Energy and energy transition in

Ivory Coast JETRO Mission - February 28, 2017

Philippe Miquel, CEO

ENGIE Western & Central Africa

Confidentiel Restreint Libre Interne

Page 2: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

ENGIE at a glance

Page 3: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

The ENGIE Group in figures*

3

* At December 31, 2015

Energy Services

228 urban cooling and heating

networks in 13 countries

Electricity

a LNG supply portfolio of

245 TWh from 6 countries

Natural Gas

117,1 GW of installed

electricity production capacity

154,950 employees throughout the world

Operations in 70 countries

€69,9 billion in 2015 revenues

Page 4: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

ENGIE in Africa

4

~ 320 employees

50 years of experience

Over

€306m

turnover in 2015

Page 5: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

ENGIE in Africa – some recent examples

5

Tarfaya (Morrocco) • 301 MW wind farm

• ENGIE: 50 %

• Launched: Jan 2015

• Utilization rate of 45%

• 20 year BOOT contract

• 40% of Morocco’s total

wind capacity

Senegy (Senegal) • 30 MW PV plant

• ENGIE is EPC and O&M

contractor (SolaireDirect)

• Includes 30 kV line from

site to Mekhé substation

• Construction underway

Dedisa + Avon (RSA) • 335 MW and 670 MW

open-cycle gas turbines

• ENGIE: 38%

• 15 year PPA with ESKOM

• Avon: COD Oct 2015

• Dedisa: COD H2 2016

Decentralized energy • Solar home system launch in

Cameroon, Ivory Coast and

Senegal (with Orange)

• PowerCorner minigrid

initiative in Tanzania

• Decentralized power

solutions for towns and

businesses

Page 6: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Energy trends

Page 7: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Energy Transition…?

7

DECARBONIZATION

DECENTRALIZATION

DIGITALIZATION

Page 8: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Cities & Regions: At the heart of the energy transition in a fast changing world

8

Source: IEA, Energy for All, 2011; MIT 2015

IEA Scenario “Energy for all” 2030

B2T & B2B

Microgrids

36%

B2C

Off-grid Solutions

20%

Centralized

power generation

44% (80% today)

Cities

2 % of World Area

50 % of World Population

75 % of World Energy Consumpt.

80 % of World GHG

Page 9: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

ENGIE’s solutions for smart cities…

2016 INVESTOR WORKSHOP 9

Cities Airports

Railway Stations Campuses

Industrial Areas

Military Bases

but also islands, ports…

Page 10: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

ENGIE positioning: from infrastructures to digital solutions

2016 INVESTOR WORKSHOP 10

SECURITY/

SAFETY (ex. Integration of Systems)

PUBLIC

LIGHTING (ex. Automation)

GREEN

MOBILITY (ex. Traffic management)

3D PLANNING/

DASHBOARDS (ex. Simulation Software)

CONNECTIVITY (ex. Wireless Technologies)

DISTRIBUTED

ENERGY (ex. Smart & micro-grids)

HEATING

& COOLING (ex. Low CO2 energy)

BUILDING

MANAGEMENT (ex. Automation, Smart)

Digital Solutions

Services

Infrastructures

TRANSITION

CORE BUSINESSES

DIGITAL

SERVICES (ex. App Development)

ENERGY PLANTS

& NETWORKS (ex. New energies)

Page 11: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

The Energy Sector in

Ivory Coast

Page 12: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Recovering political stability:

• President A. Ouattara re elected for a 2nd term

in 2015

• New constitution adopted in October 2016

• New government early January 2017;

• Thierry Tanoh, Minister of Petroleum, Energy et

Development of Renewable Energy

Economy: Rapid growth of 8 to 10% since

2011. Expected to remain around 7-8% in

coming years.

Ivory Coast’s general context

00/00/2015 TITRE DE LA PRESENTATION ( MENU "INSERTION / EN-TETE ET PIED DE PAGE") 12

Power sector: Liberalized in the 1990s (CIPREL and AZITO). WWB and IMF lobbied a tariff

increase.

Oil sector: Objective of oil production to 200,000 bl/d (from 30,000 bl/d). LNG import to sustain

power development.

Recent projects

• CIPREL IV and AZITO 2 connected in 2016 and additional extension granted;

• Soubré 270 MW HPP to be commissioned end 2017.

Page 13: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Pilot Solar Home Systems deployment with Orange

in Divo;

Soubré hydrodam: Tractebel as owner’s engineers

(275 MW);

CIPREL IV: Tractebel as owner’s engineers (275 MW);

Energy services and energy efficiency to large

industrial customers and large infrastructures;

ENGIE shortlisted for a call-for-tender for 25MW grid

connected in Northern Ivory Coast.

ENGIE’s presence in Ivory Coast

00/00/2015 TITRE DE LA PRESENTATION ( MENU "INSERTION / EN-TETE ET PIED DE PAGE") 13

Page 14: Energy and energy transition in Ivory Coast. ENGIE.pdfEnergy and energy transition in Ivory Coast JETRO Mission - February 28, ... ~ 320 employees 50 years ... Dedisa + Avon (RSA)

Thank you

00/00/2015 TITRE DE LA PRESENTATION ( MENU "INSERTION / EN-TETE ET PIED DE PAGE") 14