ANA MEGIA. CERN. SEPTEMBER 2015 1

ELENA ION SOURCE

COMMISSIONING AND PRELIMINARY RESULTS

Page 2: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 2

Page 3: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 3

H+/H- production

+/-100 kV Bias voltage

Tungsten filament

Decapole magnet

Magnetic filter

Pulsed extraction

Currents of tens of µA

ELENA Ion Source Design

Page 4: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 4

PULSE GEN.FILAMENT PS -+

ARC PS-+

Source

PULLER PS

CONTROL UNIT

220V/400Hz conv.

CONTROL UNIT

QUADRUPOLE PSs

PC

PC WS CONTROL

PC

MAINS

HIGH VOLTAGE AREA

HIGH VOLTAGE CABINET GROUND CABINET

PCPepper-pot

Puller

ScreenCam. Quadrup.

High voltage Electronic signals Fiber optics Computer com.

e-

e-

e-

e-

e-

Main triggerCalib. signal

HIGH VOLTAGE PS (+/-100kv)

Current meas.

CTWS

Stepper motor trigger

Measurement trigger

WS measurement

PICOSCOPE

TTLtoFO

Page 5: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 5

Source characterization

Page 6: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 6

Wire scanners

Pepper-pot

Current transformer

Raw data

Page 7: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 7

Where to begin?

H+/H-

Arc voltage

Arc current

Gas flow

Source voltage

Puller voltage

Quadrupole settings

Page 8: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 8

Wire Scanner analysis

Pepper-pot analysis

Page 9: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

9

Results comparison (EIS-NP-SC-014)

WIR

E

SCA

NN

ERPE

PPER

PO

T

ANA MEGIA. CERN. SEPTEMBER 2015

Page 10: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 10

Results comparison (EIS-NP-SC-014)

WIR

E

SCA

NN

ERPE

PPER

PO

T

Page 11: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 11

Results comparison (EIS-PP-SC-004)

Page 12: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 12

Results comparison (EIS-PP-SC-004)

WIR

E

SCA

NN

ERPE

PPER

PO

T

Page 13: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 13

Results comparison (EIS-PP-SC-004)

WIR

E

SCA

NN

ERPE

PPER

PO

T

Page 14: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 14

Results comparison (EIS-NP-SC-037)

Page 15: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 15

Results comparison (EIS-NP-SC-037)

WIR

E

SCA

NN

ERPE

PPER

PO

T

Page 16: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 16

Results comparison (EIS-NP-SC-037)

WIR

E

SCA

NN

ERPE

PPER

PO

T

Page 17: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 17

Source re-installation

Page 18: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 18

Page 19: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 19

Page 20: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 20

What’s next?

Improve the ellipse fitting.

Analysis of all results.

Is it possible to get better RMS Emittance values??

Determine new interesting points to be measured.

Analyze Pepper-pot images for all the measurement points.

Ideas are welcome.

Waiting for some parts from Jülich (HV cables & safety hood). September 2015

Measurement plan for the source and the ion switch (Daniel Barna)

Timing and Oasis.

Integration of the source in the AD control system?

Regarding previous measurements:

Regarding source future operation:

Page 21: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 21

Timing

Page 22: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 22

PULSE GEN.

PICOSCOPECURRENT

TRANS.

CONTROL UNIT PULLER PS PULLER

WS MEAS.

WS STEPPER MOTOR

WS CONTROL

CONTROL TEST STAND

PICOSCOPECURRENT

TRANS.

CONTROL UNIT PULLER PS PULLER PS

WS MEAS.

WS STEPPER MOTOR

WS CONTROL

Local control of the source parameters

Trigger cable

OPTION I: LOCAL CONTROL (€)

OPTION II: REMOTE CONTROL (€€€)

5000 €1805 €

?

Trigger cable

Source parameters controlled from the control room by remote desktop app

Ethernet

Serial cable

Page 23: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 23

PICOSCOPECURRENT

TRANS.

CONTROL UNIT PULLER PS PULLER

WS MEAS.

WS STEPPER MOTOR

WS CONTROL

OPTION III:LOCAL CONTROL PREPARED FOR FUTURE REMOTE CONTROL (€€)

PULSE GEN.

OPTION IV: INTEGRATION OF THE SOURCE (€€€€)

OPTION II + man power

Trigger cable

1805 €

Source parameters controlled from the control room by remote desktop app

Ethernet

Serial cable

Page 24: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 24

QUESTIONS FROM TIMING TEAM

Will the source be always operated in pulsed mode? If so, which are the maximum and minimum frequency and pulse length?

Once the commissioning is finished and ELENA is connected to the AD ring, will the source need to be synchronized with the AD beam?

Page 25: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 25

Oasis

Page 26: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 26

PICOSCOPE OASIS

Picoscope trigger

CT calibration signal

Ion current

Wire scanner signal

Main trigger

CT calibration signal

Ion current

Extraction pulse

trigger

Page 27: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 27

Comments…

Cable request deadline 25th September !

Page 28: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 28

Page 29: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 29

H- preliminary results

Page 30: ELENA ION SOURCE 1 COMMISSIONING AND PRELIMINARY RESULTS ANA MEGIA. CERN. SEPTEMBER 2015

ANA MEGIA. CERN. SEPTEMBER 2015 30

H+ preliminary results