EMF SURVEY GUIDLINE

Always wear Safety kit to Climb up in Tower.

Talk to Technician For Excess in Site, Without permission never go to the Site.

Take Signage's Photo, Sector Photo, Panoramic Photo as in format.

Consider All Adjacent building inside 60m Radius from the Tower.

Consider All Adjacent Tower inside 20m Radius.

Page 2: Emf Survey

04/18/2023

2

EMF SURVEY PROCESS

Requirement Before Survey• Talk to technician/Engineer for access in the

site (Talk to him one day before going to site so that no issue should be there in the site)

• Charge your Rechargeable cells for continuous working.

• Before going to site verify that your kit is working properly

Page 3: Emf Survey

04/18/2023

3

KIT USED IN EMF SURVEY

GPS (Global Positioning System)CameraMeasuring TapMagnetic CompassSignage PosterCell Charger4-Rechargeable cellsLaptop

Safety kit- compulsary

Page 4: Emf Survey

04/18/2023

4

SURVEY PROCESS

After Reaching site first verify signage's are available or not, if not then place the signage's at the Position-

Danger At TowerWarning At ShelterCaution At Entry Gate

Take GPS Photo ( Lat- Long ) should be clearly visible. Note Lat/Long , DFN from nominal, AMSL.

Count No. of Operators with Name

Page 5: Emf Survey

04/18/2023

5

Take Antenna Sector PhotoAntenna and no. of operator should be Visible

Page 6: Emf Survey

04/18/2023

6

TAKE SIGNAGE'S PHOTO

Take these photo’s by some distance as Background should be visible.

Page 7: Emf Survey

04/18/2023

7

Wro

ng Sig

nage Photo

Page 8: Emf Survey

04/18/2023

8

PANORAMIC PHOTO

Page 9: Emf Survey

04/18/2023

9

Page 10: Emf Survey

04/18/2023

10

Wro

ng

panoram

ic

Photo

Page 11: Emf Survey

04/18/2023

11

Adjacent Building and Tower Photo

No. of Building and Photo should be in order and no. of floor of building should be clearly visible from the picture.

Consider all the Buildings and Tower in 60m Radius from Tower

Page 12: Emf Survey

04/18/2023

12

Roof Top Layout

All Dimensions and Signage's are necessary

Page 13: Emf Survey

04/18/2023

13

BUILDING LAYOUT

Building No., Height, Azimuth and Distance should be properly Motioned

Page 14: Emf Survey

04/18/2023

14

TOWER PHOTO

Tower Photo should show the complete Height of the Tower

Take Building Photo in case of RTT,RTP or Wall Mount name it B0.

Page 15: Emf Survey

04/18/2023

15

CORNER DATA

Building Data

Page 16: Emf Survey

04/18/2023

16

VERIFY THAT THERE ARE AT LEAST 20 PHOTO’S I.E.12 PANORAMIC3 SECTOR3 SIGNAGE'S1 TOWER1 GPS+NO. OF BUILDINGS PHOTO

Page 17: Emf Survey

04/18/2023

17

EMF EXPOSURE ZONES

Page 18: Emf Survey

04/18/2023

18

ACCESSIBILITY CATEGORIES

Page 19: Emf Survey

04/18/2023

19

Page 20: Emf Survey

04/18/2023

20

Page 21: Emf Survey

04/18/2023

21