1
Building Information
Modeling: Reshaping the
Future of Construction
Building Information
Modeling: Reshaping the
Future of Construction
Mansoura UniversityMansoura University
Structural EngineeringStructural Engineering
Emad ElbeltagiEmad Elbeltagi
2
AgendaAgenda
�� IntroductionIntroduction
�� VisualizationVisualization
�� Building Information Modeling Building Information Modeling
(BIM)(BIM)
�� BIM ApplicationsBIM Applications
�� BIM PotentialsBIM Potentials
�� Success StorySuccess Story
�� Future ResearchFuture Research
�� IntroductionIntroduction
�� VisualizationVisualization
�� Building Information Modeling Building Information Modeling
(BIM)(BIM)
�� BIM ApplicationsBIM Applications
�� BIM PotentialsBIM Potentials
�� Success StorySuccess Story
�� Future ResearchFuture Research
2
3
IntroductionIntroduction
�� 22D DrawingsD Drawings
�� Planning, Design, Construction, and Planning, Design, Construction, and
Operation coOperation co--ordinationordination
�� Project ComplexityProject Complexity
�� Progress in Information TechnologyProgress in Information Technology
�� 22D DrawingsD Drawings
�� Planning, Design, Construction, and Planning, Design, Construction, and
Operation coOperation co--ordinationordination
�� Project ComplexityProject Complexity
�� Progress in Information TechnologyProgress in Information Technology
4
VisualizationVisualization
�� Representing the Project VisuallyRepresenting the Project Visually
�� Many Stakeholders : Engineers, Architects, Many Stakeholders : Engineers, Architects,
planners, Clients and Usersplanners, Clients and Users
�� Shared UnderstandingShared Understanding
�� Building Information ModelBuilding Information Model
�� Representing the Project VisuallyRepresenting the Project Visually
�� Many Stakeholders : Engineers, Architects, Many Stakeholders : Engineers, Architects,
planners, Clients and Usersplanners, Clients and Users
�� Shared UnderstandingShared Understanding
�� Building Information ModelBuilding Information Model
3
5
Building Information Model (BIM)Building Information Model (BIM)
�� BIM is a great innovation in building BIM is a great innovation in building
industry industry
�� BIM is defined as highly flexible objectBIM is defined as highly flexible object--
oriented design process that provides oriented design process that provides
viable platforms for multiviable platforms for multi--disciplinary disciplinary
integrationintegration
�� BIM is a great innovation in building BIM is a great innovation in building
industry industry
�� BIM is defined as highly flexible objectBIM is defined as highly flexible object--
oriented design process that provides oriented design process that provides
viable platforms for multiviable platforms for multi--disciplinary disciplinary
integrationintegration
6
BIMBIM
�� Unlike conventional CAD tools, BIM uses Unlike conventional CAD tools, BIM uses
intelligent objects to represent distinctive intelligent objects to represent distinctive
features in designs features in designs
�� The AIA defined BIM as a modelThe AIA defined BIM as a model--based based
technology linked with a database of technology linked with a database of
project information and this reflects the project information and this reflects the
general reliance on database technology general reliance on database technology
as the foundation for BIMas the foundation for BIM
�� Unlike conventional CAD tools, BIM uses Unlike conventional CAD tools, BIM uses
intelligent objects to represent distinctive intelligent objects to represent distinctive
features in designs features in designs
�� The AIA defined BIM as a modelThe AIA defined BIM as a model--based based
technology linked with a database of technology linked with a database of
project information and this reflects the project information and this reflects the
general reliance on database technology general reliance on database technology
as the foundation for BIMas the foundation for BIM
4
7
BIMBIM
�� BIM uses objects such as: walls, floors, BIM uses objects such as: walls, floors,
roofs, windows, doors, etc.roofs, windows, doors, etc.
�� The objects are tied to a database that The objects are tied to a database that
contains all data related to the geometry, contains all data related to the geometry,
spatial relationships, geographic spatial relationships, geographic
information, quantities, and properties of information, quantities, and properties of
the building components.the building components.
�� BIM uses objects such as: walls, floors, BIM uses objects such as: walls, floors,
roofs, windows, doors, etc.roofs, windows, doors, etc.
�� The objects are tied to a database that The objects are tied to a database that
contains all data related to the geometry, contains all data related to the geometry,
spatial relationships, geographic spatial relationships, geographic
information, quantities, and properties of information, quantities, and properties of
the building components.the building components.
8
BIMBIM
�� As such, the drawing becomes a model that As such, the drawing becomes a model that
is information rich and can readily be used is information rich and can readily be used
to visualize the entire building lifecycle to visualize the entire building lifecycle
including the processes of construction and including the processes of construction and
facility operation / maintenance.facility operation / maintenance.
�� As such, the drawing becomes a model that As such, the drawing becomes a model that
is information rich and can readily be used is information rich and can readily be used
to visualize the entire building lifecycle to visualize the entire building lifecycle
including the processes of construction and including the processes of construction and
facility operation / maintenance.facility operation / maintenance.
5
9
BIM: BIM:
�� BIM is not simply a drafting tool, like BIM is not simply a drafting tool, like 22D D
computer drafting. It is, more precisely, a computer drafting. It is, more precisely, a
design tooldesign tool
�� Each object in the model contains many Each object in the model contains many
levels of data about that object; a window levels of data about that object; a window
contains information on its dimensions, contains information on its dimensions,
glass selection, color, hardware, cost, and glass selection, color, hardware, cost, and
even its required schedule for deliveryeven its required schedule for delivery
�� BIM is not simply a drafting tool, like BIM is not simply a drafting tool, like 22D D
computer drafting. It is, more precisely, a computer drafting. It is, more precisely, a
design tooldesign tool
�� Each object in the model contains many Each object in the model contains many
levels of data about that object; a window levels of data about that object; a window
contains information on its dimensions, contains information on its dimensions,
glass selection, color, hardware, cost, and glass selection, color, hardware, cost, and
even its required schedule for deliveryeven its required schedule for delivery
Why?Why?
10
BIM: BIM:
�� Using BIM, the building is defined as a collection of Using BIM, the building is defined as a collection of
interrelated objects that can be visualized in interrelated objects that can be visualized in 33DD
�� Using BIM, the building is defined as a collection of Using BIM, the building is defined as a collection of
interrelated objects that can be visualized in interrelated objects that can be visualized in 33DD
Why?Why?
6
11
BIM: BIM:
�� BIM process take place in what is called the BIM process take place in what is called the
ii--room (or Big room)room (or Big room)
�� The Big Room is large enough to house the The Big Room is large enough to house the
entire team and allows every one to follow entire team and allows every one to follow
the process in detailthe process in detail
�� Get the team together in one spot: Get the team together in one spot:
Architects, Structural, Mechanical, etc.Architects, Structural, Mechanical, etc.
�� BIM process take place in what is called the BIM process take place in what is called the
ii--room (or Big room)room (or Big room)
�� The Big Room is large enough to house the The Big Room is large enough to house the
entire team and allows every one to follow entire team and allows every one to follow
the process in detailthe process in detail
�� Get the team together in one spot: Get the team together in one spot:
Architects, Structural, Mechanical, etc.Architects, Structural, Mechanical, etc.
The Big Room conceptThe Big Room concept
12
BIM: BIM: The Big Room conceptThe Big Room concept
7
13
BIM: BIM:
�� Work FlowWork Flow�� Work FlowWork Flow
The Big Room conceptThe Big Room concept
14
BIM: BIM: The Big Room conceptThe Big Room concept
8
15
BIM: BIM:
�� Ability to create an accurate an intelligent Ability to create an accurate an intelligent
model which is useful throughout the entire model which is useful throughout the entire
life of a facilitylife of a facility
�� Parametric modeling; objects are related Parametric modeling; objects are related
parametrically therefore a number of parametrically therefore a number of
related conditions can be updated by related conditions can be updated by
changing only one property. changing only one property.
�� Ability to create an accurate an intelligent Ability to create an accurate an intelligent
model which is useful throughout the entire model which is useful throughout the entire
life of a facilitylife of a facility
�� Parametric modeling; objects are related Parametric modeling; objects are related
parametrically therefore a number of parametrically therefore a number of
related conditions can be updated by related conditions can be updated by
changing only one property. changing only one property.
BenefitsBenefits
16
BIM: BIM:
�� Identify clashes which reduces the cost and Identify clashes which reduces the cost and
the time wasted . the time wasted .
�� Identify clashes which reduces the cost and Identify clashes which reduces the cost and
the time wasted . the time wasted .
BenefitsBenefits
9
17
BIM: BIM:
�� Design ChecksDesign Checks
�� Creating integrated Creating integrated nDnD models by linking models by linking
schedules, cost, etc.schedules, cost, etc.
�� Easy, faster and more effective information Easy, faster and more effective information
sharing between all participantssharing between all participants
�� Easy creation of accurate shop drawings, Easy creation of accurate shop drawings,
details and project reportsdetails and project reports
�� Design ChecksDesign Checks
�� Creating integrated Creating integrated nDnD models by linking models by linking
schedules, cost, etc.schedules, cost, etc.
�� Easy, faster and more effective information Easy, faster and more effective information
sharing between all participantssharing between all participants
�� Easy creation of accurate shop drawings, Easy creation of accurate shop drawings,
details and project reportsdetails and project reports
BenefitsBenefits
18
BIM: BIM:
�� Integrated Delivery Integrated Delivery �� Integrated Delivery Integrated Delivery
BenefitsBenefits
10
19
BIM: BIM: BenefitsBenefits
20
BIM: BIM:
�� NBIMS is a collection of standards for users NBIMS is a collection of standards for users
and developers. and developers.
�� It enables communications between It enables communications between
different applications different applications
�� NBIMS establishes definitions for building NBIMS establishes definitions for building
informationinformation
�� NBIMS is a collection of standards for users NBIMS is a collection of standards for users
and developers. and developers.
�� It enables communications between It enables communications between
different applications different applications
�� NBIMS establishes definitions for building NBIMS establishes definitions for building
informationinformation
StandardsStandards
11
21
BIM: BIM:
�� IFC is an open standard to represent the IFC is an open standard to represent the
information in BIM information in BIM
�� The objective of using IFC is to improve The objective of using IFC is to improve
communication, productivity, delivery time, communication, productivity, delivery time,
and quality throughout the whole life cycleand quality throughout the whole life cycle
�� Attachment of properties, classifications to Attachment of properties, classifications to
componentscomponents
�� IFC is an open standard to represent the IFC is an open standard to represent the
information in BIM information in BIM
�� The objective of using IFC is to improve The objective of using IFC is to improve
communication, productivity, delivery time, communication, productivity, delivery time,
and quality throughout the whole life cycleand quality throughout the whole life cycle
�� Attachment of properties, classifications to Attachment of properties, classifications to
componentscomponents
Industry Foundation ClassIndustry Foundation Class
22
BIM: BIM:
�� A building elements as A building elements as IfcWallIfcWall, geometry , geometry
as as IfcExtrudedAreaSolidIfcExtrudedAreaSolid, and basic , and basic
constructs such as constructs such as IfcCartesianPointIfcCartesianPoint
�� A building elements as A building elements as IfcWallIfcWall, geometry , geometry
as as IfcExtrudedAreaSolidIfcExtrudedAreaSolid, and basic , and basic
constructs such as constructs such as IfcCartesianPointIfcCartesianPoint
Industry Foundation ClassIndustry Foundation Class
12
23
BIM: BIM:
�� Classifies the entire built to provide a Classifies the entire built to provide a
standardized basis for information in AECstandardized basis for information in AEC
�� Classifies the entire built to provide a Classifies the entire built to provide a
standardized basis for information in AECstandardized basis for information in AEC
OmniclassOmniclass
24
BIM: BIM:
�� Few vendors produce software for BIM Few vendors produce software for BIM
developmentdevelopment
�� Autodesk REVIT, Autodesk REVIT, ArchiCADArchiCAD, , BentlyBently systems, systems,
VicoVico, etc., etc.
�� REVIT is the most literal interpretation of REVIT is the most literal interpretation of
BIM as a central database. The strength of BIM as a central database. The strength of
REVIT is the ability to coordinate every REVIT is the ability to coordinate every
building element in one databasebuilding element in one database
�� Few vendors produce software for BIM Few vendors produce software for BIM
developmentdevelopment
�� Autodesk REVIT, Autodesk REVIT, ArchiCADArchiCAD, , BentlyBently systems, systems,
VicoVico, etc., etc.
�� REVIT is the most literal interpretation of REVIT is the most literal interpretation of
BIM as a central database. The strength of BIM as a central database. The strength of
REVIT is the ability to coordinate every REVIT is the ability to coordinate every
building element in one databasebuilding element in one database
SoftwareSoftware
13
25
�� In the AEC industries, there are wide range In the AEC industries, there are wide range
of BIM applicationsof BIM applications
�� The applications ranges from planning, The applications ranges from planning,
designing, to construction and operation, designing, to construction and operation,
etc.etc.
�� In the literature, many research efforts In the literature, many research efforts
have been done using BIM have been done using BIM
�� In the AEC industries, there are wide range In the AEC industries, there are wide range
of BIM applicationsof BIM applications
�� The applications ranges from planning, The applications ranges from planning,
designing, to construction and operation, designing, to construction and operation,
etc.etc.
�� In the literature, many research efforts In the literature, many research efforts
have been done using BIM have been done using BIM
BIM Application: BIM Application:
26
�� Major benefit of BIM, stakeholders can Major benefit of BIM, stakeholders can
visualize and analyze all building attributes visualize and analyze all building attributes
�� Major benefit of BIM, stakeholders can Major benefit of BIM, stakeholders can
visualize and analyze all building attributes visualize and analyze all building attributes
VisualizationVisualizationBIM Application: BIM Application:
14
27
�� Real life challenges such as sustainability, Real life challenges such as sustainability,
buildabilitybuildability, etc. could be managed , etc. could be managed
�� Real life challenges such as sustainability, Real life challenges such as sustainability,
buildabilitybuildability, etc. could be managed , etc. could be managed
VisualizationVisualizationBIM Application: BIM Application:
28
�� 33D modeling allows clearer understanding D modeling allows clearer understanding
of the spaceof the space
�� Communicating design ideas to ownersCommunicating design ideas to owners
�� Many attempts have been made to use the Many attempts have been made to use the
virtual reality in design and solve virtual reality in design and solve
constructability problemsconstructability problems
�� 33D modeling allows clearer understanding D modeling allows clearer understanding
of the spaceof the space
�� Communicating design ideas to ownersCommunicating design ideas to owners
�� Many attempts have been made to use the Many attempts have been made to use the
virtual reality in design and solve virtual reality in design and solve
constructability problemsconstructability problems
Building Design and Building Design and ConstructionConstruction
BIM Application: BIM Application:
15
29
BIM Application: BIM Application:
�� BIM has been used successfully for BIM has been used successfully for
quantity takequantity take--off estimatesoff estimates
�� It has been reported (CIFE It has been reported (CIFE 20072007) that ) that
using BIM leads to Cost estimation using BIM leads to Cost estimation
accuracy within accuracy within 33% and up to % and up to 8080% %
reduction in time taken to generate a cost reduction in time taken to generate a cost
estimateestimate
�� BIM has been used successfully for BIM has been used successfully for
quantity takequantity take--off estimatesoff estimates
�� It has been reported (CIFE It has been reported (CIFE 20072007) that ) that
using BIM leads to Cost estimation using BIM leads to Cost estimation
accuracy within accuracy within 33% and up to % and up to 8080% %
reduction in time taken to generate a cost reduction in time taken to generate a cost
estimateestimate
Cost EstimatingCost Estimating
30
�� Identifying the construction activitiesIdentifying the construction activities
�� The construction sequenceThe construction sequence
�� Selecting the appropriate construction Selecting the appropriate construction
methodsmethods
�� Some efforts have been done to import CAD Some efforts have been done to import CAD
components into scheduling software to components into scheduling software to
automatically generate schedulingautomatically generate scheduling
�� Identifying the construction activitiesIdentifying the construction activities
�� The construction sequenceThe construction sequence
�� Selecting the appropriate construction Selecting the appropriate construction
methodsmethods
�� Some efforts have been done to import CAD Some efforts have been done to import CAD
components into scheduling software to components into scheduling software to
automatically generate schedulingautomatically generate scheduling
Planning and Planning and ScheduleSchedule
BIM Application: BIM Application:
16
31
�� One major benefit, BIM enables visualizing One major benefit, BIM enables visualizing
the schedule at any time period the schedule at any time period
�� One major benefit, BIM enables visualizing One major benefit, BIM enables visualizing
the schedule at any time period the schedule at any time period
Planning and Planning and ScheduleSchedule
BIM Application: BIM Application:
32
�� Construction progress could be visualized at a given Construction progress could be visualized at a given
datedate
�� Cost and schedule variances could be also reported.Cost and schedule variances could be also reported.
�� Many Other applicationsMany Other applications
�� Construction progress could be visualized at a given Construction progress could be visualized at a given
datedate
�� Cost and schedule variances could be also reported.Cost and schedule variances could be also reported.
�� Many Other applicationsMany Other applications
Project ControlProject ControlBIM Application: BIM Application:
17
33
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
34
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
18
35
General InformationGeneral Information
�� Site area Site area 420420,,790 790 SFSF
�� Parking for Parking for 1110 1110 cars, Area cars, Area 420420,,000 000 SFSF
�� Medical office building, laboratories, urgent Medical office building, laboratories, urgent
care center, outpatient surgery center, care center, outpatient surgery center,
pharmacy and radiology centerpharmacy and radiology center
�� Construction cost $Construction cost $100100,,000000,,000000
General InformationGeneral Information
�� Site area Site area 420420,,790 790 SFSF
�� Parking for Parking for 1110 1110 cars, Area cars, Area 420420,,000 000 SFSF
�� Medical office building, laboratories, urgent Medical office building, laboratories, urgent
care center, outpatient surgery center, care center, outpatient surgery center,
pharmacy and radiology centerpharmacy and radiology center
�� Construction cost $Construction cost $100100,,000000,,000000
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
36
Design ConceptDesign Concept
�� Facility assembled on computer before Facility assembled on computer before being build onsitebeing build onsite
�� Big room concept was applied to achieve:Big room concept was applied to achieve:
�� No misunderstandingNo misunderstanding
�� No conflict of systemsNo conflict of systems
�� No change ordersNo change orders
�� Changes take place during the design Changes take place during the design phase not during the constructionphase not during the construction
Design ConceptDesign Concept
�� Facility assembled on computer before Facility assembled on computer before being build onsitebeing build onsite
�� Big room concept was applied to achieve:Big room concept was applied to achieve:
�� No misunderstandingNo misunderstanding
�� No conflict of systemsNo conflict of systems
�� No change ordersNo change orders
�� Changes take place during the design Changes take place during the design phase not during the constructionphase not during the construction
Success StorySuccess Story
19
37
BIM ModelBIM ModelBIM ModelBIM Model
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
38
MEP ModelMEP ModelMEP ModelMEP Model
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
20
39
Impressive AchievementsImpressive Achievements
�� Labor productivity was Labor productivity was 15 15 to to 30 30 percent better percent better
than standards than standards
�� Less than Less than 00..2 2 percent repercent re--work on the HVAC.work on the HVAC.
�� Only two field issues related to RFIs Only two field issues related to RFIs
�� No change orders related to field conflict issuesNo change orders related to field conflict issues
�� No conflicts between the systems that were No conflicts between the systems that were
modeled and coordinated using BIMmodeled and coordinated using BIM
Impressive AchievementsImpressive Achievements
�� Labor productivity was Labor productivity was 15 15 to to 30 30 percent better percent better
than standards than standards
�� Less than Less than 00..2 2 percent repercent re--work on the HVAC.work on the HVAC.
�� Only two field issues related to RFIs Only two field issues related to RFIs
�� No change orders related to field conflict issuesNo change orders related to field conflict issues
�� No conflicts between the systems that were No conflicts between the systems that were
modeled and coordinated using BIMmodeled and coordinated using BIM
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
40
Impressive AchievementsImpressive Achievements
�� HVAC contractor saved HVAC contractor saved 33 33 percent of field labor percent of field labor
hours by creating parametric hours by creating parametric 33--D models and D models and
using them to prefabricate ductsusing them to prefabricate ducts
Impressive AchievementsImpressive Achievements
�� HVAC contractor saved HVAC contractor saved 33 33 percent of field labor percent of field labor
hours by creating parametric hours by creating parametric 33--D models and D models and
using them to prefabricate ductsusing them to prefabricate ducts
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
21
41
Success Story: Camino Health CenterCamino Health CenterSuccess Story: Camino Health CenterCamino Health Center
42
�� BIM is still in its infancy stageBIM is still in its infancy stage
�� High standardization is requiredHigh standardization is required
�� Object librariesObject libraries
�� Tools to support distributed work processTools to support distributed work process
�� Direct integration with structural analysis Direct integration with structural analysis
and project management applicationsand project management applications
�� BIM is still in its infancy stageBIM is still in its infancy stage
�� High standardization is requiredHigh standardization is required
�� Object librariesObject libraries
�� Tools to support distributed work processTools to support distributed work process
�� Direct integration with structural analysis Direct integration with structural analysis
and project management applicationsand project management applications
Challenges and PotentialsChallenges and Potentials
22
43
�� Potential increase in using BIM Potential increase in using BIM
�� Lacking of skilled BIM candidatesLacking of skilled BIM candidates
�� Accordingly, BIM should be taught as Accordingly, BIM should be taught as
subject for construction and civil subject for construction and civil
engineering studentsengineering students
�� Or, reconfiguring the current courses to Or, reconfiguring the current courses to
integrate BIM into their contentsintegrate BIM into their contents
�� Potential increase in using BIM Potential increase in using BIM
�� Lacking of skilled BIM candidatesLacking of skilled BIM candidates
�� Accordingly, BIM should be taught as Accordingly, BIM should be taught as
subject for construction and civil subject for construction and civil
engineering studentsengineering students
�� Or, reconfiguring the current courses to Or, reconfiguring the current courses to
integrate BIM into their contentsintegrate BIM into their contents
Challenges and PotentialsChallenges and Potentials
44
�� Asset ManagementAsset Management
�� Use of BIM for Site layout planningUse of BIM for Site layout planning
�� MultiMulti--criteria optimization decision analysiscriteria optimization decision analysis
�� Use of Evolutionary algorithms in Use of Evolutionary algorithms in constructionconstruction
�� Developing computerized models for Developing computerized models for construction applicationsconstruction applications
�� Use of advanced AI techniques such as Use of advanced AI techniques such as neural networks and fuzzy logicneural networks and fuzzy logic
�� Asset ManagementAsset Management
�� Use of BIM for Site layout planningUse of BIM for Site layout planning
�� MultiMulti--criteria optimization decision analysiscriteria optimization decision analysis
�� Use of Evolutionary algorithms in Use of Evolutionary algorithms in constructionconstruction
�� Developing computerized models for Developing computerized models for construction applicationsconstruction applications
�� Use of advanced AI techniques such as Use of advanced AI techniques such as neural networks and fuzzy logicneural networks and fuzzy logic
On Going ResearchOn Going Research
23
45
Finally: Drawing EvolutionFinally: Drawing Evolution
46
�� Project Idea + Land for ConstructionProject Idea + Land for Construction
�� Know you site (Land Explore)Know you site (Land Explore)
�� Discover any Discrepancies (Map Discover any Discrepancies (Map 33D)D)
�� The Relation with Surrounding The Relation with Surrounding FacilitesFacilites (Photo (Photo
Fly)Fly)
�� Map GuideMap Guide
�� Project Idea + Land for ConstructionProject Idea + Land for Construction
�� Know you site (Land Explore)Know you site (Land Explore)
�� Discover any Discrepancies (Map Discover any Discrepancies (Map 33D)D)
�� The Relation with Surrounding The Relation with Surrounding FacilitesFacilites (Photo (Photo
Fly)Fly)
�� Map GuideMap Guide
BIM Suite: How to use it?BIM Suite: How to use it?
24
47
�� Conceptual Analysis for go or not to go Decision Conceptual Analysis for go or not to go Decision
(Project Vasari)(Project Vasari)
�� Prepare your Complete BIM Model (Prepare your Complete BIM Model (RevitRevit
Architecture, Structural, MEP)Architecture, Structural, MEP)
�� (Energy Analysis) (Energy Analysis) EcotectEcotect, Green Building Studio, Green Building Studio
�� Structural Analysis (Robot)Structural Analysis (Robot)
�� Project Visualization, Animation, Time line, Project Visualization, Animation, Time line,
((NavisWorkNavisWork))
�� Conceptual Analysis for go or not to go Decision Conceptual Analysis for go or not to go Decision
(Project Vasari)(Project Vasari)
�� Prepare your Complete BIM Model (Prepare your Complete BIM Model (RevitRevit
Architecture, Structural, MEP)Architecture, Structural, MEP)
�� (Energy Analysis) (Energy Analysis) EcotectEcotect, Green Building Studio, Green Building Studio
�� Structural Analysis (Robot)Structural Analysis (Robot)
�� Project Visualization, Animation, Time line, Project Visualization, Animation, Time line,
((NavisWorkNavisWork))
BIM Suite: How to use it?BIM Suite: How to use it?
48
TAHNK YOUTAHNK YOUTAHNK YOUTAHNK YOU