Presentation structure
1. Questions / Prompts
2. Background to help discussions:
• Why bother? - Drivers and fitting into a wider master planning process
• Key issues and what needs to be done - How phasing, mix, and scale of development affects technology options
• Energy profiling through to recommended solutions • On-going project activity in the City Region
Questions / Prompts
1. Can we plan and deliver our own energy supply?
2. If we should plan, for how long - 5, 10, 15, 20 - 50 years +?
3. Should it be done now or only when legislation requires it? – eg, Code Level 6 and emphasis on Allowable Solutions
4. Who are/ should be our energy champions?
5. Are we ‘Smart Ready’?
6. Should we be integrating the delivery of infrastructure?
7. Are we making the most of the opportunities that are emerging?
Why bother?
6
Key drivers of infrastructure
7
A minefield of policy drivers across all sectors
8
It’s a long process that needs planning
9
Key players all delivering different infrastructures
Key issues and what needs to be done
11
12
13 13
Ensuring effective delivery
• Need to consider energy as part of any area or development.
• Must be able to identify energy opportunities and commission projects.
• Requires understanding in order to ask the right questions, understand recommendations and choose the optimum solution.
14 14
If you don’t look at an area strategically how do you know you’ve identified all the opportunities?
15 15
About understanding the challenges on a site/ area level
16 16
There are many issues and variables to consider
Heat networks
Programmes
Areas of change
Priority projects
Carbon compliance
Growth options
Allowable solutions
Network losses
Mix and phasing
Storage
Age and efficiency of buildings
Land capacity and availability
Constraints and measurements
Connections
Spatial Policy
Programme Technical
“There are too many debates. Too much Word, not enough Excel”
Hans Rosling 2013
18 18
Viability is critical
• The key issue is viability which is driven by:
• Load diversity (eg, mix of uses)• Presence of anchor loads• Scheme development costs - from concept through to financial
close • Revenue potential from electricity and heat sales• Avoided building energy system costs• Scheme operating costs
19 19
Its not just about the planners
• Energy champions are needed
• Champions can be found in a variety of departments:- Housing and Estates teams
- Regeneration and Planning
- Environment and Sustainability
- Infrastructure and Highways
• May need organisational changes or new joint working structures
20 20
There should be clear objectives
• Integrated approach reflected in all policy and strategy
• Awareness, knowledge and political commitment
• Projects identified at an early stage
• Links with relevant external agencies and organisations
• Evidence base is regularly reviewed and updated
• Identify and secure funding
• Record, review and comment on specific opportunities which arise
21 21
Energy Profiling
Energy Centre
Market, Leisure Centre
Retail unit, Cinema
Counciloffices
ResidentialSupermarket
Offices
Hotel
PhaseCompletion
DateBuilding
Gross Floor Area (m2)
Phase 1 Jun-17
Market, Retail, Leisure
Centre, Restaurants,
Cinema and Car Park
17,250
Phase 2 Apr-18Council Offices,
Restaurant, Unit 8 & 96,536
Phase 3 Aug-18 Food store 10,350
Phase 4 Dec-18 Offices, Residential 10,297
Future
PhaseJan-19 Retail 292
Total 44,725
22
23 23
Locating the Energy Centre
Retail unit, Cinema
Market, Leisure Centre
Energy Centre
Counciloffices
Supermarket
Offices
Hotel
24 24
Recommended approachws
Activity across the City Region
26 26
Some examples
• Alexandra Dock 150MWe biomass plant, application awaited by PINS under the NSIP planning regime
• Stobart Park/3MG 20MWe CHP plant recently approved by Halton
• 10.6MWe EfW CHP in St Helens application under consideration
• Pre-application and EIA Screening for solar parks in Sefton (20MW) and St Helens (5MW)
• Pre-application and EIA Screening for 3.3MWe biomass CHP in St Helens
• Knowsley Industrial Park heat networks – OJEU for technical advisor