end of addendum #3 · 2. custom printed imaged to be provided by architect. 3. image to include...

40
Project: Billings Catholic School K-8 Addendum #: 3 Date Issued: March 4, 2016 Description of Addendum & Attachments: 1. Architectural Addendum #3 by A&E Architects – Attached – 37 pages 2. Langlas & Associates Bid Package Clarifications – Attached – 2 pages Bid Date: March 10th, 2016 at 2:00 pm. This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form. END OF ADDENDUM #3

Upload: others

Post on 25-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

Project: Billings Catholic School K-8Addendum #: 3Date Issued: March 4, 2016

Description of Addendum & Attachments:

1. Architectural Addendum #3 by A&E Architects – Attached – 37 pages2. Langlas & Associates Bid Package Clarifications – Attached – 2 pages

Bid Date: March 10th, 2016 at 2:00 pm.

This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form.

END OF ADDENDUM #3

Page 2: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

1

Addendum Number: 03 Date Issued: March 4, 2016

Project: Billings Catholic Schools

St. Francis K-8 School

Project Number: 15053.00

Pages in Addendum: 37 w/attachments Prepared By: Kris Koessl

Issued To: All Plan Holders

All Consultants

Hulteng, Inc.

This Addendum’s attachments consist of Con’eer Addendum, Sheet C9.11, Sheets 4.2, 4.3, and 4.4, SSK-01

thru SSK-12, , MSK-1, MSK-2, and ESK-1 thru 9.

Addendum to Contract Documents:

The additions, clarifications, and corrections contained herein shall be made to the Project Specification

Manuals, Drawings, and Schedules for the above referenced project, and shall be included in the scope of

work and proposals to be submitted. References made below to the Project Specification Manual and

Drawings shall be used as a general guide only. Bidder shall determine the extent of work affected by

Addendum items.

General Bid Items:

The plan holder’s list is being recorded and maintained by Langlas & Associates. Contact their office for

questions or for a list of current plan holders.

This project is not subject to the Buy American Act or the Davis-Bacon Act (prevailing wages).

The final day for substitution requests and/or prior approvals was March 3, 2016.

Project Manual (Specifications):

09 68 13 - Tile Carpeting:

Add Paragraph 2.1.A.1: All carpet provided must meet or exceed performance criteria described

below and color and design intent listed in the Color and Finish Schedule.

10 14 00 - Signage:

Add Paragraph 2.6: WALL GRAPHICS AT COMMONS

A. Provide 3-4 mils sheet vinyl with layer of pressure-sensitive adhesive applied one side

1. Refer to drawings for extent of vinyl wall decal.

2. Custom printed imaged to be provided by Architect.

3. Image to include maximum of 10 pantone colors.

08 41 13 – Aluminum-Framed Entrance and Storefronts:

General Clarification, interior storefronts do not need to be thermally broken.

08 71 00 – Door Hardware:

All locksets to have L4 keyways with IC cores.

Hardware Group 12 to be for SGL 3’-0” x 7’-0” Door 1305.6. Delete keyed mullion, inactive leaf

panic hardware, one armor plate and mullion seal.

Page 3: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

2

09 30 00 – Tiling:

2.3.A.1, size to be 12”x 24” for PT-1, third offset pattern.

2.4.A.1, size to be 4” x 8” for CT-1

09 51 13 – Acoustical Ceiling Tiles:

2.1, Chicago Metallic Infinity Ceiling Grid and metal ceiling transitions are acceptable. Contractor

to coordinate and verify compatibility with all specified ceiling tiles, accessories, and grid-mounted

fixtures.

10 28 00 – Toilet and Bath Accessories:

2.3.B, Paper Towel Dispenser to be Owner Furnished Contractor Installed

12 66 13 – Telescoping Bleachers:

Revise Paragraph 2.3.F

1. Seating Segments: 19’ -6” (3)

2. Overall Length: 76’ -6” (plus (2) 1’ end rails for total of 78’-6”)

3. Aisle Widths: 4’- 6” (4)

4. Number of Tiers: 13

5. Row Spacing(s): 24 inch.

6. Open Dimension: 25’-3”

7. Closed Dimension: 3’-8”

8. Overall Unit Height: 11’ and 1/2”

14 24 00 – Hydraulic Elevators

1.1.A.1, change sentence to “Holeless hydraulic elevator with machine-roomless or machine-room

application”

1.8.A, change first sentence to “Contractor shall furnish quarterly maintenance service concurrent

with the warranty period. Change second sentence to “Warranty period shall be per 1.7 of this

Section.”

1.8.D, change “house” to “hours”

Drawings:

C9.5: existing striping to be removed by grinding. Overlaying in black is not acceptable.

C9.7:

Change rim elevation of CB-4 to 3242.22.

CB-8 is replaced with a 24” x 12” Tee.

C9.11: replace sheet with attached.

C9.15, Details 1 & 2: change fabric to Mirafi 600X in lieu of Mirifi RS 380i.

C9.17: delete the City of Billings logo from manhole covers.

L1.1: change quantity of Flagpole S-122 to one (1)

A2.4, Detail 14: change dimension of roof hatch to be 30” x 54” to match Spec Section 07 72 33

A4.2: see attached revised sheet for masonry control joint description and locations.

A4.3: see attached revised sheet for masonry control joint description and locations.

A4.4: see attached revised sheet for masonry control joint description and locations.

Page 4: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

3

A5.9, Detail 19: at interior masonry wall, delete the rigid insulation, air barrier, WRB and vapor retarder.

Sheathing does not need to be exterior rated, sheet for interior masonry installation.

A5.10 & A5.11: delete ‘Damproofing’ note from foundation wall details, it is not needed.

A5.10, Clarification: see Spec Section 07 11 13, 2.3.D for drainage board material. Material to cover full

vertical face of foundation wall around entire perimeter of the building. Gravel material to be ¾” minus

crushed, washed gravel.

A6.1, Detail 1: revise text “MAKE GOD SMILE” PAINTED IMAGE to “MAKE GOD SMILE” VINYL IMAGE. GRAPHIC

AND TEXT TO BE PROVIDED BY ARCHITECT, APPROVED BY OWNER to remain.

A6.10, Detail 12: Personal Whiteboards are N.I.C.

A9.1:

Window Type ‘W17’ to be a curtain wall system, per spec section 08 44 13. Glazing to be divided.

Window Type ‘W11’ to be per below snapshot:

A9.3:

Change frame type at Door 1102.1 to ‘W22’

Change frame type at Doors 1102.2 and 1102.3 to ‘W23’

Change frame type at Door 1304.3 to ‘W26’

Change frame type at Doors 1314.1 and 1400.3 to ‘8’

Change height of Door 1314.1 to 8’-0”

Change frame type at Door 1317.1 to ‘6’

Change frame material at Doors 1430.1, 1440.1, 1430.2, and 1440.2 to ‘HM’ w/P-2 finish, also

change height to 7’-0”

Change height of Door 1450.1 to 7’-0”

A9.2 & A9.3: Overhead Door Coordination Clarification

OH-A to be 19’-2” x 10’-0”

OH-C to be 4’-6” x 8’-0”

OH-E to be 8’-0” x 8’-0”

A9.6: Room Finish Schedules

Change floor in Elev. 2105 to VCT-1/VCT-2

Change floor in HS Changing 1430 to PT-1/WOM-1

W11

7'-4"

2'-2" 4'-8"

1'-6

"6'

-8" 8'

-8"

1'-6

"

A5.10

7

A2.5

4

3'-4

"

A5.11

10

Page 5: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

4

Structural Sheets: See the attached SSK-01 thru SSK-12 for clarifications and/or revisions to the structural

drawings.

M/P/E Sheets & Specifications: See attached Addendum #3, four pages, from Con’eer Engineering for

clarifications and/or revisions to the mechanical, plumbing, and electrical drawings and specification

sections.

Prior Approvals:

Reviewing is for conformance with the design concept of the project and compliance with the information

given in the contract documents. Contractor is responsible for dimensions to be confirmed and correlated

to the job site; for information that pertains solely to the fabrication processes or to techniques of

construction; and for coordination of work of all trades.

Section Description Approved

04 22 00

10 21 13

27 51 23

Concrete Masonry Unit

Toilet Compartments

Clock and PA System

Kanta Block

American Sanitary

Bogen

Page 6: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 1

ADDENDUM NO. 3 – FAXED OR EMAILED TO PLAN HOLDERS

BILLINGS CATHOLIC SCHOOL K-8

BILLINGS, MT

Con’eer Engineering, Inc. March 3, 2016 1629 Avenue D, Suite 7C Billings MT 59102 Project No. 15053

Bid Date: March 10, 2016 Bid Time: 2 p.m. local Bid Location: Langlas & Associates, 2270 Grant Road, Billings, MT 59102

GENERAL 1. THIS ADDENDUM SHALL BE CONSIDERED A PART OF THE CONTRACT DOCUMENTS AND

SHALL TAKE PRECEDENCE OVER ALL REQUIREMENTS FOR THE WORK SHOWN ON THE DRAWINGS AND/OR SPECIFICATIONS.

2. WORK NOT SPECIFICALLY CHANGED OR MODIFIED BY THIS ADDENDUM SHALL BE AS

ORIGINALLY SHOWN ON THE DRAWINGS AND/OR SPECIFICATIONS. 3. BIDDERS ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF ADDENDA BY NUMBER

INSERTED IN SPACES PROVIDED ON THE BID PROPOSAL. 4. THE GENERAL CONTRACTOR IS REQUIRED TO PROVIDE COPIES OF THIS ADDENDUM

TO ALL SUBCONTRACTORS AND SUPPLIERS BOTH DURING THE BIDDING PERIOD AND FOLLOWING AWARDING OF THE CONTRACT.

CONTRACTORS’ QUESTIONS

1. Specifications indicate SPD requirements on indicated panelboards, none are indicated, where is this required? Answer: Provide SPD per specification on SWBD2, MDP1, MDP2, L1P2, L1P5, L2P2 and L2P3.

2. Do you really want a 3 year warranty on the switchboards and panelboards? Answer: Yes 3. Do you want a SPD in the Switchboard? There is not one shown on the one-line, so I

was thinking it wasn't required, but it’s in the spec? Answer: See response to question 1.

4. Panel spec 262416-4, 2.1, E, 7, b: Do you really want painted back boxes? This would be unusual for a school.

Answer: No, remove reference to painted back boxes from project requirement. 5 Can we series rate the panelboards? Answer: No 6. There are a couple of panel designations on the one line that don't match designations

on the panel schedules. Is L1PG the same as LRPG?

Answer: No, LRPG is a relay panel not a panelboard. Is LPK the same as KP1? Answer: Yes, see additional addendum information regarding sheet E9.4. 7. Sheet E3.1, details 9 & 17 called out keynote symbols, but there is not a keynote

schedule on this page. Please reference the schedule. Answer: See sketch ESK-3 for keyed notes missing from E3.1.

Page 7: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 2

8. Science rooms 2213&2215 show a keyed note 2 (lavatory sensor). Should this actually be keyed note 4 drop cords?

Answer: Yes, the note reference should be 4. 9. Sheet (2) E2.1C calls the details 6&8 to be Alternate #1. Please confirm that these are

actually Alternate #2. Answer: Yes, these are for Alternate #2. 10. Can MC Cable be used for the receptacle branch circuits? Answer: No. 11. Will alternate #4: Lighting Option in Classrooms affect the lighting control panel?

Answer: No, the controls will be similar. The lighting will need to be programmed differently but the components required will be the same.

12. Will Aluminum feeders be acceptable in place of the copper feeders?

Answer: Aluminum feeders would be acceptable for the service entrance, feeders to MDP1 and MDP2 only. EC is responsible for up-sizing the conductors and conduit required to be equivalent in ampacity to the specified copper feeders listed on the plans.

13. Please clarify the lighting for Alternate 4. For example class room 2230 has two rows of

lights so there will be two rows of F3’s for alt#4? But for room 2228 there are one row of lights so we only need one row of F3’s or since this is a resource room and not a class room is it a part of the alternate? Answer: Although it was discussed at the pre-bid meeting to include all the rooms that students use, for bidding purposes the Alternate #4 will be just for classrooms in sections A and B.

14. On (1) E2.1C lighting note C-it refers to look at detail 16/ on (1)E2.1C, but there isn’t a

detail 16. Answer: Refer to sketches ESK-6, 7, 8 and 9 for revisions to (1) E2.1C and the

missing detail. DRAWINGS Sheet M2.1A

1. Add duct silencers in the main supply and return ducts of AHU-3, Ruskin DM-36 or approved equal. Minimum unit size 36x24.

2. Install 1” acoustical liner on the discharge of vav 3-10 for the first 5’ from the air terminal unit discharge.

Sheet M2.1B

1. Add duct silencers in the main supply and return ducts of AHU-2, Ruskin DM-36 or approved equal. Minimum unit size 36x24.

2. Add duct silencers in the 16” supply duct upstream of VAV boxes VAV-6-1 and VAV-6-2 and the 16” return duct serving the Vocal and Instrumental rooms, Ruskin AX-A or approved equal. Silencer inlet to match duct size.

Sheet M2.2A

1. Add duct silencers in the main supply and return ducts of AHU-5, Ruskin DM-36 or approved equal. Minimum unit size 36x24.

2. Install 1” acoustical liner on the discharge of VAV 5-11 and 5-1 for the first 5’ from the air terminal unit discharge.

Sheet M2.2B 1. Add duct silencers in the main supply and return ducts of AHU-4, Ruskin DM-36 or approved

equal. Minimum unit size 36x24.

Page 8: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 3

2. Add duct silencer in the 16” supply duct upstream of VAV box VAV-6-10, Ruskin AX-A or approved equal. Silencer inlet to match duct size.

Sheet M9.2

1. Added P9 to the plumbing fixture schedule. Design basis for P9 is an emergency eye / face wash, pedestal mount, Bradley S19214 Series with Bradley S19-2000 EFX8 thermostatic mixing valve to meet tepid water supply requirements.

Sheet M9.3

1. Clarification 7/M9.3. Revised 3-way valve coil piping detail. See sketch MSK-2. 2. Clarification 1/M9.3. Air-cooled chiller detail is for a grade mounted chiller, which does not

apply for this project. For this project, the chiller is mounted on the roof above the mechanical room and the piping is similar. Instead of penetrating an exterior wall, the piping will penetrate the roof. Provide roof jacks or pipe chase curbs for the piping roof penetrations and support pipes on the roof near the chiller. Maintain piping and piping appurtenances shown indoors and outdoors.

3. Clarification. No dry-cooler detail is shown, but would be similar to the air-cooled chiller detail. Refer to the piping schematic on P9.8 for valves, pressure gauge, drain, etc. For this project, the dry-cooler is mounted on the roof near the chiller. Provide roof jacks or pipe chase curbs for the piping roof penetrations and support pipes on the roof near the dry-cooler. Locate the pressure gauge indoors. Provide isolation valves outdoors near the unit and indoors in the mechanical room.

Sheet M9.4

1. Clarification 6/M9.4. Domestic water service entrance detail modified to include meter by-pass loop as required by the City of Billings. Refer to sketch MSK-1.

Sheets P2.1A, P2.1B, P2.2A

1. Clarification. Sinks not tagged that are located in classrooms and shared areas are type P4. Sheet P9.8

1. Clarification. Revised 3-way control valve piping for AHU-2, 3, 4, 5, and 6 to be consistent with MSK-2.

Sheet E2.1B

1. Added keyed note 12 for disconnect at AHU-1. Note 12 to read - PROVIDE 30A/2P 240V FUSIBLE DISCONNECT FOR AHU-1. See sketch ESK-5.

2. Added missing “15” tag to ceiling mounted fire alarm speaker strobe in reception 1001. See sketch ESK-5.

3. Added keyed note 13 for circuitry for AHU-1. Note 13 to read – PROVIDE 2#10+#10G IN ¾” CONDUIT. See sketch ESK-5.

Sheet E2.1C

1. Added circuit for Boys and Girl’s restroom sensor transformer power. Refer to sketch ESK-1. Sheet (1) E2.3C

1. Added panelboard schedule for L1PG. Refer to sketch ESK-4. Sheet E3.1

1. Added missing keyed notes. Refer to sketch ESK-3. Sheet E7.2B

1. Added recessed downlights into drop soffits in Library type D5. Refer to sketch ESK-2. Sheet E9.1

1. Added Type D5 – recessed downlight with square trim. Basis of design Juno Lighting catalog number IC91LEDG4-35K-U-17SQ-HZ-WH; 120V, 14.8 watts.

Page 9: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 4

2. Revise manufacturer and catalog number for type F6 to Prudential: STR-LED4-SO-16-TMW-D1-SS-UNV-X3-DM01.

3. Install 1” acoustical liner on the discharge of VAV 4-5 for the first 5’ from the air terminal unit discharge.

4.

Sheet E9.4 1. Revise SWBD2 circuit breaker for panelboard LL1 from 225A to 125A. 2. Revise Panelboard name “LKP” to “KP1” on Riser Diagram.

Sheet E9.5

1. Revise Panelboard schedule LL1 to reflect mains at 125Amps. 2. Added 20A/1P spare breakers in panelboard LL1 circuits 30, 32 and 34.

SPECIFICATIONS SECTION 23 07 13 – DUCT INSULATION

1. Clarification. Outdoor air ductwork: foil faced rigid board insulation with canvas jacket, R-8 minimum.

2. Clarification. Indoor concealed supply ductwork: blanket insulation with vapor barrier, R-6 minimum.

3. Clarification. Indoor exposed supply ductwork: blanket insulation with vapor barrier and canvas jacket, R-6 minimum.

SECTION 23 21 13 – HYDRONIC PIPING

1. Clarification. PEX piping is not allowed. SECTION 23 21 16 – HYDRONIC PIPING SPECIALTIES

1. Clarification. Balancing valves are to be the manual type. PRIOR APPROVALS Products from the following manufacturers are approved for bidding purposes. Products will be reviewed for compliance with Contract Documents during Shop Drawings phase. SECTION 23 21 13.13 – UNDERGROUND HYDRONIC PIPING Tricon Piping Systems SECTION 23 21 16 – HYDRONIC SPECIALTIES FLOW CONTROL Nexus Valve SECTION 23 21 23 – HYDRONIC PUMPS Taco (00 Circulators) SECTION 23 31 13 – ROUND DUCT AND FITTINGS Lewis and Lambert, West

Coast Omni Duct, Semco, NorPac Sheetmetal, Metco

SECTION 23 33 00 – AIR DUCT - BACKDRAFT DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT - MANUAL VOLUME DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – CONTROL DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – FIRE AND FIRE/SMOKE DAMPERS Nailor, Pottorff SECTION 23 33 00 – AIR DUCT – ACCESS DOORS Nailor SECTION 23 33 00 – AIR DUCT – FLEXIBLE DUCTS Flexmaster

Page 10: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 5

SECTION 23 33 00 – AIR DUCT – HIGH EFFICIENCY TAKE-OFFS Flexmaster SECTION 23 34 23 – CENTRIFUGAL ROOF VENTILATORS Aerovent, Twin City SECTION 23 34 23 – CEILING MOUNTED VENTILATORS ACME, Twin City SECTION 23 35 33 – GREASE DUCT Captive Aire, HeatFab SECTION 23 36 00 2.2 – DIFFUSER-TYPE AIR TERMINAL UNITS Krueger SECTION 23 37 13 2.1 – LOUVER FACE DIFFUSERS Krueger. Nailor SECTION 23 37 13 2.2 – LINEAR SLOT DIFFUSERS Nailor SECTION 23 37 23 – FABRIC AIR DISTRIBUTION DEVICES KE Fibertec, FabricAir SECTION 23 37 23 – HVAC GRAVITY VENTILATORS Loren Cook, ACME SECTION 23 64 23.21 – AIR-COOLED SCROLL WATER CHILLERS Daikin Applied, York/JCI SECTION 23 – HVLS FANS MacroAir SECTION 23 – DRY COOLER Guntner & Liebert, Luvata SECTION 23 – GLYCOL FEEDER John Wood SECTION 23 – BUFFER TANK John Wood SECTION 23 – MECHANICAL A-C UNIT Daikin & AAON, York/JCI,

Carrier SECTION 23 – DUCTLESS SPLIT AC SYSTEM LG, Mitsubishi SECTION 23 – BOILER VENTING Schebler SECTION 23 73 13 – VFD’S FOR AIR-HANDLING UNITS Danfoss SECTION 23 73 13 – MODULAR INDOOR AIR-HANDLING UNITS York/JCI, Carrier SECTION 23 - ELECTRIC WALL HEATERS Q-Mark SECTION 26 32 13 – ENGINE GENERATORS Cummins (RS30) SECTION 26 36 00 – TRANSFER SWITCHES Cummins PRIOR APPROVALS – SECTION 26500 (26519, 265219, 265613, 265619) LIGHTING Products from the following manufacturers are approved for bidding purposes. Products will be reviewed for compliance with Contract Documents during Shop Drawings phase along with full lighting calculations to verify that submitted fixtures meet the requirements in the Construction Documents. Manufacturers listed are approved pending review in submittal. Any revision necessary to the lumen output and performance to meet those requirements are the full responsibility of the submitting manufacturer and manufacturer’s representative. All submitted fixtures to meet final approval of design Architect. SECTION 26519 – INTERIOR LED LIGHTING Type A1 Eaton (Metalux), Columbia, Mark Lighting Type A2 Eaton (Metalux), Columbia, Mark Lighting Type A3 Vividleds, MHT, Orange Lighting Type A4 Vividleds, MHT, Orange Lighting

Page 11: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BCS K-8 Addendum #3 Page 6

Type C1 Columbia, Lithonia Type C2 Lithonia Type CW1 Lumenwerx; Focalpoint Type CW2 Lumenwerx; Focalpoint Type CW3 Lumenwerx; Focalpoint Type CW4 Lumenwerx; Focalpoint Type D1 Eaton (Portfolio); Prescolite, Acuity; Focalpoint; Erco Type D2 Eaton (Portfolio); Focalpoint; Erco Type D3 Eaton (Portfolio); Prescolite; Focalpoint; Type D4 Acuity Type F1 Eaton (Metalux); Columbia, Alights Type F2-8 Eaton (Neoray); Litecontrol; Alights; Focalpoint Type F2-12 Eaton (Neoray); Litecontrol Alights; Focalpoint Type F5 Eaton (Neoray); Litecontrol; Focalpoint Type F6 Eaton (Neoray); Litecontrol Type F7 Eaton (IO lighting) Type F8 Eaton (Neoray); Litecontrol Type F9 Eaton (Neoray) Type H1 Eaton (Metalux); Columbia Type HA1 Eaton (Metalux); Columbia; Mark Lighting Type K1 Eaton (Metalux); Columbia; Mark Lighting Type M1 Eaton (RSA) Type M2 Eaton (RSA) Type P2 Visa Lighting – LED sequence (specifications to match listed fixture characteristics) Type SP1 Eaton (McGraw Edision) Type SP1 –Pole Eaton (McGraw Edision) Type SP2` Eaton (McGraw Edision) Type SP2 – Pole Eaton (McGraw Edision) Type V1 Teron Type W1 Eaton (McGraw Edision) Type U1 Eaton (Lumiere); Kim Lighting Type X1 &2 Dual-Lite; Acuity Type X3 Dual-Lite; Acuity Lighting Controls:

1. Eaton – Greengate 2. Hubbell

END OF ADDENDUM #3

Page 12: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

2.12.2016

100%CONSTRUCTION

DOCUMENTS ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

100% CONSTRUCTION DOCUMENTS

revisiondate

phase

issuedate

sheet

project

owner

project#15053.00

4"WA

TER

SER

VICE

6" D.I. FIRE SERVICE

C9.11

3" WATER SERVICE

6"FIRE

SER

VICE

4"WA

TER

SER

VICE

6"FIRE

SER

VICE

Page 13: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

LIGHT-WELL PARAPET138'-8"

11

A5.3

11

A5.3

18

A5.3

18

A5.3

3

A5.3

3

A5.3

16

A5.9

F

GHKNQR

E

O M

W10

W7 W7 W7 W7 W7 W7

W18

/11

A4.2

/11

A4.2

IP

MP-1

MP-2

MP-1

MP-3

BRK-1

BRK-2

MP-2

MP-3

BRK-1

MP-1 MP-3 MP-3 MP-3 MP-3

W11 W11 W11 W11

MP-1

W11W11

J

18

A5.8

L

BRK-1

MP-3 MP-3 MP-3 MP-3

BRK-1

MP-1MP-2

MP-1 MP-2

W11 W11

W11 W11

MASONRY CONTROL JOINTCALLED OUT WITH "CJ" - TYPICAL

MP-3

MP-3

MP-3 VERTICAL JOINT, TYP

W5 W5 W5 W5

A2.4

16

A2.1C

1

A2.1C

1

MP-1 VERTICAL JOINT, TYP

CJCJ CJ CJ CJCJCJCJCJ

CJ

LEVEL 1100'-0"

12

MP-1114'-4"

BRK-1 CJ

2'-0"

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

1 2

MP-1

BRK-1

CANOPY STRUCTURENOT SHOWN FORCLARITY

2'-0"

CJ

LEVEL 1100'-0"

20

A5.2

20

A5.2

CLASSROOM PARAPET130'-8"

16

A5.4

RTVYAACCDDEEFFHHIIJJKKLL GG BB Z U

W6 W6W6

W6W15

W6W6

W6 W6W6

W6W6W6

W6W6

W6 W6

W15

W6W6W6

W6 W6 W6

/3

A4.2

/3

A4.2

X SW

MP-1

MP-1 MP-2 MP-1 BRK-1 MP-1 BRK-1 MP-1 MP-2 MP-1BRK-1 MP-2

MP-1 MP-2

MP-2

MP-2

BRK-1

MP-2

MP-2 MP-2

MP-2

MP-2 MP-1

MP-2

MP-2 MP-1

MP-2

MP-2 MP-1

BRK-1

MP-2

MP-2

MP-2

MP-1

BRK-1BRK-1BRK-1BRK-1BRK-1

BRK-1 BRK-1 BRK-1

BRK-1

W6W6W6

W6W6

W6W6

W6

W6

W14 W14

8

A5.2

8

A5.2

MP-2 MP-1

MASONRY CONTROL JOINT CALLEDOUT WITH "CJ" - TYPICAL

10'-4

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

MP-1 VERTICAL JOINT, TYP

A2.1C

1

CJCJCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

12

MP-1

BRK-1

CJ

2'-0"

METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)

EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION

MP-1

MP-2METAL PANELS - VERTICAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)

MP-3METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)

BRICK MASONRY UNIT

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK

THIN BRICK MASONRY

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID

BRK-1

BRK-2

LEVEL 1100'-0"

LEVEL 2114'-0"

CLASSROOM PARAPET130'-8"

17

A5.4

17

A5.1

17

A5.1

7

A5.1

7

A5.1

1234679101214 513 8

W13

MP-1 MP-1 MP-1

BRK-1

MP-2 BRK-1

BRK-1

W22

11 3.7

MASONRY CONTROL JOINT CALLEDOUT WITH "CJ" - TYPICAL

EQ EQ33'-3"

10'-4

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

CJ CJ CJ CJ

revision date

phase

issue date

shee

t

proj

ect

owne

r

a&e proj #ia proj #

3/3/

2016

1:1

7:41

PM

EX

TE

RIO

R E

LE

VA

TIO

NS

A4.2

2.12.2016

100% CONSTRUCTION

DOCUMENTS

ST

. F

RA

NC

IS K

-8 S

CH

OO

L

BIL

LIN

GS

CA

TH

OLI

C S

CH

OO

LS

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

SCALE: 1/8" = 1'-0"3NORTH ELEVATION - AREA B

SCALE: 1/8" = 1'-0"18EAST ELEVATION - AREA B 3

SCALE: 1/8" = 1'-0"19WEST ELEVATION - AREA B 2

SCALE: 1/8" = 1'-0"11NORTH ELEVATION - AREA A

SCALE: 1/8" = 1'-0"20EAST ELEVATION - AREA A 3

SCALE: 1/8" = 1'-0"16EAST ELEVATION - AREA A

Page 14: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

LEVEL 1100'-0"

LEVEL 2114'-0"

20

A5.2

20

A5.2

CLASSROOM PARAPET130'-8"

19

A5.4

20

A5.4

16

A5.5

V Y AA CC DD EE FF HH II JJ KK LLGGBBZU

/3

A4.3

/3

A4.3

W6 W6

W23

W6 W6 W6 W6

W6W6W6L1

W6

W6 W6

W6 W6 W6 W6

W6W6W6W6

XW

MP-1MP-1MP-1

MP-2

MP-2

MP-2

BRK-1

MP-2

MP-2MP-2MP-1

MP-1 MP-2

MP-1MP-2MP-1MP-1MP-1MP-2 MP-2MP-2

MP-2MP-2

BRK-1 BRK-1

BRK-1

BRK-1

MP-2MP-1BRK-1 MP-1BRK-1MP-2MP-2

MP-2

BRK-1BRK-1BRK-1

BRK-1BRK-1

MP-1

BRK-1 BRK-1

MP-1

L1

MP-1 MP-1 MP-1MP-1MP-1

W6

W6

W6

W6

W6W6W6 W14W6

CJ

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

10'-4

"

10'-4

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

CJ CJ CJCJ CJ CJ CJ CJ CJ CJ CJCJCJCJ CJ

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

1413

MP-1

BRK-1

10'-4

"

CJ

2'-0"

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

14 13

BRK-1

MP-1

CJ

2'-0"

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

1413

MP-1

BRK-1

10'-4

"

CJ

2'-0"

LEVEL 1100'-0"

GYM/COMMONS98'-0"

CLASSROOM PARAPET130'-8"

CHAPEL PARAPET116'-0"

18

A5.5

3

A5.3

3

A5.3

N Q R T UOM

/7

A4.3

/7

A4.3

L1

W6 W6

W6

W23W6W6

P S

MP-2 MP-1

BRK-1

MP-1

MP-2

MP-2MP-1

MP-2

MP-1

BRK-1

BRK-1MP-2MP-2

MP-1

W19

BRK-1BRK-1BRK-1BRK-1

W6 W6 W14

8

A5.2

8

A5.2

L

CJ

1'-8"2'-4"0'-4"2'-4"

2'-4

"0'

-4"

10'-6

"1'

-6"

A4.3

2

ALUMINUM SIGNAGE

10'-4

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

CJ CJ CJ CJ CJ CJ

LEVEL 1100'-0"

GYM/COMMONS98'-0"

4

A5.2

4

A5.2

CHAPEL PARAPET116'-0"

1214 13

BRK-1

MP-1 MP-2

W16

METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)

EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION

MP-1

MP-2METAL PANELS - VERTICAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)

MP-3METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)

BRICK MASONRY UNIT

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK

THIN BRICK MASONRY

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID

BRK-1

BRK-2

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

1 2

MP-1

CJ

2'-0"

GYM/COMMONS98'-0"

4

A5.2

4

A5.2

CLASSROOM PARAPET130'-8"

COMMONS PARAPET122'-8"

LOCKER ROOM PARAPET114'-8"

LIGHT-WELL PARAPET138'-8"

18

A5.2

18

A5.2

11

A5.1

11

A5.1

2

A5.1

2

A5.1

16

A5.6

17

A5.620

A5.519

A5.9

123467910

121415

5

1718

19

1316

8

W20W20

INTERIOR NOT SHOWNFOR CLARITY

MP-1 MP-1

BRK-2

BRK-1

MP-2

BRK-1BRK-1

MP-1

W3

18

A5.620

A5.6

11 3.7

4'-0" 23'-8"

CJ

A2.4

16

A2.4

16

A2.4

16

11'-0

"

11'-0

"

11'-0

"

11'-0

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

1/4" DARK BRONZE ANODIZED ALUMINUMPLATE 'CROSS'. COAT WITH 'NYALIC'CLEAR POLYMERIC PLASTIC RESIN

1/2"ø ALUMINUM POSTS AT 16" OC,EMBED INTO BRICK 2" MIN

HILTI HIT-HY 70 INJECTIBLE MORTAR

2 1/2" 1"

1 1/

4"

COORDINATE MASONRY TIES WITH ALLSTEEL POST EMBED LOCATIONS

BRICK VENEER WALL ASSEMBLYPER PLANS

1" ALUMINUM STANDOFF

revision date

phase

issue date

shee

t

proj

ect

owne

r

a&e proj #ia proj #

3/3/

2016

1:1

7:43

PM

EX

TE

RIO

R E

LE

VA

TIO

NS

A4.3

2.12.2016

100% CONSTRUCTION

DOCUMENTS

ST

. F

RA

NC

IS K

-8 S

CH

OO

L

BIL

LIN

GS

CA

TH

OLI

C S

CH

OO

LS

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

SCALE: 1/8" = 1'-0"7SOUTH ELEVATION - AREA A

SCALE: 1/8" = 1'-0"17WEST ELEVATION - AREA A 1

SCALE: 1/8" = 1'-0"18EAST ELEVATION - AREA A 2

SCALE: 1/8" = 1'-0"19WEST ELEVATION - AREA A 2

SCALE: 1/8" = 1'-0"3SOUTH ELEVATION - AREA B

SCALE: 1/8" = 1'-0"20WEST ELEVATION - CHAPEL - AREA B

SCALE: 1/8" = 1'-0"16WEST ELEVATION - AREA A 3

SCALE: 1/8" = 1'-0"12EAST ELEVATION - AREA B

SCALE: 3" = 1'-0"2CROSS ANCHOR/LETTERING DETAIL

Page 15: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

GYM/COMMONS98'-0"

COMMONS PARAPET122'-8"

LOCKER ROOM PARAPET114'-8"

11

A5.3

11

A5.3 16

A5.8

18

A5.3

18

A5.3

3

A5.3

3

A5.3

G H K M

INTERIOR NOT SHOWN FOR CLARITY

I

MP-1 MP-1

J L

METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: OLD TOWN GRAY (W25)

EXTERIOR MATERIALS LEGENDSYMBOL DESCRIPTION

MP-1

MP-2METAL PANELS - VERTICAL

MODEL/MANUF: METAL SALES - CONCEALED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: DARK BRONZE (50)

MP-3METAL PANELS - HORIZONTAL

MODEL/MANUF: METAL SALES - EXPOSED FASTENERS (REF. SPEC FOR FURTHER INFORMATION)COLOR: CHAMPAGNE METALLIC (168)

BRICK MASONRY UNIT

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATION 04 26 13CJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING BRICK

THIN BRICK MASONRY

MODEL/MANUF: MUTUAL MATERIALSCOLOR: REF SPECIFICATIONSCJ = CONTROL JOINT, 3/8" WIDE JOINT CONSISTING OF BACKER ROD AND SEALANT TO MATCHMORTAR DIVIDING THIN BRICK, SETTING COMPOUND AND LATH DOWN TO FACE OF RIGID

BRK-1

BRK-2

GYM/COMMONS98'-0"

COMMONS PARAPET122'-8"

LOCKER ROOM PARAPET114'-8"

11

A5.3

11

A5.3

18

A5.3

18

A5.3

B F G H KD ECA I J

16

A5.3

16

A5.3

L

MP-1

BRK-1

11'-0

"

11'-0

"

MP-1 VERTICAL JOINT, TYP

A2.1C

1

LEVEL 1100'-0"

CLASSROOM PARAPET130'-8"

CHAPEL PARAPET116'-0"

9 10 128

MP-1

11

LEVEL 1100'-0"

GYM/COMMONS98'-0"

4

A5.2

4

A5.2CLASSROOM PARAPET130'-8"

COMMONS PARAPET122'-8"

LOCKER ROOM PARAPET114'-8"

LIGHT-WELL PARAPET138'-8"

18

A5.2

18

A5.2

11

A5.1

11

A5.1

2

A5.1

2

A5.1

20

A5.7

16

A5.7

1 2 3 4 6 7 9 10

12 14 15

5

17 18 1913 16

8

6 4

5

MP-1

BRK-2 MP-2 BRK-2

MP-3

MP-3 MP-3 MP-3

BRK-1

MP-1 MP-2

BRK-1

W8 W8 W8

W17

W12 W12 W9

W10

W5

W24

W5

20

A5.8

18

A5.620

A5.6

MP-3MP-3MP-3MP-3

BRK-1BRK-1BRK-1 BRK-1

MP-1 MP-2MP-1 MP-2

MP-2MP-1

MP-1

MP-2

113.7

CJ

MP-3 VERTICAL JOINT, TYP

CJ

MP-1

MP-1 VERTICAL JOINT, TYP

MP-3

EQ

0'-8"

EQEQ

0'-8"

EQ 4"ø STEEL PRIMARY &OVERFLOWDOWNSPOUTS, PAINT TOMATCH EXT. COLUMNS

4"ø STEEL PRIMARY & OVERFLOWDOWNSPOUTS, PAINT TO MATCHEXT. COLUMNS

4"12"

4"12"

A2.1C

1

A2.1C

1

A2.1C

1

MP-1 VERTICAL JOINT, TYP

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

CJ

CJ

CJCJCJ

CJCJCJ

?BRK-1

GYM/COMMONS98'-0"

COMMONS PARAPET122'-8"

18

A5.3

18

A5.3

BFGH DE C A

18

A5.7

INTERIOR NOT SHOWNFOR CLARITY

MP-3

MP-2

W9

BRK-1 BRK-1

MP-3

BRK-1

W25

16

A5.3

16

A5.3

BRK-1BRK-2

ALUMINUM SIGNAGE, 'GOTHAM' FONT.

1'-0

"

0'-8

"

1'-6

"0'

-10"2'

-0"

2'-2

"

2'-8"13'-11 5/8"

A4.3

2

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

CJ CJ

2'-0"

LEVEL 1100'-0"

COMMONS PARAPET122'-8"

LIGHT-WELL PARAPET138'-8"

11

A5.3

11

A5.3

18

A5.3

18

A5.3

3

A5.3

3

A5.3

F G H K NE M

INTERIOR NOT SHOWNFOR CLARITY

I

MP-1 MP-3

BRK-2

J L

MP-2

MP-1

BRK-1

W4

W2

A2.4

16

MASONRY CONTROLJOINT CALLED OUT WITH "CJ" - TYPICAL

CJ

2'-0"

LEVEL 2114'-0"

GYM/COMMONS98'-0"

COMMONS PARAPET122'-8"

15

1/4" DARK BRONZE ANODIZED ALUMINUMLETTERS. COAT WITH 'NYALIC' CLEARPOLYMERIC PLASTIC RESIN

1/2"ø STEEL POSTS,(4) PER LETTER.

HILTI HIT-HY 70 INJECTIBLE MORTAR

THIN BRICK VENEER WALLASSEMBLY PER PLANS

1" ALUMINUM STANDOFF

1 1/

4"

2 1/2"

revision date

phase

issue date

shee

t

proj

ect

owne

r

a&e proj #ia proj #

3/3/

2016

1:1

7:44

PM

EX

TE

RIO

R E

LE

VA

TIO

NS

A4.4

2.12.2016

100% CONSTRUCTION

DOCUMENTS

ST

. F

RA

NC

IS K

-8 S

CH

OO

L

BIL

LIN

GS

CA

TH

OLI

C S

CH

OO

LS

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

SCALE: 1/8" = 1'-0"13SOUTH ELEVATION - AREA B 1

SCALE: 1/8" = 1'-0"3SOUTH ELEVATION - AREA C

SCALE: 1/8" = 1'-0"15EAST ELEVATION - LEVEL 2 - AREA B

SCALE: 1/8" = 1'-0"6WEST ELEVATION - AREA B

SCALE: 1/8" = 1'-0"11NORTH ELEVATION - AREA B 1

SCALE: 1/8" = 1'-0"20SOUTH ELEVATION - AREA B 2

SCALE: 1/8" = 1'-0"19EAST ELEVATION - AREA B

SCALE: 3" = 1'-0"18CROSS ANCHOR DETAIL

Page 16: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

D

7

S4.1

E

E

F

F

G

G

14 14

13 13

12 12

10 10

9 9

8 8

1111

D.8

D.8

26

S9.1

16

S9.1

HSS8X6X5/16

F1600

HSS8X6X5/16

HSS8X6X5/16

F1600

HSS8X6X5/16

F50

F50

F70

HSS7X7X

3/8

F.S.

TF (96'-6")TF (96'-0")

TF (96'-0")

5"DIA

PIP

E

5"DIA

PIP

E

5"DIA PIPE

16"X16"CONC PIER

16"X16"CONC PIER

SWA

TF (96'-6")

TF (96'-6")

TF (96'-6")

14

S9.1

7

S9.1

SIM

TOC (98'-0")

TOC (98'-0")

CF

24

12" CONC WALLTOC (100'-6")SEE 1 / L5.1

TF

(96

'-6")

SEE 26 / S9.1

FOR BASE PL

9"

7'-7

"11

"

2'-7

1/2

"

ADD #3

14'-1

0"

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

3 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK01

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK011 PARTIAL FOUNDATION PLAN - AREA B

Page 17: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

E

E

F

F

G

G

10 10

9 9

8 8

7 7

6 6

1111

D.8

D.8

W8X13W8X13

W8X21

W8X13

W8X13

W8X13

W8X13

W8X13

W8X13

SP

AE

Q(3

)

W8X

10

W8X

21 (

SLO

PE

S)

W8X10

W8X10

W8X10

1'-0

"

W10

X22

23

S9.3TYP

W16

X40

(112

'-4 1

/2")

HSS8X6X

1/4

POST UP

W8X13

H11

W8X10

(3)

EQ

SP

A

SWF

4'-0

"

W8X

28

4'-2

1/2

"

20

S9.5

H6ADD #3

ADD #3

ADD #3

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

4 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK02

03/01/201621519.00

JMM

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK021

PARTIAL SECOND FLOOR ANDLOW ROOF FRAMING PLAN - AREA B

Page 18: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

FF

FF

GG

GG

HH

HH

6 6

5 5

4 4

3 3

1 1/2" 'B' DECK

W16X26

W16X31

W16X31W14X22

TOD (128'-4 5/8")

TOD (127'-9 1/2")

H2H4

6'-0" 6'-0"7"

6'-0" 6'-0" 6'-0" 6'-0" 6'-0"

SEE/30 S9.2

ADD #3HVACOPENING > 18"

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

4 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK03

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK031 PARTIAL ROOF FRAMING PLAN - AREA A

Page 19: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

BB

BB

CC

CC

DD

DD

12 12

10 10

9 9

8 8

7 7

1111

W16X26

W16X31

H2 H10

SEE/30 S9.2

ADD #3HVACOPENING > 18"

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

5 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK04

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK041 PARTIAL ROOF FRAMING PLAN - AREA A

Page 20: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

U

U

V

V

W

W

X

X

6 6

5 5

4 4

3 3

2 2

W16X31

W16X26

W16X31W14X22

TOD (128'-4 5/8")

TOD (127'-9 1/2")

H2H4

6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"

SEE/30 S9.2

ADD #3HVACOPENING > 18"

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

5 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK05

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK051 PARTIAL ROOF FRAMING PLAN - AREA A

Page 21: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

P

P

Q

Q

R

R

12 12

10 10

9 9

8 8

7 7

1111

W16X31

W14X43 C=3/4"

H10

6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"

SEE/30 S9.2

ADD #3HVACOPENING > 18"

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

6 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK06

03/01/201621519.00

MB

Checker

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK061 PARTIAL ROOF FRAMING PLAN - AREA B

Page 22: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

G

G

H

H

I

I

12 12

10 10

9 9

8 8

7 7

1111

C6X8.2

C6X8.2

SWF

SWC

5.07

3'-5" 6'-3" 6'-3" 6'-0"

18K

4

18K

4

18K

4

18K

4

H5

ADD #3

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

6 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK07

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK071 PARTIAL ROOF FRAMING PLAN - AREA B

Page 23: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

E

E

F

F

16 16

15 15

14 14

13 13

12 12

D.8

D.8

W8X

21 C

=3/

4"

W8X10

W8X10

W8X10

W8X10

W8X10

W8X10

5

S9.2

TO

D (

112'

-10

1/2"

)

12

S9.3

W8X10

EQ

EQ

EQ

EQ

6'-0

"

W8X

21

ADD #3

ADD #3

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

7 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK08

03/01/201621519.00

Author

Checker

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK081

PARTIAL SECOND FLOOR ANDLOW ROOF FRAMING PLAN - AREA B

Page 24: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

8 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK09

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

Page 25: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

8 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK10

03/01/201621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

Page 26: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/1/

2016

10:

41:0

9 A

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK11

03/01/201621519.00

Author

Checker

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

Page 27: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

A

A

B

B

D

D

16 16

15 15

C

C

SWC

CF24 TF (96'-6")

(2) 8

00S20

0-54

(2) 8

00S20

0-54

(2) 8

00S20

0-54

(2) 8

00S20

0-54

(2) 8

00S20

0-54

(2) 8

00S20

0-54

SHD8

SHD85"

5"

7

S9.1TYP

ADD #4

Whitten & Borges, PC

Suite 'H'

Ph: 406-248-5449www.whittenborges.com

645 Grand Avenue

Billings, Montana 59101

Structural Engineers

6 0 8 N O R T H 2 9 T H

PH 4 0 6 . 2 4 8 . 2 6 3 3

FAX 4 0 6 . 2 4 8 . 2 4 2 7

B I L L I N G S, M T 59101

www.aearchitects.com

MISSOULA, M T 59802

PH 4 0 6 . 7 2 1 . 5 6 4 3

FAX 4 0 6 . 7 2 1 . 1 8 8 7

224 N. HIGGINS, SUITE B

I N T E R I O R SH I S T O R I C

A R C H I T E C T U R E

PROJECT:

DRAWN:

CHECKED:

REVISED:

ARCHITECTS CPA&E

BILLINGS, MONTANA

3/3/

2016

12:

53:1

1 P

MS

:\_P

roje

cts\

2015

(40

K)\

4009

7 A

&E

BC

S K

-8\R

evit\

4009

7 B

CS

- S

truc

tura

l.rvt

SSK12

03/03/1621519.00

JMN

MB

ST FRANCIS K-8 SCHOOLBILLINGS CATHOLIC SCHOOLS

1/8" = 1'-0"SSK121 PARTIAL FOUNDATION PLAN - AREA B

ADD #3

Page 28: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

18"

3" DOMESTIC WATER TO BUILDING SYSTEM.

AIR GAP FITTING, ROUTE TO FLOOR SINK.

PRESSURE GAUGE (TYP.), SEE SPECIFICATION.

3" REDUCED PRESSURE BACKFLOW PREVENTER (RPZ).

WATTS 009QT.

2" SHUTOFF VALVE.

DOMESTIC WATER METER.

PIPE BRACE.

FLANGED CONNECTION.

WATER SERVICE ENTRANCE, SEE CIVIL PLANS FOR

CONTINUATION.

PRESSURE REDUCING VALVE.

PVC SLEEVE.

18"

FLOOR

7

3

10

1

5

1

7

5

6

4

3

2

3

4

5

6

7

8

9

10

11

11

7

5

6 WATER SERVICE ENTRANCE - REVISED ADDENDUM #1M9.4 : M9.4

DATE:

BY:MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com 2-23-2016

ST. FRANCIS K-8WATER SERVICE ENTRANCE

BILLINGS, MT

#15057

MSK-1JAG

Page 29: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

COIL

BALANCING

VALVE (TYP)

RETURN TO

BOILER

ROOM

3-WAY MODULATING

CONTROL VALVE

NORMALLY OPEN TO FULL

FLOW THROUGH COIL

3/4" DRAIN VALVE W/

THREADED HOSE

CONN.

N.O.

N.O.

ISOLATION

VALVE (TYP)

RETURN

FROM AIR

TERMINALS

N.C.

SUPPLY

2-WAY MODULATING

CONTROL VALVE,

NORMALLY CLOSED

SUPPLY TO AIR

TERMINALS

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 MSK-2

15053APL

03/03/16

7COIL PIPING DETAIL - 3 WAY VALVE NORMALLY OPEN TO COIL

Page 30: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

CLGF

CLGF

K

18

J

GFI GFI

GFI

GFI

+42 +42

+42

+42

BOYS

1309A

GIRLS

1309B

15

15

L1P1-20

L1P1-9

P3A

P3A

L1P1-46

3

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 ESK-1

15053ZR

03/01/16

SCALE: 1/8" = 1'-0"17FIRST FLOOR POWER PLAN AREA 'C'

Page 31: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

J

OC OC

OC PC

OC

J

J

K N

3

4

6

5

OMJ

LIBRARY

2202

X1

X2

X2

X1

F5E F5F5 F5EF6F6

F5F5

DAYLIGHT

ZONES

LL3-5

5

1

1

2

2

2

4

2

7

D5 D5

D5

D5

D5 D5

3

D5 D5

D5D5

3

CHECKED:

DESIGNED:

DRAWN:

ME

CH

AN

ICA

L /

ELE

CT

RIC

AL

PR

OF

ES

SIO

NA

L E

NG

INE

ER

S

1629 A

VE

D S

TE

7C

, B

ILLIN

GS

MT

59102

PH

ON

E:

406

.252.3

237

FA

X:

406

.252.3

276

ww

w.c

oneer.

com

REVISION

DATE

#BY

ST FRANCIS K-8 SCHOOL

ADDENDUM #3

ESK-2

3.03.16

15053

REF E7.2B

ZR

ZTR

JG

3ADDENDUM 3

03-03-16

SCALE: 1/8" = 1'-0"1SECOND FLOOR LIGHTING PLAN - AREA 'B'

Page 32: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

POWER KEYED NOTES

PROVIDE POWER CONNECTION TO IRRIGATION CONTROL PANEL. COORDINATE EXACT

LOCATION AND WIRING REQUIREMENTS WITH EQUIPMENT INSTALLLER.

PROVIDE ONE 1" PVC AND ONE 2" CONDUIT FROM IRRIGATION CONTROL PANEL TO WELL PUMP

LOCATION FOR WIRING CONNECTIONS TO WELL PUMP EQUIPMENT. COORDINATE WITH

EQUIPMENT INSTALLER.

PROVIDE CEILING MOUNTED TWIST LOCK RECEPTACLE FOR DROP CORD CONNECTION FOR

FOOD SERVICE EQUIPMENT. REFER TO FS3.0 FOR CEILING DROP DETAIL 1/FS3.0. COORDINATE

EXACT LOCATION FOR TWIST LOCK RECEPTACLE IN CEILING WITH KITCHEN EQUIPMENT

INSTALLER PRIOR TO ROUGH-IN.

PROVIDE WALL MOUNTED SWITCH FOR HOOD FAN CONTROL. COORDINATE WITH EQUIPMENT

PROVIDER. FAN IS LOCATED ON THE ROOF.

PROVIDE 3#8+1#10 GROUND IN 3/4" CONDUIT.

PROVIDE 3#6+1#10 GROUND IN 1" CONDUIT.

PROVIDE 3#4+1#8 GROUND IN 1 1/4" CONDUIT.

PROVIDE POWER CONNECTION TO OVERHEAD DOOR CONTROLLER/MOTOR EQUIPMENT: BASIS

OF DESIGN 1/2HP, 120V, 1 PHASE.

LOCATION FOR OVERHEAD DOOR WALL CONTROL SWITCH PROVIDED WITH OVERHEAD DOOR

EQUIPMENT. MOUNT AT SWITCH HEIGHT. EC TO PROVIDE AND INSTALL ALL WIRING FROM

SWITCH TO DOOR MOTOR/CONTROLLER FOR A COMPLETE SYSTEM. COORDINATE

INSTALLATION WITH DOOR EQUIPMENT PROVIDER PRIOR TO ROUGH-IN.

LOCATION FOR COILING DOOR WALL CONTROL SWITCH PROVIDED WITH OVERHEAD DOOR

EQUIPMENT. MOUNT AT SWITCH HEIGHT. EC TO PROVIDE AND INSTALL ALL WIRING FROM

SWITCH TO DOOR MOTOR/CONTROLLER FOR A COMPLETE SYSTEM. COORDINATE

INSTALLATION WITH DOOR EQUIPMENT PROVIDER PRIOR TO ROUGH-IN.

PROVIDE POWER CONNECTION TO COILING DOOR CONTROLLER/MOTOR EQUIPMENT: BASIS OF

DESIGN 1/2HP, 120V, 1 PHASE.

PROVIDE BOILER EMERGENCY POWER OFF BUTTON. PROVIDE A PILLA BSD120 EMERGENCY

BOILER SHUT-DOWN WALL STATION OR AN APPROVED EQUAL FOR CONTROL CONTROL SHUT

DOWN UPON ACTIVATION. PROVIDE A CONNECTION FROM CONTACT BLOCK OF EMERGENCY

BUTTON TO BOILER CONTROLS.

EXTEND POWER FROM DSOU-1 TO DSIU-1 PER MANUFACTURER'S

RECOMMENDATION/REQUIREMENTS. DSIU-1 IS POWERED FROM DSOU-1. PROVIDE WALL

DISCONNECT SWITCH PER CONTROL EQUIPMENT SCHEDULE FOR DSIU-1.

PROVIDE 120V, 1 PHASE, 20A POWER CONNECTION TO RACK MOUNTED POWER STRIP

EQUIPMENT. COORDINATE WITH DIVISION 27000 RACK SPECIFICATION AND COMMUNICATION

PLANS AND DETAILS.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 ESK-3

15053ZTR

03/01/16

SCALE: 1/8" = 1'-0"1KEYED NOTES FOR SHEET E3.1

Page 33: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

CHECKED:

DESIGNED:

DRAWN:

ME

CH

AN

ICA

L /

ELE

CT

RIC

AL

PR

OF

ES

SIO

NA

L E

NG

INE

ER

S

1629 A

VE

D S

TE

7C

, B

ILLIN

GS

MT

59102

PH

ON

E:

406

.252.3

237

FA

X:

406

.252.3

276

ww

w.c

oneer.

com

REVISION

DATE

#BY

ST FRANCIS K-8 SCHOOL

ADDENDUM #3

ESK-4

3.03.16

15053

PANELBOARD

L1PG

ADDENDUM 3

ZTR

ZTR

JG

Total Est. Demand: 88 A

Total Conn.: 96 A

Receptacle 15,540 VA 78.61% 12,216 VA Total Est. Demand: 31,586 VA

Power 9,020 VA 100.00% 9,020 VA Total Conn. Load: 34,760 VA

Motor 10,200 VA 101.47% 10,350 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 89 A 97 A 106 A

Total Load: 10,700 VA 11,500 VA 12,560 VA

53 SPARE 20 A 1 0 VA 1,260... 1 20 A RECEPTACLES GYM (ALT#1) 54

51 SPARE 20 A 1 0 VA 180 VA 1 20 A WP EXTERIOR GFI BID ALT#1 52

49 SHADE POWER - GYM (ALT#1) 20 A 1 1,200... 180 VA 1 20 A HS LOCKER ROOM GFI BID ALT#2 50

47 RECEPTACLE HALLWAY 1400 (ALT #1) 20 A 1 720 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 48

45 RECEPTACLES OFFICE 1424 (ALT #1) 20 A 1 720 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 46

43 BLEACHER POWER GYM 1317 (ALT #1) 20 A 1 600 VA 720 VA 1 20 A RECEPTACLES GYM 1317 ALT#1 44

41 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 42

39 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A BLEACHER POWER GYM 1317 (ALT #1) 40

37 HOOP POWER CONNECTION (ALT#1) 20 A 1 600 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 38

35 GFI RECEPTACLEGIRLS LOCKER 1410 (ALT #1) 20 A 1 540 VA 600 VA 1 20 A SHADE CONTROLLER GYM 1317 36

33 GFI RECEPTACLE ROOM 1430, 1440 (BID ALT... 20 A 1 540 VA 600 VA 1 20 A HOOP POWER CONNECTION (ALT#1) 34

31 RECEPTACLES GYM 1317 ALT#1 20 A 1 540 VA 540 VA 1 20 A CEILING PROJECTOR GYM 1317 (ALT #1) 32

29 WP GFI RECEPT AT HS LOCKER RMS (ALT #2) 20 A 1 360 VA 540 VA 1 20 A RECEPTACLES STORAGE 1316A 30

27 WP EXTERIOR GFI BID ALT#1 20 A 1 360 VA 540 VA 1 20 A RECEPTACLES BOYS LOCKER RM 1420 (ALT... 28

25 SCOREBOARD POWER GYM 1317 20 A 1 200 VA 360 VA 1 20 A RECEPTACLE HS STORAGE 1450 (BID ALT #2) 26

23 RECEPTACLE GIRLS TOILET 1432 (BID ALT #2) 20 A 1 180 VA 200 VA 1 20 A SHOT CLOCK POWER -GYM 1317 24

21 RECEPTACLE GIRLS TOILET RM1412 (ALT #1) 20 A 1 180 VA 200 VA 1 20 A SHOT CLOCK POWER -GYM 1317 22

19 RECEPTACLE TOILET ROOM 1424A (ALT #1) 20 A 1 180 VA 180 VA 1 20 A CURTAIN WALLL CONTROLLER BID ALT#1 20

17 -- -- -- 2,400... 180 VA 1 20 A GFI RECEPTACLE TOILET(ALT #1) 18

15 DRYER ROOM 1401 (ALT #1) 30 A 2 2,400... 180 VA 1 20 A GFI RECEPTACLE BOYS TOILET 1422 (ALT #1) 16

13 POWER FOR PROJECTION SCREEN (ALT#1) 20 A 1 1,200... 1,500... 1 20 A WASHER RM 1401 (ALT #1) 14

11 RECEPTACLES OFFICE 1424 (ALT #1) 20 A 1 960 VA 1,200... 1 20 A SHADE POWER - GYM (ALT#1) 12

9 QUAD RECEPT ROOMS 1444 & 1434 (ALT#2) 20 A 1 720 VA 1,680... 1 20 A CONN. CURTAIN DIVIDER GYM 1317 (ALT#1) 10

7 RECEPTACLE ROOM 1414, 1424 (ALT #1) 20 A 1 960 VA 360 VA 1 20 A HS LOCKER ROOM GFI BID ALT#2 8

5 GFI RECEPTACLE ROOM 1401 (ALT #1) 20 A 1 360 VA 660 VA 1 20 A RECEPTACLE ROOM 1444 (BID ALT #2) 6

3 POWER FOR SOUTH SCOREBOARD (ALT #1) 20 A 1 200 VA 600 VA 1 20 A BLEACHER POWER GYM 1317 (ALT #1) 4

1 GFI RECEPTACLE BOYS TOILET 1442 (BID ALT... 20 A 1 180 VA 600 VA 1 20 A BLEACHER CONTROL STATION GYM 1317 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

PANELBOARD TO BE PROVIDED UNDER BID ALTERNATE #1

Notes:

ENCLOSURE: NEMA 1

MOUNTING: SURFACE WIRES: 4 MAINS RATING 225 A

SUPPLY FROM: L1P1 PHASES: 3 MAINS TYPE MLO

LOCATION: ELEC 1317 VOLTAGE: 120/208 Wye A.I.C. RATING 22 KAIC

PANELBOARD: L1PG

Page 34: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

CLGF

CLGF CLGF

CLGF

CLGF

S

CLGF

S

CLGF

CLGF CLGF

F

H

4

5

I J

+100

GFI+42

GFI+42

+42

15

15

PANEL L1P2

15

15

TOILET

1000A

COUNSELING

1007

L1P2-1

+42

+42

+42

L1P2-14

L1P2-13

L1P2-15

L1P2-9

GFI

GFI

L1P2-18

L1P2-22

AHU-1

EF-6

EF-7

15

15

L1P2-10,12

ONTONT

ONT

ONT

ONT+100

ONTONT

+42ONT

L1P2-23

12

L1P2-44

9

915

3

3

13

3

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 ESK-5

15053ZTR

03/03/16

SCALE: 1/8" = 1'-0"16FIRST FLOOR POWER PLAN AREA 'B'

Page 35: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

OC

OC

OCOC

OC

OC

JOC

J

J

J

J

A3A3E

A3A3C1

A2A2 A2 A2OS

OS

A3A3E

A3A3E

A3

A3E

A3A3

A3 A3

A3A3

A3A3

A3

A3 A3

A3A3

A3

os

C1 C1 C1

OS

A3A3

A3

A3

A3 A3

A3 A3 A3

A4A4

OS

B F G H

19

20

21

D EC I

A3E

LL1-6

EL1-8

LL1-11

A

A

A

B

B

B

W1E

W1EW1E

W1E

W1E

EL1-14

V1V1

LL1-12

LL1-3

B

B

B

A

B D

D

D

D

D

C

C

C

E

E

HALLWAY

1400

BOYS LOCKER

1420

GIRLS LOCKER

1410

OFFICE

1414OFFICE

1424

TOILET

1424A

TOILET

1414A

BOYS TOILET

1422STORAGE

1316A

GIRLS TOILET

1412

G

A3E

A3E A3E

A3E

X3X3

EL1-16

X2X2X13

A 3

JJ

33

DRAWN:

DESIGNED:

CHECKED:

BYREVISION# DATEMECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

ST FRANCIS K-8 SCHOOL

ADDENDUM #3

ESK-6

3.03.16

15053

(1)E2.1C BIDALT# 1

ADDENDUM 3

ZTR

ZTR

JG

3 ADDENDUM 3 03-03-16

SCALE: 1/8" = 1'-0"11GYMNASIUM LIGHTING PLAN - BID ALTERNATE 1

Page 36: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

LIGHTING KEYED NOTES

PROVIDE POWER PACK FOR ROOM LOW VOLTAGE OCCUPANCY SENSOR; BASIS OF DESIGN

GREENGATE SP20-MV.

CEILING MOUNTED LOW VOLTAGE DUAL TECHNOLOGY OCCUPANCY SENSOR. BASIS OF

DESIGN GREENGATE OAC-DT-2000.

CIRCUIT CONTROLLED VIA LIGHTING RELAY PANEL LRPG.

PROVIDE WALL MOUNTED DUAL TECHONOLOGY OCCUPANCY SENSOR; BASIS OF DESIGN

GREENGATE ONW-D-1001MV-W.

PROVIDE LOW VOLTAGE OVERRIDE WALL CONTROL FOR LIGHTING IN THIS AREA.

6 BUTTON MANUAL AND OVERRIDE WALL CONTROL FOR GYM. REFER TO DETAIL 16/(1)

E2.1C.

EXIT SIGN RELOCATED FROM BASE BID.

6 BUTTON MANUAL AND OVERRIDE WALL CONTROL FOR GYM AND DIMMING SLIDERS FOR

GYM LIGHTS. REFER TO DETAIL 16/(1)E2.1C.

EXIT SIGN TO BE RELOCATED IN BID ALTERNATE #2 TO EXTERIOR MOST DOORS OF HS

LOCKER ROOMS.

A

B

C

D

F

E

G

H

J

3

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 ESK-7

15053ZTR

03/03/16

11LIGHTING KEYED NOTES (1)E2.1C BID ALT #1

Page 37: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

RELAY PANEL

LRPG

BASIS OF DESIGN

LC&D

LTD BLUE BOX

LC&D CHELSEA

DIGITAL 4 BUTTON

SWITCH OR EQUAL BY

GREENGATE

LOCATION HALLWAY 1400

FOR OVERRIDE

LC&D CHELSEA

DIGITAL 4 BUTTON

SWITCH OR EQUAL BY

GREENGATE

LOCATION HALLWAY 1400

ALL ON

ALL OFF

LC&D CHELSEA

DIGITAL 6 BUTTON

SWITCH OR EQUAL BY

GREENGATE

LOCATION GYM

SOUTH DOOR

LC&D CHELSEA

DIGITAL 6 BUTTON

SWITCH OR EQUAL BY

GREENGATE

LOCATION GYM

NORTH

DOOR

LC&D CHELSEA

SLIDER WITH 2 DIGITAL

DIMMING SLIDER

CONTROLS

OR EQUAL BY

GREENGATE

LOCATION GYM

SOUTH DOOR

ALL ON ALL OFF ALL ON ALL OFFALL ON

ALL OFF

1400

HALLWAY

1314

HALLWAY

SCENE 2SCENE 1

SCENE 4SCENE 3

SCENE 1

SCENE 3

SCENE 2

SCENE 4

ROW 2

DIMMER

ROW 1

DIMMER

CAT 5E CABLE

WITH RJ 45

CONNECTORS

CAT 5E CABLE

WITH RJ 45

CONNECTORS

CAT 5E CABLE

WITH RJ 45

CONNECTORS

CAT 5E CABLE

WITH RJ 45

CONNECTORS

CAT 5E CABLE CONNECTION

TO LRP1

RELAY PANEL

3

CHECKED:

DESIGNED:

DRAWN:

ME

CH

AN

ICA

L /

ELE

CT

RIC

AL

PR

OF

ES

SIO

NA

L E

NG

INE

ER

S

1629 A

VE

D S

TE

7C

, B

ILLIN

GS

MT

59102

PH

ON

E:

406

.252.3

237

FA

X:

406

.252.3

276

ww

w.c

oneer.

com

REVISIO

NDATE

#BY

ST FRANCIS K-8 SCHOOL

ADDENDUM #

3

ESK-8

3.03.16

15053

11/(1)E2.1C

ZTR

ZTR

JG

3ADDENDUM 3

03-03-16

SCALE: 1/8" = 1'-0"16BID ALT#1 LIGHTING CONTROL DETAIL

Page 38: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

HA-1HA-1A2E

H1

F G H

18

E

F

X3

3

MECHANICAL / ELECTRICAL

PROFESSIONAL ENGINEERS

1629 AVE D STE 7C, BILLINGS MT 59102

PHONE: 406.252.3237 FAX: 406.252.3276

www.coneer.com

BY:

DATE:

ST FRANCIS K-8 SCHOOL

ADDENDUM #3 ESK-9

15053ZTR

03/03/16

SCALE: 1/8" = 1'-0"11GYMNASIUM LIGHTING PLAN - BID ALTERNATE 1

Page 39: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

Bid Package Clarifications:

General Requirements for All Bid Packages:1. This project is privately funded. There will NOT be any Montana Prevailing wage or Davis

Bacon requirements.

Bid Package 2A – Site Work & Site Utilities1. Hand jointing of sidewalks and exterior slabs is acceptable.2. Mirafi 600x or equal separation fabric can be used under the gravel base for the pavement

sections (C9.15).3. Mirafi 600x or equal separation fabric can be used under the rip-rap.4. Grinding off existing stripping prior to new asphalt striping will be required along Colton Blvd as

needed. Painting over the existing striping with black paint is not acceptable.5. There will not be any striping at the “parents drop off” area along Colton Blvd.6. Catch basin #8 has been replaced with a 24”x 12” Tee on sheets C9.7 & 3/C9.8.7. Gravel Drainage Course and Drainage Composite (see spec section 07 11 13 2.3D for drainage

board material). Drainage board material to be provided and installed under bid package 7B. Gravel drainage material to be ¾” minus crushed, washed rock to extend around the entire perimeter of the building and to be provided and installed under this bid package.

8. This bid package to provide temporary water if required by other bid package work.9. This bid package to include the sidewalk north of the access road along Woody Drive to include

but not limited to all concrete work, HC ramp and truncated domes.

Bid Package 3A – Concrete Materials, Building Rebar, Masonry Rebar, Layout for Concrete & Anchor Bolts, Vapor Barrier (S&I), Anchor Bolts (IO)

1. Masonry Rebar to be supplied under this bid package. Install of the masonry rebar will be covered in bid package #4A.

Bid Package 3C – Polished Concrete1. If Alternate #8 is accepted, this scope of work will be performed prior to the installation of the

interior walls.

Bid Package 4A – Masonry1. Masonry Rebar to be installed under this bid package and provided under bid package 3A.2. Kanta Products is an acceptable substitution for the CMU.3. Bid package 2A to provide temporary water if required by this bid package.

Bid Package 6C – Wood Framing/Misc. Carpentry1. L1, L2 Louvered Panels to be provided under this bid package.

Bid Package 6F – Music Casework, Metal Storage Shelving & Library Casework

Page 40: END OF ADDENDUM #3 · 2. Custom printed imaged to be provided by Architect. 3. Image to include maximum of 10 pantone colors. 08 41 13 – Aluminum-Framed Entrance and Storefronts:

1. Metal Shelving location to be included in this bid package. Metal shelving to include (6) 24” deep units in Storage Room 1220 along west wall and (5) 12” deep units in Storage Room 2220 along east wall.

Bid Package 7B - Exterior Envelope Supply & Install, Exterior Vapor/Air Barrier, Horizontal Primary Furring & Exterior Insulation.

1. Gravel Drainage Course and Drainage Composite (see spec section 07 11 13 2.3D for drainage board material). Drainage board material to be provided and installed under this bid package. Gravel drainage material to be ¾” minus crushed, washed rock to extend around the entire perimeter of the building and to be provided and installed under bid package 2A.

Bid Package 7D – Metal Wall Panels & Secondary Furring/Flashing1. The sill flashing under the store front windows will be covered under this bid package.

Bid Package 10A – Specialties1. Athletic storage units in high school locker rooms are be provided and installed in this bid

package. See spec section 10 51 43. Bid Package 10B – Signage

1. There are NO electronic reader boards at this time (interior or exterior).2. Aluminum crosses to be ½” thickness for both exterior and interior.

Bid Package 12A – Window Coverings1. Window coverings to be provided per spec section 12 21 00 2.3 in reference to how many blinds

will be required for each window opening.

Bid Package 15C – HVAC and HVAC Insulation1. Supply and install of the ceiling fan in the upper commons to be included in this bid package.

END OF BID PACKAGE CLARIFICATIONS – ADDENDUM #3