Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation Siobhan Burland Ross, M.Eng., P.Eng. Manager, Municipal, Industrial and Hazardous Waste Section Environmental Assessment and Licensing Branch Manitoba Conservation May 17, 2011

Upload: strom

Post on 25-Feb-2016

39 views

Category:

Documents


2 download

DESCRIPTION

Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation Siobhan Burland Ross, M.Eng., P.Eng. Manager, Municipal, Industrial and Hazardous Waste Section Environmental Assessment and Licensing Branch Manitoba Conservation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Environment Act Licence UpdateProposed Minago Mine Project

Norway House Cree Nation

Winnipeg Public Meeting - Consultation

Siobhan Burland Ross, M.Eng., P.Eng.Manager,

Municipal, Industrial and Hazardous Waste SectionEnvironmental Assessment and Licensing Branch

Manitoba ConservationMay 17, 2011

Page 2: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview• Environmental Assessment and Licensing Branch (EALB)• Manitoba’s Environmental Assessment and Licensing process• Summary of the Assessment of Victory Nickel Inc.’s Minago Project Proposal• Next Steps

Page 3: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Environmental Assessment and Licensing Branch

• Mission– Sustainable Environmental Quality

• Roles – Lead the EAL Process (Administer the Act)– Legislated to Make Licensing Decisions– Manage Potential Impacts of Developments

• One window, wide range/scope• Evaluate impacts & mitigation measures• Prescribe licence conditions • Enforcement

Page 4: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Pesticide Permits Transmission LagoonsPesticide Handling/Storage Forestry Sewage Treatment PlantsMosquito Control Wind Operator CertificationAgricultural Water (floodway) MiningEthanol, Biodiesel Hydro Gen. ManufacturingComm. Fertilizer Storage Pipelines Waste (Haz. & non)

Recreation Pulp & PaperTransportation Thermal Generation

Ethanol, Biodiesel

Page 5: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview• Environmental Assessment and Licensing Branch (EALB)• Manitoba’s Environmental Assessment and Licensing process• Summary of the Assessment of Victory Nickel Inc.’s Minago Project Proposal• Next Steps

Page 6: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Regulatory ProcessPrinciples of The Environment Act:• Sustainability & Environmental Protection• Public Health• Public Participation• Transparent• One Window• Flexible

Page 7: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Legislation• The Environment Act

– Regulations: • Classes of Development • Environment Act Fees • Licensing Procedures • Environment Act Hearing Cost Recovery• Participant Assistance

Page 8: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Application Submission • Four Components of Application:

– Covering letter & description– Application form– EA Information required is listed on form– Application fee – no exceptions

• Range $500.00 to $100,000.00

Page 9: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Initial Review• Branch Contact Person Assigned

– Project Manager– Relevant Expertise

• Application Complete?– If not, request more info– If yes, start public and technical reviews

Page 10: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Public & Technical Review • Public Notification

– Advertise– Public Registries – Local and Winnipeg

• Hard and electronic– Web Lists Current Proposals Out for Review– Due Date & Contact in EAL

• Average is 30 days, not prescribed

Page 11: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Public & Technical Review• Iterative• Request Written Public Input• Technical Advisory Committee (TAC)

– Parallel to public process– Provincial and federal experts– Federal contacts – one window

• Canadian Environmental Assessment Agency (CEAA)

Page 12: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Ongoing Iterations–More Information or Clarification–Adds time –Summarize Comments

• Summary Report• Disposition

–Registry Updates

Page 13: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Typical EA Considerations:• Water Quality • Air Quality• Terrestrial – Soil, Habitat• Nuisance – Odour, Noise• Public Issues and Concerns• Fish and Wildlife• Chemicals/Spill Prevention• Socio-Economic, Heritage

Page 14: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Clean Environment Commission • Optional• Clean Environment Commission (CEC)

– What/How? • Hearing, meeting, or investigation

– Why? • Scope, impacts of project• Public concern• Director recommends to Minister• Or, Minister can direct at any step in the process

– Terms of Reference provided (scope)

Page 15: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Licensing Decision• Director (Classes 1 & 2)

– Option to increase class• Minister (Class 3)

– Option re projects that underwent CEC process• Issue or Refuse• Circulate Draft License to TAC• Issue Licence• Post Disposition Summary and Licence

Page 16: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Licensing DecisionTypical Licence Conditions:• Pre-construction

– Rare plants, migratory birds, etc• Construction Mitigation

– Silt screens, monitoring, seasonal windows, etc.• Notification

– Inspections

Page 17: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Licensing Decision• Operational Conditions:

– Monitoring and reporting– Discharge limits– Emergency response plan– Odour and noise

• Complaint based– Decommissioning– Financial assurance

Page 18: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Appeals Process• Director’s Decision to the Minister

• Classes 1 and 2• 30 Days from issue date• Director’s recommendation re a CEC Hearing

• Minister’s Decision to Cabinet• Class 3• 6 weeks from issue date

• Construction May Commence During Appeal

Page 19: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Alterations –Minor

• Director approves, no public review• Act Amendments now require posting

–Major – New Proposal• Same as for all EA applications• Includes the public and TAC reviews

– Decision Based on Environmental Effects• Significant or insignificant

Page 20: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview• Environmental Assessment and Licensing Branch (EALB)• Manitoba’s Environmental Assessment and Licensing process• Summary of the Assessment of Victory Nickel Inc.’s Minago Project Proposal• Next Steps

Page 21: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Proposal SummaryProponent: Victory Nickel Inc. (VNI)Proposal Name: Minago ProjectClass of Development: 2Type of Development: Metal Mining and MillingClient File No.: 5463.00

Page 22: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview• Proposal received May 3, 2010 from Victory Nickel Inc.• Proposed construction and operation of a new 10,000 tonnes per day open pit nickel ore mining, milling and concentrating Development, “Minago Project”• To be located on PTH No. 6 ~225km south of Thompson

Page 23: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview (con’t)• Placed in Public Registries on May 31, 2010:

• Union Station, Winnipeg• Winnipeg Public Library• Manitoba Eco-Network• Thompson Public Library• Wabowden Community Council Office

• Advertised in three newspapers• Proposal sent to the members of the Technical

Advisory Committee (TAC) and federal departments via the Canadian Environmental Assessment Agency (CEAA)

• Closing date for comments was July 15, 2010

Page 24: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

TAC Review• The Provincial TAC for the Minago Project

included:• Agriculture, Food and Rural Initiatives• Conservation - Aboriginal Relations, Air Quality, Climate and Green

Initiatives, Environmental Operations, Environmental Services, Forestry, Lands, Parks and Natural Areas, Pollution Prevention, Sustainable Resource and Policy Management, Wildlife

• Culture, Heritage and Tourism• Health• Infrastructure and Transportation• Innovation, Energy and Mines• Labour and Immigration• Local Government• Water Stewardship

Page 25: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

TAC Roles• To identify environmental effects and mitigation

measures specific to their area of expertise relating to development proposals that are undergoing environmental assessment, and

• To identify other regulatory requirements which apply to the project.  The TAC includes both provincial and federal members, so the regulatory requirements of both levels of government are identified during the assessment process 

Page 26: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationCEAA Based on federal

survey, CEAA will not apply to the project.

N/A

Infrastructure and Transportation

No concerns. N/A

Culture, Heritage and Tourism

No concerns. N/A

Page 27: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation – Sustainable Resource and Policy Management

No concerns. N/A

Conservation – Parks and Natural Areas

No comments. N/A

Conservation – Environmental Services

1) Spill Contingency and Emergency Response Plan reference error

EAL to require plan to be updated and approved

Page 28: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation – Environmental Services

2) Both proposed sewage treatment facilities must meet standard design and discharge criteria

EAL will require standard construction and operating procedures for sewage treatment and effluent discharge.

3) Burning of non-hazardous waste is not recommended; residual non-hazardous waste should be disposed of in accordance with the Waste Disposal Grounds Regulation.

EAL will require waste to be disposed of in accordance with the Waste Disposal Grounds Regulation

Page 29: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation – Environmental Services

4) Proposed land farming of petroleum-impacted soils should be designed, operated and decommissioned in accordance with MB’s Guideline for the treatment and disposal of petroleum contaminated soil.

EAL will require adherence to the Guideline document.

Page 30: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation – Pollution Prevention

1) Environmental Protection Plan should include potential dust and emissions from specific sources.

Accepted by VNI.

2) There was no ore composition that might indicate the presence of heavy metals that may be emitted into the air as particulate/dust.

Environmental Protection Plan will include tailings material analysis.

Page 31: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation – Pollution Prevention

3) If a dryer is installed, control measures to address particulate matter will be required.

Accepted by VNI.

4) Potential for noise nuisances will not be significant, given the project location.

N/A

5) It may be necessary to perform GHG inventory reporting.

Accepted by VNI.

Page 32: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationInnovation, Energy and Mines

1) Would there be an impact created on the overall tailings and waste rock management facility (TWRMF) by the cone of depression from the pit dewatering wells? Would the pumping wells draw water from underneath the TWRMF and result in difficulty to keep the water cover?

Although VNI does not anticipate such impacts, additional geotechnical investigations are planned for the detailed engineering design phase.

Page 33: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationInnovation, Energy and Mines

2) The dam design criteria do not mention dewatering cone for the entire TWRMF.

Although VNI does not anticipate such impacts, additional assessments are planned for the detailed engineering design phase.

Water Stewardship 1) Comply with MWS Wetland Policy

EAL will require a minimum 3 metre buffer zone from wetlands.

2) Limit phosphorous to <1.0 mg/L in effluent

EAL will require an effluent limit of 1.0 mg/L.

3) Comply with Tier 2 MWQO and MMER

EAL will require effluent to meet discharge criteria.

Page 34: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationWater Stewardship 4) Line the tailings

management facility with material meeting 1x10-7 cm/s hydraulic conductivity to limit seepage

EAL will require the liner to be constructed with the maximum hydraulic conductivity and testing/verification will be required prior to authorization to use the facility is given.

5) Verify "no effects" on the baseline flow of surface waters due to the cone of depression established during groundwater pumping.

EAL will require verification.

Page 35: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationWater Stewardship 6) If construction

occurs in the immediate vicinity of surface water, an undisturbed native vegetation area shall be established and maintained.

EAL will require 30-metre buffer zone, within which permanent development is prohibited and a maximum disturbance of 25% of the shoreline length.

7) Confirm the predictions of runoff using a comprehensive model that includes surface flow, interflow and groundwater flow.

EAL will require.

Page 36: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationWater Stewardship 8) Develop and

implement a monitoring program for the fish community, subject to review and approval by the Fisheries Branch.

EAL will require.

9) Monitor Oakly Creek and the Minago River upstream and downstream of the final discharge point.

EAL requirements will include a comprehensive monitoring program including water quality, sediment quality, fish tissue, and toxicity testing.

Page 37: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation - Operations

1) Recommends the Norway House Resource Management Board be kept informed of planned long term monitoring programs and given the opportunity to request information from them.

Accepted by VNI.

2) Recommends management of the access road be full responsibility of Proponent

Accepted by VNI.

Page 38: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation - Operations

3) Burning of non-hazardous waste is not recommended; residual non-hazardous waste should be disposed of in accordance with the Waste Disposal Grounds Regulation.

EAL will require waste to be disposed of in accordance with the Waste Disposal Grounds Regulation

Page 39: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation - Operations

4) Proposed land farm of petroleum-impacted soils should be designed, operated and decommissioned in accordance with MB’s Guideline for the treatment and disposal of petroleum contaminated soil.

EAL will require adherence to the Guideline document.

Page 40: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Minago Project – Summary of TAC CommentsTAC Member Concern Proposed

MitigationConservation - Aboriginal Relations Branch

1) Necessity to consult with all potentially affected First Nations and Metis groups.

Results of the consultations will be considered for inclusion in an Environment Act Licence as appropriate.

Page 41: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Overview• Environmental Assessment and Licensing Branch (EALB)• Manitoba’s Environmental Assessment and Licensing process• Summary of the Assessment of Victory Nickel Inc.’s Minago Project Proposal• Next Steps

Page 42: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

• EALB Contact reviews all public/TAC comments to determine if additional information is needed• Iterations until all environmental assessment issues are satisfactorily resolved• Parallel process: Crown-Aboriginal Consultation Next Steps

Page 43: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

• For most projects, a draft Environment Act Licence is prepared with applicable specifications, limits, terms and conditions• The draft Licence is circulated to TAC for comment• Copies of all Summaries and Final Licences are placed on the EALB website, in all public registries and provided to interested persons. Next Steps

Page 44: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •

Manitoba Conservation/Environmental Assessment and Licensing

Next Steps• An Appeal Period of 30 days is provided

following the issuance of an Environment Act Licence

• The Licence remains valid during the appeal period

• Enforcement of the conditions of the Licence is carried out by Manitoba Conservation

Page 45: Environment Act Licence Update Proposed Minago Mine Project Norway House Cree Nation Winnipeg Public Meeting - Consultation

Manitoba Conservation• • • • • • • • • • • • • •