electrical exception (2)
DESCRIPTION
electrTRANSCRIPT
![Page 1: Electrical Exception (2)](https://reader035.vdocuments.us/reader035/viewer/2022072004/563dbb3c550346aa9aab7030/html5/thumbnails/1.jpg)
Electrical Exception report
Sr. No. Problem Action Plan
1
2 Material is available
3
4
5
6
Erection of new Earthing pits and connecting to the exisitng grid in 220kv S/Y Material is arranged and
awating for Work order to the Contractor
GI fencing wire on the boundary wall in 200kV Switchyard (220kV side) with civil work on the same wall. Installation of Barbed wire on the boundary wall in 220kV S/Y (Cement plant U-05 side)
GI sheet covering of the Overhead EHV cable trench nearby ADM & LC-11 dismanteled during erection of Fly ash line.
Identified the areas and mailed to the concern incharge for again hook up of the GI sheet coverings
GI water Pipe line laying & erection work in 220kv S/Y
Material is arranged and awating for Work order to the Contractor
Tree cutting/ trimming under the 132kV & 220kV which were identified during Line patrolling
Location identified and given observation to P&A and RRVPNL
Dismantling of tower & conductor at loc. No. 26& 27 of 220 kV Line outside Khera gate
Job to be executed by M/s Hitech
![Page 2: Electrical Exception (2)](https://reader035.vdocuments.us/reader035/viewer/2022072004/563dbb3c550346aa9aab7030/html5/thumbnails/2.jpg)
Electrical Exception report
Responsibility Present Status Remark
30/06/2015
Pending 24/06/2015
Mr. B Gaikward Pending 20/06/2015
Mr. Suresh Suthar Pending 30/06/2015
Under progress30/06/2015
Pending
Target date to complete the Job
Mr. Pankaj J, Mr. Anurag P
Material available. 5 pits excavation to be done. No contractor is agreeing for executing the job
Mr. Sunil Golani, Mr. Pankaj J, Mr. Anurag P
P&A (Mr. Girdhari)and RRVPNL(Merta)
P&A (RAS), Mr. Pankaj J