edaptracker application_1.pdf · introductory meeting (intro) preliminary energy analysis (pea) 1 2...
TRANSCRIPT
-
Page 1 Application Form
Project *
Project Name _______________________________________________________________________
PROJECT LOCATION
Address 1 __________________________________________________________________________
Address 2 __________________________________________________________________________
City ____________________________________State __________________ZIP Code _____________
Are you/will you be an Xcel Energy electric customer? * � No � Yes
Are you/will you be an Xcel Energy gas customer? * � No � Yes
Are you/will you be an Xcel Energy district heating customer? * � No � Yes
Are you/will you be an Xcel Energy district cooling customer? * � No � Yes
Applicaton
Introductory Meeting (Intro)
Preliminary Energy Analysis (PEA)
1
2
3
steps in EDAPT processs
• Fill out on-line Application on the Application tab. Information on the project, customer, design, team, certification plans, schedule, project details, design consideration options, and the terms and conditions are covered in the Application
• Submit Application for approval
Xcel Energy Review
Tasks for the Energy Consultant (EC):
• Download the Intro Meeting Report template. It is pre-populated with information from the Application and the Project Info
• Hold Intro meeting
• Revise Intro Report based on details of Intro Meeting
• Upload Report
• Update Project Info
• Submit for approval
Tasks for the Energy Consultant (EC):
• Upload the OpenStudio modeled baseline and energy efficiency measures
• Download PEA Report template
• Revise PEA Report. Hold PEA meeting
• Upload Report
• Update Project Info as needed
• Submit for approval
i
i
Final Energy Analysis (FEA)4Tasks for the Energy Consultant (EC):
• Upload the OpenStudio modeled baseline and design alternatives
• Download FEA Report template
• Revise FEA Report. Hold FEA meeting
• Upload FEA Report
• Submit for Approval
• Upload the customer's final design alternative from OpenStudio
• Update Project Info as needed
• Submit for approval
i
Construction Document (CD) Review 5The construction document review begins with the Measurement & Verification Consultant (MVC). Tasks for the MVC:
• Download CD Review template
• Review the construction documents and check for all energy efficiency measures from final design alternative
• Revise CD Review template based on constructions document review
• Upload CD Review
i
Tasks for the Energy Consultant (EC):
• Upload the OpenStudio updated model based on CD Review
• Download CD Report Template
• Revise CD Report (include MVC's CD Review)
• Upload CD Report
• Update Project Info as needed
• Submit for approval
Measurement & Verification (M&V)6
approval, move to next step rejected, review notes from Xcel Energy
approval, move to next step
approval, move to next step
approval, move to next step
approval, move to next stepEC and Design Team payment
Measurement and Verification begins with the Measurement & Verification Consultant (MVC). Tasks for the MVC:
• Download M&V Review template
• Conduct field verification
• Revise M&V Review based on field verification
• Upload M&V Review
i
Tasks for the Energy Consultant (EC):
• Upload the OpenStudio updated model based on field verification results
• Download M&V Report
• Revise M&V Report (include MVC's field verification)
• Upload M&V Report
• Update Project Info
• Submit for approval
Xcel Energy Review approval, project completeCustomer and EC payment
Submit
EDA and Construction Process
Design Phase
Schematic Design
Design Development
Construction
Construction Complete
Submit
Submit
Submit
Submit
Submit
Xcel Energy Review
Xcel Energy Review
Xcel Energy Review
Xcel Energy Review
rejected, review notes from Xcel Energy
rejected, review notes from Xcel Energy
rejected, review notes from Xcel Energy
rejected, review notes from Xcel Energy
rejected, review notes from Xcel Energy
Submit
Pre-design Phase
EDAPTrackerApply for the Energy Design Assistance Program
* Required Fields
-
Page 2 Application Form
Customer Information
_____________________________________________________________________Company Name
BILLING ADDRESS
_________________________________________________________________________
Address 1
_________________________________________________________________________
Address 2
____________________________________State __________________ZIP Code _____________
City
___________________________________________________________
Customer Contact Name
_______________________________________ Fax___________________________________
Phone
_________________________________________________________Contact Email
Customer and Design Team Information
ENERGY CONSULTANT
_______________________________________________________________________________
Name
_______________________________________________________________________________
Email
______________________________________________________________________________Phone
Additional Contacts
_______________________________________________________________________________
Name
________________________________________________________________________________
Role
______________________________________________________________________
Phone Number
_______________________________________________________________________________
Email
__________________________________________________________________________Company *
-
Page 3 Application Form
Name _______________________________________________________________________________
Role ________________________________________________________________________________
Phone Number ______________________________________________________________________
Email _______________________________________________________________________________
Company * __________________________________________________________________________
Name _______________________________________________________________________________
Role ________________________________________________________________________________
Phone Number ______________________________________________________________________
Email _______________________________________________________________________________
Company * __________________________________________________________________________
Name _______________________________________________________________________________
Role ________________________________________________________________________________
Phone Number ______________________________________________________________________
Email _______________________________________________________________________________
Company * __________________________________________________________________________
Name _______________________________________________________________________________
Role ________________________________________________________________________________
Phone Number ______________________________________________________________________
Email _______________________________________________________________________________
Company * __________________________________________________________________________
-
Page 4 Application Form
Certification/Early Analysis Infromation
Certification * � Yes � No
Are you planning on obtaining a green building certification (3rd party verified)?If yes, which certification? � USGBC LEED Platinum � USGBC LEED Gold � USGBC LEED Silver � USGBC LEED Certified � Enterprise Green Communities � Green Globes � Collaborative for High Performance Schools (CHPS) � Design to Earn the ENERGY STAR
Early Analysis ❑ Daylighting analysis ❑ Massing/Orientation analysis ❑ HVAC analysis ❑ Lighting analysisAre you interested in conducting additional early energy savings analyses (listed above) to help reach higher energy savings? Check analysis of interest.
Schedule
Schematic Design Date_______________________________________________________________
Design Development Date ___________________________________________________________
Construction Documents Date ________________________________________________________
Construction Completion Date ________________________________________________________
-
Page 5 Application Form
Project Details
Construction Type * ❑ New ❑ Addition ❑ Renovation
Building Type * � School � Office � University � Multifamily � Restaurant � Mixed-use � Hospital � Recreation � Other � Hotel
� Retail � Museum � Library � Dormitory � Grocery � Laboratory � Warehouse � Medical Office Bldg � Jail � Performing Arts � Event Center
� Senior Housing � Bank � Manufacturing � Garage � Aquatic Center � Automotive Facility � Religious Building � Sports Arena � Fire Station
Total Building Sq. Ft. _________________________________________________________________
Parking Garage Sq. Ft. ________________________________________________________________
Data Center Sq. Ft. ___________________________________________________________________
Above Grade Stories _________________________________________________________________
Below Grade Stories _________________________________________________________________
Percent Cooled ______________________________________________________________________
Design Process * � Design/Bid Single Package � Design/Bid Multiple Package (Fast Track) � Design Build � Other
Heating and Cooling ❑ On-site cooling systems ❑ District cooling ❑ On-site heating systems ❑ District heating ❑ Other
-
Page 6 Application Form
Design Consideration OptionsWillingness to consider energy saving alernatives.
Orientation-building/massing layout * � Very � Somewhat � Not at all
Lighting/control design * � Very � Somewhat � Not at all
Glazing type-window design * � Very � Somewhat � Not at all
HVAC/control efficiency * � Very � Somewhat � Not at all
Daylighting controls * � Very � Somewhat � Not at all
Load responsive equipment * � Very � Somewhat � Not at all
Wall insulation * � Very � Somewhat � Not at all
Outside air control systems * � Very � Somewhat � Not at all
-
Page 7 Application Form
Lighting controls * � Very � Somewhat � Not at all
Energy management system * � Very � Somewhat � Not at all
Roof insulation * � Very � Somewhat � Not at all
Other energy-design alternatives
Special considerations and other comments
Where did you hear about the Energy Design Assistance program?
Project Name: Daylighting analysis: OffMassingOrientation analysis: OffHVAC analysis: OffLighting analysis: OffSchematic Design Date: Design Development Date: Construction Documents Date: Construction Completion Date: New: OffAddition: OffRenovation: OffTotal Building Sq Ft: Parking Garage Sq Ft: Data Center Sq Ft: Above Grade Stories: Below Grade Stories: Percent Cooled: Onsite cooling systems: OffDistrict cooling: OffOnsite heating systems: OffDistrict heating: OffOther: OffGroup2: Offgas customer: Offdistrict heating: Offdistrict cooling: Offcertification: Offcertification type: OffBuilding Type: OffDesign Process: Offorientation: Offlighting: Offglazing: Offhvac: Offdaylighting controls: Offload responsive: Offwall insulation: Offoutside air: Offlighting controls: Offenergy management: Offroof: OffOther Energy-design Alternatives: Where did you hear about the Energy Design Assistance program?: Company Name: Customer Contace Name: Energy Consultant: Text23: Text24: Text25: Text26: Text27: Text28: Text29: Text30: Text31: Text32: Text33: Text34: Text35: Text36: Text37: Text38: Text39: Text40: Text41: Text42: Special Considerations: Energy Consultant Email: Energy Consultant Phone: Contact Name 1: Role 1: Phone 1: Email 1: Company 1: Project Address: Project City: Project State: Project ZIP Code: Company Address: Company Address 2: Company City: Company State: Company Zip Code: Customer Contact Phone: Customer Contact Fax: Customer Contact Email: Project Address 2: