Electrical Sr. No. Problem Action Plan 1 2 Material is available 3 4 5 6 Erection of new Earthing pits and connecting to the exisitng grid in 220kv S/Y Material is arranged and awating for Work order to the Contractor GI fencing wire on the boundary wall in 200kV Switchyard (220kV side) with civil work on the same wall. Installation of Barbed wire on the boundary wall in 220kV S/Y (Cement plant U-05 side) GI sheet covering of the Overhead EHV cable trench nearby ADM & LC-11 dismanteled during erection of Fly ash line. Identified the areas and mailed to the concern incharge for again hook up of the GI sheet coverings GI water Pipe line laying & erection work in 220kv S/Y Material is arranged and awating for Work order to the Contractor Tree cutting/ trimming under the 132kV & 220kV which were identified during Line patrolling Location identified and given observation to P&A and RRVPNL Dismantling of tower & conductor at loc. No. 26& 27 of 220 kV Line outside Khera gate Job to be executed by M/s Hitech

Upload: anurag-pugalia

Post on 14-Dec-2015

212 views

Category:

Documents


0 download

DESCRIPTION

electr

TRANSCRIPT

Page 1: Electrical Exception (2)

Electrical Exception report

Sr. No. Problem Action Plan

1

2 Material is available

3

4

5

6

Erection of new Earthing pits and connecting to the exisitng grid in 220kv S/Y Material is arranged and

awating for Work order to the Contractor

GI fencing wire on the boundary wall in 200kV Switchyard (220kV side) with civil work on the same wall. Installation of Barbed wire on the boundary wall in 220kV S/Y (Cement plant U-05 side)

GI sheet covering of the Overhead EHV cable trench nearby ADM & LC-11 dismanteled during erection of Fly ash line.

Identified the areas and mailed to the concern incharge for again hook up of the GI sheet coverings

GI water Pipe line laying & erection work in 220kv S/Y

Material is arranged and awating for Work order to the Contractor

Tree cutting/ trimming under the 132kV & 220kV which were identified during Line patrolling

Location identified and given observation to P&A and RRVPNL

Dismantling of tower & conductor at loc. No. 26& 27 of 220 kV Line outside Khera gate

Job to be executed by M/s Hitech

Page 2: Electrical Exception (2)

Electrical Exception report

Responsibility Present Status Remark

30/06/2015

Pending 24/06/2015

Mr. B Gaikward Pending 20/06/2015

Mr. Suresh Suthar Pending 30/06/2015

Under progress30/06/2015

Pending

Target date to complete the Job

Mr. Pankaj J, Mr. Anurag P

Material available. 5 pits excavation to be done. No contractor is agreeing for executing the job

Mr. Sunil Golani, Mr. Pankaj J, Mr. Anurag P

P&A (Mr. Girdhari)and RRVPNL(Merta)

P&A (RAS), Mr. Pankaj J