emergin g mar kets & technology de dr) p a · 009-2011 (a 272 adoptin echnology echnologies...
TRANSCRIPT
3
EDATII
3/30/2012
Emerging MDemand ResAnnual RepoTable of ConI. SummaII. Projects
A. DR1. O2. C3. R4. N
B. DR1. O2. C3. R4. N
C. DR1. O2. C3. S4. N
D. DRon CEC w
1. O2. C3. S4. N
E. DR1. O2. C3. S4. N
F. DR10DR10SCE
1. O2. C3. R4. N
G. DRDR10SCE
1. O2. C
Markets & Tesponse (DR) ort: 2011 .....ntents ..........ary ...............s Completed
R09.09 OfficeOverview ....CollaborationResults ........Next Steps ...R10.02 OfficeOverview ....CollaborationResults ........Next Steps ...R10.03 OpenAOverview ....CollaborationStatus ..........Next Steps ...R10.06 PCT Lwebsite) .......Overview ....CollaborationStatus ..........Next Steps ...R10.07 One-COverview ....CollaborationStatus ..........Next Steps ...0.09 DemandE1.09.03) ....Overview ....CollaborationResults ........Next Steps ...R10.11 DRRCE1.11.03) ....Overview ....Collaboration
chnology ...Projects .....
...................
...................
...................d in 2011 .....e of the Futu...................n .......................................................e of the Futu...................n .......................................................ADR Standa...................n .......................................................Language in......................................n .......................................................Cycle Contro...................n .......................................................d Response R......................................n .......................................................C - Mainstre......................................n .................
Table ........................................................................................................................
ure (OTF) – ................................................................................
ure – GO4 (P................................................................................ards Develop................................................................................
n Codes and ....................................................................................................ol M&V ......................................................................................Research Ce....................................................................................................
eaming Auto............................................................
EmergDeman
of Conte........................................................................................................................Federal Buil................................................................................Posted on ET................................................................................pment ..........................................................................................Standards (C........................................................................................................................................................................................................
enter (DRRC....................................................................................................
o-DR (Tasks ............................................................
ging Markend Respons
Annu
ents ........................................................................................................................lding (Poste................................................................................TCC as DR1....................................................................................................................................................................................CASE study ........................................................................................................................................................................................................
C) – DR Too....................................................................................................1 & 2) (Pos
....................
....................
....................
ts & Technse (DR) Proual Report:
....................
....................
....................
....................
....................
....................d on ETCC ................................................................................
10SCE1.02) .....................................................................................................................................................................................and 45-day
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................ls (Task 2) (....................................................................................................sted on ETCC............................................................
ology ojects 2011
1
....................
....................
....................
....................
....................
....................as DR09SCE........................................................................................................................................................................................................................................................................................language av
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................(Posted on E....................................................................................................C as ............................................................
............ 1
............ 1
............ 1
............ 1
............ 4
............ 6 E1.09) 6 ............ 6 ............ 6 ............ 6 ............ 7 ............ 7 ............ 7 ............ 7 ............ 7 ............ 8 ............ 8 ............ 8 ............ 9 ............ 9 ............ 9 vailable ............ 9 ............ 9 .......... 10 .......... 10 .......... 10 .......... 10 .......... 10 .......... 11 .......... 11 .......... 11
ETCC as .......... 11 .......... 11 .......... 12 .......... 12 .......... 12
.......... 12
.......... 12
.......... 13
3
II
3/30/2012
3. R4. N
H. DR1. O2. C3. R4. N
I. DR101. O2. C3. R4. N
J. DR111. O2. R3. N
K. DRDR11SCE
1. O2. C3. R4. N
L. DRET10SCE
1. O2. C3. R4. N
III. ProjecIV. Projec
A. DR1. O2. C3. S4. N
B. DR1. O2. C3. S4. N
C. DR1. O2. S3. N
Results ........Next Steps ...R10.12 DRRCOverview ....CollaborationResults ........Next Steps ...0.13 DRRC -Overview ....CollaborationResults ........Next Steps ...
.04 DR OppOverview ....Results ........Next Steps ...R11.05 DR OE1.05.02) ....Overview ....CollaborationResults ........Next Steps ...R11.11 Future
4.07.0) .......Overview ....CollaborationResults ........Next Steps ...cts initiated icts continued
R09.02 HomeOverview ....CollaborationStatus ..........Next Steps ...R09.08 ExpanOverview ....CollaborationStatus ..........Next Steps ...R10.05 Auto-Overview ....Status ..........Next Steps ...
...................
...................C – DR Cod...................n .......................................................- Industrial D...................n .......................................................
portunities in.........................................................
Opportunities......................................n .......................................................e Outlook fo......................................n .......................................................in 2011 ......d in 2011 ....e Battery Pil...................n .......................................................nding Reside...................n .......................................................-DR PCT .............................................................
....................
....................des and Stand................................................................................DR (Posted o................................................................................n Residential............................................................s in Corridor....................................................................................................or Residentia............................................................................................................................................ot (HBP) .....................................................................................ential DR in ................................................................................................................................................................
EmergDeman
....................
....................dards (Posted................................................................................on ETCC as ................................................................................l Lighting (P............................................................r Lighting (P....................................................................................................al Energy M................................................................................................................................................................................................................................................the Irvine S
....................
....................
....................
....................
....................
....................
....................
....................
ging Markend Respons
Annu
....................
....................d on ETCC ................................................................................DR10SCE1
....................
....................
....................
....................Posted on ET............................................................
Posted on ET....................................................................................................
Management (................................................................................................................................................................................................................................................
Smart Grid D................................................................................................................................................................
ts & Technse (DR) Proual Report:
....................
....................as DR10SCE................................................................................1.13) ............................................................................................TCC as DR1............................................................
TCC as DR1....................................................................................................(Posted on E................................................................................................................................................................................................................................................
Demonstratio................................................................................................................................................................
ology ojects 2011
2
....................
....................E1.12) .............................................................................................................................................................................................11SCE1.04.0............................................................1SCE1.05.0....................................................................................................
ETCC as ................................................................................................................................................................................................................................................on (ISGD) pr................................................................................................................................................................
.......... 13
.......... 13
.......... 13
.......... 13
.......... 14
.......... 14
.......... 14
.......... 14
.......... 14
.......... 15
.......... 15
.......... 16 01) ..... 16 .......... 16 .......... 16 .......... 16
01 and .......... 17 .......... 17 .......... 17 .......... 17 .......... 18
.......... 18
.......... 18
.......... 19
.......... 19
.......... 19
.......... 20
.......... 21
.......... 21
.......... 21
.......... 21
.......... 21
.......... 21 roject 22 .......... 22 .......... 22 .......... 22 .......... 22 .......... 23 .......... 23 .......... 23 .......... 23
3
V
3/30/2012
D. DR1. O2. S3. N
E. DR1. O2. C3. S4. N
F. DR101. O2. C3. S4. N
G. DR1. O2. C3. S4. N
H. DR1. O2. S3. N
V. Budget
R10.08 DR PoOverview ....Status ..........Next Steps ...R10.09 DRRCOverview ....CollaborationStatus ..........Next Steps ...0.11 DRRC –Overview ....CollaborationStatus ..........Next Steps ...R10.16 SmartOverview ....CollaborationStatus ..........Next Steps ...R11.01 AncilOverview ....Status ..........Next Steps ......................
ool Pumps...........................................................C – DR Tool...................n .......................................................– Mainstream...................n .......................................................t Appliances...................n .......................................................lary Service............................................................................
....................
....................
....................
....................ls (Task 1) ..................................................................................ming Auto-D................................................................................s ...................................................................................................s Pumping E................................................................................
EmergDeman
....................
....................
....................
....................
....................
....................
....................
....................
....................DR (Task 3) .....................................................................................................................................................................................Equipment ...................................................................................
ging Markend Respons
Annu
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ts & Technse (DR) Proual Report:
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ology ojects 2011
3
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.......... 23
.......... 23
.......... 24
.......... 24
.......... 24
.......... 24
.......... 24
.......... 24
.......... 25
.......... 25
.......... 25
.......... 25
.......... 25
.......... 25
.......... 25
.......... 25
.......... 26
.......... 26
.......... 26
.......... 26
.......... 26
.......... 26
.......... 26
.......... 27
3
IA(20Ttsdu Svitrw
1
fh12
h
3/30/2012
I. SummAs described(SCE) Amen2009-2011 (A0272 AdoptinTechnology technologiesstandards to directed in Oundertaken th
SCE is workvision for DRnteroperabil
to coordinateresearch effowith other st
Calif Dema Univ
SCE Emer Calif Organ Open Offic
EnergCompand S
Elect Open Cons U.S. North
Amended Tes
for Approval ofhttp://www3.sc11+DR+Amend Decision Ado
http://docs.cpuc
mary d in Section Vnded ApplicaA.08-06-001ng DR Activ(EM&T) pro, understandenable custo
Ordering Parahrough the E
king closely wR, identify telity of DR tee, collaborateorts to instituatewide agen
fornia Energyand Responsersity of Cais on the Te
rging Technofornia Lightinnization for
n Smart Gridce of the Futugy (DOE), Spany (PG&ESeattle City Ltric Power Rn Automatedumer ElectroGreen Buildh American
stimony in Supf Demand Respce.com/sscc/lawded+App_SCE
opting Demandc.ca.gov/word_
VIII of the Aation for App11) and authovities and Buogram execud customer pomer participagraph 14 ofEM&T progr
with industryechnologies echnologies. e and share r
utionalize anncies and othy Commissiose Research alifornia Berkchnical Advologies Coorng Technolothe Advance
d (OpenSG) aure (OTF) C
Sacramento ME), Sempra ULight
Research Instd Demand Reonics Assoc
ding CouncilEnergy Stan
pport of Southeponse Programw/dis/dbattach1E-01+Amendedd Response Act_pdf/FINAL_D
Amended Teproval of Deorized in Caludgets for 20utes projects references apation in SCf D. 09-08-0ram.
y groups, acthat can be lThe Californresults from
nd expand DRher parties inon (CEC) PuCenter (DRRkeley’s DR
visory Councrdinating Coogy Center (Cement of Strat UCA Inte
Consortium inMunicipal UUtilities, Nat
titute (EPRI)esponse (Opiation l (USGBC) ndards Board
ern California Ems, Goals, and B1e.nsf/0/F89EFd+Testimony+tivities and BudDECISION/106
EmergDeman
estimony in Semand Respolifornia Publ009 through
to explore iand market p
CE’s DR prog027 to provid
ademic instileveraged fonia Investor each IOUs p
R in Californnterested in ublic InteresRC) at LawrEnabling Te
cil ouncil (ETCCCLTC) ructured Infoernational Usncluding Ne
Utility Districtional Grid, B
) penADR) All
d (NAESB)
Edison CompanBudgets for 20F6F12FE7C562Vol.+I.pdf [as dgets for 2009 6008.pdf [as of
ging Markend Respons
Annu
Support of Sonse (DR) Plic Utilities C2011, SCE E
innovative anpotential andgrams. This de an annual
itutions, andor DR and esr Owned Utilportfolio of nia, SCE intDR, such as
st Energy Rerence Berkelechnology D
C)
ormation Stasers Group (ew Buildingsct (SMUD), BC Hydro, N
liance
ny’s Amended009-2011: 2882574C900of March 29, 2 through 2011:f March 29, 20
ts & Technse (DR) Proual Report:
Southern CalPrograms, GoCommissionEmerging Mnd cost effec
d provide inpreport is bei report on th
d other utilitistablish standlities (IOUs)EM&T proj
tends to conts: esearch (PIERley National
Development
andards (OA(UCAIUG) s Institute (NPacific Gas NSTAR, Co
d Application
70BEA6/$FIL2012]. : 012].
ology ojects 2011
4
lifornia Edisoals, and Bun (CPUC) D
Markets & ctive DR put on DR coing submittehe projects
es to develodards for ) meet everyects. In the otinue collabo
R) programl Laboratoryt Project for
ASIS)
NBI), Departand Electricnsolidated E
LE/A.08-06-001
son’s udgets for . 09-08-
odes and ed as
p a
y month ongoing orations
which
tment of c Edison,
1+2009-
3
Tac(a
I
Ttw
3/30/2012
The positive and other stacommunicati(BCD) Accoadopt DR tec
Custoassoc
Integcollaborganexecu
Quartof EMAdvoIrwin
DR Fdistintopic
In adEM&ca.coCEC,emeroutlin
In 2011, SCE Estab Deve Resea Conti Enab
--
This report sto each projeweb site.
results fromakeholders. Aing DR adva
ount Managechnologies aomer Informciated with Dgrated Demanboration betwnization, as wute EM&T pterly Techno
M&T DR anocacy, and Cndale, CA. Forum to helnguished gros to stakehol
ddition to the&T projects aom). ETCC c, and the CPging technolned in the Ca
E chartered Eblishing DR elopment of Darch into theinuation of tling future I OTF proje Exploring
Smart Gri
ummarizes tect are listed
m EM&T advAs detailed inances across rs who can t
and strategiesmation SheetsDR technolognd Side Manween EM&Twell as partnprojects utilizology Briefind D&ES Em
Codes and Sta
p communicoup of industlders from a
e EM&T annare also avaicoordinates aUC to facilitlogies that walifornia Lon
EM&T projecapabilities DR standarde DR potentithe Home BaIDSM policyect collaborag Home Areaid Demonstr
the results anand these ca
vance DR onn following SCE to inte
then educates. Specific as to aid Accogies and stranagement (IDT and the Cunering with Bzing the engngs for BCD
merging Techandards prog
cate and cootry speakers cross the com
nual reports plable to the pamong its metate the asse
will benefit Cng Term Ene
ects in the foin standard c
ds for buildinial of consumattery Pilot (y objectives tation with Ca Network (Hration (ISGD
nd status foran be used to
EmergDeman
nly if those rbullets, SCE
ernal stakehoe and influenapproaches foount Manageategies develDSM) explorustomer EnerBCD’s Desigineering staf
D representathnologies, Hgram project
rdinate DR iwho have ompany. provided to tpublic throuembers inclu
essment of prCalifornia cuergy Efficien
ollowing areacommercial ngs, appliancmer applianc(HBP) projecthrough
CEES HAN) capab
D) project
r individual po locate spec
ging Markend Respons
Annu
results are coE has implemolders like thnce customerfor disseminaers in commloped by EMration througrgy Efficiengn & Engineff within D&tives by D&E
HVAC Technts at the Ene
information ffered varied
the CPUC, fugh the ETCCuding Califoromising En
ustomers andncy Strategic
as: product offe
ces and mesces and new ct
bilities for D
projects. Thecific project
ts & Technse (DR) Proual Report:
ommunicatedmented severhe Business Crs to enroll inating inform
municating thM&T
gh coordinatncy & Solar (eering Servic&ES. ES to commnology and Sergy Educati
across SCE d perspectiv
full reports oC web site (hornia's IOUs,nergy Efficied respond to c Plan (LTE
ferings saging protoconstruction
DR by partici
e DR projectdocumentat
ology ojects 2011
5
d to our custral approachCustomer Dn DR progra
mation includhe opportunit
tion and (CEES) ces (D&ES)
municate the System Diagon Center (E
by hosting aes on DR-re
on the complhttp://www., the SMUD
ency (EE) anthe initiative
EESP).
ocols n building co
ipating in the
t numbers astion on the E
tomers hes for ivision’s ams and de: ties
to
results gnostics EEC) in
a elated
leted etcc-, the
nd DR es
odes
e Irvine
ssigned ETCC
3
I
3/30/2012
II. Projec
A. DETC
cts Com
DR09.09 CC as DR
1. Over
The purposolution (evaluateddevelopedLos Ange
Determfrom S
Quantand
Provid
2. CollaThis projespecificalprojects h
3. ResuThe new ldimming electrical baseline fhours oveto a 1-minthe lightincommissibaseline Dto demandfollowing
DR tebusinedemandesireactual
ThereALCS
mpleted i
Office of R09SCE1
rview
ose of this pr25% better t
d the DR capd by Encelliueles Federal B
mine whetheSCE, or busitify demand
de measured
aboration ect collaborally PG&E anhave been sh
ults lighting systballasts thatinput for ge
for DR testiner three separnute intervalng level to fioned level.
DR level. A d during the
g findings:
esting for theess managemnd reductioned reduction l DR reducti was a reduc
S and the new
in 2011
f the Futu.09)
roject was tothan 2008 Tiabilities of aum SystemsBuilding. Th
er the ALCSiness managreductions t
d and technic
ated with othnd San Diegohared during
tem includedt were commneral lightin
ng. DR testinrate days. Tol during the tive different Each settingnon-test daythree test da
e ALCS confment participn was not prois needed, thon rather thaction in overw lighting fi
EmergDeman
ure (OTF)
o evaluate anitle 24) for tyan Advanced. The systemhe primary g
S allows for rgement as pathat are achie
cal data in su
her memberso Gas & Elescheduled m
d LEDs for tmissioned at ang. This newng was succeo increase datest periods. settings: 10
g lasted for oy was also reays. The proj
firmed that lpating in a Doportionate the controls san relying onrhead lightinxtures. The
ging Markend Respons
Annu
– Federa
n in situ demypical large d Lighting Cm was installgoals of this
reliable contart of a DR Pevable with
upport of the
s of the OTFctric Compa
monthly conf
ask lighting a setting of 8
w commissionessfully condata accuracy The testing
0%, 15%, 20%one hour, aftecorded by thoject achieve
lighting loadDR Program.to the reductshould be tesn the system
ng load dema DR reductio
ts & Technse (DR) Proual Report:
al Buildin
monstration ooffice space
Control Systeled on half oproject inclu
trol of facilitProgram, a well-desig
e OTF initiat
F consortiumany (SDG&Eference calls
and downlig80% of the lning level wducted on thy, recording gg procedure i%, 25%, andter which it rhe data logged the stated
ds may be rel With this tetion in all setsted and cali
m setting. and after theon for lightin
ology ojects 2011
6
ng (Poste
of the OTF 2es. This projem (ALCS) of the 12th flouded:
ty lighting lo
gned lighting
tive.
m identified eE). Results os.
ghts with flulighting’s rat
was designatehe same busingranularity wincluded chad 30% belowreturned to ters as a comobjectives w
liably managechnology, thtting levels. ibrated to de
installation ng was 0.58
d on
25% ect
oor of the
oads
g system,
earlier; of these
uorescent ted ed as the ness was set anging w the the
mparison with the
ged by he If a
etermine
of the kW, or
33/30/2012
B. DDR
0.073 approxachiev
4. NextAlthough pursue othprogram o
DR10.02 R10SCE1.
1. Over
The purposolution (consisted building oenabled Wfourth flo
Determa DR
Examsystem
Provid
2. CollaThis projespecificalscheduled
3. ResuThe new lfluorescendown by 2the preferoccupancyarrives at unoccupiethree sepaintervals. settings: 1lasted for
Watts per sqximately 17%ved from tun
t Steps this project
her advancedofferings.
Office of 02)
rview
ose of this pr25% better tof the Execu
occupied by Wiremold ALor of the GO
mine whetheProgram,
mine demand m, and de measured
aboration ect collaborally PG&E and monthly co
ults lighting systnt lights for 20% of its torences and ney sensor thatthe desk and
ed. DR testinarate days. D The testing
10%, 15%, 2one hour, af
quare foot (W% assuming
ning the syst
has been cod lighting an
f the Futu
roject was tothan 2008 Tiutive Suites SCE. As par
LCS were evO4 Building.
er the ALCS
reductions t
d and technic
ated with othnd SDG&E.onference ca
tem consistegeneral lightotal electricaeeds of the ot brings lighd reduces ligng was succe
During the teg procedure i20%, 25%, after which it
EmergDeman
W/sf) at the g a baseline oem to 80% o
ompleted, SCnd controls p
ure – GO4
o evaluate anitle 24) for tyon the fourtrt of this stuvaluated. Th The primar
S allows for r
that can be a
cal data in su
her membersResults of th
alls.
d of LEDs foting. The ne
al input. All occupant. Ehts to the occghting levelsessfully cond
est periods reincluded chaand 30% belot returned to
ging Markend Respons
Annu
30% DR levof 3.4 kW. Tof full capac
CE will contiprojects that
4 (Posted
n in situ demypical large th floor of thudy the DR chis ALCS wary goals of th
reliable cont
achieved with
upport of the
s of the OTFhese projects
for task lightew lighting sopen office ach worksta
cupant’s prefs to 15% powducted on thecording inteanging the ligow the commthe baseline
ts & Technse (DR) Proual Report:
vel. The percThis is in addcity.
inue to monimay influen
d on ETCC
monstration ooffice space
he General Ocapabilities oas installed inhis project in
trol of facilit
h a well-des
e OTF initiat
F consortiums have been
ting and dowystem was uworkstation
ation was equferred light lwer when thehe same busiervals were rghting level missioned lee DR level o
ology ojects 2011
7
centage redudition to the
itor OTF effnce future DR
C as
of the OTF 2es. This proj
Office 4 (GOof the Convian the offices
ncluded:
ty lighting as
signed lightin
tive.
m identified eshared durin
wnlights withuniversally tuns were tuneduipped with level when se space is iness hours oreduced to 1to five diffevel. Each sef 0%. A non
uction is savings
forts and R
25% ect 4) a-s on the
s part of
ng
earlier; ng
h uned d to meet an omeone
over -minute
erent etting
n-test day
33/30/2012
C. D
was also rdays. The DR te
part ovariatsough
ThereALCS0.072
This pinitiat
4. NextAlthough pursue othprogram oproject in
DR10.03
1. Over
The EnergInstitute ocoordinatinformatiosystems…establisheachieve Sthrough PGrid InterOpenADRcommerciInternet. Ainfrastrucprocess ofexpand thproducts fthan propproducts bare based intuitive uinformatiosignals, an
recorded by e following oesting for thef a DR Progions brought
ht, or even th was a reduc
S and new ligW/sf at the
project provitive.
t Steps this project
her advancedofferings. Th general mov
OpenADR
rview
gy Independof Standards e developmeon managem
…" which resed Priority ASmart Grid InPAP 09. Oneroperability R, which defial/industrialAdopting anture (AMI), f developing
he marketplafor customerrietary or “Cbeing develoon developi
user interfacon about thend will also
the data logobjectives wee ALCS confgram. Howevt upon by oc
he pattern, wction in overghting fixtur30% DR lev
ides valuable
has been cod lighting anhe lessons leving forward
R Standa
dence and Seand Techno
ent of a framment to achiesulted in the
Action Plans nteroperabilie of the two NStandards Frfines messagl customers
n open standaand DR has
g, finalizing ace to includers enabled byCalifornia-onoped by consing productses. These pr
eir energy usempower th
EmergDeman
gers as a comere achievedfirmed that lver, due to iccupancy sch
were not realirhead lightinres. The DRvel. e data, and le
ompleted, SCnd controls pearned can bed.
ards Deve
ecurity Act (Eology (NIST)mework that ieve interoperSmart Grid (PAPs) to foity, includingNIST recognramework th
ges exchangefor price-resards approacs resulted in and adoptinge the domesty a variety only” solutionsumer electrs to engage croducts will bsage, helpinghe marketpla
ging Markend Respons
Annu
mparison to d as a result lighting loadssues in isolhedules, the ized. ng load demaR reduction f
essons learn
CE will contiprojects that e applied to
elopment
EISA) of 20) with the "pincludes prorability of smInteroperabi
ocus on a vag “Standard nized standarhat are directed between usponsive andch for Smart some delaysg standards. tic US mark
of interoperans for DR. Thronics manufcustomers wibe capable og customers race to innova
ts & Technse (DR) Proual Report:
demand durof this proje
ds may be rellating lightinpercent pow
and after thefor lighting w
ned which ca
inue to monimay influenany OTF eff
t
007, appointeprimary respotocols and mmart grid devility Standar
ariety of the cDemand Re
ards for inclutly applicablutilities and d direct load Grid, advan
s in deploym However, th
ket and will oable commerhere are manfacturers whith meaningfof providing respond to p
ate and differ
ology ojects 2011
8
ring the threeect: liably managng loads and wer reduction
installation was 0.85 kW
an support th
itor OTF effnce future DRffort or lighti
ed the Nationponsibility tomodel standavices and rds Project. components esponse Signusion in the Sle for DR is
control overnced meter ment due to th
he end resuloffer a robusrcial devices ny commerc
hose businessful informaticustomers w
price or DR erentiate prod
e test
ged as
ns
of W, or
he OTF
forts and R ing
nal o ards for
NIST to
nals” Smart
r the
he slow t should
st set of rather
cial s models ion and
with event duct
33/30/2012
D. D45-
offerings project waby OASIS
2. CollaIn this proNAESB, and the O
3. Statu
Phase onerequiremeincorporaNovembeby reviewDR. In adof OASISWeb Servreviewed work wasscheduledwill be ba
4. Next
Although continue tcertificati
DR10.06 -day lang
1. Over
The purpopotential cCommuni(USTs) inthat requisignals ancustom se
while targetas to drive aS and incorp
aboration oject, SCE cSmart Grid I
OpenADR Al
us
e of this projents specificated into the er 2010. Phaswing securityddition to enhS to get threevices Calendby the SGIP
s completed wd to completeased on elem
t Steps
the OpenADto participateion process f
PCT Lanuage ava
rview
ose of this prcode languaicating Thern the study, tre a building
nd adjust theettings progr
ting a varietyan expedited poration as a
ollaborated wInteroperabilliance.
ject was comations and swork complse two of thi
y and adding hanced capae specificatiodar (WS-CaleP, and addedwith eMIX ae this proces
ments of these
DR standarde in the Opefor products
guage in ailable on
roject was toge for Califo
rmostats (PCto be installeg permit. Thrmostat temp
rammed by th
EmergDeman
y of customedevelopmenreleased Sm
with UCAIUility Panel (S
mpleted in 20ervice definileted by OASis project furspecificatio
abilities, Phaons: 1) Energendar), and 3
d to the Smarand WS-Calss in the firste three OAS
ds developmenADR Alliautilizing the
Codes an CEC we
o evaluate feornia Title 2
CTs), referreded in all newe PCTs wouperature set he customer
ging Markend Respons
Annu
er price poinnt of the Ope
mart Grid inte
UG’s OpenSSGIP), consu
010 with the itions. TheseSIS and relerther enhanc
ons for quickase 2 monitorgy Market In3) Energy InrtGrid Catalolendar addedt quarter of 2
SIS standards
ent work hasance to devele OpenADR
and Standebsite)
easibility of, 4 which woud to as Upgr
w constructiould be able to
points basedr.
ts & Technse (DR) Proual Report:
nts. The primenADR staneroperability
SG OpenADRultants from
creation of e documents
eased for pubced the capabk response inred and enconformation Enteroperabiliog of Standa
d to the CoS 2012. The Os.
s been complop and enhastandard.
dards (CA
and if appliuld mandate
radeable Setbon and HVACo receive prid upon defau
ology ojects 2011
9
mary objectivndard for ratiy standard by
R task forceXtensible S
the system s were then blic commenbilities of Opnteractions oouraged the Exchange (ety (EI) finali
ards (CoS). Tin 2011 and
OpenADR 2.0
pleted, SCE wance a testin
ASE stud
cable, devele Programmaback ThermoC retrofit proice and DR eult factory se
ve of this ification y NIST.
, OASIS, olutions,
nt in penADR
or “fast” efforts MIX), 2) ized, This d EI 0 profile
will ng and
dy and
op able ostats ojects event ettings or
33/30/2012
E. D
2. CollaIn collaboproposed Several phagreemenSCE also possible precommen
3. Statu
Meetings IOU’s andreleased oQ2 of 201
4. NextThe CEC proposed with stake15-day lan
DR10.07
1. Over
The purpopeak load(OCC). Ofor this prSCE serviEvaluatioincluded:
En In Pr
sit As Ut
sto Va
aboration oration with that would ahone calls an
nt on the langhosted a me
provisions fondations to C
us
with CEC sd CEC agreeon February 12.
t Steps has releasedlanguage. D
eholders to rnguage and
One-Cyc
rview
ose of this prd reduction pOCC was awaroject and coice territory.n and Energ
nsure complinform vendorrovide OCC tes ssist in devetilize the Enorage alidate the re
the statewidalign with nand meetings guage regardeeting to engor PCTs withCEC.
taff and comed on the lan24, 2012, w
d the 45-dayDepending onresolve outstadopted cod
cle Contro
roject was toproject utiliziarded a PIERontacted SCE. This projec
gy Conversio
iance with Sr and customwith the for
eloping the mergy Conver
esults of the
EmergDeman
de IOU Codeational Smarwere also w
ding PCTs thgage supplierhin Title 24 w
mmissioners nguage to be
with 15-day la
y language ann the nature tanding issuede.
ol M&V
o provide Meing battery sR Emerging E for assistanct included cons & Storag
SCE Rules &mers of potenms necessar
measures to trsions & Sto
pilot sites
ging Markend Respons
Annu
es and Standrt Grid stand
with the CEChat should bers and industwhich furthe
continued d proposed. Tanguage and
nd is awaitinand volume es, and deve
easurement storage techn
Technologynce because
collaborationge groups. Th
& Tariffs ntial safety iry to request
track during orage group a
ts & Technse (DR) Proual Report:
dards team codards currentC in an efforte included intry professioer informed
during 2011 aThe 45-day ld adoption ex
ng any comm of commenlop revised r
and Verificanology from y Demonstra the propose
n with SCE’she scope of
ssues or codinterval met
the pilots as technolog
ology ojects 2011
10
ode languagetly being devt to come to n the 2013 Tonals and to the IOUs
and eventuallanguage waxpected to o
ments on the nts, SCE willrequirement
ation (M&VOne-Cycle
ation Grant (ed pilot sites s Program work for thi
de violationster data for t
gy experts fo
e was veloped. an
Title 24. discuss
lly the as ccur in
l work s for the
) for a Control ETDG) are in
is project
the pilot
or battery
33/30/2012
F. D(Ta
2. CollaThis was played strproduct.
3. StatuSeveral mof their Peoffices wecompleted
4. Next
Although with OCC
DR10.09 ask 2) (Po
1. Over
The purpopotential idevelopindeliverablTask 1 is report:
a)A web-batheir respobuilding sfrom Auto Buildi
mass, Intern
schedu HVAC
the co Auto-
during
aboration a collaborati
rictly an adv
us meetings and eak Load Reere the pilot d and provid
t Steps
the M&V pC to perform
Demand osted on E
rview
ose of this prin commerci
ng a statewidles. Task 2 wongoing and
) Task 2 - Sased databaseonse to Opensize and systo-DR eventsing Informatbuilding siz
nal Informatiules of theseC System: syooling and heDR Field Teg the test or
ion project wisory role, p
demonstratieduction (PLsite for initi
ded a letter o
portion of them additional l
ResponsETCC as
roject was toial buildings
de DR databawas completed is included
Statewide e will be set nADR signatems informas. The informtion: addressze, etc. ion: number e internal loaystem type, oeating seasonest InformatiDR period.
EmergDeman
with OCC inproviding me
ions were heLR) battery sial testing. Sof support for
e project is cab testing an
se ResearDR10SC
o improve ths by evaluatiase. The projed and is inc
d in Section I
DR Databaup to collec
als. The dataation, DR co
mation collecs, type, build
of occupancads, vertical operating scns, capacity ion: Field te
ging Markend Respons
Annu
n support of teasurement a
eld with OCCstorage devicCE reviewedr the M&V p
complete, SCnd a field tes
rch CentCE1.09.03)
he software ting existing tojects two macluded in thiIV (Projects
ase ct and store iabase will incontrol strategcted will be ding envelop
cy, lighting ptransportatio
chedules, zonof plant, etcsted control
ts & Technse (DR) Proual Report:
the PIER ETand validatio
C to gain a bce and its capd the resultsprocesses ut
CE plans to cst at another
ter (DRRC3)
tools availabtools in a scoajor tasks hais section of continued in
information clude fields gies, measuras follows:
pe, building l
power, plug on (elevator)ne temperatuc. strategies, i
ology ojects 2011
11
TDG programon for a proto
better underspabilities. O from the testilized.
continue worfacility.
C) – DR T
ble for estimaoping study
ad separate the report wn 2011) of th
on facilities for collectin
red demand s
layout, therm
and misc po), etc. ure set points
dentify any
m. SCE otype
standing OCC’s sts
rking
Tools
ating DR and
while he
and ng the savings
mal
ower,
s during
problem
33/30/2012
G. DETC
2. Colla
This projeto enhancat comme
3. Resu
The DRRand will cfrom sitesto be a painformatioprograms
4. Next
Begin utilmore accuother info
DR10.11 CC as DR
1. Over
The purpoin new comaterials,and shed and 2 werongoing a
a)Develop sretro-comcustomersstrategies
b)Assemblefeatures aproducts twill also scan suppo
aboration
ect was comce the tools aercial sites.
ults
RC collaboratcoordinate ths that have wart of this daton from the .
t Steps
lizing the staurately deterormation.
DRRC - MR10SCE1
rview
ose of this pronstruction a, assessing syattenuation. re completedand is includ
) Task 1 - segment spe
mmissioning s. This task aand value st
) Task 2 - Ae a DR guideand functionathat support survey majoort Auto-DR
mpleted in colavailable for
ted with the he data colleworked withtabase, a cenbuilding fac
atewide DR rmine DR po
Mainstrea.11.03)
roject was toand in existinystem capabThe project
d and are incded in Sectio
Develop edcific educatiagents, accoalso includedtreams from
Assessmeeline that outality for AutAuto-DR anr controls co
R strategies a
EmergDeman
llaboration wunderstandi
three IOUs ction of newthe DRRC i
ntral web-bascility manage
database witotential base
aming Au
o facilitate anng buildingsbilities of cons three majo
cluded in thisn IV (Projec
ducation aion and trainount executivd the develo
m DR.
ent of contrtlines minimto-DR and crnd comply wompanies to nd comply w
ging Markend Respons
Annu
with the DRRing and furth
to collect inw customers.in the past. Fsed survey wers as their b
th new potend on buildin
uto-DR (T
nd acceleratby developi
ntrols, and eor tasks had ss section of tcts continued
and trainingning materialves, etc. for copment of ca
rols systemmum energy mreate an onli
with OpenADcollect infor
with OpenAD
ts & Technse (DR) Proual Report:
RC and othehering the ad
nformation on Initial data
For any new will be develbuildings sig
ntial Auto-Dng types, bus
Tasks 1 &
te the adoptioing educationevaluating loseparate delithe report, wd in 2011) of
g materialsls for controcommercial
ase studies th
m capabilitmanagemenine database DR specificarmation on lDR specifica
ology ojects 2011
12
er Californiadoption of A
n existing cuwill be acqusite that wou
loped to collgn up on Aut
DR customersiness segme
& 2) (Poste
on of Auto-Dn and trainin
oad shape chiverables. Ta
while Task 3f the report:
s ols vendors, a
and industrihat will outli
ties nt and contro
of companiations. The Dlegacy systemations as we
a IOU’s Auto-DR
ustomers uired uld like lect this to-DR
rs to ents, and
ed on
DR both ng anges asks 1 is
auditors, ial ne DR
l system es with
DRRC ms that
ell as
33/30/2012
H. DDR
legacy syinclude quvendors a
2. Colla
This projeto improv
3. Resu
CustomerGrid in thconcepts ainstalling customerswell-defindecision spossible astep DR eof DR fietechnologexplore hostep, the eintegrated
4. Next
Determinsystems.
DR10.12 R10SCE1.
1. Over
The originand stand(LEED) cthe LEEDimplemenDR creditmarket stu
stems that aruestions to u
and develop m
aboration
ect was comve the unders
ults
r adoption ofhe U.S. One oand technolothe equipme
s to respond ned, streamlisupport toolsand more comenablement pld tests and i
gies. Althougow these tooenablement pd with operat
t Steps
e the best str
DRRC – D12)
rview
nal scope of dards to a foccertification. D credits a bunting DR. Tht, in order toudy was con
re not upgradunderstand thmethods for
mpleted in colstanding and
f concepts anof the key deogies with thent and lettinto price or r
ined processs that are targmmon. A resprocess, deciinteraction wgh this projeols can be usprocess shoutional EE pr
rategy to util
DR Code
f this project cus on USGB
The DRRC uilding can rhe DRRC als gain a bette
nducted throu
EmergDeman
dable to suphe maintenanlong-term m
llaboration wd adoption of
nd technologemand-side he customersng it respondreliability vas. This procegeted towardsult of this pision supporwith customect concentra
sed for integruld be followocesses.
lize training
es and Sta
evolved fromBC’s Leaderdeveloped a
receive with so performeder understandugh interview
ging Markend Respons
Annu
pport Auto-Dnce contractmaintenance
with the DRRf Auto-DR in
gies is the kemanagemens is DR. Recd to DR evenariations of thess will requds key playe
project was trt concepts, aers while depated on DR prating opera
wed up by an
g materials an
andards
m an effort trship in Enera strategy gua focus on t
d a small scading of the vws with buil
ts & Technse (DR) Proual Report:
DR strategiests between th of Auto-DR
RC and othen the market
ey to the sucnt activities tcent work hants is not sufhe electricity
uire training, ers, to make the developmand tools devploying auto
process and tational EE ann evaluation
nd the assess
(Posted o
to influence rgy and Envuide to be usthe new credale market stviability of thlding industr
ology ojects 2011
13
s. The surveyhe customersR strategies.
er Californiat.
ccess of the Sthat link Smaas shown thafficient. Engy grid requireducation, aDR particip
ment of a steveloped oveomated DR tools, it doesnd DR. As a process whi
sment of con
on ETCC
California cironmental D
sed in maximdit available tudy of the Lhe DR creditry stakehold
y will s and
a IOU’s
Smart art Grid
at simply gaging res a and ation p-by-
er years
s not next
ich is
ntrol
as
codes Design
mizing for
LEED t. The
ders.
3
3/30/2012
I. D
2. Colla
This was worked w
3. ResuThe mark
a)
LE EE Lo LE DR Re
b)
Pr Po In Gr Pr M
A guide ain DR andcredit was
4. Next
In 2012, Swith the U
Enhan Devel Track Devel
DR10.13
1. OverAs part ofimprove t
aboration
a collaboratiwith USGBC
ults ket study con
) Findings
EED points oE is not consoad shed threEED points oR strategy detro-active p
) Recomm
rovide more oints awardencentivize earant points orovide option
Make credit av
aimed at provd Auto-DR ps also develo
t Steps
SCE plans toUSGBC, the
nce the LEEDlop an under
k and improvlop peak dem
DRRC - I
rview f California’the ability of
ion project w in developi
nducted resul
s:
offer additiosidered in loesholds mayoffered are nevelopment
point acquisit
mendations
resources toed should be arly design ofon proportionn for ‘retrofivailable und
viding informprograms andoped as a res
o participate DRRC, and
D DR creditrstanding of ve the persistmand and DR
Industrial
s LTEESP, tf industry to
EmergDeman
with the DRRng the DR L
lted in the fo
onal incentivad shed requ
y be too highnot equitableeffort must tion is not av
s:
o learn aboutscaled basedf DR enablenate scale toit’ points der LEED CI
mation and ad assist thessult of this pr
in the Demad Environme
t language economic antence and repR benchmark
l DR (Pos
there are sevbetter mana
ging Markend Respons
Annu
RC and otheLEED credit
ollowing find
ves for adoptuirements h for small/me for cost andbe started eavailable
t DR opportud on energy
ement o load shed
I
assistance foe projects toroject.
and Responsental Defense
nd environmpeatability oking
sted on E
veral activitiage both peak
ts & Technse (DR) Proual Report:
er Californiacriteria.
dings and re
tion of DR
medium commd effort requarly in the de
unities in onperformanc
or LEED proo achieve the
se Partnershie Fund (EDF
mental benefiof DR
ETCC as D
ies either plak and on-go
ology ojects 2011
14
a IOU’s. The
ecommendat
mercial builuired esign proces
ne’s area e
ojects to parte LEED DR
ip Program eF) to:
its of DR
DR10SCE
anned or unding electrica
e DRRC
ions:
ldings
ss
ticipate pilot
effort
E1.13)
derway to al energy
3
3
3/30/2012
http://www.su
use. One by the DOfacilities fmanagemThe purpothe adoptiof these fasites whicdemonstraconductinmanual), the indust
2. CollaThis projefunding p
3. ResuEnergy mtechnical capabilitiefor DR. Tinstallatiorelevant oorganizatibetween Dmeters thachanges cin DR. Ancontrol ovby utilitiematerial schanges, aother induin severalfindings fand equipeither eneseparate bmandate tmanagem
uperiorenergyp
synergistic OE and a numfor EE.3 A c
ment standardose of this prion of sophis
facilities to imch had been ation progra
ng a study at load managetrial site in im
aboration ect was com
portions of th
ults management s
and operatioes and increa
The technicalon of variabloperational cion of DR opDR implemeat Bentley Pcould be madn increase inver facility des would morstorage withias well as thustrial facilitl ways. Morefrom this stupment are exergy managebut promote that the orga
ment systems
performance.ne
activity is thmber of otheore element
d, initially ANroject was tosticated contmplement thselected for
am to developthese sites t
ement, contrmplementing
mpleted in parhe project be
systems weronal changesased personnl changes moe frequency
changes werepportunities entation and rince Street de which won the control demand, and re closely min the proces
he ones whicties. The nexe comprehen
udy truly apptremely variment or DRboth through
anizations thainto their op
et [as of March
EmergDeman
he Superior Eer public andof this initiaNSI MSE 20o understandtrols in parti
he energy mathe Californp this understo examine throls capabilitg the energy
rtnership witeing undertak
re incorporats. These channel awarenesost relevant drives (VFD
e those that iand proceduenergy manreceived as
ould increasecapabilities an expansio
match utility nss will enhanh were alrea
xus of energynsive studiesply to other inied. Utility acan offer co
h coordinateat they contrperations wh
h 29, 2012].
ging Markend Respons
Annu
Energy Perfod private secative is the a000:2008, red the relationicipating indanagement stnia Superior standing. Thhe relationshties, and the
y managemen
th the DRRCken in their s
ted into the onges, througss, have resuto DR were
Ds) on proceincreased awures. Additio
nagement cappart of their
e the ability oof both faci
on in the porneeds with fnce the flexibady implemey managemes could be unndustrial fac
and market pombined proed marketingract with muherever appli
ts & Technse (DR) Proual Report:
ormance inittor partners
adoption andeplaced by ISnship betweedustrial facilitandard. ThiEnergy Perf
he scope of whip between level of suc
nt standard.
C. Other Calservice territ
organizationgh increased ulted in additthe installat
ess equipmenwareness throonally, therepabilities, asr Auto-DR syof these faciilities wouldrtfolio of DRfacility resoubility of ene
ented, are likent and DR cndertaken to cilities, as inprograms offograms or keg. Governmeust incorporaicable. Furth
ology ojects 2011
15
tiative put foto certify in
d use of an enSO 50001 inen DR as a dities and the is project levformance work includeDR (automa
ccess experie
lifornia IOUtories.
n, which led technical tional capab
tion or plannnt, while theoughout the
e seems to bes shown by thystem. Severilities to part
d allow moreR programs ources. An incergy usage. Tkely to applycould be encvalidate tha
ndustrial procfering incenteep programsental agencieate energy her experienc
orward dustrial nergy n 2011. driver for
capacity veraged
ed ated and enced by
Us are
to
bilities ned e most
e a link he sub ral other ticipate
e granular offered crease in These y to many couraged at the cesses tives for s es could
ce with
3
3/30/2012
J. DETC
standardsancillary b
4. NextAlthough managem
DR11.04 CC as DR
1. Over
This studycoincide wacceptancthrough thstudies cuinformatio
2. Resu
How consdecades. Omore enerthe resideSCE residlighting, a1999, peafrom 2006
The projecurrent inhighlight program presidentiaresidentia
3. Next
Based on could be ilighting (Utime of usload growresult of t
-based energbenefits.
t Steps this project
ment, control
DR OppoR11SCE1
rview
y evaluated awith projectece of load redhe review ofurrently avaion on reside
ults
sumers use eOver this perrgy-consumi
ential sector, dential territoand another ak lighting lo6, peak plug
ected potentincentives for
the tremendparticipational DR prograal customers
t Steps
the literaturinitiated, penUpstream Lise data on re
wth will lead the analysis o
gy managem
has been cocapabilities,
ortunities.04.01)
available liteed peak demduction durinf news publiclable. This r
ential DR for
energy in theriod, U.S. hoing devices senergy cons
ory today, a 52% to plug
oad occurs atg load occurs
al demand slighting and
dous potentian found throuams. The lite
to introduce
re review connding the anighting Progesidential lig
to peak demof this forthc
EmergDeman
ment systems
ompleted, SC, and overall
s in Resid
erature to demand, and to
ng peak demcations, reseresearch helpr lighting and
eir homes haomes on avesuch as homsumption hatypical hous
g loads, or mt 8 PM, withs at 8 PM.
avings fromd 447 MW foal for savingsugh the literaerature reviewe them to sm
nducted in thalysis of a fo
gram Evaluathting, which
mand coincidcoming CPU
ging Markend Respons
Annu
s will yield a
CE will contil energy man
dential Lig
etermine if redetermine th
mand. Extensearch documped to underd plug load a
as changed suerage have be
me electronicas steadily insehold attrib
miscellaneoush a secondary
m EE in the refor miscellans. The projecature revieww also indic
mart grid tech
his study, a sorthcoming tion report).h can help deding or exceeUC data show
ts & Technse (DR) Proual Report:
additional ins
inue efforts tnagement at
ghting (P
esidential lighe potential sive research
ments, surveyrstand and evapplications
ubstantially ecome larges. Per capita
ncreased natibutes 27% ofs loads. Basey peak at 7 A
esidential seneous from 2cted increase
w underscoreates the need
hnologies an
second phaseCPUC reporThe CPUC
etermine if aeding SCE gws a peak de
ology ojects 2011
16
sight into the
to improve lindustrial fa
Posted on
ghting and pfor customeh was condu
ys, and DR cvaluate curre.
over the paser, and most a, and specifiionally. Withf its energy ued on data frAM. Based o
ctor, 481 MW2004 to 2016e in customes the opportud to further e
nd DR progra
e of the projrt on residenreport will p
and when thegeneration. Iemand impac
eir
load acilities.
n
lug loads er ucted ase ent
st three contain
fically in hin the use to rom on data
W under 6, er DR unity for engage ams.
ect ntial provide e lighting f the ct, then
3
3/30/2012
K. Das
Phase 2 oresidentia
DR11.05 DR11SCE
1. Over
a)This projeThis ALCBeach, Ca
b)The purpoRedwoodSciences
The objec Exam
loads Exam
contro
2. CollaThis projeUCI, and
3. Resu
a)Installatio2011. TheCommisselectrical DR testinconductedinvolved creductionwhich it rloggers aswere achi
f the projectal customer s
DR OppoE1.05.01
rview
) Landmarect evaluated
CS was instalalifornia.
) Universitose of this pr
d Systems. In1 building at
ctives of thismine the ALC
from businemine demand
ol system
aboration ect was comthe CLTC.
ults
) Landmaron of the lighe new lightinioning reducinput. This ng performedd during the changing thes with respe
returned to ths a comparisieved as a re
t consisting osurvey could
ortunitiesand DR1
rk Squared the DR caplled on the 1
ty of Califoroject was to
nstallation oft the UCI.
s project at bCS features thess managemreductions t
mpleted in col
rk Squarehting systemng system coced the ballanew commis
d at the Landsame businee DR level toct to the comhe baseline Dson to demansult of this p
EmergDeman
of the analysd be pursued
s in Corrid1SCE1.05
pabilities of 10th floor of t
ornia, Irvino evaluate thf this ALCS
both locationhat allowed
ment as part othat can be a
llaboration w
m and controlonsisted of flast dimming ssioned levedmark Squaress hours ovo five differe
mmissioned lDR level. A nd during theproject:
ging Markend Respons
Annu
sis of the exid.
dor Light5.02)
an ALCS dethe Landmar
e (UCI) he DR capab
occurred on
ns were: for reliable of a DR Progachieved with
with SCE’s D
l hardware wfluorescent la
settings to 6l is also desi
re building. Tver three sepaent settings: level. Each snon-test daye three test d
ts & Technse (DR) Proual Report:
isting infrast
ting (Pos
eveloped by rk Square bu
bilities of an n the ground
control of cgram h a well-des
D&ES group
was completeamps and the65% of the liignated as thTesting was arate days. P 10%, 15%, setting lastedy was also redays. The fol
ology ojects 2011
17
tructure and
ted on ET
Lutron Elecuilding in Lo
ALCS develfloor of the
corridor light
signed, smart
p, Landmark
ed in Septeme Lutron ALighting’s ratehe baseline fsuccessfully
Part of the te20%, 25%,
d for one hoecorded by thllowing obje
a
TCC
ctronics. ong
loped by Natural
ting
t lighting
k Square,
mber LCS. ed
for the y esting and 30% ur after he data ectives
33/30/2012
L. D(Po
DR teProgra
Thereof the7.4 Wapproxdown
b)
InstallatioThe new lCommissThis new testing watest periodchanging below thethe baselicompariso as
DR tebusinecontro
ThereALCS0.031 This i
4. Next
Although lighting a
DR11.11 osted on E
1. Over
To better products aand servicSCE condresidentiamakers an
esting for theam could rel was a reduc ALCS and t
W/fixture, or 0ximately 17%the lamps.
) UCI
on of the lighlighting systioning reduccommission
as conductedds recordingthe lighting
e commissionne DR levelon to deman a result of t
esting for theess managemoller. was a reduc
S and the newW/sf at the s in addition
t Steps
this project and controls p
Future OETCC as
rview
understand rand servicesces from theducted a twoal customers nd thought-le
e ALCS confliably managction in overthe new ligh0.092 W/sf a%. This is in
hting systemtem consisteced the light ned level is ad for the samg granularity
level to fivened level. Ea. A non-test
nd during thethis project:
e ALCS confment as part
ction in overw lighting fi30% DR lev
n to the light
has been coprojects that
Outlook foET10SCE
residential cs and to unde perspective
o- pronged reand, twelve eaders.
EmergDeman
firmed that bge lighting lorhead corridohting fixturesat the 30% Dn addition to
m and controld of LED lamoutput settin
also designatme business h
was set at 1e different seach setting lday was als
e three test d
firmed that lof a DR Pro
rhead lightinxtures. The
vel. The percing savings
ompleted, SCt may influen
or ResideE4.07.0)
customer inteerstand the oes of manufasearch studyin-depth tel
ging Markend Respons
Annu
business manoads. or lighting los. The DR re
DR level. Tho the lighting
l hardware wmps and Redngs to 85% oted as the bahours over th-minute. Th
ettings: 10%asted for one
so recorded bdays. The fol
lighting loadogram, but re
ng load demaDR reductiocentage reduassociated w
CE will contince future D
ential Ene
erest in a numopportunitiesacturers and my including; lephone inter
ts & Technse (DR) Proual Report:
nagement as
oad demand eduction for
he percentageg savings ass
was completedwood Systeof the lightinaseline for thhree separate
he testing pro%, 15%, 20%
e hour, afterby the data lolowing obje
ds can be reliequires local
and after theon for lightinuction was apwith tuning d
inue to pursuDR program o
ergy Mana
mber of smas/barriers formembers of a web surverviews amon
ology ojects 2011
18
s part of a DR
after the inslighting ave
e reduction wsociated with
ed in Octobeems ALCS.ng’s rated ouhe DR testinge days. Duriocedure inclu, 25%, and 3r which it retoggers as a ctives were
iably managl connection
installation ng averaged pproximatelydown the lam
ue other advofferings.
agement
art grid-relatr smart grid pf the supply cy among SCng industry d
R
stallation eraged was h tuning
er 2011.
utput. g. DR ng the uded 30% turned to
achieved
ged by to the
of the 62W, or y 43%.
mps.
vanced
t
ted products chain,
CE decision
33/30/2012
2. Colla
This projeSCE residTechnoloAdditionaBuilding A
3. Resu
A web surin-depth ivendors, afollowing
a)
The m Aware
and ed Many Use o
b)
Two po o
Addit Soluti
servic
4. Next
Results of re
aboration
ect was comdential custogies and HVally, this projAssociation’
ults
rvey of 606 interviews wand supply c
g key finding
) Resident
main motivateness of eneducation on
y customers hf effective, b
) Industry
primary barrLack of opConsumer
ional innovaions that requces are neede
t Steps
f this study wsidential pro
mpleted in colomers and indVAC Techno
ject piggy b’s national st
residential cwere conductchain distribugs resulted fr
tial Survey
tion for savinrgy related pspecific conhave alreadybut high cost
Leader Int
riers to adoptpen and unifr lack of undation is needuire little effed
will be used ojects that ev
EmergDeman
llaboration wdustry leade
ology and Syacked off thtudy of the s
customers wated with induutors for smarom these su
ys
ng energy is products, ser
ncepts such ay taken easy t energy sav
terviews
tion of smartform standarderstanding rded to solve efort by consu
to determinevaluate emer
ging Markend Respons
Annu
with SCE’s Ders. It was alsystem Diagnoe efforts of tsame name.
as conductedustry leadersart grid prod
urveys and in
to lower elervices, and uas DR is needand less exp
ving solution
rt grid produrds and protoregarding eneenergy relateumers or bun
e where to forging market
ts & Technse (DR) Proual Report:
D&ES groupso co-fundedostic Advocthe Continen
d in SCE sers who represducts and sernterviews:
ectricity billsutility prograded
pensive stepsns has low pe
cts and serviocols ergy ed problemsndle energy
focus resourcts and techno
ology ojects 2011
19
p with input d with the Emacy programntal Automat
rvice territorent manufacrvices. The
s ams varies w
s to conserveenetration
ices:
solutions wi
ces on futureologies.
from merging
ms. ted
ry and 12 cturers,
widely
e
ith other
e
3
I
3/30/2012
III. Projec All n2012
cts initia
ew projects were started
ated in 2
initiated in 2d earlier in th
2011
2011 were cohe 2009-201
EmergDeman
ompleted by11 funding cy
ging Markend Respons
Annu
y year end. Tycle.
ts & Technse (DR) Proual Report:
The only proj
ology ojects 2011
20
jects continuuing into
3
I
4
h1
3/30/2012
IV. Pro
A. D
DR applicatio
http://www3.sc11+DR+Amend
ojects co
DR09.02
1. Over
The primaautomotivStorage Uduring DRstill allevican be fou001).
2. Colla
The HBP (EVTC) i
3. Statu
LG Chemreceived i2011, twofunctionaunits wenspecialistsUnfortunathe need tE was app
4. NextNecessary2012. Oncproceed. Ainformatioand any abe includehomes in
on (A.08-06-00ce.com/sscc/lawded+App_SCE
ontinued
Home Ba
rview
ary objectiveve grade advUnit (RESU)R events or liating demanund in Appe
aboration
project is a n Pomona, C
us
m. was selectin Decembero pre-produclity and seve
nt through thes have workately, UL ceto continue fproved, allow
t Steps y design chace the RESUAt the concluon regarding
additional leaed as part ofthe ZNE and
01) Appendicesw/dis/dbattach1E-04++Append
d in 2011
attery Pilo
e of this projvanced lithiu. The goal islocalized disnd on the poendix K4 of S
collaborativCalifornia le
ed as the venr of 2010 andction units aneral other ime complete sed with LG rtification hafunding this wing the con
anges have bU’s have UL usion of fiel
g the feasibilarning gainef the ISGD pd RESU blo
s A through M1e.nsf/0/DBCAdices+A-M.pdf
EmergDeman
1
ot (HBP)
ject, which bum-ion batters to evaluate stribution conwer grid. A
SCE’s amend
ve effort withveraging the
ndor to provd extensive lnd fourteen a
mprovementsseries of RESengineers toas been delaproject into
ntinuation of
een made ancertification
ld testing, a flity of using d as a result
project and wcks.
: A190DAE972Cf [as of March 2
ging Markend Respons
Annu
began in 200ry modules f the potentianstraints to dmore detaileded testimon
h SCE’s Eleceir expertise
vide the RESlab testing hadditional uns, including wSU tests and
o resolve issuayed leading
the next funf this project
nd UL certifin, the field tefinal report wthese types
t of this projewill receive a
CEB882574C929, 2012].
ts & Technse (DR) Proual Report:
09, is to evalfor use as a Ral of using indecrease cused explanatiny DR applic
ctric Vehiclewith lithium
SU. A prototyhas been perfnits were recweb control.d SCE’s enerues discoverto a delay in
nding cycle. t into the new
fication is anesting phasewill be writtof batteries ect. Additionadditional te
90070C520/$FI
ology ojects 2011
21
luate and tesResidential En-home battestomer impaon of this prcation (A.08
e Test Centem-ion batteri
ype device wformed. Durceived with i. These prodrgy storage red during ten field testinAdvice lettew funding cy
nticipated by e of the projeten to providas a DR resonal RESU’s sting in seve
ILE/A.08-06-0
st Energy eries ct, while roject 8-06-
er ies.
was ring increased
duction
esting. ng and er 2685-ycle.
late-ect will de ource will also
eral
001+2009-
3
5
h
3/30/2012
B. DDem
Department o
http://www.ene
DR09.08 monstrat
1. Over
SCE has bHAN depdistribute“matchingReinvestmDOE5. ThZero Net homes wiCommuniof this pro
2. CollaThis proje(TDBU) Acollaborat
3. Statu
The contrdevelopedto be signproducts pearly fieldmeters, intests sendcontinue ito continu
4. NextAdditionadrop durinincluding tested, an
f Energy Reco
ergy.gov/recov
Expandintion (ISGD
rview
been exploriployment to fd energy resg funds” alloment Act (ARhe ISGD projEnergy (ZN
ill receive diity Energy Soject are the
aboration ect is a collaAdvanced Ttes with the
us
ract with DOd, several chned with homprocured andd test was con-home displding simulateinto the nextue activities
t Steps al testing wilng several Dan EMS, sm
d installed in
overy Act Stateery/documents
ng ResideD) projec
ing how to cfurther enablsources. To fowing SCE tRRA) in SCject will dem
NE) homes infferent treatm
Storage, and DR potentia
aborative effoechnology ODOE in supp
OE was signehanges in selme owners pad installed inonducted whlays (IHDs),ed DR eventt funding cycand funding
ll be compleDR events dirmart appliancn anticipatio
e Memos: s/Recovery_Ac
EmergDeman
ential DRct
apitalize on le residentiafurther this gto leverage f
CE’s proposamonstrate pon step with Cments includa group utili
al of residen
ort with SCEOrganizationport of their
ed in Decemected vendoarticipating in the particip
hich involved and PCTs ins to these decle. Due to d
g was granted
eted during thrected at theces, plug loa
on of the prim
ct_Memo_Cali
ging Markend Respons
Annu
R in the Ir
the Edison Sal DR in coorgoal, EM&Tfunding fromal for the ISGotential EE aCalifornia’s Lding a ZNE izing individ
ntial HAN de
E’s Transmisn and BCD Dr larger, Sma
mber of 2010.rs were madin the projecpating homed the installan some of thevices were sdelays assocd in the appr
he summer oe installed PCad monitors,mary testing
ifornia.pdf [as
ts & Technse (DR) Proual Report:
rvine Sma
SmartConnerdination wi
T provided som the AmericGD project aand DR apprLTEESP. Segroup, a grodual RESU. evices and th
ssion and DiD&ES. This art Grid dem
. As detailedde and customct leading to s. However,
ation of projehe homes. Insuccessful. Aiated with throval of Adv
of 2012 to obCTs. Additioand RESUsphase of the
of March 29, 2
ology ojects 2011
22
art Grid
ectTM meterinith EE and ome of the can Recoverawarded by thoaches to en
everal groupsoup utilizing The two maj
he HBP.
istribution Uproject also
monstration ef
d plans were mer agreemedelays in ge
, during 201ect SmartCo
nitial commuAdditional tehis project, avice letter 26
bserve actuaonal HAN des will be proce project in 2
2012].
ng and
ry & he
nable s of
ajor areas
Unit
fforts.
ents had etting 1 an
onnectTM unication ests will a request 685-E.
al load evices cured, 2013.
3
6
r
3/30/2012
C. D
D. D
Pool Pump De
response-poten
DR10.05 A
1. Over
The purpothrough thwithout a offer a socommercievents by
2. Statu
An OpenAwas compactual DRneed to imcustomer software. was decidcontractinphase is supdates nfunding fo
3. Next
Finalize sselected sreport on
DR10.08
1. OverThe purpoavailable of pool puto prior stresource:
Po In
emand Respon
ntial [as of Mar
Auto-DR
rview
ose of this prhe OpenADRbuilding or lution that pial and indus enabling tem
us
ADR compapleted in earlR events thromprove the pwas identifiDuring 201
ded to move ng process wcheduled foreeded to theor this projec
t Steps
selection of csites. Monitothe results o
DR Pool
rview ose of this prpool pumps
ump loads intudies that es
ool Pump Dentegration of
nse Potential: hch 29, 2012].
PCT
roject is to dR specificatienergy man
provides somstrial custommperature se
atible PCT wly 2011. The
oughout the sprovisioning ied that requ1 an additionforward wit
was completer the summe
e original venct was grant
customer siteor PCT functof the field tr
Pumps
roject is to pand pool pu
n response tostimated the
emand RespDR into Tit
http://www.etcc
EmergDeman
demonstrate ion. This sol
nagement sysme automatedmers during Cetbacks, with
was identifiedese devices wsummer of 2of the PCT ired an updanal vendor cth a field tested for both soer of 2012. Dndor’s equipted in the app
es to participtionality duririal.
perform laboump controllo DR event spotential fo
onse Potentile 20 for Re
c-ca.com/comp
ging Markend Respons
Annu
the capabilitlution is intestem (BMS/Ed air-conditioCritical Peakhout the exp
d during 201were tested i2011. The PCallowing it t
ate to the equcontacted SCt of both soluolutions dur
Due to the adpment, a requproval of Ad
pate in the fiing summer
oratory and flers that are dsignals or prior residential
ial6 sidential Poo
ponent/content/
ts & Technse (DR) Proual Report:
ty of a PCT ended for comEMS). The poning load rk Pricing (CPpense of a ful
10 and procuin a lab settinCTs worked to be uniqueuipment and
CE with a simutions. The p
ring 2011 anddition of a suest to contindvice letter 2
ield trial. InsDR events.
field tests of designed to icing signalsl pool pumps
ol Pumps7
t/article/29/242
ology ojects 2011
23
using Auto-mmercial cuproject goal reduction forPP), or otherll BMS/EMS
urement of thng during seas anticipate
ely tied to a sd the associatmilar solutioprocurementd the field tesecond vendnue activitie2685-E.
stall PCT’s aPrepare a fi
commercialenable curtas. This is a fos to act as a D
20-pool-pump-
DR ustomers
is to r r DR, S.
he device everal ed, but a specific ted
on and it t and esting or and
es and
at nal
lly ailment follow up DR
demand-
3
7
c2
3/30/2012
E. D
Integration of
ca.com/compon29, 2012].
This projewell as re
2. Statu
After initipump witencounterin 2012. Aapproval o
3. NextCompletesolutions
DR10.09
1. Over
The purpopotential ideliverablearlier, as
a)This projedevelopmvariety ofparameterconsumpt
2. Colla
This projeenhance tcommerci
3. StatuThis projefor this pr
f DR into Title nent/content/ar
ect will inclutrofit solutio
us
ial implemenh integrated red have beeA request to of Advice le
t Steps e field trial oduring 2012
DRRC – D
rview
ose of this prin commerciles. Task 1 is it has been
) Task 1 - Sect includes
ment and the f users. This rs that allowtion.
aboration
ect is a collathe tools avaial sites.
us ect will be coroject was gr
20 for Residen
rticle/29/2938-
ude field triaons that wou
ntation planscommunica
en overcomecontinue act
etter 2685-E.
f integrated 2.
DR Tools
roject is to imial buildingss included incompleted:
Scoping Sa review ofcreation of awill include
w facility man
aborative effoailable for un
ompleted byranted in the
ntial Pool Pumpintegration-of-
EmergDeman
als of a pool uld add DR c
s were createation experie and plans ativities and f.
solution acc
s (Task 1)
mprove the ss. The projecn this section
tudy the literature
a frameworke a summary nagers to bet
ort with the nderstanding
y mid-2012. e approval of
ps - Phase 1: h-dr-into-title-20
ging Markend Respons
Annu
pump with icapabilities t
ed, the selecenced some dare moving fofunding for t
cording to pl
)
software tooct includes twn of the repo
e on existingk to evaluate y of metrics atter understa
DRRC and og and furtheri
A request tof Advice lett
http://www.etcc0-for-residentia
ts & Technse (DR) Proual Report:
integrated Dto existing po
cted vendor ddelays. The
forward to cothis project w
lans; select a
ols available wo major tasort, Task 2 w
g DR tools btools and ca
and buildingand their bui
other Califoring the adop
o continue acter 2685-E.
c-al-pool-pumps
ology ojects 2011
24
DR capabilitiool pumps.
designing theobstacles
omplete the pwas granted
and test retro
for estimatisks with sep
was reported
being used orategorize theg characterizalding’s ener
rnia IOUs toption of Auto
ctivities and
s-phase-1 [as of
es, as
e pool
project in the
ofit
ng DR arate on
r under em for a ation gy
o o-DR at
funding
f March
3
3/30/2012
F. D
G. D
4. NextContinue
DR10.11
1. Over
The purponew constseparate dhave been
a)Demand rover timeby variouthe initialover time
2. CollaThis projeimprove t
3. Statu
Delays infrom beincontinue aletter 268
4. NextContinue
DR10.16
1. Over
This projemanufactureceipt ofwill proviDR eventcapable ap
t Steps monitoring
DRRC – M
rview
ose of this prtruction and deliverables.n completed,
) Task 3 - reductions v. The DRRC
us engineerin estimation i.
aboration ect is a collathe understan
us
securing theng finalized iactivities and5-E.
t Steps monitoring
Smart Ap
rview
ect will perfourers to quanf a pricing sigide an oppor signals. Adppliance effo
Task 1 to en
Mainstrea
roject is to fain existing b Task 3 is in, and are inc
Evaluationary with eac
C will go throng firms and in order to e
aborative effonding and ad
e data needein 2011.Thisd funding fo
Task 1 to en
ppliances
orm laboratontify the DRgnal. These rtunity to seeditionally, th
forts underwa
EmergDeman
nsure comple
aming Au
facilitate andbuildings. Th
ncluded in thluded in the
n of load shch event and ough a seleccompare pevaluate how
ort with the doption of A
ed by the DRs project willor this projec
nsure comple
s
ory testing oR potential fo
tests will bee first hand hhe results of ay (e.g. Ener
ging Markend Respons
Annu
etion on sche
uto-DR (T
d accelerate the project in
his section ofearlier secti
hape chansometimes
cted number rformance o
w demand red
DRRC and oAuto-DR in th
RRC to compl be complet
ct was grante
etion on sche
f “smart appor curtailing e done in a cohow “smart af this study crgy Star con
ts & Technse (DR) Proual Report:
edule.
Task 3)
the adoptionncluded threef the report sions:
ges/shed ademand reduof audits an
of the buildinduction perfo
other Califorhe market.
plete this proted by mid-2ed in the app
edule.
pliances” froload during ontrolled labappliances”
can be used tnnected appli
ology ojects 2011
25
n of Auto-DRe major tasksince Tasks
attenuatiouctions decr
nd estimationngs over timformance cha
rnia IOUs to
oject prevent2012. A requproval of Ad
om several DR events o
b environmereact to pric
to inform variance effort)
R both in ks with 1 and 2
n rease ns done
me with anges
o
ted it uest to dvice
or upon nt and
ce and rious DR ).
33/30/2012
H. D
2. Colla
This projeDR poten
3. Statu
Initial testadditionalleast threetrends, a fcollected
4. NextDelays wimanufactuto create aTesting ofprocure sm
DR11.01 A
1. OverThe purpoequipmenproject beparticipatcompletedServices Dcomplemeresult of tresource. Pumping
2. StatuThe planncustomer durationscapabilitieselected, p
3. NextSelect thetrials to b
aboration
ect is a collantial of smart
us
ting of a “sml appliances e different mfinal report wfrom all the
t Steps ith getting courers, acquirappropriate tf appliances mart applian
Ancillary
rview ose of this prnt to participegan in 2010e in a prograd by Global DR programentary progrtransitioningInitial projecustomers c
us ning for this willingness . During 201es of each poplans will be
t Steps e equipment e completed
aborative effot appliances
mart” clothesincluding cl
manufacturerwill be creattests.
ontracts andring equipmetest cases resby several m
nces from ad
y Services
roject is to eate in an An
0 and includeam with shorEnergy Part
m for pumpinram to the exg AP-I to a Cctions are th
could be part
project begato participat
11 several pootential solue made for fi
to be used ad during the s
EmergDeman
ort with seveutilizing SC
s washer waslothes washers are schedued at the con
d Non-Discloent for testinsulted in themanufacture
dditional ven
s Pumpin
evaluate the pncillary Servied market rert notificatiotners recommng customersxisting AP-I
CAISO Reliahat by 2014 aticipating in
an in 2010 ante in a DR protential techn
ution were evield trials du
and the custosummer of 2
ging Markend Respons
Annu
eral major apCE’s D&ES l
s performed ers, refrigerauled for 2012nclusion of t
osure Agreemng and workie need to coners is schedulndors for incl
ng Equipm
potential of ices DR pro
esearch to deon and short mended that s as a potentiDR program
ability Demaapproximatean Ancillary
nd included rogram withnology vendvaluated. Onuring the sum
omer sites fo2012.
ts & Technse (DR) Proual Report:
ppliance malab facilities
during 2011ators, and dis2. In an effortesting which
ments (NDAing with spe
ntinue this prled and efforlusion in this
ment
customers wgram. The p
etermine custdurations. MSCE pursue
ial replacemm that now hand Responseely 6% of Agy Services pr
market reseh short notifidors were idence a technolmmer of 201
or the Ancilla
ology ojects 2011
26
anufacturers s and staff.
1. Testing ofshwashers frrt to determih utilizes dat
As) in place wecific manufaroject duringrts are beings project.
with pumpingplanning for tomer willin
Market researe an Ancillar
ment or has a MW cae Program (Rgricultural anrogram.
earch to deterication and sentified and logy partner 2.
ary Services
to test
f rom at ine ta
with facturers g 2012. g made to
g this
ngness to rch ry
ap as a RDRP) nd
rmine short the is
field
3
V
L
Tf
Ua2wl
8
PCab
3/30/2012
V. Budge
Line. No. Exp
1 Labor2 Non-L3 Total
The 2009-20for the follow
DR09 DR09 DR10 DR10 DR10 DR10 EPRI
Under Orderauthorization2009-2011 fuwas approvelisted above
8 D.09-08-027,Project funded California Edisadvice letter deby including a r
et
Emergin
pense Type r Labor
011 EM&T Rwing project
9.02 HBP 9.08 Expand0.05 Auto-D0.08 DR Poo0.09 DRRC 0.11 DRRC I Technology
ring Paragrapn to carry ovunding cycled effective Jto be spent i
, Ordering Parathrough the 20
son Company, escribing specifrequest to cont
ng Markets a
2009 $396,449 $404,515 $800,964
Recorded Exs:
ding ResidenDR PCT ol Pumps – DR Tools – Mainstreay Testing Co
ph 16 of D.0ver the unspee into the 20January 1, 20in the new fu
agraph 16. “To009-2011 budgand San Diegofic projects andtinue these proj
nd Technolo
201 $516,7
$896,2 $1,412,9
xpenses do n
ntial DR in IS
(Scoping Staming Auto-Dollaboration
09-08-027,8 Sent committe12-2014 fun012, allowinunding cycle
o continue beyogets adopted in o Gas & Electrid the reason fojects in their ne
EmergDeman
ogy Recorded
0 734 $214 $1,948 $2,
not include co
SGD
tudy) DR (Load Sh
SCE filed aned portion ofnding cycle.ng the remaine.
ond December this decision, Pic Company shr the project toext demand res
ging Markend Respons
Annu
d Expense –
2011 $981,835
862,709 844,544
ontractually
hape/Shed A
n advice lettef the EM&T On March 1
ning $4.2 mi
31, 2011, an EPacific Gas an
hall each requeo continue beyosponse funding
ts & Technse (DR) Proual Report:
– 2009-2011 (
2009-2011 Totals
$1,895,018 $3,163,438 $5,058,456
committed
Attenuation)
er in 2011 reauthorized f
15, 2012, Adillion commi
Emerging Marknd Electric Comest permission eond the end of g application.”
ology ojects 2011
27
($) 2009-2Author
Fund $9,244,4
and budgete
equesting funding from
dvice Letter 2itted to the p
kets and Technmpany, Southereither through
f the funding pe
2011 rized ing
405
ed funds
m the 2685-E projects
nology rn a Tier 2
eriod, or