Project: Billings Catholic School K-8Addendum #: 3Date Issued: March 4, 2016
Description of Addendum & Attachments:
1. Architectural Addendum #3 by A&E Architects – Attached – 37 pages2. Langlas & Associates Bid Package Clarifications – Attached – 2 pages
Bid Date: March 10th, 2016 at 2:00 pm.
This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form.
END OF ADDENDUM #3
![Page 2: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/2.jpg)
1
Addendum Number: 03 Date Issued: March 4, 2016
Project: Billings Catholic Schools
St. Francis K-8 School
Project Number: 15053.00
Pages in Addendum: 37 w/attachments Prepared By: Kris Koessl
Issued To: All Plan Holders
All Consultants
Hulteng, Inc.
This Addendum’s attachments consist of Con’eer Addendum, Sheet C9.11, Sheets 4.2, 4.3, and 4.4, SSK-01
thru SSK-12, , MSK-1, MSK-2, and ESK-1 thru 9.
Addendum to Contract Documents:
The additions, clarifications, and corrections contained herein shall be made to the Project Specification
Manuals, Drawings, and Schedules for the above referenced project, and shall be included in the scope of
work and proposals to be submitted. References made below to the Project Specification Manual and
Drawings shall be used as a general guide only. Bidder shall determine the extent of work affected by
Addendum items.
General Bid Items:
The plan holder’s list is being recorded and maintained by Langlas & Associates. Contact their office for
questions or for a list of current plan holders.
This project is not subject to the Buy American Act or the Davis-Bacon Act (prevailing wages).
The final day for substitution requests and/or prior approvals was March 3, 2016.
Project Manual (Specifications):
09 68 13 - Tile Carpeting:
Add Paragraph 2.1.A.1: All carpet provided must meet or exceed performance criteria described
below and color and design intent listed in the Color and Finish Schedule.
10 14 00 - Signage:
Add Paragraph 2.6: WALL GRAPHICS AT COMMONS
A. Provide 3-4 mils sheet vinyl with layer of pressure-sensitive adhesive applied one side
1. Refer to drawings for extent of vinyl wall decal.
2. Custom printed imaged to be provided by Architect.
3. Image to include maximum of 10 pantone colors.
08 41 13 – Aluminum-Framed Entrance and Storefronts:
General Clarification, interior storefronts do not need to be thermally broken.
08 71 00 – Door Hardware:
All locksets to have L4 keyways with IC cores.
Hardware Group 12 to be for SGL 3’-0” x 7’-0” Door 1305.6. Delete keyed mullion, inactive leaf
panic hardware, one armor plate and mullion seal.
![Page 3: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/3.jpg)
2
09 30 00 – Tiling:
2.3.A.1, size to be 12”x 24” for PT-1, third offset pattern.
2.4.A.1, size to be 4” x 8” for CT-1
09 51 13 – Acoustical Ceiling Tiles:
2.1, Chicago Metallic Infinity Ceiling Grid and metal ceiling transitions are acceptable. Contractor
to coordinate and verify compatibility with all specified ceiling tiles, accessories, and grid-mounted
fixtures.
10 28 00 – Toilet and Bath Accessories:
2.3.B, Paper Towel Dispenser to be Owner Furnished Contractor Installed
12 66 13 – Telescoping Bleachers:
Revise Paragraph 2.3.F
1. Seating Segments: 19’ -6” (3)
2. Overall Length: 76’ -6” (plus (2) 1’ end rails for total of 78’-6”)
3. Aisle Widths: 4’- 6” (4)
4. Number of Tiers: 13
5. Row Spacing(s): 24 inch.
6. Open Dimension: 25’-3”
7. Closed Dimension: 3’-8”
8. Overall Unit Height: 11’ and 1/2”
14 24 00 – Hydraulic Elevators
1.1.A.1, change sentence to “Holeless hydraulic elevator with machine-roomless or machine-room
application”
1.8.A, change first sentence to “Contractor shall furnish quarterly maintenance service concurrent
with the warranty period. Change second sentence to “Warranty period shall be per 1.7 of this
Section.”
1.8.D, change “house” to “hours”
Drawings:
C9.5: existing striping to be removed by grinding. Overlaying in black is not acceptable.
C9.7:
Change rim elevation of CB-4 to 3242.22.
CB-8 is replaced with a 24” x 12” Tee.
C9.11: replace sheet with attached.
C9.15, Details 1 & 2: change fabric to Mirafi 600X in lieu of Mirifi RS 380i.
C9.17: delete the City of Billings logo from manhole covers.
L1.1: change quantity of Flagpole S-122 to one (1)
A2.4, Detail 14: change dimension of roof hatch to be 30” x 54” to match Spec Section 07 72 33
A4.2: see attached revised sheet for masonry control joint description and locations.
A4.3: see attached revised sheet for masonry control joint description and locations.
A4.4: see attached revised sheet for masonry control joint description and locations.
![Page 4: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/4.jpg)
3
A5.9, Detail 19: at interior masonry wall, delete the rigid insulation, air barrier, WRB and vapor retarder.
Sheathing does not need to be exterior rated, sheet for interior masonry installation.
A5.10 & A5.11: delete ‘Damproofing’ note from foundation wall details, it is not needed.
A5.10, Clarification: see Spec Section 07 11 13, 2.3.D for drainage board material. Material to cover full
vertical face of foundation wall around entire perimeter of the building. Gravel material to be ¾” minus
crushed, washed gravel.
A6.1, Detail 1: revise text “MAKE GOD SMILE” PAINTED IMAGE to “MAKE GOD SMILE” VINYL IMAGE. GRAPHIC
AND TEXT TO BE PROVIDED BY ARCHITECT, APPROVED BY OWNER to remain.
A6.10, Detail 12: Personal Whiteboards are N.I.C.
A9.1:
Window Type ‘W17’ to be a curtain wall system, per spec section 08 44 13. Glazing to be divided.
Window Type ‘W11’ to be per below snapshot:
A9.3:
Change frame type at Door 1102.1 to ‘W22’
Change frame type at Doors 1102.2 and 1102.3 to ‘W23’
Change frame type at Door 1304.3 to ‘W26’
Change frame type at Doors 1314.1 and 1400.3 to ‘8’
Change height of Door 1314.1 to 8’-0”
Change frame type at Door 1317.1 to ‘6’
Change frame material at Doors 1430.1, 1440.1, 1430.2, and 1440.2 to ‘HM’ w/P-2 finish, also
change height to 7’-0”
Change height of Door 1450.1 to 7’-0”
A9.2 & A9.3: Overhead Door Coordination Clarification
OH-A to be 19’-2” x 10’-0”
OH-C to be 4’-6” x 8’-0”
OH-E to be 8’-0” x 8’-0”
A9.6: Room Finish Schedules
Change floor in Elev. 2105 to VCT-1/VCT-2
Change floor in HS Changing 1430 to PT-1/WOM-1
W11
7'-4"
2'-2" 4'-8"
1'-6
"6'
-8" 8'
-8"
1'-6
"
A5.10
7
A2.5
4
3'-4
"
A5.11
10
![Page 5: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/5.jpg)
4
Structural Sheets: See the attached SSK-01 thru SSK-12 for clarifications and/or revisions to the structural
drawings.
M/P/E Sheets & Specifications: See attached Addendum #3, four pages, from Con’eer Engineering for
clarifications and/or revisions to the mechanical, plumbing, and electrical drawings and specification
sections.
Prior Approvals:
Reviewing is for conformance with the design concept of the project and compliance with the information
given in the contract documents. Contractor is responsible for dimensions to be confirmed and correlated
to the job site; for information that pertains solely to the fabrication processes or to techniques of
construction; and for coordination of work of all trades.
Section Description Approved
04 22 00
10 21 13
27 51 23
Concrete Masonry Unit
Toilet Compartments
Clock and PA System
Kanta Block
American Sanitary
Bogen
![Page 6: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/6.jpg)
BCS K-8 Addendum #3 Page 1
ADDENDUM NO. 3 – FAXED OR EMAILED TO PLAN HOLDERS
BILLINGS CATHOLIC SCHOOL K-8
BILLINGS, MT
Con’eer Engineering, Inc. March 3, 2016 1629 Avenue D, Suite 7C Billings MT 59102 Project No. 15053
Bid Date: March 10, 2016 Bid Time: 2 p.m. local Bid Location: Langlas & Associates, 2270 Grant Road, Billings, MT 59102
GENERAL 1. THIS ADDENDUM SHALL BE CONSIDERED A PART OF THE CONTRACT DOCUMENTS AND
SHALL TAKE PRECEDENCE OVER ALL REQUIREMENTS FOR THE WORK SHOWN ON THE DRAWINGS AND/OR SPECIFICATIONS.
2. WORK NOT SPECIFICALLY CHANGED OR MODIFIED BY THIS ADDENDUM SHALL BE AS
ORIGINALLY SHOWN ON THE DRAWINGS AND/OR SPECIFICATIONS. 3. BIDDERS ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF ADDENDA BY NUMBER
INSERTED IN SPACES PROVIDED ON THE BID PROPOSAL. 4. THE GENERAL CONTRACTOR IS REQUIRED TO PROVIDE COPIES OF THIS ADDENDUM
TO ALL SUBCONTRACTORS AND SUPPLIERS BOTH DURING THE BIDDING PERIOD AND FOLLOWING AWARDING OF THE CONTRACT.
CONTRACTORS’ QUESTIONS
1. Specifications indicate SPD requirements on indicated panelboards, none are indicated, where is this required? Answer: Provide SPD per specification on SWBD2, MDP1, MDP2, L1P2, L1P5, L2P2 and L2P3.
2. Do you really want a 3 year warranty on the switchboards and panelboards? Answer: Yes 3. Do you want a SPD in the Switchboard? There is not one shown on the one-line, so I
was thinking it wasn't required, but it’s in the spec? Answer: See response to question 1.
4. Panel spec 262416-4, 2.1, E, 7, b: Do you really want painted back boxes? This would be unusual for a school.
Answer: No, remove reference to painted back boxes from project requirement. 5 Can we series rate the panelboards? Answer: No 6. There are a couple of panel designations on the one line that don't match designations
on the panel schedules. Is L1PG the same as LRPG?
Answer: No, LRPG is a relay panel not a panelboard. Is LPK the same as KP1? Answer: Yes, see additional addendum information regarding sheet E9.4. 7. Sheet E3.1, details 9 & 17 called out keynote symbols, but there is not a keynote
schedule on this page. Please reference the schedule. Answer: See sketch ESK-3 for keyed notes missing from E3.1.
![Page 7: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/7.jpg)
BCS K-8 Addendum #3 Page 2
8. Science rooms 2213&2215 show a keyed note 2 (lavatory sensor). Should this actually be keyed note 4 drop cords?
Answer: Yes, the note reference should be 4. 9. Sheet (2) E2.1C calls the details 6&8 to be Alternate #1. Please confirm that these are
actually Alternate #2. Answer: Yes, these are for Alternate #2. 10. Can MC Cable be used for the receptacle branch circuits? Answer: No. 11. Will alternate #4: Lighting Option in Classrooms affect the lighting control panel?
Answer: No, the controls will be similar. The lighting will need to be programmed differently but the components required will be the same.
12. Will Aluminum feeders be acceptable in place of the copper feeders?
Answer: Aluminum feeders would be acceptable for the service entrance, feeders to MDP1 and MDP2 only. EC is responsible for up-sizing the conductors and conduit required to be equivalent in ampacity to the specified copper feeders listed on the plans.
13. Please clarify the lighting for Alternate 4. For example class room 2230 has two rows of
lights so there will be two rows of F3’s for alt#4? But for room 2228 there are one row of lights so we only need one row of F3’s or since this is a resource room and not a class room is it a part of the alternate? Answer: Although it was discussed at the pre-bid meeting to include all the rooms that students use, for bidding purposes the Alternate #4 will be just for classrooms in sections A and B.
14. On (1) E2.1C lighting note C-it refers to look at detail 16/ on (1)E2.1C, but there isn’t a
detail 16. Answer: Refer to sketches ESK-6, 7, 8 and 9 for revisions to (1) E2.1C and the
missing detail. DRAWINGS Sheet M2.1A
1. Add duct silencers in the main supply and return ducts of AHU-3, Ruskin DM-36 or approved equal. Minimum unit size 36x24.
2. Install 1” acoustical liner on the discharge of vav 3-10 for the first 5’ from the air terminal unit discharge.
Sheet M2.1B
1. Add duct silencers in the main supply and return ducts of AHU-2, Ruskin DM-36 or approved equal. Minimum unit size 36x24.
2. Add duct silencers in the 16” supply duct upstream of VAV boxes VAV-6-1 and VAV-6-2 and the 16” return duct serving the Vocal and Instrumental rooms, Ruskin AX-A or approved equal. Silencer inlet to match duct size.
Sheet M2.2A
1. Add duct silencers in the main supply and return ducts of AHU-5, Ruskin DM-36 or approved equal. Minimum unit size 36x24.
2. Install 1” acoustical liner on the discharge of VAV 5-11 and 5-1 for the first 5’ from the air terminal unit discharge.
Sheet M2.2B 1. Add duct silencers in the main supply and return ducts of AHU-4, Ruskin DM-36 or approved
equal. Minimum unit size 36x24.
![Page 8: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/8.jpg)
BCS K-8 Addendum #3 Page 3
2. Add duct silencer in the 16” supply duct upstream of VAV box VAV-6-10, Ruskin AX-A or approved equal. Silencer inlet to match duct size.
Sheet M9.2
1. Added P9 to the plumbing fixture schedule. Design basis for P9 is an emergency eye / face wash, pedestal mount, Bradley S19214 Series with Bradley S19-2000 EFX8 thermostatic mixing valve to meet tepid water supply requirements.
Sheet M9.3
1. Clarification 7/M9.3. Revised 3-way valve coil piping detail. See sketch MSK-2. 2. Clarification 1/M9.3. Air-cooled chiller detail is for a grade mounted chiller, which does not
apply for this project. For this project, the chiller is mounted on the roof above the mechanical room and the piping is similar. Instead of penetrating an exterior wall, the piping will penetrate the roof. Provide roof jacks or pipe chase curbs for the piping roof penetrations and support pipes on the roof near the chiller. Maintain piping and piping appurtenances shown indoors and outdoors.
3. Clarification. No dry-cooler detail is shown, but would be similar to the air-cooled chiller detail. Refer to the piping schematic on P9.8 for valves, pressure gauge, drain, etc. For this project, the dry-cooler is mounted on the roof near the chiller. Provide roof jacks or pipe chase curbs for the piping roof penetrations and support pipes on the roof near the dry-cooler. Locate the pressure gauge indoors. Provide isolation valves outdoors near the unit and indoors in the mechanical room.
Sheet M9.4
1. Clarification 6/M9.4. Domestic water service entrance detail modified to include meter by-pass loop as required by the City of Billings. Refer to sketch MSK-1.
Sheets P2.1A, P2.1B, P2.2A
1. Clarification. Sinks not tagged that are located in classrooms and shared areas are type P4. Sheet P9.8
1. Clarification. Revised 3-way control valve piping for AHU-2, 3, 4, 5, and 6 to be consistent with MSK-2.
Sheet E2.1B
1. Added keyed note 12 for disconnect at AHU-1. Note 12 to read - PROVIDE 30A/2P 240V FUSIBLE DISCONNECT FOR AHU-1. See sketch ESK-5.
2. Added missing “15” tag to ceiling mounted fire alarm speaker strobe in reception 1001. See sketch ESK-5.
3. Added keyed note 13 for circuitry for AHU-1. Note 13 to read – PROVIDE 2#10+#10G IN ¾” CONDUIT. See sketch ESK-5.
Sheet E2.1C
1. Added circuit for Boys and Girl’s restroom sensor transformer power. Refer to sketch ESK-1. Sheet (1) E2.3C
1. Added panelboard schedule for L1PG. Refer to sketch ESK-4. Sheet E3.1
1. Added missing keyed notes. Refer to sketch ESK-3. Sheet E7.2B
1. Added recessed downlights into drop soffits in Library type D5. Refer to sketch ESK-2. Sheet E9.1
1. Added Type D5 – recessed downlight with square trim. Basis of design Juno Lighting catalog number IC91LEDG4-35K-U-17SQ-HZ-WH; 120V, 14.8 watts.
![Page 9: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/9.jpg)
BCS K-8 Addendum #3 Page 4
2. Revise manufacturer and catalog number for type F6 to Prudential: STR-LED4-SO-16-TMW-D1-SS-UNV-X3-DM01.
3. Install 1” acoustical liner on the discharge of VAV 4-5 for the first 5’ from the air terminal unit discharge.
4.
Sheet E9.4 1. Revise SWBD2 circuit breaker for panelboard LL1 from 225A to 125A. 2. Revise Panelboard name “LKP” to “KP1” on Riser Diagram.
Sheet E9.5
1. Revise Panelboard schedule LL1 to reflect mains at 125Amps. 2. Added 20A/1P spare breakers in panelboard LL1 circuits 30, 32 and 34.
SPECIFICATIONS SECTION 23 07 13 – DUCT INSULATION
1. Clarification. Outdoor air ductwork: foil faced rigid board insulation with canvas jacket, R-8 minimum.
2. Clarification. Indoor concealed supply ductwork: blanket insulation with vapor barrier, R-6 minimum.
3. Clarification. Indoor exposed supply ductwork: blanket insulation with vapor barrier and canvas jacket, R-6 minimum.
SECTION 23 21 13 – HYDRONIC PIPING
1. Clarification. PEX piping is not allowed. SECTION 23 21 16 – HYDRONIC PIPING SPECIALTIES
1. Clarification. Balancing valves are to be the manual type. PRIOR APPROVALS Products from the following manufacturers are approved for bidding purposes. Products will be reviewed for compliance with Contract Documents during Shop Drawings phase. SECTION 23 21 13.13 – UNDERGROUND HYDRONIC PIPING Tricon Piping Systems SECTION 23 21 16 – HYDRONIC SPECIALTIES FLOW CONTROL Nexus Valve SECTION 23 21 23 – HYDRONIC PUMPS Taco (00 Circulators) SECTION 23 31 13 – ROUND DUCT AND FITTINGS Lewis and Lambert, West
Coast Omni Duct, Semco, NorPac Sheetmetal, Metco
SECTION 23 33 00 – AIR DUCT - BACKDRAFT DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT - MANUAL VOLUME DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – CONTROL DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – FIRE AND FIRE/SMOKE DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – ACCESS DOORS Nailor SECTION 23 33 00 – AIR DUCT – FLEXIBLE DUCTS Flexmaster
![Page 10: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/10.jpg)
BCS K-8 Addendum #3 Page 5
SECTION 23 33 00 – AIR DUCT – HIGH EFFICIENCY TAKE-OFFS Flexmaster SECTION 23 34 23 – CENTRIFUGAL ROOF VENTILATORS Aerovent, Twin City SECTION 23 34 23 – CEILING MOUNTED VENTILATORS ACME, Twin City SECTION 23 35 33 – GREASE DUCT Captive Aire, HeatFab SECTION 23 36 00 2.2 – DIFFUSER-TYPE AIR TERMINAL UNITS Krueger SECTION 23 37 13 2.1 – LOUVER FACE DIFFUSERS Krueger. Nailor SECTION 23 37 13 2.2 – LINEAR SLOT DIFFUSERS Nailor SECTION 23 37 23 – FABRIC AIR DISTRIBUTION DEVICES KE Fibertec, FabricAir SECTION 23 37 23 – HVAC GRAVITY VENTILATORS Loren Cook, ACME SECTION 23 64 23.21 – AIR-COOLED SCROLL WATER CHILLERS Daikin Applied, York/JCI SECTION 23 – HVLS FANS MacroAir SECTION 23 – DRY COOLER Guntner & Liebert, Luvata SECTION 23 – GLYCOL FEEDER John Wood SECTION 23 – BUFFER TANK John Wood SECTION 23 – MECHANICAL A-C UNIT Daikin & AAON, York/JCI,
Carrier SECTION 23 – DUCTLESS SPLIT AC SYSTEM LG, Mitsubishi SECTION 23 – BOILER VENTING Schebler SECTION 23 73 13 – VFD’S FOR AIR-HANDLING UNITS Danfoss SECTION 23 73 13 – MODULAR INDOOR AIR-HANDLING UNITS York/JCI, Carrier SECTION 23 - ELECTRIC WALL HEATERS Q-Mark SECTION 26 32 13 – ENGINE GENERATORS Cummins (RS30) SECTION 26 36 00 – TRANSFER SWITCHES Cummins PRIOR APPROVALS – SECTION 26500 (26519, 265219, 265613, 265619) LIGHTING Products from the following manufacturers are approved for bidding purposes. Products will be reviewed for compliance with Contract Documents during Shop Drawings phase along with full lighting calculations to verify that submitted fixtures meet the requirements in the Construction Documents. Manufacturers listed are approved pending review in submittal. Any revision necessary to the lumen output and performance to meet those requirements are the full responsibility of the submitting manufacturer and manufacturer’s representative. All submitted fixtures to meet final approval of design Architect. SECTION 26519 – INTERIOR LED LIGHTING Type A1 Eaton (Metalux), Columbia, Mark Lighting Type A2 Eaton (Metalux), Columbia, Mark Lighting Type A3 Vividleds, MHT, Orange Lighting Type A4 Vividleds, MHT, Orange Lighting
![Page 11: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/11.jpg)
BCS K-8 Addendum #3 Page 6
Type C1 Columbia, Lithonia Type C2 Lithonia Type CW1 Lumenwerx; Focalpoint Type CW2 Lumenwerx; Focalpoint Type CW3 Lumenwerx; Focalpoint Type CW4 Lumenwerx; Focalpoint Type D1 Eaton (Portfolio); Prescolite, Acuity; Focalpoint; Erco Type D2 Eaton (Portfolio); Focalpoint; Erco Type D3 Eaton (Portfolio); Prescolite; Focalpoint; Type D4 Acuity Type F1 Eaton (Metalux); Columbia, Alights Type F2-8 Eaton (Neoray); Litecontrol; Alights; Focalpoint Type F2-12 Eaton (Neoray); Litecontrol Alights; Focalpoint Type F5 Eaton (Neoray); Litecontrol; Focalpoint Type F6 Eaton (Neoray); Litecontrol Type F7 Eaton (IO lighting) Type F8 Eaton (Neoray); Litecontrol Type F9 Eaton (Neoray) Type H1 Eaton (Metalux); Columbia Type HA1 Eaton (Metalux); Columbia; Mark Lighting Type K1 Eaton (Metalux); Columbia; Mark Lighting Type M1 Eaton (RSA) Type M2 Eaton (RSA) Type P2 Visa Lighting – LED sequence (specifications to match listed fixture characteristics) Type SP1 Eaton (McGraw Edision) Type SP1 –Pole Eaton (McGraw Edision) Type SP2` Eaton (McGraw Edision) Type SP2 – Pole Eaton (McGraw Edision) Type V1 Teron Type W1 Eaton (McGraw Edision) Type U1 Eaton (Lumiere); Kim Lighting Type X1 &2 Dual-Lite; Acuity Type X3 Dual-Lite; Acuity Lighting Controls:
1. Eaton – Greengate 2. Hubbell
END OF ADDENDUM #3
![Page 12: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/12.jpg)
”
”
”
2.12.2016
100%CONSTRUCTION
DOCUMENTS ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
100% CONSTRUCTION DOCUMENTS
revisiondate
phase
issuedate
sheet
project
owner
project#15053.00
4"WA
TER
SER
VICE
6" D.I. FIRE SERVICE
C9.11
3" WATER SERVICE
6"FIRE
SER
VICE
4"WA
TER
SER
VICE
6"FIRE
SER
VICE
![Page 13: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/13.jpg)
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
LIGHT-WELL PARAPET138'-8"
11
A5.3
11
A5.3
18
A5.3
18
A5.3
3
A5.3
3
A5.3
16
A5.9
F
GHKNQR
E
O M
W10
W7 W7 W7 W7 W7 W7
W18
/11
A4.2
/11
A4.2
IP
MP-1
MP-2
MP-1
MP-3
BRK-1
BRK-2
MP-2
MP-3
BRK-1
MP-1 MP-3 MP-3 MP-3 MP-3
W11 W11 W11 W11
MP-1
W11W11
J
18
A5.8
L
BRK-1
MP-3 MP-3 MP-3 MP-3
BRK-1
MP-1MP-2
MP-1 MP-2
W11 W11
W11 W11
MASONRY CONTROL JOINTCALLED OUT WITH "CJ" - TYPICAL
MP-3
MP-3
MP-3 VERTICAL JOINT, TYP
W5 W5 W5 W5
A2.4
16
A2.1C
1
A2.1C
1
MP-1 VERTICAL JOINT, TYP
CJCJ CJ CJ CJCJCJCJCJ
CJ
LEVEL 1100'-0"
12
MP-1114'-4"
BRK-1 CJ
2'-0"
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
1 2
MP-1
BRK-1
CANOPY STRUCTURENOT SHOWN FORCLARITY
2'-0"
CJ
LEVEL 1100'-0"
20
A5.2
20
A5.2
CLASSROOM PARAPET130'-8"
16
A5.4
RTVYAACCDDEEFFHHIIJJKKLL GG BB Z U
W6 W6W6
W6W15
W6W6
W6 W6W6
W6W6W6
W6W6
W6 W6
W15
W6W6W6
W6 W6 W6
/3
A4.2
/3
A4.2
X SW
MP-1
MP-1 MP-2 MP-1 BRK-1 MP-1 BRK-1 MP-1 MP-2 MP-1BRK-1 MP-2
MP-1 MP-2
MP-2
MP-2
BRK-1
MP-2
MP-2 MP-2
MP-2
MP-2 MP-1
MP-2
MP-2 MP-1
MP-2
MP-2 MP-1
BRK-1
MP-2
MP-2
MP-2
MP-1
BRK-1BRK-1BRK-1BRK-1BRK-1
BRK-1 BRK-1 BRK-1
BRK-1
W6W6W6
W6W6
W6W6
W6
W6
W14 W14
8
A5.2
8
A5.2
MP-2 MP-1
MASONRY CONTROL JOINT CALLEDOUT WITH "CJ" - TYPICAL
10'-4
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
MP-1 VERTICAL JOINT, TYP
A2.1C
1
CJCJCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
12
MP-1
BRK-1
CJ
2'-0"
METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)
EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION
MP-1
MP-2METAL PANELS - VERTICAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)
MP-3METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)
BRICK MASONRY UNIT
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK
THIN BRICK MASONRY
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID
BRK-1
BRK-2
LEVEL 1100'-0"
LEVEL 2114'-0"
CLASSROOM PARAPET130'-8"
17
A5.4
17
A5.1
17
A5.1
7
A5.1
7
A5.1
1234679101214 513 8
W13
MP-1 MP-1 MP-1
BRK-1
MP-2 BRK-1
BRK-1
W22
11 3.7
MASONRY CONTROL JOINT CALLEDOUT WITH "CJ" - TYPICAL
EQ EQ33'-3"
10'-4
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
CJ CJ CJ CJ
revision date
phase
issue date
shee
t
proj
ect
owne
r
a&e proj #ia proj #
3/3/
2016
1:1
7:41
PM
EX
TE
RIO
R E
LE
VA
TIO
NS
A4.2
2.12.2016
100% CONSTRUCTION
DOCUMENTS
ST
. F
RA
NC
IS K
-8 S
CH
OO
L
BIL
LIN
GS
CA
TH
OLI
C S
CH
OO
LS
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
SCALE: 1/8" = 1'-0"3NORTH ELEVATION - AREA B
SCALE: 1/8" = 1'-0"18EAST ELEVATION - AREA B 3
SCALE: 1/8" = 1'-0"19WEST ELEVATION - AREA B 2
SCALE: 1/8" = 1'-0"11NORTH ELEVATION - AREA A
SCALE: 1/8" = 1'-0"20EAST ELEVATION - AREA A 3
SCALE: 1/8" = 1'-0"16EAST ELEVATION - AREA A
![Page 14: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/14.jpg)
LEVEL 1100'-0"
LEVEL 2114'-0"
20
A5.2
20
A5.2
CLASSROOM PARAPET130'-8"
19
A5.4
20
A5.4
16
A5.5
V Y AA CC DD EE FF HH II JJ KK LLGGBBZU
/3
A4.3
/3
A4.3
W6 W6
W23
W6 W6 W6 W6
W6W6W6L1
W6
W6 W6
W6 W6 W6 W6
W6W6W6W6
XW
MP-1MP-1MP-1
MP-2
MP-2
MP-2
BRK-1
MP-2
MP-2MP-2MP-1
MP-1 MP-2
MP-1MP-2MP-1MP-1MP-1MP-2 MP-2MP-2
MP-2MP-2
BRK-1 BRK-1
BRK-1
BRK-1
MP-2MP-1BRK-1 MP-1BRK-1MP-2MP-2
MP-2
BRK-1BRK-1BRK-1
BRK-1BRK-1
MP-1
BRK-1 BRK-1
MP-1
L1
MP-1 MP-1 MP-1MP-1MP-1
W6
W6
W6
W6
W6W6W6 W14W6
CJ
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
10'-4
"
10'-4
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
CJ CJ CJCJ CJ CJ CJ CJ CJ CJ CJCJCJCJ CJ
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
1413
MP-1
BRK-1
10'-4
"
CJ
2'-0"
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
14 13
BRK-1
MP-1
CJ
2'-0"
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
1413
MP-1
BRK-1
10'-4
"
CJ
2'-0"
LEVEL 1100'-0"
GYM/COMMONS98'-0"
CLASSROOM PARAPET130'-8"
CHAPEL PARAPET116'-0"
18
A5.5
3
A5.3
3
A5.3
N Q R T UOM
/7
A4.3
/7
A4.3
L1
W6 W6
W6
W23W6W6
P S
MP-2 MP-1
BRK-1
MP-1
MP-2
MP-2MP-1
MP-2
MP-1
BRK-1
BRK-1MP-2MP-2
MP-1
W19
BRK-1BRK-1BRK-1BRK-1
W6 W6 W14
8
A5.2
8
A5.2
L
CJ
1'-8"2'-4"0'-4"2'-4"
2'-4
"0'
-4"
10'-6
"1'
-6"
A4.3
2
ALUMINUM SIGNAGE
10'-4
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
CJ CJ CJ CJ CJ CJ
LEVEL 1100'-0"
GYM/COMMONS98'-0"
4
A5.2
4
A5.2
CHAPEL PARAPET116'-0"
1214 13
BRK-1
MP-1 MP-2
W16
METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)
EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION
MP-1
MP-2METAL PANELS - VERTICAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)
MP-3METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)
BRICK MASONRY UNIT
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK
THIN BRICK MASONRY
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID
BRK-1
BRK-2
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
1 2
MP-1
CJ
2'-0"
GYM/COMMONS98'-0"
4
A5.2
4
A5.2
CLASSROOM PARAPET130'-8"
COMMONS PARAPET122'-8"
LOCKER ROOM PARAPET114'-8"
LIGHT-WELL PARAPET138'-8"
18
A5.2
18
A5.2
11
A5.1
11
A5.1
2
A5.1
2
A5.1
16
A5.6
17
A5.620
A5.519
A5.9
123467910
121415
5
1718
19
1316
8
W20W20
INTERIOR NOT SHOWNFOR CLARITY
MP-1 MP-1
BRK-2
BRK-1
MP-2
BRK-1BRK-1
MP-1
W3
18
A5.620
A5.6
11 3.7
4'-0" 23'-8"
CJ
A2.4
16
A2.4
16
A2.4
16
11'-0
"
11'-0
"
11'-0
"
11'-0
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
1/4" DARK BRONZE ANODIZED ALUMINUMPLATE 'CROSS'. COAT WITH 'NYALIC'CLEAR POLYMERIC PLASTIC RESIN
1/2"ø ALUMINUM POSTS AT 16" OC,EMBED INTO BRICK 2" MIN
HILTI HIT-HY 70 INJECTIBLE MORTAR
2 1/2" 1"
1 1/
4"
COORDINATE MASONRY TIES WITH ALLSTEEL POST EMBED LOCATIONS
BRICK VENEER WALL ASSEMBLYPER PLANS
1" ALUMINUM STANDOFF
revision date
phase
issue date
shee
t
proj
ect
owne
r
a&e proj #ia proj #
3/3/
2016
1:1
7:43
PM
EX
TE
RIO
R E
LE
VA
TIO
NS
A4.3
2.12.2016
100% CONSTRUCTION
DOCUMENTS
ST
. F
RA
NC
IS K
-8 S
CH
OO
L
BIL
LIN
GS
CA
TH
OLI
C S
CH
OO
LS
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
SCALE: 1/8" = 1'-0"7SOUTH ELEVATION - AREA A
SCALE: 1/8" = 1'-0"17WEST ELEVATION - AREA A 1
SCALE: 1/8" = 1'-0"18EAST ELEVATION - AREA A 2
SCALE: 1/8" = 1'-0"19WEST ELEVATION - AREA A 2
SCALE: 1/8" = 1'-0"3SOUTH ELEVATION - AREA B
SCALE: 1/8" = 1'-0"20WEST ELEVATION - CHAPEL - AREA B
SCALE: 1/8" = 1'-0"16WEST ELEVATION - AREA A 3
SCALE: 1/8" = 1'-0"12EAST ELEVATION - AREA B
SCALE: 3" = 1'-0"2CROSS ANCHOR/LETTERING DETAIL
![Page 15: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/15.jpg)
GYM/COMMONS98'-0"
COMMONS PARAPET122'-8"
LOCKER ROOM PARAPET114'-8"
11
A5.3
11
A5.3 16
A5.8
18
A5.3
18
A5.3
3
A5.3
3
A5.3
G H K M
INTERIOR NOT SHOWN FOR CLARITY
I
MP-1 MP-1
J L
METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)
EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION
MP-1
MP-2METAL PANELS - VERTICAL
MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)
MP-3METAL PANELS - HORIZONTAL
MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)
BRICK MASONRY UNIT
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK
THIN BRICK MASONRY
MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID
BRK-1
BRK-2
GYM/COMMONS98'-0"
COMMONS PARAPET122'-8"
LOCKER ROOM PARAPET114'-8"
11
A5.3
11
A5.3
18
A5.3
18
A5.3
B F G H KD ECA I J
16
A5.3
16
A5.3
L
MP-1
BRK-1
11'-0
"
11'-0
"
MP-1 VERTICAL JOINT, TYP
A2.1C
1
LEVEL 1100'-0"
CLASSROOM PARAPET130'-8"
CHAPEL PARAPET116'-0"
9 10 128
MP-1
11
LEVEL 1100'-0"
GYM/COMMONS98'-0"
4
A5.2
4
A5.2CLASSROOM PARAPET130'-8"
COMMONS PARAPET122'-8"
LOCKER ROOM PARAPET114'-8"
LIGHT-WELL PARAPET138'-8"
18
A5.2
18
A5.2
11
A5.1
11
A5.1
2
A5.1
2
A5.1
20
A5.7
16
A5.7
1 2 3 4 6 7 9 10
12 14 15
5
17 18 1913 16
8
6 4
5
MP-1
BRK-2 MP-2 BRK-2
MP-3
MP-3 MP-3 MP-3
BRK-1
MP-1 MP-2
BRK-1
W8 W8 W8
W17
W12 W12 W9
W10
W5
W24
W5
20
A5.8
18
A5.620
A5.6
MP-3MP-3MP-3MP-3
BRK-1BRK-1BRK-1 BRK-1
MP-1 MP-2MP-1 MP-2
MP-2MP-1
MP-1
MP-2
113.7
CJ
MP-3 VERTICAL JOINT, TYP
CJ
MP-1
MP-1 VERTICAL JOINT, TYP
MP-3
EQ
0'-8"
EQEQ
0'-8"
EQ 4"ø STEEL PRIMARY &OVERFLOWDOWNSPOUTS, PAINT TOMATCH EXT. COLUMNS
4"ø STEEL PRIMARY & OVERFLOWDOWNSPOUTS, PAINT TO MATCHEXT. COLUMNS
4"12"
4"12"
A2.1C
1
A2.1C
1
A2.1C
1
MP-1 VERTICAL JOINT, TYP
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
CJ
CJ
CJCJCJ
CJCJCJ
?BRK-1
GYM/COMMONS98'-0"
COMMONS PARAPET122'-8"
18
A5.3
18
A5.3
BFGH DE C A
18
A5.7
INTERIOR NOT SHOWNFOR CLARITY
MP-3
MP-2
W9
BRK-1 BRK-1
MP-3
BRK-1
W25
16
A5.3
16
A5.3
BRK-1BRK-2
ALUMINUM SIGNAGE, 'GOTHAM' FONT.
1'-0
"
0'-8
"
1'-6
"0'
-10"2'
-0"
2'-2
"
2'-8"13'-11 5/8"
A4.3
2
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
CJ CJ
2'-0"
LEVEL 1100'-0"
COMMONS PARAPET122'-8"
LIGHT-WELL PARAPET138'-8"
11
A5.3
11
A5.3
18
A5.3
18
A5.3
3
A5.3
3
A5.3
F G H K NE M
INTERIOR NOT SHOWNFOR CLARITY
I
MP-1 MP-3
BRK-2
J L
MP-2
MP-1
BRK-1
W4
W2
A2.4
16
MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL
CJ
2'-0"
LEVEL 2114'-0"
GYM/COMMONS98'-0"
COMMONS PARAPET122'-8"
15
1/4" DARK BRONZE ANODIZED ALUMINUMLETTERS. COAT WITH 'NYALIC' CLEARPOLYMERIC PLASTIC RESIN
1/2"ø STEEL POSTS,(4) PER LETTER.
HILTI HIT-HY 70 INJECTIBLE MORTAR
THIN BRICK VENEER WALLASSEMBLY PER PLANS
1" ALUMINUM STANDOFF
1 1/
4"
2 1/2"
revision date
phase
issue date
shee
t
proj
ect
owne
r
a&e proj #ia proj #
3/3/
2016
1:1
7:44
PM
EX
TE
RIO
R E
LE
VA
TIO
NS
A4.4
2.12.2016
100% CONSTRUCTION
DOCUMENTS
ST
. F
RA
NC
IS K
-8 S
CH
OO
L
BIL
LIN
GS
CA
TH
OLI
C S
CH
OO
LS
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
SCALE: 1/8" = 1'-0"13SOUTH ELEVATION - AREA B 1
SCALE: 1/8" = 1'-0"3SOUTH ELEVATION - AREA C
SCALE: 1/8" = 1'-0"15EAST ELEVATION - LEVEL 2 - AREA B
SCALE: 1/8" = 1'-0"6WEST ELEVATION - AREA B
SCALE: 1/8" = 1'-0"11NORTH ELEVATION - AREA B 1
SCALE: 1/8" = 1'-0"20SOUTH ELEVATION - AREA B 2
SCALE: 1/8" = 1'-0"19EAST ELEVATION - AREA B
SCALE: 3" = 1'-0"18CROSS ANCHOR DETAIL
![Page 16: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/16.jpg)
D
7
S4.1
E
E
F
F
G
G
14 14
13 13
12 12
10 10
9 9
8 8
1111
D.8
D.8
26
S9.1
16
S9.1
HSS8X6X5/16
F1600
HSS8X6X5/16
HSS8X6X5/16
F1600
HSS8X6X5/16
F50
F50
F70
HSS7X7X
3/8
F.S.
TF (96'-6")TF (96'-0")
TF (96'-0")
5"DIA
PIP
E
5"DIA
PIP
E
5"DIA PIPE
16"X16"CONC PIER
16"X16"CONC PIER
SWA
TF (96'-6")
TF (96'-6")
TF (96'-6")
14
S9.1
7
S9.1
SIM
TOC (98'-0")
TOC (98'-0")
CF
24
12" CONC WALLTOC (100'-6")SEE 1 / L5.1
TF
(96
'-6")
SEE 26 / S9.1
FOR BASE PL
9"
7'-7
"11
"
2'-7
1/2
"
ADD #3
14'-1
0"
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
3 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK01
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK011 PARTIAL FOUNDATION PLAN - AREA B
![Page 17: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/17.jpg)
E
E
F
F
G
G
10 10
9 9
8 8
7 7
6 6
1111
D.8
D.8
W8X13W8X13
W8X21
W8X13
W8X13
W8X13
W8X13
W8X13
W8X13
SP
AE
Q(3
)
W8X
10
W8X
21 (
SLO
PE
S)
W8X10
W8X10
W8X10
1'-0
"
W10
X22
23
S9.3TYP
W16
X40
(112
'-4 1
/2")
HSS8X6X
1/4
POST UP
W8X13
H11
W8X10
(3)
EQ
SP
A
SWF
4'-0
"
W8X
28
4'-2
1/2
"
20
S9.5
H6ADD #3
ADD #3
ADD #3
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
4 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK02
03/01/201621519.00
JMM
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK021
PARTIAL SECOND FLOOR ANDLOW ROOF FRAMING PLAN - AREA B
![Page 18: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/18.jpg)
FF
FF
GG
GG
HH
HH
6 6
5 5
4 4
3 3
1 1/2" 'B' DECK
W16X26
W16X31
W16X31W14X22
TOD (128'-4 5/8")
TOD (127'-9 1/2")
H2H4
6'-0" 6'-0"7"
6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
SEE/30 S9.2
ADD #3HVACOPENING > 18"
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
4 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK03
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK031 PARTIAL ROOF FRAMING PLAN - AREA A
![Page 19: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/19.jpg)
BB
BB
CC
CC
DD
DD
12 12
10 10
9 9
8 8
7 7
1111
W16X26
W16X31
H2 H10
SEE/30 S9.2
ADD #3HVACOPENING > 18"
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
5 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK04
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK041 PARTIAL ROOF FRAMING PLAN - AREA A
![Page 20: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/20.jpg)
U
U
V
V
W
W
X
X
6 6
5 5
4 4
3 3
2 2
W16X31
W16X26
W16X31W14X22
TOD (128'-4 5/8")
TOD (127'-9 1/2")
H2H4
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
SEE/30 S9.2
ADD #3HVACOPENING > 18"
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
5 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK05
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK051 PARTIAL ROOF FRAMING PLAN - AREA A
![Page 21: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/21.jpg)
P
P
Q
Q
R
R
12 12
10 10
9 9
8 8
7 7
1111
W16X31
W14X43 C=3/4"
H10
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
SEE/30 S9.2
ADD #3HVACOPENING > 18"
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
6 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK06
03/01/201621519.00
MB
Checker
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK061 PARTIAL ROOF FRAMING PLAN - AREA B
![Page 22: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/22.jpg)
G
G
H
H
I
I
12 12
10 10
9 9
8 8
7 7
1111
C6X8.2
C6X8.2
SWF
SWC
5.07
3'-5" 6'-3" 6'-3" 6'-0"
18K
4
18K
4
18K
4
18K
4
H5
ADD #3
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
6 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK07
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK071 PARTIAL ROOF FRAMING PLAN - AREA B
![Page 23: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/23.jpg)
E
E
F
F
16 16
15 15
14 14
13 13
12 12
D.8
D.8
W8X
21 C
=3/
4"
W8X10
W8X10
W8X10
W8X10
W8X10
W8X10
5
S9.2
TO
D (
112'
-10
1/2"
)
12
S9.3
W8X10
EQ
EQ
EQ
EQ
6'-0
"
W8X
21
ADD #3
ADD #3
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
7 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK08
03/01/201621519.00
Author
Checker
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK081
PARTIAL SECOND FLOOR ANDLOW ROOF FRAMING PLAN - AREA B
![Page 24: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/24.jpg)
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
8 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK09
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
![Page 25: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/25.jpg)
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
8 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK10
03/01/201621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
![Page 26: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/26.jpg)
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/1/
2016
10:
41:0
9 A
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK11
03/01/201621519.00
Author
Checker
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
![Page 27: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/27.jpg)
A
A
B
B
D
D
16 16
15 15
C
C
SWC
CF24 TF (96'-6")
(2) 8
00S20
0-54
(2) 8
00S20
0-54
(2) 8
00S20
0-54
(2) 8
00S20
0-54
(2) 8
00S20
0-54
(2) 8
00S20
0-54
SHD8
SHD85"
5"
7
S9.1TYP
ADD #4
Whitten & Borges, PC
Suite 'H'
Ph: 406-248-5449www.whittenborges.com
645 Grand Avenue
Billings, Montana 59101
Structural Engineers
6 0 8 N O R T H 2 9 T H
PH 4 0 6 . 2 4 8 . 2 6 3 3
FAX 4 0 6 . 2 4 8 . 2 4 2 7
B I L L I N G S, M T 59101
www.aearchitects.com
MISSOULA, M T 59802
PH 4 0 6 . 7 2 1 . 5 6 4 3
FAX 4 0 6 . 7 2 1 . 1 8 8 7
224 N. HIGGINS, SUITE B
I N T E R I O R SH I S T O R I C
A R C H I T E C T U R E
PROJECT:
DRAWN:
CHECKED:
REVISED:
ARCHITECTS CPA&E
BILLINGS, MONTANA
3/3/
2016
12:
53:1
1 P
MS
:\_P
roje
cts\
2015
(40
K)\
4009
7 A
&E
BC
S K
-8\R
evit\
4009
7 B
CS
- S
truc
tura
l.rvt
SSK12
03/03/1621519.00
JMN
MB
ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS
1/8" = 1'-0"SSK121 PARTIAL FOUNDATION PLAN - AREA B
ADD #3
![Page 28: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/28.jpg)
18"
3" DOMESTIC WATER TO BUILDING SYSTEM.
AIR GAP FITTING, ROUTE TO FLOOR SINK.
PRESSURE GAUGE (TYP.), SEE SPECIFICATION.
3" REDUCED PRESSURE BACKFLOW PREVENTER (RPZ).
WATTS 009QT.
2" SHUTOFF VALVE.
DOMESTIC WATER METER.
PIPE BRACE.
FLANGED CONNECTION.
WATER SERVICE ENTRANCE, SEE CIVIL PLANS FOR
CONTINUATION.
PRESSURE REDUCING VALVE.
PVC SLEEVE.
18"
FLOOR
7
3
10
1
5
1
7
5
6
4
3
2
3
4
5
6
7
8
9
10
11
11
7
5
6 WATER SERVICE ENTRANCE - REVISED ADDENDUM #1M9.4 : M9.4
DATE:
BY:MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com 2-23-2016
ST. FRANCIS K-8WATER SERVICE ENTRANCE
BILLINGS, MT
#15057
MSK-1JAG
![Page 29: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/29.jpg)
COIL
BALANCING
VALVE (TYP)
RETURN TO
BOILER
ROOM
3-WAY MODULATING
CONTROL VALVE
NORMALLY OPEN TO FULL
FLOW THROUGH COIL
3/4" DRAIN VALVE W/
THREADED HOSE
CONN.
N.O.
N.O.
ISOLATION
VALVE (TYP)
RETURN
FROM AIR
TERMINALS
N.C.
SUPPLY
2-WAY MODULATING
CONTROL VALVE,
NORMALLY CLOSED
SUPPLY TO AIR
TERMINALS
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 MSK-2
15053APL
03/03/16
7COIL PIPING DETAIL - 3 WAY VALVE NORMALLY OPEN TO COIL
![Page 30: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/30.jpg)
CLGF
CLGF
K
18
J
GFI GFI
GFI
GFI
+42 +42
+42
+42
BOYS
1309A
GIRLS
1309B
15
15
L1P1-20
L1P1-9
P3A
P3A
L1P1-46
3
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 ESK-1
15053ZR
03/01/16
SCALE: 1/8" = 1'-0"17FIRST FLOOR POWER PLAN AREA 'C'
![Page 31: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/31.jpg)
J
OC OC
OC PC
OC
J
J
K N
3
4
6
5
OMJ
LIBRARY
2202
X1
X2
X2
X1
F5E F5F5 F5EF6F6
F5F5
DAYLIGHT
ZONES
LL3-5
5
1
1
2
2
2
4
2
7
D5 D5
D5
D5
D5 D5
3
D5 D5
D5D5
3
CHECKED:
DESIGNED:
DRAWN:
ME
CH
AN
ICA
L /
ELE
CT
RIC
AL
PR
OF
ES
SIO
NA
L E
NG
INE
ER
S
1629 A
VE
D S
TE
7C
, B
ILLIN
GS
MT
59102
PH
ON
E:
406
.252.3
237
FA
X:
406
.252.3
276
ww
w.c
oneer.
com
REVISION
DATE
#BY
ST FRANCIS K-8 SCHOOL
ADDENDUM #3
ESK-2
3.03.16
15053
REF E7.2B
ZR
ZTR
JG
3ADDENDUM 3
03-03-16
SCALE: 1/8" = 1'-0"1SECOND FLOOR LIGHTING PLAN - AREA 'B'
![Page 32: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/32.jpg)
POWER KEYED NOTES
PROVIDE POWER CONNECTION TO IRRIGATION CONTROL PANEL. COORDINATE EXACT
LOCATION AND WIRING REQUIREMENTS WITH EQUIPMENT INSTALLLER.
PROVIDE ONE 1" PVC AND ONE 2" CONDUIT FROM IRRIGATION CONTROL PANEL TO WELL PUMP
LOCATION FOR WIRING CONNECTIONS TO WELL PUMP EQUIPMENT. COORDINATE WITH
EQUIPMENT INSTALLER.
PROVIDE CEILING MOUNTED TWIST LOCK RECEPTACLE FOR DROP CORD CONNECTION FOR
FOOD SERVICE EQUIPMENT. REFER TO FS3.0 FOR CEILING DROP DETAIL 1/FS3.0. COORDINATE
EXACT LOCATION FOR TWIST LOCK RECEPTACLE IN CEILING WITH KITCHEN EQUIPMENT
INSTALLER PRIOR TO ROUGH-IN.
PROVIDE WALL MOUNTED SWITCH FOR HOOD FAN CONTROL. COORDINATE WITH EQUIPMENT
PROVIDER. FAN IS LOCATED ON THE ROOF.
PROVIDE 3#8+1#10 GROUND IN 3/4" CONDUIT.
PROVIDE 3#6+1#10 GROUND IN 1" CONDUIT.
PROVIDE 3#4+1#8 GROUND IN 1 1/4" CONDUIT.
PROVIDE POWER CONNECTION TO OVERHEAD DOOR CONTROLLER/MOTOR EQUIPMENT: BASIS
OF DESIGN 1/2HP, 120V, 1 PHASE.
LOCATION FOR OVERHEAD DOOR WALL CONTROL SWITCH PROVIDED WITH OVERHEAD DOOR
EQUIPMENT. MOUNT AT SWITCH HEIGHT. EC TO PROVIDE AND INSTALL ALL WIRING FROM
SWITCH TO DOOR MOTOR/CONTROLLER FOR A COMPLETE SYSTEM. COORDINATE
INSTALLATION WITH DOOR EQUIPMENT PROVIDER PRIOR TO ROUGH-IN.
LOCATION FOR COILING DOOR WALL CONTROL SWITCH PROVIDED WITH OVERHEAD DOOR
EQUIPMENT. MOUNT AT SWITCH HEIGHT. EC TO PROVIDE AND INSTALL ALL WIRING FROM
SWITCH TO DOOR MOTOR/CONTROLLER FOR A COMPLETE SYSTEM. COORDINATE
INSTALLATION WITH DOOR EQUIPMENT PROVIDER PRIOR TO ROUGH-IN.
PROVIDE POWER CONNECTION TO COILING DOOR CONTROLLER/MOTOR EQUIPMENT: BASIS OF
DESIGN 1/2HP, 120V, 1 PHASE.
PROVIDE BOILER EMERGENCY POWER OFF BUTTON. PROVIDE A PILLA BSD120 EMERGENCY
BOILER SHUT-DOWN WALL STATION OR AN APPROVED EQUAL FOR CONTROL CONTROL SHUT
DOWN UPON ACTIVATION. PROVIDE A CONNECTION FROM CONTACT BLOCK OF EMERGENCY
BUTTON TO BOILER CONTROLS.
EXTEND POWER FROM DSOU-1 TO DSIU-1 PER MANUFACTURER'S
RECOMMENDATION/REQUIREMENTS. DSIU-1 IS POWERED FROM DSOU-1. PROVIDE WALL
DISCONNECT SWITCH PER CONTROL EQUIPMENT SCHEDULE FOR DSIU-1.
PROVIDE 120V, 1 PHASE, 20A POWER CONNECTION TO RACK MOUNTED POWER STRIP
EQUIPMENT. COORDINATE WITH DIVISION 27000 RACK SPECIFICATION AND COMMUNICATION
PLANS AND DETAILS.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 ESK-3
15053ZTR
03/01/16
SCALE: 1/8" = 1'-0"1KEYED NOTES FOR SHEET E3.1
![Page 33: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/33.jpg)
CHECKED:
DESIGNED:
DRAWN:
ME
CH
AN
ICA
L /
ELE
CT
RIC
AL
PR
OF
ES
SIO
NA
L E
NG
INE
ER
S
1629 A
VE
D S
TE
7C
, B
ILLIN
GS
MT
59102
PH
ON
E:
406
.252.3
237
FA
X:
406
.252.3
276
ww
w.c
oneer.
com
REVISION
DATE
#BY
ST FRANCIS K-8 SCHOOL
ADDENDUM #3
ESK-4
3.03.16
15053
PANELBOARD
L1PG
ADDENDUM 3
ZTR
ZTR
JG
Total Est. Demand: 88 A
Total Conn.: 96 A
Receptacle 15,540 VA 78.61% 12,216 VA Total Est. Demand: 31,586 VA
Power 9,020 VA 100.00% 9,020 VA Total Conn. Load: 34,760 VA
Motor 10,200 VA 101.47% 10,350 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 89 A 97 A 106 A
Total Load: 10,700 VA 11,500 VA 12,560 VA
53 SPARE 20 A 1 0 VA 1,260... 1 20 A RECEPTACLES GYM (ALT#1) 54
51 SPARE 20 A 1 0 VA 180 VA 1 20 A WP EXTERIOR GFI BID ALT#1 52
49 SHADE POWER - GYM (ALT#1) 20 A 1 1,200... 180 VA 1 20 A HS LOCKER ROOM GFI BID ALT#2 50
47 RECEPTACLE HALLWAY 1400 (ALT #1) 20 A 1 720 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 48
45 RECEPTACLES OFFICE 1424 (ALT #1) 20 A 1 720 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 46
43 BLEACHER POWER GYM 1317 (ALT #1) 20 A 1 600 VA 720 VA 1 20 A RECEPTACLES GYM 1317 ALT#1 44
41 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 42
39 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A BLEACHER POWER GYM 1317 (ALT #1) 40
37 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 38
35 GFI RECEPTACLEGIRLS LOCKER 1410 (ALT #1) 20 A 1 540 VA 600 VA 1 20 A SHADE CONTROLLER GYM 1317 36
33 GFI RECEPTACLE ROOM 1430, 1440 (BID ALT... 20 A 1 540 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 34
31 RECEPTACLES GYM 1317 ALT#1 20 A 1 540 VA 540 VA 1 20 A CEILING PROJECTOR GYM 1317 (ALT #1) 32
29 WP GFI RECEPT AT HS LOCKER RMS (ALT #2) 20 A 1 360 VA 540 VA 1 20 A RECEPTACLES STORAGE 1316A 30
27 WP EXTERIOR GFI BID ALT#1 20 A 1 360 VA 540 VA 1 20 A RECEPTACLES BOYS LOCKER RM 1420 (ALT... 28
25 SCOREBOARD POWER GYM 1317 20 A 1 200 VA 360 VA 1 20 A RECEPTACLE HS STORAGE 1450 (BID ALT #2) 26
23 RECEPTACLE GIRLS TOILET 1432 (BID ALT #2) 20 A 1 180 VA 200 VA 1 20 A SHOT CLOCK POWER -GYM 1317 24
21 RECEPTACLE GIRLS TOILET RM1412 (ALT #1) 20 A 1 180 VA 200 VA 1 20 A SHOT CLOCK POWER -GYM 1317 22
19 RECEPTACLE TOILET ROOM 1424A (ALT #1) 20 A 1 180 VA 180 VA 1 20 A CURTAIN WALLL CONTROLLER BID ALT#1 20
17 -- -- -- 2,400... 180 VA 1 20 A GFI RECEPTACLE TOILET(ALT #1) 18
15 DRYER ROOM 1401 (ALT #1) 30 A 2 2,400... 180 VA 1 20 A GFI RECEPTACLE BOYS TOILET 1422 (ALT #1) 16
13 POWER FOR PROJECTION SCREEN (ALT#1) 20 A 1 1,200... 1,500... 1 20 A WASHER RM 1401 (ALT #1) 14
11 RECEPTACLES OFFICE 1424 (ALT #1) 20 A 1 960 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 12
9 QUAD RECEPT ROOMS 1444 & 1434 (ALT#2) 20 A 1 720 VA 1,680... 1 20 A CONN. CURTAIN DIVIDER GYM 1317 (ALT#1) 10
7 RECEPTACLE ROOM 1414, 1424 (ALT #1) 20 A 1 960 VA 360 VA 1 20 A HS LOCKER ROOM GFI BID ALT#2 8
5 GFI RECEPTACLE ROOM 1401 (ALT #1) 20 A 1 360 VA 660 VA 1 20 A RECEPTACLE ROOM 1444 (BID ALT #2) 6
3 POWER FOR SOUTH SCOREBOARD (ALT #1) 20 A 1 200 VA 600 VA 1 20 A BLEACHER POWER GYM 1317 (ALT #1) 4
1 GFI RECEPTACLE BOYS TOILET 1442 (BID ALT... 20 A 1 180 VA 600 VA 1 20 A BLEACHER CONTROL STATION GYM 1317 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
PANELBOARD TO BE PROVIDED UNDER BID ALTERNATE #1
Notes:
ENCLOSURE: NEMA 1
MOUNTING: SURFACE WIRES: 4 MAINS RATING 225 A
SUPPLY FROM: L1P1 PHASES: 3 MAINS TYPE MLO
LOCATION: ELEC 1317 VOLTAGE: 120/208 Wye A.I.C. RATING 22 KAIC
PANELBOARD: L1PG
![Page 34: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/34.jpg)
CLGF
CLGF CLGF
CLGF
CLGF
S
CLGF
S
CLGF
CLGF CLGF
F
H
4
5
I J
+100
GFI+42
GFI+42
+42
15
15
PANEL L1P2
15
15
TOILET
1000A
COUNSELING
1007
L1P2-1
+42
+42
+42
L1P2-14
L1P2-13
L1P2-15
L1P2-9
GFI
GFI
L1P2-18
L1P2-22
AHU-1
EF-6
EF-7
15
15
L1P2-10,12
ONTONT
ONT
ONT
ONT+100
ONTONT
+42ONT
L1P2-23
12
L1P2-44
9
915
3
3
13
3
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 ESK-5
15053ZTR
03/03/16
SCALE: 1/8" = 1'-0"16FIRST FLOOR POWER PLAN AREA 'B'
![Page 35: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/35.jpg)
OC
OC
OCOC
OC
OC
JOC
J
J
J
J
A3A3E
A3A3C1
A2A2 A2 A2OS
OS
A3A3E
A3A3E
A3
A3E
A3A3
A3 A3
A3A3
A3A3
A3
A3 A3
A3A3
A3
os
C1 C1 C1
OS
A3A3
A3
A3
A3 A3
A3 A3 A3
A4A4
OS
B F G H
19
20
21
D EC I
A3E
LL1-6
EL1-8
LL1-11
A
A
A
B
B
B
W1E
W1EW1E
W1E
W1E
EL1-14
V1V1
LL1-12
LL1-3
B
B
B
A
B D
D
D
D
D
C
C
C
E
E
HALLWAY
1400
BOYS LOCKER
1420
GIRLS LOCKER
1410
OFFICE
1414OFFICE
1424
TOILET
1424A
TOILET
1414A
BOYS TOILET
1422STORAGE
1316A
GIRLS TOILET
1412
G
A3E
A3E A3E
A3E
X3X3
EL1-16
X2X2X13
A 3
JJ
33
DRAWN:
DESIGNED:
CHECKED:
BYREVISION# DATEMECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
ST FRANCIS K-8 SCHOOL
ADDENDUM #3
ESK-6
3.03.16
15053
(1)E2.1C BIDALT# 1
ADDENDUM 3
ZTR
ZTR
JG
3 ADDENDUM 3 03-03-16
SCALE: 1/8" = 1'-0"11GYMNASIUM LIGHTING PLAN - BID ALTERNATE 1
![Page 36: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/36.jpg)
LIGHTING KEYED NOTES
PROVIDE POWER PACK FOR ROOM LOW VOLTAGE OCCUPANCY SENSOR; BASIS OF DESIGN
GREENGATE SP20-MV.
CEILING MOUNTED LOW VOLTAGE DUAL TECHNOLOGY OCCUPANCY SENSOR. BASIS OF
DESIGN GREENGATE OAC-DT-2000.
CIRCUIT CONTROLLED VIA LIGHTING RELAY PANEL LRPG.
PROVIDE WALL MOUNTED DUAL TECHONOLOGY OCCUPANCY SENSOR; BASIS OF DESIGN
GREENGATE ONW-D-1001MV-W.
PROVIDE LOW VOLTAGE OVERRIDE WALL CONTROL FOR LIGHTING IN THIS AREA.
6 BUTTON MANUAL AND OVERRIDE WALL CONTROL FOR GYM. REFER TO DETAIL 16/(1)
E2.1C.
EXIT SIGN RELOCATED FROM BASE BID.
6 BUTTON MANUAL AND OVERRIDE WALL CONTROL FOR GYM AND DIMMING SLIDERS FOR
GYM LIGHTS. REFER TO DETAIL 16/(1)E2.1C.
EXIT SIGN TO BE RELOCATED IN BID ALTERNATE #2 TO EXTERIOR MOST DOORS OF HS
LOCKER ROOMS.
A
B
C
D
F
E
G
H
J
3
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 ESK-7
15053ZTR
03/03/16
11LIGHTING KEYED NOTES (1)E2.1C BID ALT #1
![Page 37: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/37.jpg)
RELAY PANEL
LRPG
BASIS OF DESIGN
LC&D
LTD BLUE BOX
LC&D CHELSEA
DIGITAL 4 BUTTON
SWITCH OR EQUAL BY
GREENGATE
LOCATION HALLWAY 1400
FOR OVERRIDE
LC&D CHELSEA
DIGITAL 4 BUTTON
SWITCH OR EQUAL BY
GREENGATE
LOCATION HALLWAY 1400
ALL ON
ALL OFF
LC&D CHELSEA
DIGITAL 6 BUTTON
SWITCH OR EQUAL BY
GREENGATE
LOCATION GYM
SOUTH DOOR
LC&D CHELSEA
DIGITAL 6 BUTTON
SWITCH OR EQUAL BY
GREENGATE
LOCATION GYM
NORTH
DOOR
LC&D CHELSEA
SLIDER WITH 2 DIGITAL
DIMMING SLIDER
CONTROLS
OR EQUAL BY
GREENGATE
LOCATION GYM
SOUTH DOOR
ALL ON ALL OFF ALL ON ALL OFFALL ON
ALL OFF
1400
HALLWAY
1314
HALLWAY
SCENE 2SCENE 1
SCENE 4SCENE 3
SCENE 1
SCENE 3
SCENE 2
SCENE 4
ROW 2
DIMMER
ROW 1
DIMMER
CAT 5E CABLE
WITH RJ 45
CONNECTORS
CAT 5E CABLE
WITH RJ 45
CONNECTORS
CAT 5E CABLE
WITH RJ 45
CONNECTORS
CAT 5E CABLE
WITH RJ 45
CONNECTORS
CAT 5E CABLE CONNECTION
TO LRP1
RELAY PANEL
3
CHECKED:
DESIGNED:
DRAWN:
ME
CH
AN
ICA
L /
ELE
CT
RIC
AL
PR
OF
ES
SIO
NA
L E
NG
INE
ER
S
1629 A
VE
D S
TE
7C
, B
ILLIN
GS
MT
59102
PH
ON
E:
406
.252.3
237
FA
X:
406
.252.3
276
ww
w.c
oneer.
com
REVISIO
NDATE
#BY
ST FRANCIS K-8 SCHOOL
ADDENDUM #
3
ESK-8
3.03.16
15053
11/(1)E2.1C
ZTR
ZTR
JG
3ADDENDUM 3
03-03-16
SCALE: 1/8" = 1'-0"16BID ALT#1 LIGHTING CONTROL DETAIL
![Page 38: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/38.jpg)
HA-1HA-1A2E
H1
F G H
18
E
F
X3
3
MECHANICAL / ELECTRICAL
PROFESSIONAL ENGINEERS
1629 AVE D STE 7C, BILLINGS MT 59102
PHONE: 406.252.3237 FAX: 406.252.3276
www.coneer.com
BY:
DATE:
ST FRANCIS K-8 SCHOOL
ADDENDUM #3 ESK-9
15053ZTR
03/03/16
SCALE: 1/8" = 1'-0"11GYMNASIUM LIGHTING PLAN - BID ALTERNATE 1
![Page 39: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/39.jpg)
Bid Package Clarifications:
General Requirements for All Bid Packages:1. This project is privately funded. There will NOT be any Montana Prevailing wage or Davis
Bacon requirements.
Bid Package 2A – Site Work & Site Utilities1. Hand jointing of sidewalks and exterior slabs is acceptable.2. Mirafi 600x or equal separation fabric can be used under the gravel base for the pavement
sections (C9.15).3. Mirafi 600x or equal separation fabric can be used under the rip-rap.4. Grinding off existing stripping prior to new asphalt striping will be required along Colton Blvd as
needed. Painting over the existing striping with black paint is not acceptable.5. There will not be any striping at the “parents drop off” area along Colton Blvd.6. Catch basin #8 has been replaced with a 24”x 12” Tee on sheets C9.7 & 3/C9.8.7. Gravel Drainage Course and Drainage Composite (see spec section 07 11 13 2.3D for drainage
board material). Drainage board material to be provided and installed under bid package 7B. Gravel drainage material to be ¾” minus crushed, washed rock to extend around the entire perimeter of the building and to be provided and installed under this bid package.
8. This bid package to provide temporary water if required by other bid package work.9. This bid package to include the sidewalk north of the access road along Woody Drive to include
but not limited to all concrete work, HC ramp and truncated domes.
Bid Package 3A – Concrete Materials, Building Rebar, Masonry Rebar, Layout for Concrete & Anchor Bolts, Vapor Barrier (S&I), Anchor Bolts (IO)
1. Masonry Rebar to be supplied under this bid package. Install of the masonry rebar will be covered in bid package #4A.
Bid Package 3C – Polished Concrete1. If Alternate #8 is accepted, this scope of work will be performed prior to the installation of the
interior walls.
Bid Package 4A – Masonry1. Masonry Rebar to be installed under this bid package and provided under bid package 3A.2. Kanta Products is an acceptable substitution for the CMU.3. Bid package 2A to provide temporary water if required by this bid package.
Bid Package 6C – Wood Framing/Misc. Carpentry1. L1, L2 Louvered Panels to be provided under this bid package.
Bid Package 6F – Music Casework, Metal Storage Shelving & Library Casework
![Page 40: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd7b4fba24ca47f046c88f7/html5/thumbnails/40.jpg)
1. Metal Shelving location to be included in this bid package. Metal shelving to include (6) 24” deep units in Storage Room 1220 along west wall and (5) 12” deep units in Storage Room 2220 along east wall.
Bid Package 7B - Exterior Envelope Supply & Install, Exterior Vapor/Air Barrier, Horizontal Primary Furring & Exterior Insulation.
1. Gravel Drainage Course and Drainage Composite (see spec section 07 11 13 2.3D for drainage board material). Drainage board material to be provided and installed under this bid package. Gravel drainage material to be ¾” minus crushed, washed rock to extend around the entire perimeter of the building and to be provided and installed under bid package 2A.
Bid Package 7D – Metal Wall Panels & Secondary Furring/Flashing1. The sill flashing under the store front windows will be covered under this bid package.
Bid Package 10A – Specialties1. Athletic storage units in high school locker rooms are be provided and installed in this bid
package. See spec section 10 51 43. Bid Package 10B – Signage
1. There are NO electronic reader boards at this time (interior or exterior).2. Aluminum crosses to be ½” thickness for both exterior and interior.
Bid Package 12A – Window Coverings1. Window coverings to be provided per spec section 12 21 00 2.3 in reference to how many blinds
will be required for each window opening.
Bid Package 15C – HVAC and HVAC Insulation1. Supply and install of the ceiling fan in the upper commons to be included in this bid package.
END OF BID PACKAGE CLARIFICATIONS – ADDENDUM #3