    National House Building Council

  • Update on NHBC ground gas guidance

    Contents

    • Who are NHBC?

    • NHBC perspective:

    • Managing ground risk

    • Traffic Light System

    • BS8485:2015 and NHBC guidance.

    • NHBC current expectations

    • Some current issues

  • Who is NHBC?

    The National House-Building Council

    - established 1936

    Non-profit distributing company

    Unique “stakeholder” company

    structure

    10 year Warranty introduced in 1968

    – 80% market share

    Approved Inspector licence granted in

    1985 (England and Wales) – Approx

    65%

  • Who is NHBC?

    Land Quality - Managing Ground Conditions

    Warranty - Chapter 4.1 provides framework &

    expectations for managing ground

    conditions

    Building Control – Where NHBC acting as the Building

    Control Body, we also assess

    contamination aspects under Part

    C of the Building Regulations

  • Managing Ground Gas Risks – NHBC

    Perspective

    Technical guidance - Guidance on evaluation of

    development proposals on sites where methane

    & carbon dioxide are present, 2007)

    Technical Updates – advice on good practice

    updates or changes to technical advice is

    communicated by regular technical bulletins;

    (these are now linked to the NHBC Standards)

  • Managing Ground Gas Risks – NHBC

    Perspective

    What NHBC Require – ‘the fundamental requirements

    remain unchanged’

    ‘all sites are properly assessed and investigated for potential contamination hazards“

    “sites are properly remediated where necessary or appropriate, and

    design precautions are taken’

    “documentation & verification provided to confirm that site is suitable

    for the proposed use(s)”

  • Managing Ground Gas Risks – NHBC

    Perspective

    Managing Ground Gas Risks – NHBC Perspective

    Statutory Requirements – Construction to comply with relevant Building

    Regulations applicable at time of commencement of works.

    Last amendment to Building Regulations in England was 2013

    Demonstrating Compliance - Approved Documents / British Standards used

    to demonstrate compliance with Building Regulations. But alternative

    methods can always be adopted but……..

    Note of Caution… If alternate approaches adopted, developer needs to

    demonstrate solution /design compliant (equivalent or better) with Building

    Regulations applicable at the time.

  • Managing Ground Gas Risks – NHBC traffic

    light system

    Most people will be aware of:

  • Managing Ground Gas Risks – NHBC traffic

    light system

    But how many people have read (and understood)

    appendix F – Derivations of Gas Screening Values

    used with traffic Light.

    • Critical if you are using traffic light system that

    you understand;

    • How they were derived? Assumptions?

    • What sites/construction types they are applicable to?

    • Restrictions?

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    NHBC published

    classification System in

    2007– referred to as ‘Traffic Lights’. It is a modelled

    approach

    • Only applicable to housing

    development (not apartments)

    • Assumes 150mm ventilated

    void

    • Assumes 1 air change (sub

    slab ) per day

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    Not applicable to:

    • High Rise.

    • Rafts, cast insitu suspended slabs, ground

    bearing slabs….

    • If using void formers, geocomposite void formers,

    granular blankets for sub slab ventilation.

    • Also need to consider if applicable to terraces or

    larger detached dwellings – Modelled on 64m2

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    • Defendable approach –

    Clauses 6.2 & 6.2.2 BS8485.

    • Characteristic Situation:

    • An empirical approach

    based on relationship

    between gas data &

    judgement/experience to

    yield practicable and

    reliable outcomes.

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    • ‘Traffic light’ is a:

    • Modelled approach.

    • Greater emphasis on

    ventilation element.

    • Models potential for gases

    to accumulate beneath (or

    within) specific building type

    using specific assumptions.

    • Derives the GSVs & ‘Traffic

    Light Classifications’.

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    What is Gas Screening Value?

    Sub floor void

    considered for

    CH4 & CO2

    Small room considered

    for CO2 calculations

    Small room

    ventilation rateC02

    LeakSub floor void

    ventilation rate

    Low-Rise Housing

    Development

    • For Amber 1 not

    plausible for gas

    hazard to be present.

    • Subject to

    development = model

    assumptions.

    • GSV for Amber 1

    based on target gas

    not being > critical

    concentrations.

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    What is Gas Screening Value?

    Sub floor void

    considered for

    CH4 & CO2

    Small room considered

    for CO2 calculations

    Small room

    ventilation rateC02

    LeakSub floor void

    ventilation rate

    Low-Rise Housing

    Development

    • For CH4 sub slab

    equib concentration

    must not exceed 1%.

    • For Co2 the limiting

    conc within small

    internal space must

    not exceed 0.25%.

    • Based on the

    modelled approach

    these cannot be

    exceeded for amber 1.

  • Application of BS8485 guidance - where NHBC ‘Traffic Light’ Guidance may be applicable

    • Therefore for Amber 1 sites:

    • NHBC would not normally insist on 3 party

    validation of gas protection measures.

    • May do if we have concerns over gas

    monitoring data, installer or if proposed

    construction does not meet assumptions of the

    model.

    For Amber 2 sites more reliance on the

    membrane & verification is required.

  • Ground Gas Protection - NHBC Current

    Expectations

    Gas

    Regime

    Minimum Gas Protection Expectations Verification/Information Requirements

    Green • N/A – But need to comply with BR211

    Radon requirements

    N/A

    Amber 1 • Ventilation - subfloor venting to achieve

    at least 1 air exchange per day

    (minimum 150mm void height;

    1500mm2/m air vent opening or

    500mm2/ m2 floor area spaced at not

    more than 2m centres on at least two

    opposing sides)

    • Membrane – must be suitable for use.

    • Membrane installation/design - to

    achieve complete integrity across entire

    building footprint. Penetrations and joints

    sealed.

    • Construction drawings -showing

    position of membrane, sealing details

    and ventilation points to be provided

    • Membrane specification – technical

    data sheet(s) for gas membrane

    (including gas permeability data) to be

    provided.

    • Installation – photographic evidence

    of installed membrane may be

    requested.

  • Ground Gas Protection - NHBC Current

    Expectations

    Gas

    Regime

    Minimum Gas Protection Expectations Verification/Information Requirements

    Amber 2 • Ventilation –subfloor venting to achieve at least 1 air exchange per day

    (minimum 150mm void height; 1500mm2/m

    air vent opening or 500mm2/ m2 floor area

    spaced at not more than 2m centres on at

    least two opposing sides)

    • Membrane specification must be suitable for

    purpose (criterion detailed in BS8485:2015

    clause 7.2.4)

    • Membrane installation/design to achieve

    complete integrity across entire building

    footprint. Penetrations and joints sealed.

    • Installation – Installers must be experienced

    and appropriately trained and/or qualified.

    • Construction drawings showing position

    of membrane, sealing details and

    ventilation points to be provided.

    • Membrane specification – Technical data

    sheet(s) for gas membrane (including

    gas permeability) to be provided

    • Installation – Third party verification

    report(s). Supporting evidence to be

    included (i.e. photographic evidence

    /certificates of conformity, observations

    relating to sealing, location of ventilators

    and standards of installation etc.)

    • Integrity testing – May be requested. The

    testing plan to be agreed in advance.

    Red Standard residential housing is not normally acceptable without further ground gas risk assessment and/or possible remedial mitigation measures to reduce/remove the source of the

    ground gases.

  • Ground Gas Protection - NHBC Current

    Expectations

    More Information:

    Technical Extra Article April 2016 – Issue 20.

    http://www.nhbc.co.uk/Builders/ProductsandServices

    /TechZone/NHBCStandards/TechnicalExtra/

    http://www.nhbc.co.uk/Builders/ProductsandServices/TechZone/NHBCStandards/TechnicalExtra/

  • Update on NHBC ground gas guidance

    Some current issues

    • Gas protection measures not being designed.

    Recommendations made but who is the designer?

    • Gas membranes – Struggling to meet Criteria in table 7

    BS8485. Amendment to be produced.

    • Membrane – should be dependent on the gas risk.

    What permeability does your membrane need to protect

    the end users?

    • Pressure relief should be installed as a minimum…..

  • Update on NHBC ground gas guidance

    Some current issues

    • Verification Plans (CIRIA 735) – not be received before

    construction starts (or even completes on some

    projects).

    • Verification of installation – murky world where sister

    companies are signing off installers work!

    • Poor design, installation and verification still

    happening….

  • Update on NHBC ground gas guidance

    Some current issues

    Poor installation….

  • ELQF - Update on NHBC ground gas

    guidance

    Summary

    • Our gas protection requirements remains unchanged –

    characterise the gas risk and design appropriately to

    mitigate the risk.

    • BS8485:2015 – NHBC traffic light system still

    applicable/relevant.

    • For Amber 1 our verification requirements differ to

    BS8485/C735.

    • Gas protection design/installation/verification

    improving.