and north branches
2006~2007
River channel fathering
Sediment dredge, brickwork protection, block clearing and broadening
Comprehensive fathering engineering of Zhuexi
creek Landscape
construction Affectation of both sides of the channel, ground paving and decoration
2005~2010
Sewage collecting system
Rebuild existing dredge trunk canal, newbuild some pipe duct Baisha sewage treatment
engineering Sewage treatment
New build one Baisha sewage treatment plant
2005~2008
Longquansan sewage treatment engineering
Sewage treatment Enlarge Longquansan sewage treatment plant
2006~2009
Sewage collecting system
New build sewage pipeline and sewage elevating pump station Yanhe sewage treatment
engineering Sewage treatment
New build Yanhe sewage treatment plant(first term
2007~2009
Intercepting engineering
New build sewage pipeline and sewage pump station Labao sewage treatment
engineering Sewage treatment
New build one Labao sewage treatment plant
2007~2009
3.4.2 Environment impact of construction period
3.4.2.1 Air environment
There are mainly two types of air environment pollution source in the project:①malodor;②dust
(1)Malodor
The malodor will be produced mainly during sludge storage and transport of Zhuexi creek. By comparison, apparent odor will appear during the dredging process of the river; grade 2 will be observed at 30m with light smell but lower than the odor limit (grade 2.5-3.5): the smell will disappear beyond 50m and almost no odor felt. There is a great number of enterprises and residence along both banks of Zhuexi creek and some of them are located within 30m of sensitive stripes of influence. But the influence will be temporary and disappear with the completion of the project works.
(2)Dust
Dust will cause the major pollution over the site by uncontrolled sources during the construction period: preparation of site, earth cutting and filling, material storage, loading and unloading and application of building materials, in and out of the site vehicles.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
13
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Attention to the air pollution must be addressed during the working period and related control measures taken in reducing dust pollution due to popular residence and enterprises located along the banks and pipeline network sites.
During Baisha sewage treatment plant construction, because Huilong village and regional nurse school near the factory, they will be affected by constructing dust.
The nearest village is Jila village which is 180m away from arranged Longquansan sewage treatment plant(second term). The impact of constructing dust is minor.
Dust produced by Labao sewage treatment plant will affect environmental air quality of middle and lower part of Jiangdu village.
3.4.2.2 Acoustical environment
Construction noise is mainly generated by constructing machines and transportation vehicles. Noise intensity will be different in different constructing stage.
There are many environmental sensitive points for comprehensive fathering engineering and pipeline engineering of Zhuexi creek. So there exists environmental impact during construction period. Noise for Baisha sewage treatment plant construction will affect ambient acoustic environment of Huilong village and regional nurse school. The nearest village is Jila village which is 180m away from arranged Longquansan sewage treatment plant(second term). Daytime constructing noise is relatively minor, but nighttime construction will disturb the residents. Noise produced by Labao sewage treatment plant project works will have an impact over Jianducun Zhongtun and Xiatun and the surroundings.
3.4.2.3 Solid waste
Solid waste during constructing period mainly include bed mud and garbage produced by river channel clearing; residue earth, root and detritus from earthwork dredge; construction garbage by construction dismantling; material waste of sandstone, concrete etc. of material transportation; waste and desertion of stone, clinker and construction material for road paving. In addition, constructing workers will generate some domestic garbage.
(1)Riverbed mud
There will be 33027m3 bed mud of river channel to clear during comprehensive treatment works of Zhuexi creek. The volume of wastes produced during construction works and living will exceed 1300m3 , which will be sent to Lichonggou landfill for treatment in time.
(2)Constructing garbage
The area of dismantling house is 59721m2. During construction of sewage treatment plant, construction garbage will be generated for the waste and desertion of stone, clinker and
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
14
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
constructing material.
Earthwork and construction garbage of arranged engineering are all normal solid waste, so they can be consumed by basic earth refilling, depression filling or vegetation along the banks which are appointed by municipal administrative and planning department. Surplus garbage can be sent to Ouyanlin garbage landfill or Licungou landfill for disposal. Deserted earthwork will not cause disadvantageous environmental impact generally.
(3)Domestic garbage
Domestic garbage should be taken to certain place appointed by environmental sanitation department for disposal lest affect ambient environment.
3.4.2.4 Aquatic environment
(1)Factory sewage
Major pollutants for constructing sewage are inorganic suspended mater(SS) and extremely small quantity of oil. Because of gravitational setting and adsorption, discharged water can easily get into sediment phase and will not endanger surface water and underground aquatic environment.
(2)Domestic wastewater
Fathering engineering and sewage pipeline engineering of Zhuexi creek should use existing facilities near the construction site as much as possible.
At construction site of sewage treatment plant, there should set corresponding dry toilet. The dejecta should be collected and taken out periodically. It can be used for farmland fertilizer and vegetation.
(3)Leachate of mud storage
River mud when removed from the river bed will be piled by the river banks for transport later when dried. During the process, leachate will be generated with high concentration of contaminants. Therefore temporary trench will be made to guide the leachate into Zhuexi creek, which will be lifted and sent to Longquanshan sewage treatment plant for treated discharge according to specified standards. No impact over environment will be produced after the above measures have been taken.
3.4.2.5 Ecological environment
All the surface vegetation will be removed in the permanent occupation during the working period, including crops, trees, natural covering causing the surface exposed and natural sight damaged with additional water and soil losses.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
15
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Influences over environment will be caused by removal or damage of the surface vegetation in the occupied land. Site clearance, leveling and timely restoration of plants will be required after completion of project works to reduce impact over the environment.
3.4.2.6 Urban traffic
Impacts of traffic during construction period are manifested by three aspects: ①traffic hampering from road breakage for pipeline construction② traffic hampering by piling of earthwork and excavating of the road③ increase of transportation vehicles on the road
Works of sewage pipelines will have major influence over the road traffic. Though stage work may be carried out but there are certainly some earth to store and traffic will be affected. By estimate, pipeline work passing each road will need over 20 days with road blocked for 20 days.
There will be huge amount of raw materials and soil disposal (sand, stone and cement). The influence of their transport can be reduced to minimal by operation during night time.
3.4.3 Conclusions of the environmental impact assessment
3.4.3.1 Water environment
(1)Reducing the CODcr pollution load.
According to the population development planning, industrial growth rate and drainage planning of Liuzhou, it is predicted that the discharge amount of CODcr in life wastewater and industrial sewage will be about 60351 t/a in Liuzhou in 2010. After this project is built up and begins running, the urban wastewater treatment capacity of Liuzhou will reach to 500,000m3/d (including the first stage project of Longquanshan), and the amount of CODcr will be reduced by 44639.5t/a, accounting for 74% of the total amount of the CODcr discharged in Liuzhou in 2010. This has important practical significance to the implementation of Plan for Total Amount Control of Pollutant and the facilitation of local economic development.
(2)Zhuexi Creek comprehensive management project
Under the condition of the water quality of the initial reaches reaching the standard, after the south-branch interception project intercept the 80,000 tons of sewages from more than 10 outlets along the way, the everyday amount of COD. BOD5. NH3-N. TP will be reduced by 72 tons, 5.78 tons, 1.35 tons and 0.14 tons separately. The water quality along the way will reach the Class � standard of " quality standard of surface water environment " (GB3838-2002).
Under the condition of the water quality of the initial reaches reaching the standard, after the north-branch interception project intercept the 35,000 tons of sewages from more than 10 outlets along the way, the everyday amount of COD. BOD5. NH3-N. TP will be reduced by 5.64 tons,
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
16
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
2.16 tons, 0.52 tons and 0.05 tons separately. The water quality along the way will reach the Class � standard of " quality standard of surface water environment " (GB3838-2002).
(3)Environmental improvement result of Jiuquhe River.
The completion of Labao sewage treatment plant will improve greatly the water quality along the 30km section of Jiuquhe river, Maohe river and Xiangshuihe river.
(4)Wastewater treatment project
①Environmental improvement function .
After water environmental comprehensive management project is completed, all bank contaminated zones will disappear in the first class protection zone of the drinking water source of Liuzhou. The water quality of the water catchments of the Liunan water works and Liudong water works can reach the Class � standard of " quality standard of surface water environment " (GB3838-2002).
In the 5.9Km long reach from the downriver site 200 meters away from the water catchment to the Huilonggou (Liubei trunk canal) river entrance, all sewage outlets are closed. The water quality of the water catchments of the Liunan water works and Liudong water works can reach the Class � standard of " quality standard of surface water environment " (GB3838-2002).
In the 34.3Km long reach from Huilonggou river entrance to Liushi trunk canal river entrance, more than 20 sewage outlets are intercepted. This will greatly improve the water quality of Liujiang River and the environment of the sediment depositing area of 50,000m2 at the same time.
The wastewater of Jinglan trunk canal will be intercepted into Yanghe Wastewater Treatment Plant, and discharged when reaching the standard after treatment. The water quality of the original Najing reach will be improved and reduce the pollution area caused by the sewage discharged by the Liushi trunk canal (the effluent outlets of Longquanshan Wastewater Treatment Plant), as well as the pollution degree.
(5)The impact on the Liujing River water quality of the effluent discharged by the Wastewater Treatment Plant.。
Under normal operation of all the sewage treatment plants, the super pollution stripe flow holds 10% of the sectional volume down steam of Liushi trunk channel outlets, which will be allocated in the scope of mix area and transition area. In case 4 sewage plants are under abnormal situation, there will be severe pollution stripes formed down stream generating major influence over the intake function. The situation equals to that no sewage treatment plants in existence. Therefore, using the World Bank loan for comprehensive water treatment in Liuzhou is all necessary.
3.4.3.2 Air environment
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
17There are sensitive sites around Baisha, Longquanshan and Labao Wastewater Treatment Plant.
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Though the distance from the malodor-producing buildings to the sensitive sites can't respond to the request of the predicted sanitary protection distance of the Wastewater Treatment Plants, it can meet the demand for “City sewage treatment project construction criterion “(Sewage, producing the malodor and mud production facility should lie in the leeward of summer leading wind direction. It should be far away from the inhabited region outside the factory, and accord with the relevant regulations of the country. When it cannot meet the demand, the distance from the malodor-producing buildings to the residential area should not be smaller than 50-100 meters). In order to improve the environment, reduce pollution and protect residential health, the greening protection shelter belt should be built around the plants to increase the greening area and prevent the pollution from diffusion.
In addition, regular monitoring of odor produced by the sewage treatment plant during its operation. In case of over pollution and nuisance to the residence, relocation of those affected will be required
3.4.3.3 Acoustic environment
Relative limit value set out in <<Noise standard at Boundary of Industrial Enterprises>> (GB12348-90) are complied with by all the sewage treatment plants in terms of boundary noise, which contributes almost zero to the increase of boundary noise level and thus having little impact over the surroundings during their operation.
3.4.3.4 Solid waste
The volume of sludge generated during the operation by all the sewage treatment plants will be 103,000m3/a, the screen residue and settled residue 16,000m3/a. The solid wastes will be sent to Lichonggou landfill for disposal, which has advanced anti-leak and sewage treatment plant with daily capacity of 600ton capable of receiving solid wastes produced by the project works.
4. Management plan of environmental protection
4.1 Management organization and duties
4.1.1 Establishment of organization
Due to the great difference of environmental management content between the construction period and operational period and the difference of working limit between temporary and long term nature, separate organizations must be set up with stage responsibilities. The corresponding
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
18
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
organization will be dismantled after completion of the project works and the operational organization taking over with some overlapping time as situation may require.
(1)Environmental management organization during construction
In order to guarantee the validity and equity of the environmental management, the environmental management organization which is independent of the construction department and has none conflict of interest with the project should be established and its employees should have proper longevity and experience. It is suggested that the management organization for Labao wastewater treatment project is set up alone and the other subprojects belong to another management organization. See Table 4-1 for the organizations
Table 4-1 Setup of environmental management organization during construction
Personnel Setup Labao wastewater
treatment project
Other sub
projects
Group leader(number of people) 1 1
Supervisor of environmental air(number of people) 1 2
Supervisor of noise(number of people) 1 2
Supervisor of solid waste(number of people) 1 2
Workers of complaining hotline(number of people) 1 1
(2)Environmental management organization during operation
Environmental management during operation is a kind of long-term and complex work. Each Wastewater Treatment Plant should establish environmental protection department, matched with 2 full time workers and a factory leader for the management. Meanwhile, it should also set up environmental monitoring organization with 6—8 people.
4.1.2 Duty of environmental management
4.1.2.1 Construction period
The environmental management group should draft out the detailed plans for management according to the construction plans of the project, and then check up them each month and do some necessary amendment.
The group leader should report to the project leaders and render the achievements of environmental management in a fixed time monthly and then put forward some purposeful resolutions for the checked latent environmental problems.
The supervisors of atmosphere, noise and solid waste should inspect the implementation conditions of the environmental prevention measures during each period according to the plans.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
19
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Besides, they should also arrange all the monitoring items carried out in a fixed time and report the results of inspection and monitoring and local treatment opinions to the group leader monthly.
The workers of complaining hotline see to the note and clean up of the complaining calls, report it to the group leader and in addition, answer the handling results to the public.
4.1.2.2 Operation period
(1)Environmental protection management department
See to the draft of environmental protection system then monitor its implementation. It mainly contains:
a. Publicize, organize and carry out the guidelines, policies, edicts and ordinances relevant to the national environmental protection. Assort with the local environmental protection department to do well with the environmental protection.
b. Carry out various environmental protection regulations issued by the superior charge department.
c. Periodically check up and maintain the equipment in the Wastewater Treatment plant in order to guarantee its normal running, inspect the implementation conditions of the environmental protection measures put forward in the EA report.
d. Lead and organize the environmental monitoring during the operation period ( consist of the abnormal operation period) and set up the monitoring files.
e. Register the waster water and its quality of all the waste discharge units entering into the wastewater pipe network system and monitor the running conditions of their wastewater pretreatment facilities.
f. Investigate and deal with the pollution accidents and bothers.
g. Develop the environmental protection education, technical training and academic communications in order to heighten the personnel disposition and extend the advanced techniques and experience.
(2)Monitoring station
①Duty
Monitoring station sees to the draft of the monitoring plans and the collection, clear up and keeping in files of the data, and then reports to the leadership. The duties contain:
a. Develop the environmental monitoring work on schedule and compile the monitoring report and the forms.
b. A periodically check up the wastewater quality and its emission of the major waste discharge unit.
c. Take part in the investigation of the factory’s polluting accident.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
20
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
d. Do well with the maintenance and checkout of the monitoring equipment.
②Configuration of monitoring equipment
The table 4-2 is the monitoring equipment list configured in the monitoring stations in each Wastewater Treatment Plant.
Table 4-2 Monitoring equipment list needed in Wastewater Treatment Plant during construction Serial number Equipment name Amount (set)
1 Atom absorption spectrophotometer 1 2 Electric-heated thermostatic water bath 3 3 Electrothermal constant-temperature dry box 3 4 Electro-heating standing-temperature cultivator 2 5 BOD incubator 2 6 Instant BOD meter 1 7 Spectrophotometer 2 8 Acidimeter 2 9 Dissolved oxygen determinator 3
10 Moisture determinator 2 11 Gas analyser 3 12 Precision scale 2 13 Physical libration 2 14 Biomicroscope 1 15 Ion pure water exchanger 2 16 refrigerator 2 17 Electric centrifuge 1 18 Vacuum pump 2 19 Sterilizer 1 20 Magnetic stirrer 2 21 Computer 1 22 COD determinator 2 23 Gas chromatograph 1 24 TOC determinator 1 25 Air sampler 2 26 Dust sampler 2 27 Sound level meter 2 28 Others Some
4.2 Environmental management plan during construction
Influence will occur both during the construction and operational periods. Corresponding measures shall be taken to reduce all the impact over environment to a minimal degree. Environmental monitoring procedures have been regulated for efficient function of related policies. The client shall sign contract with qualified environmental monitoring institute.
Liuzhou World Bank project office will perform its duty of project management in addition to following up and reporting the environmental measures being practiced.
The project office will be responsible for the actual conditions of follow up and report on the environmental measures. The institutes in charge are as follows:
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
21
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Sino-Japan FrienLiuzhou
dship Center for Environment Protection Urban Investment & Development Co., Ltd.
Table 4-2-1 to Table 4-2-3 gives a summery of environmental influence, proposed strategy, monitoring method and responsible organization.
f. Contractor
e. Supervisor/environment engineer
d. Sewage company
c. Environmental protection bureau
a. Construction bureau Client
22
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 4-
2-1
En
viro
nmen
tal m
anag
emen
t pla
n fo
r com
preh
ensi
ve tr
eatm
ent o
f Zhu
exi c
reek
dur
ing
proj
ect p
erio
d
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
R
eloc
atio
n &
la
nd
occu
patio
n
RA
Ps a
nd c
ompe
nsat
ion
R
ando
m
sam
plin
g an
d co
mpl
ain
a,b
Mal
odor
♦
♦
♦
♦
The
clea
ring
proj
ect s
houl
d be
con
stru
cted
in lo
w w
ater
sea
son
step
by
step
afte
r the
sid
e ba
nks
sew
age
inte
rcep
tion
proj
ect f
inis
hing
, and
th
e sl
udge
and
rubb
ish
shou
ld b
e tra
nspo
rted
to L
icho
nggo
u la
ndfil
l fie
ld fo
r inn
ocuo
usne
ss tr
eatm
ent.
If th
e sl
udge
and
rubb
ish
can
not b
e tra
nspo
rted
timel
y, th
ey s
houl
d be
sto
cked
in g
rass
bag
s to
redu
ce th
e du
st a
nd th
e m
alod
or d
isch
argi
ng,
to a
void
the
effe
ct o
n th
e lif
e qu
ality
of r
ound
resi
dent
s.
The
slud
ge sh
ould
be
trans
porte
d he
rmet
ical
ly to
avo
id fa
llout
and
impa
ir of
urb
an la
ndsc
ape.
Prop
er se
lect
ion
of ti
me
and
rout
e fo
r mud
tran
spor
t to
avoi
d tra
ffic
rush
hou
r and
bus
y an
d po
pula
r are
as
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Dus
t
♦
♦
♦
♦
♦
Stre
ngth
en m
anag
emen
t, co
nstru
ct c
ivill
y, s
light
load
and
unl
oad
cons
truct
ion
mat
eria
ls g
ently
, cle
an th
e m
ud a
ttach
ed o
n th
e su
rfac
e of
tru
cks
befo
re g
oing
out
of t
he w
orks
ite a
nd c
over
the
vehi
cles
with
clo
th w
hen
trans
porti
ng li
me
, san
dsto
nes,
cem
ent a
nd fl
y as
h w
hich
are
ap
t to
prod
uce
dust
.
Wat
er s
pray
and
cle
anin
g re
quire
d fo
r du
st p
reve
ntio
n。R
esid
ence
, sc
hool
s an
d en
terp
rises
aro
und
the
proj
ect
site
bei
ng s
ensi
tive
and
requ
iring
regu
lar c
lean
ing
durin
g co
nstru
ctio
n st
ages
of r
iver
wor
ks, 3
tim
es p
er d
ay; o
ther
rive
r sec
tions
will
nee
d le
ss s
pray
or t
wic
e pe
r da
y. O
ne sp
ray
truck
is st
atio
ned
at w
orki
ng si
te.
Sele
ct c
onst
ruct
ion
unit
with
cer
tain
stre
ngth
, and
ado
pt c
omm
erci
aliz
ed c
oncr
ete
and
clos
e ty
pe v
ehic
les.
Asp
halt
mix
pla
nt lo
cate
d w
here
with
in 3
00m
eter
s of l
eew
ard
win
d di
rect
ion
no sc
hool
s, ho
spita
ls a
nd re
side
nce
situ
ated
; mix
ing
equi
pmen
t sh
all b
e tig
htly
seal
ed a
nd d
ust r
emov
al d
evic
es e
quip
ped.
Lab
or p
rote
ctio
n sh
all b
e ad
dres
sed
for w
orki
ng st
aff e
ngag
ed.
Was
tes a
nd so
il di
spos
ed fr
om b
uild
ing
site
del
iver
ed in
a ti
mel
y m
anne
r to
the
low
site
or l
andf
ill d
esig
nate
d by
city
util
ity d
epar
tmen
t.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Solid
was
te
♦
♦
♦
♦
Slud
ge s
houl
d be
rem
oved
aw
ay a
s so
on a
s po
ssib
le i
n or
der
to a
void
dis
turb
ing
the
near
by r
esid
ents
. If
the
slud
ge c
anno
t be
rem
oved
im
med
iate
ly, i
t sho
uld
be p
acke
d in
stra
w b
ags
to r
educ
e ra
ised
dus
t and
odo
r. Sl
udge
sho
uld
be c
arrie
d in
airt
ight
veh
icle
s to
pre
vent
the
drop
ping
and
impa
ctin
g si
ght a
nd sa
nita
tion.
Slud
ge s
houl
d be
tra
nspo
rted
to t
he L
icho
nggo
u la
ndfil
l si
te. P
ay a
ttent
ion
to t
he f
acili
ty m
anag
emen
t of
filt
erin
g so
lutio
n tre
atm
ent
to
ensu
re it
to b
e di
scha
rge
afte
r rea
chin
g th
e st
anda
rd.
Dis
card
ed s
oil a
nd c
onst
ruct
ion
garb
age
shou
ld b
e fil
led
in s
ites
desi
gnat
ed a
s th
e m
unic
ipal
pla
nnin
g de
partm
ents
req
uire
. If
not b
e us
ed
tem
pora
rily,
the
back
fill s
ites s
houl
d be
pla
nted
with
veg
etat
ion
to a
void
soil
and
wat
er lo
sses
.
The
disc
arde
d sa
nd, s
tone
, bui
ldin
g m
ater
ials
, ste
el a
nd p
acki
ng m
ater
ials
sho
uld
be m
anag
ed a
nd re
cove
red
colle
cted
by
a sp
ecia
l per
son.
C
lean
the
wor
king
face
in ti
me
and
do n
ot le
ave
the
“seq
uela
e”.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
23
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
T
able
4-2
-1 c
ond.
En
viro
nmen
tal m
anag
emen
t pla
n fo
r com
preh
ensi
ve tr
eatm
ent o
f Zhu
exi c
reek
dur
ing
proj
ect p
erio
d
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Noi
se
Red
uce
nois
e le
vel
♦
Try
to c
hoos
e lo
w n
oise
equ
ipm
ent,
such
as:
Rep
lace
oil
burn
ing
mac
hine
with
hyd
raul
ic p
ress
ure
and
choo
se h
igh-
freq
uenc
y vi
brat
or.
♦
♦
♦
♦
♦
♦
♦
♦
♦
Soun
d ca
n be
red
uced
thro
ugh
exha
ust m
uffle
and
vib
ratin
g pa
rts o
f in
sula
tion
engi
nes
for
fixed
mac
hine
ry, e
xcav
atio
n an
d tra
nspo
rtatio
n m
achi
nes,
such
as n
avvy
and
bul
ldoz
er.
Soun
d le
vel w
ill b
e ra
ised
due
to th
e vi
brat
ion
of lo
osen
ed p
arts
or t
he m
uffle
dam
age
of th
e m
achi
ne S
o th
e dy
nam
ic m
achi
nery
shou
ld b
e re
paire
d an
d m
aint
aine
d re
gula
rly.
Unu
sed
equi
pmen
t sho
uld
be c
lose
d im
med
iate
ly. T
rans
porta
tion
vehi
cles
shou
ld sl
ow d
own
whe
n en
terin
g th
e si
tes a
nd re
duce
bla
ring.
R
educ
e m
an-m
ade
nois
e M
achi
nes
shou
ld b
e op
erat
ed a
ccor
ding
to r
egul
atio
ns. W
hen
disa
ssem
blin
g ba
ffles
and
bra
cket
s, op
erat
ion
regu
latio
ns s
houl
d be
obs
erve
d to
red
uce
nois
e fr
om c
ollis
ion.
Tr
y no
t to
use
whi
stle
s, be
lls a
nd fl
utes
too
freq
uent
ly w
hen
givi
ng in
stru
ctio
ns. U
se o
f mod
ern
equi
pmen
t is e
ncou
rage
d.
Rat
iona
lly a
rran
ge c
onst
ruct
ion
time:
A
ltoge
ther
ther
e ar
e 6
scho
ols
and
kind
erga
rten
alon
g Zh
uexi
cre
ek s
ectio
ns. C
onst
ruct
ion
wor
k cl
ose
to th
e sc
hool
s sh
all r
equi
re s
cien
tific
wor
king
pr
ogra
m a
nd c
onsu
ltatio
n m
ade
with
sch
ools
for
tim
e of
use
of
high
noi
se e
quip
men
t. W
ork
shal
l be
arra
nged
at w
eeke
nds
or f
ree
time
in a
void
ing
influ
ence
ove
r the
scho
olin
g.
Oth
er r
iver
sec
tions
with
in t
he t
reat
men
t sc
ope
are
resi
denc
e, c
omm
erci
al a
nd i
ndus
trial
com
bina
tion,
use
of
high
noi
se m
achi
nery
sha
ll av
oide
d si
mul
tane
ousl
y. In
add
ition
to th
is, u
se o
f hig
h no
ise
mac
hine
ry sh
all b
e ar
rang
ed m
ostly
in d
aytim
e an
d no
t nig
ht ti
me.
Se
tting
up
tem
pora
ry so
und
barr
ier:
Su
burb
sec
tion:
tem
pora
ry s
ound
bar
rier s
hall
be s
et u
p fo
r sec
tion
usin
g hi
gh n
oise
mac
hine
ry to
redu
ce n
oise
pol
lutio
n if
resi
denc
e is
loca
ted
100m
. ar
ound
.
Urb
an s
ectio
n: m
ainl
y B
eizh
ihe
river
sec
tion,
mos
t par
t loc
ated
in b
usy
city
are
a w
ith d
ense
dis
tribu
tion
of re
side
nce
and
ente
rpris
es. T
empo
rary
sou
nd
barr
ier s
hall
be re
quire
d du
ring
cons
truct
ion
wor
ks. B
uild
ing
wor
d by
stag
es w
ill a
lso
redu
ce n
oise
and
influ
ence
to u
rban
vie
w.
Nan
zhih
e riv
er h
as d
eep
sect
ions
whi
ch p
osed
diff
icul
ty in
set
ting
up s
ound
bar
riers
. Due
to m
any
sens
itive
poi
nts,
stric
t mea
sure
s sh
all b
e ta
ken
in
rega
rds o
f the
abo
ve p
oint
s in
redu
cing
noi
se p
ollu
tion.
In a
dditi
on to
the
abov
e m
easu
re ta
ken,
goo
d re
latio
nshi
p m
ust d
evel
oped
with
the
ente
rpris
es a
nd
com
mun
ities
alo
ng th
e riv
er s
ectio
ns. N
otic
e m
ust b
e gi
ven
prio
r to
oper
atio
n an
d re
port
follo
wed
on
the
wor
king
pro
gres
s an
d th
e m
easu
res
adop
ted
in
redu
cing
noi
se. C
omm
on g
roun
d sh
all
be t
hus
achi
eved
. Pro
per
econ
omic
com
pens
atio
n w
ill b
e gi
ven
to r
esid
ence
and
ent
erpr
ises
mos
tly a
ffect
ed.
Com
plai
n te
leph
one
mus
t be
prov
ided
dur
ing
proj
ect p
erio
d to
rece
ive
resi
denc
e co
mpl
ains
for p
ositi
ve tr
eatm
ent.
Ran
dom
Sa
mpl
ing
And
C
ompl
ain
b,c,
e,f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
24
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 4-
2-1
cond
.
Envi
ronm
ent m
anag
emen
t pla
n du
ring
Zhue
xi c
reek
com
preh
ensi
ve tr
eatm
ent p
roje
ct
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Soil
and
wat
er
loss
es
♦
♦
♦
♦
Atte
ntio
n sh
ould
be
paid
to e
arth
wor
k ba
lanc
e. T
ry to
use
the
soil
dug
up fo
r bac
kfill
of c
onst
ruct
ion
site
s. R
emai
ning
dis
card
ed s
oil
aris
ing
from
layi
ng p
ipes
and
con
stru
ctin
g W
aste
wat
er T
reat
men
t Pla
nt s
houl
d be
mov
ed to
oth
er c
onst
ruct
ion
site
s fo
r ba
ckfil
l and
fo
rest
atio
n or
sent
to la
ndfil
l site
s.
Tem
pora
ry s
tora
ge y
ard
shal
l be
set u
p w
ithin
the
scop
e of
land
scap
ing
in re
duci
ng te
mpo
rary
occ
upat
ion:
Fla
t gro
und
shal
l be
chos
en
for s
tora
ge o
f mat
eria
ls to
be
used
for B
eizh
ihe
river
cou
rse
chan
ging
wor
ks. R
esto
ratio
n of
sur
face
sha
ll be
requ
ired
afte
r com
plet
ion
of th
e w
orks
.
Con
stru
ctio
n sh
ould
be
carr
ied
out
step
by
step
in
diffe
rent
are
as.
Do
not
cond
uct
the
proj
ect
on a
lar
ge s
cale
at
the
sam
e tim
e,
espe
cial
ly th
e pi
pelin
e la
ying
pro
ject
, so
as to
sho
rten
the
dura
tion
of s
ingl
e pr
ojec
t. C
ontro
l mea
sure
s sh
ould
be
take
n fo
r th
e ba
re
surf
ace
to sh
orte
n ex
posu
re ti
me
and
redu
ce so
il an
d w
ater
loss
es.
Soil
shou
ld b
e pi
led
ratio
nally
at t
he c
onst
ruct
ion
site
s by
bei
ng k
ept o
ff cl
oaca
and
riv
erw
ay s
o th
at th
e im
pact
of
soil
and
wat
er
loss
es o
n riv
er a
nd r
ainw
ater
pip
elin
es c
an b
e m
itiga
ted.
Pile
up
stra
w b
ags
arou
nd t
he s
ands
tone
site
s an
d di
g si
mpl
e dr
aina
ge
chan
nels
aro
und
the
site
s to
chan
nel s
eepe
r.
Mon
thly
reco
rd
b,c,
e,f
Sew
age
disc
harg
e
♦
♦
♦
♦
Tem
pora
ry d
rain
age
shal
l be
arr
ange
d fo
r m
ud s
tora
ge y
ard
with
the
lea
chat
e di
scha
rged
int
o Zh
uexi
cre
ek a
nd g
uide
d to
Lo
ngqu
ansh
an
sew
age
treat
men
t pla
nt fo
r tre
ated
dis
char
ge.
Con
stru
ctio
n un
its s
houl
d bu
ild s
edim
enta
tion
tank
dur
ing
cons
truct
ion
so t
hat
the
rain
sew
age,
pili
ng s
lop
and
seep
er m
ay b
e di
scha
rged
whe
n re
achi
ng th
e st
anda
rd a
fter s
edim
enta
tion.
The
proj
ect i
s loc
ated
in th
e ur
ban
area
and
the
exis
ting
livin
g fa
cilit
ies a
roun
d th
e si
te sh
all b
e em
ploy
ed a
s muc
h as
pos
sibl
e.
Stre
ngth
en th
e m
anag
emen
t of
the
cons
truct
ion
site
; try
to k
eep
the
grou
nd f
lat a
nd th
e ea
rth m
ater
ials
sho
uld
be s
tack
ed o
n le
vel
grou
nd in
cas
e th
at e
arth
falls
into
the
near
by ri
verw
ay.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Soci
al
envi
ronm
enta
l
♦
♦
♦
Con
stru
ctio
n sh
ould
be
cond
ucte
d st
age
by st
age.
Dig
ging
and
bac
kfill
shou
ld b
e co
mpl
eted
as s
oon
as p
ossi
ble.
Tem
pora
ry p
avem
ents
shou
ld b
e bu
ilt n
ear p
ublic
faci
litie
s lik
e ho
spita
ls, s
choo
ls a
nd b
us s
tatio
ns a
nd tr
affic
war
ning
mar
ks a
re to
be
set.
At r
ush
hour
, the
po
licem
en s
houl
d gi
ve in
stru
ctio
ns to
peo
ple
and
vehi
cles
to k
eep
smoo
th tr
affic
. Avo
id tr
ansp
ortin
g m
ater
ials
at p
eak
hour
s to
redu
ce
traffi
c pr
essu
re.
Stre
ngth
en t
he t
rain
ing
of c
ultu
ral
relic
pro
tect
ion
educ
atio
n an
d aw
aren
ess
of m
anag
ers
and
wor
kers
sta
ff. A
ccor
ding
to
on-s
pot
surv
eyin
g da
ta, n
o cu
ltura
l rel
ic h
as b
een
foun
d in
the
proj
ect a
rea
so fa
r. O
nce
any
cultu
ral r
elic
is fo
und
durin
g co
nstru
ctio
n, in
form
th
e lo
cal c
ultu
ral r
elic
pro
tect
ion
depa
rtmen
t and
pro
tect
the
site
. Con
stru
ctio
n w
ill n
ot b
e st
arte
d un
til th
e co
mpe
tent
aut
horit
y ha
s ha
ndle
d th
e ca
se p
rope
rly.
Tran
spor
t bui
ldin
g m
ater
ials
or w
aste
ear
th a
void
ing
rush
hou
rs o
r at n
ight
, to
redu
ce tr
affic
jam
and
the
impa
ct o
n th
e m
ovem
ent o
f dw
elle
rs.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
25
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 4-
2-2
En
viro
nmen
tal m
anag
emen
t pla
n du
ring
pipe
line
wor
ks
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Dus
t
♦
♦
♦
♦
♦
Stre
ngth
en m
anag
emen
t, co
nstru
ct c
ivill
y, s
light
load
and
unl
oad
cons
truct
ion
mat
eria
ls g
ently
, cle
an th
e m
ud a
ttach
ed o
n th
e su
rfac
e of
tru
cks
befo
re g
oing
out
of t
he w
orks
ite a
nd c
over
the
vehi
cles
with
clo
th w
hen
trans
porti
ng li
me
, san
dsto
nes,
cem
ent a
nd fl
y as
h w
hich
are
ap
t to
prod
uce
dust
..
The
dust
of
cons
truct
ion
site
and
roa
d ca
n be
con
trolle
d by
spr
inkl
ing
wat
er a
nd c
lear
ing.
With
less
res
iden
ce d
istri
butio
n in
the
area
of
Yang
he s
ewag
e tre
atm
ent p
lant
, wat
er s
pray
sha
ll be
requ
ired
only
3 ti
mes
per
day
dur
ing
cons
truct
ion
wor
ks. T
he n
umbe
r wat
er s
pray
can
be
red
uced
in
othe
r ar
eas
by 1
-2 t
imes
. M
ore
sens
itive
poi
nts
and
farm
land
are
a lo
cate
d in
Bai
sha,
Lon
gqua
nsha
n an
d La
bao
Sew
age
treat
men
t pla
nt, w
hich
requ
ires r
egul
ar d
ust c
lean
ing
with
3 ti
mes
wat
er sp
ray
per d
ay in
redu
cing
dus
t pol
lutio
n.
Sele
ct c
onst
ruct
ion
unit
with
cer
tain
stre
ngth
, and
ado
pt c
omm
erci
aliz
ed c
oncr
ete
and
clos
e ty
pe v
ehic
les.
The
plan
t loc
atio
n fo
r tem
pora
ry a
nd sp
orad
ic c
emen
t stir
ring
site
shou
ld b
e fa
r aw
ay fr
om th
e re
side
ntia
l bui
ldin
gs.
Was
te s
oil s
houl
d be
cle
aned
and
tran
spor
ted
to th
e lo
w-ly
ing
field
des
igna
ted
by m
unic
ipal
adm
inis
trativ
e de
partm
ent f
or la
ndfil
l or l
andf
ill
field
for t
reat
men
t as e
arly
as p
ossi
ble.
rand
om
sam
plin
g an
d co
mpl
ain
b,c,
e,f
Noi
se
Pipe
line
wor
ks a
rea
mai
nly
loca
ted
in t
he u
rban
are
a an
d ef
fect
ive
mea
sure
s m
ust
be t
aken
in
cont
rolli
ng n
oise
pol
lutio
n. H
erei
n th
e m
ajor
m
easu
res a
re li
sted
and
det
ails
to b
e re
ferr
ed to
that
of t
he n
oise
trea
tmen
t mea
sure
s tak
en in
Zhu
exi c
reek
com
preh
ensi
ve tr
eatm
ent p
roje
ct.
♦
♦
♦
♦
Red
uce
the
soun
d le
vel o
f equ
ipm
ent
Red
uce
man
-mad
e no
ise
Rat
iona
lly a
rran
ge c
onst
ruct
ion
time
Esta
blis
h te
mpo
rary
soun
d ba
rrie
r
Ran
dom
sa
mpl
ing
and
com
plai
n
b,c,
e,f
Solid
was
te
♦
♦
Dis
card
ed s
oil a
nd c
onst
ruct
ion
garb
age
shou
ld b
e fil
led
in s
ites
desi
gnat
ed a
s th
e m
unic
ipal
pla
nnin
g de
partm
ents
req
uire
. If
not b
e us
ed
tem
pora
rily,
the
back
fill s
ites s
houl
d be
pla
nted
with
veg
etat
ion
to a
void
soil
and
wat
er lo
sses
.
The
disc
arde
d sa
nd, s
tone
, bui
ldin
g m
ater
ials
, ste
el a
nd p
acki
ng m
ater
ials
sho
uld
be m
anag
ed a
nd re
cove
red
colle
cted
by
a sp
ecia
l per
son.
C
lean
the
wor
king
face
in ti
me
and
do n
ot le
ave
the
“seq
uela
e”.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
26
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 4-
2-2
cond
.
Envi
ronm
enta
l man
agem
ent p
lan
durin
g pi
pelin
e w
orks
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Soil
and
wat
er
loss
es
♦
♦
♦
♦
Atte
ntio
n sh
ould
be
paid
to e
arth
wor
k ba
lanc
e. T
ry to
use
the
soil
dug
up f
or b
ackf
ill o
f co
nstru
ctio
n si
tes.
Rem
aini
ng d
isca
rded
soi
l ar
isin
g fr
om l
ayin
g pi
pes
and
cons
truct
ing
Was
tew
ater
Tre
atm
ent
Plan
t sh
ould
be
mov
ed t
o ot
her
cons
truct
ion
site
s fo
r ba
ckfil
l an
d fo
rest
atio
n or
sent
to la
ndfil
l site
s.
Cho
ose
the
smoo
thin
g gr
ound
as t
empo
rary
pile
site
s. Ve
geta
tion
shou
ld b
e re
cove
red
as so
on a
s pos
sibl
e af
ter t
he si
te is
use
d.
Con
stru
ctio
n sh
ould
be
carr
ied
out s
tep
by s
tep
in d
iffer
ent a
reas
. Do
not c
ondu
ct th
e pr
ojec
t on
a la
rge
scal
e at
the
sam
e tim
e, e
spec
ially
th
e pi
pelin
e la
ying
pro
ject
, so
as to
shor
ten
the
dura
tion
of si
ngle
pro
ject
. Con
trol m
easu
res s
houl
d be
take
n fo
r the
bar
e su
rfac
e to
shor
ten
expo
sure
tim
e an
d re
duce
soil
and
wat
er lo
sses
.
Soil
shou
ld b
e pi
led
ratio
nally
at t
he c
onst
ruct
ion
site
s by
bein
g ke
pt o
ff cl
oaca
and
rive
rway
so th
at th
e im
pact
of s
oil a
nd w
ater
loss
es o
n riv
er a
nd ra
inw
ater
pip
elin
es c
an b
e m
itiga
ted.
Mon
thly
reco
rd
b,c,
e,f
Was
tew
ater
♦
♦
♦
Con
stru
ctio
n un
its s
houl
d bu
ild s
edim
enta
tion
tank
dur
ing
cons
truct
ion
so th
at th
e ra
in s
ewag
e, p
iling
slo
p an
d se
eper
may
be
disc
harg
ed
whe
n re
achi
ng th
e st
anda
rd a
fter s
edim
enta
tion.
Wor
kers
shal
l use
as m
uch
as p
ossi
ble
the
exiti
ng li
ving
faci
litie
s aro
und
the
site
.
Stre
ngth
en th
e m
anag
emen
t of t
he c
onst
ruct
ion
site
; try
to k
eep
the
grou
nd fl
at a
nd th
e ea
rth m
ater
ials
sho
uld
be s
tack
ed o
n le
vel g
roun
d in
cas
e th
at e
arth
falls
into
the
near
by ri
verw
ay.
Ran
dom
sam
plin
g an
d co
mpl
ain
b,c,
e,f
Soci
al
envi
ronm
enta
l
♦
♦
♦
♦
Con
stru
ctio
n sh
ould
be
cond
ucte
d st
age
by s
tage
. Dig
ging
and
bac
kfill
sho
uld
be c
ompl
eted
as
soon
as
poss
ible
. Tem
pora
ry p
avem
ents
sh
ould
be
built
nea
r pu
blic
fac
ilitie
s lik
e ho
spita
ls, s
choo
ls a
nd b
us s
tatio
ns a
nd tr
affic
war
ning
mar
ks a
re to
be
set.
At r
ush
hour
, the
po
licem
en s
houl
d gi
ve in
stru
ctio
ns to
peo
ple
and
vehi
cles
to k
eep
smoo
th tr
affic
. Avo
id tr
ansp
ortin
g m
ater
ials
at p
eak
hour
s to
red
uce
traffi
c pr
essu
re.
Stre
ngth
en t
he t
rain
ing
of c
ultu
ral
relic
pro
tect
ion
educ
atio
n an
d aw
aren
ess
of m
anag
ers
and
wor
kers
sta
ff. A
ccor
ding
to
on-s
pot
surv
eyin
g da
ta, n
o cu
ltura
l rel
ic h
as b
een
foun
d in
the
proj
ect a
rea
so fa
r. O
nce
any
cultu
ral r
elic
is fo
und
durin
g co
nstru
ctio
n, in
form
the
loca
l cul
tura
l rel
ic p
rote
ctio
n de
partm
ent a
nd p
rote
ct th
e si
te. C
onst
ruct
ion
will
not
be
star
ted
until
the
com
pete
nt a
utho
rity
has
hand
led
the
case
pro
perly
.
Tran
spor
t bui
ldin
g m
ater
ials
or
was
te e
arth
avo
idin
g ru
sh h
ours
or
at n
ight
, to
redu
ce tr
affic
jam
and
the
impa
ct o
n th
e m
ovem
ent o
f dw
elle
rs.
Ran
dom
sam
plin
g an
d co
mpl
ain
b,c,
e,f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
27
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 4-
2-3
En
viro
nmen
tal m
anag
emen
t pla
n du
ring
cons
truct
ion
of se
wag
e w
ater
trea
tmen
t pla
nt
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Dus
t
♦
♦
♦
♦
♦
♦
Stre
ngth
en m
anag
emen
t, co
nstru
ct c
ivill
y, s
light
load
and
unl
oad
cons
truct
ion
mat
eria
ls g
ently
, cle
an th
e m
ud a
ttach
ed o
n th
e su
rfac
e of
tru
cks
befo
re g
oing
out
of t
he w
orks
ite a
nd c
over
the
vehi
cles
with
clo
th w
hen
trans
porti
ng li
me,
san
dsto
nes,
cem
ent a
nd fl
y as
h w
hich
are
ap
t to
prod
uce
dust
..
Wat
er s
pray
and
cle
anin
g sh
all b
e re
quire
d by
3 ti
mes
per
day
dur
ing
cons
truct
ion
wor
ks. T
he n
umbe
r wat
er s
pray
can
be
redu
ced
in o
ther
ar
eas
by 1
-2 ti
mes
. Mor
e se
nsiti
ve p
oint
s an
d fa
rmla
nd a
rea
loca
ted
in B
aish
a, L
ongq
uans
han
and
Laba
o Se
wag
e tre
atm
ent p
lant
, whi
ch
requ
ires r
egul
ar d
ust c
lean
ing
with
3 ti
mes
wat
er sp
ray
per d
ay in
redu
cing
dus
t pol
lutio
n.
In a
dditi
on, t
he li
me
and
sand
soi
l sho
uld
not b
e st
ocke
d in
the
open
air.
If
have
to,
sprin
klin
g w
ater
on
them
to r
aise
the
surf
ace
wat
er
cont
ent a
nd c
ontro
l dus
t.
Sele
ct c
onst
ruct
ion
unit
with
cer
tain
stre
ngth
, and
ado
pt c
omm
erci
aliz
ed c
oncr
ete
and
clos
e ty
pe v
ehic
les.
Con
cret
e m
ixin
g pl
ant w
ill b
e se
t up
far a
way
from
the
resi
denc
e an
d sc
hool
.
Was
te s
oil s
houl
d be
cle
aned
and
tran
spor
ted
to th
e lo
w-ly
ing
field
des
igna
ted
by m
unic
ipal
adm
inis
trativ
e de
partm
ent f
or la
ndfil
l or l
andf
ill
field
for t
reat
men
t as e
arly
as p
ossi
ble.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Noi
se
No
sens
itive
dis
tribu
tion
in th
e ar
ea o
f pro
pose
d Ya
nghe
sew
age
treat
men
t pla
nt a
nd li
ttle
influ
ence
gen
erat
ed to
the
surr
ound
ings
; s
ensi
tive
spot
s are
foun
d ar
ound
Bai
sha,
Lon
gqua
nsha
n an
d La
bao
sew
age
treat
men
t pla
nts.
Effe
ctiv
e m
easu
res s
hall
be ta
ken
in re
duci
ng n
oise
pol
lutio
n.
♦
♦
♦
♦
♦
Red
uce
the
soun
d le
vel o
f equ
ipm
ent:
To re
fer t
o th
e po
llutio
n pr
even
tion
mea
sure
s tak
en in
Zhu
exi c
reek
com
preh
ensi
ve tr
eatm
ent p
roje
ct.
Red
uce
man
-mad
e no
ise:
To re
fer t
o th
e po
llutio
n pr
even
tion
mea
sure
s tak
en in
Zhu
exi c
reek
com
preh
ensi
ve tr
eatm
ent p
roje
ct.
Rat
iona
lly a
rran
ge c
onst
ruct
ion
time:
prop
er a
rran
gem
ent o
f us
e of
hig
h no
ise
mac
hine
ry a
nd to
avo
id s
imul
tane
ous
use
and
nigh
t tim
e op
erat
ion.
Esta
blis
h te
mpo
rary
sou
nd b
arrie
r:te
mpo
rary
sou
nd b
arrie
r to
be s
et u
p fo
r noi
se tr
eatm
ent a
t sou
th b
ound
ary
of B
aish
a se
wag
e tre
atm
ent
plan
t (lo
cal n
urse
sch
ool,
Hui
long
vill
age)
and
nor
th b
ound
ary
(Hui
ling
villa
ge);
tem
pora
ry s
ound
bar
rier t
o be
set
up
at th
e bo
unda
ry w
est
of L
abao
trea
tmen
t pla
nt, w
hich
is c
lose
to Ji
andu
vill
age
Zhon
gtun
and
to th
e no
rth si
de c
lost
to Ji
andu
vill
age
Xia
tun.
Site
veh
icle
man
agem
ent:
desi
gnat
ed ro
ads a
re to
be
used
and
nig
ht ti
me
trans
port
of b
uild
ing
mat
eria
ls fo
rbid
den.
Ran
dom
sa
mpl
ing
and
com
plai
n
b,c,
e,f
Solid
was
te
♦
♦
Dis
card
ed s
oil a
nd c
onst
ruct
ion
garb
age
shou
ld b
e fil
led
in s
ites
desi
gnat
ed a
s th
e m
unic
ipal
pla
nnin
g de
partm
ents
req
uire
. If
not b
e us
ed
tem
pora
rily,
the
back
fill s
ites s
houl
d be
pla
nted
with
veg
etat
ion
to a
void
soil
and
wat
er lo
sses
.
The
disc
arde
d sa
nd, s
tone
, bui
ldin
g m
ater
ials
, ste
el a
nd p
acki
ng m
ater
ials
sho
uld
be m
anag
ed a
nd re
cove
red
colle
cted
by
a sp
ecia
l per
son.
C
lean
the
wor
king
face
in ti
me
and
do n
ot le
ave
the
“seq
uela
e”.
Ran
dom
sa
mpl
ing
and
com
plai
n b,
c,e,
f
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
28
Pote
ntia
l in
fluen
ce
Miti
gato
ry m
easu
res
Mon
itorin
g m
etho
d R
espo
nsib
le
inst
itute
Soil
and
wat
er lo
sses
♦
♦
♦
♦
♦
Rai
ny se
ason
shou
ld b
e av
oide
d fo
r exc
avat
ion.
Atte
ntio
n sh
ould
be
paid
to e
arth
wor
k ba
lanc
e. T
ry to
use
the
soil
dug
up fo
r bac
kfill
of c
onst
ruct
ion
site
s. R
emai
ning
dis
card
ed s
oil a
risin
g fr
om la
ying
pip
es a
nd c
onst
ruct
ing
Was
tew
ater
Tre
atm
ent P
lant
sho
uld
be m
oved
to o
ther
con
stru
ctio
n si
tes
for b
ackf
ill a
nd f
ores
tatio
n or
se
nt to
land
fill s
ites.
Flat
gro
und
shal
l be
chos
en fo
r sto
rage
of b
uild
ing
mat
eria
ls w
ithin
the
scop
e of
sew
age
treat
men
t pla
nt.
Con
side
r th
e im
pact
of
fore
stat
ion
on s
oil a
nd w
ater
loss
es. I
f po
ssib
le, W
aste
wat
er T
reat
men
t Pla
nts
can
cons
truct
bui
ldin
gs o
ne b
y on
e.
Onc
e th
e co
nstru
ctio
n of
one
bui
ldin
g fin
ishi
ng, c
arry
out
fore
stat
ion
in ti
me
acco
rdin
g to
the
fore
stat
ion
plan
ning
, to
prev
ent s
oil a
nd w
ater
lo
sses
.
Soil
shou
ld b
e pi
led
ratio
nally
at t
he c
onst
ruct
ion
site
s by
bei
ng k
ept o
ff cl
oaca
and
rive
rway
so
that
the
impa
ct o
f soi
l and
wat
er lo
sses
on
river
and
rai
nwat
er p
ipel
ines
can
be
miti
gate
d. P
ile u
p st
raw
bag
s ar
ound
the
sand
ston
e si
tes
and
dig
sim
ple
drai
nage
cha
nnel
s ar
ound
the
site
s to
chan
nel s
eepe
r.
Mon
thly
reco
rd
b,c,
e,f
Was
tew
ater
♦
♦
♦
♦
♦
Con
stru
ctio
n un
its s
houl
d bu
ild s
edim
enta
tion
tank
dur
ing
cons
truct
ion
so th
at th
e ra
in s
ewag
e, p
iling
slo
p an
d se
eper
may
be
disc
harg
ed
whe
n re
achi
ng th
e st
anda
rd a
fter s
edim
enta
tion.
The
tem
pora
ry li
ving
fac
ilitie
s w
ill b
e bu
ilt a
roun
d th
e W
aste
wat
er T
reat
men
t Pla
nt c
onst
ruct
ion
site
, inc
lude
din
ing
hall
and
toile
t. Th
e w
aste
wat
er o
f the
din
ing
hall
shou
ld b
e pr
etre
ated
by
oil s
epar
ator
firs
tly, t
hen
sink
into
the
dom
estic
sew
age.
All
sew
age
shou
ld b
e tre
ated
in
a se
ptic
tank
aga
in a
nd d
isch
arge
d.
Whe
n co
nstru
ctin
g th
e pr
essu
re p
ipe
acro
ss L
iujia
ng R
iver
in th
e Ya
nghe
sew
age
treat
men
t pro
ject
and
the
disc
harg
e ou
tlet o
f th
e pl
ant,
ratio
nal p
lan
shou
ld b
e m
ade
to a
void
dig
ging
rive
rway
.
Whe
n co
nstru
ctin
g th
e pr
essu
re p
ipe
acro
ss L
iujia
ng R
iver
in th
e Ya
nghe
sew
age
treat
men
t pro
ject
and
the
disc
harg
e ou
tlet o
f th
e pl
ant,
ratio
nal p
lan
shou
ld b
e m
ade
to a
void
dig
ging
rive
rway
.
Such
mat
eria
ls a
s oi
l or c
hem
ical
s sh
ould
not
be
plac
ed n
ear t
he w
ater
bod
y. T
hey
shou
ld b
e ke
pt o
ff th
e riv
er w
ith c
anva
s w
rapp
ed s
o as
to
avoi
d be
ing
was
hed
into
the
wat
er b
y st
rong
win
d an
d st
orm
. En
viro
nmen
tal
man
agem
ent
shou
ld b
e st
reng
then
ed.
To p
reve
nt w
ater
po
llutio
n ca
used
by
the
oil l
eaka
ge fr
om c
onst
ruct
ion
mac
hine
ry o
r shi
ps o
r by
was
te o
il du
mpe
d in
to th
e w
ater
bod
y, th
e le
akag
e oi
l of t
he
cons
truct
ion
mac
hine
ry sh
ould
be
colle
cted
.
Ran
dom
sa
mpl
ing
and
com
plai
n
b,c,
e,f
Soci
al
envi
ronm
ent
♦
♦
Stre
ngth
en th
e tra
inin
g of
cul
tura
l rel
ic p
rote
ctio
n ed
ucat
ion
and
awar
enes
s of
man
ager
s an
d w
orke
rs s
taff.
Acc
ordi
ng to
on-
spot
sur
veyi
ng
data
, no
cultu
ral r
elic
has
bee
n fo
und
in th
e pr
ojec
t are
a so
far.
Onc
e an
y cu
ltura
l rel
ic is
foun
d du
ring
cons
truct
ion,
info
rm th
e lo
cal c
ultu
ral
relic
pro
tect
ion
depa
rtmen
t and
pro
tect
the
site
. Con
stru
ctio
n w
ill n
ot b
e st
arte
d un
til th
e co
mpe
tent
aut
horit
y ha
s han
dled
the
case
pro
perly
.
Tran
spor
t bu
ildin
g m
ater
ials
or
was
te e
arth
avo
idin
g ru
sh h
ours
or
at n
ight
, to
red
uce
traffi
c ja
m a
nd t
he i
mpa
ct o
n th
e m
ovem
ent
of
dwel
lers
.
Ran
dom
sa
mpl
ing
and
com
plai
n
b,c,
e,f
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
dshi
p C
ente
r for
Env
ironm
ent P
rote
ctio
n nv
estm
ent &
Dev
elop
men
t Co.
, Ltd
. 29
Tabl
e 4-
2-3
cond
.
Envi
ronm
ent m
anag
emen
t pla
n du
ring
the
sew
age
treat
men
t pla
nt c
onst
ruct
ion
Sino
-Jap
an F
rien
Liuz
hou
Urb
an I
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
4.3 Environment management plan during the operation period
After the completion of the water treatment comprehensive project works, major influence to the surrounding area will be emission of odor, trail water discharge and noise and sludge generation by the sewage treatment plant. Table 4-3-1 and Table 4-3-5 gives a summary of the general environmental influence during its operation, proposed measures, monitoring categories and responsible organizations.
Table 4-3-1 Household waste water and industrial sewage discharged into sewage pipeline
Potential influence Environmental measures Monitoring method Res.org. Low concentration household waste water ( septic tank and penetration employed)
Canceling of septic tanks when not required to ensure connection of local sewage pipeline
Intake of sewage into sewage treatment plant, connection record of sewage pipeline
b
Treatment of industrial sewage water
Issuing of forceful pre-treatment plan, sewage treatment plant taking charge
Check up of pre-treatment, intake record B,c,f
Industrial accident and leak, sewage pipeline or treatment breakdown
Issuing notice practice and special protection measures regarding accidents
Issuance of regulation, conditions of accident record and application of regulations
b
Over flow into sewage network or penetration
Applying sight/TV/other checking method and relative measures taken
Evaluation record of sewage network
c
Design load changed due to household waste changes
Monitoring use of water and sewage generation
Record of meter and plant area
c,f
Design load changed due to industrial sewage changes
Application of pretreatment and monitoring change in industrial water supply and quality
Record of water quality and volume
b,c,f
Table 4-3-2 Sewage overflow at different spots
Potential influence Environmental measures Monitoring method Res.org. Overflow in design and
calculation Evaluation and improvement of sewage collection system
Spots and volume of rainfall overflow
b,c
Direct contact of waste water with people
Local population of outlet downstream Health record
b,a,sanitary department
Influence over surface water
● Rainfall overflow shall be treated for discharge
● Strengthening management, setting up duty and responsibility system to ensure normal operation of treatment plant facilities. Monitoring intake water shall be required to ensure water quality comply with design requirement.
● On line monitoring device set up at the outlet ● Disinfection by ultraviolet for sewage treatment.
Eye sight check up and monitoring and monitoring
of surface water
Influence over sensitive spots
If possible relocating the overflow point or regulating overflow
Eye sight checkup and record of application
b,c
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
30
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Table 4-3-3 Drainage facility and pump station
Potential influence Environmental measures Monitoring method Res.org.
Odor Proper design and industrial sewage control Complain record b Accident during building work of sewage pipeline
Safety training Training and accident record
b
Blocking of sewage pipeline
Detailed O/M procedures; avoid direct discharge into system and timely dredging
Record and telecom equipment check up
b
Noise from pump station
Low noise equipment to be selected; foundation vibration reduction, material insulation and muting measures taken during installation. Barrier room to be built for high noise machinery. Use submerged pumps as much as possible. Optimize layout arrangement.
Monitoring of surrounding environment and complains
b,c
Power accident of pump station
Double routing set up to ensure normal operation of sewage treatment system
Check up standby system
b
Mechanical failure of pump station
Design, O/M procedure and spare parts. Weekly record b
Pollution to ground water by leakage
Design and protective measures Monitoring of surrounding environment and complains
b,c
Table 4-3-4 Sewage water treatment plant (WWTP)
Potential influence Environmental measures Monitoring method Res.org.
Lower or higher water intake than forecast
Monitoring use of septic tanks, its penetration and intake; pre-treatment plan and record checking
Connection and operation record
b,c,d
Noise/odor Design protective measures Surrounding
environment and complains
b,c
Accident Training Training and accident
record b,c,d
Incident of chemicals Design, safety training and alarm system
Training and accident record
b,c
Power failure Standby system or double routing Power meter record b Equipment breakdown Design, O/M, spare parts Daily record, instrument b,d
Operational failure Design, operation training and lab monitoring
Daily record and training record
b,d
Low standard of discharge Monitoring and discharge record Daily record and
application and monitoring
b,d
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
31
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Table 4-3-5 Sludge management system
Potential influence Environmental measures Monitoring method Res.org.
Lack of stability Check up use and performance of the stability system, and check up sludge quality
Daily record and check up
b,c,sanitary department
High content of heavy metals
Monitoring sewage and sludge quality
Test of heavy metals in waste water by season and test in sludge every half year
b,c
Safety Design and training Training and accident record b,c Un-control of liquid
when dewatering Design, O/P, staff training Check up and daily record b,c
Odor Design protective measures Surrounding envr. And
complains b,c
Equipment breakdown Design, O/M, spare parts Safety training, alarm
system b,c
Landfill of sludge Design standard, leachate treatment system
Eye sight check up, leachate monitoring
b,c
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
32
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Sino-Japan FrienLiuzhou
dship Center for Environment Protection Urban Investment & Development Co., Ltd.
The regional environmental quality monitoring tasks can be entrusted to the local environmental monitoring department, including the Liujiang River section, effluent discharge outlet of Wastewater Treatment plant (2-3 monitoring cross-section, monitoring once a month, normal monitoring items), noises around the Wastewater Treatment plant and Wastewater Exaltation Pumping station, groundwater quality status in the mud burying area and polluting status of the effluvial pollutants far away from the sanitarian defend region etc.
(2)The regional environmental quality monitoring
The monitoring facilities for carrying out the sub project monitoring plans belong to the monitoring units and each sub project unit should pay proper depreciation charge for the facilities which contains in the monitoring expenses. Table 5-3-1 shows the expense estimate of each sub project monitoring.
5.3 Monitoring facilities and expense
According to the characteristics of engineering and environment, fix on the environmental monitoring contents during construction and operation which are showed in Table 5-2-1。
(1)The environmental monitoring plans during construction and operation
According to the predicted result of environmental influence, the obviously polluted sensitive site is names as the monitoring site. And based on the polluting situations during the construction and operation period, monitoring contents are the greatly influenced environments such as sound environment, air environment and surface environment. The monitoring factor is defined according to the polluting characteristic factor in the project analysis and the monitoring analytical methods for the corresponding project in “Environmental Monitoring Technical Criterion” issued by SEPA are adopted. The appraisal standard is accorded with the national standard confirmed by EA.
5.2 Monitoring implementation
Environmental monitoring contains two stages construction and operation which is to grasp project polluting trends completely and in time and also know about the local environmental quality trends caused by the project construction, its incidence and dynamical environmental quality during operation so that they can feedback the information to the responsible institutions in time which, consequently can offer scientific basis for environmental management of the project.
5.1 Monitoring purpose
5. Environmental protection monitoring plans
33
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
Tabl
e 5-
2-1
En
viro
nmen
tal m
onito
ring
plan
Sub-
proj
ect
Mon
itori
ng
peri
od
Mon
itori
ng fa
ctor
M
onito
ring
site
M
onito
ring
ite
m
Mon
itori
ng fr
eque
ncy
Mon
itori
ng
orga
niza
tion
resp
onsi
ble
orga
niza
tion
supe
rvis
ory
orga
niza
tion
Am
bien
t air
Res
iden
tial a
rea
near
the
cons
truct
ion
site
s
Mal
odor
co
ncen
tratio
n、TS
P
One
per
iod
ever
y tw
o m
onth
s; 2
day
s per
per
iod;
2
times
per
day
Noi
se
Bou
ndar
y of
the
cons
truct
ion
site
s Le
q A
perio
dic,
once
eve
ry d
ay
and
nigh
t
Con
stru
ctio
n pe
riod
Sedi
men
t So
uthe
rn B
ranc
h an
d N
orth
ern
of
Zhue
xi
As,
Cd,
Cu,
Hg,
Cr,
orga
nic
mat
ter
One
tim
e pe
r yea
r
Am
bien
t air
coas
t of t
he
Sout
hern
Bra
nch
and
Nor
ther
n of
Zh
uexi
NH
3、H
2S
One
per
iod
per s
easo
n; 2
da
ys p
er p
erio
d; 4
tim
es
per d
ay
Sout
hern
Bra
nch
and
Nor
ther
n of
Zh
uexi
CO
DM
n、B
OD
5、N
H3-
N、
tota
l ni
troge
n、to
tal
phos
phor
us
was
tew
ater
am
ount、
oil
One
per
iod
per m
onth
; 3
days
per
per
iod;
2 ti
mes
pe
r day
Surf
ace
wat
er
Col
lect
ing
wel
l of
pum
ping
st
atio
n
PH、
SS、
CO
DC
r, oi
l、B
OD
5、N
H3-
N、
TP、
was
tew
ater
am
ount
Onc
e pe
r sea
son
Noi
se
Bou
ndar
y of
the
pum
ping
stat
ion
Leq
One
per
iod
per s
easo
n; 2
da
ys p
er p
erio
d; 4
tim
es
per d
ay; o
nce
ever
y da
y an
d ni
ght
Zhue
xi C
reek
co
mpr
ehen
sive
re
habi
litat
ion
proj
ect
Ope
ratio
n pe
riod
Sedi
men
t So
uthe
rn B
ranc
h an
d N
orth
ern
of
Zhue
xi
As,
Cd,
Cu,
Hg,
Cr ,
org
anic
m
atte
r on
ce p
er y
ear
Liuz
hou
Envi
ronm
enta
l m
onito
ring
stat
ion
Riv
erw
ay
man
agem
ent
offic
e of
Zh
uexi
EPA
, Liu
zhou
Sino
-Jap
an F
riend
ship
Cen
ter f
or E
nviro
nmen
t Pro
tect
ion
Liuz
hou
Urb
an In
vest
men
t & D
evel
opm
ent C
o., L
td.
Sub-
proj
ect
Mon
itori
ng
peri
od
Mon
itori
ng
fact
or
Mon
itori
ng
site
M
onito
ring
ite
m
Mon
itori
ng
freq
uenc
y M
onito
ring
or
gani
zatio
n re
spon
sibl
e or
gani
zatio
n su
perv
isor
y or
gani
zatio
n
Am
bien
t air
resi
dent
ial
area
ne
ar
the
cons
truct
ion
site
, si
des
of
the
cons
truct
ion
road
TS
P O
ne p
erio
d ev
ery
two
mon
ths;
2
days
per
per
iod;
2 t
imes
per
da
y C
onst
ruct
ion
perio
d N
oise
bo
unda
ry
of
the
cons
truct
ion
site
s Le
q A
perio
dic,
once
eve
ry d
ay a
nd
nigh
t
Am
bien
t air
Plan
t bou
ndar
y N
H3、
H2S
O
ne p
erio
d pe
r m
onth
; 2
days
pe
r per
iod;
4 ti
mes
per
day
U
pstre
am s
ite 5
00m
aw
ay
from
the
outle
t, ou
tlets
; th
e do
wns
tream
se
ctio
n 50
0m
away
fr
om
the
outle
t
CO
DM
n、B
OD
5、N
H3-
N、
tota
l pho
spho
rus、
oil
One
per
iod
at A
nnua
l A
pril
, Ju
ly a
nd D
ecem
ber
2 da
ys p
er p
erio
d
The
outle
ts
of
the
mai
n en
terp
rises
with
pol
lutio
n To
be
conf
irmed
ac
cord
ing
to th
e ch
arac
teris
tic o
f the
w
aste
wat
er
Ape
riodi
c,(
no le
ss th
an o
nce
a m
onth)
The
inle
ts
of
the
was
tew
ater
pla
nt
Surf
ace
wat
er
the
outle
ts
of
the
was
tew
ater
pla
nt
PH、
SS、
CO
DC
r、oi
l、B
OD
5、N
H3-
N、
TP、
was
tew
ater
am
ount
auto
mat
ic o
nlin
e m
onito
ring
at
the
outle
ts
Noi
se
plan
t ar
ea o
r th
e bo
unda
ry
of th
e pu
mpi
ng st
atio
n Le
q O
ne p
erio
d pe
r se
ason
; 2
days
pe
r pe
riod;
4 t
imes
per
day
; on
ce e
very
day
and
nig
ht
Was
tew
ater
tre
atm
ent
proj
ect
Con
stru
ctio
n pe
riod
Se
dim
ent
A
s, C
d, C
u, H
g,C
r ,
orga
nic
mat
ter
Onc
e a
year
Envi
ronm
enta
l Pr
otec
tion
Div
isio
n of
th
e w
aste
wat
er
treat
men
t pl
ant
Envi
ronm
ent
man
agem
ent
plan
W
aset
wat
er t
reat
men
t co
mpo
nent
, Li
uzho
u en
viro
nmen
t m
anag
emen
t pr
ojec
t (L
ZEM
P)
dshi
p C
ente
r for
Env
ironm
ent P
rote
ctio
n nv
estm
ent &
Dev
elop
men
t Co.
, Ltd
.
Tabl
e 5-
2-1(
cont
inue
d)
Env
ironm
enta
l mon
itorin
g pl
an
Sino
-Jap
an F
rien
Liuz
hou
Urb
an I
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Table 5-3-1 Expense estimate of each sub project monitoring
Unit:ten thousand yuan Sub project’s name Monitoring expense
of construction Monitoring expense
of operation Obligated monitoring expense
for sudden accident Zhuexi comprehensive
treatment project 10 20 5
Baisha wastewater treatment project
20 40 5
Longquanshan wastewater treatment
project
10 20 5
Yanghe wastewater treatment project
20 40 5
Labao wastewater treatment project
10 20 5
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
36
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
6. Training for personnel In order to ensure the smooth and effective development of the environmental management, the employees must be trained with knowledge and skills which contain not only the importance and significance of the project, but also different trainings to different posts. Table 6-1 shows the schedule for environmental protection personnel training.
Table 6-1 Schedule for environmental protection personnel training
Subitem Phase Sort Number of people(people)
Amount(people) Time
Expenditure (ten
thousand yuan)
Environmental management personnel in liuzhou urban investment construction and development co., ltd.
Project management 1
person 1 2.0
Environmental management personnel
Zhuexi creekway management 2 people
2 2.0
Environmental monitoring and
management engineer
Contract unit and urban investment company separately 1 person
2 2.0
Construction
Emergency personnel 1 person 1
2004
1.0
Operation Environmental management personnel
Zhuexi creek way management 1 person
1 1.0
Comprehensive renovation of
zhuexi
Total 7 8.0 Environmental management personnel in liuzhou urban investment construction and development co., ltd.
Project and environmental management personnel separately 4 people
8 10.0
Construction
Environmental monitoring and
management engineer
Contract unit and urban investment company separately 1 person
2
2004
2.0
Baisha wastewater treatment plant 5 people
5 15.0
Longquanshan wastewater treatment plant 3 people
3 9.0
Yanghe wastewater treatment plant 5 people
5 15.0
Operation
Environmental management personnel in wastewater treatment plant and esd personnel
Labao wastewater treatment plant 5 people
5
After establishment of wastewater treatment plant
15.0
Wastewater treatment project
Total 18 66.0 Total 25 74.0
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
37
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
7. Intercommunication
The environmental management demands the necessary communication between the different sections within the organization and different posts. And meanwhile, the organization also has to report the relevant information to the exterior (relevant sides and public etc.)
The interior information intercourse can take the forms of conference and interior briefing etc. but there must be one formal conference in a month and all the communications should be noted and kept in files.
The exterior information intercourse takes place once in half a year or one year and the intercommunication with the cooperation unit should be noted in summary and kept in files.
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
38
Environment management plan Wasetwater treatment component, Liuzhou environment management project (LZEMP)
Sino-Japan Friendship Center for Environment Protection Liuzhou Urban Investment & Development Co., Ltd.
39
8. Note
For the effective running of the environmental management system, the organization must set up a perfect noting system and meanwhile, reserve the notes on the following aspects:
(1)Requirement of laws and regulations;
(2)Permission;
(3)Environmental factors and relevant environmental influence;
(4)Training;
(5)Activities of check-up and maintenance;
(6)Monitoring data;
(7)Disagreement;
(8)Validity of correction and prevention measures;
(9)Information on relevant sides;
(10)Auditing;
(11)Review.
In addition, the above kinds need necessary control, consisting mark, collection, catalogue, pigeonhole, storage, management, maintenance, query, storage time and disposition etc.