upldwr.up.nic.inupldwr.up.nic.in/pdfs/updated_dpr/2012-13/dpr-kanpurnagar-iwmp...8.2 eligibility for...

251

Upload: ledat

Post on 30-Apr-2018

248 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,
Page 2: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,
Page 3: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,
Page 4: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

A Executive Summary 10-13

B General Profile of The Project 14-17

C Year wise Physical And Financial at A Glance 18-22

D Benchmarking of IWMP Project 23-27

1 Background and General Description

1.1 Objective of IWMP 28

1.2 Weightage Point 29

1.3 Details of Ongoing Project 30

1.4 MWS Wise Details of Coordinates, Length, Minimum-Maximum Elevation 31

1.5 MWS/GP/Village Wise Details Land Use and Treatable Area 32-34

1.6 Details of Watershed Committee Formed At GP Level 35

1.7 Details Of Annual Rainfall and Minimum Maximum Temperature 36

1.8 Details of Natural Climeties 37

1.9 Details of Run-off and Soil Loss 37

1.10 MWS Wise Details of Land Under Various Slope Range 38

1.11 MWS Wise Details of Land Under Various Slope Category 39

1.12 MWS Wise Details of Land Under Various LCC Category 40

1.13 MWS Wise Details of Land Under Various Soil Depth 41

1.14 MWS Wise Details of Land Under Various Category of Soil Fertility 42

1.15 MWS Wise Details of Land Under Various Category of Soil Texture 43

1.16 MWS Wise Details of Land Under Various Category of Soil Erosion 44

1.17 MWS Wise details of Stream Order 45

1.18 MWS Wise Details of Road Lengths 46

1.19 MWS/Village Wise Details of Water Bodies 47-54

2 PRA and Base Line Survey

2.1 Details of PRA Activities 55

2.2 Seasonal Analysis 56

2.3 Problem and Need of The Area 57

2.5 Details of Migration 58-60

2.6 Details of Infrastructure 61

2.7 Village Wise Details of CPR 62-69

2.8 Details of Fuel Used For Cooking in the Project Area 70

2.9 Village Wise Details of Plantation-Afforestation, Horticulture, Fuel & Fodder 71-72

INDEX

Page 5: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

INDEX

2.10 Details of Farm Machinery/ Agriculture Equipments in the Project Area 73

2.11 Source of Irrigation 74

2.12 Village Wise Details of Human population 75-76

2.13 Village Wise Details of Farmer's Category 77-78

2.14 Village Wise Details of Livelihood Status of the Assetless in the Project Area 79-80

2.15 Village Wise Details of Livelihood Status of the Farmers in the Project Area 81-82

2.16 Details of Livelihood Pattern in The Project Area 83-84

3 Livestock

3.1 Details of Existing Livestock Population, Production and Productivity - Pre Project Status 85-86

3.2 Details of Projected Livestock Population, Production and Productivity - Post Project Status 87-88

3.3 Pre and Post income Status From Livestock 89

3.4 Fodder Requirement 90

3.5 Income Projection for Assetless, Farmers and Livestock 91

3.6 Problem and Thrust area of Livestock 92

4 Details of Various Institution Under The Project

4.1 Details of PIA 93

4.2 Details of PIA Staff 94

4.3 Details of WCDC 95

4.4 Details of WDT 95

4.5 Details of Watershed Committees Formed at GP Level 96

4.6 Details of Self Help Groups (SHGs) and User's Groups (UGs) to be Formed 97

5 Budget Component

5.1 Year Wise Financial Break-up (in %) of Various Component At Various Level 98

5.2 Year Wise Financial Break-up of Amounts of Various Component At Various Level under IWMP 99

5.3 MWS Wise Availability of Funds under Various Component 100

5.4 Year wise financial breakup in % of Various Component Under IWMP 101

5.5 Year Wise Financial Break-up of Various Component (in Amount) 102

5.6 Financial Break-up of Various Component (in%) and Amount 103

5.7 Availability of Funds At WC Level Under Various Component 104

5.8 Year Wise Availability of Funds At WC Level Under Various Component 105

6 Physical Financial Details of EPA Activities 106-107

7 Institutional Development and Capacity Building (I&CB)

7.1 Microwatershed wise/Year wise Financial Breakup at Various Level 108

Page 6: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

INDEX

7.2 Annual Action Plan (AAP) At A Glance 109

7.3 Annual Action Plan (AAP) Ist Year 110

7.4 Annual Action Plan (AAP) IInd Year 111

7.5 Annual Action Plan (AAP) IIIrd Year 112

7.6 Annual Action Plan (AAP) IVth Year 113

7.7 Annual Action Plan (AAP) Vth Year 114

7.8 List of Training Institutes 115-116

8 Livelihood Activities

8.1 Livelihood Planning 117-119

8.2 Eligibility for availing the Funds under The LA Component 120-123

8.3 Unit cost for Proposed Activities 124

8.4 Annual Action Plan (AAP) At A Glance 125

8.5 Annual Action Plan (AAP) IInd Year 126

8.6 Annual Action Plan (AAP) IIIrd Year 127

8.7 Annual Action Plan (AAP) IVth Year 128

8.8 Annual Action Plan (AAP) Vth Year 129

8.9 Capacity Building Plan for Livelihood 130

9 Production System & Microenterprises

9.1 Unit Cost under PSME Activities 131

9.2 Activity Wise Annual Action Plan (AAP) At A Glance 132-133

9.3 WC Wise Annual Action Plan At a Glance 134-137

9.4 Annual Action Plan (AAP) IInd Year 138-141

9.5 Annual Action Plan (AAP) IIIrd Year 142-145

9.6 Annual Action Plan (AAP) IVth Year 146-149

9.7 Annual Action Plan (AAP) Vth Year 150-153

9.8 Convergence Plan At A Glance Under PSME 154

9.9 Convergence Plan IInd Year Under PSME 155

9.10 Convergence Plan IIIrd Year Under PSME 156

9.11 Convergence Plan IVth Year Under PSME 157

9.12 Convergence Plan Vth Year Under PSME 158

9.13 Problem and Thrust area of Production System 159

9.14 Capacity Building Plan for Production System 160

10 Watershed development Works (WDW)

Page 7: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

INDEX

10.1 Land Development

10.1.1 Unit Cost/Estimate of Horticulture Plantation (Fruit Plantation) in Rs./ha 161

10.1.2 Annual Action Plan (AAP) At A Glance 162

10.1.3 Annual Action Plan (AAP) IInd Year 163

10.1.4 Annual Action Plan (AAP) IIIrd Year 164

10.1.5 Annual Action Plan (AAP) IVth Year 165

10.1.6 Annual Action Plan (AAP) Vth Year 166

10.1.7 Detail of Land Development Area in ha At A Glance

10.1.8 Afforestation and Horticulture Area in ha including Block and Scattard Plantaion

10.1.8.1 Bifercation of Afforestation and Horticulture Area According to Plant to Plant and Row to row Spacing

10.1.8.2 Conversion of Scattard Plantation into ha

10.1.8.3 Year Wise Area Under Afforestation Including Block and Scattard plantation

10.1.8.4 Year Wise Area Under Horticulture Including Block and Scattard plantation

10.1.8.5 Conversion of Scattard Plantation Year Wise

10.1.8.6 Year wise details of Land Development Activities At a Glance

10.1.8.7 Year Wise Details of Horticulture Crops in ha

10.1.8.8 Crop wise / Year wise productivity and Production value (Benefits)

10.2 Soil and Moisture Conservation Work (Through Convergence)

10.2.1 Year Wise Action Plan Contour Bund (CB) 171

10.2.2 Year Wise Action Plan Marginal Bund (MB) 172

10.2.3 Year Wise Action Plan Peripheral Bund (PB) 173

10.2.4 Technical Specification, Design and Estimation of CB, MB, PB 174-176

10.3 Water Harvesting Structures (WHS)

10.3.1 Annual Action Plan (AAP) At A Glance 177

10.3.2 Annual Action Plan (AAP) IInd Year 178

10.3.3 Annual Action Plan (AAP) IIIrd Year 179

10.3.4 Annual Action Plan (AAP) IVth Year 180

10.3.5 Annual Action Plan (AAP) Vth Year 181

11 Monitoring & Evaluation

11.1 Monitoring & Evaluation 182-184

11.2 Details of Year Wise Fund Availability At Various Level Under M&E 185

12 Consolidation

167-170

Page 8: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

INDEX

12.1 Consolidation 186-188

12.2 Details of Year Wise Fund Availability At Various Level 189

12.3 Details of Physical Financial Activities 190

12.4 Backward Forward Linkage 191

13 Convergence Plan

13.1 Convergence Plan At a Glance 192

13.2 Annual Action Plan (AAP) At A Glance Under PSME 193

13.3 Annual Action Plan (AAP) IInd Year Under PSME 194

13.4 Annual Action Plan (AAP) IIIrd Year Under PSME 195

13.5 Annual Action Plan (AAP) IVth Year Under PSME 196

13.6 Annual Action Plan (AAP) Vth Year Under PSME 197

13.7 Year Wise Action Plan Contour Bund (CB) 198

13.8 Year Wise Action Plan Marginal Bund (MB) 199

13.9 Year Wise Action Plan Peripheral Bund (PB) 200

14 Expected Out Come

14.1 Abstract of Outcome 201-202

14.2 Details of Employment Generation 203

14.3 Details of Major Crops, Production and Productivity Pre & Post Scenario 204-206

15 Year Wise Projected Benefits From Various Components under the Project 207

16 Income Projection for Assetless, Farmers and Livestock 208

17 NPV, IRR and BC 209

18 Details of Bank Accounts and Watershed Development Fund (WDF) 210-212

19 Details of Various Records To Be Maintained At Various Level 213

20 Activity Calender 214

21 Abbreviations 215

22 Thematic Maps

a Location Map of the Project Area

b Satellite Image

c Digital Elevation Model (DEM)

d Cadastral Map

e Base Map

f Transport Network Map

g Village Map

Page 9: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Particular Page Number

INDEX

h Contour Map

i Water Bodies Map

j Land use/Land Cover Map

k Land Capability Class (LCC) Map

l Slope Map

m Soil Depth Map

n Soil Fertility Map

o Soil Texture Map

p Soil Erosion Map

q Ground water Prospects Map

r Lithology and Structure Map

s NDVI Map

t Location of Well

u Action Plan Maps

Page 10: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

EXECUTIVE SUMMARY

All the 14 Micro Watershed of the Project Area of Watershed Rampur Bhimsen, IWMP-VIII, District-Kanpur Nagar, Uttar Pradesh Coded and named as2B3C1f1a-Gopalpur, 2B3C1f1b-Rampur Bhimsen,

2B3C1f2a-Pankabahadur Nagar, 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar, 2B3C1d2a-Oriyara, 2B3C1d2b-Sen Purab Para, 2B3C1d2c-Pipori, 2B3C1d3a-Magrasa, 2B3C1d3b-Sen Pashimpara,

2B3C2a2a-Rautepur, 2B3C2a2b-Raikepur, 2B3C2a3a-Dool-Pratham, 2B3C2a3b-Dool-Dwitiya are situated in Chaubepur, Bidhnu and Kalyanpur Block which is 30-35 km away from the district head

quarter. The Latitudinal and Longitudinal position of the project is From 26° 20' 12.42" N to 26° 32' 04.42" N and From 80° 08' 22.56" E to 80° 19' 49.84" E. Micro Watershed wise details are given in

the DPR. The project consist of 14 Micro Watershed 58 villages, 43 - Gram Panchayat (GP) with total Geographical Area of 10187.78 ha out of which 5705 ha area is proposed to be used for treatment

with total outlay of Rs. 684.60 Lakhs under the Integrated Watershed Management Programme (IWMP). 26 nos. of Watershed Committees (WCs) have been formed at GP Level. The Project

Implementing Agency (PIA) is Bhumi Sanrakshan Adhikari (BSA), Department of Irrigation and Water Resources, District Kanpur Nagar, Uttar Pradesh.

All Micro Watershed fall in agro-climatic zone of Central Zone. The Micro Watershed of Rampur Bhimsen, IWMP-VIII, District-Kanpur Nagar is situated at an elevation of 119.50 m to 132 m above

mean sea level and has relief from with mean elevation of 126.43 m, general topography of the Micro Watershed is described in the LCC table given in the DPR. Spatial distribution of different slope

classes has been prepared using Arc GIS. Slope has been divided into 04 categories categories viz. 0 - 0.50%, 0.51 – 1%, 1.01 – 4%, and >4% extent of different slope categories of the Geographical

area of Senia, IWMP-VII, District-Kanpur Nagar is shown in the DPR . The dominant slope category is 0-.50% percent (3824.29ha) followed by 0.51 – 1% (2835.28 ha) .

The population of the project area is 142413 covering 26576 HH with an average family size 05 in number. SC represent 40526 (28.46 %). Literacy rate 65.13% and number of BPL HH 7111 (26.76%)

and Assetless HH 4320 (16.26 %) details are given in the DPR. The land holding pattern given in the DPR. comprises 17151 (77.06%) marginal farmers who dominate the cluster followed by 3700

(16.63%) small farmers and 1405 (6.31%) large farmers. The Land Use pattern of the project area is given in the LULC Table. In Project area more than 70% of agriculture land is rainfed. The project

area is dominated by Desi/Local Breed of Cows, Bufallos, Bulls and Goats. The productivity of major crops in the project area is significantly lower than the National, State and District average.

Superfood like Quinva and Chia are proposed to be introduced on pilot basis in the project area.

The average rainfall of the area is 588.64 mm with 76 rainy days. May and June are the hottest Months ( 48°C to 47°C) and lowest temperature with 3°C to 0°C are recorded in December/January.

Expected run-off is worked out as 30 % of the average annual rainfall (588.64 mm/Annum) at 176.59 mm/year with an average soil loss 8-10 tonnes/ha/year. Around 66% in the project area depend

on agriculture and allied activity for their livelihood. The present agriculture scenario is unable to provide either sustenance or employment opportunities round the year due to low land holding

capacity, poor soil productivity, lack of irrigation facility and absence of proper agronomy practices. Ultimately it leads to unemployment and distress migration of about 21260 persons from the

project area.

Page 10

Page 11: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

EXECUTIVE SUMMARYIntegrated Watershed Management Programme is prioritized on the basis of thirteen parameters namely Poverty Index, Percentage of SC, Actual Wages, Percentage of small and marginal farmers,

Ground water status, Moisture Index, Area under rain fed agriculture, Drinking water situation in the area, Percentage of the degraded land, Productivity potential of the land, Continuity of another

watershed that has already been developed/treated, Cluster approach for plain or for hilly terrain. The Weightage Point of the project is 88 as per DPR.

The Proposed cluster of Micro watershed is characterized by low productivity of resources, prevalence of widespread poverty, lack of irrigation and safe drinking water facility, non availability of

employment opportunities and compelled unskilled migration from the project area. Integrated Watershed Management Programme aims at improving the situation of the area during the project

period.

HH Survey, PRA, PSA, FGDs and PIPs were conducted to assess the people’s/farmer’s needs/ preferences, problems thrust area of farming system, livestock production and their suggestions were also

invited. After technical analysis these technically the exercise of Participatory Net Planning (PNP) was conducted to finalize the proposed location for various proposed activities using GPS under the

head of Land Development (including Afforestation, Horticulture and Agriculture), Soil and Moisture Conservation (SMC), Water Harvesting Structures (WHS) alongwith proposed intervention in the

field of farming system, livestock production, micro-enterprises etc. After the whole exercise, Annual Action Plan (AAP) of Capacity Building, Livelihood Activities, Production System and Micro-

enterprises, Watershed Development Works, Convergence have been prepared. The Watershed Committees (WCs) have been formed at Gram Panchayat level, SHGs (Shelf Help Groups) and User

Groups (UGs) have also been constituted. Farmers were also informed about the amount/rate of contribution as per the category of farmers for various activities, user charges and Watershed

Development Fund (WDF). Farmers were willing to participate in the IWMP Programme and ready to contribute accordingly for availing/sharing the benefits. We propose renovation of 71 nos. of

existing Ponds, construction of 107 nos. of Earthen Check Dams (ECDs), 01 nos. of Masonry Check Dam (MCD) and 139 nos. of Recharge pit under Water Harvesting Structures which will provide life

saving irrigation in the area of 599.95 ha. Consequently, there should be an overall increase in the productivity of major crops in the project area.

The Natural Resource Management (NRM) intervention such as Soil and Moisture Conservation (SMC), Water Harvesting Structures (WHS), Land Development Activities like Afforestation, fuel &

fodder and Horticulture development activities are proposed to benefit 57% of the families. It is expected that the NRM activities will increase the ground water table by 1-2 meters, increase irrigated

command area by additional 599.95 ha., Additionally, it will check soil erosion, reduce run off, improve moisture availability and improve the soil quality/health. More than 70% of the project area

will be brought under treatment under project area during project period of 5 years.

The carrying capacity will be enhanced in cereal production, oilseed production, pulses production, Vegetable production, and fruit production substantially. Establishment of various Micro-

enterprises will ensure the livelihood of families of the project area with increase of additional income per annum. These interventions are aimed to reduce the migration up to 30%.

Page 11

Page 12: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

EXECUTIVE SUMMARYSeveral activities are proposed under afforestation, fuel & fodder and horticulture which will help in increase the area under vegetative cover from 103.74 ha to 415.39 ha, an increase in the area

under afforestation cover from 57.09 to 109.72, under fuel and fodder cover from 10.52 ha to 59.09 ha and under horticulture cover from 36.13 ha to 246.58 ha and . Productivity of all the important

crops under Kharif, Rabi and Zaid is proposed to be increased substantially. Crop wise details have been described in the DPR. Similarly, milk and other livestock produce is also expected to increase,

details of which are given in the chapter -‘Livestock Population and Productivity (Pre and Post Project status).

The project has been formulated with specific vision within the stipulated time frame of 5 years. Soil erosion will be checked from current rate of 8-10 tonnes/ha/annum through Soil and Moisture

Conservation (SMC) measures. Through Renovation and Construction of 179 number of Water Harvesting Structures having storage capacity of 119.99 ham an additional area of 599.95 ha will be

brought under supplementary irrigation which will lead towards crop productivity. The rain fed agriculture project area comes under kharif Paddy stabilization through proper management of water

and SRI techniques, crop productivity will be increased substantially. Increase in irrigation command area will increase the 2nd cropping area through proper management of water resources. There

will be Increase in income level of landless HH from base income through various alternative livelihood options in the project area on sustainable basis. Maximum number of population will attain

food security after successful implementation of the project. Most of the HH of the project area will have access to safe and hygienic drinking water. The capacity building programme will enhance

enough awareness, to take decision of development of all the covered village under the project after 5 years. The overall vision of the project is to uplift the socio economic condition of the

community through various proposed intervention.

The role of the PIA is to facilitate the programme by supporting various Community based organization (CBOs) like Watershed Committee (WCs), Self Help Groups (SHGs) and User’s Gropups (UGs).

The role of the Watershed Committee will be to implement the programme as well as assure the contribution of WDF for NRM and PSME activities. The secretary of the Watershed Committee will be

the most responsible person. A dedicated Watershed Development Team (WDTs) will work as a catalyst under the supervision of PIA to support various Community based organization (CBOs) for

successful implementation of the project. A total number of 26-WCs, 169-SHGs and 179-UGs will be linked with various project activities under the project.

Page 12

Page 13: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

EXECUTIVE SUMMARYRapport building and awareness generation of community members is the first stage for building self confidence to take decisions for implementation of various activities under the project. The

broad head includes EPA, I&CB, WDW for natural resource management, Livelihood promotion, Productivity Enhancement & Micro Enterprises, Monitoring and Evaluation, Convergence with other

department, consolidation/exit protocol. The major proposed activities are Entry Point Activity (4% of the total cost Rs. 27.38 Lakhs) which consist of repairing of well and water harvesting structures,

the WDW work (56% of the total cost Rs.383.38 Lakhs) Water Harvesting Structures like ECD, MCD, renovation of Pond, recharge pit, Land Development Afforestation, Fuel & Fodder and Horticulture

Plantation. Under WDW activity Water Harvesting Structures and Land Development will be taken up from IWMP funds and the rest consist of Soil and Moisture Conservation (SMC) works such as

construction of Contour Bund, Marginal Bund and Peripheral Bund, etc. will be covered through convergence. The livelihood for Assetless section (9% of the total cost Rs. 61.61 Lakhs) consist of

Goatary, Poultry, Animal Husbandry, Vermi Compost Unit, Mini Village Shops, Candle Making, Pickle making, Tailoring, Bamboo Basket making, etc. The Production system and Micro Enterprises (10%

of the total cost Rs. 68.46 Lakhs) consist of promotion of innovarive practices for superfood like quinoa & chia etc., HYV of Crop Demonstration, Vegetable Cultivation, Floriculture, Organic Farming,

Distribution of Mini Ag. Equipment, Livestock Activities, Micro Irrigation, Protected Farming and establishment of various Micro Enterprises. A comprehensive Institutional Development and Capacity

Building Plan (5% of the total cost Rs. 34.23 Lakhs) have been designed for various CBO like WCs, SHGs and UGs. The basic purpose of the capacity building programme be for project orientation and

skill improvement. Skill/Trade Training under livelihood activities are planned through the convergence from NRLM/Skill Development Mission.

The aim of the convergence is to saturate the planned WDW and PS&ME activities in the project area. A total amount of Rs. 390.14 Lakhs will be spent through convergence from MANREGA, NHM,

Department of Agriculture, NRLM/Skill Development Mission and other Line Department. During the Convergence Process SLNA, WCDC and PIA will take the leading role to facilitate the convergence

process.

Suitable systems and processes are propose to be designed and implemented to manage and maintain all the assets created under the project with the help of WDF collected from the beneficiaries

in the form of contribution and deposited in the WDF Bank Account. WDF will not be utilized during the project period. At the time of exit protocol it is important that the community should be

strong enough to maintain the development works and the systems during the project period. A specific benefit sharing mechanism for common assets will be formulated through User’s Group.

Proper utilization of WDF will occur after the project period for need based work for the community’s assets. The Watershed Committee will be also responsible for conflict management within

User’s Groups and SHGs. The Watershed Committee will take the leading role with the Institutional Linkages with government department, banks, other financial institutions as well as various NGOs.

A system of social audit will be established for proper management of fund and further development work.

Total 893544 nos. of mandays will be generated from the projects. 812483 nos mandays from the IWMP Fund and 81061 nos. of mandays from the Convergence Fund through various activities.

Details are given in the Employment Generation Table. Cropping Intensity of the project area will be increase form 118.76.% to 138.66% after implementation of the project.

Page 13

Page 14: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

EXECUTIVE SUMMARYThe present average family income of Assetless Rs. 17100/- per annum and for farmers Rs. 23300 /-, with the proposed intervention under the project, are expected to increase to Rs. 21400/- and Rs.

29200/- respectively after the completion of the project. NPV of the project is proposed to be Rs. 20146662.89 at 15% discounted factor of net benefits. IRR of project is 31.93 % and B : CR at 15 %

discounted factor is 1.30 respectively.

Page 14

Page 15: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Name of State

Name of District

Name of Tehsil

Name of Block

Name of Project/Sanction Year Rampur Bhimsen, IWMP-VIII District :-Kanpur Nagar/Year :12-13

Project Duration

Cost of The Project in Lakhs from IWMP

Cost of The Project in Lakhs from Convergence

Total Project Cost in Lakhs

Project Cost/ha in Lakhs

From IWMP

From Convergence

Total

Number of MWS

MWS Code and Name

Nos. of connected Village

Nos. of Gram Panchayat

Number of Watershed Committees (WCs) Formed

Agro Climatic Zone

Location of Watershed

Longitude 80° 08' 22.56" E 80° 19' 49.84" E

Latitude 26° 20' 12.42" N 26° 32' 04.42" N

Elevation

Highest Elevation in m

Lowest Elevation in m

Elevation Difference

Mean Elevation in m

684.60

390.14

1074.74

0.12000

General Profile of the ProjectUttar Pradesh

Kanpur Nagar

Billhaur and Kanpur

Chaubepur, Bidhnu and Kalyanpur

26

Central Zone

0.08458

0.20458

14

2B3C1f1a-Gopalpur, 2B3C1f1b-Rampur Bhimsen, 2B3C1f2a-Pankabahadur Nagar,

2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar, 2B3C1d2a-Oriyara, 2B3C1d2b-Sen Purab

Para, 2B3C1d2c-Pipori, 2B3C1d3a-Magrasa, 2B3C1d3b-Sen Pashimpara, 2B3C2a2a-

Rautepur, 2B3C2a2b-Raikepur, 2B3C2a3a-Dool-Pratham, 2B3C2a3b-Dool-Dwitiya

58

43

05 Years

132.00

119.50

12.50

126.43

Page 15

Page 16: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

General Profile of the ProjectStream Order Length in meter Nos.

68314.90 55

Nos. Of Water Bodies

Details of Land as per LULC in ha

Geographical Area

Planned Area

Rainfed Area ( Taken Under Project)

Irrigated Area

Scrub Land

Wasteland Cultivable

Average Rainfall

Maximum Temperature degree C

Minimum Temperature degree C

Relative Humidity %

Total population

Male

Female

SC/ST population

Male

Female

Total HH

BPL HH and % 7111 26.76

Assetless HH and % 4320 16.26

Farmers Details (Total farmers)

Marginal Farmers

Small Farmers

Large Farmers

Migration Pre Project Status Post Project Status

Migration in Nos. 21260 14882

Migration in days 180-210 120-150

Water Table in meter Pre Project Status Pre Monsoon Post Monsoon

22256

17151

3700

1405

26576

48°C

0°C

37%-83%

75981

142413

66432

40526

21648

18878

5705.00

4203.02

1010.68

491.30

588.64

1977.76

10187.78

225

Page 16

Page 17: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

General Profile of the ProjectOpen Well 8.25-10.25 6.25-8.25

Borewell 32-35 31-32

Cropped Area in ha Pre Project Post Project

Single Cropped Area 2845.50 2100.66

Double Cropped Area 1964.75 2699.67

Multi Cropped Area 0.00 137.00

Cropping Intensity in % 118.76 138.66

Mandays Generated in Nos.

From IWMP Funds

From Convergence Funds

Total

Average Annual Income/HH in Rs. Pre Project For Assetless Post Project

For Assetless 17100.00 21400.00

For Farmers 23300.00 29200.00

No. of Person to be Trained Under CB Plan

Detail of Beneficiaries

Livlihood Activities

PSME

WDW

Total

No. of Water harvesting Structures

Storage Capacity

Additional Area Brought under Irrigation in ha

@ 5 cm * 2 Irrigation/ha 599.95

@ 7.5 cm * 2 Irrigation/ha 399.97

Area Under Pre Project Status Addition Area under the Project

Afforestation 57.09 52.62

Fuel & Fodder 10.52 48.58

Horticulture 36.13 210.45

Vegetative Cover 103.74 311.65

6326.0

6262.0

14278

108

119.99

893544

5203

1690

812483

81061

Page 17

Page 18: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

General Profile of the Project

No. of Institutions Formed

Watershed Committees

User Groups (Ugs)

Self Help Groups (SHGs)

Fedrations

Reduction in Soil loss 8-10 tonnes/ha/Year

Runoff

NPV @ 15% Discounted Factor of Net Benefits

B : CR @ 15% Discounted Factor

IRR

179

31.93%

176.59

20146662.89

1.30

26

169

26

Page 18

Page 19: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area: 5705

Unit

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

A Administration 3.423 10.269 18.484 18.484 17.800 0 68.460

B Monitoring 1.369 1.369 1.369 2.738 0 6.846

C Evaluation 2.054 1.198 1.198 2.396 0 6.846

D EPA 0 0.000

1 Pond Renovation in no. 8 27.275 8 27.275

Well Reparing 2 2 0.000

2 Solar Light in no. 15 15 0.000

Hand Pump Platform 1 1 0.000

Pucci Guli 1 1 0.000

Culvart 5 5 0.000

FLoor Reparing 1 1 0.000

Balance 0.109 0.109

Sub Total 33 27.384 33 27.384

E DPR 1 6.846 1 6.846

F Institution & Capacity Building

1 State Level Nodal Agency(SLNA) 0 1.027 0 0.342 0 0.342 0 0.342 0 0.000 0 2.054

2 WCDC

2.1 District Level Workshop in no. 0 0.000 100 1.000 0 0.000 0 0.000 0 0.000 100 1.000

2.2 Workshop

2.2.1 Convergence Workshop in no. 20 0.140 20 0.140

2.2.2 Refreshar Wokshop in no. 20 0.140 20 0.140

2.2.3 Workshop of Inovative Practices & PPP Model in no. 20 0.140 20 0.140

2.2.4Workshop on Formation, Development &

Sustainability of Federationin no. 20 0.140 20 0.140

2.2.5 Workshop on Linkage Establishment in no. 20 0.140 20 0.140

Sub Total in no. 20 0.140 20 0.140 20 0.140 20 0.140 20 0.140 100 0.700

3 Exposure Visit

3.1 In the District in no. 159 0.239 101 0.152 26 0.039 20 0.030 159 0.239 465 0.698

3.2 Within State in no. 162 0.648 80 0.320 10 0.040 12 0.048 162 0.648 426 1.704

3.3 Out of State in no. 0 0.000 16 0.784 13 0.637 13 0.637 0 0.000 42 2.058

Sub Total : 321 0.887 197 1.256 49 0.716 45 0.715 321 0.887 933 4.460

Sub Total of WCDC 341 1.027 317 2.396 69 0.856 65 0.855 341 1.027 1133 6.160

4 Project Implementation Agency (PIA)

4.1 PIA in no. 6 0.482 4 0.322 0 0.000 0 0.000 0 0.000 10 0.804

4.2 WDT in no. 4 0.268 2 0.134 2 0.134 2 0.134 1 0.067 11 0.737

4.3 WC Basic in no. 195 0.618 1604 5.085 0 0.000 0 0.000 0 0.000 1799 5.703

4.4 WC Member in no. 0 0.000 260 1.648 0 0.000 0 0.000 0 0.000 260 1.648

4.5 WC Functionaries in no. 0 0.000 52 0.697 52 0.697 52 0.697 49 0.657 205 2.747

Year Wise Physical and Financial At A Glance of DPR Rampur Bhimsen, IWMP-VIII District: (Phy. In ha/Nos, Fin in Lacs)

S. No. Project ComponentIst Year IInd Year IIIrd Year

Kanpur Nagar

IVth Year Vth Year TOTAL

Page 19

Page 20: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area: 5705

Unit

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Year Wise Physical and Financial At A Glance of DPR Rampur Bhimsen, IWMP-VIII District: (Phy. In ha/Nos, Fin in Lacs)

S. No. Project ComponentIst Year IInd Year IIIrd Year

Kanpur Nagar

IVth Year Vth Year TOTAL

4.6 UGs in no. 0 0.000 192 0.609 59 0.187 59 0.187 181 0.574 491 1.556

4.7 UGs Functionaries in no. 0 0.000 156 2.090 22 0.295 22 0.295 30 0.402 230 3.082

4.8 SHGs in no. 0 0.000 210 1.997 149 1.417 149 1.417 0 0.000 508 4.831

4.9 SHGs Functionaries in no. 0 0.000 134 1.796 90 1.206 90 1.206 52 0.697 366 4.904

4.10 Skill Training in no. 0 0.000 0 0.000 50 7.500 70 10.500 70 10.500 190 28.500

4.11 Sub Total : 205 1.369 2614 14.377 374 3.936 374 3.936 313 2.396 3880 26.013

Total 546 3.422 2931 17.115 443 12.634 439 15.633 654 13.923 5013 62.726

Fund From IWMP 3.423 17.115 5.135 5.135 3.423 34.230

5 Institution & Capacity Building Convergence in no. 50 7.499 70 10.498 70 10.500 190 28.498

G Livelihood Activities

1 Nos. of SHGs for Seed Money in no. 21 4.313 46 10.782 46 11 56 12.939 169 38.817

2 Nos. of Individuals in no. 8 0.479 23 1.198 23 1.198 24 1.438 78 4.313

3Grant-in aid under Funding for

major activities for federation / Enterprising SHGsin no. 0 2.054 0 5.135 0 5.135 0 6.161 0 18.484

Sub Total 6.846 17.115 17.115 20.538 61.614

H Production System & Micro Enterprises

1 Crop Demonstration

1.1 Minor Millets in ha 9.250 0.740 3.500 0.280 0.000 0.000 0.000 0.000 12.75 1.020

1.2 Pulses -Urd/Moong/Arhar in ha 10.250 1.230 4.000 0.480 0.000 0.000 0.000 0.000 14.25 1.710

1.3 Oil Seeds in ha 10.750 1.290 4.750 0.570 0.000 0.000 0.000 0.000 15.50 1.860

1.4 Chia in ha 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00 0.000

1.5 Quinoa in ha 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00 0.000

2 Vegetables 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

2.1 Tomato/Brinjal/Okra/Shimla Mirch in ha 4.300 1.032 0.400 0.096 0.000 0.000 0.000 0.000 4.70 1.128

2.2 Califlower/Cabage in ha 2.500 0.600 0.000 0.000 0.000 0.000 0.000 0.000 2.50 0.600

2.3 Cucurbits in ha 2.200 0.264 0.000 0.000 0.000 0.000 0.000 0.000 2.20 0.264

2.4 Shakbhaji in ha 3.200 0.320 0.000 0.000 0.000 0.000 0.000 0.000 3.20 0.320

3 Spices 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

3.1 Garlic/Ginger/Turmeric in ha 1.000 0.240 0.000 0.000 0.000 0.000 0.000 0.000 1.00 0.240

3.2 Coriander/Methi/Saunf/Kalaunji in ha 0.800 0.096 0.400 0.048 0.000 0.000 0.000 0.000 1.20 0.144

3.3 Chili in ha 0.300 0.060 0.000 0.000 0.000 0.000 0.000 0.000 0.30 0.060

4 Floriculture 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

4.1 Marry Gold in ha 0.000 0.000 0.900 0.216 0.000 0.000 0.200 0.048 1.10 0.264

4.2 Deshi Gulab in ha 0.000 0.000 0.200 0.048 2.000 0.480 0.600 0.144 2.80 0.672

4.3 Agro-forestry in ha 0.000 0.000 2.000 0.200 0.000 0.000 0.000 0.000 2.00 0.200

5 Distribution of Various Kit

5.1 IPM Kit in no. 0 0.000 0 0.000 10 0.200 23 0.460 33 0.660

5.2 Improved/High Yeilding Variety (HYV) of Seed Kit in no. 97 0.485 52 0.260 89 0.445 133 0.665 371 1.855

5.3 Vegitable Kit in no. 124 0.248 81 0.162 107 0.214 170 0.340 482 0.964

Page 20

Page 21: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area: 5705

Unit

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Year Wise Physical and Financial At A Glance of DPR Rampur Bhimsen, IWMP-VIII District: (Phy. In ha/Nos, Fin in Lacs)

S. No. Project ComponentIst Year IInd Year IIIrd Year

Kanpur Nagar

IVth Year Vth Year TOTAL

5.4 Fodder Kit in no. 48 0.240 17 0.085 36 0.180 59 0.295 160 0.800

6 Fisheries in no. 0 0.000 4 0.400 8 0.800 10 1.000 22 2.200

7 Singhade Ki Kheti in no. 0 0.000 0 0.000 5 0.250 0 0.000 5 0.250

8 Plastic Tray Nursery in no. 0 0.000 0 0.000 9 0.450 0 0.000 9 0.450

9 Low Tunnel House in no. 0 0.000 0 0.000 19 0.380 0 0.000 19 0.380

10 Animal Health Camps in no. 0 0.000 37 3.700 7 0.700 17 1.700 61 6.100

11 Distribution of Buck in no. 0 0.000 0 0.000 6 0.300 0 0.000 6 0.300

12 Distribution of Agriculture Equipments

12.1 Winnowing Fan in no. 0 0.000 48 1.200 8 0.200 52 1.300 108 2.700

12.2 Sprayer in no. 0 0.000 0 0.000 18 0.270 0 0.000 18 0.270

12.3 Broadcaster in no. 0 0.000 44 1.320 7 0.210 18 0.540 69 2.070

12.4 Drum Seeder in no. 0 0.000 0 0.000 7 0.560 0 0.000 7 0.560

12.5 Cono Weeded in no. 0 0.000 55 0.770 54 0.756 98 1.372 207 2.898

12.6 Seed Treatment Drum in no. 0 0.000 0 0.000 24 0.480 0 0.000 24 0.480

12.7 Irrigation Pipe in no. 0 0.000 42 1.680 14 0.560 105 4.200 161 6.440

12.8 Portable Pump for Lift Irrigation in no. 0 0.000 0 0.000 0 0.000 6 1.440 6 1.440

13 Micro-enterprises

13.1 Mushroom Cultivation in no. 0 0.000 0 0.000 7 1.680 0 0.000 7 1.680

13.3 Apiculture in no. 0 0.000 0 0.000 0 0.000 2 0.480 2 0.480

13.5 Fruit Preservation in no. 0 0.000 0 0.000 2 0.480 0 0.000 2 0.480

13.7 Poultry in no. 0 0.000 6 1.200 8 1.600 18 3.600 32 6.400

13.9 Goatatry in no. 0 0.000 16 3.200 15 3.000 34 6.800 65 13.000

14.1 Dairy Product in no. 0 0.000 0 0.000 2 0.480 0 0.000 2 0.480

14.3 Mini Dal Mill in no. 0 0.000 6 1.200 5 1.000 0 0.000 11 2.200

14.5 Daliya Making Machine in no. 0 0.000 0 0.000 2 0.400 5 1.000 7 1.400

14.7 Grain Cleaner Cum Grader in no. 0 0.000 0 0.000 0 0.000 10 2.000 10 2.000

14.9 Floor Separator in no. 0 0.000 0 0.000 2 0.480 0 0.000 2 0.480

15.1 Portable Charing Kiln in no. 0 0.000 0 0.000 7 0.560 0 0.000 7 0.560

15.3 UMMB Block in no. 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

Sub Total 6.845 17.115 17.115 27.384 68.459

Convergence

16 Vermi Compost Pit @ Rs 0.09 in no. 26 2.340 26 2.340 26 2.340 52 4.680 130 11.700

17 Nadep Compost Pit @ Rs. 008 in no. 26 2.080 26 2.080 26 2.080 26 2.080 104 8.320

18 Cow Shelter @ Rs 0.45 in no. 26 11.700 26 11.700 26 11.700 26 11.700 104 46.800

19 Goat Shelter @ Rs. 0.35 in no. 26 9.100 52 18.200 26 9.100 26 9.100 130 45.500

20 Poultry Shelter @ Rs. 0.40 in no. 26 10.400 26 10.400 26 10.400 52 20.800 130 52.000

21 Azola Pit @ Rs. 0.02 in no. 26 0.520 26 0.520 26 0.520 26 0.520 104 2.080

22 Fodder Through @ Rs.0.35 in no. 26 9.100 26 9.100 26 9.100 26 9.100 104 36.400

23 Sanjeevak pit @ Rs.0.02 in no. 26 0.520 26 0.520 52 1.040 52 1.040 156 3.120

Page 21

Page 22: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area: 5705

Unit

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Year Wise Physical and Financial At A Glance of DPR Rampur Bhimsen, IWMP-VIII District: (Phy. In ha/Nos, Fin in Lacs)

S. No. Project ComponentIst Year IInd Year IIIrd Year

Kanpur Nagar

IVth Year Vth Year TOTAL

24 Micro Irrigation-Sprinkler in no. 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

25 Micro Irrigation- Drip in no. 6 0.000 5 0.000 3 0.000 9 0.000 23 0.000

26 Poly House in no. 6 0.000 1 0.000 1 0.000 9 0.000 17 0.000

27 Agro Shed Net House in no. 6 0.000 5 0.000 5 0.000 8 0.000 24 0.000

Sub Total 45.760 54.860 46.280 59.020 205.920

Total PSME 52.605 71.975 63.395 86.404 274.379

I Water Development Works

1 Land Development

1.1 Block Plantation

1.11 Horticulture in ha 17.00 3.400 40.25 8.050 40.25 8.050 40.25 8.050 137.75 27.550

1.12 Afforestation in ha 10.00 1.000 22.75 2.275 22.75 2.275 22.75 2.275 78.25 7.825

Sub Total 27.00 4.400 63.00 10.325 63.00 10.325 63.00 10.325 216.00 35.375

1.2 Scattered Plantation

1.21 Horticulture in no. 2460 0.984 3470 1.388 3470 1.388 3470 1.388 12870 5.148

1.22 Afforestation in no. 1790 0.358 2315 0.463 2315 0.463 2275 0.455 8695 1.739

Sub Total 4250 1.342 5785 1.851 5785 1.851 5745 1.843 21565 6.887

Total 5.742 12.176 12.176 12.168 42.262

2 SMC-Convergence

2.1 Contour Bund(CB) in rmt 9349 7.002 19989 14.972 20080 15.040 20007 14.985 69425 51.999

2.1.1 Outlet (for safe disposal of Water) @ Rs. 750/outlet in no. 18 0.135 39 0.293 40 0.300 40 0.300 137 1.028

2.2 Marginal Bund(MB) in rmt 4124 7.671 8875 16.508 8737 16.251 9008 16.755 30744 57.184

2.2.1 Outlet (for safe disposal of Water) @ Rs.15000/outlet in no. 8 1.200 17 2.550 17 2.550 18 2.700 60 9.000

2.3 Peripheral Bund(PB) in rmt 2277 4.235 4908 9.129 4978 9.259 4968 9.240 17131 31.864

2.3.1 Outlet (for safe disposal of Water) @ Rs.15000/outlet in no. 4 0.600 9 1.350 9 1.350 9 1.350 31 4.650

Sub Total 20.843 44.801 44.750 45.331 155.724

3 Water Harvesting Structure

3.1 Earthern Check Dam (ECD) in no. 27 22.348 27 19.827 29 21.716 24 19.929 107 83.820

3.2 Drrop Spill Way (DSW) in no. 15 6.000 25 10.000 27 10.800 24 9.600 91 36.400

3.3 Water Harvesting Bund (WHB) in no. 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000

3.4 MCD in no. 0 0.000 0 0.000 1 5.019 0 0.000 1 5.019

3.5 Ponds in no. 6 14.329 22 67.941 20 58.113 23 68.526 71 208.909

3.6 Recharge Pit in no. 47 2.366 27 1.350 34 1.700 31 1.550 139 6.966

Sub Total 95 45.043 101 99.118 111 97.348 102 99.605 409 341.114

Storage Capacity ham 24.52 30.86 33.55 31.06 119.99

Additional Area Brought Under Irrigation ha

122.60 154.30 167.75 155.30 599.95

81.73 102.87 111.83 103.53 399.97

J Consolidation

1 Completion of Various Left Over Work 14.428 0 14.428

Page 22

Page 23: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area: 5705

Unit

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Year Wise Physical and Financial At A Glance of DPR Rampur Bhimsen, IWMP-VIII District: (Phy. In ha/Nos, Fin in Lacs)

S. No. Project ComponentIst Year IInd Year IIIrd Year

Kanpur Nagar

IVth Year Vth Year TOTAL

2 Perparation of Project Completion Report 0.520 0 0.520

3 Documentation of Successful Experience 1.300 0 1.300

4Management and Maintenance of Developed

Natural Resources0.520 0 0.520

5 Users right and users charges 0.260 0 0.260

6 Sustainable utilization of natural tesources 0.520 0 0.520

7 formation of federation for post project econnomic 0.650 0 0.650

8 Capacity building of CBOs for post project period 0.260 0 0.260

9 Management and utilization of WDF 0.260 0 0.260

10 Intensification of PSME 1.040 0 1.040

11 Intensification of Livelihood 0.780 0 0.780

Sub Total 20.538 20.538

41.075 161.886 278.870 271.469 321.440 1074.740

41.076 95.844 171.150 171.150 205.380 684.600

0.00 66.04 107.72 100.32 116.06 390.14

0.00 66.04 107.72 100.32 116.06 390.14

1 Cost per ha from IWMP FUND 0.12000

2 Cost from Convergence pr ha 0.08458

3 Total Cost per ha 0.20458

Grand Total

* Earth Work under WHS will be executed through 35HP Tractor/JCB Machine

Funds Available From IWMP

Gap of Funds

Funds From Convergence

Project Cost per ha

Page 23

Page 24: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BENCHMARKING OF IWMP PROJECTS- District:

How WhoFrequency/

StagesPre Project Status Post Project Status

Soil Health

Soil Organic Carbon Increase NMR SpectroscopyExpert/

M&E Agency5 Years 0.51 8-10% due to IWMP

3 Years 5-8% due to IWMP

5 Years 8-10% due to IWMP

Hydrology

Rainfall Intensity, No. of Rainy daysRain Gauge

(TRG + DL)

WDT facilitation

/WC/PIA,

M & E Agency

76 days/annum 6-8% due to IWMP

Stream Flow Cum/sec (Mansoon flow on selected streams in watershed) reduce

V Notch + Staff

Gauge

V Notch + AWLR

(Decrease)

WDT facilitation

/WC/PIA,

M & E Agency

-10-15% reduction due to

IWMP

Groun Water Level ( in meter) Increase

Open Well-Pre Mansoon 8.25-10.25 7-8

Open Well-Post Mansoon 6.25-8.25 5-6

Bore Well 32-35 31-32

Status of Water bodies (ponds, wells and springs)

Spread area increase 6 Monthly - upto 5-10%

rejuvenation 6 Monthly - 10-20 in no.

New water bodies (in numbers) increaseNumber/ Remote

Sensing6 Monthly - 8-10 in no.

Drinking Water Availability Increase Survey/FGDWDT/Expert/

M&E Agency3 Years Sufficient Sufficient

5 Years Sufficient Sufficient

Forestry

Tree cover InventryWDT/WC/M & E

Agency3 Years 103.74 5-7%

5 Years - 8-10%

3 Years Shape File Not available

5 Years Shape File Not available

Erosion ReductionGully Formation

Sediment Loss

Expert/

M&E Agency

Run off:176.59225 mm/anum,

Soil Loss:8-10 ton/ha/anum

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Agro Climetic Zone: Central Zone

Indicators

Measuring details Benchmark Indicators/Values (in % / No.)

NDVI Remote SensingExpert/

M&E Agency-

Daily

Tape WLRWDT/WC/PIA,

M & E AgencyMonthly

Field Survey/

Remote Sensing WDT/WC/PIA,

M & E Agency

Page 24

Page 25: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BENCHMARKING OF IWMP PROJECTS- District:

How WhoFrequency/

StagesPre Project Status Post Project Status

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Agro Climetic Zone: Central Zone

Indicators

Measuring details Benchmark Indicators/Values (in % / No.)

Survival of the Plant Survey M & E Agency 3 Years 50-60%

5 Years60-75% due to casuality

replacement under IWMP

% families cultivating agroforestry increase Survey M & E Agency 5 Years - 8-10%

3 Years 4-5% due to IWMP

5 Years 6-8% due to IWMP

Agriculture and horticulture

Follow and wasteland reduction as % of total agriculture landRemote Sensing/

Survey

Expert/

M&E Agency5 Years - 15-20%

Diversification in agriculture and horticulture increase SurveyWDT/Expert/

M&E Agency5 Years - 10-15%

Area covered under improved varieties/HYV of total Cultivable Land SurveyExpert/

M&E Agency5 Years - 10-15%

Area enhanced under irrigation as to total cultivated land SurveyWDT/Expert/

M&E Agency5 Years - 7-8%

Demonstration of New technology increase SurveyWDT/Expert/

M&E Agency5 Years - 5-7 in no.

Adoption of INM/IPM/IDM increase SurveyWDT/ M & E

Agency5 Years - 33

No. of Framer's producer's institutions increase SurveyExpert/

M&E Agency5 Years - 05 No. due to IWMP

Local Innovations in Watershed Increase Survey PIA/WDT 5 Years - 3-5 No. due to IWMP

Farmer's aware about climate change impacts increase Survey WDT/Expert 5 Years - 15-20% due to IWMP

No. of farmers undergone trainings Survey Yearly - 200 farmers per anuum

Participation in exposure visits organised Survey Yearly - 200 farmers per anuum

Mechanization RCT increased Survey 5 Years - 10-15%

Cropping intensity, viz. shift from single to double, triple/intercropping increase

Single Crop Survey 2845.50 2100.66

Double C rop Survey 1964.75 2699.67

Multiple Crop Survey 0.00 137.00

Cropping Intensity (in %) Survey 118.76 138.66

B : C Ratio Survey 1.54 :1 2.39 :1

Improvement in ProductivityCereals, pulses, oil seeds, Fodder, Cash crops, ornamental, vegitables,

spices and plantation crops

35-40%

PIA/WDT/ M & E

Agency

3 Years

5 Years

Species richness increase Count Survey Expert Agency -

PIA/WDT/ M & E

Agency

Page 25

Page 26: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BENCHMARKING OF IWMP PROJECTS- District:

How WhoFrequency/

StagesPre Project Status Post Project Status

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Agro Climetic Zone: Central Zone

Indicators

Measuring details Benchmark Indicators/Values (in % / No.)

Khariff (Productivity in quintal/ha)Paddy 16.00 20.50

Jwar 5.25 5.25

Bajra 5.00 5.00

Maiz 9.00 14.50

Arhar 3.25 5.75

Urd/Moong 3.00 5.25

Til 1.75 2.50

Chia 0.00 8.00

Quinoa 10.00 10.00

Vegetable 40.00 75.00

Fodder 150.00 230.00

Others 7.75 12.50

Rabi (Productivity in quintal/ha)

Wheat 16.25 21.00

Barley 6.00 10.00

Mustard 3.00 5.75

Lentil 3.25 5.25

Field pea 9.00 14.00

Quinoa 0.00 12.50

Vegetable 45.00 75.00

Fodder 160.00 200.00

Others 8.00 12.00

Zaid (Productivity in quintal/ha) 0.00 9.00

Animal husbandary, dairy and fisheries

3 Years 4-5%

5 Years 5-6%

3 Years 4-5%

5 Years 5-6%

Shift from open grazing to stall feeding 3 Years 10-12%

5 Years 12-15%

Health camps Survey Yearly - Average one camp/annum

Survey 3 Years 20-25% due to IWMP

5 Years 20-25% due to IWMP

SurveyWDT/ M & E

Agency5 Years

Increase in area under grassland on CPRRevenue Recrd/

Survey

WDT/ M & E

Agency-

Increase in area under cultivated fodderRevenue Recrd/

Survey

WDT/ M & E

Agency-

Revenue Recrd/

Survey

WDT/ M & E

Agency-

WDT/PIA,

M & E AgencyNo. of livestock owners adopting artificial insemination services -

Page 26

Page 27: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BENCHMARKING OF IWMP PROJECTS- District:

How WhoFrequency/

StagesPre Project Status Post Project Status

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Agro Climetic Zone: Central Zone

Indicators

Measuring details Benchmark Indicators/Values (in % / No.)

increase in production of aquacultre Survey 5 Years - 5-10%

Economic, Financial Process, Assets, Institutional, Risk and Convergence

Economic Indicators

3 Years

5 Years

3 Years

5 Years

3 Years 25% due to IWMP

5 Years 50% due to IWMP

3 Years

5 Years 30% reduction due to IWMP

Financial Indicators

Financial/Credit linkages(SHGs/UGs/CIGs) Survey M & E Agency 5 Years - 75-80% as planned under DPR

Watershed development Fund Survey M & E Agency 5 Years - 100% as planned under DPR

Common property resource maintenance mechanism Survey M & E Agency 5 Years - 60-75% as planned under DPR

Process Monitoring

Status of area treatment Survey M & E Agency 3 Years - 100% as planned under DPR

status of drainage line treatment Survey M & E Agency 5 Years - 100% as planned under DPR

No. of Social audits Survey M & E Agency 5 Years - 70-80% as planned under DPR

3 Years -Active Participation as

planned under DPR

5 Years -Active Participation as

planned under DPR

Formation of Institutions

No. of SHGs/CBOs/Micro-enterprises formed Survey M & E Agency 3 Years -70-80% as planned under DPR

by 3rd Year

No. of Watershed Committee Functional Survey M & E Agency 3 Years - 100% Functional

Total Average Income for Assetless/Annum in Rs. Survey M & E Agency 17100 21400

WDT/PIA,

M & E Agency

Distress migration Survey M & E Agency -

Total Average Income for Farmers/Annum in Rs. Survey M & E Agency 23300 29200

No. of families recorded positive change in income Survey M & E Agency -

Gram Sabha's participation in planning and management of watershed Survey M & E Agency

Page 27

Page 28: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BENCHMARKING OF IWMP PROJECTS- District:

How WhoFrequency/

StagesPre Project Status Post Project Status

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Agro Climetic Zone: Central Zone

Indicators

Measuring details Benchmark Indicators/Values (in % / No.)

Capacity Building of Institutions -

WCs/PIAs/CBOs Survey M & E Agency 5 Years - As Planned under DPR

3 Years 100% office Bearer Trained

5 Years 80% Member Trained

Watershed Assets

3 Years 60% as planned under DPR

5 Years 80% as planned under DPR

No. of Private Assets Survey M & E Agency 5 Years - 70% as planned under DPR

Risk Management

No. of SHGs/CBOs/Micro-enterprises linked to market Survey M & E Agency 5 Years - 60% as planned un der DPR

Crop production related risk Survey M & E Agency 5 Years -50% reduction in crop failure

per annum

Convergence

3 Years 60% as planned under DPR

5 Years 100% as planned under DPR

3 Years 60% as planned under DPR

5 Years 100% as planned under DPR

3 Years 60% as planned under DPR

5 Years 100% as planned under DPR

-

No. of common watershed assets created Survey M & E Agency -

PRIs Survey M & E Agency -

Technology Survey M & E Agency -

Schemes Survey M & E Agency -

Institutional Survey M & E Agency -

Page 28

Page 29: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S.No. Objectives of IWMP

2 Prevention of soil, run-off; rain water harvesting and recharging of the ground water table.

3 Regeneration of natural vegetation

5 Promote development of cost effective and proven technologies to support watershed management

1The main objectives of the IWMP are to restore the ecological balance by harnessing, conserving and developing degraded natural resources

such as soil, vegetative cover and water.

4Introduction of multi-cropping and diverse agro-based activities, which help to provide sustainable

livelihoods to the people residing in the watershed area.

Page 29

Page 30: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

i ii iii iv v vi vii viii ix x xi xii xiii TOTAL

As per PPR 5 5 5 10 3 0 10 5 10 10 10 15 0 88

Marks Obtained

Name of Project

WEIGHTAGE POINT

Rampur Bhimsen, IWMP-VIII District: Kanpur Nagar

Page 30

Page 31: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District

S. No.Name of

Programme

Sponsoring

Agency/

Department

Objective of

Programme

Commencement

YearVillage Covered Remarks

1 Ekikrit Bagwani Mission Dept. of Horticulture 2005-06

All villages of the

district covered

under this scheme.

2 PMKSY Deptt. of Horticulture 2015-16 All village.

3 RKVY Deptt. of Horticulture 2015-16 All village.

4 Soli Health Card Department of Agriculture Balance use of Fertilizers as per Soil Test Report 2014-15 All village.

5Subsidised Agriculture

EquipmentsDepartment of Agriculture Farm Mechanization 2010-11 All village.

6 Crop Insurance Department of AgricultureTo provide Financial Coverage from

Natural Climeties2015-16 All village.

7 NRLM Department of Rural Development Empowerment of BPL families 2014-15 All village.

8 Skill Development MissionDirectorate of Skill Development

Mission, U.P.Skill/Trade Training for economic Empowerment 2015-16 All village.

Promotion of Horticultural development through Direct

Beneficiary Transfer (DBT) higher productivity.

Details of Ongoing Development Programme in the Project Area Kanpur Nagar

Page 31

Page 32: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District:

1 2B3C1d2a Oriyara 80° 16' 48.03" E 80° 19' 48.71" E 26° 20' 20.31" N 26° 22' 48.39" N 3406 5850 120.00 129.00 9.00 123.63

2 2B3C1d2b Sen Purab Para 80° 15' 25.61" E 80° 17' 56.11" E 26° 22' 22.22" N 26° 24' 30.42" N 3758 3013 120.50 127.50 7.00 124.72

3 2B3C1d2c Pipori 80° 14' 44.65" E 80° 17' 20.72" E 26° 23' 35.53" N 26° 25' 49.18" N 2998 4375 121.50 128.00 6.50 125.52

4 2B3C1d3a Magrasa 80° 16' 00.41" E 80° 19' 49.84" E 26° 20' 12.42" N 26° 22' 12.74" N 4246 4901 119.50 129.00 9.50 124.61

5 2B3C1d3b Sen Pashimpara 80° 14' 37.42" E 80° 16' 54.45" E 26° 21' 09.43" N 26° 23' 35.53" N 4019 3562 123.00 129.00 6.00 125.81

6 2B3C1f1a Gopalpur 80° 13' 33.77" E 80° 17' 04.75" E 26° 23' 52.22" N 26° 26' 08.82" N 6232 4580 122.00 130.00 8.00 126.44

7 2B3C1f1b Rampur Bhimsen 80° 11' 29.47" E 80° 15' 40.61" E 26° 24' 05.49" N 26° 26' 41.66" N 4841 3985 122.50 131.50 9.00 127.18

8 2B3C1f2a Pankabahadur Nagar 80° 12' 03.75" E 80° 14' 01.21" E 26° 26' 00.49" N 26° 27' 50.41" N 3319 2504 122.50 130.00 7.50 126.67

9 2B3C1f2b Bhouti Pratappur 80° 10' 37.93" E 80° 12' 34.03" E 26° 25' 53.75" N 26° 27' 50.77" N 2492 3544 123.00 131.00 8.00 128.25

10 2B3C1f2c Surar 80° 09' 05.34" E 80° 12' 29.68" E 26° 27' 22.63" N 26° 28' 57.19" N 5208 2891 123.50 130.50 7.00 127.84

11 2B3C2a2a Rautepur 80° 10' 07.35" E 80° 11' 43.77" E 26° 28' 57.97" N 26° 30' 38.74" N 1972 3503 125.00 131.50 6.50 127.85

12 2B3C2a2b Raikepur 80° 09' 38.10" E 80° 11' 25.44" E 26° 30' 33.95" N 26° 32' 04.42" N 2323 3791 125.50 131.50 6.00 128.38

13 2B3C2a3a Dool-Pratham 80° 08' 26.23" E 80° 11' 31.66" E 26° 28' 01.28" N 26° 29' 48.79" N 3970 3614 124.50 131.50 7.00 128.26

14 2B3C2a3b Dool-Dwitiya 80° 08' 22.56" E 80° 10' 28.04" E 26° 28' 04.76" N 26° 30' 09.43" N 3608 4166 126.50 132.00 5.50 129.26

TOTAL 80° 08' 22.56" E 80° 19' 49.84" E 26° 20' 12.42" N 26° 32' 04.42" N 119.50 132.00 12.50 126.43

NSEW

MWS WISE DETAILS OF COORDINATES, LENGTH, MINIMUM AND MAXIMUM ELEVATION OF THE PROJECT AREA OF Kanpur Nagar

S. No. MWS CODE

COORDINATES Elevation (in m)

MWS NAME Longitude (X) Latitude (Y)

Min

imu

m

Elev

atio

n

Max

imu

m

Elev

atio

n

Dif

fere

nce

Mea

n

Elev

atio

n

DIRECTION LENGTH IN

METER

Page 32

Page 33: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District:-

Area under Agriculture Scrub

Land

Waste

LandCanal

River

/DrainLakes/Ponds Road Railway Settlements Plantation

Brick

Kiln

2B3C1d2a Bharu Bharu 11.183 0.000 0.015 0.000 1.868 0.000 0.000 0.000 0.000 0.000 13.066

2B3C1d2a Neori Dande Ka Purwa 23.015 2.095 8.000 0.505 0.000 0.000 0.195 0.000 1.546 0.532 35.888

2B3C1d2a Gadhewa Mohasinpur Gadhewa Mohasinpur 39.625 0.000 1.910 0.558 0.000 0.658 0.134 0.000 1.450 0.283 44.618

2B3C1d2a Kanpur(MCorp.) Kanpur (MB) 7.532 4.686 0.082 0.000 1.177 0.000 0.019 0.000 0.000 0.000 13.497

2B3C1d2a Kasigawan Kumhaupar 16.870 0.000 4.099 0.000 0.227 0.000 0.073 0.000 0.000 0.000 21.268

2B3C1d2a Magrasa Magrasa 31.973 0.000 16.374 0.388 0.000 3.808 0.261 0.000 0.051 0.063 52.917

2B3C1d2a Neori Neori 55.610 13.063 12.493 0.000 0.731 0.409 0.902 0.000 10.719 0.531 94.458

2B3C1d2a Ramaipur Ramaipur 63.916 1.193 29.047 0.513 2.009 9.014 1.399 0.000 6.706 0.960 114.757

2B3C1d2a Magrasa Sarneyat Pur 1.510 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.510

2B3C1d2a Senpurab Para Sen Purab Para 13.803 11.979 10.958 0.000 1.021 0.398 0.296 0.000 13.499 1.277 53.230

2B3C1d2a Uriyara Uriyara 161.846 4.796 51.039 0.000 7.462 0.706 2.231 0.000 16.286 1.044 245.411

426.883 37.811 134.017 1.963 14.495 14.994 5.510 0.000 50.258 4.690 0.000 0.000 690.621 442.00

2B3C1d2b Neori Dande Ka Purwa 33.074 0.362 0.000 1.656 0.000 0.228 0.262 0.000 2.177 0.000 37.760

2B3C1d2b Fatehpur Dakshin Fatehpur Dakshin 103.975 27.428 3.821 0.000 5.059 2.800 1.097 0.000 14.850 0.708 159.738

2B3C1d2b Kanpur(MCorp.) Kanpur (MB) 47.979 2.101 32.986 0.000 0.879 0.825 0.122 0.000 4.086 1.334 90.311

2B3C1d2b Magrasa Sarneyat Pur 3.514 0.000 0.000 0.000 0.000 0.000 0.015 0.000 0.000 0.000 3.529

2B3C1d2b Senpurab Para Sen Purab Para 339.150 21.241 30.878 3.482 3.858 1.841 1.551 0.000 5.322 3.212 410.536

2B3C1d2b Senpashchim Para Senpashchim Para 158.011 0.608 13.481 1.893 0.000 3.808 0.957 0.000 8.121 0.000 186.877

685.702 51.741 81.167 7.031 9.796 9.502 4.003 0.000 34.555 5.254 0.000 0.000 888.751 490.00

2B3C1d2c Fatehpur Dakshin Fatehpur Dakshin 27.038 0.000 2.397 0.000 0.708 0.079 0.153 0.000 1.607 4.624 36.606

2B3C1d2c Patehuri Gambhirpur Dakshin 106.647 2.447 14.663 3.613 0.000 0.864 0.799 0.000 2.217 0.000 131.250

2B3C1d2c Gopal Pur Gopalpur 11.407 0.000 1.586 0.308 0.000 0.000 0.067 0.000 0.001 0.000 13.368

2B3C1d2c Kanpur(MCorp.) Kanpur (MB) 41.502 0.000 10.521 0.000 1.584 1.606 0.148 0.000 8.734 0.459 64.554

2B3C1d2c Mardanpur Meharban Singh Ka Purwa 11.987 0.000 0.277 0.000 1.690 0.000 0.086 0.000 4.049 0.074 18.162

2B3C1d2c Patehuri Patehuri 47.307 0.000 31.685 0.373 0.000 0.551 0.468 0.000 3.433 0.514 84.331

2B3C1d2c Pipauri Pipauri 164.508 9.607 30.589 0.000 4.922 1.820 1.259 0.000 26.077 0.897 239.679

2B3C1d2c Rampur Bhimsen Rampur Bhimsen 17.210 0.000 1.450 0.150 0.000 0.217 0.178 0.000 0.723 0.213 20.140

2B3C1d2c Rampur Khas Rampur Khas 4.334 0.000 1.598 0.126 0.000 0.000 0.083 0.000 0.269 0.000 6.411

2B3C1d2c Senpashchim Para Senpashchim Para 175.065 8.242 17.636 2.086 0.175 0.796 0.600 0.000 0.972 6.936 212.509

607.006 20.296 112.402 6.656 9.079 5.933 3.841 0.000 48.081 13.717 0.000 0.000 827.011 455.00

2B3C1d3a Bajpur Bajpur 0.521 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.521

2B3C1d3a Bharu Bharu 28.498 0.000 5.494 0.000 1.149 0.000 0.048 0.000 0.071 0.157 35.417

2B3C1d3a Kurauna Bahadur Nagar Durjanpur 3.910 0.000 0.081 0.000 0.000 0.000 0.000 0.000 0.062 0.000 4.053

2B3C1d3a Gadhewa Mohasinpur Gadhewa Mohasinpur 49.179 0.020 0.277 3.874 0.000 0.422 0.539 0.000 3.591 0.000 57.901

2B3C1d3a Magrasa Jahanpur 74.298 0.071 7.173 2.439 0.443 0.130 0.617 0.000 2.224 0.000 87.395

2B3C1d3a Jamoo Jamoo 7.890 0.000 0.345 0.000 0.000 0.000 0.046 0.000 0.029 0.000 8.311

2B3C1d3a Kasigawan Kumhaupar 3.216 0.000 0.646 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.861

2B3C1d3a Kurauna Bahadur Nagar Kurauna Bahadur Nagar 1.949 0.000 0.000 0.095 0.000 0.000 0.037 0.000 0.000 0.000 2.082

2B3C1d3a Magrasa Magrasa 175.907 2.974 13.977 1.755 0.224 0.909 1.505 0.000 13.218 7.452 217.920

2B3C1d3a Afjalpur Matiyara 11.914 0.000 7.261 0.000 0.000 0.000 0.083 0.000 0.000 0.207 19.465

2B3C1d3a Ramaipur Ramaipur 313.806 15.686 18.399 0.519 1.300 1.327 2.955 0.000 35.693 5.834 395.518

2B3C1d3a Magrasa Rautara 58.542 1.413 0.009 0.000 0.645 0.207 0.288 0.000 5.394 2.517 69.014

2B3C1d3a Bidhnoo Shivrampur 9.432 0.000 0.004 0.858 0.000 0.000 0.078 0.000 0.000 0.000 10.372

Treatable

Area

MWS

CODEGram Panchayat VILLAGE NAME

Cultivable LandNon Cultivable Land

Water bodies Builtup Area

Forest

(Area in ha)Kanpur Nagar

Geographical Area

MWS/GP/Village WISE DETAILS OF LAND-GEOGRAPHICAL AND TREATABLE AREA of Project Area- Rampur Bhimsen, IWMP-VIII

Sub Total

Sub Total

Sub Total

Page 33

Page 34: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District:-(Area in ha)

Kanpur NagarMWS/GP/Village WISE DETAILS OF LAND-GEOGRAPHICAL AND TREATABLE AREA of Project Area- Rampur Bhimsen, IWMP-VIII739.063 20.162 53.664 9.540 3.761 2.995 6.195 0.000 60.283 16.167 0.000 0.000 911.831 506.00

2B3C1d3b Gadhewa Mohasinpur Gadhewa Mohasinpur 12.440 0.371 0.872 0.000 0.000 0.000 0.040 0.000 0.292 0.000 14.014

2B3C1d3b Magrasa Jahanpur 0.357 0.013 0.000 0.000 0.039 0.000 0.000 0.000 0.000 0.000 0.408

2B3C1d3b Kurauna Bahadur Nagar Kurauna Bahadur Nagar 104.870 28.990 45.618 0.000 0.286 0.566 0.846 0.000 3.019 1.469 185.664

2B3C1d3b Magrasa Magrasa 4.667 22.549 8.205 0.000 0.011 0.000 0.134 0.000 0.000 0.000 35.566

2B3C1d3b Kurauna Bahadur Nagar Saiyangojha 0.000 2.136 0.000 0.000 0.095 0.000 0.000 0.000 0.000 0.000 2.231

2B3C1d3b Magrasa Sarneyat Pur 22.017 0.000 0.500 0.000 0.000 0.000 0.026 0.000 0.008 0.367 22.917

2B3C1d3b Senpurab Para Sen Purab Para 17.638 0.000 0.965 0.000 0.000 0.000 0.171 0.000 2.174 0.488 21.437

2B3C1d3b Shahpur Majhawan Senpashchim Para 254.856 10.180 48.691 0.523 0.782 4.924 1.648 0.000 27.685 1.168 350.456

2B3C1d3b Senpurab Para Sen purab Para 107.256 30.286 85.242 0.000 1.034 1.822 0.639 0.000 8.275 0.402 234.956

524.100 94.525 190.091 0.523 2.246 7.312 3.505 0.000 41.454 3.894 0.000 0.000 867.650 480.00

2B3C1f1a Patehuri Gambhirpur Dakshin 0.578 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.578

2B3C1f1a Gopal Pur Gopalpur 209.351 1.113 26.648 1.492 0.294 1.839 1.586 0.000 16.106 0.263 258.691

2B3C1f1a Kaindha Kaindha 23.028 0.013 0.444 0.279 0.000 0.000 0.195 0.000 3.150 0.240 27.349

2B3C1f1a Kanpur(MCorp.) Kanpur (MB) 3.052 0.000 0.000 0.000 0.178 0.416 0.000 0.000 0.345 0.020 4.011

2B3C1f1a Mardanpur Mardanpur 20.118 0.000 0.000 0.979 1.222 0.766 0.662 0.000 38.496 2.028 64.271

2B3C1f1a Mardanpur Meharban Singh Ka Purwa 44.096 0.000 9.047 0.046 5.560 0.435 0.592 0.000 43.586 6.114 109.476

2B3C1f1a Patarsa Patarsa 2.349 0.000 2.481 0.000 0.134 0.000 0.043 0.000 1.530 0.000 6.538

2B3C1f1a Patehuri Patehuri 0.165 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.165

2B3C1f1a Pipauri Pipauri 77.616 3.134 1.598 0.000 0.000 0.102 0.342 0.000 0.290 0.000 83.082

2B3C1f1a Patarsa Pratappur Majra Rampur 67.339 1.089 15.543 4.000 0.066 0.667 0.537 0.000 0.252 5.321 94.813

2B3C1f1a Rampur Bhimsen Rampur Bhimsen 62.137 4.557 0.000 0.000 0.000 0.521 0.510 0.000 3.197 0.181 71.102

2B3C1f1a Rampur Khas Rampur Khas 89.512 1.313 1.527 0.000 0.000 0.011 0.053 0.000 0.354 0.703 93.473

2B3C1f1a Patarsa Singhpur Kathar 3.900 0.000 5.840 0.000 0.022 0.000 0.062 0.000 0.000 0.000 9.823

603.242 11.219 63.128 6.796 7.476 4.756 4.579 0.000 107.305 14.870 0.000 0.000 823.373 455.00

2B3C1f1b Bhailamau Bhailamau 4.341 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.341

2B3C1f1b Garhi Kanpur Garhi Kanpur 148.237 1.554 9.683 0.000 0.000 0.000 1.130 0.455 11.539 0.264 172.861

2B3C1f1b Gopal Pur Gopalpur 2.100 0.000 1.000 0.000 0.042 0.000 0.041 0.000 0.000 0.000 3.184

2B3C1f1b Kaindha Kaindha 6.704 0.000 0.000 0.000 0.000 0.000 0.009 0.000 0.299 0.000 7.012

2B3C1f1b Mardanpur Meharban Singh Ka Purwa 0.295 0.000 0.347 0.000 0.089 0.000 0.000 0.000 0.000 0.000 0.730

2B3C1f1b Patarsa Patarsa 83.153 0.459 17.173 0.000 3.016 0.125 0.418 0.897 12.641 0.000 117.882

2B3C1f1b Patarsa Pratappur Majra Rampur 0.000 0.000 0.958 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.958

2B3C1f1b Pratappur Sarsai Pratappur Sarsai 71.696 0.789 5.752 0.000 1.640 0.504 0.282 0.000 2.956 0.000 83.619

2B3C1f1b Rampur Bhimsen Rampur Bhimsen 429.895 4.940 26.697 0.000 0.820 1.906 3.023 1.868 54.328 4.726 528.202

2B3C1f1b Rampur Khas Rampur Khas 177.317 12.481 11.696 0.000 0.000 0.370 1.911 0.000 17.850 4.350 225.976

2B3C1f1b Sachendi Urf Chacheri Sachendi Urf Chacheri 56.724 0.000 2.034 0.000 0.000 0.000 0.126 0.000 0.000 0.275 59.160

2B3C1f1b Patarsa Singhpur Kathar 80.010 0.004 8.427 0.000 0.189 0.534 0.500 0.374 3.156 0.796 93.991

2B3C1f1b Sona Sona 10.292 0.000 0.905 0.000 0.000 0.000 0.045 0.000 0.567 0.000 11.810

2B3C1f1b Garhi Kanpur Surjanpur 23.332 0.000 0.751 0.000 0.000 0.000 0.119 0.000 0.531 0.000 24.732

1094.096 20.226 85.423 0.000 5.797 3.439 7.605 3.594 103.868 10.411 0.000 0.000 1334.459 760.00

2B3C1f2a Bhailamau Bhailamau 50.460 0.776 5.254 0.000 0.000 0.531 0.605 0.000 12.682 0.000 70.309

2B3C1f2a Bhautipratappur Bhauti Pratappur 127.042 16.961 2.237 0.000 2.642 2.368 1.777 0.052 10.804 1.483 165.365

2B3C1f2a Pankabahadur Nagar Chhitepur 92.938 0.000 7.341 0.000 0.000 0.273 0.858 0.000 3.699 0.000 105.110

2B3C1f2a Garhi Kanpur Garhi Kanpur 16.499 0.000 0.000 0.000 0.000 0.000 0.124 0.000 0.000 0.000 16.622

2B3C1f2a Pankabahadur Nagar Pankabahadur Nagar 112.516 3.967 13.764 0.000 4.341 0.748 0.874 0.000 11.277 1.106 148.592

2B3C1f2a Rampur Bhimsen Rampur Bhimsen 32.488 0.115 19.561 0.000 1.052 0.812 0.410 0.000 1.615 0.000 56.054

2B3C1f2a Garhi Kanpur Surjanpur 33.184 0.000 0.000 0.000 0.000 0.000 0.220 0.000 4.505 0.000 37.910

465.127 21.818 48.157 0.000 8.035 4.733 4.868 0.052 44.583 2.588 0.000 0.000 599.962 362.00

Sub Total

Sub Total

Sub Total

Sub Total

Page 34

Page 35: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District:-(Area in ha)

Kanpur NagarMWS/GP/Village WISE DETAILS OF LAND-GEOGRAPHICAL AND TREATABLE AREA of Project Area- Rampur Bhimsen, IWMP-VIII2B3C1f2b Bhailamau Bhailamau 73.823 0.060 27.032 0.000 0.000 0.179 0.779 0.000 5.289 2.391 109.551

2B3C1f2b Bhauti Khera Bhaunti khera 0.000 4.227 0.527 0.000 0.000 0.000 0.018 0.000 0.000 0.000 4.772

2B3C1f2b Bhautipratappur Bhauti Pratappur 103.019 21.238 76.103 0.000 0.635 6.419 5.689 0.540 98.443 3.272 315.359

2B3C1f2b Bhisi Jargaon Bhisi Jargaon 12.939 0.000 0.318 0.000 0.000 0.000 0.100 0.000 1.308 0.000 14.665

2B3C1f2b Sachendi Urf Chacheri Sachendi Urf Chacheri 43.050 0.000 12.000 0.000 0.000 3.107 0.696 0.000 43.779 1.231 103.862

232.831 25.525 115.979 0.000 0.635 9.705 7.281 0.540 148.819 6.893 0.000 0.000 548.209 310.00

2B3C1f2c Bahera Bahera 24.490 0.000 5.623 0.000 1.353 0.000 0.090 0.000 0.000 0.000 31.556

2B3C1f2c Bhauti Khera Bhaunti khera 103.241 14.303 3.032 0.000 3.254 0.197 0.420 0.789 7.686 0.578 133.500

2B3C1f2c Bhautipratappur Bhauti Pratappur 40.492 23.043 0.062 0.000 0.873 0.787 0.319 0.301 2.808 0.000 68.686

2B3C1f2c Bhisi Jargaon Bhisi Jargaon 116.573 3.091 4.442 0.000 0.000 1.246 0.863 0.498 4.190 0.885 131.788

2B3C1f2c Bhool Bhool 35.187 0.000 0.346 0.000 0.000 0.000 0.088 0.860 0.000 0.253 36.733

2B3C1f2c Dool Dool 13.036 0.000 0.000 0.000 0.000 0.000 0.081 0.000 0.000 0.050 13.167

2B3C1f2c Kanpur(MCorp.) Kanpur (MB) 20.171 0.255 1.763 0.000 1.850 0.000 0.048 0.000 0.000 0.000 24.087

2B3C1f2c Nakatoo Nakatoo 39.102 0.000 0.617 0.000 0.000 0.000 0.141 0.088 0.000 0.000 39.947

2B3C1f2c Surar Surar 295.361 37.104 22.339 0.000 1.448 2.467 2.019 1.501 18.125 1.004 381.368

687.652 77.795 38.223 0.000 8.778 4.698 4.070 4.037 32.810 2.770 0.000 0.000 860.834 470.00

2B3C2a2a Bahera Bahera 0.012 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.012

2B3C2a2a Rautepur Jhakara 82.092 8.681 1.502 0.000 1.393 0.294 0.676 0.000 5.139 1.193 100.969

2B3C2a2a Bahera Nasenia 29.501 0.000 1.104 0.000 1.883 0.126 0.087 0.000 0.933 0.000 33.634

2B3C2a2a Raikepur Raikepur 4.405 5.604 0.000 0.000 0.344 0.054 0.149 0.000 0.428 0.000 10.983

2B3C2a2a Rautepur Rautepur 65.332 0.274 1.262 0.000 0.000 0.000 0.557 0.000 3.874 0.324 71.623

2B3C2a2a Surar Surar 66.142 0.000 0.000 0.000 2.260 0.000 0.366 0.000 3.176 0.000 71.944

2B3C2a2a Tikra Kanpur Tikara 32.035 6.335 3.298 0.000 1.769 0.083 0.499 0.000 6.058 3.577 53.654

2B3C2a2a Raikepur Tikari 46.834 1.748 0.000 0.000 0.174 0.088 0.183 0.000 0.602 0.000 49.629

326.352 22.641 7.166 0.000 7.822 0.645 2.516 0.000 20.209 5.095 0.000 0.000 392.448 210.00

2B3C2a2b Bani Bani 29.234 2.891 0.400 0.000 1.438 0.000 0.120 0.000 0.492 0.000 34.575

2B3C2a2b Naurangabad Lohar Khera 12.496 0.776 0.000 0.000 0.091 0.000 0.101 0.000 1.712 0.000 15.176

2B3C2a2b Raikepur Raikepur 250.293 19.732 4.538 0.000 5.559 0.820 1.844 0.000 10.146 6.484 299.416

2B3C2a2b Tikra Kanpur Tikara 5.911 6.538 0.000 0.000 0.238 0.000 0.046 0.000 0.214 0.000 12.947

2B3C2a2b Raikepur Tikari 6.913 0.000 0.000 0.000 0.000 0.000 0.001 0.000 0.000 0.010 6.924

304.848 29.937 4.938 0.000 7.327 0.820 2.112 0.000 12.564 6.494 0.000 0.000 369.038 170.00

2B3C2a3a Bahera Bahera 2.007 0.000 0.000 0.000 0.094 0.000 0.000 0.000 0.000 0.000 2.101

2B3C2a3a Bhool Bhool 31.157 0.000 0.270 0.000 0.000 0.490 0.106 0.000 6.172 0.107 38.302

2B3C2a3a Dool Dool 170.035 8.235 8.188 0.000 0.099 2.914 1.340 0.000 18.801 0.000 209.612

2B3C2a3a Rautepur Jhakara 14.972 0.000 3.711 0.000 0.000 0.000 0.047 0.000 0.015 0.056 18.800

2B3C2a3a Bahera Nasenia 4.554 0.000 0.000 0.000 0.386 0.000 0.000 0.000 0.000 0.000 4.940

2B3C2a3a Rautepur Rautepur 3.816 0.496 3.449 0.000 0.051 0.116 0.048 0.000 0.000 0.000 7.976

2B3C2a3a Surar Surar 190.068 10.245 29.964 0.000 1.331 1.214 1.689 0.000 14.088 5.676 254.275

416.609 18.975 45.582 0.000 1.960 4.735 3.230 0.000 39.076 5.838 0.000 0.000 536.005 295.00

2B3C2a3b Bhool Bhool 8.567 0.000 4.628 0.000 0.000 0.363 0.081 0.000 0.000 0.000 13.639

2B3C2a3b Dool Dool 282.847 13.332 13.606 0.000 0.343 2.654 2.407 0.000 22.549 2.192 339.931

2B3C2a3b Rautepur Rautepur 129.409 25.295 12.504 0.000 0.944 0.734 1.146 0.000 11.123 2.866 184.022

420.823 38.627 30.738 0.000 1.287 3.752 3.634 0.000 33.672 5.058 0.000 0.000 537.592 300.00

7534.33 491.300 1010.679 32.510 88.495 78.018 62.951 8.224 777.535 103.738 0.000 0.000 10187.783 5705.00

5556.57

4203.02

1977.76

Sub Total

Grand Total

Sub Total

Sub Total

Sub Total

Rainfed Area

Irrigated AreaRainfed taken under Project

Sub Total

Sub Total

Page 35

Page 36: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District Kanpur Nagar

S.No. Project Area in ha

1 125

2 74

3 107

4 302

5 360

6 99

7 169

8 70

9 150

10 112

11 305

12 104

13 125

14 238

15 236

16 156

17 384

18 220

19 334

20 212

21 229

22 510

23 413

24 83

25 427

26 161

5705

Rampur Bhimsen

Pankabahadur Nagar

Sen Purab Para

Raikepur

Rautepur

Ramaipur

Rampur Khas

Total :

Sachendi Urf Chacheri

Senpashchim Para

Surar

Uriyara

On The basis of Above Table 26 Watershed Committees (WCs) have been formed at GP Level and GP wise Treateable Area in ha Given BelowRampur Bhimsen, IWMP-VIII

Name of Watershed Committee

Dool

Bhauti Pratappur

Bhisi Jargaon

Bhaunti khera

Bhailamau

Fatehpur Dakshin

Gadhewa Mohasinpur

Garhi Kanpur

Gopalpur

Patarsa

Pipauri

Patehuri

Neori

Magrasa

Kurauna Bahadur Nagar

Page 36

Page 37: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Month June July August September October November December January February March April May

Year Rain Rain Rain Rain Rain Rain Rain Rain Rain Rain Rain Rain

1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17

2003-2004 40.20 265.40 128.90 338.50 0.00 0.00 0.00 33.30 0.00 0.00 9.90 7.50 823.70

2004-2005 96.00 279.40 139.30 197.20 30.50 0.00 0.00 3.00 0.00 15.20 0.00 0.20 760.80

2005-2006 67.40 264.90 144.30 147.10 0.00 0.00 3.00 0.00 0.00 11.90 5.60 17.40 661.60

2006-2007 33.23 178.53 86.00 39.67 5.00 0.00 0.00 0.00 15.67 7.33 0.00 1.75 367.18

2007-2008 3.50 158.18 118.50 25.25 0.00 0.00 0.00 0.00 0.00 2.60 0.00 0.00 308.03

2008-2009 516.90 601.90 315.50 110.50 0.00 0.00 0.00 0.00 0.00 1.20 5.20 0.00 1551.20

2009-2010 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 108.00 0.00 0.00 0.00 111.00

2010-2011 21.60 35.40 105.80 195.10 16.70 26.80 0.00 0.00 2.00 0.00 0.00 20.70 424.10

2011-2012 183.40 184.00 198.10 106.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 671.70

2012-2013 1.00 44.60 18.00 56.80 71.20 0.00 1.80 1.00 6.10 0.00 0.00 6.60 207.10

588.64

Month Jan Feb Mar Apl May Jun Jul Aug Sep Oct Nov Dec

Temp Max. 30°C 36°C 40°C 46°C 48°C 47°C 42°C 43°C 40°C 42°C 35°C 30°C

Min. 0°C 4°C 8°C 12°C 20°C 17°C 14°C 23°C 14°C 13°C 7°C 3°C

71% 63% 50% 37% 45% 62% 80% 83% 81% 71% 66% 71%

10 11 11 12 16 11 7 7 8 10 10 10

4 3 3 3 4 10 17 16 11 3 1 1

Central Zone

Rainfall data of District Kanpur Nagar

Avarage Rainfall of Last Ten Years

Average

Rainfall

for Last Ten Years from 2002-2013 (Rainfall in mm)

Minimum

Temp.OC

Maximum

Temp.OC

Relative

Humidity

0°C 48°C 37%-83%

No. of Rainy Days

Hours of Sunshine

Relative Humidity

District-Kanpur Nagar Agro-Climatic Zone :

Page 37

Page 38: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District:- Kanpur Nagar - (Last 05 Years)

Affected Not Affected

1 Drought - - - all villages of the project area

2 Flood - Not Affected - Unnao district.

Rampur Bhimsen, IWMP-VIII District:- Kanpur Nagar

1 2 3 4 5

Run off (30% of the Annual

Rainfall)

(mm/ year)

a Sheet (70-80% of Water

Erosion)4278.75

b Rill (15-20% of Water Erosion) 998.375

c Gully Erosion (5-10%) 427.875

5705

Name of Affected Village

Natural Climeties in the Project Area of,

176.59 8-10

N.A.

Average soil loss (Tonnes/

ha/ year)

Details of Soil Erosion in the project area of,

S. No. Name of ClimetyNumber of Village Affected

Periodicity

Total

Wind erosion - Nil

Cause Type of erosion Area affected (ha)

Water erosion (25-30% of Project Areas)

Page 38

Page 39: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No. MWS Code MWS Name Built LandWater

Bodies0.00-0.50 0.51-1.00 1.01-4.00 >4.00 Total

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.622 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.753 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.014 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.835 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.656 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.377 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.468 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.969 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.8311 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.4512 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.0413 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.0114 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

(Area In ha)

Total

MWS Wise Details of Land under Various SLOPE Range of Project Area of Rampur Bhimsen, IWMP-VIII

Page 39

Page 40: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.622 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.753 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.014 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.835 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.656 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.377 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.468 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.969 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.8311 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.4512 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.0413 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.0114 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

MWS Wise Details of Land under Various SLOPE Category of Project Area of

(Area In ha)

Total

TotalMWS Code MWS Name Built Land Water Bodies Nearly Level Gentle ModerateNearly level

to Moderate

Rampur Bhimsen, IWMP-VIII

S. No.

Page 40

Page 41: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No. MWS Code MWS Name Builtup Area Water Bodies I II III IV Total

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.622 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.753 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.014 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.835 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.656 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.377 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.468 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.969 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.8311 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.4512 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.0413 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.0114 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

MWS Wise Details of Land under Various LCC Category of Project Area of Rampur Bhimsen, IWMP-VIII

(Area In ha)

Total

Page 41

Page 42: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Very deep Deep Moderately deep Shallow

(>90.00 cm) (45.00-90.00 cm) (22.5-45.00 cm) (7.5-22.5 cm)1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.622 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.753 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.014 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.835 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.656 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.377 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.468 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.969 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.8311 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.4512 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.0413 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.0114 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

(Area In ha)

MWS Wise Details of Soil Depth of Project Area of

S.No

Total

Rampur Bhimsen, IWMP-VIII

MWS Code MWS NameBuilt

Land

Water

BodiesTotal

Kanpur Nagar

Page 42

Page 43: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S.No MWS Code MWS Name Built LandWater

BodiesHigh Medium To low Low Very Low Total

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.622 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.75

3 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.01

4 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.83

5 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.65

6 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.37

7 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.46

8 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.96

9 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.83

11 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.45

12 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.04

13 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.01

14 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78Total

(Area In ha)

MWS Wise Details of Soil Fertility of Project Area of Kanpur NagarRampur Bhimsen, IWMP-VIII

Page 43

Page 44: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.62

2 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.75

3 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.01

4 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.83

5 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.65

6 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.37

7 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.46

8 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.96

9 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.83

11 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.45

12 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.04

13 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.01

14 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

MWS Code MWS Name Built LandWater

BodiesFine Loamy Clayey

Total

Loamy Silty Loam TotalS.No.

(Area In ha)

MWS Wise Details of Soil Texture of Project Area of

Page 44

Page 45: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

1 2B3C1d2a Oriyara 60.46 31.45 152.84 187.83 86.21 171.83 690.62

2 2B3C1d2b Sen Purab Para 43.81 26.33 361.00 230.29 94.41 132.91 888.75

3 2B3C1d2c Pipori 65.64 21.67 306.05 214.87 86.09 132.70 827.01

4 2B3C1d3a Magrasa 82.64 16.30 255.46 333.29 150.32 73.83 911.83

5 2B3C1d3b Sen Pashimpara 48.85 10.08 293.09 196.46 34.55 284.62 867.65

6 2B3C1f1a Gopalpur 126.75 19.03 371.64 194.25 37.35 74.35 823.37

7 2B3C1f1b Rampur Bhimsen 125.48 9.24 591.20 389.18 113.72 105.65 1334.46

8 2B3C1f2a Pankabahadur Nagar 52.09 12.77 226.08 173.99 65.05 69.98 599.96

9 2B3C1f2b Bhouti Pratappur 163.53 10.34 99.06 102.60 31.17 141.50 548.21

10 2B3C1f2c Surar 43.69 13.48 414.76 230.05 42.84 116.02 860.83

11 2B3C2a2a Rautepur 27.82 8.47 155.18 135.95 35.21 29.81 392.45

12 2B3C2a2b Raikepur 21.17 8.15 145.33 105.36 54.16 34.87 369.04

13 2B3C2a3a Dool-Pratham 48.14 6.69 229.57 161.87 25.17 64.56 536.01

14 2B3C2a3b Dool-Dwitiya 42.36 5.04 223.03 179.29 18.50 69.37 537.59

952.45 199.02 3824.29 2835.28 874.76 1501.98 10187.78

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

S.No.

Total

(Area In ha)

MWS Wise Details of Soil EROSION of Project Area of

TotalMWS Code MWS Name Built LandWater

Bodies

None to Slight

Sheet Erosion

Slight Sheet

Erosion

Moderately

Erosion

Severe Small

Gullies

Page 45

Page 46: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

MWS WISE DETAILS OF STREAM ORDER IN THE PROJECT AREA OF Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Length NO.

1 2B3C1d2a Oriyara 13 8252.60 1

2 2B3C1d2b Sen Purab Para 34 6007.40 8

3 2B3C1d2c Pipori 25 6446.99 8

4 2B3C1d3a Magrasa 17 10145.85 7

5 2B3C1d3b Sen Pashimpara 22 7348.62 5

6 2B3C1f1a Gopalpur 17 2197.09 5

7 2B3C1f1b Rampur Bhimsen 15 5412.43 6

8 2B3C1f2a Pankabahadur Nagar 15 5575.63 3

9 2B3C1f2b Bhouti Pratappur 9 2101.41 1

10 2B3C1f2c Surar 17 3972.48 3

11 2B3C2a2a Rautepur 7 3817.07 3

12 2B3C2a2b Raikepur 4 3667.18 1

13 2B3C2a3a Dool-Pratham 14 456.19 3

14 2B3C2a3b Dool-Dwitiya 16 2913.96 1

225 68314.90 55

Stream Length ( in m)S.NO. MWS CODE MWS NAME

Total

No of Water Bodies

Page 46

Page 47: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Major Roads Minor Roads Total

1 2B3C1d2a Oriyara 1838.49 31642.78 33481.27

2 2B3C1d2b Sen Purab Para 28640.85 28640.85

3 2B3C1d2c Pipori 27479.24 27479.24

4 2B3C1d3a Magrasa 1992.07 32948.33 34940.40

5 2B3C1d3b Sen Pashimpara 25064.22 25064.22

6 2B3C1f1a Gopalpur 32761.89 32761.89

7 2B3C1f1b Rampur Bhimsen 4184.86 42190.20 46375.06

8 2B3C1f2a Pankabahadur Nagar 1840.54 26356.15 28196.69

9 2B3C1f2b Bhouti Pratappur 3451.89 22619.36 26071.25

10 2B3C1f2c Surar 29173.97 29173.97

11 2B3C2a2a Rautepur 18139.06 18139.06

12 2B3C2a2b Raikepur 13759.20 13759.20

13 2B3C2a3a Dool-Pratham 22663.64 22663.64

14 2B3C2a3b Dool-Dwitiya 26958.30 26958.30

13307.85 380397.19 393705.04

Road Length (in m)

MWS WISE DETAILS OF ROAD LENGTH OF

Total

S.NO M WS CODE WS NAME

Page 47

Page 48: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

1 19 Lakes/Ponds 2B3C1d2a 80°19'17.76" 26°21'22.32" 0.17

2 29 Lakes/Ponds 2B3C1d2a Ramaipur 129,107,89,91 80°18'09.00" 26°21'30.60" 0.22

3 30 Lakes/Ponds 2B3C1d2a Ramaipur 209 80°18'12.60" 26°21'25.20" 0.12

4 33 Lakes/Ponds 2B3C1d2a Ramaipur 157,154,146,149,53 80°18'18.72" 26°21'33.84" 0.50

5 57 Lakes/Ponds 2B3C1d2a Gadhewa Mohasinpur 174,176,175,157 80°17'06.36" 26°22'05.88" 0.48

6 59 Lakes/Ponds 2B3C1d2a Sen Purab Para 443,444,447,434,445 80°17'39.84" 26°22'37.92" 0.40

7 74 Lakes/Ponds 2B3C1d2a Uriyara 481,493,480,494,495 80°18'41.40" 26°21'16.20" 0.64

8 80 Lakes/Ponds 2B3C1d2a Neori 107,108,109 80°17'41.28" 26°22'12.00" 0.41

9 82 Lakes/Ponds 2B3C1d2a Gadhewa Mohasinpur 150 80°17'02.40" 26°22'13.44" 0.18

10 94 Lakes/Ponds 2B3C1d2a Ramaipur 134,125,133,126 80°18'02.88" 26°21'23.76" 0.59

11 99 Lakes/Ponds 2B3C1d2a Uriyara 540,491,539,494 80°18'41.04" 26°21'11.16" 0.06

12 107 Lakes/Ponds 2B3C1d2a Ramaipur 699,688,685,689,687 80°19'05.88" 26°20'42.72" 0.13

13 108 Lakes/Ponds 2B3C1d2a Ramaipur 251,253,300,250,247,252 80°18'23.76" 26°21'10.08" 0.31

4.22 13

14 5 Lakes/Ponds 2B3C1d2b Kanpur (MB) 80°17'51.72" 26°23'06.00" 0.11

15 8 Lakes/Ponds 2B3C1d2b Kanpur (MB) 80°17'51.36" 26°23'22.92" 0.08

16 9 Lakes/Ponds 2B3C1d2b Kanpur (MB) 80°17'49.92" 26°23'21.48" 0.10

17 18 Lakes/Ponds 2B3C1d2b Kanpur (MB) 80°17'40.56" 26°24'03.96" 0.46

18 24 Lakes/Ponds 2B3C1d2b Sen Purab Para 144,145 80°17'12.84" 26°23'10.32" 0.33

19 26 Lakes/Ponds 2B3C1d2b Senpashchim Para 261,260,263,264,267 80°16'32.88" 26°23'46.32" 0.24

20 27 Lakes/Ponds 2B3C1d2b Senpashchim Para 220,217,221,259,222,223 80°16'41.52" 26°23'46.32" 0.86

21 29 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 148,149,199 80°16'50.88" 26°23'56.40" 0.66

22 30 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 200,201 80°17'09.60" 26°24'05.76" 0.98

23 32 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 259,257 80°17'13.56" 26°23'54.96" 0.13

24 33 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 349 80°17'23.28" 26°24'01.08" 0.09

25 35 Lakes/Ponds 2B3C1d2b Senpashchim Para 745,746 80°16'01.92" 26°23'07.08" 0.01

26 37 Lakes/Ponds 2B3C1d2b Senpashchim Para 772,795,793,794,790 80°15'52.56" 26°23'15.72" 0.25

27 38 Lakes/Ponds 2B3C1d2b Senpashchim Para 788,611,786,787,789 80°15'59.04" 26°23'18.96" 0.87

28 40 Lakes/Ponds 2B3C1d2b Dande Ka Purwa 90,68,89,72,69 80°17'06.36" 26°22'40.08" 0.23

29 47 Lakes/Ponds 2B3C1d2b Senpashchim Para 561,562,567,563 80°15'51.12" 26°23'34.08" 0.38

30 52 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 338,333,334,332,331,342,335 80°17'20.40" 26°23'45.96" 0.60

31 53 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 4,52,453 80°17'33.72" 26°23'48.12" 0.31

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

Page 48

Page 49: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

32 55 Lakes/Ponds 2B3C1d2b Sen Purab Para 91,38,99,90,69,10,904 80°16'37.20" 26°22'45.12" 0.75

33 61 Lakes/Ponds 2B3C1d2b Senpashchim Para 8,09,80,18,08,807 80°15'49.68" 26°23'20.40" 0.06

34 62 Lakes/Ponds 2B3C1d2b Senpashchim Para 66,06,71,643 80°16'14.52" 26°23'23.64" 0.17

35 73 Lakes/Ponds 2B3C1d2b Senpashchim Para 8,97,89,58,93,922 80°15'38.16" 26°23'37.68" 0.06

36 75 Lakes/Ponds 2B3C1d2b Senpashchim Para 922 80°15'30.96" 26°23'35.16" 0.13

37 83 Lakes/Ponds 2B3C1d2b Sen Purab Para 133 80°17'10.68" 26°23'20.04" 0.13

38 88 Lakes/Ponds 2B3C1d2b Sen Purab Para 13,32,56,25,73,63,264 80°17'35.88" 26°23'01.32" 0.42

39 93 Lakes/Ponds 2B3C1d2b Senpashchim Para 7,29,72,87,30,72,37,26,000 80°16'04.80" 26°23'12.84" 0.24

40 94 Lakes/Ponds 2B3C1d2b Senpashchim Para 73,77,38,73,57,34,731 80°16'03.72" 26°23'11.04" 0.24

41 95 Lakes/Ponds 2B3C1d2b Senpashchim Para 7,13,71,47,15,716 80°16'07.32" 26°23'13.92" 0.08

42 96 Lakes/Ponds 2B3C1d2b Senpashchim Para 22,32,25,258 80°16'38.64" 26°23'48.48" 0.22

43 101 Lakes/Ponds 2B3C1d2b Kanpur (MB) 80°17'50.28" 26°23'53.88" 0.07

44 107 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 3,42,348 80°17'21.48" 26°24'00.36" 0.03

45 108 Lakes/Ponds 2B3C1d2b Fatehpur Dakshin 349 80°17'24.00" 26°24'01.80" 0.00

46 113 Lakes/Ponds 2B3C1d2b Sen Purab Para 379 80°17'34.80" 26°22'46.92" 0.16

47 121 Lakes/Ponds 2B3C1d2b Sen Purab Para 455 80°17'33.72" 26°22'38.64" 0.06

9.50 34

48 3 Lakes/Ponds 2B3C1d2c Kanpur (MB) 80°17'07.80" 26°25'45.48" 0.08

49 5 Lakes/Ponds 2B3C1d2c Kanpur (MB) 80°17'10.68" 26°25'40.08" 0.36

50 14 Lakes/Ponds 2B3C1d2c Kanpur (MB) 80°17'01.32" 26°25'16.68" 0.75

51 16 Lakes/Ponds 2B3C1d2c Kanpur (MB) 80°16'52.32" 26°25'06.24" 0.41

52 29 Lakes/Ponds 2B3C1d2c Senpashchim Para 1,40,141 80°16'26.76" 26°24'23.76" 0.21

53 30 Lakes/Ponds 2B3C1d2c Senpashchim Para 68 80°16'22.80" 26°24'21.60" 0.09

54 33 Lakes/Ponds 2B3C1d2c Pipauri 36,83,67,37,63,71,370 80°16'24.96" 26°25'12.00" 0.10

55 34 Lakes/Ponds 2B3C1d2c Pipauri 380,P 80°16'19.56" 26°25'11.28" 0.12

56 36 Lakes/Ponds 2B3C1d2c Pipauri 45,55,05,51,85,04,518 80°16'18.84" 26°24'59.76" 0.20

57 38 Lakes/Ponds 2B3C1d2c Pipauri 5,26,52,85,25,450 80°16'11.28" 26°24'56.52" 0.16

58 39 Lakes/Ponds 2B3C1d2c Pipauri 54,75,46,493 80°16'21.00" 26°24'50.04" 0.36

59 41 Lakes/Ponds 2B3C1d2c Pipauri 5,47,55,75,52,551 80°16'27.84" 26°24'46.44" 0.38

60 44 Lakes/Ponds 2B3C1d2c Patehuri 22,12,23,17,62,22,224 80°15'07.92" 26°23'58.56" 0.14

61 45 Lakes/Ponds 2B3C1d2c Patehuri 181,P,182,177,176 80°15'09.72" 26°23'53.88" 0.41

62 48 Lakes/Ponds 2B3C1d2c Rampur Bhimsen 1387 80°14'53.88" 26°24'05.04" 0.11

Page 49

Page 50: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

63 50 Lakes/Ponds 2B3C1d2c Gambhirpur Dakshin 269,267,266,310,311,365,329, 80°15'32.04" 26°24'25.20" 0.52

64 61 Lakes/Ponds 2B3C1d2c Fatehpur Dakshin 5 80°16'48.36" 26°24'24.84" 0.08

65 67 Lakes/Ponds 2B3C1d2c Rampur Bhimsen 1374,1372, 80°14'56.40" 26°24'19.44" 0.11

66 73 Lakes/Ponds 2B3C1d2c Gambhirpur Dakshin 2,87,27,92,78,281 80°15'23.40" 26°24'25.20" 0.21

67 76 Lakes/Ponds 2B3C1d2c Gambhirpur Dakshin 34,02,42,24,32,37,238 80°15'40.32" 26°24'28.44" 0.13

68 77 Lakes/Ponds 2B3C1d2c Senpashchim Para 89,58,93,894 80°15'37.80" 26°23'38.76" 0.23

69 81 Lakes/Ponds 2B3C1d2c Pipauri 4,85,487 80°16'41.52" 26°24'51.84" 0.15

70 82 Lakes/Ponds 2B3C1d2c Pipauri 487 80°16'41.88" 26°24'52.92" 0.15

71 85 Lakes/Ponds 2B3C1d2c Pipauri,Senpashchim para 16,36,72,666 80°16'45.84" 26°24'24.48" 0.19

72 89 Lakes/Ponds 2B3C1d2c Pipauri 134 80°15'58.68" 26°24'57.60" 0.15

5.80 25

73 6 Lakes/Ponds 2B3C1d3a Rautara P,131,134,135 80°17'29.40" 26°20'56.04" 0.12

74 7 Lakes/Ponds 2B3C1d3a Rautara 20 80°17'27.60" 26°20'58.92" 0.09

75 8 Lakes/Ponds 2B3C1d3a Magrasa 689 80°17'52.44" 26°21'00.36" 0.31

76 9 Lakes/Ponds 2B3C1d3a Magrasa 676 80°17'54.60" 26°21'07.56" 0.16

77 10 Lakes/Ponds 2B3C1d3a Magrasa 4,66,467 80°17'42.72" 26°21'13.32" 0.12

78 15 Lakes/Ponds 2B3C1d3a Ramaipur 9,75,960 80°19'01.20" 26°20'13.20" 0.10

79 19 Lakes/Ponds 2B3C1d3a Ramaipur 1173 80°17'36.96" 26°20'22.56" 0.36

80 21 Lakes/Ponds 2B3C1d3a Ramaipur 1341 80°17'33.36" 26°20'36.24" 0.05

81 25 Lakes/Ponds 2B3C1d3a Gadhewa Mohasinpur 110,116,117,113,169,114, 80°17'08.52" 26°21'57.24" 0.18

82 27 Lakes/Ponds 2B3C1d3a Gadhewa Mohasinpur 1,09,110 80°17'09.60" 26°21'54.72" 0.24

83 59 Lakes/Ponds 2B3C1d3a Jahanpur 1,85,186 80°16'55.20" 26°20'53.52" 0.13

84 62 Lakes/Ponds 2B3C1d3a Magrasa 648 80°17'52.44" 26°21'23.76" 0.10

85 74 Lakes/Ponds 2B3C1d3a Ramaipur 1076,1075,1087, 80°17'57.12" 26°20'30.12" 0.15

86 86 Lakes/Ponds 2B3C1d3a Ramaipur 920 80°18'36.72" 26°20'20.76" 0.33

87 92 Lakes/Ponds 2B3C1d3a Ramaipur 532 80°18'40.32" 26°20'45.96" 0.29

88 96 Lakes/Ponds 2B3C1d3a Magrasa 466 80°17'45.24" 26°21'06.48" 0.09

89 103 Lakes/Ponds 2B3C1d3a Ramaipur 1048,1049,1050, 80°18'11.52" 26°20'31.20" 0.04

2.87 17

90 0 Lakes/Ponds 2B3C1d3b Senpurab Para 1122,1123,1124,1125,1126,1121, 80°15'57.24" 26°23'02.76" 1.92

91 2 Lakes/Ponds 2B3C1d3b Kurauna Bahadur Nagar 267,252,270,253,268,251,257,269,249, 80°16'43.32" 26°21'55.80" 0.54

92 4 Lakes/Ponds 2B3C1d3b Senpurab Para 1106,1109,1110,1112, 80°16'08.76" 26°22'53.04" 0.34

Page 50

Page 51: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

93 5 Lakes/Ponds 2B3C1d3b Senpashchim Para 7,47,74,57,46,744 80°16'01.56" 26°23'06.36" 0.14

94 6 Lakes/Ponds 2B3C1d3b Senpashchim Para 1434,1435,1424, 80°15'38.88" 26°22'58.08" 0.69

95 7 Lakes/Ponds 2B3C1d3b Senpashchim Para 1154,1156,1150,1153,1155, 80°15'38.52" 26°23'09.96" 0.27

96 9 Lakes/Ponds 2B3C1d3b Senpashchim Para 7,79,78,17,72,796 80°15'48.24" 26°23'12.84" 0.08

97 10 Lakes/Ponds 2B3C1d3b Senpashchim Para 7,72,795 80°15'51.48" 26°23'15.36" 0.11

98 22 Lakes/Ponds 2B3C1d3b Senpashchim Para 1082,1083, 80°16'24.24" 26°22'30.00" 0.14

99 33 Lakes/Ponds 2B3C1d3b Senpashchim Para 1492,1493,1491,1488,1378, 80°15'17.28" 26°22'36.84" 0.34

100 34 Lakes/Ponds 2B3C1d3b Senpashchim Para 1370,1371,1369,1344, 80°15'06.12" 26°22'44.76" 0.28

101 39 Lakes/Ponds 2B3C1d3b Senpashchim Para 1394,1395,1396, 80°15'19.44" 26°22'54.12" 0.24

102 40 Lakes/Ponds 2B3C1d3b Senpashchim Para 1379,1380,1381,1398, 80°15'22.68" 26°22'49.44" 0.33

103 41 Lakes/Ponds 2B3C1d3b Senpashchim Para 1405,1406,1407, 80°15'28.08" 26°22'52.32" 0.37

104 44 Lakes/Ponds 2B3C1d3b Senpashchim Para 1235,1259, 80°15'11.16" 26°23'02.40" 0.10

105 45 Lakes/Ponds 2B3C1d3b Senpashchim Para 1248,1246, 80°15'02.88" 26°22'57.00" 0.18

106 46 Lakes/Ponds 2B3C1d3b Senpashchim Para 1097,1096,1099,1103,1098,1100, 80°15'28.80" 26°23'11.76" 0.44

107 50 Lakes/Ponds 2B3C1d3b Senpashchim Para 1121,1120,1116,1119,1117, 80°15'39.96" 26°23'14.64" 0.13

108 51 Lakes/Ponds 2B3C1d3b Senpashchim Para 845,846,844,1118, 80°15'43.56" 26°23'15.00" 0.31

109 56 Lakes/Ponds 2B3C1d3b Senpashchim Para 1083,1082, 80°15'34.56" 26°23'19.32" 0.18

110 65 Lakes/Ponds 2B3C1d3b Senpashchim Para 1776,1780, 80°15'11.52" 26°22'09.12" 0.09

111 71 Lakes/Ponds 2B3C1d3b Kurauna Bahadur Nagar,Senpurab Para 81,304 80°16'23.88" 26°22'22.44" 0.10

7.31 22

112 5 Lakes/Ponds 2B3C1f1a Kanpur (MB) 80°16'59.16" 26°25'48.72" 0.42

113 16 Lakes/Ponds 2B3C1f1a Meharban Singh Ka Purwa,Mardanpur 18,1,19,P 80°15'57.60" 26°26'06.72" 0.48

114 17 Lakes/Ponds 2B3C1f1a Meharban Singh Ka Purwa,Mardanpur 12,9,8,7,6,3,P,1 80°16'05.16" 26°26'03.12" 0.52

115 22 Lakes/Ponds 2B3C1f1a Pratappur Majra Rampur,Mardanpur 11,8,9,34,10,P 80°15'45.72" 26°26'01.68" 0.36

116 29 Lakes/Ponds 2B3C1f1a Gopalpur 484 80°15'05.76" 26°24'49.32" 0.21

117 31 Lakes/Ponds 2B3C1f1a Gopalpur 356,353,355/603,354 80°15'02.52" 26°24'53.64" 0.13

118 32 Lakes/Ponds 2B3C1f1a Gopalpur 355/603 80°15'04.68" 26°24'54.36" 0.10

119 36 Lakes/Ponds 2B3C1f1a Pratappur Majra Rampur 68,69 80°15'28.08" 26°25'32.88" 0.21

120 37 Lakes/Ponds 2B3C1f1a Pratappur Majra Rampur 73,72,68 80°15'30.24" 26°25'31.80" 0.11

121 43 Lakes/Ponds 2B3C1f1a Pratappur Majra Rampur,Gopalpur 90,88,70,92,91,101,P 80°15'30.24" 26°25'16.68" 0.53

122 45 Lakes/Ponds 2B3C1f1a Rampur Bhimsen 390,1277, 80°14'21.12" 26°24'44.28" 0.05

123 59 Lakes/Ponds 2B3C1f1a Gopalpur 201,200, 80°15'22.32" 26°24'48.96" 0.14

Page 51

Page 52: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

124 62 Lakes/Ponds 2B3C1f1a Gopalpur 49,54,96,48,74,89,488 80°15'11.52" 26°24'49.68" 0.39

125 63 Lakes/Ponds 2B3C1f1a Gopalpur 49,44,93,49,24,97,490 80°15'13.32" 26°24'48.60" 0.18

126 64 Lakes/Ponds 2B3C1f1a Gopalpur 17,61,77,175 80°15'25.92" 26°24'54.72" 0.13

127 75 Lakes/Ponds 2B3C1f1a Gopalpur,Pipauri 1,36,10,11,30,102 80°15'47.16" 26°25'04.08" 0.34

128 87 Lakes/Ponds 2B3C1f1a Rampur Bhimsen 1439,1440,1435,1436,1344,1441,1442,1437, 80°14'36.24" 26°24'26.64" 0.48

4.76 17

129 21 Lakes/Ponds 2B3C1f1b Rampur Bhimsen,Rampur Khas 9,02,954 80°13'29.28" 26°25'20.64" 0.27

130 22 Lakes/Ponds 2B3C1f1b Rampur Khas 25,15 80°13'19.92" 26°25'09.84" 0.12

131 23 Lakes/Ponds 2B3C1f1b Rampur Bhimsen 5,51,55,25,52,901 80°13'26.76" 26°25'23.16" 0.67

132 25 Lakes/Ponds 2B3C1f1b Rampur Khas 1,85,184 80°13'19.56" 26°24'43.20" 0.14

133 30 Lakes/Ponds 2B3C1f1b Singhpur Kathar 2,39,23,82,37,236 80°14'39.12" 26°25'27.12" 0.14

134 32 Lakes/Ponds 2B3C1f1b Singhpur Kathar 16,11,60,15,98,65,165 80°14'32.28" 26°25'33.96" 0.29

135 33 Lakes/Ponds 2B3C1f1b Singhpur Kathar 46,45,30,29,43,44,31 80°14'35.16" 26°25'37.92" 0.11

136 52 Lakes/Ponds 2B3C1f1b Rampur Bhimsen 79,98,00,805 80°14'06.72" 26°25'50.88" 0.28

137 53 Lakes/Ponds 2B3C1f1b Rampur Bhimsen 8,89,830 80°14'16.44" 26°25'47.28" 0.16

138 56 Lakes/Ponds 2B3C1f1b Rampur Bhimsen 1233,1204, 80°14'21.48" 26°25'03.00" 0.15

139 63 Lakes/Ponds 2B3C1f1b Pratappur Sarsai 35,33,22 80°14'07.08" 26°26'25.80" 0.34

140 91 Lakes/Ponds 2B3C1f1b Rampur Bhimsen,Rampur Khas 19,20,18,17,21,529,524,525,528,527 80°13'19.56" 26°25'13.08" 0.47

141 113 Lakes/Ponds 2B3C1f1b Patarsa 1,27,120 80°14'35.52" 26°25'53.40" 0.07

142 114 Lakes/Ponds 2B3C1f1b Patarsa 11,51,16,117 80°14'39.12" 26°25'59.52" 0.03

143 115 Lakes/Ponds 2B3C1f1b Patarsa 130 80°14'40.92" 26°25'53.76" 0.02

3.28 15

144 17 Lakes/Ponds 2B3C1f2a Rampur Bhimsen 43 80°13'42.60" 26°26'39.48" 0.30

145 18 Lakes/Ponds 2B3C1f2a Rampur Bhimsen 46,57,47 80°13'54.84" 26°26'38.76" 0.28

146 19 Lakes/Ponds 2B3C1f2a Rampur Bhimsen 41,42,43 80°13'40.44" 26°26'37.68" 0.23

147 20 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 9,30,929 80°12'57.60" 26°27'00.72" 0.45

148 22 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 1259,1263,1265,1268,1267,1143,1266,1264, 80°12'23.04" 26°26'50.28" 0.56

149 23 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 1265,1239,1241,1242,1243,1244, 80°12'26.64" 26°26'50.64" 0.30

150 24 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 1141,1144,1145,1142,1135,1146, 80°12'19.80" 26°26'51.00" 0.38

151 27 Lakes/Ponds 2B3C1f2a Bhailamau 2,36,221 80°12'08.28" 26°26'22.20" 0.15

152 28 Lakes/Ponds 2B3C1f2a Bhailamau 28,62,88,289 80°12'06.48" 26°26'16.08" 0.03

153 34 Lakes/Ponds 2B3C1f2a Chhitepur 28,44 80°12'46.44" 26°26'39.12" 0.27

Page 52

Page 53: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

154 42 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 82,48,26,823 80°12'49.68" 26°27'16.20" 0.33

155 43 Lakes/Ponds 2B3C1f2a Bhauti Pratappur 84,38,42,844 80°12'56.88" 26°27'16.56" 0.23

156 45 Lakes/Ponds 2B3C1f2a Bhailamau 28,30,31,32,33,37,27 80°12'20.88" 26°26'25.44" 0.35

157 63 Lakes/Ponds 2B3C1f2a Pankabahadur Nagar 2,44,248 80°13'29.28" 26°26'57.84" 0.13

158 71 Lakes/Ponds 2B3C1f2a Pankabahadur Nagar 132 80°13'17.04" 26°27'06.84" 0.08

4.07 15

159 7 Lakes/Ponds 2B3C1f2b Bhailamau 21,92,20,221 80°12'06.48" 26°26'21.48" 0.12

160 8 Lakes/Ponds 2B3C1f2b Bhailamau 2,86,289 80°12'06.12" 26°26'15.72" 0.06

161 12 Lakes/Ponds 2B3C1f2b Bhauti Pratappur 24,12,28,232 80°11'19.32" 26°27'28.08" 0.78

162 21 Lakes/Ponds 2B3C1f2b Bhauti Pratappur 62,06,15,61,66,16,614 80°12'12.24" 26°27'27.72" 0.48

163 22 Lakes/Ponds 2B3C1f2b Bhauti Pratappur 65,96,60,65,66,58,657 80°12'20.16" 26°27'32.40" 0.67

164 27 Lakes/Ponds 2B3C1f2b Sachendi Urf Chacheri 1100 80°11'38.04" 26°25'58.08" 0.28

165 29 Lakes/Ponds 2B3C1f2b Sachendi Urf Chacheri 1069 80°11'28.32" 26°25'58.44" 0.22

166 33 Lakes/Ponds 2B3C1f2b Bhauti Pratappur 1088,761, 80°12'16.92" 26°27'16.20" 0.03

167 34 Lakes/Ponds 2B3C1f2b Bhauti Pratappur 1102,1095,1103,1101,1100, 80°12'12.60" 26°27'09.36" 0.11

2.76 9

168 10 Lakes/Ponds 2B3C1f2c Surar 7,17,71,67,15,714 80°10'57.36" 26°28'09.48" 0.39

169 11 Lakes/Ponds 2B3C1f2c Surar 70,88,09,81,08,11,814 80°10'52.32" 26°28'15.24" 0.17

170 12 Lakes/Ponds 2B3C1f2c Surar 80,28,03,794 80°10'49.80" 26°28'10.92" 0.18

171 13 Lakes/Ponds 2B3C1f2c Surar 89,78,96,819 80°10'33.96" 26°28'24.24" 0.16

172 15 Lakes/Ponds 2B3C1f2c Surar 8,19,821 80°10'49.44" 26°28'20.28" 0.20

173 16 Lakes/Ponds 2B3C1f2c Surar 9,09,57,69,10,914 80°10'42.24" 26°28'28.56" 0.11

174 18 Lakes/Ponds 2B3C1f2c Surar 65,16,50,645 80°11'18.60" 26°28'19.92" 0.07

175 19 Lakes/Ponds 2B3C1f2c Surar 6,58,651 80°11'22.56" 26°28'18.84" 0.05

176 27 Lakes/Ponds 2B3C1f2c Bhisi Jargaon 86,94,87,85,79,84,82,81,83 80°10'05.88" 26°27'35.28" 0.82

177 29 Lakes/Ponds 2B3C1f2c Surar 1,23,71,23,81,323 80°10'37.56" 26°27'50.04" 0.39

178 32 Lakes/Ponds 2B3C1f2c Bhauti Pratappur,Bhauti Khera 14,01,41,14,32,32,228 80°11'08.16" 26°27'44.64" 0.87

179 33 Lakes/Ponds 2B3C1f2c Bhauti Pratappur 232 80°11'20.04" 26°27'30.60" 0.01

180 39 Lakes/Ponds 2B3C1f2c Bhauti Khera 2,28,22,92,26,227 80°11'56.04" 26°28'07.68" 0.08

181 43 Lakes/Ponds 2B3C1f2c Surar 6,13,608 80°11'15.72" 26°28'30.36" 0.60

182 48 Lakes/Ponds 2B3C1f2c Bhauti Pratappur,Bhauti Khera 31,96,92,317 80°12'14.40" 26°27'53.28" 0.17

183 57 Lakes/Ponds 2B3C1f2c Bhisi Jargaon 24,P,25 80°09'57.96" 26°27'43.56" 0.26

Page 53

Page 54: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

184 61 Lakes/Ponds 2B3C1f2c Bhisi Jargaon 3,11,32,83,12,324 80°10'39.36" 26°27'33.48" 0.16

4.70 17

185 6 Lakes/Ponds 2B3C2a2a Nasenia P,173,172 80°11'36.24" 26°29'21.84" 0.13

186 19 Lakes/Ponds 2B3C2a2a Jhakara 149,147,81 80°10'44.40" 26°30'03.96" 0.14

187 22 Lakes/Ponds 2B3C2a2a Raikepur 842 80°11'06.36" 26°30'32.04" 0.05

188 25 Lakes/Ponds 2B3C2a2a Tikari 1,30,12,91,28,109 80°10'51.60" 26°30'20.52" 0.09

189 30 Lakes/Ponds 2B3C2a2a Raikepur 776 80°10'54.48" 26°30'37.08" 0.00

190 39 Lakes/Ponds 2B3C2a2a Jhakara 252 80°10'38.64" 26°29'51.00" 0.15

191 45 Lakes/Ponds 2B3C2a2a Tikara P 80°11'24.72" 26°29'58.20" 0.08

0.65 7

192 16 Lakes/Ponds 2B3C2a2b Raikepur 443,446,P 80°09'56.52" 26°31'17.40" 0.26

193 18 Lakes/Ponds 2B3C2a2b Raikepur P 80°10'53.40" 26°30'44.28" 0.18

194 32 Lakes/Ponds 2B3C2a2b Raikepur 4,48,447 80°09'56.16" 26°31'11.28" 0.09

195 50 Lakes/Ponds 2B3C2a2b Raikepur 7,76,779 80°10'54.12" 26°30'37.80" 0.29

0.82 4

196 8 Lakes/Ponds 2B3C2a3a Surar 1123 80°10'25.68" 26°28'35.76" 0.27

197 10 Lakes/Ponds 2B3C2a3a Surar 1118,1121,1123,1120, 80°10'26.40" 26°28'39.00" 0.35

198 13 Lakes/Ponds 2B3C2a3a Dool 716 80°09'38.88" 26°28'33.60" 0.20

199 14 Lakes/Ponds 2B3C2a3a Bhool 33,33,31,324 80°09'23.40" 26°28'09.12" 0.49

200 22 Lakes/Ponds 2B3C2a3a Rautepur 22,12,02,223 80°10'21.00" 26°29'34.44" 0.12

201 23 Lakes/Ponds 2B3C2a3a Dool 900 80°10'10.92" 26°29'20.40" 0.24

202 41 Lakes/Ponds 2B3C2a3a Dool 1137,1135,1136,1138, 80°09'22.68" 26°28'18.84" 0.32

203 42 Lakes/Ponds 2B3C2a3a Dool 775,78,779,774 80°09'24.12" 26°28'25.32" 0.13

204 43 Lakes/Ponds 2B3C2a3a Dool 747 80°09'19.44" 26°28'31.44" 0.07

205 44 Lakes/Ponds 2B3C2a3a Dool 79,37,92,71,97,20,716 80°09'35.64" 26°28'30.36" 1.17

206 45 Lakes/Ponds 2B3C2a3a Dool 698 80°09'23.76" 26°28'35.40" 0.01

207 46 Lakes/Ponds 2B3C2a3a Dool 72,57,00,69,97,01,695 80°09'27.72" 26°28'37.92" 0.28

208 47 Lakes/Ponds 2B3C2a3a Dool 7,09,70,67,05,690 80°09'33.12" 26°28'38.64" 0.21

209 57 Lakes/Ponds 2B3C2a3a Dool 1098 80°10'24.24" 26°28'51.60" 0.16

4.03 14

210 5 Lakes/Ponds 2B3C2a3b Dool 66,96,71,668 80°09'32.76" 26°28'49.08" 0.34

211 9 Lakes/Ponds 2B3C2a3b Dool 1,50,108 80°08'44.52" 26°29'14.64" 0.09

Page 54

Page 55: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. NO. ID CLASS MWS CODE VILLAGE NAME KHASRA NO Longitude (X) Latitude (Y) AREA (ha)

No.

Water

Bodies

Rampur Bhimsen, IWMP-VIII Kanpur NagarMWS WISE DETAILS OF WATERBODIES UNDER

212 11 Lakes/Ponds 2B3C2a3b Dool 2,46,21,02,45,244 80°08'49.92" 26°29'03.48" 0.26

213 12 Lakes/Ponds 2B3C2a3b Dool 93,96,97,95 80°08'53.52" 26°29'21.84" 0.38

214 23 Lakes/Ponds 2B3C2a3b Rautepur 2,21,22,22,02,223 80°10'19.56" 26°29'34.80" 0.47

215 33 Lakes/Ponds 2B3C2a3b Dool 900 80°10'10.20" 26°29'21.12" 0.05

216 36 Lakes/Ponds 2B3C2a3b Dool 2,27,244 80°08'28.68" 26°28'10.56" 0.36

217 41 Lakes/Ponds 2B3C2a3b Dool 747 80°09'19.08" 26°28'31.80" 0.02

218 42 Lakes/Ponds 2B3C2a3b Dool 73,07,26,72,97,27,698 80°09'22.32" 26°28'36.12" 0.68

219 43 Lakes/Ponds 2B3C2a3b Dool 72,56,99,695 80°09'27.00" 26°28'38.64" 0.16

220 50 Lakes/Ponds 2B3C2a3b Rautepur 625,667,P,631,634 80°09'38.16" 26°29'26.16" 0.10

221 58 Lakes/Ponds 2B3C2a3b Rautepur 327,P,329 80°10'04.08" 26°29'41.64" 0.08

222 59 Lakes/Ponds 2B3C2a3b Rautepur 3,22,32,33,21,311 80°10'05.16" 26°29'46.68" 0.09

223 61 Lakes/Ponds 2B3C2a3b Dool 1,70,147 80°08'38.40" 26°29'14.64" 0.04

224 62 Lakes/Ponds 2B3C2a3b Dool 1,73,17,81,79,180 80°08'30.12" 26°29'13.20" 0.39

225 66 Lakes/Ponds 2B3C2a3b Dool 1,98,200 80°08'36.60" 26°29'00.24" 0.10

3.60 16

225

Page 55

Page 56: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

PRA Team

S.No.

1

2

3

4

5

6

7

8

9

10

11

Transect Walk

Problem Identification and Ranking

Live Stock Analysis

(Details of PRA are annexed in Project File)

 

Crop Analysis

Livelihood Analysis

Seasonal Analysis

Participatory Identification of Poor (PIPs)

Participatory Situation Analysis (PSAs)

Focus Group Discussion (FGDs)

Rampur Bhimsen, IWMP-VIII Kanpur NagarDetails of PRA Activities under

Resource Map

Social Map

Activity During PRA

PIA

Page 56

Page 57: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Item/Month January February March April May June July August September October November December

Festivals Holi Baishaki Raksha Bandhan Dusshehra Diwali Guru Parv

Maize, Paddy, Arhar

Mustard Maize, Paddy

Disease Fever

Purchase/ Expenditure

Rains

Fodder scarcity ▒▒▒▒

Fuel/Wood scarcity

Loaning period

(required)

Marriage period

Drinking water scarcity

Irrigation water scarcity

▒▒▒▒▒▒▒▒ ▒▒▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒ ▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒ ▒▒▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒▒▒

▒▒▒▒▒▒▒▒▒▒

Cough & ColdGastro Intestinal/Gastro

Motions

SEASONAL ANALYSISSeasonal analysis has been done with the help of farmers about rainfall patterns, cultivated crops, employment, income, availability of fuel, fodder, migration, transport and health hazards

etc. with respect to seasonal variation in a year which is shown as below :-

Sowing crops/

harvesting

Mustard, Wheat

Wheat, Arhar

Page 57

Page 58: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. No.

1

2

3

4

5

6

7

8

9

Non availability of fuel wood

Lack of Safe drinking water

Lack of irrigation water

Others

Degraded Land

Lack of medical, educational and transportation facilities

Lack of fodder availability and low annual productivity

Medical and health care facilities for milching animals and low productivity

Lack of inputs like quality seeds, fertilizers, pesticides etc.

6

7

8

9

4

5

3

PROBLEM AND NEED OF AREA UNDER Rampur Bhimsen, IWMP-VIII Kanpur Nagar

2

Rank

Low production of field crops

Problem

1

Page 58

Page 59: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No VillageNo. of Persons

Migrating

No. of Days per year of

Migration

Major Reasons for

Migration

Distance of Destination

of Migration Km.

Occupation During

Migration

Income/person from

Each Occupation

(During The migration

Period) (In Rs.)

1 Bahera 318 180-210 90-500 Km. Unskilled labour 8000-10000/pm2 Bajpur 392 180-210 90-500 Km. Unskilled labour 8000-10000/pm3 Bani 128 180-210 90-500 Km. Unskilled labour 8000-10000/pm4 Bhailamau 478 180-210 90-500 Km. Unskilled labour 8000-10000/pm5 Bharu 0 0 0 0 8000-10000/pm6 Bhaunti khera 115 180-210 90-500 Km. Unskilled labour 8000-10000/pm7 Bhauti Pratappur 228 180-210 90-500 Km. Unskilled labour 8000-10000/pm8 Bhisi Jargaon 316 180-210 90-500 Km. Unskilled labour 8000-10000/pm9 Bhool 126 180-210 90-500 Km. Unskilled labour 8000-10000/pm

10 Chhitepur 661 180-210 90-500 Km. Unskilled labour 8000-10000/pm11 Dande Ka Purwa 692 180-210 90-500 Km. Unskilled labour 8000-10000/pm12 Dool 358 180-210 90-500 Km. Unskilled labour 8000-10000/pm13 Durjanpur 343 180-210 90-500 Km. Unskilled labour 8000-10000/pm14 Fatehpur Dakshin 285 180-210 90-500 Km. Unskilled labour 8000-10000/pm15 Gadhewa Mohasinpur 192 180-210 90-500 Km. Unskilled labour 8000-10000/pm16 Gambhirpur Dakshin 850 180-210 90-500 Km. Unskilled labour 8000-10000/pm17 Garhi Kanpur 380 180-210 90-500 Km. Unskilled labour 8000-10000/pm18 Gopalpur 122 180-210 90-500 Km. Unskilled labour 8000-10000/pm19 Jahanpur 325 180-210 90-500 Km. Unskilled labour 8000-10000/pm20 Jamoo 106 180-210 90-500 Km. Unskilled labour 8000-10000/pm21 Jhakara 195 180-210 90-500 Km. Unskilled labour 8000-10000/pm22 Kaindha 1095 180-210 90-500 Km. Unskilled labour 8000-10000/pm23 Kanpur (MB) 361 180-210 90-500 Km. Unskilled labour 8000-10000/pm24 Kumhaupar 0 0 0 0 025 Kurauna Bahadur Nagar 102 180-210 90-500 Km. Unskilled labour 8000-10000/pm26 Lohar Khera 334 180-210 90-500 Km. Unskilled labour 8000-10000/pm

Rampur Bhimsen, IWMP-VIIIVillage Wise Details of Migration from Project area Of

Poverty & Non

Availability of

Employment

Page 59

Page 60: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No VillageNo. of Persons

Migrating

No. of Days per year of

Migration

Major Reasons for

Migration

Distance of Destination

of Migration Km.

Occupation During

Migration

Income/person from

Each Occupation

(During The migration

Period) (In Rs.)

Rampur Bhimsen, IWMP-VIIIVillage Wise Details of Migration from Project area Of

27 Magrasa 396 180-210 90-500 Km. Unskilled labour 8000-10000/pm28 Mardanpur 714 180-210 90-500 Km. Unskilled labour 8000-10000/pm29 Matiyara 730 180-210 90-500 Km. Unskilled labour 8000-10000/pm30 Meharban Singh Ka Purwa 2957 180-210 90-500 Km. Unskilled labour 8000-10000/pm31 Nakatoo 330 180-210 90-500 Km. Unskilled labour 8000-10000/pm32 Nasenia 136 180-210 90-500 Km. Unskilled labour 8000-10000/pm33 Neori 554 180-210 90-500 Km. Unskilled labour 8000-10000/pm34 Pankabahadur Nagar 558 180-210 90-500 Km. Unskilled labour 8000-10000/pm35 Patarsa 57 180-210 90-500 Km. Unskilled labour 8000-10000/pm36 Patehuri 280 180-210 90-500 Km. Unskilled labour 8000-10000/pm37 Pipauri 742 180-210 90-500 Km. Unskilled labour 8000-10000/pm38 Pratappur Majra Rampur 262 180-210 90-500 Km. Unskilled labour 8000-10000/pm39 Pratappur Sarsai 627 180-210 90-500 Km. Unskilled labour 8000-10000/pm40 Raikepur 809 180-210 90-500 Km. Unskilled labour 8000-10000/pm41 Ramaipur 0 0 0 0 042 Rampur Bhimsen 121 180-210 90-500 Km. Unskilled labour 8000-10000/pm43 Rampur Khas 102 180-210 90-500 Km. Unskilled labour 8000-10000/pm44 Rautara 195 180-210 90-500 Km. Unskilled labour 8000-10000/pm45 Rautepur 149 180-210 90-500 Km. Unskilled labour 8000-10000/pm46 Sachendi Urf Chacheri 67 180-210 90-500 Km. Unskilled labour 8000-10000/pm47 Saiyangojha 145 180-210 90-500 Km. Unskilled labour 8000-10000/pm48 Sarneyat Pur 46 180-210 90-500 Km. Unskilled labour 8000-10000/pm49 Sen Purab Para 0 0 0 0 050 Senpashchim Para 63 180-210 90-500 Km. Unskilled labour 8000-10000/pm51 Shivrampur 146 180-210 90-500 Km. Unskilled labour 8000-10000/pm52 Singhpur Kathar 291 180-210 90-500 Km. Unskilled labour 8000-10000/pm

Poverty & Non Availability

of Employment

Page 60

Page 61: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No VillageNo. of Persons

Migrating

No. of Days per year of

Migration

Major Reasons for

Migration

Distance of Destination

of Migration Km.

Occupation During

Migration

Income/person from

Each Occupation

(During The migration

Period) (In Rs.)

Rampur Bhimsen, IWMP-VIIIVillage Wise Details of Migration from Project area Of

53 Sona 385 180-210 90-500 Km. Unskilled labour 8000-10000/pm54 Surar 1126 180-210 90-500 Km. Unskilled labour 8000-10000/pm55 Surjanpur 214 180-210 90-500 Km. Unskilled labour 8000-10000/pm56 Tikara 163 180-210 90-500 Km. Unskilled labour 8000-10000/pm57 Tikari 218 180-210 90-500 Km. Unskilled labour 8000-10000/pm58 Uriyara 175 180-210 90-500 Km. Unskilled labour 8000-10000/pm

21260 180-210 90-500 Km. Unskilled labour 8000-10000/pm

No.

Days 180-210

21260

Post project migration14882

120-150

Note: After intervention of the project it is expected that migration will be reduced by 30%

Pre Project migration

Poverty & Non Availability

of Employment

Page 61

Page 62: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar1 2 3 4 5

S.No Infrastructure type No./Quantity Distance (km) Status (description)

1 Educational Institutions

Anganwadi 51 Within the village Running smoothly

Asha Centre 48 Within the village Running smoothly

Pre Primary School 17 -

Primary School 92 Within the village Running smoothly

Middle School 42 Within the village Running smoothly

Secondary School 3 Within 7-8 km Running smoothly

Senior Secondary School 2 Within 8-10 km Government.

Govt. College - - -

Vocational Institutions - - -

2 Service Institutions

Bank 1 5-7 km Nationalized Bank

Post office 6 Within 6-8 km Post Office (Rural)

Primary Health Care Center 4 Within 10-12 km Functional

Mobile Health Clinic - - -

Veterinary Center 8 Within 12-15 km Trained Staff Available

Markets/ Village Haat 5/9 6-7 km Daily/Weekly

3 No. of bore wells 614 Within village -

Functional 172 N.A.

Defunct 442 N.A.

4 No. of Tube wells 133

Functional 42 N.A.

Defunct 91 N.A.

5 No. Of Well 0

Functional N.A.

Defunct/Abandon N.A.

6 Road Connectivity (to main road by an all- weather road) (Yes/No) Yes Yes

7 Bus facility (Yes/No) Yes Tempo Service Bus facility available up to main road

8 No. of Village provided electricity All Villages All Villages Erratic supply of Electricity

9 No. of HHs with access to drinking water All Villagers All Villages Potable Water

10 Access to Agro Industries (Yes/No) Yes In few villages Unorganized

Infrastructure FacilitiesRampur Bhimsen, IWMP-VIII

Page 62

Page 63: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

1 Bhailamau Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

2 Bhailamau Vegetative cover /Ponds/Pasture 0.03 Gram Panchayat fuel wood, fodder no management

3 Bhailamau Vegetative cover /Ponds/Pasture 0.35 Gram Panchayat fuel wood, fodder no management

4 Bhailamau Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

5 Bhailamau Vegetative cover /Ponds/Pasture 0.06 Gram Panchayat fuel wood, fodder no management

6 Bhauti Khera Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

7 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.45 Gram Panchayat fuel wood, fodder no management

8 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.56 Gram Panchayat fuel wood, fodder no management

9 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.30 Gram Panchayat fuel wood, fodder no management

10 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.38 Gram Panchayat fuel wood, fodder no management

11 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.33 Gram Panchayat fuel wood, fodder no management

12 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.23 Gram Panchayat fuel wood, fodder no management

13 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.78 Gram Panchayat fuel wood, fodder no management

14 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.48 Gram Panchayat fuel wood, fodder no management

15 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.67 Gram Panchayat fuel wood, fodder no management

16 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.03 Gram Panchayat fuel wood, fodder no management

17 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

18 Bhauti Pratappur Vegetative cover /Ponds/Pasture 0.01 Gram Panchayat fuel wood, fodder no management

19 Bhauti Pratappur,Bhauti KheraVegetative cover /Ponds/Pasture 0.87 Gram Panchayat fuel wood, fodder no management

20 Bhauti Pratappur,Bhauti KheraVegetative cover /Ponds/Pasture 0.17 Gram Panchayat fuel wood, fodder no management

21 Bhisi Jargaon Vegetative cover /Ponds/Pasture 0.82 Gram Panchayat fuel wood, fodder no management

22 Bhisi Jargaon Vegetative cover /Ponds/Pasture 0.26 Gram Panchayat fuel wood, fodder no management

23 Bhisi Jargaon Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

24 Bhool Vegetative cover /Ponds/Pasture 0.49 Gram Panchayat fuel wood, fodder no management

25 Chhitepur Vegetative cover /Ponds/Pasture 0.27 Gram Panchayat fuel wood, fodder no management

26 Dande Ka Purwa Vegetative cover /Ponds/Pasture 0.23 Gram Panchayat fuel wood, fodder no management

27 Dool Vegetative cover /Ponds/Pasture 0.20 Gram Panchayat fuel wood, fodder no management

28 Dool Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

Details of CPR of the project AreaKanpur Nagar

Page 63

Page 64: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

29 Dool Vegetative cover /Ponds/Pasture 0.32 Gram Panchayat fuel wood, fodder no management

30 Dool Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

31 Dool Vegetative cover /Ponds/Pasture 0.07 Gram Panchayat fuel wood, fodder no management

32 Dool Vegetative cover /Ponds/Pasture 1.17 Gram Panchayat fuel wood, fodder no management

33 Dool Vegetative cover /Ponds/Pasture 0.01 Gram Panchayat fuel wood, fodder no management

34 Dool Vegetative cover /Ponds/Pasture 0.28 Gram Panchayat fuel wood, fodder no management

35 Dool Vegetative cover /Ponds/Pasture 0.21 Gram Panchayat fuel wood, fodder no management

36 Dool Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

37 Dool Vegetative cover /Ponds/Pasture 0.34 Gram Panchayat fuel wood, fodder no management

38 Dool Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

39 Dool Vegetative cover /Ponds/Pasture 0.26 Gram Panchayat fuel wood, fodder no management

40 Dool Vegetative cover /Ponds/Pasture 0.38 Gram Panchayat fuel wood, fodder no management

41 Dool Vegetative cover /Ponds/Pasture 0.05 Gram Panchayat fuel wood, fodder no management

42 Dool Vegetative cover /Ponds/Pasture 0.36 Gram Panchayat fuel wood, fodder no management

43 Dool Vegetative cover /Ponds/Pasture 0.02 Gram Panchayat fuel wood, fodder no management

44 Dool Vegetative cover /Ponds/Pasture 0.68 Gram Panchayat fuel wood, fodder no management

45 Dool Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

46 Dool Vegetative cover /Ponds/Pasture 0.04 Gram Panchayat fuel wood, fodder no management

47 Dool Vegetative cover /Ponds/Pasture 0.39 Gram Panchayat fuel wood, fodder no management

48 Dool Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

49 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.66 Gram Panchayat fuel wood, fodder no management

50 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.98 Gram Panchayat fuel wood, fodder no management

51 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

52 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

53 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.60 Gram Panchayat fuel wood, fodder no management

54 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.31 Gram Panchayat fuel wood, fodder no management

55 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.03 Gram Panchayat fuel wood, fodder no management

56 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.00 Gram Panchayat fuel wood, fodder no management

57 Fatehpur Dakshin Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

58 Gadhewa Mohasinpur Vegetative cover /Ponds/Pasture 0.48 Gram Panchayat fuel wood, fodder no management

59 Gadhewa Mohasinpur Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

Page 64

Page 65: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

60 Gadhewa Mohasinpur Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

61 Gadhewa Mohasinpur Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

62 Gambhirpur Dakshin Vegetative cover /Ponds/Pasture 0.52 Gram Panchayat fuel wood, fodder no management

63 Gambhirpur Dakshin Vegetative cover /Ponds/Pasture 0.21 Gram Panchayat fuel wood, fodder no management

64 Gambhirpur Dakshin Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

65 Gopalpur Vegetative cover /Ponds/Pasture 0.21 Gram Panchayat fuel wood, fodder no management

66 Gopalpur Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

67 Gopalpur Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

68 Gopalpur Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

69 Gopalpur Vegetative cover /Ponds/Pasture 0.39 Gram Panchayat fuel wood, fodder no management

70 Gopalpur Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

71 Gopalpur Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

72 Gopalpur,Pipauri Vegetative cover /Ponds/Pasture 0.34 Gram Panchayat fuel wood, fodder no management

73 Jahanpur Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

74 Jhakara Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

75 Jhakara Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

76 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

77 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

78 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

79 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.46 Gram Panchayat fuel wood, fodder no management

80 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.07 Gram Panchayat fuel wood, fodder no management

81 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

82 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.36 Gram Panchayat fuel wood, fodder no management

83 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.75 Gram Panchayat fuel wood, fodder no management

84 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.41 Gram Panchayat fuel wood, fodder no management

85 Kanpur (MB) Vegetative cover /Ponds/Pasture 0.42 Gram Panchayat fuel wood, fodder no management

86 Kurauna Bahadur Nagar Vegetative cover /Ponds/Pasture 0.54 Gram Panchayat fuel wood, fodder no management

87 Kurauna Bahadur Nagar,Senpurab ParaVegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

88 Magrasa Vegetative cover /Ponds/Pasture 0.31 Gram Panchayat fuel wood, fodder no management

89 Magrasa Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

90 Magrasa Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

Page 65

Page 66: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

91 Magrasa Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

92 Magrasa Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

93 Meharban Singh Ka Purwa,MardanpurVegetative cover /Ponds/Pasture 0.48 Gram Panchayat fuel wood, fodder no management

94 Meharban Singh Ka Purwa,MardanpurVegetative cover /Ponds/Pasture 0.52 Gram Panchayat fuel wood, fodder no management

95 Nasenia Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

96 Neori Vegetative cover /Ponds/Pasture 0.41 Gram Panchayat fuel wood, fodder no management

97 Pankabahadur Nagar Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

98 Pankabahadur Nagar Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

99 Patarsa Vegetative cover /Ponds/Pasture 0.07 Gram Panchayat fuel wood, fodder no management

100 Patarsa Vegetative cover /Ponds/Pasture 0.03 Gram Panchayat fuel wood, fodder no management

101 Patarsa Vegetative cover /Ponds/Pasture 0.02 Gram Panchayat fuel wood, fodder no management

102 Patehuri Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

103 Patehuri Vegetative cover /Ponds/Pasture 0.41 Gram Panchayat fuel wood, fodder no management

104 Pipauri Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

105 Pipauri Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

106 Pipauri Vegetative cover /Ponds/Pasture 0.20 Gram Panchayat fuel wood, fodder no management

107 Pipauri Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

108 Pipauri Vegetative cover /Ponds/Pasture 0.36 Gram Panchayat fuel wood, fodder no management

109 Pipauri Vegetative cover /Ponds/Pasture 0.38 Gram Panchayat fuel wood, fodder no management

110 Pipauri Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

111 Pipauri Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

112 Pipauri Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

113 Pipauri,Senpashchim para Vegetative cover /Ponds/Pasture 0.19 Gram Panchayat fuel wood, fodder no management

114 Pratappur Majra Rampur Vegetative cover /Ponds/Pasture 0.21 Gram Panchayat fuel wood, fodder no management

115 Pratappur Majra Rampur Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

116 Pratappur Majra Rampur,GopalpurVegetative cover /Ponds/Pasture 0.53 Gram Panchayat fuel wood, fodder no management

117 Pratappur Majra Rampur,MardanpurVegetative cover /Ponds/Pasture 0.36 Gram Panchayat fuel wood, fodder no management

118 Pratappur Sarsai Vegetative cover /Ponds/Pasture 0.34 Gram Panchayat fuel wood, fodder no management

119 Raikepur Vegetative cover /Ponds/Pasture 0.05 Gram Panchayat fuel wood, fodder no management

120 Raikepur Vegetative cover /Ponds/Pasture 0.00 Gram Panchayat fuel wood, fodder no management

121 Raikepur Vegetative cover /Ponds/Pasture 0.26 Gram Panchayat fuel wood, fodder no management

Page 66

Page 67: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

122 Raikepur Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

123 Raikepur Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

124 Raikepur Vegetative cover /Ponds/Pasture 0.29 Gram Panchayat fuel wood, fodder no management

125 Ramaipur Vegetative cover /Ponds/Pasture 0.22 Gram Panchayat fuel wood, fodder no management

126 Ramaipur Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

127 Ramaipur Vegetative cover /Ponds/Pasture 0.50 Gram Panchayat fuel wood, fodder no management

128 Ramaipur Vegetative cover /Ponds/Pasture 0.59 Gram Panchayat fuel wood, fodder no management

129 Ramaipur Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

130 Ramaipur Vegetative cover /Ponds/Pasture 0.31 Gram Panchayat fuel wood, fodder no management

131 Ramaipur Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

132 Ramaipur Vegetative cover /Ponds/Pasture 0.36 Gram Panchayat fuel wood, fodder no management

133 Ramaipur Vegetative cover /Ponds/Pasture 0.05 Gram Panchayat fuel wood, fodder no management

134 Ramaipur Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

135 Ramaipur Vegetative cover /Ponds/Pasture 0.33 Gram Panchayat fuel wood, fodder no management

136 Ramaipur Vegetative cover /Ponds/Pasture 0.29 Gram Panchayat fuel wood, fodder no management

137 Ramaipur Vegetative cover /Ponds/Pasture 0.04 Gram Panchayat fuel wood, fodder no management

138 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

139 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

140 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.05 Gram Panchayat fuel wood, fodder no management

141 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.48 Gram Panchayat fuel wood, fodder no management

142 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.67 Gram Panchayat fuel wood, fodder no management

143 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.28 Gram Panchayat fuel wood, fodder no management

144 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

145 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.15 Gram Panchayat fuel wood, fodder no management

146 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.30 Gram Panchayat fuel wood, fodder no management

147 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.28 Gram Panchayat fuel wood, fodder no management

148 Rampur Bhimsen Vegetative cover /Ponds/Pasture 0.23 Gram Panchayat fuel wood, fodder no management

149 Rampur Bhimsen,Rampur KhasVegetative cover /Ponds/Pasture 0.27 Gram Panchayat fuel wood, fodder no management

150 Rampur Bhimsen,Rampur KhasVegetative cover /Ponds/Pasture 0.47 Gram Panchayat fuel wood, fodder no management

151 Rampur Khas Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

152 Rampur Khas Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

Page 67

Page 68: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

153 Rautara Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

154 Rautara Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

155 Rautepur Vegetative cover /Ponds/Pasture 0.12 Gram Panchayat fuel wood, fodder no management

156 Rautepur Vegetative cover /Ponds/Pasture 0.47 Gram Panchayat fuel wood, fodder no management

157 Rautepur Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

158 Rautepur Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

159 Rautepur Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

160 Sachendi Urf Chacheri Vegetative cover /Ponds/Pasture 0.28 Gram Panchayat fuel wood, fodder no management

161 Sachendi Urf Chacheri Vegetative cover /Ponds/Pasture 0.22 Gram Panchayat fuel wood, fodder no management

162 Sen Purab Para Vegetative cover /Ponds/Pasture 0.40 Gram Panchayat fuel wood, fodder no management

163 Sen Purab Para Vegetative cover /Ponds/Pasture 0.33 Gram Panchayat fuel wood, fodder no management

164 Sen Purab Para Vegetative cover /Ponds/Pasture 0.75 Gram Panchayat fuel wood, fodder no management

165 Sen Purab Para Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

166 Sen Purab Para Vegetative cover /Ponds/Pasture 0.42 Gram Panchayat fuel wood, fodder no management

167 Sen Purab Para Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

168 Sen Purab Para Vegetative cover /Ponds/Pasture 0.06 Gram Panchayat fuel wood, fodder no management

169 Senpashchim Para Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

170 Senpashchim Para Vegetative cover /Ponds/Pasture 0.86 Gram Panchayat fuel wood, fodder no management

171 Senpashchim Para Vegetative cover /Ponds/Pasture 0.01 Gram Panchayat fuel wood, fodder no management

172 Senpashchim Para Vegetative cover /Ponds/Pasture 0.25 Gram Panchayat fuel wood, fodder no management

173 Senpashchim Para Vegetative cover /Ponds/Pasture 0.87 Gram Panchayat fuel wood, fodder no management

174 Senpashchim Para Vegetative cover /Ponds/Pasture 0.38 Gram Panchayat fuel wood, fodder no management

175 Senpashchim Para Vegetative cover /Ponds/Pasture 0.06 Gram Panchayat fuel wood, fodder no management

176 Senpashchim Para Vegetative cover /Ponds/Pasture 0.17 Gram Panchayat fuel wood, fodder no management

177 Senpashchim Para Vegetative cover /Ponds/Pasture 0.06 Gram Panchayat fuel wood, fodder no management

178 Senpashchim Para Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

179 Senpashchim Para Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

180 Senpashchim Para Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

181 Senpashchim Para Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

182 Senpashchim Para Vegetative cover /Ponds/Pasture 0.22 Gram Panchayat fuel wood, fodder no management

183 Senpashchim Para Vegetative cover /Ponds/Pasture 0.21 Gram Panchayat fuel wood, fodder no management

Page 68

Page 69: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

184 Senpashchim Para Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

185 Senpashchim Para Vegetative cover /Ponds/Pasture 0.23 Gram Panchayat fuel wood, fodder no management

186 Senpashchim Para Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

187 Senpashchim Para Vegetative cover /Ponds/Pasture 0.69 Gram Panchayat fuel wood, fodder no management

188 Senpashchim Para Vegetative cover /Ponds/Pasture 0.27 Gram Panchayat fuel wood, fodder no management

189 Senpashchim Para Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

190 Senpashchim Para Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

191 Senpashchim Para Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

192 Senpashchim Para Vegetative cover /Ponds/Pasture 0.34 Gram Panchayat fuel wood, fodder no management

193 Senpashchim Para Vegetative cover /Ponds/Pasture 0.28 Gram Panchayat fuel wood, fodder no management

194 Senpashchim Para Vegetative cover /Ponds/Pasture 0.24 Gram Panchayat fuel wood, fodder no management

195 Senpashchim Para Vegetative cover /Ponds/Pasture 0.33 Gram Panchayat fuel wood, fodder no management

196 Senpashchim Para Vegetative cover /Ponds/Pasture 0.37 Gram Panchayat fuel wood, fodder no management

197 Senpashchim Para Vegetative cover /Ponds/Pasture 0.10 Gram Panchayat fuel wood, fodder no management

198 Senpashchim Para Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

199 Senpashchim Para Vegetative cover /Ponds/Pasture 0.44 Gram Panchayat fuel wood, fodder no management

200 Senpashchim Para Vegetative cover /Ponds/Pasture 0.13 Gram Panchayat fuel wood, fodder no management

201 Senpashchim Para Vegetative cover /Ponds/Pasture 0.31 Gram Panchayat fuel wood, fodder no management

202 Senpashchim Para Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

203 Senpashchim Para Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

204 Senpurab Para Vegetative cover /Ponds/Pasture 1.92 Gram Panchayat fuel wood, fodder no management

205 Senpurab Para Vegetative cover /Ponds/Pasture 0.34 Gram Panchayat fuel wood, fodder no management

206 Singhpur Kathar Vegetative cover /Ponds/Pasture 0.14 Gram Panchayat fuel wood, fodder no management

207 Singhpur Kathar Vegetative cover /Ponds/Pasture 0.29 Gram Panchayat fuel wood, fodder no management

208 Singhpur Kathar Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

209 Surar Vegetative cover /Ponds/Pasture 0.39 Gram Panchayat fuel wood, fodder no management

210 Surar Vegetative cover /Ponds/Pasture 0.17 Gram Panchayat fuel wood, fodder no management

211 Surar Vegetative cover /Ponds/Pasture 0.18 Gram Panchayat fuel wood, fodder no management

212 Surar Vegetative cover /Ponds/Pasture 0.16 Gram Panchayat fuel wood, fodder no management

213 Surar Vegetative cover /Ponds/Pasture 0.20 Gram Panchayat fuel wood, fodder no management

214 Surar Vegetative cover /Ponds/Pasture 0.11 Gram Panchayat fuel wood, fodder no management

Page 69

Page 70: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. VILLAGE NAME Type of CPR AreaUnder the

possession ofExisting use*

Existing

condition**

215 Surar Vegetative cover /Ponds/Pasture 0.07 Gram Panchayat fuel wood, fodder no management

216 Surar Vegetative cover /Ponds/Pasture 0.05 Gram Panchayat fuel wood, fodder no management

217 Surar Vegetative cover /Ponds/Pasture 0.39 Gram Panchayat fuel wood, fodder no management

218 Surar Vegetative cover /Ponds/Pasture 0.60 Gram Panchayat fuel wood, fodder no management

219 Surar Vegetative cover /Ponds/Pasture 0.27 Gram Panchayat fuel wood, fodder no management

220 Surar Vegetative cover /Ponds/Pasture 0.35 Gram Panchayat fuel wood, fodder no management

221 Tikara Vegetative cover /Ponds/Pasture 0.08 Gram Panchayat fuel wood, fodder no management

222 Tikari Vegetative cover /Ponds/Pasture 0.09 Gram Panchayat fuel wood, fodder no management

223 Uriyara Vegetative cover /Ponds/Pasture 0.64 Gram Panchayat fuel wood, fodder no management

224 Uriyara Vegetative cover /Ponds/Pasture 0.06 Gram Panchayat fuel wood, fodder no management

225 Uriyara Vegetative cover /Ponds/Pasture 0.17 Gram Panchayat fuel wood, fodder no management

58.36

Page 70

Page 71: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

1 Bhailamau 7.00% 54.00% 33.00% 6.00%

2 Bhaunti khera 6.00% 52.00% 35.00% 7.00%

3 Bhisi Jargaon 6.00% 54.00% 35.00% 5.00%

4 Bhauti Pratappur 4.00% 52.00% 38.00% 6.00%

5 Dool 7.00% 54.00% 33.00% 6.00%

6 Fatehpur Dakshin 6.00% 52.00% 35.00% 7.00%

7 Gopalpur 5.00% 54.00% 37.00% 4.00%

8 Gadhewa Mohasinpur 5.00% 54.00% 37.00% 4.00%

9 Garhi Kanpur 7.00% 57.00% 30.00% 6.00%

10 Kurauna Bahadur Nagar 3.00% 49.00% 41.00% 7.00%

11 Magrasa 7.00% 54.00% 33.00% 6.00%

12 Neori 6.00% 52.00% 35.00% 7.00%

13 Patehuri 3.00% 55.00% 36.00% 6.00%

14 Pipauri 7.00% 57.00% 30.00% 6.00%

15 Patarsa 5.00% 58.00% 32.00% 5.00%

16 Pankabahadur Nagar 7.00% 54.00% 33.00% 6.00%

17 Rampur Bhimsen 6.00% 52.00% 35.00% 7.00%

18 Rampur Khas 5.00% 54.00% 37.00% 4.00%

19 Ramaipur 7.00% 57.00% 30.00% 6.00%

20 Rautepur 3.00% 49.00% 41.00% 7.00%

21 Raikepur 7.00% 54.00% 33.00% 6.00%

22 Sen Purab Para 6.00% 52.00% 35.00% 7.00%

23 Senpashchim Para 7.00% 54.00% 33.00% 6.00%

24 Sachendi Urf Chacheri 6.00% 52.00% 35.00% 7.00%

25 Surar 5.00% 58.00% 32.00% 5.00%

26 Uriyara 7.00% 54.00% 33.00% 6.00%

Fuel & Cooking Pattern in the Project Area

S.No.WC/Gram

Panchayat

Cooking gas

(% of families)

Fire wood

(% of families)

Cow dung cake

(% of families)

Kerosene

( % of families)

Rampur Bhimsen, IWMP-VIII

Page 71

Page 72: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Village Plantation Afforstation Horticulture Fuel & FodderBahera 0.000 0.00 0.00 0.00

Bajpur 0.000 0.00 0.00 0.00

Bani 0.000 0.00 0.00 0.00

Bhailamau 2.391 1.34 0.84 0.21

Bharu 0.157 0.08 0.05 0.02

Bhaunti khera 0.578 0.32 0.20 0.06

Bhauti Pratappur 4.754 2.59 1.63 0.53

Bhisi Jargaon 0.885 0.47 0.31 0.10

Bhool 0.360 0.19 0.13 0.04

Chhitepur 0.000 0.00 0.00 0.00

Dande Ka Purwa 0.532 0.29 0.19 0.06

Dool 2.242 1.26 0.78 0.20

Durjanpur 0.000 0.00 0.00 0.00

Fatehpur Dakshin 5.332 2.96 1.86 0.51

Gadhewa Mohasinpur 0.283 0.15 0.10 0.03

Gambhirpur Dakshin 0.000 0.00 0.00 0.00

Garhi Kanpur 0.264 0.15 0.09 0.02

Gopalpur 0.263 0.14 0.09 0.03

Jahanpur 0.000 0.00 0.00 0.00

Jamoo 0.000 0.00 0.00 0.00

Jhakara 1.249 0.69 0.44 0.12

Kaindha 0.240 0.13 0.08 0.02

Kanpur (MB) 1.813 1.01 0.63 0.17

Kumhaupar 0.000 0.00 0.00 0.00

Kurauna Bahadur Nagar 1.469 0.81 0.51 0.14

Lohar Khera 0.000 0.00 0.00 0.00

Magrasa 7.514 4.21 2.62 0.68

Mardanpur 2.028 1.13 0.71 0.19

Matiyara 0.207 0.11 0.07 0.02

Meharban Singh Ka Purwa 6.188 3.47 2.16 0.56

Nakatoo 0.000 0.00 0.00 0.00

Village Wise Details of Plantation, Afforestation, Horticulture and Fuel & Fodder under Project

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Page 72

Page 73: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Village Plantation Afforstation Horticulture Fuel & Fodder

Village Wise Details of Plantation, Afforestation, Horticulture and Fuel & Fodder under Project

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Nasenia 0.000 0.00 0.00 0.00

Neori 0.531 0.29 0.18 0.06

Pankabahadur Nagar 1.106 0.59 0.38 0.13

Patarsa 0.000 0.00 0.00 0.00

Patehuri 0.514 0.28 0.18 0.05

Pipauri 0.897 0.48 0.31 0.10

Pratappur Majra Rampur 5.321 2.98 1.85 0.48

Pratappur Sarsai 0.000 0.00 0.00 0.00

Raikepur 6.484 3.60 2.27 0.61

Ramaipur 6.794 3.66 2.33 0.80

Rampur Bhimsen 5.120 2.81 1.79 0.52

Rampur Khas 5.053 2.81 1.77 0.48

Rautara 2.517 1.36 0.88 0.28

Rautepur 3.190 1.73 1.11 0.35

Sachendi Urf Chacheri 1.506 0.83 0.53 0.15

Saiyangojha 0.000 0.00 0.00 0.00

Sarneyat Pur 0.367 0.20 0.13 0.03

Sen Purab Para 5.378 2.98 1.88 0.52

Senpashchim Para 8.104 4.44 2.83 0.83

Shivrampur 0.000 0.00 0.00 0.00

Singhpur Kathar 0.796 0.44 0.28 0.08

Sona 0.000 0.00 0.00 0.00

Surar 6.679 3.58 2.32 0.78

Surjanpur 0.000 0.00 0.00 0.00

Tikara 3.577 1.92 1.24 0.42

Tikari 0.010 0.01 0.00 0.00

Uriyara 1.044 0.56 0.37 0.12Total 103.74 57.09 36.13 10.52

Page 73

Page 74: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Tractor PUMP Set Plough Harrow Cultivator Sprayer Rotavator Chaff Cutter Thresher

1 Bhailamau 3 5 1 1 1 2 0 2 1

2 Bhaunti khera 1 3 1 1 1 1 0 1 1

3 Bhisi Jargaon 2 4 0 0 0 2 0 2 0

4 Bhauti Pratappur 6 12 2 2 2 5 1 5 2

5 Dool 7 14 2 2 2 6 1 6 2

6 Fatehpur Dakshin 2 4 0 0 0 2 0 2 0

7 Gopalpur 3 7 1 1 1 3 0 3 1

8 Gadhewa Mohasinpur 1 3 1 1 1 1 0 1 1

9 Garhi Kanpur 3 6 1 1 1 3 0 2 1

10 Kurauna Bahadur Nagar 2 4 0 0 0 2 0 2 0

11 Magrasa 6 12 2 2 2 5 1 5 2

12 Neori 2 4 0 0 0 2 0 2 0

13 Patehuri 3 5 1 1 1 2 0 2 1

14 Pipauri 5 10 1 1 1 4 1 4 1

15 Patarsa 5 9 1 1 1 4 1 4 1

16 Pankabahadur Nagar 3 6 1 1 1 3 0 2 1

17 Rampur Bhimsen 8 15 2 2 2 6 2 6 2

18 Rampur Khas 4 9 1 1 1 4 1 3 1

19 Ramaipur 7 13 2 2 2 6 1 5 2

20 Rautepur 4 8 1 1 1 4 1 3 1

21 Raikepur 5 9 1 1 1 4 1 4 1

22 Sen Purab Para 10 20 3 3 3 9 2 8 3

23 Senpashchim Para 8 17 2 2 2 7 2 6 2

24 Sachendi Urf Chacheri 2 3 0 0 0 1 0 1 0

25 Surar 9 17 3 3 3 7 2 7 3

26 Uriyara 3 6 1 1 1 3 0 2 1

114 225 31 31 31 98 17 90 31

Details of existing Farm Machinery/Ag. Equipment under the Project Area

S. No. Name of GPNumber of farm machinery/Ag. equipments

Total

Kanpur NagarRampur Bhimsen, IWMP-VIII

Page 74

Page 75: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District-

Canal

ha No. Area in ha No. Area in ha No. Area in ha

1 2B3C1f1a Gopalpur 19.60 13 4.55 6 48.00 28 84.56 156.710

2 2B3C1f1b Rampur Bhimsen 70.30 34 11.90 13 104.00 47 142.40 328.600

3 2B3C1f2a Pankabahadur Nagar 66.60 25 8.75 11 88.00 40 121.35 284.700

4 2B3C1f2b Bhouti Pratappur 95.40 17 5.95 12 96.00 36 109.53 306.880

5 2B3C1f2c Surar 5.20 22 7.70 13 104.00 70 211.81 328.710

6 2B3C1d2a Oriyara 68.00 17 5.95 9 72.00 25 76.63 222.580

7 2B3C1d2b Sen Purab Para 0.00 15 5.25 18 144.00 96 290.49 439.740

8 2B3C1d2c Pipori 0.00 15 5.25 7 56.00 37 111.85 173.100

9 2B3C1d3a Magrasa 0.00 9 3.15 3 24.00 12 37.18 64.330

10 2B3C1d3b Sen Pashimpara 0.00 17 5.95 13 104.00 74 223.72 333.670

11 2B3C2a2a Rautepur 0.00 7 2.45 6 48.00 31 95.70 146.150

12 2B3C2a2b Raikepur 0.00 4 1.40 7 56.00 37 112.32 169.720

13 2B3C2a3a Dool-Pratham 0.00 14 4.90 7 56.00 41 125.26 186.160

14 2B3C2a3b Dool-Dwitiya 0.00 16 5.60 8 64.00 40 120.58 190.180

325.10 225.00 78.75 133 1064.00 614 1863.38 3331.23

19 8 20.5 52.5

Total Irrigated

Area in haPond Tubewell (8ha/no) Borewell (3 ha/no)

Status of Existing Source of Irrigation by ha under Area of Kanpur Nagar

Total

S. No. MWS Code Name of MWS

Source of Irrigation

Page 75

Page 76: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BP

L H

H

Ass

etl

ess

HH

T M F T M F T M F T M F T M F T M F % %

1 Bahera Bahera 398 2227 1185 1042 301 147 154 944 494 450 0 0 0 1540 895 645 687 290 397 164 41.27 100 25.12

2 Bajpur Bajpur 490 2700 1439 1261 371 212 159 509 265 244 0 0 0 2005 1134 871 695 305 390 95 19.32 58 11.83

3 Bani Bani 160 867 479 388 110 59 51 172 95 77 0 0 0 576 373 203 291 106 185 32 20.24 19 11.87

4 Bhailamau Bhailamau 597 3471 1830 1641 527 275 252 1332 692 640 0 0 0 2421 1359 1062 1050 471 579 224 0.00 136 0.00

5 Bharu Bharu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00

6 Bhaunti khera Bhaunti khera 144 889 467 422 99 51 48 330 163 167 0 0 0 672 386 286 217 81 136 52 36.36 32 22.22

7 Bhauti Pratappur Bhauti Pratappur 285 1606 836 770 225 120 105 639 331 308 0 0 0 932 519 413 674 317 357 111 38.85 67 23.50

8 Bhisi Jargaon Bhisi Jargaon 395 2103 1138 965 327 179 148 433 218 215 0 0 0 1384 826 558 719 312 407 83 20.94 50 12.65

9 Bhool Bhool 157 783 416 367 118 71 47 133 71 62 0 0 0 476 276 200 307 140 167 28 17.58 17 10.82

10 Chhitepur Pankabahadur Nagar 826 4315 2338 1977 646 349 297 1654 904 750 0 0 0 2859 1696 1163 1456 642 814 310 37.49 188 22.76

11 Dande Ka Purwa Neori 865 4674 2531 2143 626 363 263 1715 933 782 0 0 0 3367 1925 1442 1307 606 701 311 35.96 189 21.84

12 Dool Dool 448 2338 1250 1088 312 175 137 1043 571 472 0 0 0 1603 938 665 735 312 423 8 1.75 5 1.11

13 Durjanpur Kurauna Bahadur Nagar 429 2307 1247 1060 349 195 154 729 396 333 0 0 0 1569 925 644 738 322 416 134 31.21 81 18.88

14 Fatehpur Dakshin Fatehpur Dakshin 356 1969 1024 945 274 140 134 420 246 174 0 0 0 1256 717 539 713 307 406 77 0.00 47 0.00

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 240 1441 760 681 241 132 109 632 343 289 0 0 0 838 492 346 603 268 335 102 42.64 62 25.83

16 Gambhirpur Dakshin Patehuri 1062 6034 3211 2823 798 433 365 1387 738 649 0 0 0 4041 2308 1733 1993 903 1090 19 1.75 12 1.12

17 Garhi Kanpur Garhi Kanpur 475 2470 1353 1117 372 204 168 799 444 355 0 0 0 1428 836 592 1042 517 525 152 31.91 92 19.36

18 Gopalpur Gopalpur 153 774 419 355 85 46 39 304 169 135 0 0 0 566 343 223 208 76 132 59 38.37 36 23.52

19 Jahanpur Magrasa 406 2322 1238 1084 345 203 142 609 332 277 0 0 0 1605 909 696 717 329 388 106 26.20 64 15.76

20 Jamoo Jamoo 132 732 407 325 103 55 48 381 209 172 0 0 0 442 284 158 290 123 167 66 50.28 40 30.30

21 Jhakara Rautepur 244 1296 704 592 209 111 98 201 112 89 0 0 0 763 466 297 533 238 295 40 16.21 24 9.83

22 Kaindha Kaindha 1369 7359 3903 3456 1199 612 587 1994 1026 968 0 0 0 4475 2627 1848 2884 1276 1608 370 27.01 225 16.43

23 Kanpur (MB) Kanpur (MB) 451 2294 1240 1054 323 172 151 1445 776 669 0 0 0 1434 862 572 860 378 482 273 60.48 166 36.80

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 128 725 364 361 120 58 62 331 154 177 0 0 0 286 169 117 439 195 244 57 44.32 35 27.34

26 Lohar Khera Naurangabad 418 2270 1228 1042 357 195 162 805 429 376 0 0 0 1352 794 558 918 434 484 146 34.81 89 21.29

27 Magrasa Magrasa 495 2563 1348 1215 310 150 160 765 413 352 0 0 0 1787 1030 757 776 318 458 146 29.58 89 17.97

28 Mardanpur Mardanpur 892 4484 2405 2079 706 382 324 877 464 413 0 0 0 2701 1662 1039 1783 743 1040 178 19.98 108 12.10

29 Matiyara Afjalpur 912 4788 2516 2272 684 376 308 902 480 422 0 0 0 2806 1666 1140 1982 850 1132 176 19.31 107 11.73

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 3696 19424 10339 9085 2669 1427 1242 6202 3312 2890 0 0 0 12768 7310 5458 6656 3029 3627 1165 31.52 708 19.15

31 Nakatoo Nakatoo 413 2054 1127 927 123 75 48 472 263 209 5 2 3 1657 966 691 397 161 236 97 23.40 59 14.28

32 Nasenia Bahera 170 977 527 450 109 54 55 156 83 73 0 0 0 780 452 328 197 75 122 28 16.63 17 10.00

33 Neori Neori 692 3454 1887 1567 451 245 206 323 170 153 0 0 0 2275 1377 898 1179 510 669 72 10.47 44 6.35

34 Pankabahadur Nagar Pankabahadur Nagar 698 3981 2108 1873 582 308 274 1021 526 495 0 0 0 2477 1443 1034 1504 665 839 179 25.66 109 15.61

Kanpur Nagar

Total Literate Total IlliterateTotal Poulation 0-6 Population SC Population

ST

Populati

on

Village Wise Human Population of the Project Area of

S. No VillageGram

Panchayat

Tota

l HH

District-Rampur Bhimsen, IWMP-VIII

Page 76

Page 77: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

BP

L H

H

Ass

etl

ess

HH

T M F T M F T M F T M F T M F T M F % %

Kanpur Nagar

Total Literate Total IlliterateTotal Poulation 0-6 Population SC Population

ST

Populati

on

Village Wise Human Population of the Project Area of

S. No VillageGram

Panchayat

Tota

l HH

District-Rampur Bhimsen, IWMP-VIII

35 Patarsa Patarsa 71 357 167 190 57 29 28 137 61 76 0 0 0 196 108 88 161 59 102 27 37.53 16 22.53

36 Patehuri Patehuri 350 1763 967 796 238 129 109 1500 821 679 0 0 0 1098 668 430 665 299 366 284 81.08 173 49.42

37 Pipauri Pipauri 928 5113 2684 2429 672 336 336 833 460 373 0 0 0 3156 1807 1349 1957 877 1080 157 16.94 95 10.23

38 Pratappur Majra Rampur Patarsa 327 1874 998 876 238 127 111 208 106 102 0 0 0 1307 731 576 567 267 300 40 12.10 24 7.33

39 Pratappur Sarsai Patarsa 784 3855 2040 1815 526 266 260 1024 548 476 0 0 0 2638 1525 1113 1217 515 702 208 26.51 126 16.07

40 Raikepur Raikepur 1011 5552 2985 2567 624 343 281 568 304 264 0 0 0 3995 2288 1707 1557 697 860 114 11.28 69 6.82

41 Ramaipur Ramaipur 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00

42 Rampur Bhimsen Rampur Bhimsen 151 835 440 395 94 55 39 57 39 18 0 0 0 571 324 247 264 116 148 12 8.11 7 4.63

43 Rampur Khas Rampur Khas 128 653 350 303 99 58 41 443 235 208 0 0 0 427 254 173 226 96 130 83 65.01 50 39.06

44 Rautara Magrasa 244 1316 712 604 182 105 77 504 274 230 0 0 0 807 477 330 509 235 274 91 37.46 55 22.54

45 Rautepur Rautepur 186 973 517 456 110 55 55 187 100 87 0 0 0 646 366 280 327 151 176 37 19.67 22 11.82

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 84 494 263 231 59 31 28 247 132 115 0 0 0 391 217 174 103 46 57 41 48.37 25 29.76

47 Saiyangojha Kurauna Bahadur Nagar 181 1022 533 489 130 68 62 554 301 253 0 0 0 701 389 312 321 144 177 95 52.29 58 32.04

48 Sarneyat Pur Magrasa 57 298 161 137 26 11 15 124 67 57 0 0 0 210 135 75 88 26 62 23 40.55 14 24.56

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00

50 Senpashchim Para Senpashchim Para 79 447 236 211 53 27 26 71 38 33 0 0 0 330 185 145 117 51 66 13 16.56 8 10.12

51 Shivrampur Bidhnoo 182 926 494 432 145 78 67 0 0 0 0 0 0 564 336 228 362 158 204 3 1.75 2 1.09

52 Singhpur Kathar Patarsa 364 2138 1131 1007 292 156 136 699 378 321 0 0 0 1404 825 579 734 306 428 117 32.23 71 19.50

53 Sona Sona 481 2573 1360 1213 390 188 202 480 255 225 0 0 0 1731 1004 727 842 356 486 92 19.14 56 11.64

54 Surar Surar 1408 7546 4022 3524 1130 611 519 1524 799 725 13 7 6 4620 2655 1965 2926 1367 1559 292 20.74 177 12.57

55 Surjanpur Garhi Kanpur 268 1395 739 656 204 115 89 505 265 240 0 0 0 880 522 358 515 217 298 95 35.50 58 21.64

56 Tikara Tikara 204 1031 543 488 167 82 85 545 284 261 0 0 0 510 286 224 521 257 264 104 51.04 63 30.88

57 Tikari Raikepur 273 1431 763 668 195 101 94 191 94 97 0 0 0 836 521 315 595 242 353 39 14.19 24 8.79

58 Uriyara Uriyara 219 1130 612 518 176 97 79 448 256 192 0 0 0 593 338 255 537 274 263 85 38.71 52 23.74

26576 142413 75981 66432 19878 10642 9236 40508 21639 18869 18 9 9 92752 53926 38826 49661 22055 27606 7111 26.76 4320 16.26Total :

Page 77

Page 78: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Marginal

FarmersSmall Farmers

Large

Farmers

Total

Farmers

No. of

HH%

No. of

HH%

1 Bahera Bahera 398 230 43 25 298 100 25.13 98 40.61

2 Bajpur Bajpur 490 326 77 29 432 58 11.84 120 40.83

3 Bani Bani 160 109 22 10 141 19 11.88 39 41.03

4 Bhailamau Bhailamau 597 362 73 26 461 136 22.78 146 40.89

5 Bharu Bharu 0 0 0 0 0 0 0.00 0 0.00

6 Bhaunti khera Bhaunti khera 144 87 17 8 112 32 22.22 35 41.14

7 Bhauti Pratappur Bhauti Pratappur 285 167 38 13 218 67 23.51 70 40.71

8 Bhisi Jargaon Bhisi Jargaon 395 268 60 17 345 50 12.66 97 40.72

9 Bhool Bhool 157 106 27 7 140 17 10.83 38 41.32

10 Chhitepur Pankabahadur Nagar 826 493 92 53 638 188 22.76 202 40.89

11 Dande Ka Purwa Neori 865 510 120 46 676 189 21.85 212 40.80

12 Dool Dool 448 342 68 33 443 5 1.12 110 40.73

13 Durjanpur Kurauna Bahadur Nagar 429 273 55 20 348 81 18.88 105 40.86

14 Fatehpur Dakshin Fatehpur Dakshin 356 242 51 16 309 47 13.20 87 0.00

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 240 138 28 12 178 62 25.83 59 40.68

16 Gambhirpur Dakshin Patehuri 1062 802 183 65 1050 12 1.13 260 40.85

17 Garhi Kanpur Garhi Kanpur 475 298 67 18 383 92 19.37 116 40.95

18 Gopalpur Gopalpur 153 88 23 6 117 36 23.53 37 41.35

19 Jahanpur Magrasa 406 267 57 18 342 64 15.76 99 41.01

20 Jamoo Jamoo 132 71 14 7 92 40 30.30 32 41.25

21 Jhakara Rautepur 244 168 38 14 220 24 9.84 60 40.67

22 Kaindha Kaindha 1369 889 200 55 1144 225 16.44 335 40.87

23 Kanpur (MB) Kanpur (MB) 451 220 44 21 285 166 36.81 110 41.00

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0.00 0 0.00

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 128 73 15 5 93 35 27.34 31 41.29

26 Lohar Khera Naurangabad 418 256 51 22 329 89 21.29 102 40.98

27 Magrasa Magrasa 495 310 71 25 406 89 17.98 121 40.91

28 Mardanpur Mardanpur 892 610 137 37 784 108 12.11 219 40.73

29 Matiyara Afjalpur 912 607 157 41 805 107 11.73 223 40.90

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 3696 2307 430 251 2988 708 19.16 906 40.79

Assetless BPL

Rampur Bhimsen, IWMP-VIII Kanpur NagarVillage Wise Farmer's Category of the Project Area of

S. No. NAME Village Name of Gram PanchayatTotal No. of

HH

Datails of Farmers HH

Page 78

Page 79: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Marginal

FarmersSmall Farmers

Large

Farmers

Total

Farmers

No. of

HH%

No. of

HH%

Assetless BPL

Rampur Bhimsen, IWMP-VIII Kanpur NagarVillage Wise Farmer's Category of the Project Area of

S. No. NAME Village Name of Gram PanchayatTotal No. of

HH

Datails of Farmers HH

31 Nakatoo Nakatoo 413 267 63 24 354 59 14.29 101 40.89

32 Nasenia Bahera 170 118 23 12 153 17 10.00 42 40.48

33 Neori Neori 692 509 103 36 648 44 6.36 170 40.71

34 Pankabahadur Nagar Pankabahadur Nagar 698 461 97 31 589 109 15.62 171 40.82

35 Patarsa Patarsa 71 43 9 3 55 16 22.54 17 41.76

36 Patehuri Patehuri 350 135 31 11 177 173 49.43 86 40.70

37 Pipauri Pipauri 928 628 162 43 833 95 10.24 227 40.88

38 Pratappur Majra Rampur Patarsa 327 237 50 16 303 24 7.34 80 40.88

39 Pratappur Sarsai Patarsa 784 511 103 44 658 126 16.07 192 40.83

40 Raikepur Raikepur 1011 720 164 58 942 69 6.82 248 40.77

41 Ramaipur Ramaipur 0 0 0 0 0 0 0.00 0 0.00

42 Rampur Bhimsen Rampur Bhimsen 151 113 23 8 144 7 4.64 37 40.81

43 Rampur Khas Rampur Khas 128 61 13 4 78 50 39.06 31 41.29

44 Rautara Magrasa 244 147 29 13 189 55 22.54 60 40.67

45 Rautepur Rautepur 186 125 29 10 164 22 11.83 46 40.43

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 84 46 10 3 59 25 29.76 21 40.00

47 Saiyangojha Kurauna Bahadur Nagar 181 93 24 6 123 58 32.04 44 41.14

48 Sarneyat Pur Magrasa 57 33 6 4 43 14 24.56 14 40.71

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0.00 0 0.00

50 Senpashchim Para Senpashchim Para 79 55 11 5 71 8 10.13 19 41.58

51 Shivrampur Bidhnoo 182 141 29 10 180 2 1.10 45 40.44

52 Singhpur Kathar Patarsa 364 229 48 16 293 71 19.51 89 40.90

53 Sona Sona 481 330 66 29 425 56 11.64 118 40.76

54 Surar Surar 1408 940 214 77 1231 177 12.57 345 40.81

55 Surjanpur Garhi Kanpur 268 163 33 14 210 58 21.64 66 40.61

56 Tikara Tikara 204 108 25 8 141 63 30.88 50 40.80

57 Tikari Raikepur 273 188 49 12 249 24 8.79 67 40.75

58 Uriyara Uriyara 219 131 28 8 167 52 23.74 54 40.56

26576 17151 3700 1405 22256 4320 6509Total

Page 79

Page 80: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

SC Others Total Women

1 Bahera Bahera 100 42 58 100 62 17500 21875 1750000 2187500

2 Bajpur Bajpur 58 11 47 58 35 17000 21250 986000 1232500

3 Bani Bani 19 4 15 19 11 17000 21250 323000 403750

4 Bhailamau Bhailamau 136 52 84 136 84 17000 21250 2312000 2890000

5 Bharu Bharu 0 0 0 0 0 0 0 0 0

6 Bhaunti khera Bhaunti khera 32 12 20 32 19 17000 21250 544000 680000

7 Bhauti Pratappur Bhauti Pratappur 67 27 40 67 41 17000 21250 1139000 1423750

8 Bhisi Jargaon Bhisi Jargaon 50 10 40 50 31 17500 21875 875000 1093750

9 Bhool Bhool 17 3 14 17 10 16000 20000 272000 340000

10 Chhitepur Pankabahadur Nagar 188 72 116 188 116 17000 21250 3196000 3995000

11 Dande Ka Purwa Neori 189 69 120 189 117 17000 21250 3213000 4016250

12 Dool Dool 5 0 5 5 3 17000 21250 85000 106250

13 Durjanpur Kurauna Bahadur Nagar 81 26 55 81 50 16000 20000 1296000 1620000

14 Fatehpur Dakshin Fatehpur Dakshin 47 10 37 47 29 17000 21250 799000 998750

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 62 27 35 62 38 17000 21250 1054000 1317500

16 Gambhirpur Dakshin Patehuri 12 0 12 12 7 17000 21250 204000 255000

17 Garhi Kanpur Garhi Kanpur 92 30 62 92 57 17500 21875 1610000 2012500

18 Gopalpur Gopalpur 36 14 22 36 22 17000 21250 612000 765000

19 Jahanpur Magrasa 64 17 47 64 39 17000 21250 1088000 1360000

20 Jamoo Jamoo 40 21 19 40 24 16000 20000 640000 800000

21 Jhakara Rautepur 24 4 20 24 14 17000 21250 408000 510000

22 Kaindha Kaindha 225 61 164 225 139 17000 21250 3825000 4781250

23 Kanpur (MB) Kanpur (MB) 166 105 61 166 102 17000 21250 2822000 3527500

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0 0 0

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 35 16 19 35 21 17000 21250 595000 743750

26 Lohar Khera Naurangabad 89 32 57 89 55 17500 21875 1557500 1946875

27 Magrasa Magrasa 89 27 62 89 55 17000 21250 1513000 1891250

28 Mardanpur Mardanpur 108 21 87 108 66 17000 21250 1836000 2295000

29 Matiyara Afjalpur 107 20 87 107 66 17000 21250 1819000 2273750

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 708 226 482 708 438 17000 21250 12036000 15045000

31 Nakatoo Nakatoo 59 14 45 59 36 16000 20000 944000 1180000

32 Nasenia Bahera 17 3 14 17 10 17000 21250 289000 361250

33 Neori Neori 44 4 40 44 27 17000 21250 748000 935000

34 Pankabahadur Nagar Pankabahadur Nagar 109 28 81 109 67 17500 21875 1907500 2384375

35 Patarsa Patarsa 16 6 10 16 9 17000 21250 272000 340000

36 Patehuri Patehuri 173 147 26 173 107 17000 21250 2941000 3676250

Kanpur NagarRampur Bhimsen, IWMP-VIIIVillage-wise Livelihood Status of Assetless People in the Project Area of

Total

Income

Post

Project

in Rs.

Remarks

Expected

Income

from

Desired

Activities

Rs./Year

Total

Income

Pre

Project

in Rs.

S. No. Name of Village Name of GP

Number

of

Assetless

Ag

ricu

ltu

re/C

asu

al L

abo

ur,

Cat

tle

Rea

rin

g,

Go

at F

arm

ing

, P

ou

ltry

,

Can

dle

,

Ver

mi

Co

mp

ost

, M

ini

Vil

lag

e S

ho

ps,

Sew

ing

Mac

hin

e,

Fo

od

Pre

serv

atio

n

No. of Household EngagedPre Project

Average

Income/

Year

Desired

Activities

Name of

Livelihood

Activities

Ag

ricu

ltu

re/C

asu

al L

abo

ur,

Cat

tle

Rea

rin

g,

Go

at F

arm

ing

, P

ou

ltry

Page 80

Page 81: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

SC Others Total Women

Kanpur NagarRampur Bhimsen, IWMP-VIIIVillage-wise Livelihood Status of Assetless People in the Project Area of

Total

Income

Post

Project

in Rs.

Remarks

Expected

Income

from

Desired

Activities

Rs./Year

Total

Income

Pre

Project

in Rs.

S. No. Name of Village Name of GP

Number

of

Assetless

No. of Household EngagedPre Project

Average

Income/

Year

Desired

Activities

Name of

Livelihood

Activities

37 Pipauri Pipauri 95 15 80 95 58 17500 21875 1662500 2078125

38 Pratappur Majra Rampur Patarsa 24 3 21 24 14 16500 20625 396000 495000

39 Pratappur Sarsai Patarsa 126 33 93 126 78 17000 21250 2142000 2677500

40 Raikepur Raikepur 69 7 62 69 42 17000 21250 1173000 1466250

41 Ramaipur Ramaipur 0 0 0 0 0 0 0 0 0

42 Rampur Bhimsen Rampur Bhimsen 7 0 7 7 4 17000 21250 119000 148750

43 Rampur Khas Rampur Khas 50 34 16 50 31 17500 21875 875000 1093750

44 Rautara Magrasa 55 21 34 55 34 17500 21875 962500 1203125

45 Rautepur Rautepur 22 4 18 22 13 17500 21875 385000 481250

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 25 13 12 25 15 17500 21875 437500 546875

47 Saiyangojha Kurauna Bahadur Nagar 58 31 27 58 35 17500 21875 1015000 1268750

48 Sarneyat Pur Magrasa 14 6 8 14 8 17500 21875 245000 306250

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0 0 0

50 Senpashchim Para Senpashchim Para 8 1 7 8 4 17500 21875 140000 175000

51 Shivrampur Bidhnoo 2 0 2 2 1 17500 21875 35000 43750

52 Singhpur Kathar Patarsa 71 23 48 71 44 17500 21875 1242500 1553125

53 Sona Sona 56 10 46 56 34 17500 21875 980000 1225000

54 Surar Surar 177 36 141 177 109 17500 21875 3097500 3871875

55 Surjanpur Garhi Kanpur 58 21 37 58 35 17500 21875 1015000 1268750

56 Tikara Tikara 63 33 30 63 39 17500 21875 1102500 1378125

57 Tikari Raikepur 24 3 21 24 14 17500 21875 420000 525000

58 Uriyara Uriyara 52 21 31 52 32 17500 21875 910000 1137500

4320 1476 2844 4320 2651 73866000 92332500

17100

21400 18466500Post Project Average Income

Total

Pre Project Average Income/HH/Annum

Net Increase in Income

Ag

ricu

ltu

re/C

asu

al L

abo

ur,

Cat

tle

Rea

rin

g,

Go

at F

arm

ing

, P

ou

ltry

,

Can

dle

,

Ver

mi

Co

mp

ost

, M

ini

Vil

lag

e S

ho

ps,

Sew

ing

Mac

hin

e,

Fo

od

Pre

serv

atio

n

Ag

ricu

ltu

re/C

asu

al L

abo

ur,

Cat

tle

Rea

rin

g,

Go

at F

arm

ing

, P

ou

ltry

Agri

cultu

re/C

asu

al L

ab

ou

r, C

attle

Rea

ring

, G

oa

t F

arm

ing

, P

ou

ltry

,

Can

dle

, V

erm

i C

om

po

st, M

ini V

illag

e S

ho

ps,

Sew

ing

Mach

ine

, F

oo

d

Pre

se

rvation

Ag

ricu

ltu

re/C

asu

al L

abo

ur,

Cat

tle

Rea

rin

g,

Go

at F

arm

ing

, P

ou

ltry

Page 81

Page 82: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

SC/ST Others Total Women

1 Bahera Bahera 298 126 172 298 19 22000 27500 6556000 8195000

2 Bajpur Bajpur 432 81 351 432 28 24000 30000 10368000 12960000

3 Bani Bani 141 27 114 141 9 22500 28100 3172500 3962100

4 Bhailamau Bhailamau 461 176 285 461 30 21000 26200 9681000 12078200

5 Bharu Bharu 0 0 0 0 0 0 0 0 0

6 Bhaunti khera Bhaunti khera 112 41 71 112 7 22000 27500 2464000 3080000

7 Bhauti Pratappur Bhauti Pratappur 218 86 132 218 14 21500 26800 4687000 5842400

8 Bhisi Jargaon Bhisi Jargaon 345 71 274 345 22 24000 30000 8280000 10350000

9 Bhool Bhool 140 23 117 140 9 24000 30000 3360000 4200000

10 Chhitepur Pankabahadur Nagar 638 244 394 638 41 22000 27500 14036000 17545000

11 Dande Ka Purwa Neori 676 248 428 676 44 23500 29300 15886000 19806800

12 Dool Dool 443 0 443 443 29 24000 30000 10632000 13290000

13 Durjanpur Kurauna Bahadur Nagar 348 109 239 348 22 22000 27500 7656000 9570000

14 Fatehpur Dakshin Fatehpur Dakshin 309 65 244 309 20 22000 27500 6798000 8497500

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 178 78 100 178 11 24000 30000 4272000 5340000

16 Gambhirpur Dakshin Patehuri 1050 0 1050 1050 68 24500 30600 25725000 32130000

17 Garhi Kanpur Garhi Kanpur 383 123 260 383 25 21000 26200 8043000 10034600

18 Gopalpur Gopalpur 117 45 72 117 7 21000 26200 2457000 3065400

19 Jahanpur Magrasa 342 89 253 342 22 22000 27500 7524000 9405000

20 Jamoo Jamoo 92 47 45 92 6 22000 27500 2024000 2530000

21 Jhakara Rautepur 220 34 186 220 14 22000 27500 4840000 6050000

22 Kaindha Kaindha 1144 309 835 1144 74 21000 26200 24024000 29972800

23 Kanpur (MB) Kanpur (MB) 285 179 106 285 18 21000 26200 5985000 7467000

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0 0 0

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 93 42 51 93 6 21000 26200 1953000 2436600

26 Lohar Khera Naurangabad 329 116 213 329 21 20500 25600 6744500 8422400

27 Magrasa Magrasa 406 121 285 406 26 22000 27500 8932000 11165000

28 Mardanpur Mardanpur 784 153 631 784 51 24000 30000 18816000 23520000

29 Matiyara Afjalpur 805 151 654 805 52 24000 30000 19320000 24150000

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 2988 954 2034 2988 195 24000 30000 71712000 89640000

31 Nakatoo Nakatoo 354 82 272 354 23 24000 30000 8496000 10620000

32 Nasenia Bahera 153 24 129 153 10 24000 30000 3672000 4590000

Kanpur NagarRampur Bhimsen, IWMP-VIIIVillage-wise Livelihood Status of Farmers People in the Project Area of

S. No. Name of Village Name of GP Remarks

Expected

Income

from

Desired

Activities

Rs./Year

Total

Income

Pre

Project

in Rs.

Number of

Farmers

Name of

Livelihood

Activities

No. of Household EngagedPre Project

Average

Income/

Year

Desired

Activities

Total

Income

Post

Project

in Rs.

Ag

ricu

ltu

re,

Lab

ou

r, C

attl

e R

eari

ng

, G

oat

ary

Ag

ricu

ltu

re,

Lab

ou

r, C

attl

e R

eari

ng

, G

oat

ary

Ag

ricu

ltu

re,

Lab

ou

r, C

attl

e R

eari

ng

, G

oat

ary

, P

olt

ry,

Ho

rtic

ult

ure

, M

icro

-en

terp

rise

sA

gri

cult

ure

, L

abo

ur,

Cat

tle

Rea

rin

g,

Go

atar

y,

Po

ltry

, H

ort

icu

ltu

re,

Mic

ro-e

nte

rpri

ses

Page 82

Page 83: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

SC/ST Others Total Women

Kanpur NagarRampur Bhimsen, IWMP-VIIIVillage-wise Livelihood Status of Farmers People in the Project Area of

S. No. Name of Village Name of GP Remarks

Expected

Income

from

Desired

Activities

Rs./Year

Total

Income

Pre

Project

in Rs.

Number of

Farmers

Name of

Livelihood

Activities

No. of Household EngagedPre Project

Average

Income/

Year

Desired

Activities

Total

Income

Post

Project

in Rs.

33 Neori Neori 648 60 588 648 42 24000 30000 15552000 19440000

34 Pankabahadur Nagar Pankabahadur Nagar 589 151 438 589 38 24000 30000 14136000 17670000

35 Patarsa Patarsa 55 21 34 55 3 24000 30000 1320000 1650000

36 Patehuri Patehuri 177 150 27 177 11 24000 30000 4248000 5310000

37 Pipauri Pipauri 833 135 698 833 54 24000 30000 19992000 24990000

38 Pratappur Majra Rampur Patarsa 303 33 270 303 19 24000 30000 7272000 9090000

39 Pratappur Sarsai Patarsa 658 174 484 658 43 24000 30000 15792000 19740000

40 Raikepur Raikepur 942 96 846 942 61 24000 30000 22608000 28260000

41 Ramaipur Ramaipur 0 0 0 0 0 0 0 0 0

42 Rampur Bhimsen Rampur Bhimsen 144 9 135 144 9 24000 30000 3456000 4320000

43 Rampur Khas Rampur Khas 78 52 26 78 5 24000 30000 1872000 2340000

44 Rautara Magrasa 189 72 117 189 12 24000 30000 4536000 5670000

45 Rautepur Rautepur 164 31 133 164 10 24000 30000 3936000 4920000

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 59 29 30 59 3 24000 30000 1416000 1770000

47 Saiyangojha Kurauna Bahadur Nagar 123 66 57 123 8 24000 30000 2952000 3690000

48 Sarneyat Pur Magrasa 43 17 26 43 2 24000 30000 1032000 1290000

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0 0 0

50 Senpashchim Para Senpashchim Para 71 11 60 71 4 24000 30000 1704000 2130000

51 Shivrampur Bidhnoo 180 0 180 180 11 24000 30000 4320000 5400000

52 Singhpur Kathar Patarsa 293 95 198 293 19 24000 30000 7032000 8790000

53 Sona Sona 425 79 346 425 27 24000 30000 10200000 12750000

54 Surar Surar 1231 250 981 1231 80 24000 30000 29544000 36930000

55 Surjanpur Garhi Kanpur 210 76 134 210 13 24000 30000 5040000 6300000

56 Tikara Tikara 141 74 67 141 9 24000 30000 3384000 4230000

57 Tikari Raikepur 249 33 216 249 16 24000 30000 5976000 7470000

58 Uriyara Uriyara 167 66 101 167 10 24000 30000 4008000 5010000

22256 5624 16632 22256 1432 519444000 649075800

23300

29200

Pre Project Average Income/HH/Annum

Post Project Average Income

Total

Net Increase in Income 129631800

Ag

ricu

ltu

re,

Lab

ou

r, C

attl

e R

eari

ng

, G

oat

ary

Ag

ricu

ltu

re,

Lab

ou

r, C

attl

e R

eari

ng

, G

oat

ary

, P

olt

ry,

Ho

rtic

ult

ure

, M

icro

-en

terp

rise

s

Page 83

Page 84: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Sr. No. Name of villageTotal Workforce

AvailableAgriculture

Animal

Husbandary

Agriculture

& Animal

Husbandary

Non Farm

Wages

Self Emploted

/BusinessService Others

1 Bahera 751 263 89 165 135 45 7 47

2 Bajpur 896 315 108 198 162 54 9 50

3 Bani 1060 369 123 234 187 59 6 82

4 Bhailamau 604 212 71 134 109 36 5 37

5 Bharu 0 0 0 0 0 0 0 0

6 Bhaunti khera 305 107 36 67 55 18 3 19

7 Bhauti Pratappur 1060 373 128 234 191 63 9 62

8 Bhisi Jargaon 604 213 73 134 109 36 6 33

9 Bhool 376 132 45 83 68 22 4 22

10 Chhitepur 1312 463 158 289 238 77 13 74

11 Dande Ka Purwa 1356 479 160 299 246 80 13 79

12 Dool 840 296 100 186 152 49 7 50

13 Durjanpur 1060 373 127 233 192 62 8 65

14 Fatehpur Dakshin 604 212 72 132 108 36 5 39

15 Gadhewa Mohasinpur 432 151 52 94 78 26 3 28

16 Gambhirpur Dakshin 1356 477 156 298 238 75 7 105

17 Garhi Kanpur 856 301 103 189 155 52 8 48

18 Gopalpur 1060 373 127 234 191 63 10 62

19 Jahanpur 604 212 73 133 108 35 6 37

20 Jamoo 1312 459 157 290 233 76 12 85

21 Jhakara 1356 477 162 299 245 81 14 78

22 Kaindha 840 293 100 182 150 50 7 58

23 Kanpur (MB) 1060 368 123 233 190 61 6 79

24 Kumhaupar 604 212 72 133 109 36 6 36

25 Kurauna Bahadur Nagar 1060 367 127 233 191 64 7 71

26 Lohar Khera 604 212 72 133 109 36 6 36

27 Magrasa 856 298 99 188 149 50 6 66

28 Mardanpur 1060 371 125 232 189 61 7 75

44 Rautara 397 140 47 87 72 23 4 24

45 Rautepur 312 109 37 69 56 19 2 20

Rampur Bhimsen, IWMP-VIII Kanpur NagarDetails of Livelihood Pattern of the project Area of

Page 84

Page 85: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Sr. No. Name of villageTotal Workforce

AvailableAgriculture

Animal

Husbandary

Agriculture

& Animal

Husbandary

Non Farm

Wages

Self Emploted

/BusinessService Others

Rampur Bhimsen, IWMP-VIII Kanpur NagarDetails of Livelihood Pattern of the project Area of

46 Sachendi Urf Chacheri 156 55 19 34 28 9 1 10

47 Saiyangojha 347 122 41 76 62 21 3 22

48 Sarneyat Pur 103 36 12 23 18 6 1 7

49 Sen Purab Para 0 0 0 0 0 0 0 0

50 Senpashchim Para 133 47 16 29 24 8 1 8

51 Shivrampur 364 128 43 80 65 22 3 23

52 Singhpur Kathar 786 276 94 173 141 47 6 49

53 Sona 938 329 112 207 168 56 7 59

54 Surar 2244 787 268 494 402 134 17 142

55 Surjanpur 353 124 42 78 63 21 3 22

56 Tikara 441 155 53 97 79 26 3 28

57 Tikari 729 256 87 160 131 44 5 46

58 Uriyara 350 123 42 77 63 21 3 21

31541 11065 3751 6943 5659 1860 259 2004Total

Page 85

Page 86: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Kg. Nos. Kg. Nos. Kg. Nos. Eggs/L/y

1 Bahera Bahera 6 1.2 10 2.25 70 2.5 19 3.5 14 108 8-10 0 0 42 1-1.5 12 120

2 Bajpur Bajpur 7 1.2 12 2.25 86 2.5 23 3.5 18 132 8-10 0 0 49 1-1.5 16 120

3 Bani Bani 2 1.2 4 2.25 28 2.5 8 3.5 6 42 8-10 0 0 14 1-1.5 4 120

4 Bhailamau Bhailamau 9 1.2 15 2.25 104 2.5 28 3.5 20 162 8-10 0 0 63 1-1.5 16 120

5 Bharu Bharu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Bhaunti khera Bhaunti khera 2 1.2 4 2.25 25 2.5 7 3.5 6 36 8-10 0 0 14 1-1.5 4 120

7 Bhauti Pratappur Bhauti Pratappur 4 1.2 7 2.25 50 2.5 14 3.5 10 78 8-10 0 0 28 1-1.5 8 120

8 Bhisi Jargaon Bhisi Jargaon 6 1.2 10 2.25 69 2.5 19 3.5 14 108 8-10 0 0 42 1-1.5 12 120

9 Bhool Bhool 2 1.2 4 2.25 27 2.5 7 3.5 6 42 8-10 0 0 14 1-1.5 4 120

10 Chhitepur Pankabahadur Nagar 12 1.2 21 2.25 145 2.5 39 3.5 28 222 8-10 0 0 84 1-1.5 24 120

11 Dande Ka Purwa Neori 13 1.2 22 2.25 151 2.5 41 3.5 30 234 8-10 0 0 84 1-1.5 24 120

12 Dool Dool 7 1.2 11 2.25 78 2.5 21 3.5 16 120 8-10 0 0 42 1-1.5 12 120

13 Durjanpur Kurauna Bahadur Nagar 6 1.2 11 2.25 75 2.5 20 3.5 16 114 8-10 0 0 42 1-1.5 12 120

14 Fatehpur Dakshin Fatehpur Dakshin 5 1.2 9 2.25 62 2.5 17 3.5 12 96 8-10 0 0 35 1-1.5 12 120

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 4 1.2 6 2.25 42 2.5 11 3.5 8 66 8-10 0 0 21 1-1.5 8 120

16 Gambhirpur Dakshin Patehuri 16 1.2 27 2.25 186 2.5 50 3.5 38 288 8-10 0 0 105 1-1.5 32 120

17 Garhi Kanpur Garhi Kanpur 7 1.2 12 2.25 83 2.5 23 3.5 16 126 8-10 0 0 49 1-1.5 16 120

18 Gopalpur Gopalpur 2 1.2 4 2.25 27 2.5 7 3.5 6 42 8-10 0 0 14 1-1.5 4 120

19 Jahanpur Magrasa 6 1.2 10 2.25 71 2.5 19 3.5 14 108 8-10 0 0 42 1-1.5 12 120

20 Jamoo Jamoo 2 1.2 3 2.25 23 2.5 6 3.5 4 36 8-10 0 0 14 1-1.5 4 120

21 Jhakara Rautepur 4 1.2 6 2.25 43 2.5 12 3.5 8 66 8-10 0 0 28 1-1.5 8 120

22 Kaindha Kaindha 21 1.2 34 2.25 240 2.5 65 3.5 48 372 8-10 0 0 140 1-1.5 40 120

23 Kanpur (MB) Kanpur (MB) 7 1.2 11 2.25 79 2.5 21 3.5 16 120 8-10 0 0 42 1-1.5 12 120

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 2 1.2 3 2.25 22 2.5 6 3.5 4 36 8-10 0 0 14 1-1.5 4 120

26 Lohar Khera Naurangabad 6 1.2 10 2.25 73 2.5 20 3.5 14 114 8-10 0 0 42 1-1.5 12 120

27 Magrasa Magrasa 7 1.2 12 2.25 87 2.5 24 3.5 18 132 8-10 0 0 49 1-1.5 16 120

28 Mardanpur Mardanpur 13 1.2 22 2.25 156 2.5 42 3.5 32 240 8-10 0 0 91 1-1.5 28 120

29 Matiyara Afjalpur 14 1.2 23 2.25 160 2.5 43 3.5 32 246 8-10 0 0 91 1-1.5 28 120

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

S.

No.Name of Village

Name of

Gram Panchayat

Cow BuffaloOx/

Bull

Desi Crossed Desi Murrah Broiler LayersGoat Pig

Poultry

Other

Details Of Projected Productivity of Livestock Population in Pre Project Period of

Page 86

Page 87: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Kg. Nos. Kg. Nos. Kg. Nos. Eggs/L/y

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 55 1.2 92 2.25 647 2.5 176 3.5 130 996 8-10 0 0 371 1-1.5 112 120

31 Nakatoo Nakatoo 6 1.2 10 2.25 72 2.5 20 3.5 14 114 8-10 0 0 42 1-1.5 12 120

32 Nasenia Bahera 3 1.2 4 2.25 30 2.5 8 3.5 6 48 8-10 0 0 14 1-1.5 4 120

33 Neori Neori 10 1.2 17 2.25 121 2.5 33 3.5 24 186 8-10 0 0 70 1-1.5 20 120

34 Pankabahadur Nagar Pankabahadur Nagar 10 1.2 17 2.25 122 2.5 33 3.5 24 186 8-10 0 0 70 1-1.5 20 120

35 Patarsa Patarsa 1 1.2 2 2.25 12 2.5 3 3.5 2 18 8-10 0 0 7 1-1.5 4 120

36 Patehuri Patehuri 5 1.2 9 2.25 61 2.5 17 3.5 12 96 8-10 0 0 35 1-1.5 12 120

37 Pipauri Pipauri 14 1.2 23 2.25 162 2.5 44 3.5 32 252 8-10 0 0 91 1-1.5 28 120

38 Pratappur Majra Rampur Patarsa 5 1.2 8 2.25 57 2.5 16 3.5 12 90 8-10 0 0 35 1-1.5 8 120

39 Pratappur Sarsai Patarsa 12 1.2 20 2.25 137 2.5 37 3.5 28 210 8-10 0 0 77 1-1.5 24 120

40 Raikepur Raikepur 15 1.2 25 2.25 177 2.5 48 3.5 36 270 8-10 0 0 105 1-1.5 32 120

41 Ramaipur Ramaipur 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

42 Rampur Bhimsen Rampur Bhimsen 2 1.2 4 2.25 26 2.5 7 3.5 6 42 8-10 0 0 14 1-1.5 4 120

43 Rampur Khas Rampur Khas 2 1.2 3 2.25 22 2.5 6 3.5 4 36 8-10 0 0 14 1-1.5 4 120

44 Rautara Magrasa 4 1.2 6 2.25 43 2.5 12 3.5 8 66 8-10 0 0 28 1-1.5 8 120

45 Rautepur Rautepur 3 1.2 5 2.25 33 2.5 9 3.5 6 48 8-10 0 0 21 1-1.5 4 120

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 1 1.2 2 2.25 15 2.5 4 3.5 2 24 8-10 0 0 7 1-1.5 4 120

47 Saiyangojha Kurauna Bahadur Nagar 3 1.2 5 2.25 32 2.5 9 3.5 6 48 8-10 0 0 21 1-1.5 4 120

48 Sarneyat Pur Magrasa 1 1.2 1 2.25 10 2.5 3 3.5 2 18 8-10 0 0 7 1-1.5 0 120

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

50 Senpashchim Para Senpashchim Para 1 1.2 2 2.25 14 2.5 4 3.5 2 24 8-10 0 0 7 1-1.5 4 120

51 Shivrampur Bidhnoo 3 1.2 5 2.25 32 2.5 9 3.5 6 48 8-10 0 0 21 1-1.5 4 120

52 Singhpur Kathar Patarsa 5 1.2 9 2.25 64 2.5 17 3.5 12 96 8-10 0 0 35 1-1.5 12 120

53 Sona Sona 7 1.2 12 2.25 84 2.5 23 3.5 16 132 8-10 0 0 49 1-1.5 16 120

54 Surar Surar 21 1.2 35 2.25 246 2.5 67 3.5 50 378 8-10 0 0 140 1-1.5 44 120

55 Surjanpur Garhi Kanpur 4 1.2 7 2.25 47 2.5 13 3.5 10 72 8-10 0 0 28 1-1.5 8 120

56 Tikara Tikara 3 1.2 5 2.25 36 2.5 10 3.5 8 54 8-10 0 0 21 1-1.5 8 120

57 Tikari Raikepur 4 1.2 7 2.25 48 2.5 13 3.5 10 72 8-10 0 0 28 1-1.5 8 120

58 Uriyara Uriyara 3 1.2 5 2.25 38 2.5 10 3.5 8 60 8-10 0 0 21 1-1.5 8 120

395 1.2 663 2.25 4650 2.25 1263 3.5 930 7170 9 0 0 2674 1.25 800 120

Details Of Projected Productivity of Livestock Population in Pre Project Period of Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Desi

Total

S.

No.Name of Village

Name of

Gram Panchayat

Cow BuffaloOx/

Bull

Goat PigPoultry

OtherCrossed Desi Murrah Broiler Layers

Page 87

Page 88: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Kg. Nos. Kg. Nos. Kg. Nos. Eggs/L/y

1 Bahera Bahera 8 1.5 14 3 98 3 27 4 20 216 11-13 0 0 63 1-1.5 20 180

2 Bajpur Bajpur 10 1.5 17 3 120 3 32 4 24 264 11-13 0 0 77 1-1.5 24 180

3 Bani Bani 3 1.5 6 3 39 3 11 4 8 84 11-13 0 0 28 1-1.5 8 180

4 Bhailamau Bhailamau 13 1.5 21 3 146 3 39 4 30 324 11-13 0 0 91 1-1.5 28 180

5 Bharu Bharu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Bhaunti khera Bhaunti khera 3 1.5 6 3 35 3 10 4 8 78 11-13 0 0 21 1-1.5 8 180

7 Bhauti Pratappur Bhauti Pratappur 6 1.5 10 3 70 3 20 4 14 156 11-13 0 0 42 1-1.5 16 180

8 Bhisi Jargaon Bhisi Jargaon 8 1.5 14 3 97 3 27 4 20 216 11-13 0 0 63 1-1.5 20 180

9 Bhool Bhool 3 1.5 6 3 38 3 10 4 8 84 11-13 0 0 28 1-1.5 8 180

10 Chhitepur Pankabahadur Nagar 17 1.5 29 3 203 3 55 4 42 444 11-13 0 0 133 1-1.5 40 180

11 Dande Ka Purwa Neori 18 1.5 31 3 211 3 57 4 44 468 11-13 0 0 133 1-1.5 44 180

12 Dool Dool 10 1.5 15 3 109 3 29 4 22 240 11-13 0 0 70 1-1.5 24 180

13 Durjanpur Kurauna Bahadur Nagar 8 1.5 15 3 105 3 28 4 22 234 11-13 0 0 70 1-1.5 20 180

14 Fatehpur Dakshin Fatehpur Dakshin 7 1.5 13 3 87 3 24 4 18 192 11-13 0 0 56 1-1.5 16 180

15 Gadhewa Mohasinpur Gadhewa Mohasinpur 6 1.5 8 3 59 3 15 4 12 132 11-13 0 0 35 1-1.5 12 180

16 Gambhirpur Dakshin Patehuri 22 1.5 38 3 260 3 70 4 54 576 11-13 0 0 168 1-1.5 52 180

17 Garhi Kanpur Garhi Kanpur 10 1.5 17 3 116 3 32 4 24 258 11-13 0 0 77 1-1.5 24 180

18 Gopalpur Gopalpur 3 1.5 6 3 38 3 10 4 8 84 11-13 0 0 21 1-1.5 8 180

19 Jahanpur Magrasa 8 1.5 14 3 99 3 27 4 20 222 11-13 0 0 63 1-1.5 20 180

20 Jamoo Jamoo 3 1.5 4 3 32 3 8 4 6 72 11-13 0 0 21 1-1.5 8 180

21 Jhakara Rautepur 6 1.5 8 3 60 3 17 4 12 132 11-13 0 0 35 1-1.5 12 180

22 Kaindha Kaindha 29 1.5 48 3 336 3 91 4 70 738 11-13 0 0 217 1-1.5 68 180

23 Kanpur (MB) Kanpur (MB) 10 1.5 15 3 111 3 29 4 24 246 11-13 0 0 70 1-1.5 24 180

24 Kumhaupar Kasigawan 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Kurauna Bahadur Nagar Kurauna Bahadur Nagar 3 1.5 4 3 31 3 8 4 6 72 11-13 0 0 21 1-1.5 8 180

26 Lohar Khera Naurangabad 8 1.5 14 3 102 3 28 4 22 228 11-13 0 0 63 1-1.5 20 180

27 Magrasa Magrasa 10 1.5 17 3 122 3 34 4 26 270 11-13 0 0 77 1-1.5 24 180

28 Mardanpur Mardanpur 18 1.5 31 3 218 3 59 4 46 480 11-13 0 0 140 1-1.5 44 180

29 Matiyara Afjalpur 20 1.5 32 3 224 3 60 4 46 492 11-13 0 0 147 1-1.5 44 180

30 Meharban Singh Ka Purwa Meharban Singh Ka Purwa 77 1.5 129 3 906 3 246 4 188 1998 11-13 0 0 581 1-1.5 184 180

Details Of Projected Productivity of Livestock Population in Post Project Period of Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Goat PigPoultry

OtherDesi Crossed Desi Murrah Broiler LayersS.

No.Name of Village Name of Gram Panchayat

Cow BuffaloOx/

Bull

Page 88

Page 89: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Ltr. Nos. Kg. Nos. Kg. Nos. Kg. Nos. Eggs/L/y

31 Nakatoo Nakatoo 8 1.5 14 3 101 3 28 4 22 222 11-13 0 0 63 1-1.5 20 180

32 Nasenia Bahera 4 1.5 6 3 42 3 11 4 8 90 11-13 0 0 28 1-1.5 8 180

33 Neori Neori 14 1.5 24 3 169 3 46 4 36 372 11-13 0 0 112 1-1.5 36 180

34 Pankabahadur Nagar Pankabahadur Nagar 14 1.5 24 3 171 3 46 4 36 378 11-13 0 0 112 1-1.5 36 180

35 Patarsa Patarsa 1 1.5 3 3 17 3 4 4 4 36 11-13 0 0 14 1-1.5 4 180

36 Patehuri Patehuri 7 1.5 13 3 85 3 24 4 18 192 11-13 0 0 56 1-1.5 16 180

37 Pipauri Pipauri 20 1.5 32 3 227 3 62 4 48 504 11-13 0 0 147 1-1.5 48 180

38 Pratappur Majra Rampur Patarsa 7 1.5 11 3 80 3 22 4 16 174 11-13 0 0 49 1-1.5 16 180

39 Pratappur Sarsai Patarsa 17 1.5 28 3 192 3 52 4 40 426 11-13 0 0 126 1-1.5 40 180

40 Raikepur Raikepur 21 1.5 35 3 248 3 67 4 52 546 11-13 0 0 161 1-1.5 52 180

41 Ramaipur Ramaipur 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

42 Rampur Bhimsen Rampur Bhimsen 3 1.5 6 3 36 3 10 4 8 84 11-13 0 0 21 1-1.5 8 180

43 Rampur Khas Rampur Khas 3 1.5 4 3 31 3 8 4 6 72 11-13 0 0 21 1-1.5 8 180

44 Rautara Magrasa 6 1.5 8 3 60 3 17 4 12 132 11-13 0 0 35 1-1.5 12 180

45 Rautepur Rautepur 4 1.5 7 3 46 3 13 4 10 102 11-13 0 0 28 1-1.5 8 180

46 Sachendi Urf Chacheri Sachendi Urf Chacheri 1 1.5 3 3 21 3 6 4 4 48 11-13 0 0 14 1-1.5 4 180

47 Saiyangojha Kurauna Bahadur Nagar 4 1.5 7 3 45 3 13 4 10 96 11-13 0 0 28 1-1.5 8 180

48 Sarneyat Pur Magrasa 1 1.5 1 3 14 3 4 4 2 30 11-13 0 0 7 1-1.5 4 180

49 Sen Purab Para Sen Purab Para 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

50 Senpashchim Para Senpashchim Para 1 1.5 3 3 20 3 6 4 4 42 11-13 0 0 14 1-1.5 4 180

51 Shivrampur Bidhnoo 4 1.5 7 3 45 3 13 4 10 96 11-13 0 0 28 1-1.5 8 180

52 Singhpur Kathar Patarsa 7 1.5 13 3 90 3 24 4 18 198 11-13 0 0 56 1-1.5 20 180

53 Sona Sona 10 1.5 17 3 118 3 32 4 24 258 11-13 0 0 77 1-1.5 24 180

54 Surar Surar 29 1.5 49 3 344 3 94 4 72 762 11-13 0 0 224 1-1.5 72 180

55 Surjanpur Garhi Kanpur 6 1.5 10 3 66 3 18 4 14 144 11-13 0 0 42 1-1.5 12 180

56 Tikara Tikara 4 1.5 7 3 50 3 14 4 10 108 11-13 0 0 35 1-1.5 12 180

57 Tikari Raikepur 6 1.5 10 3 67 3 18 4 14 150 11-13 0 0 42 1-1.5 12 180

58 Uriyara Uriyara 4 1.5 7 3 53 3 14 4 12 120 11-13 0 0 35 1-1.5 12 180

553 1.5 931 3 6510 3 1769 4 1354 14382 12.00 0 0 4186 1.25 1332 180

Desi

Total

Crossed Desi Murrah Broiler Layers

Details Of Projected Productivity of Livestock Population in Post Project Period of Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

S.

No.Name of Village Name of Gram Panchayat

Cow BuffaloOx/

Bull

Goat PigPoultry

Other

Page 89

Page 90: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Type of Animal

Nos. Yield RateIncome

in Rs.Nos. Yield Rate

Income

in Rs.

Milch Animals

Cow 1058 1966 22 43252 1484 3623 27 97821

Buffalo 5913 14883 22 327426 8279 26606 27 718362

Animal for Other Purpose

Goat (Meat) 7170 64530 220 14196600 14382 172584 240 41420160

Pig (Meat) 0 0 55 0 0 0 60 0

Broiler (Meat) 2674 3343 70 234010 4186 5233 85 444805

Eggs 800 96000 3 288000 1332 239760 4 959040

TOTAL Income: 15089288 43640188

102438

10243

112681

19985630

8565270

Pre Project Post Project Total Human Population

Total Meat Production/Year 67873 177817 Assuming 10% increase

Kanpur Nagar

Milk in ltr. - Meat in kg. - Eggs in No. - Amount in Rs.

Pre and Post Income Status from Livestock under The Project Area of Rampur Bhimsen, IWMP-VIII

Pre Project Status Post Project Status

Population in Post project

Milk Production/head/day 0.164 0.268

Average Production Cost 70%

Net Profit 30% Net Increase in Income 28550900

Total Milk Production/day 16849 30229

Page 90

Page 91: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

DM

=5*2.5/100

in kg/day

Roughae

in kg/day

Straw

Dry M B

in kg/day

Bhusa

in kg/day

GF

DM Based

in kg/day

Green Fodder

in kg/day

Conceentr

ate

in kg/day

Total Fodder

Requirement

in Tonnes

(9+11)*365/1000

1 2 3 4 5 6 7 8 9 10 11 12 13

1 Draft Animal 930 300 279000 6975.00 4650.00 3100.00 3444.00 1550.00 6200.00 2325.00 3520.00

2 Buffaloes 5913 400 2365200 59130.00 39420.00 26280.00 29200.00 13140.00 52560.00 19710.00 29842.00

3 Indiginous Cow 395 300 118500 2963.00 1975.00 1317.00 1463.00 658.00 2632.00 988.00 1495.00

4 Cross Breed Cows 663 350 232050 5801.00 3867.00 2578.00 2864.00 1289.00 5156.00 1934.00 2927.00

5 Goat 7170 10 71700 1793.00 1195.00 797.00 886.00 398.00 1592.00 598.00 904.00

Total : 37857.00 68140.00 25555.00 38688.00

Status of Fodder Requirement, Availability and Deficit in the Project District-

Bbusa Green Fodder Concn Bbusa Green Fodder Concn Bbusa Green Fodder Concn

1 2 3 4 5 6 7 8 9 10

38688.00 8608.00 11316.00 5270.00 13818.00 24871.00 9328.00 5210.00 13555.00 4058.00

in % ---> 62.30 45.50 56.50 37.70 54.50 43.50

Feed requirement per day (dry matters in kg.) (6 x 6.875)

Rampur Bhimsen, IWMP-VIII Kanpur NagarLivestock population and Requirement of fodder in Project Area of

11

Based on

Body Weight

Sr. No. Category of

LivestockExisting Nos

Average

Body Weight

in kg

Total Body

Wt in kg

22823.00

Feed and Fodder requirement has been calculated on average body wt. of animals. Dry matter basis

Total Fodder

requirement

Tons/Year

Fodder Availability (Tons / Year) Fodder Requirement (Tons / Year) Deficit

(Tons / Year)

Total Deficit

(Tons / Year)

Kanpur NagarRampur Bhimsen, IWMP-VIII

Page 91

Page 92: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Amt in Rs.

Assetless Farmers LivestockTotal

Increase

18466500 129631800 28550900 176649200

1 1 0 0 0 0 0

2 2 0 0 0 0 0

3 3 12 2215980 15555816 3426108 21197904

4 4 16 2954640 20741088 4568144 28263872

5 5 20 3693300 25926360 5710180 35329840

6 6 24 4431960 31111632 6852216 42395808

7 7 28 5170620 36296904 7994252 49461776

Total 100 18466500 129631800 28550900 176649200

Income Projection for Assetless, Farmers and Livestock under the project for 7 years.

YearS.No.%

Increase

Page 92

Page 93: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S.No.

1

2

3

4

5

6

7

8

9

Problem Thrust Area of Livestock Production in the Project Area of Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Proposed Intervention

Breed improvement through Artificial Insemination (AI) and Natural Process (Buck/Bull).

Improvement/Replacement of existing breed of animals.

Provide Chaff Cutter

Distribution of Fodder Seed Kits

Formation and conduction of self help groups for socio-economic up-liftment.

Promoting dairy, goatary and poultry as main enterprise for the resource rich farmers

Introduction of improved breed of goats & control of internal parasite(Buck)

Promote practice of balance ration for cattle and buffaloes

Awareness about animal vaccination, Mineral mixture and green fodder.

Improvement of animal health through vaccination & deworming

Inadequate availability of Dry/GreenFodder

Low production of Milk & Meat

Lack of improved breed in animals.

Local and indigenous breeds.

Problem Thrust Area

Improper feeding practices

No use of supplementary feeds

Problems of infertility and balanced nutrition in dairy cattle and buffaloes.

Poor Facilities of Animal Health and Care (vaccination, de-worming and feeding)

Low Productivity of animals

Page 93

Page 94: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S.No.

¼1½ Date of PIA selection

¼2½ Nature of PIA U.P. State Government Department

¼3½ Name of PIA Bhumi Sanrakshan Adikari

¼4½ Designation and AddressBhumi Sanrakshan Adikari, Irrigation & Water Resources, 117/K/65A, R. S. Puram, Kakadev, Kanpur

Nagar

¼5½ Telephone No. 0512-2501919

¼6½ Fax No. -

¼7½ e-mail [email protected]

Details of PIA

Page 94

Page 95: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

7571849504, 9415353190

[email protected]

2 Shri Gyan Prakash Yadav Diploma In Civil Engg. 32 Year Junior Engineer 9454871001 24.03.1984

3 Sri Rakesh Kumar Srivastava Diploma In Civil Engg. 32 Year Junior Engineer 9198133840 26.06.1984

4 Sri Ravindra Bahadur Srivastav B.A. 35 Year Jiledar 9450209959 12.09.1981

5 Sri Dinesh Kumar M.A. 36 Year Draft Man 9839683414 08.02.1980

6 Sri Anil Kumar Srivastav B. Com. 35 Year Tracer 9858147100 04.02.1981

7 Sri Swadesh Mishra B.A. 16 Year Tracer 8090203310 22.07.2000

8 Sri Manish Singh B.sc (agri) & M.B.A 5 Year ASCI 8090901346 10.10.2011

9 Sir Raj Pratap Singh B sc (Ag.) 5 Year ASCI 9450889248 15.10.2011

10 Km. Upasna Singh B sc (Ag.) 5 Year ASCI 9452110931 18.10.2011

11 Smt. Santosh Kumari Rathore M.A. 21 Year Sr. Clerk 9450751848 29.04.1995

12 Sri Prabhat Pandey M.A. 5 Year Junior Clerk 9839112828 08.09.2011

13 Sri Pradeep Kumar Shukla Intermediates 626Year Munsi 7398589335 26.11.1990

14 Sri Sew Mangal M. Com. Year Munsi 9839282516 30.05.2003

15 Sri Shivnath Singh Chandel B.A. 31Year Seench Paryavekshak 9889415128 20.11.1985

16 Sri Ram Adhar Prajapati High School 32 Year Seench Paryavekshak 9452530544 20.11.1984

17 Sri Panna Lal Diwakar B. A. 29 Year Seench Paryavekshak 9956833224 03.02.1987

18 Sri Rakesh Kumar Sonkar Intermediates 29 Year Seench Paryavekshak 9450650106 05.02.1987

19 Sri Bal Mukund Tiwari Intermediate 31Year Seench Paryavekshak 9935410134 15.11.1985

20 Sri Sukhram Singh Intermediate 31 Year Seench Paryavekshak 9935326818 22.11.1985

21 Sri Om Prakesh Sukla B.A. 31Year Seench Paryavekshak 9839028562 15.11.1985

22 Sri Pramod Kumar Dwivedi M. A. B. Ed. 27 Year Seench Pal 9839371276 01.05.1989

23 Sri Ratan Kumar Mishra Intermediate 39 Year Seench Pal 9415078219 23.05.1977

24 Smt. Asha Sukla Intermediate 18 Year Seench Pal 9415431820 07.08.1998

25 Sri Chandra Prakash Misra B. Com. 27 Year Seench Pal 7398042025 09.05.1989

26 Sri Kamalas Kumar Intermediate 30 Year Seench Pal 9451425911 18.11.1985

27 Sri Dhirendra Singh BA 30 Year Runner 9793452909 12.03.1987

28 Sri Ashish Kumar Mishra Intermediate 11 Year Peon 8127291239 25.03.2006

29 Sri Pradeep Kumar High School 3 Year Peon 9838634303 30.05.2014

30 Smt. Nasaren Jaha High School 4Year Peon 7388343923 12.12.2012

31 Mo. Aariph Class 8 28 Year Peon 9889021732 05.06.1989

Contact NO. & e-mail Date of Joining

Details of PIA's Staff, District-

Sri. P.N. Singh Diploma In Civil Engg. 39 YearBhoomi Sanrakshan

Adhikari08.09.1978

Sr. No. Name Qualification Experience (Yrs.) Designation

Kanpur Nagar

1

Page 95

Page 96: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Sr. No. Name Qualification Experience (Yrs.) Designation Contact NO. & e-mail Date of Joining

1 Dr. Manoj Kumar mall Visen Ph.D. Ag. (SCWM) 7 Technical Expert9918121010.

manojr.mall1982@gmail com21.07.2012

2 Kum. Preeti Nigam PCC, Copa Cource ITI, B.A. 4 Computer Operator 8765053910 01.09.2013

Sr. No. Name Qualification Experience Designation Contact NO. & e-mail Date of Joining

1 Sri Rakesh Kumar Trivedi B. Sc. (Agriculture) 4 WDT Member 860451675518.05.2012to 04.06.2015 &

22.08.2016 to till date

2 Kum. Poonam Gautam M.A. (Sociology) 4 WDT Member 893304167729.08.2012to 04.06.2015 &

22.08.2016 to till date

2 Kum. Poonam Gautam M.A. (Sociology) 4 WDT Member 893304167729.08.2012to 04.06.2015 &

22.08.2016 to till date

Details of WCDC's Staff, District- Kanpur Nagar

Details of WDT Attached with PIA, District : Kanpur Nagar

Page 96

Page 97: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Ass

etl

ee

Mar

gin

al

Smal

l

Larg

e

WD

T

Total SC OBC Gen. Total

Pri

mar

y

Jr. H

S

HS

Inte

r

Gra

du

ate

PG

Lite

rate

Ilit

era

te

Total

Wo

me

n

GP

me

mb

er

SHG

Me

mb

er

UG

Me

mb

er

1 Bhailamau Smt. Jaishri Sri Manoj Kumar 3 4 2 1 1 11 2 5 4 11 1 3 2 2 2 1 11 2 4 3 2

2 Bhaunti khera Smt. Susita Devi Sri Balwant Kumar 3 4 2 1 1 11 2 5 4 11 2 1 2 3 2 1 11 3 3 3 2

3 Bhisi Jargaon Sri Rajendra Singh Sri Arvind Singh 3 4 2 1 1 11 2 5 4 11 3 2 0 3 3 11 3 3 3 2

4 Bhauti Pratappur Sri Ram Bhadur Singh Sri Sonu Duba 3 4 2 1 1 11 2 5 4 11 2 1 1 4 2 1 11 3 3 3 2

5 Dool Sri Ram Sawrup Sri Santosh Singh 3 4 2 1 1 11 2 5 4 11 4 3 2 1 1 11 2 4 3 2

6 Fatehpur Dakshin Smt. Deepa Singh Smt. Rinka Singh 3 4 2 1 1 11 2 5 4 11 2 2 1 2 3 1 0 11 2 4 3 2

7 Gopalpur Sri Kailash Pal Sri Shyamsudar 3 4 2 1 1 11 2 5 4 11 3 2 2 2 1 1 11 3 3 3 2

8 Gadhewa Mohasinpur Sri Indra Pal Sri Raj Bahadur 3 4 2 1 1 11 2 5 4 11 4 2 3 2 11 2 4 3 2

9 Garhi Kanpur Sri Ajay Kushwaha Sri Ravendra Kumar 3 4 2 1 1 11 2 5 4 11 2 2 1 2 2 2 11 2 4 3 2

10 Kurauna Bahadur Nagar Sri Mardaan Singh Sri Ram Murat 3 4 2 1 1 11 2 5 4 11 1 2 2 3 2 1 11 2 4 3 2

11 Magrasa Smt Kamla Devi Sri Deepnarayan 3 4 2 1 1 11 2 5 4 11 2 2 1 2 3 1 11 2 4 3 2

12 Neori Sri Auran Kunar Sri Ram Kumar 3 4 2 1 1 11 2 5 4 11 2 3 1 2 1 2 11 2 4 3 2

13 Patehuri Smt. Raj Rani Sri Gayan Babu 3 4 2 1 1 11 2 5 4 11 2 3 1 2 2 1 11 3 3 3 2

14 Pipauri Smt Nirmala Devi Sri Jeet Kumar 3 4 2 1 1 11 2 5 4 11 3 3 3 2 11 3 3 3 2

15 Patarsa Smt. Sharda Devi Sri Anil Kumar 3 4 2 1 1 11 2 5 4 11 3 2 2 3 1 11 3 3 3 2

16 Pankabahadur Nagar Smt. Jaishri Sri Manoj 3 4 2 1 1 11 2 5 4 11 2 2 3 3 1 11 3 3 3 2

17 Rampur Bhimsen Smt Sangita Devi Sri Sanjay 3 4 2 1 1 11 2 5 4 11 3 3 2 2 1 11 2 4 3 2

18 Rampur Khas Sri Shiv Prakash Sri Rajesh Trivedi 3 4 2 1 1 11 2 5 4 11 2 3 3 3 11 3 3 3 2

19 Ramaipur Dr. Sangram Singh Sri Aruind Kumar 3 4 2 1 1 11 2 5 4 11 2 2 4 2 1 11 2 4 3 2

20 Rautepur Smt. Phoomati Sri Rajnarayan 3 4 2 1 1 11 2 5 4 11 2 2 3 3 1 11 2 4 3 2

21 Raikepur Sri Kamalash Sri Umrandr 3 4 2 1 1 11 2 5 4 11 3 1 1 2 2 2 11 3 3 3 2

22 Sen Purab Para Sri Ghanshyam Sri Mahesh 3 4 2 1 1 11 2 5 4 11 3 3 1 2 2 11 2 4 3 2

23 Senpashchim Para Smt. Ramkali Sri Govind 3 4 2 1 1 11 2 5 4 11 3 3 1 3 1 11 2 4 3 2

24 Sachendi Urf Chacheri Smt Meena Singh Sri Dhruva Naryan 3 4 2 1 1 11 2 5 4 11 2 3 2 1 1 2 11 2 4 3 2

25 Surar Sri Ramkaran Yadav Sri Harihom 3 4 2 1 1 11 2 5 4 11 2 2 2 1 2 2 11 2 4 3 2

26 Uriyara Sri Satendra Singh Sri Mahesh Yadav 3 4 3 2 1 13 2 5 4 11 3 3 0 2 2 0 3 0 13 4 4 3 2

TOTAL : 78 104 53 27 26 288 52 130 104 286 63 60 21 61 54 1 27 1 288 64 94 78 52

List of WC Member are given in Project File

Composition

of WCCategory Wise Caste wise Qualification Wise

Details of Watershed Committee formed at Gram Panchayat Level under Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

S. No.Name of Watershed

CommitteeName of Chairman Name of Secretary

Category wise Details of Members (in numbers)

Page 97

Page 98: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

With only Men With only Women With Both Total

1 Bhailamau 0 2 2 4 40 4 24

2 Bhaunti khera 0 1 2 3 30 4 24

3 Bhisi Jargaon 0 1 2 3 30 4 24

4 Bhauti Pratappur 1 4 3 8 80 8 48

5 Dool 2 6 2 10 100 9 54

6 Fatehpur Dakshin 0 1 2 3 30 5 307 Gopalpur 1 3 1 5 50 5 308 Gadhewa Mohasinpur 0 1 2 3 30 2 12

9 Garhi Kanpur 1 3 1 5 50 4 24

10 Kurauna Bahadur Nagar 0 1 2 3 30 4 24

11 Magrasa 1 4 3 8 80 5 30

12 Neori 0 1 2 3 30 4 24

13 Patehuri 0 2 2 4 40 3 18

14 Pipauri 1 4 2 7 70 11 66

15 Patarsa 1 4 2 7 70 5 30

16 Pankabahadur Nagar 1 3 1 5 50 5 30

17 Rampur Bhimsen 2 6 3 11 110 9 54

18 Rampur Khas 1 4 2 7 70 4 24

19 Ramaipur 2 6 2 10 100 11 66

20 Rautepur 1 4 2 7 70 10 60

21 Raikepur 1 4 2 7 70 9 54

22 Sen Purab Para 3 9 3 15 150 17 102

23 Senpashchim Para 2 6 3 11 110 7 42

24 Sachendi Urf Chacheri 0 1 2 3 30 3 18

25 Surar 2 7 3 12 120 21 126

26 Uriyara 1 3 1 5 50 6 36

24 91 54 169 1690 179 1074* 05 No. of Farmer's Producer Organisation (FPO) will be promoted/Formed by SLNA on Cluster/Project Basis under the component of I & CB fund.

TOTAL :

GP/WC wise Details of Self Help Groups (SHGs) and User's Groups (UGs) Proposed to be Formed in the project

S.

No. Name of GP

Total No. of SHGs Number of SHGs

MembersTotal No. of UGs

Number of UGs

Members

Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Page 98

Page 99: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

100

Installment Year Agency Administration Monitoring Evaluation EPA I & CB DPR Livelihood

Production Sys.

& Micro-

enterprises

Watershed

Develoment

Works

Consolidation TOTAL

SLNA 0.150 0.150

WCDC 0.150 0.150

PIA 0.250 4.000 0.200 1.000 5.450

WC 0.250 0.250

TOTAL 0.500 0.000 0.000 4.000 0.500 1.000 0.000 0.000 0.000 0.000 6.000

SLNA 0.050 0.300 0.050 0.400

WCDC 0.100 0.350 0.450

PIA 0.750 0.050 2.100 4.900

WC 0.750 1.000 1.000 7.500 8.250

TOTAL 1.500 0.200 0.300 0.000 2.500 0.000 1.000 1.000 7.500 0.000 14.000

SLNA 0.040 0.175 0.050 0.270

WCDC 0.100 0.125 0.230

PIA 1.350 0.060 0.575 6.990

WC 1.350 2.500 2.500 16.175 17.530

TOTAL 2.700 0.200 0.175 0.000 0.750 0.000 2.500 2.500 16.175 0.000 25.020

SLNA 0.040 0.175 0.050 0.270

WCDC 0.100 0.125 0.230

PIA 1.350 0.060 0.575 6.990

WC 1.350 2.500 2.500 16.175 17.530

TOTAL 2.700 0.200 0.175 0.000 0.750 0.000 2.500 2.500 16.175 0.000 25.020

SLNA 0.080 0.350 0.100 0.530

WCDC 0.200 0.150 0.100 0.450

PIA 1.300 0.120 0.350 0.200 8.970

WC 1.300 3.000 4.000 16.150 2.600 20.050

TOTAL 2.600 0.400 0.350 0.000 0.500 0.000 3.000 4.000 16.150 3.000 30.000

SLNA 0 0.210 1.000 0 0.300 0 0 0 0 0.100 1.620

WCDC 0 0.500 0 0 0.900 0 0 0 0 0.100 1.510

PIA 5.000 0.290 0 4.000 3.800 1.000 0 0 0 0.200 33.300

WC 5.000 0 0 0 0 0 9.000 10.000 56.000 2.600 63.610

TOTAL 10.000 1.000 1.000 4.000 5.000 1.000 9.000 10.000 56.000 3.000 100.000

IIIr

d

Inst

allm

ent

30

% V Year (30%)

TOTAL (100%)

YEARWISE FINANCIAL BREAK-UP (in %) OF VARIOUS COMPONENT At VARIOUS LEVEL UNDER IWMP SCHEME% of Sanctioned Amount in Lakhs :

Ist

Inst

allm

ent

20

% Ist Year 6%

IInd Year 14%

IIn

d In

stal

lmen

t

50

%

III Year (25%)

IV Year (25%)

Page 99

Page 100: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

ifj;kstuk District- Kanpur Nagar 5705.00 684.60

;kstuk ds pj.k o"kZ laLFkk iz'kklfud

10%

fuxjkuh

¼ekfuVfjax½

1%

ewY;kadu

1%

bZ0ih0,0

4%

vkbZ0 ,s.M lh0ch0

5% Mh0ih0vkj0 1%

vkthfodk

izcU/ku

9%

mRiknu iz.kkyh

rFkk vfr lw{e

m|e 10%

dk;Z en

56%

dUlksfyMs'ku

3%

;ksx

100%

SLNA 1.027 1.027

WCDC 1.027 1.027

PIA 1.712 27.384 1.369 6.846 37.311

WC 1.712 1.712

TOTAL 3.423 0 0 27.384 3.423 6.846 0 0 0 0 41.076

SLNA 0.342 2.054 0.342 2.738

WCDC 0.685 2.396 3.081

PIA 5.135 0.342 14.377 19.853

WC 5.135 6.846 6.846 51.345 70.172

TOTAL 10.269 1.369 2.054 0.000 17.115 0 6.846 6.846 51.345 0 95.844

SLNA 0.274 1.198 0.342 1.814

WCDC 0.685 0.856 1.540

PIA 9.242 0.411 3.936 13.589

WC 9.242 17.115 17.115 110.734 154.206

TOTAL 18.484 1.369 1.198 0.000 5.135 0 17.115 17.115 110.734 0 171.150

SLNA 0.274 1.198 0.342 1.814

WCDC 0.685 0.856 1.540

PIA 9.242 0.411 3.936 13.589

WC 9.242 17.115 17.115 110.734 154.206

TOTAL 18.484 1.369 1.198 0.000 5.135 0 17.115 17.115 110.734 0 171.150

SLNA 0.548 2.396 0.685 3.628

WCDC 1.369 1.027 0.685 3.081

PIA 8.900 0.822 2.396 1.369 13.487

WC 8.900 20.538 27.384 110.563 17.800 185.184

TOTAL 17.800 2.738 2.396 0.000 3.423 0.000 20.538 27.384 110.563 20.538 205.380

SLNA 0 1.438 6.846 0 2.054 0 0 0 0 0.685 11.022

WCDC 0 3.423 0 0 6.161 0 0 0 0 0.685 10.269

PIA 34.230 1.985 0 27.384 26.015 6.846 0 0 0 1.369 97.829

WC 34.230 0 0 0 0 0 61.614 68.460 383.376 17.800 565.480

TOTAL 68.460 6.846 6.846 27.384 34.230 6.846 61.614 68.460 383.376 20.538 684.600

vkbZ0MCY;w0,e0ih0 ;kstukUrxZr okf"kZd vk/kkj fofHkUu ?kVkdksa esa laLFkkxr Lrj ij ns; /kujkf'k dk fooj.k yk[k esa

fu;ksftr {ks0 gs0 esa Sanctioned Amount Rs. In LakhsRampur Bhimsen, IWMP-VIII

YEARWISE FINANCIAL BREAK-UP (in Lakhs) OF VARIOUS COMPONENT At VARIOUS LEVEL UNDER IWMP SCHEME Rampur Bhimsen, IWMP-VIII Kanpur Nagar

lesdu pj.k 30%

(Consolidation

Phase 30%)

Vth Year

iape o"kZ 30%

;ksx (100%)

Ist Year

izFke o"kZ 6%

IInd Year

f}rh; o"kZ 14%

okVj'ksM dk;Z pj.k

50% (Work

Phase 50%)

IIIrd Year

rr̀h; o"kZ 25%

IVth Year

prqFkZ o"kZ 25%

izkjfEHkd pj.k 20%

(Preparatoy

Phase 20%)

Page 100

Page 101: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Kanpur Nagar

Sr.

No.MWS Code Name of MWS

Geographical

Area

Planned

Area

EPA

4%

DPR

1%

I&CB

5%

Monitoring

@1%

Evaluation

1%

Administration

10%

LA

@ 9%

PSME

@10%

WDW

@56%

Consolidation

@3%

Total

@ 100%

1 2B3C1f1a Gopalpur 823.37 455 2.184 0.546 2.73 0.546 0.546 5.46 4.914 5.46 30.576 1.638 54.60

2 2B3C1f1b Rampur Bhimsen 1334.45 760 3.648 0.912 4.56 0.912 0.912 9.12 8.208 9.12 51.072 2.736 91.20

3 2B3C1f2a Pankabahadur Nagar 599.96 362 1.7376 0.434 2.172 0.4344 0.4344 4.344 3.9096 4.344 24.3264 1.3032 43.44

4 2B3C1f2b Bhouti Pratappur 548.21 310 1.488 0.372 1.86 0.372 0.372 3.72 3.348 3.72 20.832 1.116 37.20

5 2B3C1f2c Surar 860.85 470 2.256 0.564 2.82 0.564 0.564 5.64 5.076 5.64 31.584 1.692 56.40

6 2B3C1d2a Oriyara 690.64 442 2.1216 0.53 2.652 0.5304 0.5304 5.304 4.7736 5.304 29.7024 1.5912 53.04

7 2B3C1d2b Sen Purab Para 888.76 490 2.352 0.588 2.94 0.588 0.588 5.88 5.292 5.88 32.928 1.764 58.80

8 2B3C1d2c Pipori 827.01 455 2.184 0.546 2.73 0.546 0.546 5.46 4.914 5.46 30.576 1.638 54.60

9 2B3C1d3a Magrasa 911.82 506 2.4288 0.607 3.036 0.6072 0.6072 6.072 5.4648 6.072 34.0032 1.8216 60.72

10 2B3C1d3b Sen Pashimpara 867.66 480 2.304 0.576 2.88 0.576 0.576 5.76 5.184 5.76 32.256 1.728 57.60

11 2B3C2a2a Rautepur 392.42 210 1.008 0.252 1.26 0.252 0.252 2.52 2.268 2.52 14.112 0.756 25.20

12 2B3C2a2b Raikepur 369.05 170 0.816 0.204 1.02 0.204 0.204 2.04 1.836 2.04 11.424 0.612 20.40

13 2B3C2a3a Dool-Pratham 536.01 295 1.416 0.354 1.77 0.354 0.354 3.54 3.186 3.54 19.824 1.062 35.40

14 2B3C2a3b Dool-Dwitiya 537.59 300 1.44 0.36 1.8 0.36 0.36 3.6 3.24 3.6 20.16 1.08 36.00

10187.80 5705 27.38 6.85 34.23 6.85 6.85 68.46 61.61 68.46 383.38 20.54 684.60TOTAL :

District-

Planned Area in ha : (Area in ha, Amount in Lakhs)

Rampur Bhimsen, IWMP-VIIIAvailability of Fund At Micro Watershed Level Under The Project of-5705.00

Page 101

Page 102: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

S. No. Installment Year

Ad

min

istr

ati

ve

10

%

EP

A 4

%

Inst

itu

tio

n

an

d C

B 5

%

DP

R 1

%

Wa

ters

hed

dev

elo

pm

ent

wo

rk 5

0%

Liv

elih

oo

d f

or

ass

etle

ss 9

%

Pro

du

ctio

n s

yst

em a

nd

Mic

roen

terp

rise

s10

%

Mo

nit

ori

ng

1%

Ev

alu

ati

on

1%

Co

nso

lid

ati

on

3%

To

tal

10

0%

1 Ist Phase Ist Year 0.5 4 0.5 1 0 0 0 0 0 0 6

IInd Year 1.5 0 2.5 0 7.5 1 1 0.2 0.3 0 14

2 II nd Phase IIIrd Year 2.7 0 0.75 0 16.175 2.5 2.5 0.2 0.175 0 25

IVth Year 2.7 0 0.75 0 16.175 2.5 2.5 0.2 0.175 0 25

3 III rd Phase Vth Year 2.6 0 0.5 0 16.15 3 4 0.4 0.35 3 30

TOTAL : 10 4 5 1 56 9 10 1 1 3 100

Amount in %

YEARWISE FINANCIAL BREAKUP (in%) OF VARIOUS COMPONENT UNDER Kanpur NagarRampur Bhimsen, IWMP-VIII

Page 102

Page 103: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

5705.00 684.60

S. No. Installment Year

Ad

min

istr

ati

ve

10

%

EP

A 4

%

Inst

itu

tio

n

an

d C

B 5

%

DP

R 1

%

Wa

ters

hed

dev

elo

pm

ent

wo

rk 5

0%

Liv

elih

oo

d f

or

ass

etle

ss 9

%

Pro

du

ctio

n s

yst

em a

nd

Mic

roen

terp

rise

s10

%

Mo

nit

ori

ng

1%

Ev

alu

ati

on

1%

Co

nso

lid

ati

on

3%

To

tal

10

0%

1 Ist Phase Ist Year 3.4230 27.3840 3.4230 6.8460 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 41.08

IInd Year 10.2690 0.0000 17.1150 0.0000 51.3450 6.8460 6.8460 1.3692 2.0538 0.0000 95.84

2 II nd Phase IIIrd Year 18.4842 0.0000 5.1345 0.0000 110.7341 17.1150 17.1150 1.3692 1.1981 0.0000 171.15

IVth Year 18.4842 0.0000 5.1345 0.0000 110.7341 17.1150 17.1150 1.3692 1.1981 0.0000 171.15

3 III rd Phase Vth Year 17.7996 0.0000 3.4230 0.0000 110.5629 20.5380 27.3840 2.7384 2.3961 20.5380 205.38

TOTAL : 68.46 27.38 34.23 6.85 383.38 61.61 68.46 6.85 6.85 20.54 684.60

Area in ha Amount in Lakhs

YEARWISE FINANCIAL BREAKUP OF VARIOUS COMPONENT UNDER Kanpur NagarRampur Bhimsen, IWMP-VIII

Page 103

Page 104: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

Area in ha : 5705.00 Amount in Lacs : 684.60

S. No. Budget Component %

A. Management Cost

1. Administrative 10

2. Monitoring 1

3. Evaluation 1

SUB TOTAL : 12

B. Preparatory Phase

1. Entry Point Activities 4

2. Institution & Capacity Building 5

3. Detailed Project Report (DPR) 1

SUB TOTAL : 10

C. Watershed Work Phase

1. Livelihood Activities for the Asset less Person 9

2. Production System and Micro-enterprises 10

3. Watershed Development Works 56

SUB TOTAL : 75

D. Consolidation Phase 3

Grand Total : 100

Rampur Bhimsen, IWMP-VIII% of Budget for Various Components Under

6846000.00 68.46

684600.00 6.85

Total Amount (in Rs.) Total Amount (In Lakhs)

684600.00 6.85

8215200.00 82.15

2738400.00 27.38

3423000.00 34.23

684600.00 6.85

6846000.00 68.46

6161400.00 61.61

6846000.00 68.46

68460000.00 684.60

38337600.00 383.38

51345000.00 513.45

2053800.00 20.54

Page 104

Page 105: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar Treatable Area : 5705.00

S. No. Name of WCTraetable Area

in ha

LA

@ 9%

PSME

@10%

WDW

@56%

Consolidation

@2.6%

Total

@ 77.6%

1 Bhailamau 125 1.3500 1.5000 8.4000 0.3900 11.6400

2 Bhaunti khera 74 0.7992 0.8880 4.9728 0.2309 6.8909

3 Bhisi Jargaon 107 1.1556 1.2840 7.1904 0.3338 9.9638

4 Bhauti Pratappur 302 3.2616 3.6240 20.2944 0.9422 28.1222

5 Dool 360 3.8880 4.3200 24.1920 1.1232 33.5232

6 Fatehpur Dakshin 99 1.0692 1.1880 6.6528 0.3089 9.2189

7 Gopalpur 169 1.8252 2.0280 11.3568 0.5273 15.7373

8 Gadhewa Mohasinpur 70 0.7560 0.8400 4.7040 0.2184 6.5184

9 Garhi Kanpur 150 1.6200 1.8000 10.0800 0.4680 13.9680

10 Kurauna Bahadur Nagar 112 1.2096 1.3440 7.5264 0.3494 10.4294

11 Magrasa 305 3.2940 3.6600 20.4960 0.9516 28.4016

12 Neori 104 1.1232 1.2480 6.9888 0.3245 9.6845

13 Patehuri 125 1.3500 1.5000 8.4000 0.3900 11.6400

14 Pipauri 238 2.5704 2.8560 15.9936 0.7426 22.1626

15 Patarsa 236 2.5488 2.8320 15.8592 0.7363 21.9763

16 Pankabahadur Nagar 156 1.6848 1.8720 10.4832 0.4867 14.5267

17 Rampur Bhimsen 384 4.1472 4.6080 25.8048 1.1981 35.7581

18 Rampur Khas 220 2.3760 2.6400 14.7840 0.6864 20.4864

19 Ramaipur 334 3.6072 4.0080 22.4448 1.0421 31.1021

20 Rautepur 212 2.2896 2.5440 14.2464 0.6614 19.7414

21 Raikepur 229 2.4732 2.7480 15.3888 0.7145 21.3245

22 Sen Purab Para 510 5.5080 6.1200 34.2720 1.5912 47.4912

23 Senpashchim Para 413 4.4604 4.9560 27.7536 1.2886 38.4586

24 Sachendi Urf Chacheri 83 0.8964 0.9960 5.5776 0.2590 7.7290

25 Surar 427 4.6116 5.1240 28.6944 1.3322 39.7622

26 Uriyara 161 1.7388 1.9320 10.8192 0.5023 14.9923

5705 61.614 68.46 383.376 17.7996 531.2496TOTAL :

Availability of Fund At Watershed Committee Level Formed At Gram Panchayat Level Under The Project of

ha (Area in ha, Amount in Lakhs)Rampur Bhimsen, IWMP-VIII

Page 105

Page 106: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

LA

(1%

)

PS

ME

(1%

)

WD

W (

7.5

%)

LA

(2.5

%)

PS

ME

(2.5

%)

WD

W (

16.1

75%

)

LA

(2.5

%)

PS

ME

(2.5

%)

WD

W (

16.1

75%

)

LA

(3%

)

PS

ME

(4%

)

WD

W (

16.1

50%

)

Co

nso

lid

ati

on

LA

(9%

)

PS

ME

(10%

)

WD

W (

56%

)

Co

nso

lid

ati

on

(2.6

%)

1 Bhailamau 125 0.150 0.150 1.125 0.375 0.375 2.426 0.375 0.375 2.426 0.450 0.600 2.423 0.390 1.350 1.500 8.400 0.390 11.640

2 Bhaunti khera 74 0.089 0.089 0.666 0.222 0.222 1.436 0.222 0.222 1.436 0.266 0.355 1.434 0.231 0.799 0.888 4.973 0.231 6.891

3 Bhisi Jargaon 107 0.128 0.128 0.963 0.321 0.321 2.077 0.321 0.321 2.077 0.385 0.514 2.074 0.334 1.156 1.284 7.190 0.334 9.964

4 Bhauti Pratappur 302 0.362 0.362 2.718 0.906 0.906 5.862 0.906 0.906 5.862 1.087 1.450 5.853 0.942 3.262 3.624 20.294 0.942 28.122

5 Dool 360 0.432 0.432 3.240 1.080 1.080 6.988 1.080 1.080 6.988 1.296 1.728 6.977 1.123 3.888 4.320 24.192 1.123 33.523

6 Fatehpur Dakshin 99 0.119 0.119 0.891 0.297 0.297 1.922 0.297 0.297 1.922 0.356 0.475 1.919 0.309 1.069 1.188 6.653 0.309 9.219

7 Gopalpur 169 0.203 0.203 1.521 0.507 0.507 3.280 0.507 0.507 3.280 0.608 0.811 3.275 0.527 1.825 2.028 11.357 0.527 15.737

8 Gadhewa Mohasinpur 70 0.084 0.084 0.630 0.210 0.210 1.359 0.210 0.210 1.359 0.252 0.336 1.357 0.218 0.756 0.840 4.704 0.218 6.518

9 Garhi Kanpur 150 0.180 0.180 1.350 0.450 0.450 2.912 0.450 0.450 2.912 0.540 0.720 2.907 0.468 1.620 1.800 10.080 0.468 13.968

10 Kurauna Bahadur Nagar112 0.134 0.134 1.008 0.336 0.336 2.174 0.336 0.336 2.174 0.403 0.538 2.171 0.349 1.210 1.344 7.526 0.349 10.429

11 Magrasa 305 0.366 0.366 2.745 0.915 0.915 5.920 0.915 0.915 5.920 1.098 1.464 5.911 0.952 3.294 3.660 20.496 0.952 28.402

12 Neori 104 0.125 0.125 0.936 0.312 0.312 2.019 0.312 0.312 2.019 0.374 0.499 2.016 0.324 1.123 1.248 6.989 0.324 9.684

13 Patehuri 125 0.150 0.150 1.125 0.375 0.375 2.426 0.375 0.375 2.426 0.450 0.600 2.423 0.390 1.350 1.500 8.400 0.390 11.640

14 Pipauri 238 0.286 0.286 2.142 0.714 0.714 4.620 0.714 0.714 4.620 0.857 1.142 4.612 0.743 2.570 2.856 15.994 0.743 22.163

15 Patarsa 236 0.283 0.283 2.124 0.708 0.708 4.581 0.708 0.708 4.581 0.850 1.133 4.574 0.736 2.549 2.832 15.859 0.736 21.976

16 Pankabahadur Nagar 156 0.187 0.187 1.404 0.468 0.468 3.028 0.468 0.468 3.028 0.562 0.749 3.023 0.487 1.685 1.872 10.483 0.487 14.527

17 Rampur Bhimsen 384 0.461 0.461 3.456 1.152 1.152 7.453 1.152 1.152 7.453 1.382 1.843 7.442 1.198 4.147 4.608 25.805 1.198 35.758

18 Rampur Khas 220 0.264 0.264 1.980 0.660 0.660 4.270 0.660 0.660 4.270 0.792 1.056 4.264 0.686 2.376 2.640 14.784 0.686 20.486

19 Ramaipur 334 0.401 0.401 3.006 1.002 1.002 6.483 1.002 1.002 6.483 1.202 1.603 6.473 1.042 3.607 4.008 22.445 1.042 31.102

20 Rautepur 212 0.254 0.254 1.908 0.636 0.636 4.115 0.636 0.636 4.115 0.763 1.018 4.109 0.661 2.290 2.544 14.246 0.661 19.741

21 Raikepur 229 0.275 0.275 2.061 0.687 0.687 4.445 0.687 0.687 4.445 0.824 1.099 4.438 0.714 2.473 2.748 15.389 0.714 21.324

22 Sen Purab Para 510 0.612 0.612 4.590 1.530 1.530 9.899 1.530 1.530 9.899 1.836 2.448 9.884 1.591 5.508 6.120 34.272 1.591 47.491

23 Senpashchim Para 413 0.496 0.496 3.717 1.239 1.239 8.016 1.239 1.239 8.016 1.487 1.982 8.004 1.289 4.460 4.956 27.754 1.289 38.459

24 Sachendi Urf Chacheri 83 0.100 0.100 0.747 0.249 0.249 1.611 0.249 0.249 1.611 0.299 0.398 1.609 0.259 0.896 0.996 5.578 0.259 7.729

25 Surar 427 0.512 0.512 3.843 1.281 1.281 8.288 1.281 1.281 8.288 1.537 2.050 8.275 1.332 4.612 5.124 28.694 1.332 39.762

26 Uriyara 161 0.193 0.193 1.449 0.483 0.483 3.125 0.483 0.483 3.125 0.580 0.773 3.120 0.502 1.739 1.932 10.819 0.502 14.992

5705 6.85 6.85 51.35 17.12 17.12 110.73 17.12 17.12 110.73 20.54 27.38 110.56 17.80 61.61 68.46 383.38 17.80 531.25TOTAL :

S. No. Name of WC

Treatable

Area

in ha

IInd Year

District- Kanpur NagarRampur Bhimsen,

IWMP-VIII

IIIrd Year IVth Year Vth Year Total

Gra

nd

To

tal

(77.6

%)

WC wise Yearly availability of Fund Under Various Components of IWMP (Amount in Lakhs)

Page 106

Page 107: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Sr. No. MWS Code Name of MWSGeographical

Area

Planned

Area

Amount

ReleasedVillage EPA Work Khasra No.

Expenditure

(Lakhs)Balance

1 2 3 4 5 6 7 8 9 10 11

1 2B3C1d2a Uriyara 690.64 442.00 2.122 Driyara Pond 458/461 2.100

690.64 442.00 2.122 2.100 0.022

2 2B3C1d2b Sen Purab Para 888.76 490.00 2.352 Dhauri Pond 1556 2.321

888.76 490.00 2.352 2.321 0.031

3 2B3Cad2c Pipauri 827.01 455.00 2.184 Pipauri Culvart - 1.865

827.01 455.00 2.184 1.865 0.319

Jahanpur FLoor Reparing - 1.489

4 Solar Light - 0.956

911.82 506.00 2.429 2.445 -0.016

5 2B3C1d3b Sen Pashchim Para 867.66 480.00 2.304 Dhukaha Pond 144 2.289

867.66 480.00 2.304 2.289 0.015

6 2B3C1f1a Gopalpur 823.37 455.00 2.184 Hridayapur Pond 262 2.168

823.37 455.00 2.184 2.168 0.017

7 2B3C1f1b Rampur Bhimsen 1334.45 760.00 3.648 Rampur Bhimsen

4 Culvart, Hand

Pump Platform, 39

M. Pucci Gul

- 3.957

1334.45 760.00 3.648 3.957 -0.309

8 2B3C1f2aPankabahadur

Nagar599.96 362.00 1.738 Bhailamau 2 Well Reparing - 1.495

599.96 362.00 1.738 1.495 0.243

Surar Pond 1123 2.249

860.85 470.00 2.256 2.249 0.007

Rautepur Pond 631 0.995

392.42 210.00 1.008 0.995 0.014

Raikepur 5 Solar Light - 1.140

369.05 170.00 0.816 1.140 -0.324

Sub Total :

1.008392.42

Rampur Bhimsen, IWMP-VIII Kanpur NagarDetails of EPA Activities Executed under Project Area

Sub Total :

2.429

Sub Total :

Sub Total :

Sub Total :

170.00 0.816

4 2B3C1d3a Magrasa

Sub Total :

210.00

911.82 506.00

2B3C2a2b Raikepur 369.05

860.85 470.00 2.256

Sub Total :

Sub Total :

Sub Total :

Sub Total :

9 2B3C1f2c Surar

10 2B3C2a2a Rautepur

Sub Total :

11

Page 107

Page 108: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Sr. No. MWS Code Name of MWSGeographical

Area

Planned

Area

Amount

ReleasedVillage EPA Work Khasra No.

Expenditure

(Lakhs)Balance

1 2 3 4 5 6 7 8 9 10 11

Rampur Bhimsen, IWMP-VIII Kanpur NagarDetails of EPA Activities Executed under Project Area

12 2B3C2a3a Dool-I 536.01 295.00 1.416 Hetpur Pond 96 1.409

536.01 295.00 1.416 1.409 0.007

13 2B3C2a3b Dool-II 537.59 300.00 1.440 Hatpur Pond 96 1.445

537.59 300.00 1.440 1.445 -0.004

14 2B3C1f2b Bhauti Pratappur 548.21 310.00 1.488 Bhauti Pratappur 6 Solar Light - 1.400

548.21 310.00 1.488 1.400 0.088

10187.80 5705.00 27.384 27.275 0.109

Sub Total :

Sub Total :

Sub Total :

TOTAl :

Page 108

Page 109: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

SL

NA

WC

DC

PIA

WC

To

tal

SL

NA

WC

DC

PIA

WC

To

tal

SL

NA

WC

DC

PIA

WC

To

tal

SL

NA

WC

DC

PIA

WC

To

tal

SL

NA

WC

DC

PIA

WC

To

tal

SL

NA

WC

DC

PIA

WC

1 2B3C1f1a=+'MWS NAME Master'!C10455.00 0.082 0.082 0.109 0 0.273 0.03 0.19 1.15 0.00 1.37 0.03 0.07 0.31 0.00 0.41 0.03 0.07 0.31 0.00 0.41 0.00 0.08 0.19 0.00 0.27 0.16 0.49 2.07 0.00 2.73

2 2B3C1f1b Rampur Bhimsen 760.00 0.137 0.137 0.182 0 0.456 0.05 0.32 1.92 0.00 2.28 0.05 0.11 0.52 0.00 0.68 0.05 0.11 0.52 0.00 0.68 0.00 0.14 0.32 0.00 0.46 0.27 0.82 3.47 0.00 4.56

3 2B3C1f2a Pankabahadur Nagar362.00 0.065 0.065 0.087 0 0.217 0.02 0.15 0.91 0.00 1.09 0.02 0.05 0.25 0.00 0.33 0.02 0.05 0.25 0.00 0.33 0.00 0.07 0.15 0.00 0.22 0.13 0.39 1.65 0.00 2.17

4 2B3C1f2b Bhouti Pratappur 310.00 0.056 0.056 0.074 0 0.186 0.02 0.13 0.78 0.00 0.93 0.02 0.05 0.21 0.00 0.28 0.02 0.05 0.21 0.00 0.28 0.00 0.06 0.13 0.00 0.19 0.11 0.33 1.41 0.00 1.86

5 2B3C1f2c Surar 470.00 0.085 0.085 0.113 0 0.282 0.03 0.20 1.18 0.00 1.41 0.03 0.07 0.32 0.00 0.42 0.03 0.07 0.32 0.00 0.42 0.00 0.08 0.20 0.00 0.28 0.17 0.51 2.14 0.00 2.82

6 2B3C1d2a Oriyara 442.00 0.08 0.08 0.106 0 0.265 0.03 0.19 1.11 0.00 1.33 0.03 0.07 0.30 0.00 0.40 0.03 0.07 0.30 0.00 0.40 0.00 0.08 0.19 0.00 0.27 0.16 0.48 2.02 0.00 2.65

7 2B3C1d2b Sen Purab Para 490.00 0.088 0.088 0.118 0 0.294 0.03 0.21 1.23 0.00 1.47 0.03 0.07 0.34 0.00 0.44 0.03 0.07 0.34 0.00 0.44 0.00 0.09 0.21 0.00 0.29 0.18 0.53 2.23 0.00 2.94

8 2B3C1d2c Pipori 455.00 0.082 0.082 0.109 0 0.273 0.03 0.19 1.15 0.00 1.37 0.03 0.07 0.31 0.00 0.41 0.03 0.07 0.31 0.00 0.41 0.00 0.08 0.19 0.00 0.27 0.16 0.49 2.07 0.00 2.73

9 2B3C1d3a Magrasa 506.00 0.091 0.091 0.121 0 0.304 0.03 0.21 1.28 0.00 1.52 0.03 0.08 0.35 0.00 0.46 0.03 0.08 0.35 0.00 0.46 0.00 0.09 0.21 0.00 0.30 0.18 0.55 2.31 0.00 3.04

10 2B3C1d3b Sen Pashimpara 480.00 0.086 0.086 0.115 0 0.288 0.03 0.20 1.21 0.00 1.44 0.03 0.07 0.33 0.00 0.43 0.03 0.07 0.33 0.00 0.43 0.00 0.09 0.20 0.00 0.29 0.17 0.52 2.19 0.00 2.88

11 2B3C2a2a Rautepur 210.00 0.038 0.038 0.05 0 0.126 0.01 0.09 0.53 0.00 0.63 0.01 0.03 0.14 0.00 0.19 0.01 0.03 0.14 0.00 0.19 0.00 0.04 0.09 0.00 0.13 0.08 0.23 0.96 0.00 1.26

12 2B3C2a2b Raikepur 170.00 0.031 0.031 0.041 0 0.102 0.01 0.07 0.43 0.00 0.51 0.01 0.03 0.12 0.00 0.15 0.01 0.03 0.12 0.00 0.15 0.00 0.03 0.07 0.00 0.10 0.06 0.18 0.78 0.00 1.02

13 2B3C2a3a Dool-Pratham 295.00 0.053 0.053 0.071 0 0.177 0.02 0.12 0.74 0.00 0.89 0.02 0.04 0.20 0.00 0.27 0.02 0.04 0.20 0.00 0.27 0.00 0.05 0.12 0.00 0.18 0.11 0.32 1.35 0.00 1.77

14 2B3C2a3b Dool-Dwitiya 300.00 0.054 0.054 0.072 0 0.18 0.02 0.13 0.76 0.00 0.90 0.02 0.05 0.21 0.00 0.27 0.02 0.05 0.21 0.00 0.27 0.00 0.05 0.13 0.00 0.18 0.11 0.32 1.37 0.00 1.80

5705 1.027 1.027 1.369 0.000 3.423 0.342 2.396 14.377 0.000 17.115 0.342 0.856 3.936 0.000 5.135 0.342 0.8558 3.936 0.000 5.135 0.000 1.027 2.3961 0.000 3.423 2.054 6.161 26.015 0.000 34.230

TOTAL (5%)

GRAND

TOTAL

Total :

S.

No.

MWS

CodeName of MWS

Are

a

Ist Year (0.5%) IInd Year (2.5%) IIIrd Year (0.75%) IVthYear (0.75%) Vth Year (0.5%)

Area in ha Amount in

LakhsKanpur NagarDistrictMicrowatershed-wise Financial Break-up of Institutional & Capacity Building Programme (Year-wise) Rampur Bhimsen, IWMP-VIII

Page 109

Page 110: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District:- Kanpur Nagar 5705.00

S. No. LevelNumber of persons to

be trainedNos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0 2.0538

2 WCDC

2.1 District Level Workshop 100 1 1 100 0.01 1.000

2.2 Workshop

2.2.1 Convergence Workshop 20 1 1 20 0.007 0.140

2.2.2 Refreshar Wokshop 20 1 1 20 0.007 0.140

2.2.3 Workshop of Inovative Practices & PPP Model 20 1 1 20 0.007 0.140

2.2.4Workshop on Formation, Development &

Sustainability of Federation20 1 1 20 0.007 0.140

2.2.5 Linkage Establishment 20 1 1 20 0.007 0.140

Sub Total of 2 : 100 5 200 0.700

2.3 Exposure Visit

2.3.a In the District 465 1 1 465 0.00150 0.6975

2.3.b Within State 426 1 1 426 0.00400 1.704

2.3.c Out of State 42 1 7 294 0.00700 2.058

Sub Total of WCDC 1133 9 1405 6.160

3 PIA 0.000

3.1 PIA 10 2 6 120 0.00670 0.804

3.2 WDT 11 2 5 110 0.00670 0.737

3.3 WC Basic 1799 1 1 1799 0.00317 5.703

3.4 WC Member 260 2 1 520 0.00317 1.648

3.5 WC Functionaries 205 2 1 410 0.00670 2.747

3.6 UGs 491 1 1 491 0.00317 1.556

3.7 UGs Functionaries 230 1 2 460 0.00670 3.082

3.8 SHGs 508 1 3 1524 0.00317 4.831

3.9 SHGs Functionaries 366 1 2 732 0.00670 4.904

Sub Total of PIA 3880 6166 26.013

3.10 Skill Training (from Convergence) 190 1 30 5700 0.00500 28.500

190 5700 54.513

5203 13271 - 62.726

34.230

28.496Convergence from NRLM/SKILL Development Mission

At A GlanceAmount in

Lakhs

Sub Total :

Total :

Fund From IWMP

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

(5% of Project Cost) Area ha

Page 110

Page 111: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District : 5705.00

S. No. LevelNumber of persons

to be trainedNos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0.00000 1.0269

2 WCDC

2.1 District Level Workshop 0 0 0 0 0.01000 0.000

2.2Convergence

Workshop20 1 1 20 0.00700 0.140

2.3 Exposure Visit

2.3.a In the District 159 1 1 159 0.00150 0.239

2.3.b Within State 162 1 1 162 0.00400 0.648

2.3.c Out of State 0 0 0 0 0.00700 0.000

Sub Total of WCDC 321 3 341 1.0265

3 PIA

3.1 PIA 6 2 6 72 0.00670 0.482

3.2 WDT 4 2 5 40 0.00670 0.268

3.3 WC Basic 195 1 1 195 0.00317 0.618

3.4 WC Member 0 2 1 0 0.00317 0.000

3.5 WC Functionaries 0 2 1 0 0.00670 0.000

3.6 UGs 0 1 1 0 0.00317 0.000

3.7 UGs Functionaries 0 1 2 0 0.00670 0.000

3.8 SHGs 0 1 3 0 0.00317 0.000

3.9 SHGs Functionaries 0 1 2 0 0.00670 0.000

Sub Total of PIA 205 307 1.369

3.10 Skill Training 0 0 0 0 0.00500 0.000

0 0 1.369

526 648 - 3.422

3.423Fund From IWMP

Ist Year Amount in Lakhs

Sub Total :

Total :

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

Kanpur Nagar (0.5% of Project Cost) Area :

Page 111

Page 112: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District : 5705.00

S. No. Level

Number of

persons to be

trained

Nos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0.00000 0.342

2 WCDC

2.1District Level

Workshop100 1 1 100 0.01000 1.000

2.2Refreshar

Wokshop20 1 1 20 0.00700 0.140

2.3 Exposure Visit

2.3.a In the District 101 1 1 101 0.00150 0.152

2.3.b Within State 80 1 1 80 0.00400 0.320

2.3.c Out of State 16 1 7 112 0.00700 0.784

Sub Total of WCDC 197 5 413 2.396

3 PIA

3.1 PIA 4 2 6 48 0.00670 0.322

3.2 WDT 2 2 5 20 0.00670 0.134

3.3 WC Basic 1604 1 1 1604 0.00317 5.085

3.4 WC Member 260 2 1 520 0.00317 1.648

3.5 WC Functionaries 52 2 1 104 0.00670 0.697

3.6 UGs 192 1 1 192 0.00317 0.609

3.7 UGs Functionaries 156 1 2 312 0.00670 2.090

3.8 SHGs 210 1 3 630 0.00317 1.997

3.9SHGs

Functionaries134 1 2 268 0.00670 1.796

Sub Total of PIA 2614 3698 14.377

3.10 Skill Training 0 0 0 0 0.00500 0.000

0 0 14.377

2811 4111 - 17.115

17.115Fund From IWMP

IInd Year Amount in Lakhs

Sub Total :

Total :

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

Kanpur Nagar (2.5% of Project Cost) Area :

Page 112

Page 113: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District : 5705.00

S. No. LevelNumber of persons

to be trainedNos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0.00000 0.342

2 WCDC

2.1 District Level Workshop 0 0 0 0 0.01000 0.000

2.2Workshop of Inovative

Practices & PPP Model20 1 1 20 0.00700 0.140

2.3 Exposure Visit

2.3.a In the District 26 1 1 26 0.00150 0.0390

2.3.b Within State 10 1 1 10 0.00400 0.040

2.3.c Out of State 13 1 7 91 0.00700 0.637

Sub Total of WCDC 49 4 147 0.8560

3 PIA 0.000

3.1 PIA 0 0 0 0 0.00670 0.000

3.2 WDT 2 2 5 20 0.00670 0.134

3.3 WC Basic 0 0 0 0 0.00317 0.000

3.4 WC Member 0 0 0 0 0.00317 0.000

3.5 WC Functionaries 52 2 1 104 0.00670 0.697

3.6 UGs 59 1 1 59 0.00317 0.187

3.7 UGs Functionaries 22 1 2 44 0.00670 0.295

3.8 SHGs 149 1 3 447 0.00317 1.4173.9 SHGs Functionaries 90 1 2 180 0.00670 1.206

Sub Total of PIA 374 854 3.936

3.10Skill Training (from

Convergence)50 1 30 1500 0.00500 7.500

35 1500 11.436

458 2501 - 12.634

5.135

7.499Convergence from NRLM/SKILL Development Mission

Fund From IWMP

IIIrd Year Amount in Lakhs

Sub Total :

Total :

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

Kanpur Nagar (0.75% of Project Cost) Area :

Page 113

Page 114: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District : 5705.00

S. No. LevelNumber of persons

to be trainedNos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0.00000 0.342

2 WCDC

2.1 District Level Workshop 0 0 0 0 0.01000 0.000

2.2Workshop on Formation, Development &

Sustainability of Federation 20 1 1 20 0.00700 0.140

2.3 Exposure Visit

2.3.a In the District 20 1 1 20 0.00150 0.0300

2.3.b Within State 12 1 1 12 0.00400 0.048

2.3.c Out of State 13 1 7 91 0.00700 0.637

Sub Total of WCDC 45 143 0.8550

3 PIA 0.000

3.1 PIA 0 0 0 0 0.00670 0.000

3.2 WDT 2 2 5 20 0.00670 0.134

3.3 WC Basic 0 0 0 0 0.00317 0.000

3.4 WC Member 0 0 0 0 0.00317 0.000

3.5 WC Functionaries 52 2 1 104 0.00670 0.697

3.6 UGs 59 1 1 59 0.00317 0.187

3.7 UGs Functionaries 22 1 2 44 0.00670 0.295

3.8 SHGs 149 1 3 447 0.00317 1.417

3.9 SHGs Functionaries 90 1 2 180 0.00670 1.206

Sub Total of PIA 374 854 3.936

3.10Skill Training (from

Convergence)70 1 30 2100 0.00500 10.500

70 2100 14.436

489 3097 - 15.633

5.135

10.498Convergence from NRLM/SKILL Development Mission

Fund From IWMP

IVth Year Amount in Lakhs

Sub Total :

Total :

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

Kanpur Nagar (0.75% of Project Cost) Area :

Page 114

Page 115: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District : 5705.00

S. No. LevelNumber of persons

to be trainedNos. Of Trngs Days Preson days Rate/person/day Amount

1 SLNA 0 0 0 0 0.00000 0.000

2 WCDC

2.1 District Level Workshop 0 0 0 0 0.01000 0.000

2.2 Linkage Establishment 20 1 1 20 0.00700 0.140

2.3 Exposure Visit

2.3.a In the District 159 1 1 159 0.00150 0.239

2.3.b Within State 162 1 1 162 0.00400 0.648

2.3.c Out of State 0 0 0 0 0.00700 0.000

Sub Total of WCDC 321 3 341 1.0265

3 PIA 0.000

3.1 PIA 0 0 0 0 0.00670 0.000

3.2 WDT 1 2 5 10 0.00670 0.067

3.3 WC Basic 0 0 0 0 0.00317 0.000

3.4 WC Member 0 0 0 0 0.00317 0.000

3.5 WC Functionaries 49 2 1 98 0.00670 0.657

3.6 UGs 181 1 1 181 0.00317 0.574

3.7 UGs Functionaries 30 1 2 60 0.00670 0.402

3.8 SHGs 0 1 3 0 0.00317 0.000

3.9 SHGs Functionaries 52 1 2 104 0.00670 0.697

Sub Total of PIA 313 453 2.3962

3.10Skill Training (from

Convergence)70 1 30 2100 0.00500 10.500

70 2100 12.896

704 2894 - 13.923

3.423

10.500Convergence from NRLM/SKILL Development Mission

Fund From IWMP

Vth Year Amount in Lakhs

Sub Total :

Total :

Annual Action Plan (APP) of I & CB of Project Area Under Rampur Bhimsen, IWMP-VIII

Kanpur Nagar (0.5% of Project Cost) Area :

Page 115

Page 116: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Training Institute Area of Specialization

1 Indian Veterinary Research Institute IVRI, Izatnagar, Bareilly in Uttar Pradesh Livestock Rearing and Management.

2 Banaras Hindu University (BHU) , Varanasi, Uttar Pradesh 221005 Phone: 0542 236 8558 Farming System and Livelihood Development.

3 Central Institute for Research on Goats (CIRG), Farah Main Bazar Rd, Makhdum, Uttar Pradesh 281122 Goatary

4Uttar Pradesh Pandit Deen Dayal Upadhyaya Pashu Chikitsa Vigyan Vishwavidyalaya Evam Go Anusandhan

Sansthan, Mathura E-mail: [email protected] Phone: +91-512-2594005 (Off.)Livestock Rearing and Management.

5 Department of Animal Husbandary, U.P. Poultry/ Piggery

6Pradeshik Cooperative Dairy Federation (PCDF), 29, Park Road, Lucknow-226001

Ph-236465,2236035 [email protected]

Dairy Development, Paravet, Milk Production and Micro

Enterprises.

7 Institute of Financial Management Training and Research (IFMTR), U.P. Lucknow Accounting Procedure and Finance.

8National Bank for Agriculture and Rural Development (NABARD), 11, Vipin Khand, Gomti Nagar, Lucknow, Uttar

Pradesh 226010 Phone: 0522 230 4530

Basic Orientation, SHGs Formation-Sustainability and

Bank Linkage.

9 U.P. Khadi Gramodyuog Micro Enterprises

10 Horticulture and Food Processing Department, UP Udhyan Bhawan, 2-Sapru Marg, Lucknow-226001. Telephone -

0522-4044414, 2623277

Horticulture, Nursery Management and Food

Processing

11 Department of Fisheries, U.P. Fisheries

12Institute of Entrepreneurship Development, U.P.. A - 1 & 2, Industrial Area, Sarojini Nagar Kanpur Road, Lucknow-

226008. Uttar Pradesh. Phone: 0522 - 2476012, 2476055 Livelihood Development and Micro Enterprises

13 Department of Forest, U.P. Horticulture and Agro Forestry

14

15State Institute Of Rural Development in Bakshi Ka Talab Airport, Lucknow, Bakshi-Ka-Talab, Bakshi Ka

Talab, Lucknow - 227208 .

Basic Orientation, Project Formulaion, Livelihood,

Social Mobilization and other Speciific Area.

16 District Institute of Rural Development (DIRD), U.P.Basic Orientation, Project Formulaion, Production

System.

17 Sardar Vallabhbhai Patel University of Agriculture and Technology, Modipuram, Meerut, Uttar Pradesh 250110Basic Orientation, Project Formulaion, Production

System.

18 Chandra Shekhar Azad University of Agriculture & Technology (CSAUA&T), KanpurBasic Orientation, Project Formulaion, Production

System.

19Banda University of Agriculture and Technology, Banda Near New Circuit House, Banda, Uttar Pradesh 210001, India,

Banda, Uttar Pradesh 210001 Phone: 05192 221 605

Basic Orientation, Project Formulaion, Production

System.

20Narendra Dev University Of Agriculture And Technology Kumarganj, Faizabad, Uttar Pradesh 224229

Phone: 05270 262 03

Basic Orientation, Project Formulaion, Production

System.

21Sam Higginbottom Institute of Agriculture, Technology and Sciences, Post. Agriculture Institute, Allahabad, Uttar

Pradesh 211007 Phone: 0532 268 4281

Basic Orientation, Project Formulaion, Production

System.

22 All Government KVKs, U.P.Basic Orientation, Project Formulaion, Production

System.

List of Identified Training Institute

Page 116

Page 117: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

23 Trining Institute, Beni Kalan, U.P.Basic Orientation, Project Formulaion, Production

System.

24 State Agriculture Management Institute, U.P.Basic Orientation, Project Formulaion, Production

System.

25The ICAR-Indian Institute of Soil and Water Conservation(ICAR-IISWC), (Formerly CSWCRTI), 218, Kaulagarh Road,

Forest Research Institute, ONGC, Dehradun, Uttarakhand 248195 Phone: 0135 275 7214

Basic Orientation, Project Formulaion, Production

System.

26

ICAR-Indian Institute of Soil and Water Conservation, Research Centre, Chhaleser, Agra-282 006 (U.P) Tel: (O) 0562-

6544599; (R) 91-9837017725; Fax No.: 0562-2440179

E-mail: [email protected] ; [email protected]

Basic Orientation, Project Formulaion, Production

System.

27 Indian Grassland and Fodder Research Institute (IGFR), Jhansi, Uttar Pradesh 284003 Phone: 081203 11814 Grass and Ffodder Management

28 National Research Centre for Agroforestry (NRCAF), Gwalior Road, Jhansi-284 003 Afforestation and Agro Forestry

29 Remote Sensing Application Centre, Kursi Road, Lucknow.Role and Application of Remote Sensing, G.I.S. and

GPS in Watershed Management.

30 Agricultuure Finance Corporation (AFC) Ltd. Vidhan Sabha Marg, Lucknow All WC Level Training under IWMP at Local Level.

31Herbert Buttlar Technological Institute (STEP HBTI), Nawabganj, Kanpur 208002 Ph. No. 0512-2560831, 2562536,

2563016 E-mail : [email protected]

Basic Orientation and Skill Training for Livelihood and

Micro Enterprises.

* OR Any other Institute Identified by the DoLR/SLNA from time to time

Page 117

Page 118: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Step 8

Step 7

Step 6

Step 5

Step 4

Step 3

Step 2

Step 1

PIA has spend 3 days

time for awareness

generation in the project

area.

Livelihood PlanningWe propose to bring meaningful participation of primary stakeholders, in the identification of livelihood options for different members in the project area. Particularly the landless/asset less,

marginal community including SC/ST and women. A community based action planning process involves Participatory Situation Analysis (PSA), preparation of inventory of existing livelihood

activities, possibilities of extension of existing livelihood activities and its sustainability, identification of new livelihood options/income generation activities, formation of landless/asset less,

marginal community including SC/ST and women into new Self Help Groups (SHGs), capacity building /skill training requirement, generation of new ideas and planning of viable livelihood options,

plan for disbursement of seed money/revolving fund, recovery plan of disbursed seed money, reinvestment plan of recovered amount of seed money, funding of major livelihood activities/

formation of federation, establishment of backward forward linkages, establishment of Public Private Partnership (PPP) Model.

PIA would finalize the

funding of major livelihood

activities/ formation of

federation, establishment of

backward forward linkages,

establishment of Public

Private Partnership (PPP)

Model during the

consolidation phase of

project

PIA would Conduct Skill

training for the identified

activities of the SHGs, PIA

would implement

disbursement of seed

money, recovery of seed

money, reinvestment of

seed money during the

work phase of the project

within 18 to 48 months.

Finalisation of micro plan

by the end of 18 months

or say preparatory phase

of the proposed project.

Conduct Skill training for

the identified activities of

the SHGs within 18

months.

After the completion of

step 4 , SHGs are involved

in the identification of

viable livelihood options

within 15 months. PIA

should identify the

training institutes to

conduct capacity building

program during this

period.

Once the SHGs are

formed, PIA facilitates the

process of conducting

meetings of SHGs for

generating new ideas for

preparing livelihood

action plan. PIA at the

same time promotes

small scale livelihood

activities in order to

stimulate interest of

SHGs members within 12

months.

The PIA has started

capacity building

(mandatory training)

process for the SHGs

after the completion of

step 2

The PIA has spend 3

months time in the

project area for the

Participatory Situation

Analysis (PSA),

collecting quantitative

data, preparing action

plans for the formation,

development and

strengthening of SHGs

Page 118

Page 119: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

PSA

InformationSharing

Poverty Ranking

Negotiation

MOUCommunity

LivelihoodPlanning

Micro-plan

PSA Process AdoptedThe most Important priority is to involve thepeople in the identification of target groupsand their needs for livelihood options andpreparing of micro-plans.

Page 119

Page 120: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

A CONCEPT MAP USED FOR LIVELIHOOD ANALYSIS IN THE PROJECT AREA

People

Power

Gender

Age

Status Learning Capacity

Culture, attitude

KnowledgeSkills

Interest

Household

Taking care of sick and elderly

Pension

Succession

Sustainability

Long-term vs. short term

Outcomes

Objectives

Education, Socialization

Non-farm

Farm

Reproductive

Subsistence

Own enterprise

Cash earning

Wage Labour

Life CycleSeasonality

Shocks

Dynamics

Trends

Vulnerability

Prices, subsidies, land distribution , labour

wages, etc.Policies

Access

Control

Information

Financial Capital

Physical Capital (land, water, buildings, …)

Resources

Natural Capital (genetic, vegetation,

forest, …)

Human Capital(labour, knowledge. Skill …)

Social Capital

Markets for inputs and outputs

Institutions

Prices, quality requirement,

timing …..

Macro Influence

Livelihood

Level (sub-household,

household, CBO …)

•Structure, hierarchy, division

of labour

Organization

Strategies

Activities

Page 120

Page 121: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

•9% of the total project fund i.e. Rs. 61.61 Lakhs is earmarked as the livelihood component for the benefit of marginalized communities,

including SC, landless/assetless people, women, etc.

•This earmarked amount shall be taken out of the total project fund as a grant to WC in its bank account, which in turn will be used to provide

financial assistance, (seed money for revolving fund to SHGs and a grant -n -aid for enterprising SHGs/ SHG federations to undertake major

livelihood activities).

At least 70% of this livelihood fund i.e. Rs. 43.13 Lakhs will be used to support/seed money revolving fund for SHGs, including support to

enterprising individuals, and a maximum of 30% i.e. Rs. 18.48 Lakhs for supporting grant–in–aid to enterprising SHGs/ SHG federations.

Seed Money for Revolving Fund:-

•Seed money for SHGs

•Each SHG shall make an application for financial assistance to the WC. WC in its regular meeting, will consider these applications and pass

resolution regarding its approval of financial assistance to SHGs based on merit of the case. The representatives of applicant SHGs may also be

present in such meetings of the WC. The resolution will clearly rank the approved cases, based on the priorities and preferences, so that the

support may be extended to all the eligible SHGs in order of ranking.

•The initial amount up to Rs. 25,000 may be given as seed money to a SHG as the revolving fund after their proposed activity(s) has been

approved by the WC in its meeting and included in the resolution.

•The SHGs will return the seed money on monthly basis and that could be reinvested in the same or other SHGs as per the

resolution passed in meeting of WC. The amount and number of monthly installments may be decided by WC based on the type of activity, capacity of the group and their savings. The amount may be returned in a maximum of 18 months.

•The payment will be made by cheque after the respective SHG has opened a joint bank account with two signatories from

the SHG members.

Budget, procedure of release and administration:-

Eligibility for availing the funds under the Livelihood Component :-

•The beneficiaries should be marginalized communities, including SC, landless/assetless people, women, etc., among which preference will be

given to women, specially female headed households, SCs, as identified under the wealth ranking conducted as a part of the PRA exercise.

•It may be ensured that the selected SHG does not have more than one member from a household.

•Priority may be given to women SHGs.

Page 121

Page 122: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

•Up-keep of record is being maintained. Account has been opened in the bank.

•Mandatory training has been organised for the SHGs.

•Regular saving is being made. Internal lending and its recovery is being made properly.

•The applicants may also be present in such meetings of the WC. The resolution will clearly rank the approved cases, based on the priorities and

preferences, so that the support may be extended to all the eligible enterprising individuals in order of ranking.

•The WC may release financial assistance to these enterprising individuals after approval by WCDC. Such individuals will return the seed money

on monthly basis and that could be reinvested further as per the resolution passed in meeting of WC. The amount and number of monthly installments may be decided by WC based on the type of activity and capacity of the individual. The amount may be returned in a maximum of 18 months.

•The payment will be made by account payee cheque in such individual cases.

Funding for Major Livelihood activities for enterprising SHGs/ SHG federation:-

• The funding for major livelihood activities will enable the enterprising SHGs/ SHG federations (with at least 5 enterprising SHGs) to avail a

composite loan for undertaking major livelihood activities or to expand/upscale activities as recommended by the WC and approved by WCDC in consultation with line departments and bank.

•For such activities, a composite loan (grant in aid and bank loan) can be availed depending upon the type of activity. The grant-in-aid will be 50%

of the cost of the activity or Rs. 2.00 lakh whichever is less. However, grant in aid shall not exceed 30% of the livelihood component (i.e. 9% of thetotal project cost) of the project.

•SLNA may issue detailed modalities for payment of grant-n-aid for funding major livelihood activities.

Disbursement Plan of Seed Money :-Seed Money to the SHGs will be disbursed after fulfilling the following conditions –

•SHGs has been formed.

•Regular Meeting of the SHGs is being conducted.

•The enterprising individual shall apply for financial assistance to the WC, along with a viable livelihood proposal. WC in its regular meeting, will

consider such applications and recommend to WCDC, through PIA, the amount to be provided as seed money to such individual(s) as the revolving fund after their proposed activity(s) has been approved by the WC in its meeting and included in the resolution based on the merits of the case.

•The SHGs may use the amount for a combined activity and/ or shall provide the above amount to the concerned members as individual loan

against a specific activity for improving income. In case of individual support under the SHGs, the individual will be accountable to the main SHGsfor finances and performance.

•Seed money for Enterprising Individuals

Page 122

Page 123: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Duration Duration Recovery Period

(in months) (in months) (in months)

18 3 15 12 2 10

-

-

-

-

-

-

•Representative of the respective Line Department Member

•Lead bank manager Member

•Krishi Vigyan Kendra (KVK) Member

Plan For Formation of Federation :- We propose to go for the formation of federation in the consolidation phase of the project and 30% of the

livelihood component under the project cost i.e. 30% of the project cost or Rs. 18.48 Lakhs is earmarked for it.

Funding for Major Livelihood activities/Federation :-

•Nominated member of PIA Member Secretary

Reinvestment to the existing SHGs will be made subject to fulfilling the following conditions-•Minimum 50% of the seed money has been recovered.

•Recovery of seed money has been made regularly without any default.

•Assessment has been about the improvement in livelihood status of SHGs.

•Willingness of SHGs to take more seed money to upscale/ expand their activity.

•Recovery of the reinvested amount of seed money to the same SHG will be made as per the above recovery plan of seed money.

Composition of committee for the sanction, disbursement and reinvestment of seed money- A 6-member Committee will be constituted under the •President Watershed Committee (WC) ex officio chairman

•Technical expert- WCDC coordinator

Reinvestment Plan of Seed Money :- Recovered amount of seed money may be reinvested to the same SHG or the new SHGs as the case may be.

•Required Skill Training has also been organised.

•Amount of Seed Money will be subject to maximum of 4 times of their up to date saving of the respective SHGs subject to the maximum limit of the Activity-wise limit of the

seed money is given in Table of Unit Cost for LA activities. -

Recovery Plan of Seed Money :- Recovery of Seed Money will be made in maximum of 18 equal installments. We propose to give 03 months grace

Details of Recovery Plan of Seed Money Disbursed

For the SHGs For the Enterprising Individuals

Grace Period for

Recovery (in

months)

Recovery Period

(in months)

Grace Period for

Recovery (in

months)

Page 123

Page 124: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

•Other related aspects.

•Activity based Skill Training

•The expenditure for the training for livelihood component will be met from 5% of the budget component of the project cost earmarked for

institution and capacity building.

•It shall be mandatory to provide skill based training on the following components apart from the other training needs expressed by SHGs:

•Book Keeping (cash book and ledger registers, preparing budget, maintenance of accounts etc.).

•Minutes of meeting (proceedings) and follow up.

•Exposure visits and discussions in the specialized areas of livestock, agriculture/horticulture, agro-forestry, fisheries and other watershed related

income generating activities, micro-enterprises, micro-credit, etc.

•Knowledge of market and pricing, value addition, alternate institutions including Farmers Production Companies etc.

•The capacity building needs of the marginalized communities, including SC, landless/assetless people, women, etc has be included in the livelihood

action plan prepared after the livelihood analysis. The capacity building will be aim at skill enhancement and not just knowledge and information. The capacity building component should be planned by the livelihood expert of WDT/Livelihood agency in consultation with WC for making necessary budgetary provision on annual basis.

•The funding for major livelihood activities will enable the enterprising SHGs/ SHG federations (with at least 5 enterprising SHGs) to avail a

composite loan for undertaking major livelihood activities or to expand/upscale activities as recommended by the WC and approved by WCDC in consultation with line departments and bank.

•For such activities, a composite loan (grant in aid and bank loan) can be availed depending upon the type of activity. The grant -n-aid will be 50%

of the cost of the activity or Rs. 2.00 Lakhs whichever is less. However, grant in aid shall not exceed 30% of the livelihood component (i.e. 9% of the total project cost) of the project. We proposed 20% margin money as SHG contribution for availing composite loan under funding for major livelihood activities for Enterprising SHGs/Federation of SHGs.

Capacity Building for Beneficiaries :-

Page 124

Page 125: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District:- Kanpur Nagar

S.No. Name Of Activity Type of Activity Unit Cost in Rs. S.No. Name Of Activity Type of Activity Unit Cost in Rs.

1 Poultry SHGs 25000 1 Mini Village Shop Individual 5000

2 Goatary SHGs 25000 2 Diesel Engine Mechanic Individual 10000

3 Cattle Rearing SHGs 25000 3 Fabricator Individual 10000

4 Vermi Compost SHGs 10000 4 Masson Individual 5000

5 Chiken Kadahai SHGs 10000 5 Domestic Wiring Individual 10000

6 Agarbati Making SHGs 20000 6 Mobile Repairing Individual 10000

7 Candle Making SHGs 20000 7 Electric Appliances Mechanic Individual 10000

8 Food Preservation SHGs 20000 8 Hand Pump Mechanic Individual 5000

9 Basket Making SHGs 20000 9 Puncture Repair Individual 5000

10 Paper Plate Making SHGs 25000 10 Vermi Compost Unit Individual 2000

Note:-

1

2

3

4

5

Unit Cost for Various Proposed Activity Under Livelihood Rampur Bhimsen, IWMP-VIII

No. of Federation proposed to be formed and project cost including contribution of SHGs/Federation of SHGs, grant-in-aid and

Bank Loan are shown in AT-a-Glance Table.

Above List of activities are Indicative. Need base changes could be made after due approval of respective Watershed Committee

Above Mention Unit cost is the maximum ceiling limit for seed money. But seed money will be released subject to availability of

fund under respective year

Amount for grant-in-aid under funding for major Activities will carry forward as such the federation will be formed in consolidation

Phase.

Amount for grant-in-aid under funding for major Activities for federation or Enterprising SHGs will be released as composite loan

after due consent and approval of respective Bank.

Page 125

Page 126: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Total

Amount

Seed

Money for

SHGs

Nos. of

SHGs for

Seed

Money

Seed Money

For

Individuals

Nos. of

IndividualsFedration

Project

Cost

Contribution

of SHGs/Fed.

Grant in-aid

@ Rs. 50% or

Rs. 2.00 Lacs

whichever is less

Bank

Loan

1 Bhailamau 125 1.3500 0.9450 0.8505 4 0.0945 3 1 0.810 0.162 0.405 0.243

2 Bhaunti khera 74 0.7992 0.5594 0.5035 3 0.0559 0 1 0.480 0.096 0.240 0.144

3 Bhisi Jargaon 107 1.1556 0.8089 0.7280 3 0.0809 3 1 0.693 0.139 0.347 0.208

4 Bhauti Pratappur 302 3.2616 2.2831 2.0548 8 0.2283 4 1 1.957 0.391 0.978 0.587

5 Dool 360 3.8880 2.7216 2.4494 10 0.2722 4 1 2.333 0.467 1.166 0.700

6 Fatehpur Dakshin 99 1.0692 0.7484 0.6736 3 0.0748 3 1 0.642 0.128 0.321 0.192

7 Gopalpur 169 1.8252 1.2776 1.1499 5 0.1278 3 1 1.095 0.219 0.548 0.329

8 Gadhewa Mohasinpur 70 0.7560 0.5292 0.4763 3 0.0529 0 1 0.454 0.091 0.227 0.136

9 Garhi Kanpur 150 1.6200 1.1340 1.0206 5 0.1134 3 1 0.972 0.194 0.486 0.292

10 Kurauna Bahadur Nagar 112 1.2096 0.8467 0.7620 3 0.0847 3 1 0.726 0.145 0.363 0.218

11 Magrasa 305 3.2940 2.3058 2.0752 8 0.2306 4 1 1.976 0.395 0.988 0.593

12 Neori 104 1.1232 0.7862 0.7076 3 0.0786 3 1 0.674 0.135 0.337 0.202

13 Patehuri 125 1.3500 0.9450 0.8505 4 0.0945 3 1 0.810 0.162 0.405 0.243

14 Pipauri 238 2.5704 1.7993 1.6194 7 0.1799 4 1 1.542 0.308 0.771 0.463

15 Patarsa 236 2.5488 1.7842 1.6057 7 0.1784 3 1 1.529 0.306 0.765 0.459

16 Pankabahadur Nagar 156 1.6848 1.1794 1.0614 5 0.1179 3 1 1.011 0.202 0.505 0.303

17 Rampur Bhimsen 384 4.1472 2.9030 2.6127 11 0.2903 3 1 2.488 0.498 1.244 0.746

18 Rampur Khas 220 2.3760 1.6632 1.4969 7 0.1663 3 1 1.426 0.285 0.713 0.428

19 Ramaipur 334 3.6072 2.5250 2.2725 10 0.2525 4 1 2.164 0.433 1.082 0.649

20 Rautepur 212 2.2896 1.6027 1.4424 7 0.1603 3 1 1.374 0.275 0.687 0.412

21 Raikepur 229 2.4732 1.7312 1.5581 7 0.1731 3 1 1.484 0.297 0.742 0.445

22 Sen Purab Para 510 5.5080 3.8556 3.4700 15 0.3856 4 1 3.305 0.661 1.652 0.991

23 Senpashchim Para 413 4.4604 3.1223 2.8101 11 0.3122 4 1 2.676 0.535 1.338 0.803

24 Sachendi Urf Chacheri 83 0.8964 0.6275 0.5647 3 0.0627 1 1 0.538 0.108 0.269 0.161

25 Surar 427 4.6116 3.2281 2.9053 12 0.3228 4 1 2.767 0.553 1.383 0.830

26 Uriyara 161 1.7388 1.2172 1.0954 5 0.1217 3 1 1.043 0.209 0.522 0.313

5705.00 61.61 43.13 38.82 169 4.3130 78 26 36.968 7.394 18.484 11.091Total :

Annual Action Plan (AAP) At a Glance For Seed Money Distribution to SHGs/Individuals and Grant-in-aid Under

S.

No.Name of WC

Project

Area in ha.

Proposed

Amount

Details of Seed Money Distribution Grant-in aid under Funding for major activities

Livelihood Component of Project Area Under Rampur Bhimsen, IWMP-

VIIIKanpur Nagar Phy.in : Nos. and Fin. : in Lakhs

Page 126

Page 127: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Total

Amount

Seed Money

for SHGs

Nos. of

SHGs for

Seed Money

Seed Money

For

Individuals

Nos. of

IndividualsProject Cost

Grant in-aid @ Rs. 50%

or Rs. 2.00 Lakhs

whichever is less

Bank

Loan

1 Bhailamau 125 0.1500 0.1050 0.0945 1 0.0105 0 0.0450

2 Bhaunti khera 74 0.0888 0.0622 0.0559 0 0.0062 0 0.0266

3 Bhisi Jargaon 107 0.1284 0.0899 0.0809 0 0.0090 0 0.0385

4 Bhauti Pratappur 302 0.3624 0.2537 0.2283 1 0.0254 1 0.1087

5 Dool 360 0.4320 0.3024 0.2722 1 0.0302 1 0.1296

6 Fatehpur Dakshin 99 0.1188 0.0832 0.0748 0 0.0083 0 0.0356

7 Gopalpur 169 0.2028 0.1420 0.1278 1 0.0142 0 0.0608

8 Gadhewa Mohasinpur 70 0.0840 0.0588 0.0529 0 0.0059 0 0.0252

9 Garhi Kanpur 150 0.1800 0.1260 0.1134 1 0.0126 0 0.0540

10 Kurauna Bahadur Nagar 112 0.1344 0.0941 0.0847 0 0.0094 0 0.0403

11 Magrasa 305 0.3660 0.2562 0.2306 1 0.0256 1 0.1098

12 Neori 104 0.1248 0.0874 0.0786 0 0.0087 0 0.0374

13 Patehuri 125 0.1500 0.1050 0.0945 1 0.0105 0 0.0450

14 Pipauri 238 0.2856 0.1999 0.1799 1 0.0200 1 0.0857

15 Patarsa 236 0.2832 0.1982 0.1784 1 0.0198 0 0.0850

16 Pankabahadur Nagar 156 0.1872 0.1310 0.1179 1 0.0131 0 0.0562

17 Rampur Bhimsen 384 0.4608 0.3226 0.2903 1 0.0323 0 0.1382

18 Rampur Khas 220 0.2640 0.1848 0.1663 1 0.0185 0 0.0792

19 Ramaipur 334 0.4008 0.2806 0.2525 1 0.0281 1 0.1202

20 Rautepur 212 0.2544 0.1781 0.1603 1 0.0178 0 0.0763

21 Raikepur 229 0.2748 0.1924 0.1731 1 0.0192 0 0.0824

22 Sen Purab Para 510 0.6120 0.4284 0.3856 2 0.0428 1 0.1836

23 Senpashchim Para 413 0.4956 0.3469 0.3122 1 0.0347 1 0.1487

24 Sachendi Urf Chacheri 83 0.0996 0.0697 0.0627 0 0.0070 0 0.0299

25 Surar 427 0.5124 0.3587 0.3228 2 0.0359 1 0.1537

26 Uriyara 161 0.1932 0.1352 0.1217 1 0.0135 0 0.0580

5705 6.8460 4.7922 4.3130 21 0.4792 8 2.0538

Annual Action Plan (AAP) IInd Year For Seed Money Distribution to SHGs/Individuals and Grant-in-aid Under

S.

No.Name of WC

Project Area

in ha.

Proposed

Amount

Details of Seed Money Distribution (Amount in Lakhs)Grant-in aid under Funding for major

activities

Livelihood Component of Project Area Under Rampur Bhimsen, IWMP- Kanpur Nagar Phy.in : Nos. and Fin. :

Total :

Page 127

Page 128: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Total

Amount

Seed Money

for SHGs

Nos. of

SHGs for

Seed Money

Seed Money

For

Individuals

Nos. of

IndividualsProject Cost

Grant in-aid @ Rs. 50%

or Rs. 2.00 Lakhs

whichever is less

Bank

Loan

1 Bhailamau 125 0.3750 0.2625 0.2363 1 0.0263 1 0.1125

2 Bhaunti khera 74 0.2220 0.1554 0.1399 1 0.0155 0 0.0666

3 Bhisi Jargaon 107 0.3210 0.2247 0.2022 1 0.0225 1 0.0963

4 Bhauti Pratappur 302 0.9060 0.6342 0.5708 2 0.0634 1 0.2718

5 Dool 360 1.0800 0.7560 0.6804 3 0.0756 1 0.3240

6 Fatehpur Dakshin 99 0.2970 0.2079 0.1871 1 0.0208 1 0.0891

7 Gopalpur 169 0.5070 0.3549 0.3194 1 0.0355 1 0.1521

8 Gadhewa Mohasinpur 70 0.2100 0.1470 0.1323 1 0.0147 0 0.0630

9 Garhi Kanpur 150 0.4500 0.3150 0.2835 1 0.0315 1 0.1350

10 Kurauna Bahadur Nagar 112 0.3360 0.2352 0.2117 1 0.0235 1 0.1008

11 Magrasa 305 0.9150 0.6405 0.5765 2 0.0641 1 0.2745

12 Neori 104 0.3120 0.2184 0.1966 1 0.0218 1 0.0936

13 Patehuri 125 0.3750 0.2625 0.2363 1 0.0263 1 0.1125

14 Pipauri 238 0.7140 0.4998 0.4498 2 0.0500 1 0.2142

15 Patarsa 236 0.7080 0.4956 0.4460 2 0.0496 1 0.2124

16 Pankabahadur Nagar 156 0.4680 0.3276 0.2948 1 0.0328 1 0.1404

17 Rampur Bhimsen 384 1.1520 0.8064 0.7258 3 0.0806 1 0.3456

18 Rampur Khas 220 0.6600 0.4620 0.4158 2 0.0462 1 0.1980

19 Ramaipur 334 1.0020 0.7014 0.6313 3 0.0701 1 0.3006

20 Rautepur 212 0.6360 0.4452 0.4007 2 0.0445 1 0.1908

21 Raikepur 229 0.6870 0.4809 0.4328 2 0.0481 1 0.2061

22 Sen Purab Para 510 1.5300 1.0710 0.9639 4 0.1071 1 0.4590

23 Senpashchim Para 413 1.2390 0.8673 0.7806 3 0.0867 1 0.3717

24 Sachendi Urf Chacheri 83 0.2490 0.1743 0.1569 1 0.0174 0 0.0747

25 Surar 427 1.2810 0.8967 0.8070 3 0.0897 1 0.3843

26 Uriyara 161 0.4830 0.3381 0.3043 1 0.0338 1 0.1449

5705.00 17.1150 11.9805 10.7825 46 1.1981 23 0 5.1345 0

Rampur Bhimsen, IWMP-Grant-in aid under Funding for major

activities

Total :

S.

No.Name of WC

Project Area

in ha.

Proposed

Amount

Details of Seed Money Distribution (Amount in Lakhs)

Kanpur Nagar Phy.in : Nos. and Fin. :

Annual Action Plan (AAP) IIIrd Year For Seed Money Distribution to SHGs/Individuals and Grant-in-aid Under

Livelihood Component of Project Area Under

Page 128

Page 129: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Total

Amount

Seed Money

for SHGs

Nos. of

SHGs for

Seed Money

Seed Money

For

Individuals

Nos. of

IndividualsProject Cost

Grant in-aid @ Rs. 50%

or Rs. 2.00 Lakhs

whichever is less

Bank

Loan

1 Bhailamau 125 0.3750 0.2625 0.2363 1 0.0263 1 0.1125

2 Bhaunti khera 74 0.2220 0.1554 0.1399 1 0.0155 0 0.0666

3 Bhisi Jargaon 107 0.3210 0.2247 0.2022 1 0.0225 1 0.0963

4 Bhauti Pratappur 302 0.9060 0.6342 0.5708 2 0.0634 1 0.2718

5 Dool 360 1.0800 0.7560 0.6804 3 0.0756 1 0.3240

6 Fatehpur Dakshin 99 0.2970 0.2079 0.1871 1 0.0208 1 0.0891

7 Gopalpur 169 0.5070 0.3549 0.3194 1 0.0355 1 0.1521

8 Gadhewa Mohasinpur 70 0.2100 0.1470 0.1323 1 0.0147 0 0.0630

9 Garhi Kanpur 150 0.4500 0.3150 0.2835 1 0.0315 1 0.1350

10 Kurauna Bahadur Nagar 112 0.3360 0.2352 0.2117 1 0.0235 1 0.1008

11 Magrasa 305 0.9150 0.6405 0.5765 2 0.0641 1 0.2745

12 Neori 104 0.3120 0.2184 0.1966 1 0.0218 1 0.0936

13 Patehuri 125 0.3750 0.2625 0.2363 1 0.0263 1 0.1125

14 Pipauri 238 0.7140 0.4998 0.4498 2 0.0500 1 0.2142

15 Patarsa 236 0.7080 0.4956 0.4460 2 0.0496 1 0.2124

16 Pankabahadur Nagar 156 0.4680 0.3276 0.2948 1 0.0328 1 0.1404

17 Rampur Bhimsen 384 1.1520 0.8064 0.7258 3 0.0806 1 0.3456

18 Rampur Khas 220 0.6600 0.4620 0.4158 2 0.0462 1 0.1980

19 Ramaipur 334 1.0020 0.7014 0.6313 3 0.0701 1 0.3006

20 Rautepur 212 0.6360 0.4452 0.4007 2 0.0445 1 0.1908

21 Raikepur 229 0.6870 0.4809 0.4328 2 0.0481 1 0.2061

22 Sen Purab Para 510 1.5300 1.0710 0.9639 4 0.1071 1 0.4590

23 Senpashchim Para 413 1.2390 0.8673 0.7806 3 0.0867 1 0.3717

24 Sachendi Urf Chacheri 83 0.2490 0.1743 0.1569 1 0.0174 0 0.0747

25 Surar 427 1.2810 0.8967 0.8070 3 0.0897 1 0.3843

26 Uriyara 161 0.4830 0.3381 0.3043 1 0.0338 1 0.1449

5705.00 17.115 11.981 10.782 46 1.198 23 0 5.135

Grant-in aid under Funding for major

activities

Total :

S.

No.Name of WC

Project Area

in ha.

Proposed

Amount

Details of Seed Money Distribution (Amount in Lakhs)

Annual Action Plan (AAP) IVth Year For Seed Money Distribution to SHGs/Individuals and Grant-in-aid Under

Livelihood Component of Project Area Under Rampur Bhimsen, IWMP- Kanpur Nagar Phy.in : Nos. and Fin. :

Page 129

Page 130: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Total

Amount

Seed Money

for SHGs

Nos. of

SHGs for

Seed Money

Seed Money

For

Individuals

Nos. of

IndividualsProject Cost

Grant in-aid @ Rs. 50%

or Rs. 2.00 Lakhs

whichever is less

Bank

Loan

1 Bhailamau 125 0.4500 0.3150 0.2835 1 0.0315 1 0.1350

2 Bhaunti khera 74 0.2664 0.1865 0.1678 1 0.0186 0 0.0799

3 Bhisi Jargaon 107 0.3852 0.2696 0.2427 1 0.0270 1 0.1156

4 Bhauti Pratappur 302 1.0872 0.7610 0.6849 3 0.0761 1 0.3262

5 Dool 360 1.2960 0.9072 0.8165 3 0.0907 1 0.3888

6 Fatehpur Dakshin 99 0.3564 0.2495 0.2245 1 0.0249 1 0.1069

7 Gopalpur 169 0.6084 0.4259 0.3833 2 0.0426 1 0.1825

8 Gadhewa Mohasinpur 70 0.2520 0.1764 0.1588 1 0.0176 0 0.0756

9 Garhi Kanpur 150 0.5400 0.3780 0.3402 2 0.0378 1 0.1620

10 Kurauna Bahadur Nagar 112 0.4032 0.2822 0.2540 1 0.0282 1 0.1210

11 Magrasa 305 1.0980 0.7686 0.6917 3 0.0769 1 0.3294

12 Neori 104 0.3744 0.2621 0.2359 1 0.0262 1 0.1123

13 Patehuri 125 0.4500 0.3150 0.2835 1 0.0315 1 0.1350

14 Pipauri 238 0.8568 0.5998 0.5398 2 0.0600 1 0.2570

15 Patarsa 236 0.8496 0.5947 0.5352 2 0.0595 1 0.2549

16 Pankabahadur Nagar 156 0.5616 0.3931 0.3538 2 0.0393 1 0.1685

17 Rampur Bhimsen 384 1.3824 0.9677 0.8709 4 0.0968 1 0.4147

18 Rampur Khas 220 0.7920 0.5544 0.4990 2 0.0554 1 0.2376

19 Ramaipur 334 1.2024 0.8417 0.7575 3 0.0842 1 0.3607

20 Rautepur 212 0.7632 0.5342 0.4808 2 0.0534 1 0.2290

21 Raikepur 229 0.8244 0.5771 0.5194 2 0.0577 1 0.2473

22 Sen Purab Para 510 1.8360 1.2852 1.1567 5 0.1285 1 0.5508

23 Senpashchim Para 413 1.4868 1.0408 0.9367 4 0.1041 1 0.4460

24 Sachendi Urf Chacheri 83 0.2988 0.2092 0.1882 1 0.0209 1 0.0896

25 Surar 427 1.5372 1.0760 0.9684 4 0.1076 1 0.4612

26 Uriyara 161 0.5796 0.4057 0.3651 2 0.0406 1 0.1739

5705.00 20.5380 14.3766 12.9389 56 1.4377 24 0 6.1614 0

Grant-in aid under Funding for major

activities

Total :

S.

No.Name of WC

Project Area

in ha.

Proposed

Amount

Details of Seed Money Distribution (Amount in Lakhs)

Annual Action Plan (AAP) Vth Year For Seed Money Distribution to SHGs/Individuals and Grant-in-aid Under

Livelihood Component of Project Area Under Rampur Bhimsen, IWMP- Kanpur Nagar Phy.in : Nos. and Fin. :

Page 130

Page 131: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

S. No. Details of Programme Preparatory phase

( Ist to IInd Year)

work phase

( IInd to IVth year)

Consolidation and

withdrawal plan (Vth year)

For SHGs

1 Basic Orientation Programme √

i Social Mobilization Programme √

iiIdentification of IGA and institutional arrangements for

income generation activities, co-ordination and linkages√

iii Mandatory training for SHGs √

iv Gender Senstization, equity, benefit sharing √

v Exposure Visits √

2 Procedure and Management of Seed Money √ √

3 EDP Training √ √

4 Skill Training for Identified Activities of SHGs √

5 Formation of Federation and its working and linkages √

6 Management of Composite Loan and Grant-in-aid √

7 PPP Model √

8 Consolidation and Withdrawal Plan √

Capacity Building Plan Under Livelihood Component of

Note: Financial Aspects for Implementing the above plan will be met under the component of Institutional & Capacity Building Plan at SHGs Level

Page 131

Page 132: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. ParticularsUnit in

ha/No.

Unit Cost

in LacsUnit Size

No. of

Farmer/haS. No. Particulars

Unit in

ha/No.

Unit Cost

in LacsUnit Size

No. of

Farmer/ha

1 Crop Demonstration 14 Distribution of Agriculture Equipments

1.1 Perl Millets (@ .25 ha/farmer) ha 0.08 0.25 1 15 Winnowing Fan No. 0.025 1 5

1.2 Pulses -Urd/Moong/Arhar ha 0.12 0.25 15.1 Chaff Cutter No. 0.05 1 5

1.3 Oil Seeds ha 0.12 0.25 15.2 Sprayer No. 0.03 1 5

1.4 Quinoa ha 0.12 0.25 15.3 Broadcaster No. 0.015 1 5

1.5 Chia ha 0.10 0.25 15.4 Drum Seeder No. 0.08 1 5

1.6 Quinoa ha 0.12 0.25 15.5 Cono Weeded No. 0.014 1 5

1.7 Vegetables 15.6 Seed Treatment Drum No. 0.02 1 5

2 Tomato/Brinjal/Okra/Shimla Mirch ha 0.24 0.1 15.7 Irrigation Pipe No. 0.04 1 5

2.1 Cauliflower/Cabbage ha 0.24 0.1 15.8 Portable Pump for Lift Irrigation No. 0.24 1 5

2.2 Cucurbits ha 0.12 0.1 15.9 Micro-enterprises

2.3 Shakbhaji ha 0.10 0.1 16 Mushroom Cultivation No. 0.24 1 1

3 Spices 16.1 Apiculture No. 0.24 1 1

3.1 Garlic/Ginger/Turmeric ha 0.24 0.1 16.2 Fruit Preservation No. 0.24 1 1

3.2 Coriander/Methi/Saunf/Kalaunji ha 0.12 0.1 16.3 Poultry No. 0.2 1 1

3.3 Chilly ha 0.20 0.1 16.4 Goatary No. 0.2 1 1

4 Floriculture 16.5 Dairy Product No. 0.24 1 5

4.1 Marry Gold ha 0.24 0.1 10 16.6 Mini Dal Mill No. 0.2 1 5

4.2 Deshi Gulab ha 0.24 0.1 10 16.7 Daliya Making Machine No. 0.2 1 5

4.3 Agro-forestry ha 0.10 0.25 4 16.8 Grain Cleaner Cum Grader No. 0.2 1 5

5 Distribution of Various Kit 16.9 Pulverizer No. 0.24 1 5

7 IPM Kit No. 0.02 16.10 Floor Separator No. 0.24 1 5

7.1 Seed Kit No. 0.005 16.11 Portable Charring Kiln No. 0.08 1 5

7.2 Vegetable Kit No. 0.002 16.12 Flakes Making Machine No. 0.20 1 5

7.3 Fodder Kit No. 0.005 16.13 UMMB Block No. 0.10 1 5

7.4 Fisheries No. 0.1

8 Singhade Ki Kheti No. 0.05

9 Plastic Tray Nursery No. 0.05

10 Low Tunnel House No. 0.02

11 Animal Health Camps No. 0.10

12 Distribution of Buck No. 0.05

13 Broiler Goat No. 0.24

Unit COST UNDER PSME in Rs. Lacs/Unit

Page 132

Page 133: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.Phy in

ha

No. of

Farmer

Phy in

No.

No. of

Farmer

Total

FarmersFin

1 Crop Demonstration

1.1 Minor Millets ha 0.08 9.25 0.74 3.50 0.28 0.00 0.00 0.00 0.00 12.75 51 51 1.020

1.2 Pulses -Urd/Moong/Arhar ha 0.12 10.25 1.23 4.00 0.48 0.00 0.00 0.00 0.00 14.25 57 57 1.710

1.3 Oil Seeds ha 0.12 10.75 1.29 4.75 0.57 0.00 0.00 0.00 0.00 15.50 62 62 1.860

1.4 Chia ha 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.000

1.5 Quinoa ha 0.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0.000

2 Vegetables

2.1 Tomato/Brinjal/Okra/Shimla Mirch ha 0.24 4.30 1.03 0.40 0.10 0.00 0.00 0.00 0.00 4.70 47 47 1.128

2.2 Cauliflower/Cabbage ha 0.24 2.50 0.60 0.00 0.00 0.00 0.00 0.00 0.00 2.50 25 25 0.600

2.3 Cucurbits ha 0.12 2.20 0.26 0.00 0.00 0.00 0.00 0.00 0.00 2.20 22 22 0.264

2.4 Shakbhaji ha 0.10 3.20 0.32 0.00 0.00 0.00 0.00 0.00 0.00 3.20 32 32 0.320

3 Spices

3.1 Garlic/Ginger/Turmeric ha 0.24 1.00 0.24 0.00 0.00 0.00 0.00 0.00 0.00 1.00 10 10 0.240

3.2 Coriander/Methi/Saunf/Kalaunji ha 0.12 0.80 0.10 0.40 0.05 0.00 0.00 0.00 0.00 1.20 12 12 0.144

3.3 Chili ha 0.20 0.30 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.30 3 3 0.060

4 Floriculture

4.1 Marry Gold ha 0.24 0.00 0.00 0.90 0.22 0.00 0.00 0.20 0.05 1.10 11 11 0.264

4.2 Deshi Gulab ha 0.24 0.00 0.00 0.20 0.05 2.00 0.48 0.60 0.14 2.80 28 28 0.672

5 Agro-forestry ha 0.10 0.00 0.00 2.00 0.20 0.00 0.00 0.00 0.00 2.00 8 8 0.200

6 Distribution of Various Kit

6.1 IPM Kit No. 0.02 0 0.00 0 0.00 10 0.20 23 0.46 33 33 33 0.660

6.2 Seed Kit No. 0.005 97 0.49 52 0.26 89 0.45 133 0.67 371 371 371 1.855

6.3 Vegetable Kit No. 0.002 124 0.25 81 0.16 107 0.21 170 0.34 482 482 482 0.964

6.4 Fodder Kit No. 0.005 48 0.24 17 0.09 36 0.18 59 0.30 160 160 160 0.800

7 Fisheries No. 0.1 0 0.00 4 0.40 8 0.80 10 1.00 22 22 22 2.200

8 Singhade Ki Kheti No. 0.05 0 0.00 0 0.00 5 0.25 0 0.00 5 5 5 0.250

9 Plastic Tray Nursery No. 0.05 0 0.00 0 0.00 9 0.45 0 0.00 9 9 9 0.450

10 Low Tunnel House No. 0.02 0 0.00 0 0.00 19 0.38 0 0.00 19 19 19 0.380

11 Animal Health Camps No. 0.10 0 0.00 37 3.70 7 0.70 17 1.70 61 3660 3660 6.100

12 Distribution of Buck No. 0.05 0 0.00 0 0.00 6 0.30 0 0.00 6 450 450 0.300

13 Distribution of Agriculture Equipments

13.1 Winnowing Fan No. 0.025 0 0.00 48 1.20 8 0.20 52 1.30 108 108 108 2.700

13.2 Broadcaster No. 0.015 0 0.00 0 0.00 18 0.27 0 0.00 18 18 18 0.270

13.3 Sprayer No. 0.03 0 0.00 44 1.32 7 0.21 18 0.54 69 69 69 2.070

13.4 Drum Seeder No. 0.08 0 0.00 0 0.00 7 0.56 0 0.00 7 7 7 0.560

13.5 Cono Weeded No. 0.014 0 0.00 55 0.77 54 0.76 98 1.37 207 207 207 2.898

ANNUAL ACTION PLAN AT A GLANCE OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER Kanpur Nagar District- Kanpur Nagar

S. No. ParticularsUnit in

ha/No.

Unit Cost

in Lacs

1st Year 2nd Year 3rd Year 4th Year 5th Year TOTAL

Page 133

Page 134: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.Phy in

ha

No. of

Farmer

Phy in

No.

No. of

Farmer

Total

FarmersFin

ANNUAL ACTION PLAN AT A GLANCE OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER Kanpur Nagar District- Kanpur Nagar

S. No. ParticularsUnit in

ha/No.

Unit Cost

in Lacs

1st Year 2nd Year 3rd Year 4th Year 5th Year TOTAL

13.6 Seed Treatment Drum No. 0.02 0 0.00 0 0.00 24 0.48 0 0.00 24 24 24 0.480

13.7 Irrigation Pipe No. 0.04 0 0.00 42 1.68 14 0.56 105 4.20 161 161 161 6.440

13.8 Portable Pump for Lift Irrigation No. 0.24 0 0.00 0 0.00 0 0.00 6 1.44 6 6 6 1.440

14 Micro-enterprises

14.1 Mushroom Cultivation No. 0.24 0 0.00 0 0.00 7 1.68 0 0.00 7 7 7 1.680

14.2 Apiculture No. 0.24 0 0.00 0 0.00 0 0.00 2 0.48 2 2 2 0.480

14.3 Fruit Preservation No. 0.24 0 0.00 0 0.00 2 0.48 0 0.00 2 2 2 0.480

14.4 Poultry No. 0.2 0 0.00 6 1.20 8 1.60 18 3.60 32 32 32 6.400

14.5 Goatry No. 0.2 0 0.00 16 3.20 15 3.00 34 6.80 65 65 65 13.000

14.6 Dairy Product No. 0.24 0 0.00 0 0.00 2 0.48 0 0.00 2 2 2 0.480

14.7 Mini Dal Mill No. 0.2 0 0.00 6 1.20 5 1.00 0 0.00 11 11 11 2.200

14.8 Daliya Making Machine No. 0.2 0 0.00 0 0.00 2 0.40 5 1.00 7 7 7 1.400

14.9 Grain Cleaner Cum Grader No. 0.2 0 0.00 0 0.00 0 0.00 10 2.00 10 10 10 2.000

14.1 Floor Separator No. 0.24 0 0.00 0 0.00 2 0.48 0 0.00 2 2 2 0.480

14.11 Portable Charring Kiln No. 0.08 0 0.00 0 0.00 7 0.56 0 0.00 7 7 7 0.560

14.12 UMMB Block No. 0.1 0 0.00 0 0.00 0 0.00 0 0.00 0 0 0 0.000

6.85 17.12 17.12 27 64 368 1915 5958 6326 68.46Total

Page 134

Page 135: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 Bhailamau 125 1.500 0.5 0.04 0.5 0.06 0.75 0.09 0 0 0 0 0.2 0.048 0 0 0.1 0.012 0.2 0.02

2 Bhaunti khera 74 0.888 0.25 0.02 0.25 0.03 0.5 0.06 0 0 0 0 0.2 0.048 0.1 0.024 0 0 0 0

3 Bhisi Jargaon 107 1.284 0.25 0.02 0.25 0.03 0.25 0.03 0 0 0 0 0.1 0.024 0.1 0.024 0 0 0 0

4 Bhauti Pratappur 302 3.624 0.5 0.04 0.5 0.06 0.5 0.06 0 0 0 0 0.6 0.144 0.3 0.072 0.2 0.024 0.2 0.02

5 Dool 360 4.320 0.5 0.04 0.75 0.09 0.5 0.06 0 0 0 0 0.3 0.072 0.1 0.024 0.2 0.024 0.2 0.02

6 Fatehpur Dakshin 99 1.188 0.25 0.02 0.25 0.03 0 0 0 0 0 0 0.1 0.024 0 0 0 0 0.2 0.02

7 Gopalpur 169 2.028 0.5 0.04 0.5 0.06 0.5 0.06 0 0 0 0 0.1 0.024 0 0 0 0 0 0

8 Gadhewa Mohasinpur 70 0.840 0.25 0.02 0.25 0.03 0.25 0.03 0 0 0 0 0 0 0 0 0 0 0 0

9 Garhi Kanpur 150 1.800 0.5 0.04 0.75 0.09 0.5 0.06 0 0 0 0 0.1 0.024 0 0 0 0 0 0

10 Kurauna Bahadur Nagar 112 1.344 0.25 0.02 0.25 0.03 0 0 0 0 0 0 0.2 0.048 0 0 0 0 0.2 0.02

11 Magrasa 305 3.660 0.75 0.06 1 0.12 0.75 0.09 0 0 0 0 0.1 0.024 0.1 0.024 0 0 0 0

12 Neori 104 1.248 0.25 0.02 0 0 0.25 0.03 0 0 0 0 0.1 0.024 0.1 0.024 0.1 0.012 0.1 0.01

13 Patehuri 125 1.500 0.5 0.04 0.25 0.03 0.75 0.09 0 0 0 0 0.1 0.024 0 0 0 0 0.1 0.01

14 Pipauri 238 2.856 0.75 0.06 0.75 0.09 0.75 0.09 0 0 0 0 0.2 0.048 0 0 0.2 0.024 0.1 0.01

15 Patarsa 236 2.832 0.75 0.06 0.75 0.09 1 0.12 0 0 0 0 0.1 0.024 0 0 0.2 0.024 0.2 0.02

16 Pankabahadur Nagar 156 1.872 0 0 0.5 0.06 1 0.12 0 0 0 0 0.2 0.048 0.1 0.024 0 0 0 0

17 Rampur Bhimsen 384 4.608 0.75 0.06 1 0.12 1.25 0.15 0 0 0 0 0.2 0.048 0.1 0.024 0.2 0.024 0.1 0.01

18 Rampur Khas 220 2.640 0.25 0.02 0.25 0.03 0.5 0.06 0 0 0 0 0.2 0.048 0.2 0.048 0 0 0.3 0.03

19 Ramaipur 334 4.008 0.75 0.06 0.5 0.06 0.75 0.09 0 0 0 0 0.2 0.048 0.2 0.048 0 0 0.3 0.03

20 Rautepur 212 2.544 0.5 0.04 0.5 0.06 0.5 0.06 0 0 0 0 0.1 0.024 0 0 0 0 0 0

21 Raikepur 229 2.748 1 0.08 0.75 0.09 0.75 0.09 0 0 0 0 0.2 0.048 0.2 0.048 0 0 0 0

22 Sen Purab Para 510 6.120 1 0.08 1.25 0.15 1.25 0.15 0 0 0 0 0.3 0.072 0.3 0.072 0.2 0.024 0.5 0.05

23 Senpashchim Para 413 4.956 1 0.08 1 0.12 1 0.12 0 0 0 0 0.3 0.072 0.4 0.096 0.2 0.024 0.2 0.02

24 Sachendi Urf Chacheri 83 0.996 0 0 0.25 0.03 0.25 0.03 0 0 0 0 0.1 0.024 0 0 0 0 0 0

25 Surar 427 5.124 0.5 0.04 0.75 0.09 0.5 0.06 0 0 0 0 0.4 0.096 0.2 0.048 0.5 0.06 0.3 0.03

26 Uriyara 161 1.932 0.25 0.02 0.5 0.06 0.5 0.06 0 0 0 0 0 0 0 0 0.1 0.012 0 0

5705.00 68.460 12.75 1.02 14.25 1.71 15.5 1.86 0 0 0 0 4.7 1.128 2.5 0.6 2.2 0.264 3.2 0.32Total :

Min

or

Mill

ets

Pu

lse

s

Oil

See

ds

Ch

ia

Qu

ino

a

Vegetables

Tom

ato

/

Bri

nja

l/O

kra/

Shim

la M

irch

Cau

liflo

we

r/

Cab

bag

e

Cu

curb

its

Shak

bh

aji

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Crop Demonstration

At a Glance (Phy. In ha & No.)

Page 135

Page 136: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 1.500

2 Bhaunti khera 74 0.888

3 Bhisi Jargaon 107 1.284

4 Bhauti Pratappur 302 3.624

5 Dool 360 4.320

6 Fatehpur Dakshin 99 1.188

7 Gopalpur 169 2.028

8 Gadhewa Mohasinpur 70 0.840

9 Garhi Kanpur 150 1.800

10 Kurauna Bahadur Nagar 112 1.344

11 Magrasa 305 3.660

12 Neori 104 1.248

13 Patehuri 125 1.500

14 Pipauri 238 2.856

15 Patarsa 236 2.832

16 Pankabahadur Nagar 156 1.872

17 Rampur Bhimsen 384 4.608

18 Rampur Khas 220 2.640

19 Ramaipur 334 4.008

20 Rautepur 212 2.544

21 Raikepur 229 2.748

22 Sen Purab Para 510 6.120

23 Senpashchim Para 413 4.956

24 Sachendi Urf Chacheri 83 0.996

25 Surar 427 5.124

26 Uriyara 161 1.932

5705.00 68.460Total :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

At a Glance (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0.1 0.024 0 0 0 0 0 0 0 0 0 0 1 0.02 11 0.06 14 0.03 3 0.02 1 0.1 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 3 0.02 17 0.03 1 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 10 0.05 14 0.03 4 0.02 0 0 0 0

0 0 0.3 0.036 0.2 0.04 0.1 0.024 0 0 0 0 3 0.06 12 0.06 14 0.03 5 0.03 1 0.1 0 0

0.1 0.024 0.3 0.036 0 0 0.1 0.024 0 0 0 0 1 0.02 18 0.09 26 0.05 8 0.04 2 0.2 0 0

0 0 0 0 0 0 0 0 0 0 0 0 2 0.04 8 0.04 17 0.03 7 0.04 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 2 0.04 11 0.06 24 0.05 5 0.03 1 0.1 1 0.05

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 10 0.05 18 0.04 3 0.02 0 0 0 0

0.1 0.024 0 0 0 0 0.2 0.048 0.2 0.048 0 0 1 0.02 13 0.07 9 0.02 4 0.02 2 0.2 0 0

0.1 0.024 0 0 0 0 0 0 0 0 0 0 1 0.02 14 0.07 18 0.04 7 0.04 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 19 0.1 27 0.05 14 0.07 1 0.1 1 0.05

0 0 0.1 0.012 0 0 0 0 0 0 0 0 1 0.02 11 0.06 11 0.02 5 0.03 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 8 0.04 20 0.04 5 0.03 1 0.1 0 0

0 0 0 0 0 0 0.1 0.024 0 0 0 0 1 0.02 13 0.07 15 0.03 3 0.02 1 0.1 1 0.05

0 0 0 0 0 0 0.1 0.024 0 0 0 0 2 0.04 19 0.1 24 0.05 7 0.04 1 0.1 0 0

0 0 0 0 0.1 0.02 0 0 0 0 0 0 1 0.02 9 0.05 14 0.03 5 0.03 0 0 0 0

0.2 0.048 0.2 0.024 0 0 0 0 0.5 0.12 0 0 2 0.04 19 0.1 19 0.04 7 0.04 0 0 0 0

0 0 0 0 0 0 0.1 0.024 0 0 0 0 2 0.04 11 0.06 21 0.04 2 0.01 0 0 0 0

0 0 0 0 0 0 0.1 0.024 0 0 0 0 1 0.02 22 0.11 17 0.03 3 0.02 2 0.2 1 0.05

0 0 0.1 0.012 0 0 0 0 0.2 0.048 0 0 1 0.02 15 0.08 19 0.04 9 0.05 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.02 16 0.08 15 0.03 5 0.03 3 0.3 0 0

0.2 0.048 0.2 0.024 0 0 0.2 0.048 0.7 0.168 1 0.1 2 0.04 30 0.15 30 0.06 12 0.06 3 0.3 0 0

0 0 0 0 0 0 0 0 0.5 0.12 1 0.1 1 0.02 19 0.1 23 0.05 10 0.05 2 0.2 0 0

0 0 0 0 0 0 0 0 0.2 0.048 0 0 0 0 8 0.04 13 0.03 3 0.02 0 0 0 0

0.2 0.048 0 0 0 0 0.1 0.024 0.5 0.12 0 0 0 0 25 0.13 17 0.03 9 0.05 1 0.1 0 0

0 0 0 0 0 0 0 0 0 0 0 0 2 0.04 17 0.09 26 0.05 14 0.07 0 0 1 0.05

1 0.24 1.2 0.144 0.3 0.06 1.1 0.264 2.8 0.672 2 0.2 33 0.66 371 1.86 482 0.96 160 0.8 22 2.2 5 0.25

Ch

ili

Mar

ry G

old

De

shi G

ula

b

Agr

o-

fore

stry

IPM

Kit

See

d K

it

Ve

geta

ble

Kit

Fod

de

r K

it

Fish

eri

es

Sin

ghad

e K

i

Kh

eti

Spices Floriculture

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER

Gar

lic/

Gin

ger/

Turm

eri

c

Co

rian

de

r/

Me

thi/

Sau

nf/

Kal

aun

ji

Rampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 136

Page 137: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 1.500

2 Bhaunti khera 74 0.888

3 Bhisi Jargaon 107 1.284

4 Bhauti Pratappur 302 3.624

5 Dool 360 4.320

6 Fatehpur Dakshin 99 1.188

7 Gopalpur 169 2.028

8 Gadhewa Mohasinpur 70 0.840

9 Garhi Kanpur 150 1.800

10 Kurauna Bahadur Nagar 112 1.344

11 Magrasa 305 3.660

12 Neori 104 1.248

13 Patehuri 125 1.500

14 Pipauri 238 2.856

15 Patarsa 236 2.832

16 Pankabahadur Nagar 156 1.872

17 Rampur Bhimsen 384 4.608

18 Rampur Khas 220 2.640

19 Ramaipur 334 4.008

20 Rautepur 212 2.544

21 Raikepur 229 2.748

22 Sen Purab Para 510 6.120

23 Senpashchim Para 413 4.956

24 Sachendi Urf Chacheri 83 0.996

25 Surar 427 5.124

26 Uriyara 161 1.932

5705.00 68.460Total :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

At a Glance (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 2 0.2 0 0 3 0.08 1 0.02 2 0.06 0 0 7 0.1 1 0.02 3 0.12 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 1 0.03 0 0 3 0.04 0 0 4 0.16 0 0 0 0

1 0.05 1 0.02 1 0.1 0 0 3 0.08 1 0.02 2 0.06 0 0 7 0.1 1 0.02 5 0.2 0 0 0 0

0 0 1 0.02 3 0.3 0 0 4 0.1 1 0.02 3 0.09 1 0.08 9 0.13 1 0.02 6 0.24 0 0 1 0.24

0 0 1 0.02 4 0.4 1 0.05 6 0.15 0 0 5 0.15 1 0.08 11 0.15 1 0.02 9 0.36 1 0.24 0 0

0 0 1 0.02 3 0.3 0 0 4 0.1 1 0.02 2 0.06 0 0 5 0.07 1 0.02 7 0.28 0 0 0 0

0 0 1 0.02 2 0.2 0 0 5 0.13 1 0.02 2 0.06 0 0 9 0.13 1 0.02 7 0.28 0 0 0 0

0 0 1 0.02 1 0.1 0 0 4 0.1 1 0.02 2 0.06 0 0 6 0.08 1 0.02 4 0.16 0 0 0 0

1 0.05 1 0.02 2 0.2 1 0.05 6 0.15 1 0.02 2 0.06 0 0 7 0.1 1 0.02 4 0.16 1 0.24 0 0

0 0 0 0 2 0.2 0 0 4 0.1 1 0.02 2 0.06 0 0 9 0.13 1 0.02 7 0.28 0 0 1 0.24

0 0 0 0 3 0.3 1 0.05 6 0.15 1 0.02 4 0.12 1 0.08 7 0.1 1 0.02 8 0.32 0 0 0 0

0 0 1 0.02 2 0.2 1 0.05 6 0.15 1 0.02 4 0.12 0 0 7 0.1 1 0.02 6 0.24 0 0 0 0

0 0 1 0.02 3 0.3 0 0 4 0.1 1 0.02 2 0.06 0 0 9 0.13 1 0.02 9 0.36 0 0 0 0

0 0 0 0 2 0.2 0 0 5 0.13 0 0 2 0.06 0 0 9 0.13 0 0 7 0.28 0 0 0 0

0 0 1 0.02 4 0.4 0 0 5 0.13 1 0.02 2 0.06 1 0.08 8 0.11 1 0.02 7 0.28 0 0 1 0.24

0 0 1 0.02 1 0.1 1 0.05 3 0.08 0 0 4 0.12 0 0 7 0.1 1 0.02 9 0.36 0 0 0 0

0 0 1 0.02 3 0.3 0 0 5 0.13 0 0 2 0.06 1 0.08 9 0.13 1 0.02 5 0.2 0 0 1 0.24

1 0.05 1 0.02 3 0.3 0 0 2 0.05 1 0.02 3 0.09 1 0.08 12 0.17 1 0.02 5 0.2 0 0 0 0

1 0.05 1 0.02 2 0.2 0 0 1 0.03 1 0.02 1 0.03 0 0 7 0.1 1 0.02 9 0.36 0 0 0 0

1 0.05 0 0 3 0.3 0 0 3 0.08 0 0 1 0.03 0 0 9 0.13 1 0.02 5 0.2 1 0.24 1 0.24

1 0.05 1 0.02 2 0.2 0 0 5 0.13 0 0 3 0.09 0 0 8 0.11 1 0.02 7 0.28 0 0 1 0.24

1 0.05 1 0.02 3 0.3 0 0 7 0.18 1 0.02 5 0.15 1 0.08 11 0.15 1 0.02 9 0.36 0 0 0 0

0 0 1 0.02 3 0.3 0 0 5 0.13 0 0 4 0.12 0 0 12 0.17 1 0.02 8 0.32 1 0.24 0 0

1 0.05 1 0.02 1 0.1 1 0.05 2 0.05 1 0.02 2 0.06 0 0 7 0.1 1 0.02 2 0.08 1 0.24 0 0

0 0 0 0 4 0.4 0 0 5 0.13 1 0.02 4 0.12 0 0 6 0.08 1 0.02 4 0.16 0 0 0 0

1 0.05 1 0.02 2 0.2 0 0 5 0.13 1 0.02 3 0.09 0 0 6 0.08 1 0.02 5 0.2 1 0.24 1 0.24

9 0.45 19 0.38 61 6.1 6 0.3 108 2.7 18 0.27 69 2.07 7 0.56 207 2.9 24 0.48 161 6.44 6 1.44 7 1.68

Po

rtab

le

Pu

mp

Mu

shro

om

Cu

ltiv

atio

n

Bro

adca

ste

r

Spra

yer

Win

no

win

g

Fan

An

imal

He

alth

Cam

ps

Dis

trib

uti

on

of

Bu

ck

Mini Agriculture Equipments

Pla

stic

Tra

y

Nu

rse

ry

Low

Tu

nn

el

Ho

use

Kanpur Nagar

Dru

m S

ee

de

r

Co

no

We

ed

ed

See

d

Tre

atm

en

t

Dru

m

Irri

gati

on

Pip

e

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict-

Page 137

Page 138: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 1.500

2 Bhaunti khera 74 0.888

3 Bhisi Jargaon 107 1.284

4 Bhauti Pratappur 302 3.624

5 Dool 360 4.320

6 Fatehpur Dakshin 99 1.188

7 Gopalpur 169 2.028

8 Gadhewa Mohasinpur 70 0.840

9 Garhi Kanpur 150 1.800

10 Kurauna Bahadur Nagar 112 1.344

11 Magrasa 305 3.660

12 Neori 104 1.248

13 Patehuri 125 1.500

14 Pipauri 238 2.856

15 Patarsa 236 2.832

16 Pankabahadur Nagar 156 1.872

17 Rampur Bhimsen 384 4.608

18 Rampur Khas 220 2.640

19 Ramaipur 334 4.008

20 Rautepur 212 2.544

21 Raikepur 229 2.748

22 Sen Purab Para 510 6.120

23 Senpashchim Para 413 4.956

24 Sachendi Urf Chacheri 83 0.996

25 Surar 427 5.124

26 Uriyara 161 1.932

5705.00 68.460Total :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

At a Glance (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinPhy

in ha

No. of

Farmer

Phy

in No.

No. of

Farmer

Total

Farmer

Fin

in Lakhs

0 0 0 0 0 0 2 0.4 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 2.35 0 51 0 0 1.500

0 0 0 0 0 0 1 0.2 0 0 0 0 1 0.2 0 0 0 0.00 0 0.00 0 0.00 1.30 0 32 0 0 0.888

0 0 0 0 0 0 2 0.4 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 0.95 0 53 0 0 1.284

0 0 0 0 3 0.6 3 0.6 0 0 1 0.2 0 0 1 0.2 0 0.00 0 0.00 0 0.00 3.40 0 73 0 0 3.624

0 0 0 0 4 0.8 3 0.6 0 0 2 0.4 0 0 0 0 0 0.00 1 0.08 0 0.00 3.05 0 105 0 0 4.320

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 0.80 0 59 0 0 1.188

0 0 0 0 0 0 3 0.6 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 1.60 0 76 0 0 2.028

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 0.75 0 53 0 0 0.840

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 2.35 0 57 0 0 1.800

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 1.00 0 67 0 0 1.344

0 0 0 0 0 0 4 0.8 0 0 2 0.4 2 0.4 1 0.2 0 0.00 0 0.00 0 0.00 2.70 0 104 0 0 3.660

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 1.00 0 58 0 0 1.247

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 1 0.08 0 0.00 1.70 0 66 0 0 1.500

0 0 1 0.2 1 0.2 4 0.8 0 0 0 0 0 0 1 0.2 0 0.00 0 0.00 0 0.00 2.85 0 66 0 0 2.857

0 0 0 0 0 0 3 0.6 0 0 0 0 0 0 1 0.2 0 0.00 0 0.00 0 0.00 3.10 0 88 0 0 2.832

0 0 1 0.2 0 0 1 0.2 0 0 0 0 0 0 1 0.2 0 0.00 0 0.00 0 0.00 1.90 0 59 0 0 1.873

0 0 0 0 5 1 5 1 0 0 2 0.4 1 0.2 0 0 0 0.00 0 0.00 0 0.00 4.50 0 88 0 0 4.607

1 0.2 0 0 1 0.2 4 0.8 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 1.80 0 72 0 0 2.640

0 0 0 0 4 0.8 6 1.2 0 0 0 0 1 0.2 1 0.2 0 0.00 0 0.00 0 0.00 2.80 0 82 0 0 4.007

0 0 0 0 1 0.2 2 0.4 1 0.2 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 1.90 0 73 0 0 2.543

0 0 0 0 2 0.4 2 0.4 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 2.90 0 73 0 0 2.748

0 0 0 0 4 0.8 8 1.6 0 0 1 0.2 1 0.2 2 0.4 0 0.00 0 0.00 0 0.00 7.10 0 133 0 0 6.120

0 0 0 0 2 0.4 7 1.4 1 0.2 1 0.2 0 0 0 0 1 0.24 0 0.00 0 0.00 5.60 0 102 0 0 4.956

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 0.80 0 44 0 0 0.996

1 0.2 0 0 4 0.8 5 1 0 0 2 0.4 1 0.2 2 0.4 1 0.24 0 0.00 0 0.00 3.95 0 93 0 0 5.124

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 1.35 0 88 0 0 1.933

2 0.5 2 0.5 32 6.4 65 13 2 0.5 11 2.2 7 1.4 10 2 2 0.48 7 0.56 0 0.00 63.50 0 1915 0 0 68.459

UM

MB

Blo

ck

Dai

ry P

rod

uct

Min

i Dal

Mill

Dal

iya

Mak

ing

Mac

hin

e

Gra

in C

lean

er

Cu

m

Gra

de

r

Flo

or

Sep

arat

or

Po

rtab

le

Ch

arri

ng

Kiln

Ap

icu

ltu

re

Fru

it

Pre

serv

atio

n

Po

ult

ry

Go

atry

Micro-enterprises

TOTAL

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 138

Page 139: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 Bhailamau 125 0.150 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0.000 0 0 0 0 0.1 0.012 0.2 0.02

2 Bhaunti khera 74 0.089 0.00 0.000 0.00 0 0.25 0.03 0 0.000 0.1 0.024 0.1 0.024 0 0 0 0

3 Bhisi Jargaon 107 0.128 0.25 0.020 0.25 0.03 0.25 0.03 0.00 0.000 0.1 0.024 0.1 0.024 0 0 0 0

4 Bhauti Pratappur 302 0.362 0.25 0.020 0.25 0.03 0.25 0.03 0 0.000 0.5 0.12 0.3 0.072 0.2 0.024 0.2 0.02

5 Dool 360 0.432 0.5 0.040 0.75 0.09 0.5 0.06 0 0 0.000 0.3 0.072 0.1 0.024 0.2 0.024 0.2 0.02

6 Fatehpur Dakshin 99 0.119 0.25 0.020 0.25 0.03 0 0 0 0.000 0.1 0.024 0 0 0 0 0.2 0.02

7 Gopalpur 169 0.203 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.1 0.024 0 0 0 0 0 0

8 Gadhewa Mohasinpur 70 0.084 0.25 0.020 0.25 0.03 0.25 0.03 0 0.000 0 0 0 0 0 0 0 0

9 Garhi Kanpur 150 0.180 0.25 0.020 0.5 0.06 0.25 0.03 0 0.000 0.1 0.024 0 0 0 0 0 0

10 Kurauna Bahadur Nagar 112 0.134 0.000 0.25 0.03 0 0 0.000 0.2 0.048 0 0 0 0 0.2 0.02

11 Magrasa 305 0.366 0.5 0.040 0.75 0.09 0.5 0.06 0 0.000 0.1 0.024 0.1 0.024 0 0 0 0

12 Neori 104 0.125 0.25 0.020 0 0 0.25 0.03 0 0.000 0.1 0.024 0.1 0.024 0.1 0.012 0.1 0.01

13 Patehuri 125 0.150 0.25 0.020 0.25 0.03 0.5 0.06 0 0.000 0.1 0.024 0 0 0 0 0.1 0.01

14 Pipauri 238 0.286 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.2 0.048 0 0 0.2 0.024 0.1 0.01

15 Patarsa 236 0.283 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.1 0.024 0 0 0.2 0.024 0.2 0.02

16 Pankabahadur Nagar 156 0.187 0 0.000 0.25 0.03 0.5 0.06 0 0.000 0.2 0.048 0.1 0.024 0 0 0 0

17 Rampur Bhimsen 384 0.461 0.5 0.040 0.75 0.09 0.75 0.09 0 0.000 0.2 0.048 0.1 0.024 0.2 0.024 0.1 0.01

18 Rampur Khas 220 0.264 0.25 0.020 0.25 0.03 0.5 0.06 0 0.000 0.2 0.048 0.2 0.048 0 0 0.3 0.03

19 Ramaipur 334 0.401 0.75 0.060 0.5 0.06 0.75 0.09 0 0.000 0.2 0.048 0.2 0.048 0 0 0.3 0.03

20 Rautepur 212 0.254 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.1 0.024 0 0 0 0 0 0

21 Raikepur 229 0.275 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.2 0.048 0.2 0.048 0 0 0 0

22 Sen Purab Para 510 0.612 0.75 0.060 0.75 0.09 0.75 0.09 0 0.000 0.3 0.072 0.3 0.072 0.2 0.024 0.5 0.05

23 Senpashchim Para 413 0.496 0.75 0.060 0.5 0.06 0.5 0.06 0 0.000 0.3 0.072 0.4 0.096 0.2 0.024 0.2 0.02

24 Sachendi Urf Chacheri 83 0.100 0 0.000 0.25 0.03 0.25 0.03 0 0.000 0.1 0.024 0 0 0 0 0 0

25 Surar 427 0.512 0.5 0.040 0.5 0.06 0.5 0.06 0 0.000 0.4 0.096 0.2 0.048 0.5 0.06 0.3 0.03

26 Uriyara 161 0.193 0.25 0.020 0.25 0.03 0.5 0.06 0 0.000 0 0 0 0 0.1 0.012 0 0

5705.00 6.846 9.25 0.74 10.25 1.23 10.75 1.29 0 0 0 0 4.3 1.032 2.5 0.6 2.2 0.264 3.2 0.32TOTAl :

Min

or

Mill

ets

Pu

lse

s

Oil

See

ds

Ch

ia

Qu

ino

a

Vegetables

Tom

ato

/

Bri

nja

l/O

kra/

Shim

la M

irch

Cau

liflo

we

r/

Cab

bag

e

Cu

curb

its

Shak

bh

aji

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Crop Demonstration

IInd Year (Phy. In ha & No.)

Page 139

Page 140: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.150

2 Bhaunti khera 74 0.089

3 Bhisi Jargaon 107 0.128

4 Bhauti Pratappur 302 0.362

5 Dool 360 0.432

6 Fatehpur Dakshin 99 0.119

7 Gopalpur 169 0.203

8 Gadhewa Mohasinpur 70 0.084

9 Garhi Kanpur 150 0.180

10 Kurauna Bahadur Nagar 112 0.134

11 Magrasa 305 0.366

12 Neori 104 0.125

13 Patehuri 125 0.150

14 Pipauri 238 0.286

15 Patarsa 236 0.283

16 Pankabahadur Nagar 156 0.187

17 Rampur Bhimsen 384 0.461

18 Rampur Khas 220 0.264

19 Ramaipur 334 0.401

20 Rautepur 212 0.254

21 Raikepur 229 0.275

22 Sen Purab Para 510 0.612

23 Senpashchim Para 413 0.496

24 Sachendi Urf Chacheri 83 0.100

25 Surar 427 0.512

26 Uriyara 161 0.193

5705.00 6.846TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IInd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0.1 0.024 0 0 0 0 0 0 0 0 0 0 0 0 2 0.01 2 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 ##### 1 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0.2 0.04 0 0 0 0 0 0 0 0 0 0 3 0.01 0 0 0 0 0

0.1 0.024 0.3 0.036 0 0 0 0 0 0 0 0 0 0 4 0.02 6 0.01 2 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0.010 3 0.02 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.01 2 0 1 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0

0.1 0.024 0 0 0 0 0 0 0 0 0 0 0 0 2 0.01 1 0 2 0.01 0 0 0 0

0.1 0.024 0 0 0 0 0 0 0 0 0 0 0 0 1 0.01 1 0 1 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0.05 14 0.03 10 0.05 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.01 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0.03 7 0.01 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0.04 10 0.02 0 0 0 0 0

0 0 0 0 0.1 0.02 0 0 0 0 0 0 0 0 0 3 0.01 0 0 0 0 0

0.2 0.048 0.2 0.024 0 0 0 0 0 0 0 0 0 0 8 0.04 4 0.01 3 0.02 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.02 4 0.01 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0.05 7 0.01 0 0 0 0 0

0 0 0.1 0.012 0 0 0 0 0 0 0 0 0 0 5 0.03 4 0.01 5 0.03 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.01 2 0 1 0.01 0 0 0 0

0.2 0.048 0.2 0.024 0 0 0 0 0 0 0 0 0 0 10 0.05 11 0.02 2 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0.05 14 0.03 5 0.03 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.01 3 0.01 1 0.01 0 0 0 0

0.2 0.048 0 0 0 0 0 0 0 0 0 0 0 0 9 0.05 5 0.01 3 0.02 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.02 6 0.01 8 0.04 0 0 0 0

1 0.24 0.8 0.096 0.3 0.06 0 0 0 0 0 0 0 0 97 0.49 124 0.25 48 0.24 0 0 0 0

Ch

ili

Mar

ry G

old

De

shi G

ula

b

Agr

o-

fore

stry

IPM

Kit

See

d K

it

Ve

geta

ble

Kit

Fod

de

r K

it

Fish

eri

es

Sin

ghad

e K

i

Kh

eti

Spices Floriculture

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER

Gar

lic/

Gin

ger/

Turm

eri

c

Co

rian

de

r/

Me

thi/

Sau

nf/

Kal

aun

ji

Rampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 140

Page 141: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.150

2 Bhaunti khera 74 0.089

3 Bhisi Jargaon 107 0.128

4 Bhauti Pratappur 302 0.362

5 Dool 360 0.432

6 Fatehpur Dakshin 99 0.119

7 Gopalpur 169 0.203

8 Gadhewa Mohasinpur 70 0.084

9 Garhi Kanpur 150 0.180

10 Kurauna Bahadur Nagar 112 0.134

11 Magrasa 305 0.366

12 Neori 104 0.125

13 Patehuri 125 0.150

14 Pipauri 238 0.286

15 Patarsa 236 0.283

16 Pankabahadur Nagar 156 0.187

17 Rampur Bhimsen 384 0.461

18 Rampur Khas 220 0.264

19 Ramaipur 334 0.401

20 Rautepur 212 0.254

21 Raikepur 229 0.275

22 Sen Purab Para 510 0.612

23 Senpashchim Para 413 0.496

24 Sachendi Urf Chacheri 83 0.100

25 Surar 427 0.512

26 Uriyara 161 0.193

5705.00 6.846TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IInd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Po

rtab

le

Pu

mp

Mu

shro

om

Cu

ltiv

atio

n

Bro

adca

ste

r

Spra

yer

Win

no

win

g

Fan

An

imal

He

alth

Cam

ps

Dis

trib

uti

on

of

Bu

ck

Mini Agriculture Equipments

Pla

stic

Tra

y

Nu

rse

ry

Low

Tu

nn

el

Ho

use

Kanpur Nagar

Dru

m S

ee

de

r

Co

no

We

ed

ed

See

d

Tre

atm

en

t

Dru

m

Irri

gati

on

Pip

e

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict-

Page 141

Page 142: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.150

2 Bhaunti khera 74 0.089

3 Bhisi Jargaon 107 0.128

4 Bhauti Pratappur 302 0.362

5 Dool 360 0.432

6 Fatehpur Dakshin 99 0.119

7 Gopalpur 169 0.203

8 Gadhewa Mohasinpur 70 0.084

9 Garhi Kanpur 150 0.180

10 Kurauna Bahadur Nagar 112 0.134

11 Magrasa 305 0.366

12 Neori 104 0.125

13 Patehuri 125 0.150

14 Pipauri 238 0.286

15 Patarsa 236 0.283

16 Pankabahadur Nagar 156 0.187

17 Rampur Bhimsen 384 0.461

18 Rampur Khas 220 0.264

19 Ramaipur 334 0.401

20 Rautepur 212 0.254

21 Raikepur 229 0.275

22 Sen Purab Para 510 0.612

23 Senpashchim Para 413 0.496

24 Sachendi Urf Chacheri 83 0.100

25 Surar 427 0.512

26 Uriyara 161 0.193

5705.00 6.846TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IInd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinPhy

in ha

No. of

Farmer

Phy

in No.

No. of

Farmer

Total

Farmer

Fin

in Lakhs

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.15 7 4 4 11 0.150

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.45 3 4 4 7 0.089

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.95 5 0 0 5 0.128

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.15 17 3 3 20 0.362

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.95 19 12 12 31 0.432

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 5 8 8 13 0.119

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6 7 5 5 12 0.203

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 3 2 2 5 0.084

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 6 5 5 11 0.180

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 6 3 3 9 0.134

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.95 9 34 34 43 0.366

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.9 6 2 2 8 0.124

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 6 3 3 9 0.150

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 11 13 13 24 0.286

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 11 17 17 28 0.283

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.15 7 3 3 10 0.188

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 18 15 15 33 0.461

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7 11 8 8 19 0.264

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.7 15 17 17 32 0.400

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7 8 14 14 22 0.254

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9 10 5 5 15 0.275

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.95 26 23 23 49 0.612

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.85 18 29 29 47 0.495

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6 3 5 5 8 0.100

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.1 22 17 17 39 0.512

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1 5 18 18 23 0.194

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 44.55 264 269 269 533 6.84500

UM

MB

Blo

ck

Dai

ry P

rod

uct

Min

i Dal

Mill

Dal

iya

Mak

ing

Mac

hin

e

Gra

in C

lean

er

Cu

m

Gra

de

r

Flo

or

Sep

arat

or

Po

rtab

le

Ch

arri

ng

Kiln

Ap

icu

ltu

re

Fru

it

Pre

serv

atio

n

Po

ult

ry

Go

atry

Micro-enterprises

TOTAL

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER Senia, IWMP-VII District- Kanpur Nagar

Page 142

Page 143: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 Bhailamau 125 0.375 0.25 0.020 0.25 0.03 0.5 0.06 0 0 0.2 0.048 0 0 0 0

2 Bhaunti khera 74 0.222 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0.1 0.024 0 0 0

3 Bhisi Jargaon 107 0.321 0.000 0 0 0 0 0 0 0 0

4 Bhauti Pratappur 302 0.906 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0.1 0.024 0 0 0

5 Dool 360 1.080 0.000 0 0 0 0 0 0 0 0

6 Fatehpur Dakshin 99 0.297 0.000 0 0 0 0 0 0 0 0

7 Gopalpur 169 0.507 0.000 0 0 0 0 0 0 0 0

8 Gadhewa Mohasinpur 70 0.210 0.000 0 0 0 0 0 0 0 0

9 Garhi Kanpur 150 0.450 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0 0 0 0

10 Kurauna Bahadur Nagar 112 0.336 0.25 0.020 0 0 0 0 0 0 0 0

11 Magrasa 305 0.915 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0 0 0 0

12 Neori 104 0.312 0.000 0 0 0 0 0 0 0 0

13 Patehuri 125 0.375 0.25 0.020 0 0.25 0.03 0 0 0 0 0 0

14 Pipauri 238 0.714 0.25 0.020 0.25 0.03 0.25 0.03 0 0 0 0 0 0

15 Patarsa 236 0.708 0.25 0.020 0.25 0.03 0.5 0.06 0 0 0 0 0 0

16 Pankabahadur Nagar 156 0.468 0.000 0.25 0.03 0.5 0.06 0 0 0 0 0 0

17 Rampur Bhimsen 384 1.152 0.25 0.020 0.25 0.03 0.5 0.06 0 0 0 0 0 0

18 Rampur Khas 220 0.660 0.000 0 0 0 0 0 0 0 0

19 Ramaipur 334 1.002 0.000 0 0 0 0 0 0 0 0 0

20 Rautepur 212 0.636 0.000 0 0 0 0 0 0 0 0

21 Raikepur 229 0.687 0.5 0.040 0.25 0.03 0.25 0.03 0 0 0 0 0 0

22 Sen Purab Para 510 1.530 0.25 0.020 0.5 0.06 0.5 0.06 0 0 0 0 0 0

23 Senpashchim Para 413 1.239 0.25 0.020 0.5 0.06 0.5 0.06 0 0 0 0 0 0

24 Sachendi Urf Chacheri 83 0.249 0.000 0 0 0 0 0 0 0 0

25 Surar 427 1.281 0.000 0.25 0.03 0 0 0 0 0 0 0

26 Uriyara 161 0.483 0.000 0.25 0.03 0 0 0 0 0 0 0

5705.00 17.115 3.50 0.280 4.00 0.480 4.75 0.570 0.00 0.000 0.00 0.000 0.40 0.096 0.00 0.000 0.00 0.000 0.00 0.000TOTAl :

Cau

liflo

we

r/

Cab

bag

e

Cu

curb

its

Shak

bh

aji

Min

or

Mill

ets

Pu

lse

s

Oil

See

ds

Ch

ia

Qu

ino

a

Vegetables

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Crop Demonstration

IIIrd Year (Phy. In ha & No.)

Tom

ato

/

Bri

nja

l/O

kra/

Shim

la M

irch

Kanpur NagarDistrict-Rampur Bhimsen,

IWMP-VIII

Page 143

Page 144: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8 Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10 Kurauna Bahadur Nagar 112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16 Pankabahadur Nagar 156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24 Sachendi Urf Chacheri 83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IIIrd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 0 0 0 0 0 0 0 1 0.005 1 0.002 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 4 0.008 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 3 0.015 4 0.008 0 0 0 0 0 0

0 0.3 0.036 0 0.1 0.024 0 0 0 0 0 0 3 0.015 2 0.004 1 0.005 1 0.1 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 2 0.01 3 0.006 0 0 1 0.1 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.005 2 0.004 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.005 7 0.014 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.002 0 0 0 0 0 0

0 0 0 0.2 0.048 0.2 0.048 0 0 0 0 4 0.02 3 0.006 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 2 0.01 4 0.008 2 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 2 0.01 1 0.002 1 0.005 0 0 0 0

0 0.1 0.012 0 0 0 0 0 0 0 0 0 2 0.01 1 0.002 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 2 0.01 6 0.012 3 0.015 0 0 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 2 0.01 1 0.002 2 0.01 0 0 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 2 0.01 3 0.006 2 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 2 0.01 5 0.010 2 0.01 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 3 0.015 2 0.004 2 0.01 0 0 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 2 0.01 4 0.008 0 0 0 0 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 0 0 0 0.000 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 3 0.015 4 0.008 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 3 0.015 5 0.010 0 0 1 0.1 0 0

0 0 0 0 0 0 0 1 0.1 0 0 5 0.025 4 0.008 2 0.01 1 0.1 0 0

0 0 0 0 0 0 0 1 0.1 0 0 2 0.01 3 0.006 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 3 0.015 6 0.012 0 0 0 0 0 0

0 0 0 0.1 0.024 0 0 0 0 0 0 1 0.005 0 0.000 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.005 5 0.010 0 0 0 0 0 0

0.00 0.000 0.40 0.048 0.00 0.000 0.90 0.216 0.20 0.048 2.00 0.200 0 0.000 52 0.260 81 0.162 17 0.085 4 0.400 0 0.000

Gar

lic/

Gin

ger/

Turm

eri

c

Co

rian

de

r/

Me

thi/

Sau

nf/

Kal

aun

ji

Ve

geta

ble

Kit

Fod

de

r K

it

Fish

eri

es

Sin

ghad

e K

i

Kh

eti

Spices Floriculture

Ch

ili

Mar

ry G

old

De

shi G

ula

b

Agr

o-

fore

stry

IPM

Kit

See

d K

it

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 144

Page 145: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8 Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10 Kurauna Bahadur Nagar 112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16 Pankabahadur Nagar 156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24 Sachendi Urf Chacheri 83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IIIrd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 1 0.1 0 0 2 0.05 0 0 2 0.06 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.03 0 0 0 0 0 0 2 0.08 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.03 0 0 2 0.028 0 0 1 0.04 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 2 0.06 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 2 0.06 0 0 5 0.07 0 0 4 0.16 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 0 0 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 1 0.04 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 2 0.06 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 1 0.03 0 0 2 0.028 0 0 1 0.04 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 3 0.09 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 3 0.075 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 2 0.06 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 0 0 0 0 1 0.03 0 0 2 0.028 0 0 3 0.12 0 0 0 0

0 0 0 0 2 0.2 0 0 3 0.075 0 0 1 0.03 0 0 2 0.028 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 3 0.09 0 0 3 0.042 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 3 0.075 0 0 5 0.15 0 0 3 0.042 0 0 2 0.08 0 0 0 0

0 0 0 0 2 0.2 0 0 1 0.025 0 0 3 0.09 0 0 2 0.028 0 0 1 0.04 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 3 0.042 0 0 0 0 0 0 0 0

0 0 0 0 2 0.2 0 0 2 0.05 0 0 3 0.09 0 0 3 0.042 0 0 1 0.04 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 2 0.06 0 0 2 0.028 0 0 0 0 0 0 0 0

0 0.000 0 0.000 37 3.700 0 0.000 48 1.200 0 0.000 44 1.320 0 0.000 55 0.770 0 0.000 42 1.680 0 0.000 0 0.000

Bro

adca

ste

r

Spra

yer

See

d

Tre

atm

en

t

Dru

m

Irri

gati

on

Pip

e

Po

rtab

le

Pu

mp

Mu

shro

om

Cu

ltiv

atio

n

Pla

stic

Tra

y

Nu

rse

ry

Low

Tu

nn

el

Ho

use

Win

no

win

g

Fan

An

imal

He

alth

Cam

ps

Dis

trib

uti

on

of

Bu

ck

Mini Agriculture Equipments

Dru

m S

ee

de

r

Co

no

We

ed

ed

Kanpur NagarDistrict-WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIII

Page 145

Page 146: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8 Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10 Kurauna Bahadur Nagar 112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16 Pankabahadur Nagar 156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24 Sachendi Urf Chacheri 83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IIIrd Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinPhy

in ha

No. of

Farmer

Phy

in No.

No. of

Farmer

Total

Farmer

Fin

in Lakhs

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.20 6 7 22 28 0.375

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.85 4 7 4 8 0.222

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 12 8 8 0.321

0 0 0 0 0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 1.25 8 18 7 15 0.906

0 0 0 0 0 0 1 0.2 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0.10 1 23 7 8 1.080

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 11 3 3 0.297

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 17 9 9 0.507

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 7 1 1 0.210

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.15 7 14 7 14 0.450

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 1 16 8 9 0.336

0 0 0 0 0 0 1 0.2 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0.75 3 16 5 8 0.915

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.10 1 11 3 4 0.312

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.50 2 19 11 13 0.375

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.85 4 15 6 10 0.714

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.10 5 16 8 13 0.708

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 3 19 9 12 0.468

0 0 0 0 1 0.2 1 0.2 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 1.00 4 20 9 13 1.152

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.10 1 17 7 8 0.660

0 0 0 0 1 0.2 2 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.10 1 11 3 4 1.002

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 18 8 8 0.636

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 4 21 9 13 0.687

0 0 0 0 1 0.2 2 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.25 9 30 15 24 1.530

0 0 0 0 0 0 2 0.4 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 2.25 9 17 7 16 1.239

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0 16 9 9 0.249

0 0 0 0 1 0.2 2 0.4 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0.35 2 16 4 6 1.281

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 1 14 7 8 0.483

0 0.00 0 0.00 6 1.20 16 3.20 0 0.00 6 1.20 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 16.15 76 408 196 272 17.12

Dai

ry P

rod

uct

Min

i Dal

Mill

Dal

iya

Mak

ing

Mac

hin

e

Gra

in C

lean

er

Cu

m

Gra

de

r

Fru

it

Pre

serv

atio

n

Po

ult

ry

Go

atry TOTAL

Micro-enterprises

UM

MB

Blo

ck

Flo

or

Sep

arat

or

Po

rtab

le

Ch

arri

ng

Kiln

Ap

icu

ltu

re

Kanpur NagarWC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict-

Page 146

Page 147: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 Bhailamau 125 0.375 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

2 Bhaunti khera 74 0.222 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

3 Bhisi Jargaon 107 0.321 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

4 Bhauti Pratappur 302 0.906 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

5 Dool 360 1.080 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

6 Fatehpur Dakshin 99 0.297 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

7 Gopalpur 169 0.507 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

8Gadhewa Mohasinpur 70 0.210 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

9 Garhi Kanpur 150 0.450 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

10Kurauna Bahadur Nagar112 0.336 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

11 Magrasa 305 0.915 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

12 Neori 104 0.312 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

13 Patehuri 125 0.375 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

14 Pipauri 238 0.714 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

15 Patarsa 236 0.708 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

16Pankabahadur Nagar156 0.468 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

17 Rampur Bhimsen 384 1.152 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

18 Rampur Khas 220 0.660 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

19 Ramaipur 334 1.002 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

20 Rautepur 212 0.636 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

21 Raikepur 229 0.687 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

22 Sen Purab Para 510 1.530 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

23 Senpashchim Para 413 1.239 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

24Sachendi Urf Chacheri83 0.249 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

25 Surar 427 1.281 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

26 Uriyara 161 0.483 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0

5705.00 17.115 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0TOTAl :

Min

or

Mill

ets

Pu

lse

s

Oil

See

ds

Ch

ia

Qu

ino

a

Vegetables

Tom

ato

/

Bri

nja

l/O

kra/

Shim

la M

irch

Cau

liflo

we

r/

Cab

bag

e

Cu

curb

its

Shak

bh

aji

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Crop Demonstration

IVth Year (Phy. In ha & No.)

Page 147

Page 148: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10Kurauna Bahadur Nagar112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16Pankabahadur Nagar156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24Sachendi Urf Chacheri83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IVth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 0 0 0 0 0 7 0.04 11 0.022 3 0.02 0 0

0 0 0 0 0 0 0 0 0 2 0.01 6 0.012 0 0 0

0 0 0 0 0 0 0 0 0 2 0.01 4 0.008 1 0.01 0 0

0 0 0 0 0 0 0 0 1 0.02 5 0.03 4 0.008 2 0.01 0 0

0 0 0 0 0 0 0 0 0 5 0.03 6 0.012 3 0.02 1 0.1 0 0

0 0 0 0 0 0 0 0 1 0.02 1 0.01 2 0.004 1 0.01 0 0

0 0 0 0 0 0 0 0 1 0.02 4 0.02 7 0.014 2 0.01 0 1 0.05

0 0 0 0 0 0 0 0 6 0.03 6 0.012 1 0.01 0 0

0 0 0 0 0 0 0 0 3 0.02 1 0.002 1 0.01 1 0.1 0

0 0 0 0 0 0 0 0 4 0.02 4 0.008 1 0.01 0 0

0 0 0 0 0 0 0 0 2 0.01 1 0.002 1 0.01 0 1 0.05

0 0 0 0 0 0 0 0 1 0.01 2 0.004 1 0.01 0 0

0 0 0 0 0 0 0 1 0.02 6 0.03 6 0.012 2 0.01 0 0

0 0 0 0 0 0 0 0 2 0.01 0 0.000 0 0 1 0.05

0 0 0 0 0 0 0 1 0.02 5 0.03 5 0.010 2 0.01 1 0.1 0

0 0 0 0 0 0 0 0 3 0.02 3 0.006 2 0.01 0 0

0 0 0 0 0 0.5 0.12 0 1 0.02 2 0.01 7 0.014 0 0 0 0

0 0 0 0 0 0 0 1 0.02 2 0.01 7 0.014 1 0.01 0 0

0 0 0 0 0 0 0 0 5 0.03 5 0.010 1 0.01 1 0.1 1 0.05

0 0 0 0 0 0 0 1 0.02 4 0.02 4 0.008 2 0.01 0 0

0 0 0 0 0 0 0 0 4 0.02 2 0.004 1 0.01 1 0.1 0

0 0 0 0 0 0.5 0.12 0 1 0.02 5 0.03 1 0.002 2 0.01 1 0.1 0

0 0 0 0 0 0.5 0.12 0 0 1 0.01 1 0.002 2 0.01 1 0.1 0

0 0 0 0 0 0 0 0 3 0.02 3 0.006 1 0.01 0 0

0 0 0 0 0 0.5 0.12 0 0 1 0.01 4 0.008 1 0.01 1 0.1 0

0 0 0 0 0 0 0 1 0.02 4 0.02 5 0.010 2 0.01 0 1 0.05

0 0 0 0 0 0 0 0 2 0.48 0 0 10 0.2 89 0.45 107 0.21 36 0.18 8 0.8 5 0.25

Ch

ili

Mar

ry G

old

De

shi G

ula

b

Agr

o-

fore

stry

IPM

Kit

See

d K

it

Ve

geta

ble

Kit

Fod

de

r K

it

Fish

eri

es

Sin

ghad

e K

i

Kh

eti

Spices Floriculture

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER

Gar

lic/

Gin

ger/

Turm

eri

c

Co

rian

de

r/

Me

thi/

Sau

nf/

Kal

aun

ji

Rampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 148

Page 149: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10Kurauna Bahadur Nagar112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16Pankabahadur Nagar156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24Sachendi Urf Chacheri83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IVth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 0 0 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 0.05 1 0.02 1 0.1 0 1 0.03 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

0 1 0.02 0 0 0 1 0.02 0 1 0.08 2 0.03 1 0.02 1 0.04 0 0 1 0.24

0 1 0.02 1 0.1 1 0.05 2 0.05 0 2 0.06 1 0.08 2 0.03 1 0.02 1 0.04 0 0 0 0

0 1 0.02 1 0.1 0 0 1 0.02 0 0 2 0.03 1 0.02 0 0 0 0 0

0 1 0.02 0 0 0 1 0.02 1 0.03 0 2 0.03 1 0.02 0 0 0 0 0

0 1 0.02 0 0 0 1 0.02 0 0 2 0.03 1 0.02 0 0 0 0 0

1 0.05 1 0.02 0 1 0.05 1 0.03 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

0 0 0 0 0 1 0.02 0 0 2 0.03 1 0.02 0 0 0 1 0.24

0 0 0 1 0.05 1 0.03 1 0.02 1 0.03 1 0.08 2 0.03 1 0.02 0 0 0 0 0

0 1 0.02 0 1 0.05 1 0.03 1 0.02 2 0.06 0 2 0.03 1 0.02 0 0 0 0 0

0 1 0.02 1 0.1 0 0 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

0 0 0 0 0 0 0 0 1 0.01 0 0 0 0 0 0 0

0 1 0.02 1 0.1 0 0 1 0.02 0 1 0.08 2 0.03 1 0.02 1 0.04 0 0 1 0.24

0 1 0.02 0 1 0.05 1 0.03 0 0 0 3 0.04 1 0.02 1 0.04 0 0 0 0

0 1 0.02 0 0 0 0 0 1 0.08 2 0.03 1 0.02 0 0 0 1 0.24

1 0.05 1 0.02 1 0.1 0 0 1 0.02 1 0.03 1 0.08 4 0.06 1 0.02 1 0.04 0 0 0 0

1 0.05 1 0.02 0 0 1 0.03 1 0.02 0 0 3 0.04 1 0.02 1 0.04 0 0 0 0

1 0.05 0 0 0 0 0 0 0 2 0.03 1 0.02 0 0 0 1 0.24

1 0.05 1 0.02 0 0 0 0 0 0 2 0.03 1 0.02 0 0 0 1 0.24

1 0.05 1 0.02 0 0 0 1 0.02 0 1 0.08 2 0.03 1 0.02 1 0.04 0 0 0 0

0 1 0.02 0 0 0 0 0 0 3 0.04 1 0.02 1 0.04 0 0 0 0

1 0.05 1 0.02 0 1 0.05 0 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

0 0 1 0.1 0 0 1 0.02 0 0 2 0.03 1 0.02 1 0.04 0 0 0 0

1 0.05 1 0.02 0 0 0 1 0.02 0 0 2 0.03 1 0.02 0 0 0 1 0.24

9 0.45 19 0.38 7 0.7 6 0.3 8 0.2 18 0.27 7 0.21 7 0.56 54 0.76 24 0.48 14 0.56 0 0 7 1.68

Po

rtab

le

Pu

mp

Mu

shro

om

Cu

ltiv

atio

n

Bro

adca

ste

r

Spra

yer

Win

no

win

g

Fan

An

imal

He

alth

Cam

ps

Dis

trib

uti

on

of

Bu

ck

Mini Agriculture Equipments

Pla

stic

Tra

y

Nu

rse

ry

Low

Tu

nn

el

Ho

use

Kanpur Nagar

Dru

m S

ee

de

r

Co

no

We

ed

ed

See

d

Tre

atm

en

t

Dru

m

Irri

gati

on

Pip

e

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict-

Page 149

Page 150: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.375

2 Bhaunti khera 74 0.222

3 Bhisi Jargaon 107 0.321

4 Bhauti Pratappur 302 0.906

5 Dool 360 1.080

6 Fatehpur Dakshin 99 0.297

7 Gopalpur 169 0.507

8Gadhewa Mohasinpur 70 0.210

9 Garhi Kanpur 150 0.450

10Kurauna Bahadur Nagar112 0.336

11 Magrasa 305 0.915

12 Neori 104 0.312

13 Patehuri 125 0.375

14 Pipauri 238 0.714

15 Patarsa 236 0.708

16Pankabahadur Nagar156 0.468

17 Rampur Bhimsen 384 1.152

18 Rampur Khas 220 0.660

19 Ramaipur 334 1.002

20 Rautepur 212 0.636

21 Raikepur 229 0.687

22 Sen Purab Para 510 1.530

23 Senpashchim Para 413 1.239

24Sachendi Urf Chacheri83 0.249

25 Surar 427 1.281

26 Uriyara 161 0.483

5705.00 17.115TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

IVth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinPhy

in ha

No. of

Farmer

Phy

in No.

No. of

Farmer

Total

Farmer

Fin

in Lakhs

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 27 47 47 0.375

0 0 0 0 0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 9 8 8 0.222

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 9 9 0.321

0 0 0 0 1 0.2 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 22 16 16 0.906

0 0 0 0 1 0.2 0 0 0 1 0.2 0 0 0 0 0 1 0.1 0 0 0 30 17 17 1.080

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.1 0 0 0 12 6 6 0.297

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 1 0.1 0 0 0 23 17 17 0.507

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.1 0 0 0 19 14 14 0.210

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.1 0 0 0 16 8 8 0.450

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 10 10 0.336

0 0 0 0 0 0 1 0.2 0 0 1 0.2 1 0.2 0 0 0 0 0 0 0 16 6 6 0.915

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.1 0 0 0 14 5 5 0.312

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0.1 0 0 0 23 16 16 0.375

0 0 1 0.2 1 0.2 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 7 6 6 0.714

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 16 16 0.708

0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17 10 10 0.468

0 0 0 0 1 0.2 1 0.2 0 0 1 0.2 0 0 0 0 0 0 0 0.5 5 19 14 19 1.152

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 24 14 14 0.660

0 0 0 0 1 0.2 2 0.4 0 0 0 0 0 0 0 0 0 0 0 0 25 18 18 1.002

0 0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 17 13 13 0.636

0 0 0 0 0 0 1 0.2 0 0 0 0 0 0 0 0 0 0 0 0 15 12 12 0.687

0 0 0 0 1 0.2 3 0.6 0 0 1 0.2 0 0 0 0 0 0 0 0.5 5 23 16 21 1.530

0 0 0 0 0 0 2 0.4 1 0.2 0 0 0 0 1 0.2 0 0 0.5 5 15 8 13 1.239

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 9 9 0.249

0 0 0 0 1 0.2 1 0.2 0 0 1 0.2 0 0 0 1 0.2 0 0 0.5 5 17 9 14 1.281

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 16 16 0.483

0 0 2 0.5 8 1.6 15 3 2 0.5 5 1 2 0.4 0 0 2 0.5 7 0.6 0 0 2.00 20 478 340 360 #######

UM

MB

Blo

ck

Dai

ry P

rod

uct

Min

i Dal

Mill

Dal

iya

Mak

ing

Mac

hin

e

Gra

in C

lean

er

Cu

m

Gra

de

r

Flo

or

Sep

arat

or

Po

rtab

le

Ch

arri

ng

Kiln

Ap

icu

ltu

re

Fru

it

Pre

serv

atio

n

Po

ult

ry

Go

atry

Micro-enterprises

TOTAL

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 150

Page 151: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

1 Bhailamau 125 0.600 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 Bhaunti khera 74 0.355 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Bhisi Jargaon 107 0.514 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Bhauti Pratappur 302 1.450 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5 Dool 360 1.728 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 Fatehpur Dakshin 99 0.475 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 Gopalpur 169 0.811 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8 Gadhewa Mohasinpur 70 0.336 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 Garhi Kanpur 150 0.720 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 Kurauna Bahadur Nagar 112 0.538 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11 Magrasa 305 1.464 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

12 Neori 104 0.499 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

13 Patehuri 125 0.600 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

14 Pipauri 238 1.142 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

15 Patarsa 236 1.133 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 Pankabahadur Nagar 156 0.749 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Rampur Bhimsen 384 1.843 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

18 Rampur Khas 220 1.056 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

19 Ramaipur 334 1.603 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

20 Rautepur 212 1.018 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21 Raikepur 229 1.099 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

22 Sen Purab Para 510 2.448 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 Senpashchim Para 413 1.982 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 Sachendi Urf Chacheri 83 0.398 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Surar 427 2.050 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

26 Uriyara 161 0.773 0 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5705.00 27.384 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 0 0TOTAl :

Min

or

Mill

ets

Pu

lse

s

Oil

See

ds

Ch

ia

Qu

ino

a

Vegetables

Tom

ato

/

Bri

nja

l/O

kra/

Shim

la M

irch

Cau

liflo

we

r/

Cab

bag

e

Cu

curb

its

Shak

bh

aji

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Crop Demonstration

Vth Year (Phy. In ha & No.)

Page 151

Page 152: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.600

2 Bhaunti khera 74 0.355

3 Bhisi Jargaon 107 0.514

4 Bhauti Pratappur 302 1.450

5 Dool 360 1.728

6 Fatehpur Dakshin 99 0.475

7 Gopalpur 169 0.811

8 Gadhewa Mohasinpur 70 0.336

9 Garhi Kanpur 150 0.720

10 Kurauna Bahadur Nagar 112 0.538

11 Magrasa 305 1.464

12 Neori 104 0.499

13 Patehuri 125 0.600

14 Pipauri 238 1.142

15 Patarsa 236 1.133

16 Pankabahadur Nagar 156 0.749

17 Rampur Bhimsen 384 1.843

18 Rampur Khas 220 1.056

19 Ramaipur 334 1.603

20 Rautepur 212 1.018

21 Raikepur 229 1.099

22 Sen Purab Para 510 2.448

23 Senpashchim Para 413 1.982

24 Sachendi Urf Chacheri 83 0.398

25 Surar 427 2.050

26 Uriyara 161 0.773

5705.00 27.384TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Vth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 0 0 0 0 0 0 0 1 0.02 1 0.01 0 0 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 1 0.01 4 0.01 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 5 0.03 6 0.01 3 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 2 0.04 4 0.02 5 0.01 2 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 7 0.04 11 0.02 3 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 6 0.03 8 0.02 3 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 4 0.02 8 0.02 2 0.01 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 4 0.02 9 0.02 2 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 4 0.02 4 0.01 1 0.01 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 7 0.04 9 0.02 3 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 5 0.03 11 0.02 2 0.01 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 8 0.04 6 0.01 4 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0.01 0 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 3 0.02 7 0.01 1 0.01 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 5 0.03 6 0.01 3 0.02 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 4 0.02 3 0.01 1 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 6 0.03 6 0.01 2 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 3 0.02 6 0.01 1 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 7 0.04 5 0.01 2 0.01 1 0.1 0

0 0 0 0 0 0 0 0.2 0.048 0 0 0 0 3 0.02 7 0.01 2 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 7 0.04 6 0.01 3 0.02 1 0.1 0

0 0 0 0 0 0.2 0.048 0.2 0.048 0 0 1 0.02 10 0.05 14 0.03 6 0.03 1 0.1 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 6 0.03 5 0.01 3 0.02 1 0.1 0

0 0 0 0 0 0 0 0.2 0.048 0 0 0 0 1 0.01 1 0 1 0.01 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 14 0.07 8 0.02 5 0.03 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.02 8 0.04 10 0.02 4 0.02 0 0

0 0 0 0 0 0 0.2 0.048 0.6 0.144 0 0 23 0.46 133 0.67 170 0.34 59 0.3 10 1 0 0

Ch

ili

Mar

ry G

old

De

shi G

ula

b

Agr

o-

fore

stry

IPM

Kit

See

d K

it

Ve

geta

ble

Kit

Fod

de

r K

it

Fish

eri

es

Sin

ghad

e K

i

Kh

eti

Spices Floriculture

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDER

Gar

lic/

Gin

ger/

Turm

eri

c

Co

rian

de

r/

Me

thi/

Sau

nf/

Kal

aun

ji

Rampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 152

Page 153: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.600

2 Bhaunti khera 74 0.355

3 Bhisi Jargaon 107 0.514

4 Bhauti Pratappur 302 1.450

5 Dool 360 1.728

6 Fatehpur Dakshin 99 0.475

7 Gopalpur 169 0.811

8 Gadhewa Mohasinpur 70 0.336

9 Garhi Kanpur 150 0.720

10 Kurauna Bahadur Nagar 112 0.538

11 Magrasa 305 1.464

12 Neori 104 0.499

13 Patehuri 125 0.600

14 Pipauri 238 1.142

15 Patarsa 236 1.133

16 Pankabahadur Nagar 156 0.749

17 Rampur Bhimsen 384 1.843

18 Rampur Khas 220 1.056

19 Ramaipur 334 1.603

20 Rautepur 212 1.018

21 Raikepur 229 1.099

22 Sen Purab Para 510 2.448

23 Senpashchim Para 413 1.982

24 Sachendi Urf Chacheri 83 0.398

25 Surar 427 2.050

26 Uriyara 161 0.773

5705.00 27.384TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Vth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

0 0 0 0 1 0.1 0 0 1 0.03 0 0 0 0 0 5 0.07 0 0 2 0.08 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0.04 0 0 2 0.08 0 0 0 0

0 0 0 0 0 0 0 2 0.05 0 0 1 0.03 0 0 3 0.04 0 0 3 0.12 0 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 5 0.07 0 0 3 0.12 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 4 0.06 0 0 4 0.16 1 0.24 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 1 0.01 0 0 5 0.2 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 0 0 0 5 0.07 0 0 5 0.2 0 0 0

0 0 0 0 0 0 0 2 0.05 0 0 1 0.03 0 0 2 0.03 0 0 4 0.16 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 3 0.04 0 0 2 0.08 1 0.24 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 5 0.07 0 0 5 0.2 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 3 0.04 0 0 6 0.24 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 3 0.04 0 0 4 0.16 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 5 0.07 0 0 6 0.24 0 0 0

0 0 0 0 0 0 0 3 0.08 0 0 1 0.03 0 0 6 0.08 0 0 5 0.2 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 4 0.06 0 0 5 0.2 0 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.03 0 0 2 0.03 0 0 6 0.24 0 0 0

0 0 0 0 1 0.1 0 0 2 0.05 0 0 1 0.03 0 0 5 0.07 0 0 3 0.12 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0.08 0 0 2 0.08 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.03 0 0 5 0.2 0 0 0

0 0 0 0 1 0.1 0 0 0 0 0 0 0 0 0 5 0.07 0 0 3 0.12 1 0.24 0 0

0 0 0 0 0 0 0 3 0.08 0 0 0 0 0 3 0.04 0 0 5 0.2 0 0 0

0 0 0 0 1 0.1 0 0 4 0.1 0 0 0 0 0 6 0.08 0 0 6 0.24 0 0 0

0 0 0 0 1 0.1 0 0 4 0.1 0 0 1 0.03 0 0 7 0.1 0 0 6 0.24 1 0.24 0 0

0 0 0 0 0 0 0 0 0 0 0 1 0.03 0 0 2 0.03 0 0 1 0.04 1 0.24 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 1 0.01 0 0 2 0.08 0 0 0

0 0 0 0 1 0.1 0 0 3 0.08 0 0 1 0.03 0 0 2 0.03 0 0 5 0.2 1 0.24 0 0

0 0 0 0 17 1.7 0 0 52 1.3 0 0 18 0.54 0 0 98 1.37 0 0 105 4.2 6 1.44 0 0

Po

rtab

le

Pu

mp

Mu

shro

om

Cu

ltiv

atio

n

Bro

adca

ste

r

Spra

yer

Win

no

win

g

Fan

An

imal

He

alth

Cam

ps

Dis

trib

uti

on

of

Bu

ck

Mini Agriculture Equipments

Pla

stic

Tra

y

Nu

rse

ry

Low

Tu

nn

el

Ho

use

Kanpur Nagar

Dru

m S

ee

de

r

Co

no

We

ed

ed

See

d

Tre

atm

en

t

Dru

m

Irri

gati

on

Pip

e

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict-

Page 153

Page 154: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

1 Bhailamau 125 0.600

2 Bhaunti khera 74 0.355

3 Bhisi Jargaon 107 0.514

4 Bhauti Pratappur 302 1.450

5 Dool 360 1.728

6 Fatehpur Dakshin 99 0.475

7 Gopalpur 169 0.811

8 Gadhewa Mohasinpur 70 0.336

9 Garhi Kanpur 150 0.720

10 Kurauna Bahadur Nagar 112 0.538

11 Magrasa 305 1.464

12 Neori 104 0.499

13 Patehuri 125 0.600

14 Pipauri 238 1.142

15 Patarsa 236 1.133

16 Pankabahadur Nagar 156 0.749

17 Rampur Bhimsen 384 1.843

18 Rampur Khas 220 1.056

19 Ramaipur 334 1.603

20 Rautepur 212 1.018

21 Raikepur 229 1.099

22 Sen Purab Para 510 2.448

23 Senpashchim Para 413 1.982

24 Sachendi Urf Chacheri 83 0.398

25 Surar 427 2.050

26 Uriyara 161 0.773

5705.00 27.384TOTAl :

S. No. Name of WC

Planned

Area

in ha

Amount

in Lakhs

Vth Year (Phy. In ha & No.)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinPhy in

ha

No. of

Farmer

Phy in

No.

No. of

Farmer

Total

Farmers

Fin

in Lakhs

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0.00 0 0 13 44 44 0.600

0 0 0 0 1 0.2 0 0 0 0 0 0 0.00 0 0 12 7 7 0.355

0 0 0 0 1 0.2 0 0 0 0 0 0 0 0.00 0 0 25 16 16 0.514

0 0 2 0.4 2 0.4 0 0 0 0 1 0.2 0 0 0.00 0 0 30 17 17 1.450

0 0 3 0.6 2 0.4 0 0 0 0 0 0 0 0.00 0 0 40 27 27 1.728

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 28 18 18 0.475

0 0 0 1 0.2 0 0 0 0 0 0 0 0.00 0 0 31 17 17 0.811

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 25 16 16 0.336

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 22 11 11 0.720

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 34 20 20 0.538

0 0 0 2 0.4 0 0 0 1 0.2 1 0.2 0 0 0.00 0 0 38 22 22 1.464

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 31 19 19 0.499

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 21 6 6 0.600

0 0 0 2 0.4 0 0 0 0 1 0.2 0 0 0.00 0 0 31 15 15 1.143

0 0 0 2 0.4 0 0 0 0 1 0.2 0 0 0.00 0 0 32 17 17 1.133

0 0 0 1 0.2 0 0 0 0 1 0.2 0 0 0.00 0 0 20 10 10 0.749

0 0 3 0.6 3 0.6 0 0 0 1 0.2 0 0 0 0.00 0 0 34 21 21 1.842

1 0.24 0 0 3 0.6 0 0 0 0 0 0 0 0.00 0 0 23 15 15 1.056

0 0 2 0.4 2 0.4 0 0 0 1 0.2 1 0.2 0 0 0.00 0 0 29 20 20 1.603

0 0 0 2 0.4 0 0 0 0 0 0 0 0.00 0.2 2 24 14 16 1.017

0 0 2 0.4 1 0.2 0 0 0 0 0 0 0 0.00 0 0 32 21 21 1.099

0 0 2 0.4 3 0.6 0 0 0 1 0.2 2 0.4 0 0 0.00 0.4 4 57 37 41 2.448

0 0 2 0.4 3 0.6 0 0 0 0 0 0 0.00 0 0 41 21 21 1.983

0 0 0 0 0 0 0 0 0 0 0 0.00 0.2 2 8 3 5 0.398

1 0.24 0 2 0.4 2 0.4 0 0 0 1 0.2 2 0.4 0 0 0.00 0 0 43 32 32 2.050

0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 36 23 23 0.773

2 0.48 0 0 18 3.6 34 6.8 0 0 0 0 5 1 10 2 0 0 0 0 0 0 0.80 8 760 489 497 27.38400

UM

MB

Blo

ck

Dai

ry P

rod

uct

Min

i Dal

Mill

Dal

iya

Mak

ing

Mac

hin

e

Gra

in C

lean

er

Cu

m

Gra

de

r

Flo

or

Sep

arat

or

Po

rtab

le

Ch

arri

ng

Kiln

Ap

icu

ltu

re

Fru

it

Pre

serv

atio

n

Po

ult

ry

Go

atry

Micro-enterprises

TOTAL

WC WISE ACTION PLAN OF PRODUCTION SYSTEM AND MICRO-ENTERPRISES UNDERRampur Bhimsen,

IWMP-VIIIDistrict- Kanpur Nagar

Page 154

Page 155: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

2 Bhaunti khera 74.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

3 Bhisi Jargaon 107.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

4 Bhauti Pratappur 302.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

5 Dool 360.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 1 0 1 0 45 7.920

6 Fatehpur Dakshin 99.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

7 Gopalpur 169.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

8 Gadhewa Mohasinpur 70.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

9 Garhi Kanpur 150.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

10Kurauna Bahadur Nagar112.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

11 Magrasa 305.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

12 Neori 104.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

13 Patehuri 125.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

14 Pipauri 238.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 1 0 1 0 43 7.920

15 Patarsa 236.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

16 Pankabahadur Nagar156.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

17 Rampur Bhimsen 384.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 3 0 3 0 49 7.920

18 Rampur Khas 220.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 0 0 0 0 41 7.920

19 Ramaipur 334.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 1 0 1 0 43 7.920

20 Rautepur 212.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

21 Raikepur 229.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 1 0 1 0 41 7.920

22 Sen Purab Para 510.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 4 0 4 0 3 0 3 0 51 7.920

23 Senpashchim Para 413.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 4 0 4 0 2 0 2 0 49 7.920

24 Sachendi Urf Chacheri83.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

25 Surar 427.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

26 Uriyara 161.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

5705.00 130 11.70 104 8.32 104 46.80 130 45.50 130 52.00 104 2.08 104 36.40 156 3.12 33 0.00 33 0.00 18 0.00 18 0.00 1064 205.92

District-

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

At A Glance Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, Kanpur Nagar ( Phy in Nos. Fin. In Lakhs)

Total

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

TotalS. No. Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Page 155

Page 156: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

5 Dool 360 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

11 Magrasa 305 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

12 Neori 104 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

13 Patehuri 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

14 Pipauri 238 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

15 Patarsa 236 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

16Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

20 Rautepur 212 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

21 Raikepur 229 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

24Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

25 Surar 427 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

26 Uriyara 161 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

Total 5705 26 2.34 26 2.08 26 11.7 26 9.1 26 10.40 26 0.52 26 9.1 26 0.52 6 0.00 6 0.00 6 0.00 6 0.00 232 45.76

TotalS.

No.Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

( Phy in Nos. Fin. In Lakhs)Kanpur NagarIInd Year District-Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, IWMP-

Page 156

Page 157: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

5 Dool 360 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

11 Magrasa 305 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

12 Neori 104 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

13 Patehuri 125 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

14 Pipauri 238 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

15 Patarsa 236 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

16 Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 0 0.00 0 0.00 11 2.11

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

20 Rautepur 212 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

21 Raikepur 229 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

24 Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

25 Surar 427 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

26 Uriyara 161 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

5705.00 26 2.34 26 2.08 26 11.7 52 18.2 26 10.40 26 0.52 26 9.1 26 0.52 9 0.00 9 0.00 8 0.00 8 0.00 268 54.86

District-

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

IIIrd Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, Kanpur Nagar ( Phy in Nos. Fin. In Lakhs)

Total

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

TotalS. No. Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Page 157

Page 158: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

5 Dool 360 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

11 Magrasa 305 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

12 Neori 104 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

13 Patehuri 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

14 Pipauri 238 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

15 Patarsa 236 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

16 Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

20 Rautepur 212 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

21 Raikepur 229 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

24 Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

25 Surar 427 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

26 Uriyara 161 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

5705.00 26 2.34 26 2.08 26 11.70 26 9.10 26 10.40 26 0.52 26 9.10 52 1.04 12 0.00 12 0.00 4 0.00 4 0.00 266 46.28

District-

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

IVth Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, Kanpur Nagar ( Phy in Nos. Fin. In Lakhs)

Total

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

TotalS. No. Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Page 158

Page 159: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

2 Bhaunti khera 74 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

3 Bhisi Jargaon 107 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

4 Bhauti Pratappur 302 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

5 Dool 360 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

6 Fatehpur Dakshin 99 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

7 Gopalpur 169 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

8 Gadhewa Mohasinpur 70 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

9 Garhi Kanpur 150 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

10Kurauna Bahadur Nagar 112 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

11 Magrasa 305 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

12 Neori 104 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

13 Patehuri 125 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

14 Pipauri 238 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

15 Patarsa 236 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

16Pankabahadur Nagar 156 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

17 Rampur Bhimsen 384 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

18 Rampur Khas 220 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

19 Ramaipur 334 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

20 Rautepur 212 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

21 Raikepur 229 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

22 Sen Purab Para 510 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

23 Senpashchim Para 413 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

24Sachendi Urf Chacheri 83 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

25 Surar 427 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

26 Uriyara 161 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

5705.00 52 4.68 26 2.08 26 11.70 26 9.10 52 20.80 26 0.52 26 9.10 52 1.04 6 0.00 6 0.00 0 0.00 0 0.00 298 59.02

District-

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

Vth Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, IWMP- Kanpur Nagar ( Phy in Nos. Fin. In Lakhs)

Total

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

TotalS.

No.Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Page 159

Page 160: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Problem Thrust Area

1Cluster of IWMP-I Project area lacks the high value agro forestry plantations

and the existing plantations do not have technical & developmental support.2 Non-mechanised farming system

3 Use of local varieties and impure seed materials

4 No seed treatments

5 Broadcast sowing

6 Imbalance use of fertilizer and its placement.

7 No use of Bio-fertilizer and Bio-pesticides

8 Unavailability of irrigation facilities .

9 Practice of mono cropping system.

10 Unawareness of newly recommended varieties of crops for Bundelkhand region

11 Poor water management & poor plant protection measures.

12 High yielding varieties suited to land condition are not available.

13 Increased Soil Erosion

14 Inadequate & untimely support services.

15 Soil becoming infertile

16 Uneven topography

17 Weak infrastructure

18 Water table becoming lower

19 Inadequate knowledge of improved technology

20 Untimely fertilizer availability

21 Improper sowing technique

22 Improper crop rotation

23 Weed infestation

24 Low relative profitability from farming

25 Rainfed Agriculture Area

26 Non-availability of Quality Horticulture/Agro Plants

Production System

Proposed Intervention

Soil and water conservation, watershed management

S.No.

Problem Thrust Area of Production System in the Project Area of

Availability, distribution and production of quality seeds

Integrated Weed management in different crops (Distribution of Weeder).

Distribution of Agriculture Equipments/Pumps

Seed treatment with fungicides, insecticides & rhizobium culture.

Popularization of Green manuring, Vermi compost and NADEP compost to nourish the soil.

Popularization of high yielding varieties suited to sodic conditions

Ensure availability of quality seeds/seedlings/planting materials.

Awareness about health and value addition of fruits and vegetables.

Promoting IPM, IDM and INM in crop production System

Motivation of farmers to Diversified farming

Popularizing use of sulphur in oilseed/ Pulses crop

Line sowing & weed management

Proper seed treatment

Growing of crops on the basis of crop rotation

Promote organic farming/green manuring.

Need of conducting trainings of scientific agricultural activities for practicing

Fertilizer application as per soil analysis report/Soil Testing

Use of high yielding variety seeds

Need of formation of farmers clubs.

farmers/farm women.

Use of bio-fertilizers and fertilizers scheduling for oil seeds, pulses and other crops.

Need of creating awareness regarding excessive chemical use in agriculture.

Need of conducting employment-generating trainings

Promoting farmers to grow medicinal plants

Introduction of nursery management and orchard management

Page 160

Page 161: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Rampur Bhimsen, IWMP-VIII District-

1 Basic Orintation Programme √

2 Mechansation of Production System √

3 Advanced Agriculture Practices

i Soil Testing √

ii Balanced Dose of Fertilizer √

iii Seed Treatment √

iv IPM, INM Practices √

v Weed Management : Chemical/Mechanical √

vi Seed Production and Multiplication of Seeds √

4 Farming System Improvements √

5 Organic Farming : Vermi/Nadep Compost, Green Manuring, Use of Bio-fertilizer √

6 Agro-Forestry/Horticulture √

i Scope of Vegitable and Fruit Production √

ii Kitchen Garden √

7 Post Harvest Management √

8 Nursery Raising √

9 Livestock Development √

i Livestock Production : Milk Prodution, Egg Production, Meat Production √

ii Animal Health Camps √

iii AI / Vaccination √

iv Mineral and Mixtures √

v Deworming √

vi Health Check-up √

vii Breed Replacement √

viii Breed Improvement √

ix Feed Management √

x Fodder Production Management √

10 Micro-enterprises

i Skill Training for Micro-enterprises √

ii Value Addition/Agro Procesing, Packaging and Marketing √

iii Backward and Forward Linkages √

iv Record Keeping, Quality Control and Business Promotion √

11 Miscs.

Exposure Visits of Farmers √ √

Within district @ 5 farmers per Microwatershed 15 √ √

Out of district but within state @ 3 farmers per Microwatershed 15 √ √

Out of State @ 1 farmers per Microwatershed 15 √ √

Pre and Post Crop GoshthiField Day √ √

Note: Financial Aspects for Implementing the above plan will be met under the component of Institutional & Capacity Building Plan at Users Group & Others Level

Capacity Building Plan Under Production System & Micro Enterprises of

S. No. Details of Programme Preparatory phase

(I st to IInd Year)

work phase

(IInd to IVth year)

Consolidation and

withdrawal plan (Vth year)

Kanpur Nagar

Page 161

Page 162: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Horticulture Plantation Plant to Plant Spacing Row to row spacing No. of Plants/ha Cost of Plantation in Rs.

1 Mango 10 10 100

2 Guava 6 6 278

3 Amala 6 6 278

4 Lemmon/Ber/Bale 6 6 278

5 Sharifa 6 6 278

6 Anar 6 6 278

1 Planting Material

2 Compost

3 Irrigation/Watering Mahuwa Babool Amaltas

4 Fertilizer/ Bio-frtilizer Jamun Su Babool Palm

5 Maint. In Ist Year Kahal Sahjan Gulmohar

6 Maint. In 2nd Year Pakad Bamboo Teak

7 Maint. In IIIrd Year Peepal Ashok Popular

8 Dispplay Board Gular Kadamb Gular 

Neem Kachnar

1 Mary Gold 24000

2 Deshi Gulab 24000

3 IPM Kit 2000

Unit Cost/Estimate of Horticulture Plantation (Fruit Plantation) in Rs./ha

Above Cost include the following items :-

Cost of Afforestation in Rs. 10000/ha

Scattered Plantation :-

@ Rs. 40/- Plant for Horticulture Plantation.

@ Rs.20/- per Plant for Timber, Fuel and Fodder Plantation

(inclusive of all costs comprising cost of plant, transportation,

advance work, plantation, SMC, casualty replacement, protection,

awareness and overheads)

Rs. 20000/ha

Page 162

Page 163: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin in ha in No.

1 Bhailamau 1.75 0.18 2.50 0.50 345.00 0.07 445.00 0.18 4.25 790 0.92

2 Bhaunti khera 1.00 0.10 1.75 0.35 175.00 0.04 280.00 0.11 2.75 455 0.60

3 Bhisi Jargaon 1.75 0.18 2.50 0.50 190.00 0.04 190.00 0.08 4.25 380 0.79

4 Bhauti Pratappur 4.50 0.45 7.50 1.50 385.00 0.08 515.00 0.21 12.00 900 2.23

5 Dool 5.75 0.58 8.75 1.75 405.00 0.08 640.00 0.26 14.50 1045 2.66

6 Fatehpur Dakshin 1.25 0.13 1.75 0.35 360.00 0.07 585.00 0.23 3.00 945 0.78

7 Gopalpur 1.75 0.18 4.25 0.85 245.00 0.05 440.00 0.18 6.00 685 1.25

8 Gadhewa Mohasinpur 0.75 0.08 1.00 0.20 260.00 0.05 475.00 0.19 1.75 735 0.52

9 Garhi Kanpur 1.75 0.18 3.25 0.65 290.00 0.06 565.00 0.23 5.00 855 1.11

10 Kurauna Bahadur Nagar 1.00 0.10 2.50 0.50 290.00 0.06 425.00 0.17 3.50 715 0.83

11 Magrasa 4.25 0.43 7.75 1.55 380.00 0.08 510.00 0.20 12.00 890 2.26

12 Neori 1.00 0.10 2.50 0.50 235.00 0.05 305.00 0.12 3.50 540 0.77

13 Patehuri 1.75 0.18 2.50 0.50 335.00 0.07 450.00 0.18 4.25 785 0.92

14 Pipauri 3.25 0.33 6.00 1.20 340.00 0.07 415.00 0.17 9.25 755 1.76

15 Patarsa 3.25 0.33 6.00 1.20 250.00 0.05 425.00 0.17 9.25 675 1.75

16 Pankabahadur Nagar 1.75 0.18 3.50 0.70 360.00 0.07 515.00 0.21 5.25 875 1.15

17 Rampur Bhimsen 4.25 0.43 10.25 2.05 475.00 0.10 660.00 0.26 14.50 1135 2.83

18 Rampur Khas 3.25 0.33 5.25 1.05 270.00 0.05 495.00 0.20 8.50 765 1.63

19 Ramaipur 4.25 0.43 8.50 1.70 400.00 0.08 660.00 0.26 12.75 1060 2.47

20 Rautepur 3.25 0.33 5.25 1.05 240.00 0.05 360.00 0.14 8.50 600 1.57

21 Raikepur 3.50 0.35 5.00 1.00 400.00 0.08 650.00 0.26 8.50 1050 1.69

22 Sen Purab Para 7.75 0.78 13.00 2.60 575.00 0.12 700.00 0.28 20.75 1275 3.77

23 Senpashchim Para 6.00 0.60 10.25 2.05 495.00 0.10 760.00 0.30 16.25 1255 3.05

24 Sachendi Urf Chacheri 0.75 0.08 1.75 0.35 230.00 0.05 360.00 0.14 2.50 590 0.62

25 Surar 6.25 0.63 11.00 2.20 460.00 0.09 595.00 0.24 17.25 1055 3.16

26 Uriyara 2.50 0.25 3.50 0.70 305.00 0.06 450.00 0.18 6.00 755 1.19

78.25 7.83 137.75 27.55 8695 1.74 12870 5.15 216.00 21565 42.26

(Phy. In ha/Nos.-Fin in Lakhs)

Physical Financial Detailis of Land Development Activities under the Component of WDWAt A Glance

PhyFin

Total

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Total :

S.No. Name of WC

Block Plantation (in ha) Scattered Plantation (in Nos.)

Aff Hort Aff Hort

Page 163

Page 164: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin in ha in No.

1 Bhailamau 0.25 0.03 0.25 0.05 45 0.009 100 0.040 0.50 145 0.12

2 Bhaunti khera 0.25 0.03 0.25 0.05 40 0.008 100 0.040 0.50 140 0.12

3 Bhisi Jargaon 0.25 0.03 0.25 0.05 40 0.008 55 0.022 0.50 95 0.11

4 Bhauti Pratappur 0.75 0.08 0.75 0.15 90 0.018 140 0.056 1.50 230 0.30

5 Dool 0.50 0.05 1.25 0.25 80 0.016 100 0.040 1.750 180 0.356

6 Fatehpur Dakshin 0.50 0.05 0.25 0.05 60 0.012 90 0.036 0.75 150 0.15

7 Gopalpur 0.25 0.03 0.50 0.10 50 0.010 80 0.032 0.75 130 0.17

8 Gadhewa Mohasinpur 0.00 0.00 0.25 0.05 50 0.010 25 0.010 0.25 75 0.07

9 Garhi Kanpur 0.25 0.03 0.25 0.05 110 0.022 130 0.052 0.50 240 0.15

10 Kurauna Bahadur Nagar 0.25 0.03 0.25 0.05 50 0.010 65 0.026 0.50 115 0.11

11 Magrasa 0.50 0.05 1.00 0.20 80 0.016 90 0.036 1.50 170 0.30

12 Neori 0.25 0.03 0.25 0.05 40 0.008 50 0.020 0.50 90 0.10

13 Patehuri 0.25 0.03 0.25 0.05 65 0.013 90 0.036 0.50 155 0.12

14 Pipauri 0.25 0.03 0.75 0.15 100 0.020 100 0.040 1.00 200 0.24

15 Patarsa 0.25 0.03 0.75 0.15 70 0.014 110 0.044 1.00 180 0.23

16 Pankabahadur Nagar 0.25 0.03 0.50 0.10 45 0.009 50 0.020 0.75 95 0.15

17 Rampur Bhimsen 0.50 0.05 1.25 0.25 100 0.020 150 0.060 1.75 250 0.38

18 Rampur Khas 0.25 0.03 0.75 0.15 60 0.012 75 0.030 1.00 135 0.22

19 Ramaipur 0.50 0.05 1.00 0.20 100 0.020 150 0.060 1.50 250 0.33

20 Rautepur 0.25 0.03 0.75 0.15 50 0.010 60 0.024 1.00 110 0.21

21 Raikepur 0.50 0.05 0.50 0.10 100 0.020 140 0.056 1.00 240 0.23

22 Sen Purab Para 1.00 0.10 1.75 0.35 75 0.015 100 0.040 2.75 175 0.51

23 Senpashchim Para 0.75 0.08 1.25 0.25 100 0.020 160 0.064 2.00 260 0.41

24 Sachendi Urf Chacheri 0.00 0.00 0.25 0.05 40 0.008 60 0.024 0.25 100 0.08

25 Surar 1.00 0.10 1.25 0.25 100 0.020 130 0.052 2.25 230 0.42

26 Uriyara 0.25 0.03 0.50 0.10 50 0.010 60 0.024 0.75 110 0.16

10.00 1.000 17.00 3.400 1790 0.36 2460 0.98 27.00 4250 5.74

Fin

Total

IInd Year Physical Financial Detailis of Land Development Activities under the Component of WDWRampur Bhimsen, IWMP-VIII District- Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

Phy

Total :

S.No. Name of WC

Block Plantation (in ha) Scattered Plantation (in Nos.)

Aff Hort Aff Hort

Page 164

Page 165: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin in ha in No.

1 Bhailamau 0.50 0.05 0.75 0.15 100 0.020 115 0.046 1.25 215 0.27

2 Bhaunti khera 0.25 0.03 0.50 0.10 45 0.009 60 0.024 0.75 105 0.16

3 Bhisi Jargaon 0.50 0.05 0.75 0.15 50 0.010 45 0.018 1.25 95 0.23

4 Bhauti Pratappur 1.25 0.13 2.25 0.45 100 0.020 125 0.050 3.50 225 0.65

5 Dool 1.75 0.18 2.50 0.50 110 0.022 180 0.072 4.25 290 0.77

6 Fatehpur Dakshin 0.25 0.03 0.50 0.10 100 0.020 165 0.066 0.75 265 0.21

7 Gopalpur 0.50 0.05 1.25 0.25 65 0.013 120 0.048 1.75 185 0.36

8 Gadhewa Mohasinpur 0.25 0.03 0.25 0.05 70 0.014 150 0.060 0.50 220 0.15

9 Garhi Kanpur 0.50 0.05 1.00 0.20 60 0.012 145 0.058 1.50 205 0.32

10 Kurauna Bahadur Nagar 0.25 0.03 0.75 0.15 80 0.016 120 0.048 1.00 200 0.24

11 Magrasa 1.25 0.13 2.25 0.45 100 0.020 140 0.056 3.50 240 0.65

12 Neori 0.25 0.03 0.75 0.15 65 0.013 85 0.034 1.00 150 0.22

13 Patehuri 0.50 0.05 0.75 0.15 90 0.018 120 0.048 1.25 210 0.27

14 Pipauri 1.00 0.10 1.75 0.35 80 0.016 105 0.042 2.75 185 0.51

15 Patarsa 1.00 0.10 1.75 0.35 60 0.012 105 0.042 2.75 165 0.50

16 Pankabahadur Nagar 0.50 0.05 1.00 0.20 105 0.021 155 0.062 1.50 260 0.33

17 Rampur Bhimsen 1.25 0.13 3.00 0.60 125 0.025 170 0.068 4.25 295 0.82

18 Rampur Khas 1.00 0.10 1.50 0.30 70 0.014 140 0.056 2.50 210 0.47

19 Ramaipur 1.25 0.13 2.50 0.50 100 0.020 170 0.068 3.75 270 0.71

20 Rautepur 1.00 0.10 1.50 0.30 65 0.013 100 0.040 2.50 165 0.45

21 Raikepur 1.00 0.10 1.50 0.30 100 0.020 170 0.068 2.50 270 0.49

22 Sen Purab Para 2.25 0.23 3.75 0.75 170 0.034 200 0.080 6.00 370 1.09

23 Senpashchim Para 1.75 0.18 3.00 0.60 135 0.027 200 0.080 4.75 335 0.88

24 Sachendi Urf Chacheri 0.25 0.03 0.50 0.10 65 0.013 100 0.040 0.75 165 0.18

25 Surar 1.75 0.18 3.25 0.65 120 0.024 155 0.062 5.00 275 0.91

26 Uriyara 0.75 0.08 1.00 0.20 85 0.017 130 0.052 1.75 215 0.34

22.75 2.28 40.25 8.05 2315 0.46 3470 1.39 63.00 5785 12.18

Hort

Total :

Phy

IIIrd Year Physical Financial Detailis of Land Development Activities under the Component of WDWRampur Bhimsen, IWMP-VIII District- Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

FinS.No. Name of WC

Block Plantation (in ha) Scattered Plantation (in Nos.) TotalAff Hort Aff

Page 165

Page 166: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin in ha in No.

1 Bhailamau 0.50 0.05 0.75 0.15 100 0.020 115 0.046 1.25 215 0.27

2 Bhaunti khera 0.25 0.03 0.50 0.10 45 0.009 60 0.024 0.75 105 0.16

3 Bhisi Jargaon 0.50 0.05 0.75 0.15 50 0.010 45 0.018 1.25 95 0.23

4 Bhauti Pratappur 1.25 0.13 2.25 0.45 100 0.020 125 0.050 3.50 225 0.65

5 Dool 1.75 0.18 2.50 0.50 110 0.022 180 0.072 4.25 290 0.77

6 Fatehpur Dakshin 0.25 0.03 0.50 0.10 100 0.020 165 0.066 0.75 265 0.21

7 Gopalpur 0.50 0.05 1.25 0.25 65 0.013 120 0.048 1.75 185 0.36

8 Gadhewa Mohasinpur 0.25 0.03 0.25 0.05 70 0.014 150 0.060 0.50 220 0.15

9 Garhi Kanpur 0.50 0.05 1.00 0.20 60 0.012 145 0.058 1.50 205 0.32

10 Kurauna Bahadur Nagar 0.25 0.03 0.75 0.15 80 0.016 120 0.048 1.00 200 0.24

11 Magrasa 1.25 0.13 2.25 0.45 100 0.020 140 0.056 3.50 240 0.65

12 Neori 0.25 0.03 0.75 0.15 65 0.013 85 0.034 1.00 150 0.22

13 Patehuri 0.50 0.05 0.75 0.15 90 0.018 120 0.048 1.25 210 0.27

14 Pipauri 1.00 0.10 1.75 0.35 80 0.016 105 0.042 2.75 185 0.51

15 Patarsa 1.00 0.10 1.75 0.35 60 0.012 105 0.042 2.75 165 0.50

16 Pankabahadur Nagar 0.50 0.05 1.00 0.20 105 0.021 155 0.062 1.50 260 0.33

17 Rampur Bhimsen 1.25 0.13 3.00 0.60 125 0.025 170 0.068 4.25 295 0.82

18 Rampur Khas 1.00 0.10 1.50 0.30 70 0.014 140 0.056 2.50 210 0.47

19 Ramaipur 1.25 0.13 2.50 0.50 100 0.020 170 0.068 3.75 270 0.71

20 Rautepur 1.00 0.10 1.50 0.30 65 0.013 100 0.040 2.50 165 0.45

21 Raikepur 1.00 0.10 1.50 0.30 100 0.020 170 0.068 2.50 270 0.49

22 Sen Purab Para 2.25 0.23 3.75 0.75 170 0.034 200 0.080 6.00 370 1.09

23 Senpashchim Para 1.75 0.18 3.00 0.60 135 0.027 200 0.080 4.75 335 0.88

24 Sachendi Urf Chacheri 0.25 0.03 0.50 0.10 65 0.013 100 0.040 0.75 165 0.18

25 Surar 1.75 0.18 3.25 0.65 120 0.024 155 0.062 5.00 275 0.91

26 Uriyara 0.75 0.08 1.00 0.20 85 0.017 130 0.052 1.75 215 0.34

22.75 2.28 40.25 8.05 2315 0.46 3470 1.39 63.00 5785 12.18

IVth Year Physical Financial Detailis of Land Development Activities under the Component of WDWRampur Bhimsen, IWMP-VIII District- Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

Total :

Phy

FinS.No. Name of WC

Block Plantation (in ha) Scattered Plantation (in Nos.) TotalAff Hort Aff Hort

Page 166

Page 167: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy Fin Phy Fin Phy Fin Phy Fin in ha in No.

1 Bhailamau 0.50 0.05 0.75 0.15 100 0.020 115 0.046 1.25 215 0.27

2 Bhaunti khera 0.25 0.03 0.50 0.10 45 0.009 60 0.024 0.75 105 0.16

3 Bhisi Jargaon 0.50 0.05 0.75 0.15 50 0.010 45 0.018 1.25 95 0.23

4 Bhauti Pratappur 1.25 0.13 2.25 0.45 95 0.019 125 0.050 3.50 220 0.64

5 Dool 1.75 0.18 2.50 0.50 105 0.021 180 0.072 4.25 285 0.77

6 Fatehpur Dakshin 0.25 0.03 0.50 0.10 100 0.020 165 0.066 0.75 265 0.21

7 Gopalpur 0.50 0.05 1.25 0.25 65 0.013 120 0.048 1.75 185 0.36

8 Gadhewa Mohasinpur 0.25 0.03 0.25 0.05 70 0.014 150 0.060 0.50 220 0.15

9 Garhi Kanpur 0.50 0.05 1.00 0.20 60 0.012 145 0.058 1.50 205 0.32

10 Kurauna Bahadur Nagar 0.25 0.03 0.75 0.15 80 0.016 120 0.048 1.00 200 0.24

11 Magrasa 1.25 0.13 2.25 0.45 100 0.020 140 0.056 3.50 240 0.65

12 Neori 0.25 0.03 0.75 0.15 65 0.013 85 0.034 1.00 150 0.22

13 Patehuri 0.50 0.05 0.75 0.15 90 0.018 120 0.048 1.25 210 0.27

14 Pipauri 1.00 0.10 1.75 0.35 80 0.016 105 0.042 2.75 185 0.51

15 Patarsa 1.00 0.10 1.75 0.35 60 0.012 105 0.042 2.75 165 0.50

16 Pankabahadur Nagar 0.50 0.05 1.00 0.20 105 0.021 155 0.062 1.50 260 0.33

17 Rampur Bhimsen 1.25 0.13 3.00 0.60 125 0.025 170 0.068 4.25 295 0.82

18 Rampur Khas 1.00 0.10 1.50 0.30 70 0.014 140 0.056 2.50 210 0.47

19 Ramaipur 1.25 0.13 2.50 0.50 100 0.020 170 0.068 3.75 270 0.71

20 Rautepur 1.00 0.10 1.50 0.30 60 0.012 100 0.040 2.50 160 0.45

21 Raikepur 1.00 0.10 1.50 0.30 100 0.020 170 0.068 2.50 270 0.49

22 Sen Purab Para 2.25 0.23 3.75 0.75 160 0.032 200 0.080 6.00 360 1.09

23 Senpashchim Para 1.75 0.18 3.00 0.60 125 0.025 200 0.080 4.75 325 0.88

24 Sachendi Urf Chacheri 0.25 0.03 0.50 0.10 60 0.012 100 0.040 0.75 160 0.18

25 Surar 1.75 0.18 3.25 0.65 120 0.024 155 0.062 5.00 275 0.91

26 Uriyara 0.75 0.08 1.00 0.20 85 0.017 130 0.052 1.75 215 0.34

22.75 2.28 40.25 8.05 2275 0.46 3470 1.39 63.00 5745 12.17

Vth Year Physical Financial Detailis of Land Development Activities under the Component of WDWRampur Bhimsen, IWMP-VIII District- Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

PhyFin

Total :

S.No. Name of WC

Block Plantation (in ha) Scattered Plantation (in Nos.) Total

Aff Hort Aff Hort

Page 167

Page 168: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Block Plantation

Scattered Plantation

Total ha In Land Development

No. Plant/ha No. Plant/ha No. Plant/ha

Row To Row Spacing 6 x 6 278 6 x 6 278 4 x 4 625

Plant to Plant Spacing 6 x 6 6 x 6 4 x 4

No. Plant/ha No. Plant/ha No. Plant/ha

Row To Row Spacing 10 x 10 100 7 x 7 204 6 x 6 278

Plant to Plant Spacing 10 x 10 7 x 7 6 x 6

Afforestation Timber Ornamental Fuel & Fodder Total

% 40 12 48 100

No. of Plants 3478 1041 4176 8695

ha 12.51 3.75 6.69 22.95

Horticulture Mango GuavaCitrus &

Other Fruits

% 30 10 60 100

No. of Plants 3861 1287 7722 12870

ha 38.61 6.31 27.78 72.70

22.95 72.70

Mango Guava Citrus & Other Fruits

95.65

311.65

Afforatation Horticulture

78.25 137.75

101.20 210.45

Bifurcation of Afforestation AreaFuel & Fodder

Conversion Of Scattered Plantation Into ha

AfforestationTimber

Horticulture

Ornamental

216.00

Total

Detail of Land Development Area in ha At A Glance

Page 168

Page 169: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Afforestation TimberOrname

ntal

Fuel and

Fodder

Year Block Scattard Total

IInd Year 10.00 4.73 14.73 5.892 1.7676 7.07

IIIrd Year 22.75 6.11 28.86 11.544 3.4632 13.85

IVth Year 22.75 6.11 28.86 11.544 3.4632 13.85

Vth Year 22.75 6.00 28.75 11.5 3.45 13.80

Total 78.25 22.95 101.20 40.48 12.144 48.58

Vth Year 7.07

VI th Year 20.92

VIIth Year 34.78

Year Block Scattard TotalMango/Bel/

Jack FruitsGuava citrus & others

IInd Year 17.00 13.90 30.90 9.27 3.09 18.54

IIIrd Year 40.25 19.60 59.85 17.955 5.985 35.91

IVth Year 40.25 19.60 59.85 17.955 5.985 35.91

Vth Year 40.25 19.60 59.85 17.955 5.985 35.91

Total 137.75 72.7 210.45 63.135 21.045 126.27

Vth Year 9.27 3.09 18.54

VI th Year 27.23 9.08 54.45

VIIth Year 45.18 15.06 90.36

Afforestation Timber Ornamental Timber Ornamental Timber Ornamental Timber Ornamental

% 40 12 48 100 40 12 48 100 40 12 48 100 40 12 48 100

No. of Plants 716 214 860 1790 926 277 1112 2315 926 277 1112 2315 910 273 1092 2275

ha 2.58 0.77 1.38 4.73 3.33 1.00 1.78 6.11 3.33 1.00 1.78 6.11 3.27 0.98 1.75 6.00

Horticulture Mango GuavaCitrus &

Other FruitsMango Guava

Citrus &

Other FruitsMango Guava

Citrus &

Other FruitsMango Guava

Citrus &

Other Fruits

% 30 10 60 100 30 10 60 100 30 10 60 100 30 10 60 100

No. of Plants 738 246 1476 2460 1041 347 2082 3470 1041 347 2082 3470 1041 347 2082 3470

ha 7.38 1.21 5.31 13.90 10.41 1.70 7.49 19.60 10.41 1.70 7.49 19.60 10.41 1.70 7.49 19.60

Fuel & Fodder

Area under Afforestation including Block & Scattered Plantation

Considration of Area in ha for

calculating Production Value

Area under Horticulture including Block & Scattered Plantation

Considration of Area in ha for calculating

Production Value

Fuel & Fodder Total

IInd Year IIIrd Year IVth Year Vth Year

AfforestationFuel & Fodder Total

AfforestationFuel & Fodder Total

AfforestationTotal

Afforestation

Page 169

Page 170: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Block Scattered Block Scattered Block Scattered

IInd Year 10.00 4.73 14.73 4.80 2.27 7.07 7.66 17.00 13.90 30.90 45.63

IIIrd Year 22.75 6.11 28.86 10.92 2.93 13.85 15.01 40.25 19.60 59.85 88.71

IVth Year 22.75 6.11 28.86 10.92 2.93 13.85 15.01 40.25 19.60 59.85 88.71

Vth Year 22.75 6.00 28.75 10.92 2.88 13.80 14.95 40.25 19.60 59.85 88.60

Total 78.25 22.95 101.20 37.56 11.02 48.58 52.62 137.75 72.70 210.45 311.65

IInd Year IIIrd Year IVth Year Vth Year Total

Mango/Bel/Jack

Fruits9.27 17.96 17.96 17.96 63.14

Guava 3.09 5.99 5.99 5.99 21.05

Citrus & Others 18.54 35.91 35.91 35.91 126.27

Total :- 30.90 59.85 59.85 59.85 210.45

Year wise details of Land Development Activities At a Glance under The Project Area of Rampur Bhimsen, IWMP-VIII, District-Kanpur Nagar

(Area in ha)

Year

Afforestation

Sub Total

Fuel & Fodder

Sub Total

Net Area

under

Afforestation

Horticulture

Total Grand Total

Year wise Details of Horticulture Crops (Area in ha)

Page 170

Page 171: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Crop

Production/ha

at Maturity

after 10 Years

in Tonnes

Vth Year

(12%)

Vith Year

(20%)

VIIth Year

(35%)

VIIIth Year

(55%)

IXth Year

(80%)

Xth Year

(100%)

Value/Ton

in Rs.

Mango/Bel/Jack

Fruits7 0.84 1.40 2.45 3.85 5.6 7 15000

Guava 12 1.44 2.40 4.20 6.6 9.6 12 15000

Citrus and Others 12 1.44 2.40 4.20 6.6 9.6 12 16000

Fuel and Fodder 18 2.16 3.60 6.30 9.9 14.4 18 2000

Total

AreaProduction/

ha

Total

ProductionValue Area

Production/

ha

Total

ProductionValue Area

Production/

ha

Total

ProductionValue Area

Mango/Bel/Jack

Fruits9.27 0.84 7.78 116700 27.23 1.40 38.11 571650 45.18 2.45 110.69 1660350 81.68

Guava 3.09 1.44 4.44 66600 9.08 2.40 21.78 326700 15.06 4.20 63.25 948750 27.23

Citrus and Other

Fruits18.54 1.44 26.69 427040 54.45 2.40 130.68 2090880 90.36 4.20 379.51 6072160 163.35

Fuel and Fodder 7.07 2.16 15.27 30540 20.92 3.60 75.32 150640 34.78 6.30 219.08 438160 62.77

Total : 37.97 5.88 640880 111.67 265.89 3139870 185.38 772.53 9119420 335.02

859764 3817698 10576200

At 75% Survival 5.83 87450 28.58 428700 83.01 1245150

3.33 49950 16.33 244950 47.43 711450

20.01 320160 98.01 1568160 284.63 4554080

11.45 22900 56.49 112980 164.31 328620

40.62 480460 199.41 2354790 579.38 6839300

Crop Wise/Year Wise Productivity in T and Value in Rs. Based on 10 Year Projection

Crop Wise/Year Wise Production and Production Value (benefits), Production in Tonnes and value in Rs.

Crops

Vth Year VIth VIIth Year

Mango/Bel/Jack Fruits

Guava

Citrus and Other Fruits

Fuel and Fodder

Total :

Page 171

Page 172: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Bhailamau 847 0.634 924 0.692 0.000 0.000 1771 1.326

Bhaunti khera 707 0.530 0.000 0.000 0.000 707 0.530

Bhauti Pratappur 843 0.631 874 0.655 0.000 0.000 1717 1.286

Bhisi Jargaon 933 0.699 0.000 0.000 0.000 933 0.699

Dool 1092 0.818 1085 0.813 952 0.713 1505 1.127 4634 3.471

Fatehpur Dakshin 788 0.590 1060 0.794 0.000 0.000 1848 1.384

Gadhewa Mohasinpur 749 0.561 0.000 0.000 0.000 749 0.561

Garhi Kanpur 1326 0.993 1121 0.840 0.000 0.000 2447 1.833

Gopalpur 0.000 0.000 1606 1.203 0.000 1606 1.203

Kurauna Bahadur Nagar 0.000 955 0.715 0.000 1149 0.861 2104 1.576

Magrasa 1341 1.004 1602 1.200 0.000 0.000 2943 2.204

Neori 723 0.542 0.000 0.000 0.000 723 0.542

Pankabahadur Nagar 0.000 1647 1.234 0.000 0.000 1647 1.234

Patarsa 0.000 1709 1.280 1828 1.369 1512 1.132 5049 3.782

Patehuri 0.000 1353 1.013 0.000 0.000 1353 1.013

Pipauri 0.000 1057 0.792 1076 0.806 0.000 2133 1.598

Raikepur 0.000 1547 1.159 1396 1.046 0.000 2943 2.204

Ramaipur 0.000 1651 1.237 1716 1.285 1839 1.377 5206 3.899

Rampur Bhimsen 0.000 1217 0.912 1113 0.834 988 0.740 3318 2.485

Rampur Khas 0.000 1159 0.868 1158 0.867 1080 0.809 3397 2.544

Rautepur 0.000 0.000 1492 1.118 1610 1.206 3102 2.323

Sachendi Urf Chacheri 0.000 0.000 0.000 1376 1.031 1376 1.031

Sen Purab Para 0.000 1028 0.770 2730 2.045 2739 2.052 6497 4.866

Senpashchim Para 0.000 0.000 2621 1.963 2647 1.983 5268 3.946

Surar 0.000 0.000 1096 0.821 2500 1.873 3596 2.693

Uriyara 0.000 0.000 1296 0.971 1062 0.795 2358 1.766

Total: 9349 7.002 19989 14.972 20080 15.040 20007 14.985 69425 51.999

Nos 18 0.135 39 0.2925 40 0.3 40 0.3 137 1.0275

Amount @ Rs. 0.0075 lac per Outlet 0.135 0.2925 0.3 0.3 1.0275

(Phy. In rmt, Fin. In Lakhs)

OUTLETS (for safe Disposal of Water)

IIIrd Year IVth Year Vth Year TotalName of WC

IInd year

WC Wise Planing of Contour Bund (CB) Under Project Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Page 172

Page 173: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.Bhailamau 597 1.110 0.000 0.000 0.000 597 1.110

Bhaunti khera 0.000 825 1.535 0.000 0.000 825 1.535

Bhauti Pratappur 747 1.389 672 1.250 708 1.317 0.000 2127 3.956

Bhisi Jargaon 375 0.698 0.000 0.000 0.000 375 0.698

Dool 0.000 487 0.906 656 1.220 743 1.382 1886 3.508

Fatehpur Dakshin 0.000 640 1.190 0.000 0.000 640 1.190

Gadhewa Mohasinpur 670 1.246 0.000 0.000 0.000 670 1.246

Garhi Kanpur 729 1.356 0.000 0.000 0.000 729 1.356

Gopalpur 0.000 0.000 699 1.300 0.000 699 1.300

Kurauna Bahadur Nagar 0.000 795 1.479 0.000 0.000 795 1.479

Magrasa 0.000 471 0.876 0.000 1422 2.645 1893 3.521

Neori 197 0.366 0.000 0.000 0.000 197 0.366

Pankabahadur Nagar 0.000 712 1.324 1207 2.245 0.000 1919 3.569

Patarsa 0.000 0.000 0.000 0.000 0 0.000

Patehuri 0.000 0.000 0.000 1012 1.882 1012 1.882

Pipauri 0.000 0.000 0.000 988 1.838 988 1.838

Raikepur 0.000 0.000 1000 1.860 0.000 1000 1.860

Ramaipur 809 1.505 0.000 0.000 0.000 809 1.505

Rampur Bhimsen 0.000 1029 1.914 0.000 818 1.521 1847 3.435

Rampur Khas 0.000 0.000 806 1.499 0.000 806 1.499

Rautepur 0.000 0.000 519 0.965 931 1.732 1450 2.697

Sen Purab Para 0.000 950 1.767 1455 2.706 828 1.540 3233 6.013

Senpashchim Para 0.000 0.000 0.000 1091 2.029 1091 2.029

Surar 0.000 1226 2.280 1163 2.163 0.000 2389 4.444

Uriyara 0.000 1068 1.986 524 0.975 1175 2.186 2767 5.147

4124 7.671 8875 16.508 8737 16.251 9008 16.755 30744 57.184

Nos 8 1.200 17 2.550 17 2.550 18 2.700 60 9.000

Amount @ Rs. 0.15 lac per Outlet 1.200 2.550 2.550 2.700 9.000

(Phy. In rmt, Fin. In Lakhs)

OUTLETS (for safe Disposal of Water)

IIIrd Year IVth Year Vth Year TotalName of WC

IInd year

WC Wise Planing of Marginal Bund (MB) Under Project Rampur Bhimsen, IWMP-VIII Kanpur Nagar

Page 173

Page 174: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Dool 879 1.635 0.000 0.000 0.000 879 1.635

Gopalpur 719 1.337 2310 4.297 0.000 0.000 3029 5.634

Kurauna Bahadur Nagar 0.000 1694 3.151 1132 2.106 557 1.036 3383 6.292

Magrasa 0.000 0.000 993 1.847 0.000 993 1.847

Pankabahadur Nagar 0.000 0.000 1087 2.022 0.000 1087 2.022

Ramaipur 0.000 904 1.681 0.000 1052 1.957 1956 3.638

Rampur Bhimsen 0.000 0.000 1099 2.044 0.000 1099 2.044

Rautepur 0.000 0.000 0.000 1966 3.657 1966 3.657

Senpashchim Para 679 1.263 0.000 0.000 707 1.315 1386 2.578

Senpurab Para 0.000 0.000 667 1.241 686 1.276 1353 2.517

2277 4.235 4908 9.129 4978 9.259 4968 9.240 17131 31.864

Nos 4 0.600 9 1.350 9 1.350 9 1.350 31 4.650

Amount @ Rs. 0.15 lac per Outlet 0.600 1.350 1.350 1.350 4.650

WC Wise Planing of Peripheral Bund (PB) Under Project (Phy. In rmt, Fin. In Lakhs)Rampur Bhimsen, IWMP-VIII Kanpur Nagar

OUTLETS (for safe Disposal of Water)

IIIrd Year IVth Year Vth Year TotalName of WC

IInd year

Page 174

Page 175: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Length 1 meter

Top 0.45 meter 0.45 (Not to Scale)

Base 2.25 meter

Height 0.60 meter

Side Slope 1.5 : 1

Labour Rate Rs./day 174.00 Slope 1.5 : 1

Labour out put in cmt. 2.85

Rate /cmt. Rs. 61.10

Dressing Charge 20.90

Total Rate/cmt. 82.00

2.25

CS (T+B)/2*h 0.81 sq m

Earth Work CS*L 0.81 cmt

Existing CS 0.02 sq m

Actual CS for Execution 0.79 sq m

Rate/cmt. Rs. 82.00

Amount 64.78

2.61 sq m

Rate/sqm Rs. 3.87

Amount 10.11

Amount/per m length 74.89

Say 74.90

Estimate Of Contour Bund (CB)

0.6

0

0.9

Sodding Area

Page 175

Page 176: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Length 1 meter

Top 0.60 meter 0.60 (Not to Scale)

Base 3.60 meter

Height 1.00 meter

Side Slope 1.5 : 1

Labour Rate Rs./day 174.00 Slope 1.5 : 1

Labour out put in cmt. 2.85

Rate /cmt. Rs. 61.10

Dressing Charge 20.90

Total Rate/cmt. 82.00

3.6

CS (T+B)/2*h 2.10 sq m

Earth Work CS*L 2.10 cmt

Existing CS 0.03 sq m

Actual CS for Execution 2.07 sq m

Rate/cmt. Rs. 82.00

Amount/per m length 169.74

4.206 sq m

Rate/sqm Rs. 3.87

Amount 16.28

Amount/per m length 186.02

Say 186.00

Estimate Of Marginal Bund (MB)

1.0

0

1.5

Sodding Area

Page 176

Page 177: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Length 1 meter

Top 0.60 meter 0.60 (Not to Scale)

Base 3.60 meter

Height 1.00 meter

Side Slope 1.5 : 1

Labour Rate Rs./day 174.00 Slope 1.5 : 1

Labour out put in cmt. 2.85

Rate /cmt. Rs. 61.10

Dressing Charge 20.90

Total Rate/cmt. 82.00

3.6

CS (T+B)/2*h 2.10 sq m

Earth Work CS*L 2.10 cmt

Existing CS 0.03 sq m

Actual CS for Execution 2.07 sq m

Rate/cmt. Rs. 82.00

Amount/per m length 169.74

4.206 sq m

Rate/sqm Rs. 3.87

Amount 16.28

Amount/per m length 186.02

Say 186.00

Estimate Of Pheripheral Bund (PB)

1.0

0

1.5

Sodding Area

Page 177

Page 178: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC Area Amount

Phy. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin.

1 Bhailamau 125 8.40 7.48 1 1.00 0 0.00 0 0.00 0 0.00 3 6.33 3 0.15 7 7.478

2 Bhaunti khera 74 4.97 4.38 2 1.42 1 0.40 0 0.00 0 0.00 2 2.45 2 0.10 7 4.376

3 Bhisi Jargaon 107 7.19 6.40 2 2.26 1 0.40 0 0.00 0 0.00 2 3.59 3 0.15 8 6.401

4 Bhauti Pratappur 302 20.29 18.06 5 4.24 5 2.00 0 0.00 0 0.00 3 11.62 4 0.20 17 18.061

5 Dool 360 24.19 21.53 5 3.71 5 2.00 0 0.00 0 0.00 4 15.62 4 0.20 18 21.530

6 Fatehpur Dakshin 99 6.65 5.87 3 2.00 1 0.40 0 0.00 0 0.00 2 3.32 3 0.15 9 5.872

7 Gopalpur 169 11.36 10.11 2 1.50 2 0.80 0 0.00 0 0.00 3 7.61 4 0.20 11 10.107

8 Gadhewa Mohasinpur 70 4.70 4.19 0 0.00 0 0.00 0 0.00 0 0.00 2 4.09 2 0.10 4 4.187

9 Garhi Kanpur 150 10.08 8.97 0 0.00 0 0.00 0 0.00 0 0.00 4 8.77 4 0.20 8 8.971

10 Kurauna Bahadur Nagar 112 7.53 6.70 3 3.91 2 0.80 0 0.00 0 0.00 1 1.88 2 0.10 8 6.698

11 Magrasa 305 20.50 18.24 2 1.59 2 0.80 0 0.00 1 5.02 2 10.43 8 0.40 15 18.241

12 Neori 104 6.99 6.22 2 2.18 1 0.40 0 0.00 0 0.00 2 3.49 3 0.15 8 6.220

13 Patehuri 125 8.40 7.48 0 0.00 0 0.00 0 0.00 0 0.00 3 6.33 23 1.15 26 7.477

14 Pipauri 238 15.99 14.23 11 9.83 10 4.00 0 0.00 0 0.00 0 0.00 8 0.40 29 14.235

15 Patarsa 236 15.86 14.11 2 2.33 2 0.80 0 0.00 0 0.00 3 10.78 4 0.20 11 14.114

16 Pankabahadur Nagar 156 10.48 9.33 3 2.64 3 1.20 0 0.00 0 0.00 2 5.29 4 0.20 12 9.330

17 Rampur Bhimsen 384 25.80 22.97 3 2.63 1 0.40 0 0.00 0 0.00 6 19.69 5 0.25 15 22.971

18 Rampur Khas 220 14.78 13.16 0 0.00 0 0.00 0 0.00 0 0.00 4 12.96 4 0.20 8 13.157

19 Ramaipur 334 22.44 19.98 8 5.84 8 3.20 0 0.00 0 0.00 3 10.74 4 0.20 23 19.976

20 Rautepur 212 14.25 12.68 9 6.17 7 2.80 0 0.00 0 0.00 1 3.61 2 0.10 19 12.679

21 Raikepur 229 15.39 13.70 7 5.82 6 2.40 0 0.00 0 0.00 2 5.32 3 0.15 18 13.699

22 Sen Purab Para 510 34.27 30.50 13 7.43 13 5.20 0 0.00 0 0.00 4 17.63 5 0.25 35 30.502

23 Senpashchim Para 413 27.75 24.70 0 0.00 0 0.00 0 0.00 0 0.00 7 24.55 3 0.15 10 24.701

24 Sachendi Urf Chacheri 83 5.58 4.96 0 0.00 0 0.00 0 0.00 0 0.00 3 4.15 16 0.80 19 4.948

25 Surar 427 28.69 25.54 19 12.56 16 6.40 0 0.00 0 0.00 2 5.93 13 0.65 50 25.539

26 Uriyara 161 10.82 9.63 5 4.75 5 2.00 0 0.00 0 0.00 1 2.73 3 0.15 14 9.628

Total : 5705.00 383.38 341.11 107 83.82 91 36.40 0 0.00 1 5.02 71 208.91 139 6.95 409 341.10

R Pit TotalFunds

Available

ECD DSW WHB PondMCD

At a Glance Year Wise Physical and Finanacial Annual Action Plan Of Water Harvesting Structures Under WDW

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

Page 178

Page 179: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC Area Amount

No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin.

1 Bhailamau 125 1.125 1.00 1 1.00 0.00 0.00 0.00 1 1.001

2 Bhaunti khera 74 0.666 0.54 1 0.54 0.00 0.00 0.00 1 0.543

3 Bhisi Jargaon 107 0.963 0.86 1 0.86 0.00 0.00 0.00 1 0.858

4 Bhauti Pratappur 302 2.718 2.42 2 1.57 2 0.80 0.00 1 0.05 5 2.419

5 Dool 360 3.24 2.88 0.00 0.00 1 2.834 1 0.05 2 2.884

6 Fatehpur Dakshin 99 0.891 0.74 1 0.74 0.00 0.00 0.00 1 0.743

7 Gopalpur 169 1.521 1.35 1 0.90 1 0.40 0.00 1 0.05 3 1.354

8 Gadhewa Mohasinpur 70 0.63 0.56 0.00 0.00 0.00 0 0.560

9 Garhi Kanpur 150 1.35 1.20 0.00 0.00 1 1.151 1 0.05 2 1.201

10 Kurauna Bahadur Nagar 112 1.008 0.90 1 0.90 0.00 0.00 0.00 1 0.897

11 Magrasa 305 2.745 2.44 2 1.59 2 0.80 0.00 1 0.05 5 2.443

12 Neori 104 0.936 0.83 1 0.83 0.00 0.00 0.00 1 0.833

13 Patehuri 125 1.125 1.00 0.00 0.00 20 1.00 20 1.001

14 Pipauri 238 2.142 1.91 2 1.46 1 0.40 0.00 1 0.05 4 1.907

15 Patarsa 236 2.124 1.89 1 1.44 1 0.40 0.00 1 0.05 3 1.891

16 Pankabahadur Nagar 156 1.404 1.25 1 0.85 1 0.40 0.00 0.00 2 1.250

17 Rampur Bhimsen 384 3.456 3.08 3 2.63 1 0.40 0.00 1 0.05 5 3.076

18 Rampur Khas 220 1.98 1.76 0.00 0.00 1 1.713 1 0.05 2 1.763

19 Ramaipur 334 3.006 2.68 2 1.83 2 0.80 0.00 1 0.05 5 2.676

20 Rautepur 212 1.908 1.70 2 1.25 1 0.40 0.00 1 0.05 4 1.699

21 Raikepur 229 2.061 1.84 2 1.39 1 0.40 0.00 1 0.05 4 1.835

22 Sen Purab Para 510 4.59 4.09 1 0.89 1 0.40 0.00 1 2.74 1 0.05 4 4.085

23 Senpashchim Para 413 3.717 3.31 0.00 0.00 1 3.308 0 0.00 1 3.308

24 Sachendi Urf Chacheri 83 0.747 0.67 0.00 0.00 13 0.67 13 0.665

25 Surar 427 3.843 3.42 1 0.79 0.00 0.00 1 2.58 1 0.05 3 3.421

26 Uriyara 161 1.449 1.29 1 0.89 1 0.40 0.00 0.00 2 1.290

Total : 5705.00 51.35 45.60 27 22.35 15 6.00 0 0.00 0 0.00 6 14.33 47 2.37 95 45.60

0.56

45.04

Year Wise Physical and Finanacial Annual Action Plan Of Water Harvesting Structures Under WDW

Plan of Serial No.8 has not been Planned

Total

Kanpur NagarDistrict-Rampur Bhimsen, IWMP-VIII

Funds

Available

ECD DSW WHB Pond R Pit

(Phy. In ha/Nos.-Fin in Lakhs)

IInd Year

MCD

Page 179

Page 180: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC Area Amount

No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin.

1 Bhailamau 125 2.43 2.16 0.00 0.00 1 2.110 1 0.05 2 2.160

2 Bhaunti khera 74 1.44 1.28 1 0.88 1 0.40 0.00 0.00 2 1.278

3 Bhisi Jargaon 107 2.08 1.85 1 1.40 1 0.40 0.00 1 0.05 3 1.849

4 Bhauti Pratappur 302 5.86 5.22 1 0.89 1 0.40 0.00 1 3.88 1 0.05 4 5.217

5 Dool 360 6.99 6.22 2 1.24 2 0.80 0.00 1 4.13 1 0.05 6 6.219

6 Fatehpur Dakshin 99 1.92 1.71 2 1.26 1 0.40 0.00 1 0.05 4 1.711

7 Gopalpur 169 3.28 2.92 0.00 0.00 1 2.869 1 0.05 2 2.919

8 Gadhewa Mohasinpur 70 1.36 1.77 0.00 0.00 1 1.720 1 0.05 2 1.770

9 Garhi Kanpur 150 2.91 2.59 0.00 0.00 1 2.542 1 0.05 2 2.592

10 Kurauna Bahadur Nagar 112 2.17 1.93 0.00 0.00 1 1.885 1 0.05 2 1.935

11 Magrasa 305 5.92 5.27 0.00 0.00 1 5.219 1 0.05 2 5.269

12 Neori 104 2.02 1.80 0.00 0.00 1 1.747 1 0.05 2 1.797

13 Patehuri 125 2.43 2.16 0.00 0.00 1 2.110 1 0.05 2 2.160

14 Pipauri 238 4.62 4.11 3 2.81 3 1.20 0.00 2 0.10 8 4.112

15 Patarsa 236 4.58 4.08 1 0.89 1 0.40 0.00 1 2.74 1 0.05 4 4.077

16 Pankabahadur Nagar 156 3.03 2.69 2 1.79 2 0.80 0.00 2 0.10 6 2.695

17 Rampur Bhimsen 384 7.45 6.64 0.00 0.00 2 6.585 1 0.05 3 6.635

18 Rampur Khas 220 4.27 3.80 0.00 0.00 1 3.750 1 0.05 2 3.800

19 Ramaipur 334 6.48 5.77 2 1.34 2 0.80 0.00 1 3.58 1 0.05 6 5.770

20 Rautepur 212 4.11 3.66 1 0.00 0.00 1 3.61 1 0.05 3 3.662

21 Raikepur 229 4.44 3.96 1 0.84 1 0.40 0.00 1 2.67 1 0.05 4 3.957

22 Sen Purab Para 510 9.90 8.81 4 2.18 4 1.60 0.00 1 4.98 1 0.05 10 8.810

23 Senpashchim Para 413 8.02 7.13 0.00 0.00 2 7.084 1 0.05 3 7.134

24 Sachendi Urf Chacheri 83 1.61 1.43 0.00 0.00 1 1.383 1 0.05 2 1.433

25 Surar 427 8.29 7.38 4 2.38 4 1.60 0.00 1 3.35 1 0.05 10 7.377

26 Uriyara 161 3.13 2.78 2 1.93 2 0.80 0.00 1 0.05 5 2.781

Total : 5705.00 110.73 99.12 27 19.83 25 10.00 0 0.00 0 0.00 22 67.94 27 1.35 101 99.12

Year Wise Physical and Finanacial Annual Action Plan Of Water Harvesting Structures Under WDW

Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

R Pit Total

IIIrd Year

Rampur Bhimsen, IWMP-VIII District-

PondFunds

Available

ECD DSW WHB MCD

Page 180

Page 181: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC Area Amount

No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin.

1 Bhailamau 125 2.43 2.16 0.00 0.00 1 2.110 1 0.05 2 2.160

2 Bhaunti khera 74 1.44 1.28 0.00 0.00 1 1.228 1 0.05 2 1.278

3 Bhisi Jargaon 107 2.08 1.85 0.00 0.00 1 1.799 1 0.05 2 1.849

4 Bhauti Pratappur 302 5.86 5.22 1 0.89 1 0.40 0.00 1 3.88 1 0.05 4 5.217

5 Dool 360 6.99 6.22 2 1.24 2 0.80 0.00 1 4.13 1 0.05 6 6.219

6 Fatehpur Dakshin 99 1.92 1.71 0.00 0.00 1 1.661 1 0.05 2 1.711

7 Gopalpur 169 3.28 2.92 0.00 0.00 1 2.869 1 0.05 2 2.919

8 Gadhewa Mohasinpur 70 1.36 1.21 0.00 0.00 0.00 0 1.210

9 Garhi Kanpur 150 2.91 2.59 0.00 0.00 1 2.542 1 0.05 2 2.592

10 Kurauna Bahadur Nagar 112 2.17 1.93 1 1.48 1 0.40 0.00 1 0.05 3 1.935

11 Magrasa 305 5.92 5.27 0.00 1.00 5.02 5 0.25 6 5.269

12 Neori 104 2.02 1.80 0.00 0.00 1 1.747 1 0.05 2 1.797

13 Patehuri 125 2.43 2.16 0.00 0.00 1 2.110 1 0.05 2 2.160

14 Pipauri 238 4.62 4.11 3 2.76 3 1.20 0.00 3 0.15 9 4.112

15 Patarsa 236 4.58 4.08 0.00 0.00 1 4.027 1 0.05 2 4.077

16 Pankabahadur Nagar 156 3.03 2.69 0.00 0.00 1 2.645 1 0.05 2 2.695

17 Rampur Bhimsen 384 7.45 6.64 0.00 0.00 2 6.585 1 0.05 3 6.635

18 Rampur Khas 220 4.27 3.80 0.00 0.00 1 3.750 1 0.05 2 3.800

19 Ramaipur 334 6.48 5.77 2 1.34 2 0.80 0.00 1 3.58 1 0.05 6 5.770

20 Rautepur 212 4.11 3.66 3 2.46 3 1.20 0.00 0.00 6 3.662

21 Raikepur 229 4.44 3.96 3 2.76 3 1.20 0.00 0.00 6 3.957

22 Sen Purab Para 510 9.90 8.81 4 2.18 4 1.60 0.00 1 4.98 1 0.05 10 8.810

23 Senpashchim Para 413 8.02 7.13 0.00 0.00 2 7.084 1 0.05 3 7.134

24 Sachendi Urf Chacheri 83 1.61 1.43 0.00 0.00 1 1.383 1 0.05 2 1.433

25 Surar 427 8.29 7.38 8 4.68 6 2.40 0.00 6 0.30 20 7.377

26 Uriyara 161 3.13 2.78 2 1.93 2 0.80 0.00 1 0.05 5 2.781

Total : 5705.00 110.73 98.56 29 21.72 27 10.80 0 0.00 1 5.02 20 58.11 34 1.70 111 98.56

1.21

97.35

Year Wise Physical and Finanacial Annual Action Plan Of Water Harvesting Structures Under WDW

Kanpur Nagar (Phy. In ha/Nos.-Fin in Lakhs)

Plan of Serial No.8 has not been Planned

R Pit Total

IVth Year

Rampur Bhimsen, IWMP-VIII District-

PondFunds

Available

ECD DSW WHB MCD

Page 181

Page 182: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC Area Amount

No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin. No. Fin.

1 Bhailamau 125 2.42 2.16 0.00 0.00 1 2.107 1 0.05 2 2.157

2 Bhaunti khera 74 1.43 1.28 0.00 0.00 1 1.226 1 0.05 2 1.276

3 Bhisi Jargaon 107 2.07 1.85 0.00 0.00 1 1.796 1 0.05 2 1.846

4 Bhauti Pratappur 302 5.85 5.21 1 0.89 1 0.40 0.00 1 3.87 1 0.05 4 5.209

5 Dool 360 6.98 6.21 1 1.24 1 0.40 0.00 1 4.52 1 0.05 4 6.209

6 Fatehpur Dakshin 99 1.92 1.71 0.00 0.00 1 1.658 1 0.05 2 1.708

7 Gopalpur 169 3.28 2.91 1 0.59 1 0.40 0.00 1 1.87 1 0.05 4 2.914

8 Gadhewa Mohasinpur 70 1.36 2.42 0.00 0.00 1 2.367 1 0.05 2 2.417

9 Garhi Kanpur 150 2.91 2.59 0.00 0.00 1 2.537 1 0.05 2 2.587

10 Kurauna Bahadur Nagar 112 2.17 1.93 1 1.53 1 0.40 0.00 0.00 2 1.932

11 Magrasa 305 5.91 5.26 0.00 0.00 1 5.210 1 0.05 2 5.260

12 Neori 104 2.02 1.79 1 1.34 1 0.40 0.00 1 0.05 3 1.794

13 Patehuri 125 2.42 2.16 0.00 0.00 1 2.107 1 0.05 2 2.157

14 Pipauri 238 4.61 4.10 3 2.80 3 1.20 0.00 2 0.10 8 4.104

15 Patarsa 236 4.57 4.07 0.00 0.00 1 4.020 1 0.05 2 4.070

16 Pankabahadur Nagar 156 3.02 2.69 0.00 0.00 1 2.640 1 0.05 2 2.690

17 Rampur Bhimsen 384 7.44 6.62 0.00 0.00 2 6.524 2 0.10 4 6.624

18 Rampur Khas 220 4.26 3.79 0.00 0.00 1 3.744 1 0.05 2 3.794

19 Ramaipur 334 6.47 5.76 2 1.34 2 0.80 0.00 1 3.57 1 0.05 6 5.760

20 Rautepur 212 4.11 3.66 3 2.46 3 1.20 0.00 0.00 6 3.657

21 Raikepur 229 4.44 3.95 1 0.84 1 0.40 0.00 1 2.66 1 0.05 4 3.950

22 Sen Purab Para 510 9.88 8.80 4 2.18 4 1.60 0.00 1 4.92 2 0.10 11 8.797

23 Senpashchim Para 413 8.00 7.12 0.00 0.00 2 7.074 1 0.05 3 7.124

24 Sachendi Urf Chacheri 83 1.61 1.43 0.00 0.00 1 1.382 1 0.05 2 1.432

25 Surar 427 8.28 7.36 6 4.71 6 2.40 0.00 5 0.25 17 7.364

26 Uriyara 161 3.12 2.78 0.00 0.00 1 2.726 1 0.05 2 2.776

Total : 5705.00 110.56 99.60 24 19.93 24 9.60 0 0.00 0 0.00 23 68.53 31 1.55 102 99.60

R Pit Total

Vth Year

Rampur Bhimsen, IWMP-VIII District-

PondFunds

Available

ECD DSW WHB MCD

Year Wise Physical and Finanacial Annual Action Plan Of Water Harvesting Structures Under WDW

0 (Phy. In ha/Nos.-Fin in Lakhs)

Page 182

Page 183: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Under the project Area implementation programme a separate Watershed Development Fund Account will be opened and maintained as per the IWMP Guidelines.

To control the activities at the stage of implementing, proper plans was formed for monitoring and Evaluation. Project monitoring is one of the important components in

7.Time to time monitoring of anticipated outcomes such as Soil Loss, Ground Water Recharge, amelioration of environment al parameters, Production enhancement,

Income generation, Employment generation, increase in vegetative cover, status of Water Harvesting Structures, additional area brought under irrigation, etc. must be

recorded and reported to WCDC/SLNA.

•Sustainability Monitoring

•Social Audits (atleast one Social Audit Event should be organized on Watershed Committee wise on yearly basis.

•Independent and External Monitoring by independent agencies

•Process Monitoring

Streams of Monitoring Different Streams of monitoring as prescribed by the Department of Land Resources, Government of India are to be

1.Internal monitoring by Project Team. The PIA and the WCDC must arrange adequate arrangement for internal monitoring of the Project.

2.Progress of the Quarter must be reported in time without delay and must be monitored so that the time schedule as per approved DPR is strictly followed. If there

3.GIS Web based On-line monitoring must be done as per laid down directives as well as instructions from SLNA and DoLR, Government of India issued from time to time.

4.Self Monitoring by Communities is to be done from time to time.

5.Sustainability of the outputs due to interventions in the project area should be monitored.

6.Arrangements for Independent and external monitoring as well as social auditing should be appropriately made.

•Self Monitoring by communities

4.The WCDC will ensure uploading of monitoring data complete in all aspects to SLNA and DoLR as per Format and guidelines issued from time to time.

Budget provision for Monitoring-

Project Fund-There is fund provision amounting to Rs. 1% of the total Project Cost in the DPR. The year wise breakup of the allotted amount is also prescribed in

•Online monitoring must become a feature of all projects.

•Monitoring should include process and outcome monitoring.

•The PIA shall submit monthly/quarterly progress reports (countersigned by the Watershed Committee (WC) President) to the WCDC for further submission to the SLNA.

•The WCDC will have one member exclusively responsible for monitoring.

Different streams of monitoring are proposed

•Internal Monitoring by Project Teams (PIA/WCDC)

•Progress Monitoring

•GIS/ Web Based On-Line Monitoring

3.The WCDC will have one member exclusively for monitoring.

MONITORING AND EVALUATION

Monitoring (1% of the Project Cost) Rs. 6.85 Lakhs

Regular Monitoring of the project have to be carried out at each stage. We propose -

1.On line monitoring as per format prescribed by the Government of India in the Department of Land Resources(DoLR) is to be done continuously. Monitoring will

include process and outcome monitoring.

2.The Project Implementing Agency (PIA) will compulsorily submit monthly/quarterly Progress Reports countersigned by the member of Watershed Development Team to

the SLNA vis-à-vis WCDC.

Page 183

Page 184: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Tiers of Monitoring Basis of monitoring Frequency of monitoring Orientation of the Indicator Monitoring by

First tier Immediate result basisRegular Monthly

MonitoringActivity oriented Local People organizations

Second Tier Monitoring of Outputs

Regular monitoring

( Quarterly, half yearly and

annually )

Objective orientedInternal project team (WDT, PIA

& Experts)

Specified monitoring team

formed by WCDC

External Monitoring team by

PIA/SLNA

Vigilance and Monitoring Committees :-

•For every work sanctioned under the Scheme, there should be a local vigilance and monitoring committee, composed of members of the locality or village

where the work is undertaken, to monitor the progress and quality of work while it is in progress. The Gram Sabha will elect the members of this committee and

ensure that SC/STs and women are represented on it.

•The Implementing Agency should apprise this committee of estimates regarding the work, time frame and quality parameters. The final report of the committee

•Local beneficiary committees may also be constituted for effective articulation of their entitlements and their access to them. The PIA members will be responsible for ensuring that local

Third TierMonitoring of

Outcomes

Annually but monitoring

start from second year

onwards.

Goal Oriented

Three Tiers of Monitoring:The following three tiers of monitoring are planned:

First Tier (Monitoring of activities) :

This will be carried out by PIA along with WDT and WC to monitor the implementation of all activities as per the action plan. The monitoring also aims at ensuring

Second Tier (Monitoring of outputs) :

To check the outputs of the activities, PIA along with WDT monitors as per the logical frame work. The indicators are selected considering the broad objectives of the

Third Tier (Monitoring of Outcomes) :

Project Implementation Agency along with the WC will monitor the overall outcomes of the objectives as per the logical frame. The outcomes level monitoring will

start in the second year and continue on an annual basis. Most of the information can be available from the sets of output level indicators. Participatory methods will

be used at the time of monitoring the activities.

The methods of collecting sample data for the monitoring activities will be clearly documented in the monitoring report. The detail of the monitoring system is presented

in the table as under.

Page 184

Page 185: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Project Fund-There is fund provision amounting to Rs. 1% of the total Project Cost in the DPR. The year wise breakup of the allotted amount is also prescribed in the table.

f)An amount of Rs 1% of the Project Cost is provided in the DPR for evaluation of the project.

Evaluation will be done on the completion of following phase :-

i.Preparatory phase.

ii.Work Phase.

iii.Consolidation Phase.

Budget provision for Monitoring-

e)The Fund release by Government of India on a favourable report from the evaluators.

Evaluation (1% of the Project Cost) - Rs. 6.85 Lakhs

1.Evaluation will include physical, financial and social audit of the work done.

2.Panel of evaluating agencies-

a)At Central Level there is a panel of evaluating agencies. A minimum percentage of evaluations and impact studies will be carried out by National Level agencies.

b)There is a SLNA level panel of evaluators approved by the Departmental Nodal Agency at SLNA Level. This panel includes only institutions not individuals.

c)The panel to be entrusted for evaluation of the project will not belong to the project area.

d)Evaluators will evaluate the project work as per specific instructions of the Government of India as well as of the SLNA.

Page 185

Page 186: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

1 2B3C1f1a Gopalpur 455 0.00 0.00 0.00 0.00 0.00 0.03 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.04 0.11 0.07 0.00 0.22 0.11 0.27 0.16 0.00 0.55

2 2B3C1f1b Rampur Bhimsen 760 0.00 0.00 0.00 0.00 0.00 0.05 0.09 0.05 0.00 0.18 0.04 0.09 0.05 0.00 0.18 0.04 0.09 0.05 0.00 0.18 0.07 0.18 0.11 0.00 0.36 0.19 0.46 0.26 0.00 0.91

3 2B3C1f2a Pankabahadur Nagar 362 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.02 0.00 0.09 0.02 0.04 0.03 0.00 0.09 0.02 0.04 0.03 0.00 0.09 0.03 0.09 0.05 0.00 0.17 0.09 0.22 0.13 0.00 0.43

4 2B3C1f2b Bhouti Pratappur 310 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.03 0.07 0.04 0.00 0.15 0.08 0.19 0.11 0.00 0.37

5 2B3C1f2c Surar 470 0.00 0.00 0.00 0.00 0.00 0.03 0.06 0.03 0.00 0.11 0.02 0.06 0.03 0.00 0.11 0.02 0.06 0.03 0.00 0.11 0.05 0.11 0.07 0.00 0.23 0.12 0.28 0.16 0.00 0.56

6 2B3C1d2a Oriyara 442 0.00 0.00 0.00 0.00 0.00 0.03 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.04 0.11 0.06 0.00 0.21 0.11 0.27 0.15 0.00 0.53

7 2B3C1d2b Sen Purab Para 490 0.00 0.00 0.00 0.00 0.00 0.03 0.06 0.03 0.00 0.12 0.02 0.06 0.04 0.00 0.12 0.02 0.06 0.04 0.00 0.12 0.05 0.12 0.07 0.00 0.24 0.12 0.29 0.17 0.00 0.59

8 2B3C1d2c Pipori 455 0.00 0.00 0.00 0.00 0.00 0.03 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.02 0.05 0.03 0.00 0.11 0.04 0.11 0.07 0.00 0.22 0.11 0.27 0.16 0.00 0.55

9 2B3C1d3a Magrasa 506 0.00 0.00 0.00 0.00 0.00 0.03 0.06 0.03 0.00 0.12 0.02 0.06 0.04 0.00 0.12 0.02 0.06 0.04 0.00 0.12 0.05 0.12 0.07 0.00 0.24 0.13 0.30 0.18 0.00 0.61

10 2B3C1d3b Sen Pashimpara 480 0.00 0.00 0.00 0.00 0.00 0.03 0.06 0.03 0.00 0.12 0.02 0.06 0.03 0.00 0.12 0.02 0.06 0.03 0.00 0.12 0.05 0.12 0.07 0.00 0.23 0.12 0.29 0.17 0.00 0.58

11 2B3C2a2a Rautepur 210 0.00 0.00 0.00 0.00 0.00 0.01 0.03 0.01 0.00 0.05 0.01 0.03 0.02 0.00 0.05 0.01 0.03 0.02 0.00 0.05 0.02 0.05 0.03 0.00 0.10 0.05 0.13 0.07 0.00 0.25

12 2B3C2a2b Raikepur 170 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.01 0.00 0.04 0.01 0.02 0.01 0.00 0.04 0.01 0.02 0.01 0.00 0.04 0.02 0.04 0.02 0.00 0.08 0.04 0.10 0.06 0.00 0.20

13 2B3C2a3a Dool-Pratham 295 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.03 0.07 0.04 0.00 0.14 0.07 0.18 0.10 0.00 0.35

14 2B3C2a3b Dool-Dwitiya 300 0.00 0.00 0.00 0.00 0.00 0.02 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.01 0.04 0.02 0.00 0.07 0.03 0.07 0.04 0.00 0.14 0.08 0.18 0.10 0.00 0.36

5705 0.000 0.000 0.000 0.000 0.000 0.342 0.685 0.342 0.000 1.369 0.274 0.685 0.411 0.000 1.369 0.274 0.685 0.411 0.000 1.369 0.548 1.369 0.822 0.000 2.738 1.438 3.423 1.985 0.000 6.846

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

SL

NA

WC

DC

PIA

WC

1 2B3C1f1a Gopalpur 455 0 0 0 0 0.00 0.164 0 0 0 0.16 0.096 0 0 0 0.10 0.096 0 0 0 0.10 0.191 0 0 0 0.19 0.546 0 0 0 0.55

2 2B3C1f1b Rampur Bhimsen 760 0 0 0 0 0.00 0.274 0 0 0 0.27 0.16 0 0 0 0.16 0.16 0 0 0 0.16 0.319 0 0 0 0.32 0.912 0 0 0 0.91

3 2B3C1f2a Pankabahadur Nagar 362 0 0 0 0 0.00 0.13 0 0 0 0.13 0.076 0 0 0 0.08 0.076 0 0 0 0.08 0.152 0 0 0 0.15 0.434 0 0 0 0.43

4 2B3C1f2b Bhouti Pratappur 310 0 0 0 0 0.00 0.112 0 0 0 0.11 0.065 0 0 0 0.07 0.065 0 0 0 0.07 0.13 0 0 0 0.13 0.372 0 0 0 0.37

5 2B3C1f2c Surar 470 0 0 0 0 0.00 0.169 0 0 0 0.17 0.099 0 0 0 0.10 0.099 0 0 0 0.10 0.197 0 0 0 0.20 0.564 0 0 0 0.56

6 2B3C1d2a Oriyara 442 0 0 0 0 0.00 0.159 0 0 0 0.16 0.093 0 0 0 0.09 0.093 0 0 0 0.09 0.186 0 0 0 0.19 0.53 0 0 0 0.53

7 2B3C1d2b Sen Purab Para 490 0 0 0 0 0.00 0.176 0 0 0 0.18 0.103 0 0 0 0.10 0.103 0 0 0 0.10 0.206 0 0 0 0.21 0.588 0 0 0 0.59

8 2B3C1d2c Pipori 455 0 0 0 0 0.00 0.164 0 0 0 0.16 0.096 0 0 0 0.10 0.096 0 0 0 0.10 0.191 0 0 0 0.19 0.546 0 0 0 0.55

9 2B3C1d3a Magrasa 506 0 0 0 0 0.00 0.182 0 0 0 0.18 0.106 0 0 0 0.11 0.106 0 0 0 0.11 0.213 0 0 0 0.21 0.607 0 0 0 0.61

10 2B3C1d3b Sen Pashimpara 480 0 0 0 0 0.00 0.173 0 0 0 0.17 0.101 0 0 0 0.10 0.101 0 0 0 0.10 0.202 0 0 0 0.20 0.576 0 0 0 0.58

11 2B3C2a2a Rautepur 210 0 0 0 0 0.00 0.076 0 0 0 0.08 0.044 0 0 0 0.04 0.044 0 0 0 0.04 0.088 0 0 0 0.09 0.252 0 0 0 0.25

12 2B3C2a2b Raikepur 170 0 0 0 0 0.00 0.061 0 0 0 0.06 0.036 0 0 0 0.04 0.036 0 0 0 0.04 0.071 0 0 0 0.07 0.204 0 0 0 0.20

13 2B3C2a3a Dool-Pratham 295 0 0 0 0 0.00 0.106 0 0 0 0.11 0.062 0 0 0 0.06 0.062 0 0 0 0.06 0.124 0 0 0 0.12 0.354 0 0 0 0.35

14 2B3C2a3b Dool-Dwitiya 300 0 0 0 0 0.00 0.108 0 0 0 0.11 0.063 0 0 0 0.06 0.063 0 0 0 0.06 0.126 0 0 0 0.13 0.36 0 0 0 0.36

5705 0.000 0.000 0.000 0.000 0.000 2.054 0.000 0.000 0.000 2.054 1.198 0.000 0.000 0.000 1.198 1.198 0.000 0.000 0.000 1.198 2.396 0.000 0.000 0.000 2.396 6.846 0.000 0.000 0.000 6.846Total:

Total

lllrd Year (0.175%)

Total

IVthYear (0.175%)

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

s. No. MWS Code Name of MWS Area

lst Year (0.0%)

Total

llnd Year (0.3%)

TOTAL

TOTAL (1%)

TotalTotal

Vth Year (0.350%)

Microwatershed-wise Financial Break-up of Evaluation Component (Year-wise -1% of the Project Cost) Area in ha Amount in Lakhs

llnd Year (0.2%)

Total

lllrd Year (0.2%)

Total

IVthYear (0.2%)

Total

Vth Year (0.4%)

TOTAL

TOTAL (1%)

Total

Total:

Microwatershed-wise Financial Break-up of Monitoring Component (Year-wise -1% of the Project Cost) Area in ha Amount in Lakhs

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

S. No. MWS Code Name of MWS Area

lst Year (0.0%)

Total

Page 186

Page 187: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

CONSOLIDATION AND WITHDRAWAL PHASE (3% of the Project Cost)The last two years are the Consolidation and Withdrawal Phase of the Watershed development programme. This is the crucial phase of the project as the local institutions will be

trained to manage the project independently after withdrawal of the Government Institutions from the project area.

The main purpose of this phase is to create innovative NRM based, sustainable livelihoods and raise/enhance productivity levels of the augmented resources and local economic

development plans developed during the watershed works phase.

CONSOLIDATION AND WITHDRAWAL STRATEGY

Success of the programme depends on Different watershed interventions and sustainability can only be achieved through active participation of community. It will be on capacity

building and empowerment of stakeholders. The WC SHGs UGs etc. will be on established trained and strengthened to continue development after withdraw of PIA. By building

economic activities through CBOs community participation will be sustained. The need based and demand driven interventions will reduce dependency on subsidies. Contribution

from the community will be ensured for the entire activities to develop sense of belongingness and the contribution will be deposited to the account of watershed development fund

(WDF). It will also be strengthening through donations from the individuals and institutions and the CBOs will be trained to run watershed as business model on sustainable basis.

The tangible economic benefits alongwith empowerment by PIA will empower the CBOs to develop and sustain the watershed activities after withdrawal ent of fund and further

development work.gence. The livelihood for Assetless section (9% of the total cost Rs. 61.61 Lakhs) consist of G

The consolidation phase will also include:- 1.To prepare the project completion report.

2.Documentation of success stories.

3.Making films leaflets bulletins and the lessons learnt.

4.Watershed plus Activities

5.The expenditure will be done as per the common guidelines for watershed development projects.

6.The completion report will reflect the development on following aspects:-

a)Productivity enhancement.

b)Nutritional Security.

c)Risk minimization (Integrated farming system water harvesting and protected cultivation value addition and improved marketing).

d)Profitability.

e)Livelihood security (skill enhancement capacity building increased employment in agriculture and allied enterprises reduction in migration etc.).

The activities those will be under taken during this phase are:

1.Completion of various leftover works under taken during work phase.

2.Consensus among the villagers to take up any new works out of any unspent amount.

3.Preparation of Project completion report with details about status of each asset.

4.Documentation of successful experiences as well as lessons learnt for future use.

5.Evolving mechanisms to improve the sustainability of various interventions made in the project area.

6.Formulation of mechanisms for allocation of user’s right over common property resources.

7.Formulation of mechanisms to collect user charges for common property resources (CPR).

8.Creation of awareness and building capacity of the community to repair, maintain and protection of common property resources.

9.Training the user groups for optimum utilization of the developed natural resources.

Page 187

Page 188: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

10.Up scaling of successful experiences related to farm production system and off- farm livelihood activities undertaken through revolving fund under the project as well as credit

and technical support from external institutions.

11.Evolving marketing arrangements of the farm produce as well as the off-farm and other micro enterprises.

12.Formation of Farmer’s Federation for credit, input procurement, sale of local produce etc.

Under the project Area for the implementation of programme a separate Watershed Development Fund Account will be opened and maintained as per the IWMP Guidelines.

Withdrawal Mechanism:

1.At the end of the project, The Watershed Committee is to take the responsibility for post project management .For which the Memorandum of Agreement is to be formulated

between the PIA and Watershed Committee on the following terms and conditions.

2.The list of assets created under EPA, NRM, Production system & microenterprises and Livelihood support system is to be prepared with joint signature of the Chairman,

Secretary of the Watershed committee and PIA. The Watershed Committee will retain one copy of the list for future reference.

3.The amount lying unspent as on closing date will be transferred to the Watershed Development Fund.

4.Watershed Committee will be authorised to use only one Bank account i.e. WDF account.

5.Yearly auditing of the accounts by the Chartered Accountant will be mandatory and to be adhered strictly.

6.The office bearer of the Watershed Committee shall involve all the community irrespective of caste, creed and religion.

7.The Gram Sabha shall have the right to decide the user charges to be collected from the beneficiaries which shall be deposited under the watershed development fund.

8.The cost of repair and maintenance of the assets created out of NRM component shall be borne out of Watershed development fund by using maximum 50% of the amount

collected in a year.

9.The WDF account will primarily run as revolving fund.

10.No individual beneficiary should be granted any sort of grant or financial assistance in any form.

11.The SHGs and UGs shall have the eligibility to take loan from the WDF with marginal interest as decided by Gram Sabha.

12.The Watershed Committee is also at their liberty to start new profit making ventures by utilising WDF as security deposit and the profit earned should go to the WDF.

13.The remuneration for the Watershed secretary will be finalised in the Gram Sabha.

14.The Watershed Committee may collect financial assistance from any other sources to augment the WDF. All donations, interests, fines and fees shall be deposited in the WDF.

15.The WDF Bank Account shall be jointly operated and maintained as per the IWMP guidelines by the Chairman and Secretary of the watershed committee.

16.All the expenditure shall be authenticated by the Watershed committee.

17.Annual meeting of the Gram Sabha is mandatory. However it may meet at any time if required.

18.The Watershed Committee should meet in every quarter to review the income and expenditure.

19.Any change in the Watershed Committee or its office bearer shall be made once it is resolved in the Gram Sabha. The Gram Sabha should believe in rotational

leadership.

20.All the group representatives, at least one from each group shall be ensured in the Watershed Committee.

21.The decision approved and resolved in the Gram Sabha will only be implemented by the Watershed Committee.

22.In case of any embezzlement of fund, the Administrative system shall proceed according to Rules and Laws.

Page 188

Page 189: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

23.In the event of Gram Sabha and watershed Committee become defunct, the assets created under the project and WDF will be transferred to the Panchayat.

In the consolidation phase, the PIA would initiate works which lead to furtherance of the benefits and to sustainability of impacts. Please refer the Common

Guidelines, 2008 for detailed explanation.

However, emphasis will be given to the following activities -

Promoting judicious use of water by scaling up of Micro Irrigation Systems; encouraging more and more farmers to use such techniques

Scaling up of successful interventions in the project

Scaling up forward and backward linkages established during the works phase, especially, credit and marketing linkages

Scaling up of people’s collectives, like making the WCs/SHGs/UGs into Federations at project level or district level

Documentation of successful interventions and farmer-cases focusing on the learning there-from

Prepare the Project Completion Report (PCR); the PIA shall submit the PCR to the WCDC in the format provided for the purpose

Prepare a withdrawal strategy in such a way that the project is smoothly handed over to the Gram Sabha and the Gram Sabha delegates the responsibilities

to the Watershed Committee for future management

Prepare a strategy for Post-Project Management.

Distributing roles and responsibilities to different stakeholders including village level institutions

Delegating authority to various individuals/institutions in relation to maintenance and up keep of the physical structures created during the works phase

Page 189

Page 190: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

SLNA WCDC PIA WC Total

1 Bhailamau 125 0.015 0.015 0.030 0.390 0.450

2 Bhaunti khera 74 0.009 0.009 0.018 0.231 0.266

3 Bhisi Jargaon 107 0.013 0.013 0.026 0.334 0.385

4 Bhauti Pratappur 302 0.036 0.036 0.072 0.942 1.087

5 Dool 360 0.043 0.043 0.086 1.123 1.296

6 Fatehpur Dakshin 99 0.012 0.012 0.024 0.309 0.356

7 Gopalpur 169 0.020 0.020 0.041 0.527 0.608

8 Gadhewa Mohasinpur 70 0.008 0.008 0.017 0.218 0.252

9 Garhi Kanpur 150 0.018 0.018 0.036 0.468 0.540

10 Kurauna Bahadur Nagar 112 0.013 0.013 0.027 0.349 0.403

11 Magrasa 305 0.037 0.037 0.073 0.952 1.098

12 Neori 104 0.012 0.012 0.025 0.324 0.374

13 Patehuri 125 0.015 0.015 0.030 0.390 0.450

14 Pipauri 238 0.029 0.029 0.057 0.743 0.857

15 Patarsa 236 0.028 0.028 0.057 0.736 0.850

16 Pankabahadur Nagar 156 0.019 0.019 0.037 0.487 0.562

17 Rampur Bhimsen 384 0.046 0.046 0.092 1.198 1.382

18 Rampur Khas 220 0.026 0.026 0.053 0.686 0.792

19 Ramaipur 334 0.040 0.040 0.080 1.042 1.202

20 Rautepur 212 0.025 0.025 0.051 0.661 0.763

21 Raikepur 229 0.027 0.027 0.055 0.714 0.824

22 Sen Purab Para 510 0.061 0.061 0.122 1.591 1.836

23 Senpashchim Para 413 0.050 0.050 0.099 1.289 1.487

24 Sachendi Urf Chacheri 83 0.010 0.010 0.020 0.259 0.299

25 Surar 427 0.051 0.051 0.102 1.332 1.537

26 Uriyara 161 0.019 0.019 0.039 0.502 0.580

5705.00 0.685 0.685 1.369 17.800 20.5380

Watershed Committee Wise Financial Break-up of Consolidation Component at Various Level (Area in ha-Amount in Lakhs)

S. No. Name of WC AreaVth Year (3%) of the Project Cost

Rampur Bhimsen, IWMP-VIII District- Kanpur Nagar

Page 190

Page 191: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

S. No. Name of WC AreaAmount

in lacs

Completion

of Various

Left Over

Work

Perparation

of Project

Completion

Report

Documentat

ion of

Successful

Experience

Management

and

Maintenance

of Developed

Natural

Resources

Users

right and

users

charges

Sustainable

utilization of

natural

tesources

formation

of

federation

for post

project

econnomic

Capacity

building

of CBOs

for post

project

period

Manageme

nt and

utilization

of WDF

Intensific

ation of

PSME

Intensificati

on of

Livelihood

Total

in Lakhs

1 Bhailamau 125 0.4500 0.2150 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.4500

2 Bhaunti khera 74 0.2664 0.0314 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.2664

3 Bhisi Jargaon 107 0.3852 0.1502 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.3852

4 Bhauti Pratappur 302 1.0872 0.8522 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.0872

5 Dool 360 1.2960 1.0610 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.2960

6 Fatehpur Dakshin 99 0.3564 0.1214 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.3564

7 Gopalpur 169 0.6084 0.3734 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.6084

8 Gadhewa Mohasinpur 70 0.2520 0.0170 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.2520

9 Garhi Kanpur 150 0.5400 0.3050 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.5400

10Kurauna Bahadur Nagar112 0.4032 0.1682 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.4032

11 Magrasa 305 1.0980 0.8630 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.0980

12 Neori 104 0.3744 0.1394 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.3744

13 Patehuri 125 0.4500 0.2150 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.4500

14 Pipauri 238 0.8568 0.6218 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.8568

15 Patarsa 236 0.8496 0.6146 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.8496

16 Pankabahadur Nagar156 0.5616 0.3266 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.5616

17 Rampur Bhimsen 384 1.3824 1.1474 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.3824

18 Rampur Khas 220 0.7920 0.5570 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.7920

19 Ramaipur 334 1.2024 0.9674 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.2024

20 Rautepur 212 0.7632 0.5282 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.7632

21 Raikepur 229 0.8244 0.5894 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.8244

22 Sen Purab Para 510 1.8360 1.6010 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.8360

23 Senpashchim Para 413 1.4868 1.2518 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.4868

24Sachendi Urf Chacheri83 0.2988 0.0638 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.2988

25 Surar 427 1.5372 1.3022 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 1.5372

26 Uriyara 161 0.5796 0.3446 0.0200 0.0500 0.0200 0.0100 0.0200 0.0250 0.0100 0.0100 0.0400 0.0300 0.5796

5705 20.5380 14.4280 0.5200 1.3000 0.5200 0.2600 0.5200 0.6500 0.2600 0.2600 1.0400 0.7800 20.5380Total :

Details of Activities under Consolidation Plan of the Project Area of Kanpur NagarRampur Bhimsen, IWMP- District-

Page 191

Page 192: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Backward Linkages : Forward Linkages•Seed Certification •Harvesting /threshing machinery

•Supply of Improved Variety of Seed •Storage

•Supply of other Farming inputs •Road network

•Fertilizer •Transport facilities

•Pesticide •Markets

•Credit Delivery System •Agro, processing industries

•Extension services •Milk and other collection centers

•Price support system •Labour

•Tools/machinery

•Nursery

LINKAGE

Page 192

Page 193: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 LA Skill Training (in nos) 50 7.50 70 10.50 70 10.50 190 28.50

NRLM/

Skill Development

Mission

PIA/Distrct Level

2 PSME

2.1 Vermi Compost Pit (in Nos.) 26 2.34 26 2.34 26 2.340 52 4.68 130 11.700

2.2 Nadep Compost Pit (in Nos.) 26 2.08 26 2.08 26 2.080 26 2.08 104 8.320

2.3 Cow Shelter(in Nos.) 26 11.7 26 11.7 26 11.700 26 11.7 104 46.800

2.4 Goat Shelter (in Nos.) 26 9.1 52 18.2 26 9.100 26 9.1 130 45.500

2.5 Poultry Shelter (in Nos.) 26 10.4 26 10.4 26 10.400 52 21 130 52.000

2.6 Azola Pit (in Nos.) 26 0.52 26 0.52 26 0.520 26 0.52 104 2.080

2.7 Fodder Through (in Nos.) 26 9.1 26 9.1 26 9.100 26 9.1 104 36.400

2.8 Sanjeeva Pit(in Nos.) 26 0.52 26 0.52 52 1.040 52 1.04 156 3.120

2.9 Micro Irrigation (in Nos.)

2.9.1 Sprinkler Irrigation (in Nos.) 6 0.00 5 0.00 3 0.00 9 0.00 23 0.00

2.9.2 Drip Irrigation 6 0.00 1 0.00 1 0.00 9 0.00 17 0.00

2.10 Poly Houise 6 0.00 5 0.00 5 0.00 8 0.00 24 0.00

2.11 Agro Shed Net House 6 0.00 5 0.00 5 0.00 8 0.00 24 0.00

3 SMC Work

3.1 Contour Bund (in rmt.) 9349 7.00 19989 14.97 20080 15.04 20007 14.99 69425 52.00

3.2 Nos. of Outlet 18 0.14 39 0.29 40 0.30 40 0.30 137 1.03

3.3 Marginal Bund (in rmt.) 4124 7.67 8875 16.51 8737 16.25 9008 16.75 30744 57.18

3.4 Nos. of Outlet 8 1.20 17 2.55 17 2.55 18 2.70 60 9.00

3.5 Perpheral Bund (in rmt.) 2277 4.24 4908 9.13 4978 9.26 4968 9.24 17131 31.86

3.6 Nos. of Outlet 4 0.60 9 1.35 9 1.35 9 1.35 31 4.65

0.00 66.60 107.16 101.53 114.85 390.14

*

TotalIst Year IInd Year IIIrd Year IVth Year Vth Year

Financial for the Activity will be taken as per the norms and Guidelines of the respective departments applicable at the time of the execution.

Name of Scheme/

Department

Level of

Convergence

MGNAREGA PIA/Distrct Level

*NHM/Deartment of

Agricultur/PMKSYPIA/Distrct Level

*NHM PIA/Distrct Level

MGNAREGA PIA/Distrct Level

TOTAL :

S.

No.Component Activity

District-Convergence Plan At A Glance Under Project Area of Rampur Bhimsen, IWMP-VIII Kanpur Nagar ( Phy in Nos. Fin. In Lacs)

Page 193

Page 194: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

2 Bhaunti khera 74.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

3 Bhisi Jargaon 107.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

4 Bhauti Pratappur 302.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

5 Dool 360.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 1 0 1 0 45 7.920

6 Fatehpur Dakshin 99.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

7 Gopalpur 169.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

8 Gadhewa Mohasinpur 70.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

9 Garhi Kanpur 150.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

10 Kurauna Bahadur Nagar 112.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

11 Magrasa 305.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

12 Neori 104.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

13 Patehuri 125.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

14 Pipauri 238.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 1 0 1 0 43 7.920

15 Patarsa 236.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

16 Pankabahadur Nagar 156.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

17 Rampur Bhimsen 384.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 3 0 3 0 49 7.920

18 Rampur Khas 220.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 0 0 0 0 41 7.920

19 Ramaipur 334.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 2 0 2 0 1 0 1 0 43 7.920

20 Rautepur 212.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

21 Raikepur 229.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 1 0 1 0 41 7.920

22 Sen Purab Para 510.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 4 0 4 0 3 0 3 0 51 7.920

23 Senpashchim Para 413.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 4 0 4 0 2 0 2 0 49 7.920

24 Sachendi Urf Chacheri 83.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 1 0 1 0 0 0 0 0 39 7.920

25 Surar 427.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 3 0 3 0 2 0 2 0 47 7.920

26 Uriyara 161.00 5 0.45 4 0.32 4 1.8 5 1.75 5 2 4 0.08 4 1.4 6 0.12 0 0 0 0 0 0 0 0 37 7.920

5705.00 130 11.70 104 8.32 104 46.80 130 45.50 130 52.00 104 2.08 104 36.40 156 3.12 33 0.00 33 0.00 18 0.00 18 0.00 1064 205.92

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

Total

Total

Po

ult

ry S

he

lter

@ R

s. 0

.40

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jeev

ak p

it

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

S. No. Name of WC

Ver

mi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lter

@ R

s 0

.45

Go

at S

he

lter

@ R

s. 0

.35

( Phy in Nos. Fin. In Lakhs)At A Glance Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, District- Kanpur Nagar

Page 194

Page 195: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

5 Dool 360 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

11 Magrasa 305 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

12 Neori 104 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

13 Patehuri 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

14 Pipauri 238 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

15 Patarsa 236 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

16Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

20 Rautepur 212 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

21 Raikepur 229 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

24Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

25 Surar 427 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 12 1.76

26 Uriyara 161 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 8 1.76

Total 5705 26 2.34 26 2.08 26 11.7 26 9.1 26 10.40 26 0.52 26 9.1 26 0.52 6 0.00 6 0.00 6 0.00 6 0.00 232 45.76

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

Kanpur Nagar ( Phy in Nos. Fin. In Lakhs)

Go

at S

he

lte

r

@ R

s. 0

.35

IInd Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, IWMP- District-

S.

No.Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

Total

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Page 195

Page 196: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

5 Dool 360 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

11 Magrasa 305 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

12 Neori 104 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

13 Patehuri 125 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

14 Pipauri 238 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

15 Patarsa 236 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

16 Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 0 0.00 0 0.00 11 2.11

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

20 Rautepur 212 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

21 Raikepur 229 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

24 Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

25 Surar 427 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 1 0.00 1 0.00 1 0.00 1 0.00 13 2.11

26 Uriyara 161 1 0.09 1 0.08 1 0.45 2 0.7 1 0.40 1 0.02 1 0.35 1 0.02 0 0.00 0 0.00 0 0.00 0 0.00 9 2.11

5705.00 26 2.34 26 2.08 26 11.7 52 18.2 26 10.40 26 0.52 26 9.1 26 0.52 9 0.00 9 0.00 8 0.00 8 0.00 268 54.86

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

Total

Total

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

S. No. Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

( Phy in Nos. Fin. In Lakhs)IIIrd Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, District- Kanpur Nagar

Page 196

Page 197: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in

ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

2 Bhaunti khera 74 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

3 Bhisi Jargaon 107 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

4 Bhauti Pratappur 302 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

5 Dool 360 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

6 Fatehpur Dakshin 99 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

7 Gopalpur 169 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

8 Gadhewa Mohasinpur 70 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

9 Garhi Kanpur 150 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

10Kurauna Bahadur Nagar112 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

11 Magrasa 305 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

12 Neori 104 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

13 Patehuri 125 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

14 Pipauri 238 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

15 Patarsa 236 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

16 Pankabahadur Nagar 156 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

17 Rampur Bhimsen 384 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

18 Rampur Khas 220 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

19 Ramaipur 334 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

20 Rautepur 212 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

21 Raikepur 229 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

22 Sen Purab Para 510 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 1 0.00 1 0.00 13 1.78

23 Senpashchim Para 413 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

24 Sachendi Urf Chacheri 83 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

25 Surar 427 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 11 1.78

26 Uriyara 161 1 0.09 1 0.08 1 0.45 1 0.35 1 0.40 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 9 1.78

5705.00 26 2.34 26 2.08 26 11.70 26 9.10 26 10.40 26 0.52 26 9.10 52 1.04 12 0.00 12 0.00 4 0.00 4 0.00 266 46.28

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

Total

Total

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

S. No. Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

( Phy in Nos. Fin. In Lakhs)IVth Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, District- Kanpur Nagar

Page 197

Page 198: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Area in ha

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Bhailamau 125 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

2 Bhaunti khera 74 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

3 Bhisi Jargaon 107 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

4 Bhauti Pratappur 302 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

5 Dool 360 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

6 Fatehpur Dakshin 99 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

7 Gopalpur 169 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

8 Gadhewa Mohasinpur 70 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

9 Garhi Kanpur 150 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

10Kurauna Bahadur Nagar 112 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

11 Magrasa 305 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

12 Neori 104 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

13 Patehuri 125 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

14 Pipauri 238 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

15 Patarsa 236 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

16Pankabahadur Nagar 156 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

17 Rampur Bhimsen 384 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

18 Rampur Khas 220 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

19 Ramaipur 334 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

20 Rautepur 212 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

21 Raikepur 229 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

22 Sen Purab Para 510 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

23 Senpashchim Para 413 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

24Sachendi Urf Chacheri 83 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 1 0.00 1 0.00 0 0.00 0 0.00 13 2.27

25 Surar 427 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

26 Uriyara 161 2 0.18 1 0.08 1 0.45 1 0.35 2 0.80 1 0.02 1 0.35 2 0.04 0 0.00 0 0.00 0 0.00 0 0.00 11 2.27

5705.00 52 4.68 26 2.08 26 11.70 26 9.10 52 20.80 26 0.52 26 9.10 52 1.04 6 0.00 6 0.00 0 0.00 0 0.00 298 59.02

Po

ly H

ou

se

Agr

o S

he

d N

et

Ho

use

Total

Total

Po

ult

ry S

he

lte

r

@ R

s. 0

.40

Azo

la P

it

@ R

s. 0

.02

Fod

de

r Th

rou

gh

@ R

s.0

.35

San

jee

vak

pit

@ R

s.0

.02

Mic

ro Ir

riga

tio

n-

Spri

nkl

er

Mic

ro Ir

riga

tio

n-

Dri

p

S.

No.Name of WC

Ve

rmi C

om

po

st P

it

@ R

s 0

.09

Nad

ep

Co

mp

ost

Pit

@ R

s. 0

08

Co

w S

he

lte

r

@ R

s 0

.45

Go

at S

he

lte

r

@ R

s. 0

.35

( Phy in Nos. Fin. In Lakhs)Vth Year Convergence Programme Under the Component of PSME under the Project of Rampur Bhimsen, IWMP- District- Kanpur Nagar

Page 198

Page 199: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Bhailamau 847 0.634 924 0.692 0.000 0.000 1771 1.326

Bhaunti khera 707 0.530 0.000 0.000 0.000 707 0.530

Bhauti Pratappur 843 0.631 874 0.655 0.000 0.000 1717 1.286

Bhisi Jargaon 933 0.699 0.000 0.000 0.000 933 0.699

Dool 1092 0.818 1085 0.813 952 0.713 1505 1.127 4634 3.471

Fatehpur Dakshin 788 0.590 1060 0.794 0.000 0.000 1848 1.384

Gadhewa Mohasinpur 749 0.561 0.000 0.000 0.000 749 0.561

Garhi Kanpur 1326 0.993 1121 0.840 0.000 0.000 2447 1.833

Gopalpur 0.000 0.000 1606 1.203 0.000 1606 1.203

Kurauna Bahadur Nagar 0.000 955 0.715 0.000 1149 0.861 2104 1.576

Magrasa 1341 1.004 1602 1.200 0.000 0.000 2943 2.204

Neori 723 0.542 0.000 0.000 0.000 723 0.542

Pankabahadur Nagar 0.000 1647 1.234 0.000 0.000 1647 1.234

Patarsa 0.000 1709 1.280 1828 1.369 1512 1.132 5049 3.782

Patehuri 0.000 1353 1.013 0.000 0.000 1353 1.013

Pipauri 0.000 1057 0.792 1076 0.806 0.000 2133 1.598

Raikepur 0.000 1547 1.159 1396 1.046 0.000 2943 2.204

Ramaipur 0.000 1651 1.237 1716 1.285 1839 1.377 5206 3.899

Rampur Bhimsen 0.000 1217 0.912 1113 0.834 988 0.740 3318 2.485

Rampur Khas 0.000 1159 0.868 1158 0.867 1080 0.809 3397 2.544

Rautepur 0.000 0.000 1492 1.118 1610 1.206 3102 2.323

Sachendi Urf Chacheri 0.000 0.000 0.000 1376 1.031 1376 1.031

Sen Purab Para 0.000 1028 0.770 2730 2.045 2739 2.052 6497 4.866

Senpashchim Para 0.000 0.000 2621 1.963 2647 1.983 5268 3.946

Surar 0.000 0.000 1096 0.821 2500 1.873 3596 2.693

Uriyara 0.000 0.000 1296 0.971 1062 0.795 2358 1.766

Total: 9349 7.002 19989 14.972 20080 15.040 20007 14.985 69425 51.999

Nos 18 0.135 39 0.2925 40 0.3 40 0.3 137 1.0275

Amount @ Rs. 0.0075 lac per Outlet 0.135 0.2925 0.3 0.3 1.0275

OUTLETS (for safe Disposal of Water)

WC Wise Planing of Contour Bund (CB) Under Project Rampur Bhimsen, IWMP-VIII Kanpur Nagar (Phy. In rmt, Fin. In Lakhs)

Name of WCIInd year IIIrd Year IVth Year Vth Year Total

Page 199

Page 200: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.Bhailamau 597 1.110 0.000 0.000 0.000 597 1.110

Bhaunti khera 0.000 825 1.535 0.000 0.000 825 1.535

Bhauti Pratappur 747 1.389 672 1.250 708 1.317 0.000 2127 3.956

Bhisi Jargaon 375 0.698 0.000 0.000 0.000 375 0.698

Dool 0.000 487 0.906 656 1.220 743 1.382 1886 3.508

Fatehpur Dakshin 0.000 640 1.190 0.000 0.000 640 1.190

Gadhewa Mohasinpur 670 1.246 0.000 0.000 0.000 670 1.246

Garhi Kanpur 729 1.356 0.000 0.000 0.000 729 1.356

Gopalpur 0.000 0.000 699 1.300 0.000 699 1.300

Kurauna Bahadur Nagar 0.000 795 1.479 0.000 0.000 795 1.479

Magrasa 0.000 471 0.876 0.000 1422 2.645 1893 3.521

Neori 197 0.366 0.000 0.000 0.000 197 0.366

Pankabahadur Nagar 0.000 712 1.324 1207 2.245 0.000 1919 3.569

Patarsa 0.000 0.000 0.000 0.000 0 0.000

Patehuri 0.000 0.000 0.000 1012 1.882 1012 1.882

Pipauri 0.000 0.000 0.000 988 1.838 988 1.838

Raikepur 0.000 0.000 1000 1.860 0.000 1000 1.860

Ramaipur 809 1.505 0.000 0.000 0.000 809 1.505

Rampur Bhimsen 0.000 1029 1.914 0.000 818 1.521 1847 3.435

Rampur Khas 0.000 0.000 806 1.499 0.000 806 1.499

Rautepur 0.000 0.000 519 0.965 931 1.732 1450 2.697

Sen Purab Para 0.000 950 1.767 1455 2.706 828 1.540 3233 6.013

Senpashchim Para 0.000 0.000 0.000 1091 2.029 1091 2.029

Surar 0.000 1226 2.280 1163 2.163 0.000 2389 4.444

Uriyara 0.000 1068 1.986 524 0.975 1175 2.186 2767 5.147

4124 7.671 8875 16.508 8737 16.251 9008 16.755 30744 57.184

Nos 8 1.200 17 2.550 17 2.550 18 2.700 60 9.000

Amount @ Rs. 0.15 lac per Outlet 1.200 2.550 2.550 2.700 9.000

OUTLETS (for safe Disposal of Water)

WC Wise Planing of Marginal Bund (MB) Under Project Rampur Bhimsen, IWMP-VIII Kanpur Nagar (Phy. In rmt, Fin. In Lakhs)

Name of WCIInd year IIIrd Year IVth Year Vth Year Total

Page 200

Page 201: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District-

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

Dool 879 1.635 0.000 0.000 0.000 879 1.635

Gopalpur 719 1.337 2310 4.297 0.000 0.000 3029 5.634

Kurauna Bahadur Nagar 0.000 1694 3.151 1132 2.106 557 1.036 3383 6.292

Magrasa 0.000 0.000 993 1.847 0.000 993 1.847

Pankabahadur Nagar 0.000 0.000 1087 2.022 0.000 1087 2.022

Ramaipur 0.000 904 1.681 0.000 1052 1.957 1956 3.638

Rampur Bhimsen 0.000 0.000 1099 2.044 0.000 1099 2.044

Rautepur 0.000 0.000 0.000 1966 3.657 1966 3.657

Senpashchim Para 679 1.263 0.000 0.000 707 1.315 1386 2.578

Senpurab Para 0.000 0.000 667 1.241 686 1.276 1353 2.517

2277 4.235 4908 9.129 4978 9.259 4968 9.240 17131 31.864

Nos 4 0.600 9 1.350 9 1.350 9 1.350 31 4.650

Amount @ Rs. 0.15 lac per Outlet 0.600 1.350 1.350 1.350 4.650

OUTLETS (for safe Disposal of Water)

WC Wise Planing of Peripheral Bund (PB) Under Project Rampur Bhimsen, IWMP-VIII Kanpur Nagar (Phy. In rmt, Fin. In Lakhs)

Name of WCIInd year IIIrd Year IVth Year Vth Year Total

Page 201

Page 202: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No. Item Unit Pre-project Status Expected Post-project Status Remarks

1 2 3 4 5 6

1 Status of water table

1.1 Open Well In mt

1.1.1 Pre Monsoon 8.25-10.25 7-8

1.1.2 Post Monsoon 6.25-8.25 5-6

1.2 Bore Well In mt 32-35 31-32

3 Water Harvesting structures repaired/ rejuvenated 108

4 Availability of water months. 4-5 5-6

5 Storage Capacity ham N.A. 119.99

6 Area brought under Supplementary Irrigation in ha

6.1 @ 5 cm * 2 Irrigation/ha ha - 599.95

6.2 @ 7.5 cm * 2 Irrigation/ha ha - 399.97

7 Availability of drinking water ha Sufficient Sufficient

8Increase in irrigation potential @ 50% of storage

Capacityham N.A. 59.99

9 Area under agricultural crop ha

9.1 Area under single crop ha 2845.50 2100.66

9.2 Area under double crop ha 1964.75 2699.67

9.3 Area under multiple crop ha 0.00 137.00

9.4 Cropping Intensity % 118.76 138.66

9.5 B:C Ratio 1.54 2.39

10 Increase in area under Afforestation ha 57.09 52.62

11 Increase in area under horticulture ha 10.52 48.58

12 Increase in area under fodder ha 36.13 210.45

13 Increase in area under vegetation ha 103.74 311.65

14 Increase in milk production in Ltr 0.164 0.268

15 Increase in no. of livelihoods in no. - 1690

Abstract of Expected Outcomes in the Project Area Rampur Bhimsen, IWMP-VIII

Page 202

Page 203: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar

S. No. Item Unit Pre-project Status Expected Post-project Status Remarks

Abstract of Expected Outcomes in the Project Area Rampur Bhimsen, IWMP-VIII

15.1 Increase in income no.

15.2 For Assetless In Rs. 17100.00 21400.00

16 For Farmers In Rs. 23300.00 29200.00

17 Change in Migration Status in Rs. 21260 14882

18 No. of SHGs no 169

19 No. of SHGs Linkage no. 0 169

20 SHG Federations no. 0 26

21 Credit Institutions no.

22 Backward/Farward Linkage Established no. 0 26

23 No. of Assett Created no. N.A. 179

24 NPV of Net Benefit at 15% discounted Factor In Rs. 20146662.89

25 BCR at 15% discounted Factor of Net Benefit - 1.30

26 IRR in % - 31.93%

Page 203

Page 204: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

SMC (Through Convergence) 81061 GEN SC Total WOMEN

81061 60% 40% 100% 35%

Through IWMP Fund :- 48636 32425 81061 28371 487 325 812 284

Land Development 14573 8743 5829 14572 5100 88 59 147 51

WHS 0 0 0 0 0 0 0 0

14573 8743 5829 14572 5100 88 59 147 51

Self Employment :-

Through SHGs 253500 152100 101400 253500 88725 1014 676 1690 888

Through Micro Enterprises 540000 324000 216000 540000 189000 1800 1200 3000 1890

Through use of Farm Machinary 4410 2646 1764 4410 1543 88 59 147 16

797910 478746 319164 797910 279268 2902 1935 4837 2793

893544 536125 357418 893543 312739 3477 2319 5796 3128

Details of Employement GenerationMandays Generated CATEGORY WISE MANDAYS GENERATED in Nos. No. of person employed

Total Amount/174GEN SC Total WOMEN

Sub Total

No. of Machine * 30

Sub Total

Total

60% of Total Amount /174

(Amount of Dressing + Sodding)/174

Sub Total

No. of SHG * 10 *150

No. of ME * 5 *180

Page 204

Page 205: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District: 5705.00 ha

S.No. Particular Area ha.Prodictivity in

q/ha.

Total Production

in q (3*4)

Investment

Cost/ha in Rs.

Total Investment

Cost (3*6)

Market Rate/q in

Rs.

Gross Return

(5*8)

Net Profit

(9-7)BC Ratio (9/7)

1 2 3 4 5 6 7 8 9 10 11

A Khariff

1 Paddy 1006.00 16.00 16096.00 7000 7042000 1000 16096000 9054000 1.29

2 Jwar 245.00 5.25 1286.25 3200 784000 1400 1800750 1016750 1.30

3 Bajra 272.00 5.00 1360.00 3000 816000 1400 1904000 1088000 1.33

4 Maiz 109.00 9.00 981.00 4500 490500 1100 1079100 588600 1.20

5 Arhar 353.00 3.25 1147.25 5000 1765000 4000 4589000 2824000 1.60

6 Urd/Moong 326.00 3.00 978.00 5000 1630000 4000 3912000 2282000 1.40

7 Til 109.00 1.75 190.75 4000 436000 6500 1239875 803875 1.84

8 Chia 0.00 0.00 0.00 0 0 0 0 0 0.00

9 Quinoa 0.00 10.00 0.00 8000 0 6000 0 0 0.00

10 Vegetable 109.00 40.00 4360.00 8000 872000 500 2180000 1308000 1.50

11 Fodder 82.00 150.00 12300.00 6000 492000 100 1230000 738000 1.50

12 Others 109.00 7.75 844.75 5000 545000 1500 1267125 722125 1.33

2720 14872500.00 35297850.00 20425350.00 1.37

B Rabi

1 Wheat 1582.00 16.25 25707.50 7000 11074000 1200 30849000 19775000 1.79

2 Barley 324.00 6.00 1944.00 3500 1134000 1400 2721600 1587600 1.40

3 Mustard 446.00 3.00 1338.00 2500 1115000 2200 2943600 1828600 1.64

4 Lentil 568.00 3.25 1846.00 4500 2556000 3500 6461000 3905000 1.53

5 Field pea 527.00 9.00 4743.00 5500 2898500 1500 7114500 4216000 1.45

6 Quinoa 0.00 0.00 0.00 0 0 0 0 0 0.00

7 Vegetable 162.00 45.00 7290.00 8000 1296000 500 3645000 2349000 1.81

8 Fodder 122.00 160.00 19520.00 6000 732000 100 1952000 1220000 1.67

9 Others 324.00 8.00 2592.00 5000 1620000 1500 3888000 2268000 1.40

4055.00 22425500.00 59574700.00 37149200.00 1.66

C Zaid 0.00 0.00 0.00 0 0 0 0 0 0.00

6775.00 37298000.00 119149400.00 57574550.00 1.54

118.76

Sub Total B

Gross Area

Cropping Intensity %

Sub Total A

Production, Productivity, Investment Cost, BC and Croping Intensity of Major Crops under

Rampur Bhimsen, IWMP-VIII Kanpur Nagar Net Cultivable Area :

Pre-project

Page 205

Page 206: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District: 5705.00 ha

S.No. Particular Area ha.Prodictivity in

q/ha.

Total Production

in q

(3*4)

Investment

Cost/ha

in Rs.

Total Investment

Cost (3*6)

Market Rate/q in

Rs.

Gross Return

(5*8)

Net Profit

(9-7)BC Ratio (9/7)

1 2 3 4 5 6 7 8 9 10 11

A Khariff

1 Paddy 873.00 20.50 17896.50 9000 7857000 1400 25055100 17198100 2.19

2 Jwar 291.00 5.25 1527.75 5000 1455000 1600 2444400 989400 0.68

3 Bajra 323.00 5.00 1615.00 5000 1615000 1600 2584000 969000 0.60

4 Maiz 323.00 14.50 4683.50 7500 2422500 1450 6791075 4368575 1.80

5 Arhar 420.00 5.75 2415.00 7000 2940000 4500 10867500 7927500 2.70

6 Urd/Moong 453.00 5.25 2378.25 7000 3171000 4800 11415600 8244600 2.60

7 Til 162.00 2.50 405.00 4800 777600 7200 2916000 2138400 2.75

8 Chia 10.00 8.00 80.00 8000 80000 7000 560000 480000 6.00

9 Quinoa 16.00 10.00 160.00 8000 128000 6000 960000 832000 6.50

10 Vegetable 137.00 75.00 10275.00 10000 1370000 700 7192500 5822500 4.25

11 Fodder 97.00 230.00 22310.00 9000 873000 120 2677200 1804200 2.07

12 Others 47.00 12.50 587.50 7500 352500 1700 998750 646250 1.83

3152.00 23041600.00 74462125.00 51420525.00 2.23

B Rabi

1 Wheat 1659.00 21.00 34839.00 9000 14931000 1600 55742400 40811400 2.73

2 Barley 427.00 10.00 4270.00 6000 2562000 1800 7686000 5124000 2.00

3 Mustard 474.00 5.75 2725.50 6500 3081000 3400 9266700 6185700 2.01

4 Lentil 616.00 5.25 3234.00 6000 3696000 3500 11319000 7623000 2.06

5 Field pea 664.00 14.00 9296.00 7000 4648000 1800 16732800 12084800 2.60

6 Quinoa 24.00 12.50 300.00 8000 192000 6000 1800000 1608000 8.38

7 Vegetable 237.00 75.00 17775.00 10000 2370000 500 8887500 6517500 2.75

8 Fodder 178.00 200.00 35600.00 8000 1424000 140 4984000 3560000 2.50

9 Others 343.00 12.00 4116.00 7000 2401000 1700 6997200 4596200 1.91

4622.00 35305000.00 123415600.00 88110600.00 2.50

C Zaid 137.00 9.00 1233.00 5000 685000 1800 2219400 1534400 2.24

Gross Area 7911.00 59031600.00 125635000.00 141065525.00 2.39

138.66

Production, Productivity, Investment Cost, BC and Croping Intensity of Major Crops under

Rampur Bhimsen, IWMP-VIII Kanpur Nagar Net Cultivable Area :

Post-project

Sub Total A

Sub Total B

Cropping Intensity %

Page 206

Page 207: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District: 5705.00 haPre-project

Post-project

2845.50 1 2845.50 2100.66 1 2100.66

1964.75 2 3929.50 2699.67 2 5399.34

0.00 3 0.00 137.00 3 411.00

6775.00 7911.00

Crpping Intensity % 118.76 Crpping Intensity % 138.66

Area under Double Crop Area under Double Crop

Area under Multiple Crop Area under Multiple Crop

Total : Total :

Area under Single Crop Area under Single Crop

Rampur Bhimsen, IWMP-VIII Kanpur Nagar Net Cultivable Area :Over all BC 1.54 : 1

2.39 : 1

Area Under Agriculture Use in ha

Pre-Project Status Post-Project Status

Production, Productivity, Investment Cost, BC and Croping Intensity of Major Crops under

Page 207

Page 208: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

District- Kanpur Nagar (amt in Rs.)

Year Land Development

From Livelihood

Activities of

Assetless

From Livelihood

Activities of Farmers

From Livestock

ActivitiesTotal

1 0.00 0.00 0.00 0.00 0.00

2 0.00 0.00 0.00 0.00 0.00

3 0.00 2215980.00 15555816.00 3426108.00 21197904.00

4 0.00 2954640.00 20741088.00 4568144.00 28263872.00

5 480460.00 3693300.00 25926360.00 5710180.00 35810300.00

6 2354790.00 4431960.00 31111632.00 6852216.00 44750598.00

7 6839300.00 5170620.00 36296904.00 7994252.00 56301076.00

Total 9674550.00 18466500.00 129631800.00 28550900.00 186323750.00

Year wise Projected Benefit from Various Component under Project Area

Rampur Bhimsen, IWMP-VIII

Page 208

Page 209: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Amt in Rs.

Assetless Farmers LivestockTotal

Increase

18466500 129631800 28550900 176649200

1 1 0 0 0 0 0

2 2 0 0 0 0 0

3 3 12 2215980 15555816 3426108 21197904

4 4 16 2954640 20741088 4568144 28263872

5 5 20 3693300 25926360 5710180 35329840

6 6 24 4431960 31111632 6852216 42395808

7 7 28 5170620 36296904 7994252 49461776

Total 100 18466500 129631800 28550900 176649200

Income Projection for Assetless, Farmers and Livestock under the project for 7 years.

S.No. Year%

Increase

Page 209

Page 210: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Year

IWMP Convergence Op. maint. Total

1 4107600 4107600.00 0.00 -4107600 0.870 -3573612

2 9584400 6660326 16244726.00 0.00 -16244726 0.756 -12281012.86

3 17115000 10716064 27831064.00 21197904.00 -6633160 0.658 -4364619.28

4 17115000 10152982 27267982.00 28263872.00 995890 0.572 569649.08

5 20538000 11485060 32023060.00 35810300.00 3787240 0.497 1882258.28

6 0 3202306 3202306.00 44750598.00 41548292 0.432 17948862.14

7 0 3202306 3202306.00 56301076.00 53098770 0.376 19965137.52

68460000 39014432 6404612 113879044.00 186323750.00 72444706 20146662.89

Year Total Cost BenefitDiscounted

Factor @ 15%

Actual Cost

@ 15%

DiscountedVal

ue

Actual Benefit

@ 15% Discounted

Value

1 4107600 0 0.870 3573612 0

2 16244726 0 0.756 12281012.86 0

3 27831064 21197904 0.658 18312840.11 13948220.83

4 27267982 28263872 0.572 15597285.7 16166934.78

5 32023060 35810300 0.497 15915460.82 17797719.1

6 3202306 44750598 0.432 1383396.192 19332258.34

7 3202306 56301076 0.376 1204067.056 21169204.58

68267674.74 88414337.63

B : C 1.30

Year

IWMP CovergenceOperation &

Maintenance CostTotal

1 4107600 0 0 4107600 0 -4107600 0.870 -3573612 0.833 -3421630.8 0.800 -3286080 0.769 -3158744.4 0.741 -3043731.6

2 9584400 6660326 0 16244726 0 -16244726 0.756 -12281012.86 0.694 -11273839.84 0.640 -10396624.64 0.592 -9616877.792 0.549 -8918354.574

3 17115000 10716064 0 27831064 21197904 -6633160 0.658 -4364619.28 0.579 -3840599.64 0.512 -3396177.92 0.455 -3018087.8 0.406 -2693062.96

4 17115000 10152982 0 27267982 28263872 995890 0.572 569649.08 0.482 480018.98 0.410 408314.9 0.350 348561.5 0.301 299762.89

5 20538000 11485060 0 32023060 35810300 3787240 0.497 1882258.28 0.402 1522470.48 0.328 1242214.72 0.269 1018767.56 0.223 844554.52

6 0 0 3202306 3202306 44750598 41548292 0.432 17948862.14 0.335 13918677.82 0.262 10885652.5 0.207 8600496.444 0.165 6855468.18

7 0 0 3202306 3202306 56301076 53098770 0.376 19965137.52 0.279 14814556.83 0.210 11150741.7 0.159 8442704.43 0.122 6478049.94

68460000 39014432 6404612 113879044 186323750 72444706 20146662.89 12199653.83 6608041.264 2616819.942 -177313.604

IRR% 30 +

30 + 1.93 = 31.93

Calculation of NPV of Net Benefit @ 15% of Discounted ValueProject Cost

Total Benefit Net BenefitDiscounted

Factor @ 15%NPV # 15%

2616819.94/((2616819.94+(-177313.6)))*(35-30)

Calculation of B : C Ratio

Calculation of IRR

Project Cost

Total Bnenfit Net BenefitDiscounted

Factor @ 15%

NPV

@ 15%

Discounted

Factor

@ 20%

NPV

@ 20%

Discounted

Factor

@ 25%

NPV

@ 25%

Discounted

Factor

@ 30%

NPV

@ 30%

Discounted

Factor

@ 35%

NPV

@ 35%

Page 210

Page 211: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Bank Accounts :-

Following Bank Accounts will be opened in the Bank and operated in the manner prescribed below :-

WCDC Account :- Jointly Operated by District Magistrate & BSA (PIA)

•P.I.A. Account :-

1.Joint S.B. Account in the name of PIA

2.It will be opened in the Government Recognized Bank.

3.It will be operated jointly by BSA & Accountant of P.I.A.

•Project Fund Account of WC :-

1.Joint S.B. Account in the name of Watershed Project for the Watershed Fund received from the PIA

2.It will be opened in the local Bank Branch

3.It will be operated jointly by

I)Secretary - WC

II)Nominated Member - WDT

Structure of Watershed Committee (WC) :-

Category Members

•Chairman : 1

•Secretary : 1

•Representing User Group : 2-3

1.Representing Self Help Group : 2-3

2.Representing Women : 1

3.Representing SC : 1

4.Representing Landless : 1

5.Representing WDT : 1

Total No. of Members : 10-12

Office Bearer of WC :-

1.Chairman

Secretary

•WDF Account :-

Opening of Watershed Development Fund Accounts :-

Under the project Area for the implementation of programme a separate Watershed Development Fund Account will be opened and maintained as per the IWMP

Guidelines.

Following activities will be taken for mobilizing the beneficiaries contribution –

•Briefing the beneficiaries about the purpose, utility and rate of contribution.

BANK ACCOUNTS & WATERSHED DEVELOPMENT FUND (WDF)

Page 211

Page 212: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

•Informing the beneficiaries about the implications of non-payment of contribution.

•Motivating beneficiaries for making contribution.

•Collecting and depositing the contribution in the Watershed Development Fund.

•WDT & WC will be responsible for obtaining the contribution.

Utilization of WDF –

1.Watershed Development Fund shall be in operation only after the project period.

•It will be operated jointly by the President of the Gram Panchayat and any member from the SHG nominated by the Gram Sabha.

•This fund should be utilised only with the approval of watershed committee for the maintenance and development of Community Assets, CPR and

administrative cost if watershed secretary will continue after the project period with the approval of WC.

•No money shall be withdrawn during the project period.

•Watershed Project Fund should not be used for individual work.

WATERSHED DEVELOPMENT FUND (WDF)

1. One of the mandatory conditions for selection of villages for watershed projects is Farmer’s contribution towards the Watershed Development Fund (WDF).

The contributions to WDF shall be a minimum 10% of the cost of NRM works executed on private lands only. However, in case of SC, small and marginal

farmers, the minimum contribution shall be 5% of the cost of NRM works executed on their lands.2. For other cost intensive farming system activities such as Aquaculture, Horticulture, Agro-forestry, Animal Husbandry etc on private land directly benefiting

the individual farmers, the contribution of farmers will be 20% for General category and 10% for SC & ST beneficiaries.

3. These contributions would be acceptable either in cash at the time of execution of works or voluntary labour. A sum equivalent to the monetary value of the

voluntary labour would be transferred from the watershed project account to the WDF bank account that will be distinct from the Watershed Committee (WC)

bank account. User charges, sales proceeds and disposal amounts of intermediate usufruct rights shall also be deposited in the WDF bank account.

4. Income earned from assets created under the project on common property resources shall also be credited to WDF. 5. The Secretary, Watershed Committee (WC) shall maintain a completely separate account of the income and expenditure of the WDF. Rules for operation of

the fund should be prepared by the Watershed Committee (WC) and ratified by the Gram Sabha. The WDF bank account should be operated by the President

of the Gram Panchayat and any member from the SHG nominated by the Gram Sabha. Alternatively, the guidelines for the management and utilization of the

WDF may be evolved by the concerned Nodal Ministry.6. After completion of Phase II, at least 50% of the WDF funds shall be reserved for maintenance of assets created on community land or for common use

under the project. Works taken up on private land shall not be eligible for repair/maintenance out of this Fund. The remaining money may be used as a

revolving fund to advance loans to the villagers of the project area who have contributed to the fund. Individuals as well as charitable institutions should be

encouraged to contribute generously to this Fund.User Charges -The Gram Sabha through the Watershed Committee (WC) shall put in place mechanism for collecting user charges. No charge will be taken from landless,

destitute or disabled / widow headed house holds for work done on private or public land. The user charges collected shall be credited to the WDF for

maintenance of assets created during the project.

Page 212

Page 213: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Component Category Rate Amount in Lakhs

SC/ST SC/ST, small and marginal farmers 5% 1.4792

General 10% 1.2679

SMC Wok Through Convergence - - -

Farming System SC/ST 10% 2.7384

General 20% 8.2151

- -

13.7005

NRM Works Amount on Land Development only

User Charges as applicable on WHS Work fixed by user group on the basis of mutual concent for

providing Supplementary Irrigation.

Total :

Watershed Development Fund

One of the mandatory conditions for IWMP projects is people’s contribution towards the Watershed Development Fund (WDF). The contributions to WDF shall be

a minimum 10% of the cost of NRM works executed on private lands only. However, in case of SC/ST, small and marginal farmers, the minimum contribution shall

be 5% of the cost of NRM works executed on their lands. However, for other cost intensive farming system activities such as Aquaculture, Horticulture, Agro-

forestry, Animal Husbandry etc on private land directly benefiting the individual farmers, the contribution of farmers will be 20% for General category and 10% for

SC & ST beneficiaries and the remaining cost of the activities i.e. 80% for the General and 90% for SC/ST category will come from the project funds subject to a

maximum limit of an amount equal to double of the standard unit cost norm for Watershed Development Project.

These contributions would be acceptable either in cash at the time of execution of works or voluntary labour. A sum equivalent to the monetary value of the

voluntary labour would be transferred from the watershed project account to the WDF bank account that will be distinct from the Watershed Committee (WC)

bank account. User charges, sales proceeds and disposal amounts of intermediate usufruct rights shall also be deposited in the WDF bank account. Common

Guidelines for Watershed Development Projects Income earned from assets created under the project on common property resources shall also be credited to

WDF.

The Secretary, Watershed Committee (WC) shall maintain a completely separate account of the income and expenditure of the WDF. Rules for operation of the

fund should be prepared by the Watershed Committee (WC) and ratified by the Gram Sabha. The WDF bank account should be operated by the President of the

Gram Panchayat and any member from the SHG nominated by the Gram Sabha. Alternatively, the guidelines for the management and utilization of the WDF may

be evolved by the concerned Nodal Ministry.

After completion of Phase II, at least 50% of the WDF funds shall be reserved for maintenance of assets created on community land or for common use under the

project. Works taken up on private land shall not be eligible for repair/maintenance out of this Fund. The remaining money may be used as a revolving fund to

advance loans to the villagers of the project area who have contributed to the fund. Individuals as well as charitable institutions should be encouraged to

contribute generously to this Fund.

Details of WDF Collected Under The Project

Page 213

Page 214: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

WCDC: PIA Level Watershed Committee Level SHGs: 1. Cheque book register 1. Register for grants received from states 1. Cash book 1.Meeting Register

2. Grants received from Centre/State 2. UCs register for UCs to be sent to WCDC 2. Contingency bill register 2.Fund received Register

3. Grants Distribution Register 3. Bank pass book/ cheque Book Register 3. Voucher register 3.Bank Pass Book Register

4. UCs register for UCs received from PIA/watershed

committees 4. Bank Reconciliation statement register 4. Bank Pass Book Register 4. Internal Lending/Loan Register

5. Activities wise Physical and Financial Progress

Details

5. UCs register for UCs received from different

watershed committees 5. Bank Reconciliation statement- register 5.Savings Book Register

6. Technical Sanction Register 6. Physical and financial progress report 6. Advances/Adjustment register 6.Seed Money Distribution & Recovery Register

7. Administrative Sanction Register 7. Asset Register- Dead Stock Register 7. Bank cheque book register 7.Training Register

8. Bank Reconciliation statement register 8. Training Register 8. Asset Register- dead stock Register 8. Composit Loan/Grant-in-aid Register

9. Asset Register- Dead-stock Register 9. Material Book (EPA) 9. Assets Created Register

10. Meeting Register 10. Ledger 10. Income register (from watershed assets)

11. Training Register 11. Payment Book 11. WDF Account Register

12. Ledger 12.Seed Money Register

13. Payments Book 13. Register showing physical and financial progress

14. Visitor’s Book 14. Training Register

15. Technical Sanction Register

16. Administrative Sanction Register

17. Meeting Register (Resolution Book)

18. Material Book Register

19. Stock Register

20. Receipt Book

21. Voucher Book

22. Ledger

23. Account Ledger

24. Bill Book

25. Members’ Pass Book Register

26. Attendance Register (for Labour)

27. Payments Register

28. Works wise Expenditure Register

Under the project Area for the implementation of

programme a separate Watershed Development Fund

Account will be opened and maintained as per the IWMP

29. Visitor’s Book

List of Records/Registers to be maintained at different levels

OR Any other Records/Register prescribed by the SLNA/DoLR from time to time

Page 214

Page 215: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

Quarter/Month-->

April May June July Aug Sep Oct Nov Dec Jan Feb Mar

Components

Capacity Building X X X

Production System & Micro Enterprises X X X

Soil & Moisture Conservation X X X

Land Development X

Water harvesting Structure X X X

Livelihood Activities

Activity Calendar for Various Component Under IWMP Projects.

Q1 Q2 Q3 Q4

Page 215

Page 216: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

AAP Annual Action Plan PB Peripheral Bund

BPL Below Power Line PCA Project Completion Report

CB Capacity Building PIA Project Implementing Agency

CB Contour Bund PPP Public Private Partnership

CBO Community Based Organization PRA Participatory Rural Appraisal

CPR Common Property Resources PSA Participatory Situation Analysis

DoLR Department of Land Resources PSME Production System and Microenterprise

DRDA District Rural Development Agency SHG Self Help Group

ECD Earthen Check Dam SLNA State Level Nodal Agency

EPA Entry Point Activity SMC Soil and Moisture Conservation

FGD Focus Group Discussion SRI System of Rice Intensification

FPO Farmer's Producer Organization SWI System of Wheat Intensification

GP Gram Panchayat UG User's Group

IWMP Integrated Watershed Management Programme UMMB Urea Mineral Mixture Block

MB Marginal Bund WC Watershed Committee

MCD Masonry Check Dam WCDC Watershed Cum Data Centre

MGNREGA Mahatma Gandhi National Rural Employment Guarantee Programme WDF Watershed Development Fund

NHM National Horticulture Mission WDT Watershed Development Team

NRLM National Rural Livelihood Mission WDW Watershed Development Work

NRM Natural Resource Management WHS Water Harvesting Structure

ABRIVIATION

Page 216

Page 217: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 218: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 219: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 220: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 221: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 222: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 223: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 224: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 225: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 226: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 227: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 228: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 229: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 230: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 231: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 232: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 233: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 234: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 235: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 236: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

THEMATIC MAPS

Page 237: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 238: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 239: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 240: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 241: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 242: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 243: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 244: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 245: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 246: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 247: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 248: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 249: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 250: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS

Page 251: upldwr.up.nic.inupldwr.up.nic.in/pdfs/Updated_DPR/2012-13/DPR-KANPURNAGAR-IWMP...8.2 Eligibility for availing the Funds under The LA ... 2B3C1f2b-Bhouti Pratappur, 2B3C1f2c-Surar,

ACTION PLAN MAPS