WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
1
WuhanWuhanWuhanWuhan MunicipalMunicipalMunicipalMunicipal TrafficTrafficTrafficTraffic ProjectProjectProjectProject
(Phase(Phase(Phase(Phase 2)2)2)2) WorldWorldWorldWorld BankBankBankBank LoanLoanLoanLoan--------------------PublicPublicPublicPublictraffictraffictraffictrafficpriorityprioritypriorityprioritycorridorscorridorscorridorscorridorsimprovementimprovementimprovementimprovement
EMPEMPEMPEMP(((( FinalFinalFinalFinal DDDDraftraftraftraft ))))
GradeGradeGradeGrade AAAA G.G.G.G. H.H.H.H. P.P.P.P. Z.Z.Z.Z. A.A.A.A. Zi.Zi.Zi.Zi. No.No.No.No. 2605260526052605DDDDeeeeCCCC 2009,2009,2009,2009, WuhanWuhanWuhanWuhan
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
2
ContentsContentsContentsContents
1 Preface ................................................................................................................. 3
1.1 Project Background .....................................................................................3
1.2 Project Scale ................................................................................................ 8
1.3 Implementation Purpose of EMP ............................................................... 9
1.4 Preparation Basis ........................................................................................10
1.5 Evaluation Standard ................................................................................... 16
1.6 Objective of environmental protection ..................................................... 21
2 Environment impact and mitigation measures ................................................ 23
3 Enviromental Management and Monitoring Plans ..........................................30
3.1 Purpose of Enviromental Management .................................................... 30
3.2 Environmemtal management and monitoring organization ....................31
3.3 Environment management procedure ....................................................... 37
3.4 Content of environment management .......................................................37
3.5 Enviromental supervising management plan ........................................... 39
4 Enviroment supervising plan ............................................................................ 41
4.1 Purpose and principle for preparing ......................................................... 41
4.2 Monitoring organization ............................................................................ 41
4.3 Enviromental supervising proposal .......................................................... 41
4.4 Environmental Monitoring Report ............................................................44
4.5 Environmental Monitoring Expense ......................................................... 45
5 Environmental monitoring ................................................................................46
6 Acceptance of as-built environmental protection facilities ............................48
7 Training plan ......................................................................................................49
8 Estimate of environmental investment...............................................................51
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
3
1111 PrefacePrefacePrefacePreface
1.11.11.11.1 ProjectProjectProjectProject BackgroundBackgroundBackgroundBackground
Wuhan, the capital of Hubei Province, is the largest city in Central China and
one of the seven central cities in China with its 8.97 million of permanent
population. The Yangtze river and its longest branch-Hanjiang River go across and
divide the metropolis located its middle and lower reaches into three parts,
Wuchang, Hankou and Hanyang .Wuhan with its vast territory has been greatly
restricted by the less developed traffic. With rapid urbanization and motorization,
traffic in Wuhan encounters new development opportunity and great challenge.
For the following 10 to 15 years, with the continuous growth of the GDP per
capita, the motorization development will be brought to another higher level, so
traffic demand will be under rapid growth. According to the forecast, in 2020,
vehicle reserve in Wuhan will reach a number of 1.90~2.50 million; The gross
citizen traffic in downtown will reach 23 million person-times per day, twice of
that at present; the vehicle traffic will be 4.5 million times per day, 2.7 times as
many as that at present and the traffic flow 400 thousand times per day, 4 times of
that at present. The doubled and redoubled total vehicle traffic brings forward the
higher requirement to the capacity of traffic infrastructure. The tripod pattern and
the balanced development at both sides of the Yangtze River will lead that traffic
crossing the river will become the most important issue. It is forecasted that the
passenger flow crossing the river will grows to 1.4 million person-times per day
from the 700 thousand person-times at present and the vehicle flow will increase
to 550 thousand times from the present 250 thousand times. Construction of the
new river-crossing channels and relieving the tense river-crossing traffic situation
is a long-term task for the improvement of the urban traffic. The downtown of
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
4
Wuhan has the most intensive use of urban land and the most centralized traffic.
Because of the limited growth space for traffic volume of the road network in
downtown, the traffic issue becomes more and more conspicuous. In addition, as
the optimized adjustment of the urban layout and the axial extension of the land
use in downtown, the centripetal traffic flow between the surrounding area and the
downtown will increase.
In sum, compared with other large cities in same size, the traffic demand and
supply actuality in Wuhan remains at a relatively low level, but has come to the
stage of the rapid development of urbanization and motorization. The conflict
between the various demands and the backward traffic service is the fundamental
problem of the traffic presently, even in the future. According to the present urban
and traffic development situation, in a long time in future, the traffic conflict will
be further extended in time, space and ways. Taking all factors into account, it is
the essential time to determine the urban traffic development orientation and
establish the harmonious traffic system to lead the urban traffic to be under
prosperous development.
In 1998, the Wuhan municipal government applied for loans from the Word
Bank to carry out urban traffic (phase-I) construction project. With the loan of 200
million dollars, preparation of phase-I project was started in 1999, and it passed
the evaluation by the World Bank in November, 2003. In May of 2004, the loan
agreement was signed and the construction was commenced formally in August,
2003, and it is planned to complete the project at the end of 2008. With the
preliminary study and support from the World Bank, the urban traffic development
strategy study for Wuhan was finished, which provide a scientific decision-making
basis for urban traffic construction in Wuhan. With completion of the phase-I
construction, the road traffic supply level been improved, which plays an
important role in improving the traffic situation in Wuhan and promotes
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
5
improvement of the urban comprehensive traffic system, especially for traffic road
network. A new prospect was initialed and the urban function was exalted. The
project has not only brought advanced technology and concepts, elevated
comprehensive quality of technicians, promoted the project management and
impelled the urban construction management to conform to international practices,
but also has established a new platform for financing of the urban construction and
relieved the financing pressure of the urban infrastructure construction.
On December 7, 2007, Wuhan urban circle was formally approved by the
State Council to be “the pilot area for comprehensive and supporting reform for
construction of the resource-saving and environment-friendly society in China”.
The comprehensive and supporting reform in Wuhan urban circle will aim at
building a resource-saving and environment-friendly society with Wuhan city as
the principal part, and will give a full play to its leading and radiating role and
enhance the integration of Wuhan and the other eight cities in industry, financing
and transportation to reduce the difference between urban and rural areas by
reform.
In the Report on Government Work of Wuhan in 2008, it proposed to start the
“30min Smooth Traffic Project” within the second ring-road. The first ring-road is
to be improved; construction of the second ring-road will be accelerated. The third
ring-road will built up basically. The construction of the overpasses in Yuejiazui,
Jiedaokou and Zhuodaoquan shall be accelerated. The linking roads among ring
roads and the fast traffic tracks between the suburban area and the downtown shall
be positively pushed forward. The Yangtze River tunnel shall be completed, the
Erqi Yangtze River Bridge shall be commenced, the preliminary preparation for
the river-crossing tunnel in Yingwuzhou shall be conducted. The road network
system in downtown shall be improved, and the sub-trunk road and the branches
shall be widened and cleared. The construction of the parking lots and the traffic
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
6
transit and junction stops shall be quickened. The strategy of “public traffic first”
shall be carried out and the public traffic service shall be improved. The traffic
management shall be enhanced to alleviate traffic jams.
With the drawing up of “rise of middle China” strategy, Wuhan, as the most
important city in the middle China encounters the unprecedented development
opportunity. Relying on the superior geographical location and convenient
transportation conditions, Wuhan will have a more powerful radiating and
industrial cohesive force. Presently, the traffic construction confronts with austere
challenges in Wuhan. The location advantage can be transformed to the economic
superiorities only bridged by the transportation. The modern urban traffic system
is required to present the urban individuality and charming and raise its
comprehensive competitiveness.
At present, Wuhan has been come into a strategic period of large-scale traffic
construction mainly involved with the rapid road and rapid track traffic. In order to
improve the urban traffic and function, give a full play of the leading role and
radiating force in the urban group circle, push forward reform and pilot the
National pilot area of Wuhan urban circle and continuously employ the experience
of the World Bank project (phase-I), it is necessary to strengthen traffic
infrastructure construction to meet the constant development requirements. Thus,
in February 2007, Wuhan municipal government applied for the loans from the
World Bank to carry out the urban traffic construction project (phase-II). In
November 2007, the urban traffic construction project (phase-II) was approved by
the State Council to be listed in the spare project planning of the fiscal years of
2008-2010 for the loans from the World Bank. The credit line is 100 million
dollars and the main construction items are as following: to relieve the traffic jams
situation in the downtown in Wuhan, to build the river-crossing tunnel, to build or
rebuild the urban roads to form the second ring-road and to perfect the city road
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
7
network.
In December 2007, the preliminary study organization for the World Bank
phase-II project was founded in Wuhan. Led by the municipal urban construction
and foreign capital office, joined by the urban planning and design department,
traffic research institution, public traffic department, traffic management
department and environmental protection department, the preliminary preparation
for the project was conducted.
In February 2008, the relevant municipal departments organized all of the
traffic research institutions to execute the further research on the “30-minute
Smooth Traffic Project” within the second ring-road put forward by the Municipal
government. And the preliminary research of the World Bank project was
conducted simultaneously.
On March 18, 2008, after the initial communication, the World Bank in
principle agreed on the construction objective to solve the traffic jams in the
downtown of Wuhan put forward by the project team and showed their concern to
the following development of the project.
The construction scheme of this project has been revised for several times
since March, 2008 and several schemes have been formed. After this process and
considering the requirement of the World Bank, a fairly perfect construction
scheme has come into being.
The construction project shall comply with the environmental evaluation
regulations according to the PRC Environmental Impact Assessment Law, the
Regulations on environmental protection of Construction Project (ordinance of the
State Council of the PRC, No.253) and environmental assessment prescribed in the
service manual of the World Bank. In order to better conduct the environmental
assessment, the Project Office of Foreign Capital entrusted the Environmental
Project Research Division of China Railway Siyuan Survey and Design Group
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
8
Limited to undertake the environmental assessment and work out the
environmental impact assessment statement. The assessor worked out the
Environmental Impact Assessment Statement of Wuhan Urban Traffic Project
(Phase II) with the World Bank Loan according to the relevant environmental
regulations and technical criteria and based on analysis of the research and the
monitoring. Herein, we give thanks to the leaders, the departments and all the staff
members who have given great help during the workout of the Statement.
1.21.21.21.2 ProjectProjectProjectProject ScaleScaleScaleScale
Wuhan Municipal Traffic Project (Phase II) with World Bank Loan falls into
the following 4 sub-projects according to the different management and
enforcement bodies as the followings:public traffic priority corridors improvement
sub-project;road safety sub-project;road perfection;organization development and
capacity building sub-project.
Public traffic priority corridors improvement sub-project will set up five bus-
only lanes and three bus depots, including one bus junction station, two bus
initial/terminal stations and one interchange junction station. Meanwhile, the
project will set up forty bus bays along the road, matching road perfection
project.See Table 1.2-1 for Public traffic priority corridors improvement sub-
projec content and Geographic Location Diagram for Public traffic priority
corridors improvement,see Diagram 1.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
9
Table 1.2-1
PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projecsub-projecsub-projecsub-projec contentcontentcontentcontent
DiagramDiagramDiagramDiagram 1111 GeographicGeographicGeographicGeographic LocationLocationLocationLocation DiagramDiagramDiagramDiagram forforforfor PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement
1.31.31.31.3 ImplementationImplementationImplementationImplementation objectiveobjectiveobjectiveobjective ofofofof EMPEMPEMPEMP
The construction and operation shall produce some impact on the social
ecological environment,natural environment and social economic environment as
well as public life quality around it. In order to promptly take effective
environmental protection measures to relieve or eliminate the adverse effect, the
necessary EMP and environmental protection monitoring plan shall be prepared at
Bus-only lane
To construct five bus-only lanes, with total length of 33km, i.e.:Xinhua Road/Youyi Road (from Fazhan Avenue to Zhongshan Avenue),
Jiefang Avenue (from Huangpu Street to Jianshe Avenue), Hanyang Avenue(from Longyang Avenue to Yingwu Avenue), Yingwu Avenue (from Hanyang
Avenue to Jiangang Road) and Heping Avenue (from Gongye Road toZhongshan Road).
Bus depot
To construct a Sanjintan bus junction station
To construct two bus initial/terminal stations, i.e.: Gangdu Garden andTianshunyuan
To construct Jinyintan P+R parking lots
Bus bay To reconstruct 18 bus stations and newly construct 22 bay-mode busstations
JunctionStationJunctionStationJunctionStationJunctionStation ofofofof SanjintanSanjintanSanjintanSanjintan
ParkingParkingParkingParking LotLotLotLot ofofofof JinyintanJinyintanJinyintanJinyintan
OOOOriginriginriginrigin aaaandndndnd DestinationDestinationDestinationDestination StationStationStationStation ooooffffGangdouGangdouGangdouGangdou GardenGardenGardenGarden
BusBusBusBus LaneLaneLaneLane ofofofof JiefangJiefangJiefangJiefang AvenueAvenueAvenueAvenue
BusBusBusBus LaneLaneLaneLane ofofofof HanyangHanyangHanyangHanyang AvenueAvenueAvenueAvenue
BusBusBusBus LaneLaneLaneLane ofofofof HepingHepingHepingHeping AvenueAvenueAvenueAvenue
BusBusBusBus LaneLaneLaneLane ofofofof YingwuYingwuYingwuYingwu AvenueAvenueAvenueAvenue
OOOOriginriginriginrigin aaaandndndnd DestinationDestinationDestinationDestination StationStationStationStation ooooffff PublicPublicPublicPublicTrafficTrafficTrafficTraffic fffforororor TianshunyuanTianshunyuanTianshunyuanTianshunyuan GardenGardenGardenGarden
BBBBus us us us LLLLaneaneaneane of of of of Hua Road and Youyi RoadHua Road and Youyi RoadHua Road and Youyi RoadHua Road and Youyi Road
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
10
the public traffic junction, the origin and destination station and parking lot as well
as bus lane during the construction and operation period.
Its main purpose is to promptly and accurately monitor the actual impact on
the environment; various environmental protection measures to monitor the project
must be implemented; the predict result and evaluation conclusion for the
environment impact report should be inspected.
1.41.41.41.4 PreparationPreparationPreparationPreparation BasisBasisBasisBasis
1.4.11.4.11.4.11.4.1 TheTheTheThe NationalNationalNationalNational Laws,Laws,Laws,Laws, Regulations,Regulations,Regulations,Regulations, RulesRulesRulesRules andandandand NormativeNormativeNormativeNormative DocumentsDocumentsDocumentsDocuments
(1) The environmental protection Law of the People’s Republic of China, Dec.
26th, 1989;
(2) The Environmental Impact Assessment Law of the People’s Republic of
China, Sep. 1st, 2003;
(3) The Air Pollution Control Law of the People’s Republic of China, Sep. 1st,
2001;
(4) The Noise Pollution Control Law of the People’s Republic of China, Mar.
1st, 1997;
(5) The Water Pollution Control Law of the People’s Republic of China, May,
1996 and the Rules for Implementation for the Water Pollution Control Law of the
People’s Republic of China, Mar, 2000;
(6) The Solid Wastes Pollution Control Law of the People’s Republic of China,
April 1st, 2005;
(7) The Water Law of the Peoples Republic of China, Oct. 1st, 2002;
(8) Law on Water and Soil Conservation of the People’s Republic of China,
June 29th, 1991;
(9) Law on the Protection of Cultural Relics of the People’s Republic of
China, Oct, 28th, 2002;
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
11
(10) Urban Planning Law of the People's Republic of China Apr. 1st, 1990;
(11) The Law of Land Administration of the People's Republic of China, Aug,
28th, 2004;
(12) Clean Production Promotion Law of the People's Republic of China, Jan,
1st, 2003;
(13) Regulations on environmental protection of Construction Project, Nov,
29th, 1998 (ordinance of the State Council of the PRC, No.253);
(14) Categories for the Environmental Impact Assessment Management of the
Construction Project Oct.1st, 2008(Ordinance of the National Environment
Protection Ministry, No.2);
(15) Provisions on the Grading Approval of EIA Documents of Construction
Projects, Mar. 1st, 2009 (Ordinance of the National environmental protection
Ministry, No.5);
(16) The Issuance of the List of the Construction Projects Directly Examined
and Approved by the environmental protection Ministry and the List of the
Construction Projects Examined and Approved by Provincial environmental
protection Department (Announcement of the National environmental protection
Ministry. No.7, 2009);
(17) Notice on the Further Strengthening the Environmental Impact
Assessment Administration of Projects Financed by Loans from International
Financial Organizations (No.324 [1993], State environmental protection
Administration);
(18) Notice on the Environmental Impact Assessment of the Construction
Projects of Roads, Railways ant rail. (No.94 [2003], State environmental
protection Administration);
(19) Notice on the print and distribution of the requirements for the mobile
vehicles pollution control of 2005-2007 (No.83 [2005], State environmental
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
12
protection Administration);
(20) Interim Regulations of the Public Participation in Environmental Impact
Assessment (No.28 [2006], State environmental protection Administration);
(21) Regulations on environmental protection of Transport Construction (No.
5, 2003, order of the Transportation Ministry);
(22) Provisions on environmental protection (revised), The Standing
Committee of the People's Congress of Hubei Province, executed since Jan.1st,
1998;
(23) Provisions on air pollution control of Hubei Province, the Standing
Committee of the People's Congress of Hubei Province, executed since Dce.3rd,
1997;
(24) Provisions on urban environmental noise control of Hubei Province, the
Standing Committee of the People's Congress of Hubei Province, executed since
April, 1st, 1987;
(25) Measures on the implementation of Law of the People's Republic of
China on Prevention and Control of Water Pollution, executed since Jan.1st, 2001;
(26) The interim regulations on the construction waste dregs clearance in
Wuhan city (No.24, ordinance of Wuhan municipal government);
(27) Regulations on the implementation of the environmental impact
assessment of Wuhan city (No.169, ordinance of Wuhan municipal government);
(28)The announcement of the Wuhan municipal government’s on prevention
and control about the noise pollution on the construction sites (No.24 [1995],
Wuhan municipal government);
(29) Notice of the Provisions on the Grading Approval of EIA Documents of
Construction Projects by Environment Protection Bureau of Wuhan, (No.47
[2003], Environment Protection Bureau of Wuhan);
(30) Regulations on the urban appearance, environment and sanitation in
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
13
Wuhan city;
(31) Announcement on municipal governmental further strengthening on the
construction waste dregs management (No.25, [2003], Wuhan municipal
government;
(32) Construction Project construction site management provisions.
1.4.21.4.21.4.21.4.2 TheTheTheThe relevantrelevantrelevantrelevant documentsdocumentsdocumentsdocuments ofofofof thethethethe WorldWorldWorldWorld BankBankBankBank
(1) The World Bank: OP/BP4.01 and its attachment-environment assessment,
Jan, 1999;
(2) The World Bank: OP/ (environment assessment), Jan, 1999;
(3) The World Bank: GP4.01 (environment assessment), Jan, 1999;
(4) Information compilation of the environmental impact assessment;
(5) The World Bank: OP/ BP 4.12-Non-voluntary Migration, June, 1990;
(6) The World Bank: OP/ BP 4.12, the participation of the non-governmental
organization in the financial help from the World Bank;
(7) The World Bank Operational Manual -the protection of the culture in the
World Bank finance project. (OP4.11);
(8) The World Bank’s security policies.
1.4.1.4.1.4.1.4.3333 PlanningPlanningPlanningPlanning DocumentsDocumentsDocumentsDocuments
(1) Master planning of Wuhan city (2006~2020);
(2) Master planning of the land utilization of Wuhan;
(3) The public transportation development planning of Wuhan city
(2004~2020);
(4) The environmental protection planning during the eleventh five-year plan
of Wuhan city;
(5) The second ring-road construction planning of Wuhan city, December,
2004.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
14
1.4.41.4.41.4.41.4.4 TechnicalTechnicalTechnicalTechnical specificationspecificationspecificationspecification
(1) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, General, atmosphere
environment, surface water environment, (HJ/T2.1~2.3- 93);
(2) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, atmosphere environment,
(HJ2.2-2008);
(3) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, atmosphere environment,
acoustic environment (HJ/T2.4-1995);
(4) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, General, atmosphere
environment, Non -Pollution EIA (HJ/T19-1997);
(5) Industrial standards of the PRC, Road construction environmental impact
assessment specification (JTG B03—2006);
(6) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, Principle and technical methods
for functional zoning of ambient air quality (HJ14-1996);
(7) Environmental protection industrial standards of the PRC, Technical
Guidelines for Environmental Impact Assessment, Technical specifications
applicable to areas for environmental noise of urban area (GB/T15190 -1994);
(8) Code for design and construction of automobile gasoline and gas filling
station (GB50156 -2002);
(9) Method for Estimation of Air Pollution from Vehicular Emission in Urban
Area (HJ/T180-2005), State environmental protection Administration;
(10) The Technical Specification for Environmental monitoring, State
environmental protection Administration;
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
15
1.4.51.4.51.4.51.4.5 DocumentsDocumentsDocumentsDocuments ofofofof EnvironmentEnvironmentEnvironmentEnvironment FunctionFunctionFunctionFunction zoningzoningzoningzoning
(1) The notice of the General Office of municipal government on forwarding
the function zoning of the ambient acoustic quality in urban area of Wuhan city
(NO.203, [2006], the General Office of municipal government);
(2) The notice of the environmental protection bureau of Wuhan city on the
variation of the function zoning of the ambient acoustic quality for the standard I
in the East Lake beauty spot .(No.25,[2006], the environmental protection bureau
of Wuhan city);
(3) The notice of the General Office of municipal government on forwarding
the function zoning of the ambient air quality in Wuhan city (NO.85, [2006], the
General Office of municipal government);
(4) The notice of the General Office of municipal government on the official
reply to the surface water environment function zoning and the provisions on
classification of the drinking water sources reserve of the centralized surface
water. (No.74, [2000], the General Office of provincial government);
(5) Water function zoning of Hubei Province (No.42 [2003] Hubei
Hydrographic and Water Resources Bureau);
(6) Surface water ambient function zoning of Wuhan city (July, 1997, Wuhan
municipal government);
(7) Provisions on classification of the drinking water sources reserve of the
centralized surface water (November, 1991).
1.4.61.4.61.4.61.4.6 ProjectProjectProjectProject DocumentsDocumentsDocumentsDocuments
(1) The pre-feasibility study report on the Wuhan urban traffic project
(phase-II) with the loans from World Bank;
(2) Memorandum of the World Bank assessment group for the Wuhan urban
traffic project (phase-II) (March 2nd~10th, 2009);
(3) Memorandum of understanding of the World Bank assessment group for
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
16
the Wuhan urban traffic project (phase-II) (April 8th ~10th, 2009);
(4) General Feasibility Study Report (Pre-evaluation Draft) for Wuhan
Municipal Traffic Project(Phase II) World Bank Loan(2009.5)
(5) Feasibility Study Report (Pre-evaluation Draft) for Public traffic priority
corridors improvement(2009.5)
(6) The certificate of entrustment of the environmental impact assessment.
1.51.51.51.5 EvaluationEvaluationEvaluationEvaluation StandardStandardStandardStandard
1.5.11.5.11.5.11.5.1 EnvironmentalEnvironmentalEnvironmentalEnvironmental StandardStandardStandardStandard
(1) Noise
Referring to the table 1.5-1 for applicable acoustic environment standards:
Table 1.5-1 SummarySummarySummarySummary ofofofof applicableapplicableapplicableapplicable standardsstandardsstandardsstandards ofofofof acousticacousticacousticacoustic environmentenvironmentenvironmentenvironmentEnvironmental
Factors Standard No. Standard Name Standard Value andGrade (Category)
ApplicationScope Remarks
Acousticenvironment GB3096-2008
Quality Standardfor AcousticEnvironment
Type 4a Area:Daytime:70dB(A)
Nighttime:55dB(A)
The front rowof residential
area facingstreet
Buildingsmore than 3floors facing
streetInterfacing
areasapplicable for
type 2 & 3standard and
30 & 20meters
separately farfrom roads
boundary line
Buildings nomore than 3floors facing
street
Type 3 Area:Daytime:65dB(A)
Nighttime:55dB(A)
WithinDaishan and
Dijiaoindustrial park
Type 2 Area:Daytime:60dB(A)
Nighttime:50dB(A)
Other sensitivepoints
Includingschool
classroomsand
hospitalswithin type
4 area
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
17
(2) Vibration
Referring to Table 1.5-2 for applicable Vibration Environmental Standards
Table 1.5-2
ApplicableApplicableApplicableApplicable StandardsStandardsStandardsStandards forforforfor VibrationVibrationVibrationVibration environmentalenvironmentalenvironmentalenvironmental impactimpactimpactimpact AssessmentAssessmentAssessmentAssessment
(3) Ambient Air
① Functional zone
According to the notice of the General Office of municipal government on
EnvironmentalFactors Standard No. Standard Name Standard Value and
Grade (Category)Application
Scope Remarks
Acousticenvironment
GB12348-2008
EmissionStandard forEnvironmental
Noise atBoundary ofIndustrialEnterprises
Type 2 Area:Daytime:60dB(A)
Nighttime:50dB(A)
1meter frombus depot(Gangdu
Garden, SanJin Tan, TianShun Yuan)and Jin YinTan ground
floor parkingarea
GB12523-90 Noise limits forconstruction site
Constructionsite boundary
relevant tosensitive area
Standard No. Standard Name Standard Value and Grade Application ScopeCriterion for
StandardSelection
GB10070-88
Standard forEnvironmental
Vibration in UrbanArea
Standard for Residentialand Cultural andeducational Area:
Daytime:70dBNighttime:67dB
Sensitive points withintype 1 area in noise
function area
Referring tothe noise
function areatype to decide
gradingstandard
Mixing Area:Daytime:75dB
Nighttime:72dB
Sensitive points withintype 2 area in noise
function areaIndustrial Area:Daytime:75dB
Nighttime:72dB
Sensitive points withintype 3 area in noise
function areaStandards for Traffic
Artery Sides:Daytime:75dB,Nighttime:72dB
Sensitive points withintype 4a area in noise
function area
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
18
forwarding they function zoning of the ambient air quality of Wuhan city No. 178,
2006, the environment air Functional zone for this project is type 2 in Ambient Air
Quality Standard (GB 3095—1996).
② Applicable standard
According to the location of Functional zone of this project, class2 of
Ambient Air Quality Standard shall be followed as table 1.5-3
Table 1.5-3 AmbientAmbientAmbientAmbient AirAirAirAir QualityQualityQualityQuality StandardStandardStandardStandard Class2Class2Class2Class2
(4) Surface Water
① Functional zone
According to Wuhan Surface Water Functional Zone Classification (Wuhan
municipal government, July 1997), Class V standard of Environmental Quality
Standard for Surface Water (GBZB1-1999) shall be applied for the waters using
for agriculture crossing Zhujia River of extension line of Jiefang Avenue for this
project.
② Applicable standard
To apply class V standard of Environmental Quality Standard for Surface
Pollutant Time for valuing Concentration Limit
SO2(mg/m3)
Annual Average Value 0.06
Daily Average Value 0.15
1h Average Value 0.50
NO2(mg/m3)
Annual Average Value 0.08
Daily Average Value 0.12
1h Average Value 0.24
Inhalable Particles PM10(mg/m3)Annual Average Value 0.10
Daily Average Value 0.15
CO(mg/m3)Daily Average Value 4.00
1h Average Value 10.00
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
19
Water (GB3838-2002) for the waters function of crossing Zhujia River for this
project as the following table 1.5-4:
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
20
Table 1.5-4 Unit: mg/L
ClassClassClassClass IIIIIIIIIIII &&&& VVVV StandardStandardStandardStandard forforforfor SurfaceSurfaceSurfaceSurface WaterWaterWaterWater EnvironmentalEnvironmentalEnvironmentalEnvironmental QualityQualityQualityQuality
1.5.21.5.21.5.21.5.2 StandardStandardStandardStandard forforforfor PollutantPollutantPollutantPollutant DischargeDischargeDischargeDischarge
(1) Noise
① Construction noise
Noise Limits for Construction Site GB12523-90 shall be applied during
construction period as table 1.5-5
Table 1.5-5 NoiseNoiseNoiseNoise LimitsLimitsLimitsLimits forforforfor ConstructionConstructionConstructionConstruction SiteSiteSiteSite Unit: LAeq (dB)
Notes:1.The noise listed is the limit value of construction boundary corresponding to sensitive area.2.The noise value shall be subject to the highest one if there are several construction items going on
together.
②Boundary noise
It shall comply with class II standard in Emission Standard for Environmental
Noise at Boundary of Industrial Enterprises GB12348-2008 for bus depot and
vehicle parking area boundary as table 1.5-6
Pollutant pH COD BOD5 Ammonia Nitrogen Petroleum LAS
Type V Standard 6~9 40 10 2.0 1.0 0.3
Construction PeriodMain Noise Source Noise Limit
Daytime Nighttime
Earthwork and rockwork Bulldozer, diggers, loader, etc. 75 55
Piling Different pile drivers, etc. 85 Construction forbidden
Structure Concrete mixer, vibrator, electricalsaw 70 55
Decoration Crane, elevator, etc. 65 55
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
21
Table 1.5-6 Unit: Equivalent sound level Leq [dB (A)]
StandardsStandardsStandardsStandards forforforfor NoiseNoiseNoiseNoise atatatat BoundaryBoundaryBoundaryBoundary ofofofof IndustrialIndustrialIndustrialIndustrial EnterprisesEnterprisesEnterprisesEnterprises
(2) Emissions of Air Pollutant
① It shall comply with class2 standard of Integrated Emission Standard of
Air Pollutants (GB16297-1996) for the exhaust emission during construction
period as table 1.5-7
Table 1.5-7 IntegratedIntegratedIntegratedIntegrated EmissionEmissionEmissionEmission StandardStandardStandardStandard forforforfor AirAirAirAir PollutantsPollutantsPollutantsPollutants
②Motor vehicle exhaust shall follow the following standards: Light Vehicle
Contamination Emission limits and Measuring Method (I) (GB18352.1-2001),
Light Vehicle Contamination Emission limits and Measuring Method (II)
(GB18352.1-2001), Vehicle Compression Ignition Engine Exhaust Contaminant
Emission Limits and Measuring Method (GB17691-2001) the second period of
time, Vehicle Spark-ignition Engine and P.I Engines Exhaust Contaminant
Emission Limits and Measuring Method (GB14762-2002), Auto bike and Light
Auto bike Exhaust Contaminant Emission Limits and Measuring Method (Idle
Speed Method) (GB14621-2002), Auto bike Exhaust Contaminant Emission Limits
Type Daytime Nighttime
II 60 50
Pollutant
Maximumpermissible emission
concentration(mg/m3)
Maximum permissible emissionfrequency (kg/h)
Monitored emissionconcentrationlimitation in
disorderly way(mg/m3)
Exhaust pipeheight (m)
Class2 emissionstandard
Particulate matter 120
15 3.5Maximum
concentration foroutside 1.0
20 5.9
30 23
Petroleum fumes 75
15 0.18 Emission shall notbe allowed for
production facilitiesin disorderly way.
20 0.30
30 1.3
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
22
and Measuring Method (ASM) (GB14622-2002), Light Auto bike Exhaust
Contaminant Emission Limits and Measuring Method (ASM) (GB18176-2002),
Off-road Movable Industrial Diesel Engine Exhaust Contaminant Emission Limits
and Measuring Method (I & II in China),etc;
(3) Sewage
This project is mainly for the urban roads. The sewage shall be discharge to
the urban sewer and finally runs into sewage disposal work. The emission standard
shall meet requirements of class3 of Integrated Waste Water drainage Standard as
table 1.5-8.
Table 1.5-8 SewageSewageSewageSewage DischargeDischargeDischargeDischarge StandardStandardStandardStandard Unit: mg/l
1.61.61.61.6 ObjectiveObjectiveObjectiveObjective ofofofof environmentalenvironmentalenvironmentalenvironmental protectionprotectionprotectionprotection
1.6.11.6.11.6.11.6.1 ObjectiveObjectiveObjectiveObjective ofofofof environmentalenvironmentalenvironmentalenvironmental protectionprotectionprotectionprotection forforforfor water,water,water,water, atmosphereatmosphereatmosphereatmosphere andandandand soundsoundsoundsound
In accordance with the site investigation, there isn’t the objective of water
environmental protection in the proposed land near the Public traffic priority
corridors improvement sub-project, the main protection objective of the
environmental atmosphere and sound environment for the project is the residential
area within the scope of 200m at the origin and destination station of Gangdou
Garden, there aren’t such sensitive areas as the residential areas, schools and
hospitals within the scope of 200m at the parking lot of Jinyintan and origin and
destination station of public traffic for Tianshunyuan Garden as well as junction
station of Sanjintan. The objectives of the origin and destination station of
Helaowan refer to Table 1.6-1.
Pollutant pH COD BOD5 SSanimal andvegetable
oil
Ammonianitrogen Petroleum LAS
Class3standard 6~9 500 300 400 100 / 20 20
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
23
Table 1.6-1
ListListListList ToToToTo thethethethe ObjectivesObjectivesObjectivesObjectives ofofofof EnvironmentalEnvironmentalEnvironmentalEnvironmental ProtectionProtectionProtectionProtection forforforfor PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority
corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projectsub-projectsub-projectsub-project
Note: A2—The ambient air reaches the secondary standard of Ambient Air Quality Standard(GB3095-1996);
N1—Acoustic ambient reaches the first class standard of Standard Of Environmental Noise OfUrban Area(GB3096-93).
1.6.21.6.21.6.21.6.2 ProtectionProtectionProtectionProtection objectiveobjectiveobjectiveobjective forforforfor socialsocialsocialsocial enviromentenviromentenviromentenviroment
The main objective of for the social environment protection refers to the
residents involved with and affected by the removal of project. There is not the
removed project for this subitem.
Public traffic prioritycorridors improvement sub-
projectSensitive spots Location
Distance to theboundry of thefactory (m)
Requirement ofenvironmental
protection
Origin and destination stationof Gangdou Garden
LvjingyuanGarden N 40 A2,N1
Midea Garden W,N 80 A2,N1
Wufeng Village W,S 15 A2,N1
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
24
2222 EnvironmentalEnvironmentalEnvironmentalEnvironmental impactimpactimpactimpact andandandand releasingreleasingreleasingreleasing measuresmeasuresmeasuresmeasures
Public traffic priority corridors improvement sub-project promotes the
development of urban public traffic for Wuhan City and meets the requirement of
urban expanding as well as releases the traffic pressure of road net in the urban
center. Although the construction and the operation shall inevitably produce some
impact on the environment,after the corresponding environmental measures are
taken,the adverse impact to the project shall be effectively controlled.Based on the
environmental impact report for this project, the releasing measures to impact the
environment for design,construction and operation are summed up, the details refer
to table 2-1.
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
25
Table 2-1
ListListListList totototo EnvironmentalEnvironmentalEnvironmentalEnvironmental ImpactImpactImpactImpact andandandand ControlControlControlControl MeasuresMeasuresMeasuresMeasures forforforfor PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projectsub-projectsub-projectsub-projectType of
itemsPotentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
A.A.A.A. DesignDesignDesignDesign andandandand feasibilityfeasibilityfeasibilityfeasibility studystudystudystudy phasephasephasephase
Site option
Influence toperiphery
residents; thefarmer’s land is
requisitioned
Futher optimizing the selected site andminimizing the impact to theperiphery residents and land requisitionarea
Design organization Reserve fundsfor project
Project managementoffice for utilizingforeign investment
of WuhanMunicipality
ProjectManagement office
for UtilizingForeign Investment
of WuhanMunicipality
Design proposalfor public traffic
station
Beforeconstruction
Design forpublic traffic
station
The peripherylandscape isdamaged.
①Special design shall be made for theafforestation of public traffic station.②Greening percentage is not less than25%; greening area of origin anddestination station in Jinyintan is3056m2,with 32.14% in greeningpercentage; greening area at origin anddestination station in Gangdou Gardonis 1892 m2,with 25.02% in greeningpercentage; greening area at origin anddestination station in Tianshunyuan is2085 m2,with 26.2% in greeningpercentage; total greening area forparking lot of Jinyintan is 7026 m2,with45.5% in greening percentage.
Design organization 351.48
Project ManagementOffice for UtilizingForeign Investment
of WuhanMunicipality
ProjectManagement Office
for UtilizingForeign Investment
of WuhanMunicipality
UrbanAfforestation Rules
of WuhanMunicipality(2004
)
Beforeconstruction
The surfacewater is
contaiminatedby the drainedwaste water.
After the domestic sewage at the publictraffic station is treated by the sump, itis drained into urban sewage pipelineand finally drained into urban sewagetreatment plant. The origin anddestination station of Gangdou Gardenis located in the scope of LuobuzuiSewage Treatment Plant; the publictraffic junction station of Sanjintan islocated in the scope of Sanjintan Sewag
Design organization 93.12
Project ManagementOffice for UtilizingForeign Investment
of WuhanMunicipality
ProjectManagement Office
for UtilizingForeign Investment
of WuhanMunicipality
SewageComprehensivedrainage Standard(GB8978-1996)
Beforeconstruction
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
26
Type ofitems
Potentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
e Treatment Plant; the origin anddestination station of Gangdou Gardenand parking lot of Jinyintan arelocated in the scope of Hanxi SewageTreatment Plant
B.B.B.B. ConstructionConstructionConstructionConstruction stagestagestagestage
①The construction organization mustproperly transact the drainageprocedure of surplus mud and dregsin the local environmental healthmanagement department according tothe regulation( the application shouldbe offered by the constructionorganization, the review and approvalshall be made by the dregs office ofenvironmental health managementdepartment), the dregs disposal feesshall be handed over according to therelated regulation, after the approval isgotten, the construction organizationcan dispose the dregs in the specifiedbackfilling yard of constructiondregs(after the dumped soil is centrallyembedded and covered, the greeningshall be carried out,the embedment iscarried out by Environmental HealthBureau of Wuhan Municipality )②When transporting the dregs,theplugging transportation should bemade in accordance with the stipulationto avoid the raising dust.③Strengthing the management ofbackfilling earthwork stockpiling yard,preparing such measures as earthworksurface compaction,regular sprinklingand covering; the unnecessary earth and
Contractor( the design
organization shall beresponsible for
collecting it intobidding documents)
10.0Project funds
included in thecontract
ProjectManagement Office
for UtilizingForeign Investment
of WuhanMunicipality;Bureau of
EnvironmentalProtection of
WuhanMunicipality;
EnvironmentalSupervising
Dregs volume TSP( The details referto table 4.3-1) 、《Construction
Projectconstruction site
managementprovisions》
Supervisor:supervisingeveryday
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
27
Type ofitems
Potentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
construction material slags should bepromptly hauled away, long-termstockpiling is not allowed.④The construction should be carriedout within the red line, the stockpilingearth and stockpiling materials shouldnot be invaded into the adjacent fieldand road.⑤Properly carrying out thereasonable blending work, theprotective measures should be takenin the temporary spoil stockpiling spotand the rain erosion should be avoidedto produce water loss and soilerosion,pollution of water body andblockage of water pipeline.⑥Executing the necessary raisingdust monitoring in construction.
BRT andPublic traffic
stationconstruction
Influcing thesite traffic and
transplanting ofstreet trees
①Establishing the guardrail and trafficindicator②Strictly prohibiting the operation ofequipments with high noises andvibration at noon or at nignt, themechanical equipments with low noisesor the equipments with sound insulationand noise elimination should beselected by construction organization③When the wind is strong, watersprinkling should be made.
④Prior to construction, the employershould go to the Bureau of UrbanUtilities and Landscaping of WuhanMunicipality to transact relevanttransplanting formality, thetransplanting shall be made by theBureau of Urban Utilities andLandscaping of Wuhan Municipality.
Contractor( the design
organization shall beresponsible for
collecting it intobidding documents
0.5Project funds
included in thecontract
ProjectManagement Office
For UtilizingForeign Investment
of WuhanMunicipality;Bureau of
EnvironmentalProtection Of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Stationof Wuhan
Municipality;Bureau of Urban
Utilities andLandscaping of
Wuhan Municipalit
Raising dust(thedetails refer to 4.3-1)street streets 、《Construction
Projectconstruction site
managementprovisions》
Supervisor:supervisingeveryday
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
28
Type ofitems
Potentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
y
Constructionsite of public
trafficstation
Constructionsite affects the
pedestriansafety and
pollutes the air.
①Establishing the site installingindicator, noting the main content andconstruction time. The inconveniencedue to construction hopes to beunderstood,please, indicating thelinkman and complaint hotline.② The construction site should besealed.③When the wind is strong, watersprinkling should be made.④When the construction is complteted,promptly restore the ground road andvegetation within the construction site.⑤After the construction waste water issettled, it is drained into municipal pipenetwork, the domestic sewage is treatedthrough sump.
Contractor( the design
organization shall beresponsible for
collecting it intobidding documents)
16.5Project funds
included in thecontract
WuhanMunicipality;Bureau of
EnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Stationof Wuhan
Municipality;Bureau of Urban
Utilities AndLandscaping of
WuhanMunicipality
Complaintcondition of public、《Construction
Projectconstruction site
managementprovisions》
Supervisor:supervisingeveryday
The peripheryresidents are
affected by theconstruction
noise
①High noise equipment is strictlyprohibited to be used.②The night construction for origin anddestination station of Gangdou Gardenand Jinyintan Parking Lot should beavoided.③The night construction should bereported to Bureau of EnvironmentalProtection of Wuhan Municipality forapproval and filing, and the prior publicnotice to such sensitive spots asresidents and hospitals.④Noise monitoring at night should becombined with adjacent sensitive spotsfor night construction.
Contractor( the design
organization shall beresponsible for
collecting it intobidding documents
8.0Project funds
included in thecontract
WuhanMunicipality;Bureau of
EnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Stationof Wuhan
Municipality;Bureau of Urban
Utilities andLandscaping of Wu
Noise atconstruction
site(the detailsrefer to 4.3-1) 、
《ConstructionProject
construction sitemanagementprovisions》
Supervisor:supervisingeveryday
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
29
Type ofitems
Potentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
han Municipality
The adjacenttraffic isaffected
①Preparing the plans for roadleading,distributary and temporaryaccess and establishing the trafficleading indicator with enough quantityas well as issuing a notice to reassurethe public making using ofbroadcast,television and newspaper.②The construction organization shouldcontact with the relateddepartments(such as:Power SupplyBureau and Running-water Company todetermine the pipeline leading proposal.③In construction, when the culturalrelics is found,the excavation operationshould be stopped and the relatedcondition should be reported to localcultural relics protectiondepartment.The excavation work shouldnot be resumed until the competentdepartment has completed the appraisalwork for cultural relics and thenecessary protection measures has beentaken.④The hanging height and direction ofconstruction lamp should be taken intothe account of not influencing the nightrest of residents.
Contractor( the design
organization shall beresponsible for
collecting it intobidding documents)
2.0Project funds
included in thecontract
ProjectManagement Office
for UtilizingForeign Investment
of WuhanMunicipality;Bureau of
EnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Stationof Wuhan
Municipality
Complaintcondition of
public、《Construction
Projectconstruction site
managementprovisions》
Supervisor:supervisingeveryday
C.C.C.C. OperatingOperatingOperatingOperating phasephasephasephase
Operating ofpublic traffic
station
The operationnoise affecting
the adjacentresidents
①Strictly controlling the in and outtime of vehicle, prohibiting passing thein and out stations at night (22:00~6:00)to ensure the residents not to bedisturbed at night.②Necessary monitoring shouldbe carried out for the noise at the plant
Public TrafficCompany of Wuhan
Municipality4.5
Project fundsincluded in the
contract
Bureau ofEnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Station
Noise at theboundry of
plant( the detailsrefer to table4.3-1)
After operation
WuhanM
unicipalTrafficProject(Phase2)WorldBankLoan
EMP----Publictrafficprioritycorridorsim
provement
■■
■■
30
Type ofitems
Potentialimpact Releasing measures Implementation
organization
Estimated cost(RMB 1
thousand)Capital source Supervising
organization Supervising index Frequency
boundry. of WuhanMunicipality
Wasted gaspolluting theatmosphere
Necessary monitoring shouldbe carried out.
Public TrafficCompany of Wuhan
Municipality9.0
Project fundsincluded in the
contract
Bureau ofEnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring Stationof Wuhan
Municipality
NO2 and CO ( thedetails referring to
table4.3-1)After operation
Wasted waterdischargingpolluting the
river
①Ensuring the normal operation ofsewage treatment facilities②Discharging after reaching thestandards
Public TrafficCompany of Wuhan
Municipality2.0
Project fundsincluded in the
contract
Bureau ofEnvironmentalProtection of
WuhanMunicipality;Envir
onmentalSupervising and
Monitoring StationOf Wuhan
Municipality
①Dischargingafter reaching the
standards②BOD5,CODCr,
ammonian andpetroleum (Thedetails refer totable 4.3-1)
After operation
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
31
3333 EnviromentalEnviromentalEnviromentalEnviromental ManagementManagementManagementManagement andandandand MonitoringMonitoringMonitoringMonitoring PlansPlansPlansPlans
3.13.13.13.1 PurposePurposePurposePurpose ofofofof EnviromentalEnviromentalEnviromentalEnviromental ManagementManagementManagementManagement
The EMP for Public traffic priority corridors improvement sub-project shall
give the specification in such contents as environment releasing measures,
environment management ,environment supervising and environment monitoring,
which shall be the guidance document to implement these acitivities. Its functions
are as follows:
(1) Definiting the environmental releasing measures of affecting the
objectives.
Project Management Office for Utilizing Foreign Investment of Wuhan
Municipality, environmental impact assessment organization and design
organization specifically review and verify the affected objective at site as well as
propose the effective environmental releasing measures to collect it into the project
design.
(2) Providing the guidance document on environmental management and
monitoring
After the EMP is reviewed by the World Bank, it shall be served as
environmental protection document to be provided for the construction supervising
organization, environment monitoring organization and other relevant
organizations in construction and operation period.
(3) Definiting the responsibilities and functions of related organizations
The responsibilities and functions of related functional departments and
management authorities should be definited, and the communication channels and
modes should be proposed.
(4) Proposing the environmental monitoring plan in the period of construction
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
32
and operation.
In order to ensure the effective implementation of environment releasing
measures and earlier treat the unforeseen or abrupt environmental issues, this EMP
proposes the environmental monitoring plan in the period of construction and
operation.
3.23.23.23.2 EnvironmemtalEnvironmemtalEnvironmemtalEnvironmemtal managementmanagementmanagementmanagement andandandand monitoringmonitoringmonitoringmonitoring organizationorganizationorganizationorganization
3.2.13.2.13.2.13.2.1 EnvironmemtalEnvironmemtalEnvironmemtalEnvironmemtal managementmanagementmanagementmanagement organizationorganizationorganizationorganization
In accordance with the relevant regulation and the requirement of actual
project, the Public traffic priority corridors improvement sub-project should
establish environmemtal management organization to be responsible for such
works as environmental management, environmental monitoring and
environmental supervising, the frame diagram of environmental management and
supervising organization for Public traffic priority corridors improvement sub-
project refers to diagram 2.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
33
Bureau of Environmental Protection ofWuhan Municipality
Urban construction fund management office of
Popele’s Government of Wuhan City
Environmetal appraisal department for Project
management office for utilizing foreign investment
of Wuhan MunicipalityPPPPerioderioderioderiod ofofofof
designdesigndesigndesign andandandand constructionconstructionconstructionconstructionD
esig
nor
gani
zatio
n
Con
stru
ctio
nco
ntra
ctin
gor
gani
zatio
n
Supe
rvis
ing
for
proj
ect
envi
rom
ent
Office of public traffic subitems
Popele’s Government of Wuhan CityBureau of Environmental Protection
of Hubei Province
Envi
rom
enta
lmon
itori
ngst
atio
nof
Wuh
anC
ityDiagramDiagramDiagramDiagram 2222 FrameFrameFrameFrame diagramdiagramdiagramdiagram ofofofof environmentalenvironmentalenvironmentalenvironmental managementmanagementmanagementmanagement organizationorganizationorganizationorganization forforforfor PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority
corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projectsub-projectsub-projectsub-project forforforfor WuhanWuhanWuhanWuhan municipalmunicipalmunicipalmunicipal urbanurbanurbanurban traffictraffictraffictraffic (Phase(Phase(Phase(Phase II)II)II)II)
The specific responsibilities of various environmental management and
execution organization for Wuhan Municipal Traffic Project(Phase II)World Bank
Loan:
(1) Project Management Office for Utilizing Foreign Investment of Wuhan
Municipality
Responsibilities: taking charge of the feasibility study of organizing the
project construction; arranging 1 special management personnel at least in the
management office; being responsible for the environmental management of
Public traffic priority corridors improvement sub-project;reviewing the specific
EnvironmentalEnvironmentalEnvironmentalEnvironmental managementmanagementmanagementmanagement andandandand executionexecutionexecutionexecution organizationorganizationorganizationorganizationEnviromentalEnviromentalEnviromentalEnviromental supervisingsupervisingsupervisingsupervising organizationorganizationorganizationorganization
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
34
requirement on environmental management in the bidding document and the
contract; being responsible for the environmental protection work of Public traffic
priority corridors improvement sub-project;preparing the environmental
management rules of environmental protection plan and design.
(2)Office of public traffic subitems
Responsibilities: taking charge of such construction and management works
as preliminary design,inviting and submitting bids, construction
organization,contract manmagement and quality control, arranging 1 special
management personnel.
Principle of organization management: the Public traffic priority corridors
improvement sub-project for Wuhan City shall strictly conform to the related
domestic law and regulations and the construction procedure of the infrastructural
construction project and related requirement of World Bank to execute the
standardized management and ensure the smooth implementation of the works.
①Office of public traffic subitems preferentially select such organizations as
design,goods supply, construction and supervising,for the individual minor works
and a small quantity of material purchasing the contracted mode shall be adopted
to determine the construction organization and goods supply organization. The
necessary qualification review should be exeuted for the selection of the
construction organization for the works.
②Such organizations as design, goods supply,construction and supervising
should fulfill the necessary law procedure with the legal entity of this project and
undertake the corresponding responsibility for breach of the contract.
(3)The contracting organization for the construction
Responsibilities: The contracting organization for the construction should
organize the construction in accordance with the requirement of works contract
and various environmental protection laws prepared by state and local
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
35
governments, and the civilized construction and environmental protection shall be
conducted according to the various environmental measures and suggestions of
environment assessment report,in addition,Wuhan Environmental Monitoring
Station shall be entrusted to carry out the environmental supervising work during
the construction.
The contracting organization for the construction should arrange 1 special
(part-time) environment management personnel in various conctruction sites
responsible for the site control and management,especially for high noise.The
construction time for the high vibration construction equipment should be strictly
controlled.
(4)Project environmental supervising
Project environmental supervising shall be undertaken by the project
supervising organization, 1 environmental engineer at least should be served as
for each sunitem, whose specific responsibilities are:
① Monitoring and inspecting the production and domestic sewage treatment
and the control measures for wasted gas,dust and noise as well as the
environmental protection work in the immigrant settlement district;
② Observing the influence on the periphery crowds due to construction and
determining whether the additional protective measures should be adopted or not.
③ Proposing the solution proposal to the construction contarctor on
environmental protection in the construction and preparing the monthly report of
environmental supervising.
(5)Wuhan Environment Monitoring Station
Responsibilities: regularly or irregularly monitoring the environmental
monitoring index of water,air and sound in the project construction area and
influence area as well as during operation and submitting the environmental
monitoring report to the Project Management Office of Wuhan City.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
36
3.2.23.2.23.2.23.2.2 EnvironmentEnvironmentEnvironmentEnvironment supervisingsupervisingsupervisingsupervising organizationorganizationorganizationorganization
Environment supervising organization for the road improvement subitem of
Wuhan Municipal Traffic Project(Phase II) World Bank Loan is composed of
Project Management Office for Utilizing Foreign Investment Of Wuhan
Municipality, Bureau of Environmental Protection of Wuhan Municipality and
Bureau of Environmental Protection of Hubei Province, the phase implementation
shall be made by the supervising organization:
(1) Feasibility study phase and preliminary design phase
① Project Management Office for Utilizing Foreign Investment of Wuhan
Municipality is responsible for the environmental protection and environment
influence report compilation.
② Bureau of Environmental Protection of Hubei Province is completely
responsible for the environmental management of the project, reviewing the
environment influence report and guiding the Bureau of Environmental Protection
of Wuhan Municipality to fufill each regulation as well as as-built acceptance of
environmental protection facilities.
Bureau of Environmental Protection of Wuhan Municipality monitors and
manages the environmental protection of road improvement subitem, organizes
and coordinates the environmental protection service of road improvement
subitem and monitors the implementation of environment action plan as well as
takes charge of the as-built acceptance of environmental protection facilities.
(2) Construction stage: it is taken charge by the project management office
and Bureau of Environmental Protection of Hubei Province. Bureau of
Environmental Protection of Wuhan Municipality accepts the work guidance from
Bureau of Environmental Protection of Hubei Province, the supervising
construction organization implements the environment action plan and execute the
regulation and standard of related environment management; properly
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
37
coordinating environmental protection work among each departments; being
responsible for the construction,as-built acceptance and inspection of operation as
well as supervising management of the project environment protection facilities.
The specific responsibilities are:
① In accordance with the related state construction management rules and
operation specification, combined with the pollution prevention measures
proposed in the specific construction plan and environment assessment report of
the road works, the pertinent environmental management methods and detailed
environmental protection management plan should be prepared, especially for the
training on environment knowledge and environment monitoring to the project
contractor and environment engineer.
② Regularly inspecting the construction site, monitoring the execution
condition of environment management methods for the construction organization
and promptly holding down and rectifying the construction actions not
conforming to the management methods.
③Investigating and handling the disturbing residents and pollution issues
produced in construction.
(3) Operation phase
The supervision shall be made by Bureau of Environmental Protection of
Hubei Province,Bureau of Environmental Protection of Wuhan Municipality and
the project competent department. The project competent department shall be
responsible for executing the environmental protection measures proposed in the
environmental protection regulation and standard and environment assessment
report during the operation and reporting the exeution conditions of
environmental protection regulation and standard as well as measures.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
38
3.33.33.33.3 EnvironmentEnvironmentEnvironmentEnvironment managementmanagementmanagementmanagement procedureprocedureprocedureprocedure
Environmental protection management procedure for Public traffic priority
corridors improvement sub-project refers to Diagram 3.
Pre-evaluation
Evaluation
Formalevaluation
Negotiation
Feasibility study forthe project
Statement of planned tasks
Preliminary design
Bidding document
Project construction plan
Project supervising
Bringing into service
Outline of assessment work for theenvironment influence
Assessment report for theenvironment
influence
Implementation plan of releasingmeasures( review of final text)
Supervision of Implementation plan ofreleasing measures
Inspecting for implementation plan ofreleasing measures and acceptance ofenvironmemtal protection facilities
Implementation plan of releasingmeasures( review of first draft)
Preparation forproject approval
Proposal for the project Preliminary analysis of theenvironment influence of the project
Effectiveimplementation
Approved bythe board
DiagramDiagramDiagramDiagram 3333 EnvironmentalEnvironmentalEnvironmentalEnvironmental protectionprotectionprotectionprotection managementmanagementmanagementmanagement procedureprocedureprocedureprocedure forforforfor PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority
corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projectsub-projectsub-projectsub-project
3.43.43.43.4 ContentContentContentContent ofofofof environmentenvironmentenvironmentenvironment managementmanagementmanagementmanagement
In order to effectively control the environmental pollution during the project
construction,not only the construction quality and progress of the works but also
the civilization degree of the project and the implementation condition of the
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
39
releasing measures for the environment influence and the contract provisions on
environmental protection should be monitored and inspected.
(1) When carrying out the ovrall contract construction, the construction
organization should list the environmental protection measures into the contract
document, requiring the strict fulfilling of the construction organization and
execution of penalty rules.
(2) The construction organization should organize the construction
conforming to the requirement of project contract and the various regulation on
environmental protection and environmental health prepared by the state and local
governments, and in accordance with various environmental protection measures
and suggestions proposed in the environmental assessment report, the civilized
construction and environmental protection shall be made.
(3) The works supervision organization shall be entrusted to arrange a special
environmental protection engineer to monitor the construction organization and
implement the various environmental protection measures during the construction.
(4) The construction organization should arrange special ( part-time)
environmental management personnel at the construction site to be responsible for
the site control and management of various polluted source.The construction time
should be strictly controlled especially for the construction facilities with high
noise and high vibration.
(5) Properly carrying out the popularization. Due to the limit of technology
condition and construction environment, even if the corresponding control
measures is adopted, the environmental pollution arising from the construction
still can’t be avoided. Therefore, the proper popularization to the residents
affected by the Public traffic priority corridors improvement sub-project should be
made to raise the mental bearing capacity of the personnel due to the adverse
impact and get the understanding as well as overcome the temporary difficulty,
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
40
coordinating with the construction organization to fluently complete the
construction tasks of the project.
(6) The construction competent department and construction organization
should establish the “Complaints Office” and complaint hotline to receive the
complaints from the crowds and solve the issues in the limited time by the special
personnel as well as appropriately treat the complaints from the citizens.
3.53.53.53.5 EnviromentalEnviromentalEnviromentalEnviromental supervisingsupervisingsupervisingsupervising managementmanagementmanagementmanagement planplanplanplan
Due to the larger difference of the environmental management content
between the construction period and operation period for the Public traffic priority
corridors improvement sub-project and the succession difference of the work time
limit between them, the separate organization should be established and the phase
responsibility mode should be adopted to conduct the environmental management
for the proposed project.
Enviromental supervising management plan for the Public traffic priority
corridors improvement sub-project during the project execution refers to Table
3.5-1
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
41
Table 3.5-1 ListListListList ofofofof EnviromentalEnviromentalEnviromentalEnviromental SupervisingSupervisingSupervisingSupervising ManagementManagementManagementManagement PlanPlanPlanPlan
Phase Supervisingorganization Supervising content Supervising purpose
Feasibility studyand preliminary
design phase
Bureau ofEnvironmental
Protection of HubeiProvince,Bureau of
EnvironmentalProtection of Wuhan
Municipality
1. Reviewing theenvironmental influencereport
1.Guaranteeing the completeenvironmental assessmentcontent,the proper subject andprominent emphasis.2.Guaranteeing thereflection of the potential andmajor issues.3.Guaranteeing the specificand practicableimplementation plan of themeasures to release theenvironment influence.
Construction phase
Bureau ofEnvironmental
Protection of HubeiProvince,Bureau of
EnvironmentalProtection of Wuhan
Municipality
1.Verifying whether theenvironmental protectioninvestment is implemented ornot.2.Inspecting the restorationof temporary land,vegetations and environment.3.Inspecting whether thetreatment of domesticsewage and constructionalwasted water reaches thedischarging standard.4.Inspecting the pollutioncontrol of dust and noise todetermine the constructiontime.5.Inspecting theenvironmental facilities toensure the final deadline.6.Inspecting whether theenvironmental protectionfacilities reach the standardor not.
1.Ensuring the investment ofenvironmental protection2.Ensuring the surface waternot to be polluted3. The constructional wastedwater should reach thestandard and doesn’t pollutethe surface water4.Ensuring the ecologicalenvironment and landresources not to be destroyedseriously and get restoration.5.Reducing the environmentalimpact arising fromconstruction and executing therelated environmentalprotection regulation andstandard.6.Ensuring “design,,,,construction and operation atthe same time”
7.Ensuring the normaloperation of environmentalprotection facilities.
Operation period
Bureau ofEnvironmental
Protection of HubeiProvince,Bureau of
EnvironmentalProtection of Wuhan
Municipality
1.Inspecting theimplementation ofmonitoring plan.2.Inspecting whether thefurther environmentalmeasures are taken ornot( unforeseen environmentissues may be produced)3.Inspecting Whether theenvironmental quality in thesensitive area meets thecorresponding qualitystandard or not.4.Inspecting the stockpilingand embedding conditions ofsolids waste.
1.Implementing themonitoring plan2.Earnestly protecting theenvironment3.Strengthening theenvironment management andearnestly protecting thehealth of the crowds.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
42
4444 EnviromentEnviromentEnviromentEnviroment supervisingsupervisingsupervisingsupervising planplanplanplan
4.14.14.14.1 PurposePurposePurposePurpose andandandand principleprincipleprincipleprinciple forforforfor preparingpreparingpreparingpreparing
The purpose to prepare the enviroment supervising plan is to supervise the
implementation of various measures. Based on the monitoring result, properly
adjust the environmental protection action plan to provide the basis for the
implementation time and proposal of the envirommental protection measures. The
preparing principle shall be based on the main environmental impact from the
expected and various period ( construction period or operation period).
4.24.24.24.2 MonitoringMonitoringMonitoringMonitoring organizationorganizationorganizationorganization
The environmental monitoring during the construction and the operation
shall be undertaken by Wuhan Environment Supervising Station, the undertaking
organization should be the certification organization for state environment quality
supervising with complete equipments and strong technology strength and
properly complete the undertaken environmental monitoring tasks.
4.34.34.34.3 EnviromentalEnviromentalEnviromentalEnviromental supervisingsupervisingsupervisingsupervising proposalproposalproposalproposal
Based on the project features of the public traffic and in accordance with the
period of construction and operation, the environmental monitoring proposal shall
be prepared, referring to table 4.3-1.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
43
Table 4.3-1
ListListListList ofofofof environmentalenvironmentalenvironmentalenvironmental monitoringmonitoringmonitoringmonitoring planplanplanplan forforforfor forforforfor thethethethe PublicPublicPublicPublic traffictraffictraffictraffic prioritypriorityprioritypriority
corridorscorridorscorridorscorridors improvementimprovementimprovementimprovement sub-projectsub-projectsub-projectsub-project duringduringduringduring thethethethe constructionconstructionconstructionconstruction andandandand operationoperationoperationoperation
Type Items
Monitoring proposal
Construction period Operation period
Express publictraffic station
Public trafficjunction; the
origin anddestination
station; parkinglot
Public traffic junction;the origin and
destination station;parking lot
Environmental air
Source of pollutant Dust of construction Vehicle exhaust
Supervising factor TSP NO2、CO
Executionstandard
Qualitystandard
Secondary standard (GB3095-1996)of Ambient Air Quality
Standard
Secondary standard(GB3095-1996)ofAmbient Air Quality
Standard
Exhaustingstandard /
Secondary standard(GB16297-1996)ofComprehensive Exhaust
Standard ofAtmospheric Pollutant
Monitoring position
Based on theprogress of theconstruction,
the monitoringposition shall be
selected
LiujingyuanGarden Liujingyuan Garden
Frequency of monitoringIn rush hours of construction 2
days /month; 1 time in themorning and afternoon every day
respectively
Once in the winerevery year,1-2 days
each time
Estimated cost( RMB 1 thousand ) 4.0 2.0 9.0
Implementationorganization
Wuhan Environment SupervisingStation
Wuhan EnvironmentSupervising Station
Supervising organizationProject Management Office forUtilizing Foreign Investment of
Wuhan Municipality
Project ManagementOffice for Utilizing
Foreign Investment ofWuhan Municipality
Environmetalnoise
Source of pollutant Noise of construction machinery Traffic noise
Supervising factor LAeq LAeq
Executionstandard
Qualitystandard
Standard of Enviromental Noioseof Urban Area(GB3096-93)
Standard ofEnviromental Noiose ofUrban Area(GB3096-
93)
Exhaustingstandard
Noise Limited Value at theBoundry of Construction Site
(GB12523-93)
Standard ofEnviromental Noiose atthe plant boundry ofIndustrial Enterprise
(GB12348-90)
Surveystandard
Survey Method of EnviromentalNoiose of Urban
Area(GB/T14623-93)
Standard ofEnviromental Noiose atthe plant boundry ofIndustrial Enterprise
(GB12349-90)
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
44
Type Items
Monitoring proposal
Construction period Operation period
Express publictraffic station
Public trafficjunction; the
origin anddestination
station; parkinglot
Public traffic junction;the origin and
destination station;parking lot
Monitoring position
Based on theprogress of theconstruction,
the monitoringposition shall be
selected
LiujingyuanGarden
Public traffic parkinglot; the origin and
destination station;inthe periphery of theplant boundry at the
parking lot
Frequency of monitoring 1day /month; 2 times every day( in the day, at night)
Monitoring once for as-built acceptance
Estimated cost( RMB 1 thousand) 1.0 2.0 4.5
Implementationorganization
Wuhan Environment SupervisingStation
Wuhan EnvironmentSupervising Station
Responsibility organization Project office of Wuhan City Project office of WuhanCity
Supervising organizationBureau of Environmental
Protection for Wuhan City;Projectoffice of Wuhan City
Bureau ofEnvironmental
Protection for WuhanCity;Project office of
Wuhan City
Waterenvironment
Supervising organization Constructional wasted water Domestic polluted water
Supervising factor / SSBOD5,CODCr,ammonian and
petroleum
Executionstandard
Qualitystandard
Environmental Quality Standardfor Surface Water(GB3838-
2002)
Environmental QualityStandard for SurfaceWater(GB3838-2002)
Exhaustingstandard
First class standard of IntegratedWastewater Disharge Standard
(GB8978-1996)
Third class standard ofIntegrated
Wastewater DishargeStandard (GB8978-
1996)
Surveystandard
Monitoring Analysis Method ofWater and Wastewater ( Fourth
Version)
Monitoring AnalysisMethod of Water andWastewater ( Fourth
Version)
Monitoring position -Discharge outlet
for constructionalwastewater
Discharge outlet
Frequency of monitoring 1 day /month; 2 times every day( in the day, at night)
2 times/year,2 days /time,once atnight and in the day
respectivelyEstimated cost
( RMB 1 thousand) - 1.0 2.0
Implementationorganization
Wuhan Environment SupervisingStation
Wuhan EnvironmentSupervising Station
Responsibility organization Construction organization Public Traffic Companyof Wuhan City
Supervising organizationBureau of Environmental
Protection for Wuhan City;Projectoffice of Wuhan City
Bureau ofEnvironmental
Protection for WuhanCity;Project office of
Wuhan City
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
45
4.44.44.44.4 EnvironmentalEnvironmentalEnvironmentalEnvironmental MonitoringMonitoringMonitoringMonitoring ReportReportReportReport
(1) Environmental monitoring report during the construction
The construction period of the Public traffic priority corridors improvement
sub-project is about 2 years, based on the requirement of environmental
management regulation of related construction project for our country and the
business policy of World Bank, the environmental monitoring department should
respectively compile Phase Environmental Monitoring Report ( 2 times every
year) so that the environmental protection department can ensure all the
environmental protection measures to be implemented according to the relevant
requirement of the approved environmental monitoring plan to control the adverse
influence in the project plan.
Phase Environmental Monitoring Report shall cover: establishment of
environmental management organization, the progress condition of the project,
main content and method of the construction,produced environmental influence
and measures to release the influence as well as the implementation condition of
the measures, if necessary, the content of the resident complaint and solution
condition should be included. Bedides the above monitoring report, the
construction organization should also compile the daily and monthly report itself
and submit it to the upper competent authority and local environmental protection
department.
(2) Environmental monitoring report during the operation
After the proposed project is put into operation, the regular compilation with
Environmental Monitoring Report( once every year) shall be made by the
environmental monitoring organization. Its main content shall include:
establishment of environmental management organization and the operation
condition of the project, implementation condition of the review suggestions on
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
46
preliminiary report for the environmental protection department, monitoring
rules(including time, frequency, position, applied instrument and equipment and
applicable standard), statistical analysis result of the monitoring data and
proposed pollution prevention measures.
The environmental monitoring report compiled by the environmental
monitoring department should be submitted to the Project management office for
utilizing foreign investment of Wuhan Municipality, after that, the Project
Management Office for Utilizing Foreign Investment of Wuhan Municipality shall
submit it to the World Bank, Bureau of Environmental Protection for Wuhan City
and Bureau of Environmental Protection for Hubei Province and report the
implemementation condition of the environmental protection measures to the
environmental protection expert group of World Bank and Bureau of
Environmental Protection for Wuhan City and Bureau of Environmental
Protection for Hubei Province.
4.54.54.54.5 ExpenseExpenseExpenseExpense forforforfor environmentalenvironmentalenvironmentalenvironmental monitoringmonitoringmonitoringmonitoring
The monitoring expense for the construction project in the first year during
the construction and operation refers to table 4.5-1
Table 4.5-1 Unit: RMB 10 thousand
MonitoringMonitoringMonitoringMonitoring expenseexpenseexpenseexpense ofofofof thethethethe projectprojectprojectproject duringduringduringduring thethethethe constructionconstructionconstructionconstruction andandandand operationoperationoperationoperation
Name Items Environmetal air Noise Water Subtotal
Public trafficpriority
corridorsimprovementsub-project
Construction period 6 3 1 10
Operation period 9 4.5 2 15.5
Total 25.5
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
47
5555 EnvironmentalEnvironmentalEnvironmentalEnvironmental monitoringmonitoringmonitoringmonitoring
Since the main environmental influence of this project takes place during the
construction, as so far as the environmental management, it is necessary to entrust
the qualified environmental monitoring organization to supervise the
environmental pollution during the construction, the project environmental
supervision shall be undertaken together, the main plan of the environmental
supervision refers to table 5-1.
Table 5-1 EnvironmentalEnvironmentalEnvironmentalEnvironmental monitoringmonitoringmonitoringmonitoring planplanplanplan duringduringduringduring constructionconstructionconstructionconstruction
Item Requirement of environmental protection Liable personnel
Sound environment
1.During construction, the machinery equipmentwith high efficiency and low noise shall beselected, taking notice of the proper use andfrequent maintenance and lowering the impact ofthe noise to the lowest.2.The construction camp, stockpiling yard andmaterial and equipment yard should be kept awaythe villages and residential buildings with morethan 200m in distance generally, when thedistance is less than 200m, the operation withhigh noise source should be stopped at night.
Environmental engineerConstruction
organization( contractor)
Water environment
1.The constructional waste materials and thesurface removed substances can’t be poured ontothe vicinity of the water body and promptlycleared or treated according to the stipulation ofthe environmental protection department.2.During the construction, flushing water shall bedrained into collecting basin and reused, and thewaste water included oil from the machinerywashing and maintenance shall be drained intoanti-seepage tank and stored centrally for naturalevaporation.3.After the domestic sewage is treated, dischargeafter reaching standard shall be made.
Environmental engineerConstruction
organization( contractor)
Ecologicalenvironment
1.During the construction of the project, balanceof earthwork shall be made as possible, and theconstruction project should be executed step bystep, don’t destroy the surface vegetations in theplace not being disturbed.2.Current road network should be applied aspossible for the material transport in theconstruction site, and the detour road shall not beopened randomly.3.The construction steps should be accelerated,construction in the windy and raining day isstrictly forbidden to reduce the water loss andsoil erosion..4. The removed construction rubbish should bepromptly cleared, and the qualified transportorganization should be entrusted to transport therubbish into the specified dreg backfilling yard.
Environmental engineerConstruction
organization( contractor)
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
48
Item Requirement of environmental protection Liable personnel
Environmental air
1.During the construction, frequent sprinklingshall be made to fall the dust, and the operationin the windy day is strictly forbidden.2. The construction materials should bestockpiled onto the downward wind direction andcovered with paulin.3.The transport vehicle should travel slowly tostrictly avoid throwing; the cement in sack shallbe adopted for construction project.
Environmental engineerConstruction
organization( contractor)
Cultural relics
In construction, when the cultural relics is found,the excavation operation should be stopped andthe related condition should be reported to localcultural relics protection department.Theexcavation work should not be resumed until thecompetent department has completed theappraisal work for cultural relics and thenecessary protection measures has been taken.
Environmental engineerConstruction
organization( contractor)
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
49
6666 AcceptanceAcceptanceAcceptanceAcceptance ofofofof as-builtas-builtas-builtas-built environmentalenvironmentalenvironmentalenvironmental protectionprotectionprotectionprotection facilitiesfacilitiesfacilitiesfacilities
Based on the project features of the works design, it is emphasis on the proper
prevention work of waste water, waste gas and solids waste to ensure the
discharging after reaching the standard of the pollutant after the completion and
investment of the project; in accordance with the related requirement of As-built
Acceptance Management Regulation for Environmental Protection Facilities of
the Construction Project, the construction organization needs to propose the
application of environmental protection as-built acceptance and prepare the
acceptance monitoring plan, after approved, and carry out the environmental
protection as-built acceptance monitoring. Prior to as-built acceptance, the
necessary data shall include: environmental influence report, environmental
protection as-built acceptance monitoring report, environmental protection
execution report.
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
50
7777 TrainingTrainingTrainingTraining planplanplanplan
In order to fluently and effectively implement this project, the training of
environmental protection knowledge and technology should be made for all the
staffs, especially for the construction personel. Besides explaining the importance
of the proposed works and implementation meaning toward all the staffs, pertinent
training to the staffs in different positions shall be executed according to the
different emphasis, and the specific training with the method of combining with
the domestic one and oversea one shall be adopted accoding to the different
management level and the importance of environmental protection position in
training mode. The specific training plan refers to table 7-1.
Table 7-1 ListListListList ofofofof trainingtrainingtrainingtraining planplanplanplan forforforfor environmentalenvironmentalenvironmentalenvironmental protectionprotectionprotectionprotection techniciantechniciantechniciantechnician
Personnel Training content Mode Number ofpersonnel
Arrangementof time
Time(day)
Expense(RMB 10thousand)
Environmentalprotection
personnel forconstruction
Basic theory andmonitoring method
on environment,monitoring reportcompilation andposition training
Domestictraining
2 persons forevery
constructionsection
1 monthbefore the
construction4 5
Environmentalprotectionengineer,
environmentalmanagementpersonnel ofconstructionorganization,
environmentalmanagement
personnel of theproject
Environmentalprotection regulation,
construction planning,environmental
monitoring standardand specification
Domestictraining
1-2 persons forevery
constructionsection,2-4 for
constructionorganization
1 monthbefore the
construction
3 5
Advancedenvironmentalmanagementpersonnel,
environmentengineer
Advanced publictraffic environmental
managementexperienceabroad,
noise controlmethod,daily waste
water treatmenttechnology and safetyoperation technologytraining in gas station
Overseatraining 6
1 monthbefore
operation5 20
Total 12 30
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
51
8888 EstimateEstimateEstimateEstimate ofofofof environmentalenvironmentalenvironmentalenvironmental investmentinvestmentinvestmentinvestment
In order to reach the harmony between the economic constrtuction and
environmental protection, a series of effective environmental protection measures
are taken for the project, the preliminary estimate for environmental protection
investment of the works project is RMB 5,941,000, the specific environmental
protection investment refers to table 8-1.
Table 8-1 ListListListList ofofofof environmentalenvironmentalenvironmentalenvironmental protectionprotectionprotectionprotection investmentinvestmentinvestmentinvestment forforforfor thethethethe projectprojectprojectproject
Time period ContentInvestment ( RMB 10 thousand)
Estimate Note
Constructionperiod
Socialenvironment
Media and a notice toreassure the public 2.0
Indicating board atconstruction board 2.0
AtmosphereSprinkling 3.0
Monitoring 6.0
Noise
Establishing the denoisingfacilities such as:
temporary sound barrier5.0
Monitoring 3.0
Waste water
Constructional wastewater treatment 2.0
Monitoring 1.0
Solids waste
Waste soil treatment forthe project 10.0
Transporting to thedesignated dreg backfilling
yard.
Treatment of domesticrubbish 5.0
Being stockpiled centrallyand treated by environmental
health departmentEnvironmental supervising during the
construction 50.0
Unforeseen 5.0
Total 94.0
Operationperiod
Ecologicalcompensation Greening 351.48 The total greening area is
14059 m2
Atmosphere Monitoring (2011) 9.0
Noise Monitoring (2011) 4.5
WuhanMunicipalTrafficProject(Phase 2) WorldBank Loan EMP---- Public trafficpriority corridors improvement ■■■■
52
Time period ContentInvestment ( RMB 10 thousand)
Estimate Note
Operationperiod
Waste water
Waste watertreatment 93.12
Monitoring (2011) 2.0
Unforeseen 10.0
Total 470.1
Training 30.0
Total 594.1
Total investment percentage covering the subitems (%) 2.74