Page 1: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

Emily Couric Clinical Emily Couric Clinical Cancer CenterCancer Center

University of VirginiaUniversity of VirginiaCharlottesville, VACharlottesville, VA

Gilbane Building Co. Gilbane Building Co.

Brittany MuthBrittany MuthConstruction Management Construction Management

Page 2: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

OutlineOutline

BackgroundBackgroundSolar PanelsSolar Panels•Electrical BreadthElectrical BreadthBIM for FaçadeBIM for FaçadePrefabricationPrefabrication•Mechanical BreadthMechanical BreadthConclusionsConclusionsQuestionsQuestions

Page 3: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Building Statistics:Building Statistics:•154,000 SF154,000 SF•5 floors + penthouse5 floors + penthouse•$74 million $74 million •Outpatient diagnostic Outpatient diagnostic and treatment centerand treatment center•Apr. 2008 – Dec. 2010Apr. 2008 – Dec. 2010•Design-Bid-BuildDesign-Bid-Build

Page 4: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Architecture:Architecture:•Consolidate existing services into Consolidate existing services into one buildingone building•Offices, exam rooms, linear Offices, exam rooms, linear accelerators, radiation/oncologyaccelerators, radiation/oncology•44thth floor expansion floor expansion•Entrance LobbyEntrance Lobby

Page 5: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Mechanical System:Mechanical System:•All air, local reheat in All air, local reheat in each roomeach room•4 main AHU’s4 main AHU’s•288 air terminal units288 air terminal units

Electrical System:Electrical System:•23 local 23 local transformerstransformers•83 panel boards83 panel boards•65 different light 65 different light fixtures, fixtures, fluorescent fluorescent

Page 6: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Building Envelope:Building Envelope:•Brick veneer, stone, and curtain wallBrick veneer, stone, and curtain wall•EPDM single-ply roof membrane w/ white EPDM single-ply roof membrane w/ white acrylic coatingacrylic coating•Roof gardenRoof garden

Page 7: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Possible Limitations:Possible Limitations:•Learning curveLearning curve•TechnologyTechnology•ExperienceExperiencePossible Benefits:Possible Benefits:•Quicker constructionQuicker construction•Better coordinationBetter coordination•Shorter scheduleShorter schedule

BIM for Façade ConstructionBIM for Façade Construction

Page 8: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Increase Increase Constructability?Constructability?•YesYes

• Structural analysisStructural analysis• CoordinationCoordination• DetailsDetails

BIM for Façade ConstructionBIM for Façade Construction

Page 9: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Increase Productivity?Increase Productivity?•YesYes

• CommunicationCommunication• Plan executionPlan execution

BIM for Façade ConstructionBIM for Façade Construction

Page 10: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Beneficial for Façade Beneficial for Façade Analysis/ Coordination?Analysis/ Coordination?•YesYes

• Quantifying materialsQuantifying materials• Understanding water Understanding water

infiltration and infiltration and energy lossenergy loss

BIM for Façade ConstructionBIM for Façade Construction

Page 11: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Learning curve = Learning curve = negative affects?negative affects?•NoNo

• Find right peopleFind right people

BIM for Façade ConstructionBIM for Façade Construction

Page 12: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Reduce cost of façade Reduce cost of façade construction?construction?•NeutralNeutral

• Saves on errorsSaves on errors• Increase in Increase in

productivityproductivity

BIM for Façade ConstructionBIM for Façade Construction

Page 13: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Survey Results:Survey Results:•Most difficult parts:Most difficult parts:

• Level of detailsLevel of details• TrainingTraining• SubcontractorsSubcontractors

BIM for Façade ConstructionBIM for Façade Construction

• Most beneficial parts:Most beneficial parts:• Increase field productivityIncrease field productivity• Managing costsManaging costs• Coordination Coordination

Page 14: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Conclusion:Conclusion:•Use for mock upsUse for mock ups•Not for complete modelNot for complete model

BIM for Façade ConstructionBIM for Façade Construction

Page 15: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

Advantages:Advantages:•Shorter scheduleShorter schedule•Better qualityBetter quality•Possibly cheaperPossibly cheaper•constructabilityconstructability

Disadvantages:Disadvantages:•Possibly more expensivePossibly more expensive•StorageStorage

Page 16: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

Brick Facade:Brick Facade:•Area = 33,472 SFArea = 33,472 SF•Schedule = 244 daysSchedule = 244 days•Original cost = $1.8 millionOriginal cost = $1.8 million

Page 17: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Materials:Materials:•8” CMU Backup8” CMU Backup•2” Insulation2” Insulation•Mortar NetMortar Net•WeepsWeeps•Brick VeneerBrick Veneer

Page 18: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Materials Excluded with Materials Excluded with Prefab:Prefab:•Mortar NetMortar Net•WeepsWeeps•Air CavityAir Cavity•Steel PlatesSteel Plates•CMU BackupCMU Backup

Page 19: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Thin Brick Prefab System:Thin Brick Prefab System:•Cold formed structural stud: 6" Cold formed structural stud: 6" 16 ga. 1-5/8" @ 16" o.c.16 ga. 1-5/8" @ 16" o.c.•5/8" sheathing5/8" sheathing•WP membraneWP membrane•ZZ•5/8" sheathing5/8" sheathing•LathLath•Scratch coatScratch coat•LaticreteLaticrete•Thin brickThin brick

Page 20: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

New Advantages:New Advantages:•Shorter scheduleShorter schedule•Better qualityBetter quality•No air cavity, no leaksNo air cavity, no leaks•ConstructabilityConstructability

New Disadvantages:New Disadvantages:•More expensiveMore expensive

Page 21: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

Panel Calculations:Panel Calculations:•Panel Area = 30’ x 7’ = 210 SFPanel Area = 30’ x 7’ = 210 SF

•# of panels = 33,472 SF / 210 SF= # of panels = 33,472 SF / 210 SF= 159 panels159 panels

•Days = 159 panels / 8 panels per day Days = 159 panels / 8 panels per day = 20 days= 20 days

30’ 7’

Page 22: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

Comparison:Comparison:•Original:Original:

• Cost = $1.8 millionCost = $1.8 million• Schedule = 244 daysSchedule = 244 days

•Prefabricated:Prefabricated:• Cost = $3.2 millionCost = $3.2 million• Schedule = 178 daysSchedule = 178 days

Page 23: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Prefabrication of Brick FacadePrefabrication of Brick Facade

Conclusion:Conclusion:•Too expensiveToo expensive•Not a fast track scheduleNot a fast track schedule

Page 24: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Mechanical BreadthMechanical Breadth

Original Wall Properties:Original Wall Properties:•R-value = 10.63R-value = 10.63•U-value = 0.094U-value = 0.094•Thickness = 16”Thickness = 16”

Prefab Wall Properties:Prefab Wall Properties:•R-value = 13.28R-value = 13.28•U-value = 0.075U-value = 0.075•Thickness = 11”Thickness = 11”

Page 25: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Mechanical BreadthMechanical Breadth

Heat Loss:Heat Loss:•Original DesignOriginal Design

• 176,384 BTU/HR176,384 BTU/HR•Prefab DesignPrefab Design

• 141,145 BTU/HR141,145 BTU/HR• 19.9% better19.9% better

Page 26: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

Mechanical BreadthMechanical Breadth

Conclusion:Conclusion:•Prefab has better Prefab has better mechanical propertiesmechanical properties•Still too expensiveStill too expensive

Page 27: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

ConclusionsConclusions

• Solar panels not economicalSolar panels not economical• BIM should have been used BIM should have been used

for mockupsfor mockups• Prefab definitely shortens the Prefab definitely shortens the

schedule and adds quality , schedule and adds quality , but too expensivebut too expensive

Page 28: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

IntroductionBackgroundSolar Panels•Electrical BreadthBIM for FaçadePrefabrication•Mechanical BreadthConclusionsQuestions

AcknowledmentsAcknowledmentsUniversity of Virginia:University of Virginia:•Fred DunnFred Dunn•Jeff MooreJeff Moore•Dee EadieDee Eadie  

Gilbane Building CompanyGilbane Building Company•Mike Poulin, Project ExecutiveMike Poulin, Project Executive  

ISEC, Inc.:ISEC, Inc.:•Matt HeistandMatt Heistand•Paul HarschPaul Harsch•Jim McAllisterJim McAllister  Eastern Exterior Wall Systems Inc.:Eastern Exterior Wall Systems Inc.:•Wayne MartinWayne Martin

Clark NexsonClark Nexson•Jonathan WalkerJonathan Walker  

Davis ConstructionDavis Construction

Balfour BeattyBalfour Beatty

Jacobs EngineeringJacobs Engineering

United States Army Corps EngineersUnited States Army Corps Engineers  The Pennsylvania State University:The Pennsylvania State University:•FacultyFaculty

Page 29: Emily Couric Clinical Cancer Center University of Virginia Charlottesville, VA Gilbane Building Co. Brittany Muth Construction Management

Questions?Questions?