Page 1 Application Form Project * Project Name _______________________________________________________________________ PROJECT LOCATION Address 1 __________________________________________________________________________ Address 2 __________________________________________________________________________ City ____________________________________State __________________ZIP Code _____________ Are you/will you be an Xcel Energy electric customer? * No Yes Are you/will you be an Xcel Energy gas customer? * No Yes Are you/will you be an Xcel Energy district heating customer? * No Yes Are you/will you be an Xcel Energy district cooling customer? * No Yes EDAPTracker Apply for the Energy Design Assistance Program * Required Fields

Upload: others

Post on 28-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Page 1 Application Form

    Project *

    Project Name _______________________________________________________________________

    PROJECT LOCATION

    Address 1 __________________________________________________________________________

    Address 2 __________________________________________________________________________

    City ____________________________________State __________________ZIP Code _____________

    Are you/will you be an Xcel Energy electric customer? * � No � Yes

    Are you/will you be an Xcel Energy gas customer? * � No � Yes

    Are you/will you be an Xcel Energy district heating customer? * � No � Yes

    Are you/will you be an Xcel Energy district cooling customer? * � No � Yes

    Applicaton

    Introductory Meeting (Intro)

    Preliminary Energy Analysis (PEA)

    1

    2

    3

    steps in EDAPT processs

    • Fill out on-line Application on the Application tab. Information on the project, customer, design, team, certification plans, schedule, project details, design consideration options, and the terms and conditions are covered in the Application

    • Submit Application for approval

    Xcel Energy Review

    Tasks for the Energy Consultant (EC):

    • Download the Intro Meeting Report template. It is pre-populated with information from the Application and the Project Info

    • Hold Intro meeting

    • Revise Intro Report based on details of Intro Meeting

    • Upload Report

    • Update Project Info

    • Submit for approval

    Tasks for the Energy Consultant (EC):

    • Upload the OpenStudio modeled baseline and energy efficiency measures

    • Download PEA Report template

    • Revise PEA Report. Hold PEA meeting

    • Upload Report

    • Update Project Info as needed

    • Submit for approval

    i

    i

    Final Energy Analysis (FEA)4Tasks for the Energy Consultant (EC):

    • Upload the OpenStudio modeled baseline and design alternatives

    • Download FEA Report template

    • Revise FEA Report. Hold FEA meeting

    • Upload FEA Report

    • Submit for Approval

    • Upload the customer's final design alternative from OpenStudio

    • Update Project Info as needed

    • Submit for approval

    i

    Construction Document (CD) Review 5The construction document review begins with the Measurement & Verification Consultant (MVC). Tasks for the MVC:

    • Download CD Review template

    • Review the construction documents and check for all energy efficiency measures from final design alternative

    • Revise CD Review template based on constructions document review

    • Upload CD Review

    i

    Tasks for the Energy Consultant (EC):

    • Upload the OpenStudio updated model based on CD Review

    • Download CD Report Template

    • Revise CD Report (include MVC's CD Review)

    • Upload CD Report

    • Update Project Info as needed

    • Submit for approval

    Measurement & Verification (M&V)6

    approval, move to next step rejected, review notes from Xcel Energy

    approval, move to next step

    approval, move to next step

    approval, move to next step

    approval, move to next stepEC and Design Team payment

    Measurement and Verification begins with the Measurement & Verification Consultant (MVC). Tasks for the MVC:

    • Download M&V Review template

    • Conduct field verification

    • Revise M&V Review based on field verification

    • Upload M&V Review

    i

    Tasks for the Energy Consultant (EC):

    • Upload the OpenStudio updated model based on field verification results

    • Download M&V Report

    • Revise M&V Report (include MVC's field verification)

    • Upload M&V Report

    • Update Project Info

    • Submit for approval

    Xcel Energy Review approval, project completeCustomer and EC payment

    Submit

    EDA and Construction Process

    Design Phase

    Schematic Design

    Design Development

    Construction

    Construction Complete

    Submit

    Submit

    Submit

    Submit

    Submit

    Xcel Energy Review

    Xcel Energy Review

    Xcel Energy Review

    Xcel Energy Review

    rejected, review notes from Xcel Energy

    rejected, review notes from Xcel Energy

    rejected, review notes from Xcel Energy

    rejected, review notes from Xcel Energy

    rejected, review notes from Xcel Energy

    Submit

    Pre-design Phase

    EDAPTrackerApply for the Energy Design Assistance Program

    * Required Fields

  • Page 2 Application Form

    Customer Information

    _____________________________________________________________________Company Name

    BILLING ADDRESS

    _________________________________________________________________________

    Address 1

    _________________________________________________________________________

    Address 2

    ____________________________________State __________________ZIP Code _____________

    City

    ___________________________________________________________

    Customer Contact Name

    _______________________________________ Fax___________________________________

    Phone

    _________________________________________________________Contact Email

    Customer and Design Team Information

    ENERGY CONSULTANT

    _______________________________________________________________________________

    Name

    _______________________________________________________________________________

    Email

    ______________________________________________________________________________Phone

    Additional Contacts

    _______________________________________________________________________________

    Name

    ________________________________________________________________________________

    Role

    ______________________________________________________________________

    Phone Number

    _______________________________________________________________________________

    Email

    __________________________________________________________________________Company *

  • Page 3 Application Form

    Name _______________________________________________________________________________

    Role ________________________________________________________________________________

    Phone Number ______________________________________________________________________

    Email _______________________________________________________________________________

    Company * __________________________________________________________________________

    Name _______________________________________________________________________________

    Role ________________________________________________________________________________

    Phone Number ______________________________________________________________________

    Email _______________________________________________________________________________

    Company * __________________________________________________________________________

    Name _______________________________________________________________________________

    Role ________________________________________________________________________________

    Phone Number ______________________________________________________________________

    Email _______________________________________________________________________________

    Company * __________________________________________________________________________

    Name _______________________________________________________________________________

    Role ________________________________________________________________________________

    Phone Number ______________________________________________________________________

    Email _______________________________________________________________________________

    Company * __________________________________________________________________________

  • Page 4 Application Form

    Certification/Early Analysis Infromation

    Certification * � Yes � No

    Are you planning on obtaining a green building certification (3rd party verified)?If yes, which certification? � USGBC LEED Platinum � USGBC LEED Gold � USGBC LEED Silver � USGBC LEED Certified � Enterprise Green Communities � Green Globes � Collaborative for High Performance Schools (CHPS) � Design to Earn the ENERGY STAR

    Early Analysis ❑ Daylighting analysis ❑ Massing/Orientation analysis ❑ HVAC analysis ❑ Lighting analysisAre you interested in conducting additional early energy savings analyses (listed above) to help reach higher energy savings? Check analysis of interest.

    Schedule

    Schematic Design Date_______________________________________________________________

    Design Development Date ___________________________________________________________

    Construction Documents Date ________________________________________________________

    Construction Completion Date ________________________________________________________

  • Page 5 Application Form

    Project Details

    Construction Type * ❑ New ❑ Addition ❑ Renovation

    Building Type * � School � Office � University � Multifamily � Restaurant � Mixed-use � Hospital � Recreation � Other � Hotel

    � Retail � Museum � Library � Dormitory � Grocery � Laboratory � Warehouse � Medical Office Bldg � Jail � Performing Arts � Event Center

    � Senior Housing � Bank � Manufacturing � Garage � Aquatic Center � Automotive Facility � Religious Building � Sports Arena � Fire Station

    Total Building Sq. Ft. _________________________________________________________________

    Parking Garage Sq. Ft. ________________________________________________________________

    Data Center Sq. Ft. ___________________________________________________________________

    Above Grade Stories _________________________________________________________________

    Below Grade Stories _________________________________________________________________

    Percent Cooled ______________________________________________________________________

    Design Process * � Design/Bid Single Package � Design/Bid Multiple Package (Fast Track) � Design Build � Other

    Heating and Cooling ❑ On-site cooling systems ❑ District cooling ❑ On-site heating systems ❑ District heating ❑ Other

  • Page 6 Application Form

    Design Consideration OptionsWillingness to consider energy saving alernatives.

    Orientation-building/massing layout * � Very � Somewhat � Not at all

    Lighting/control design * � Very � Somewhat � Not at all

    Glazing type-window design * � Very � Somewhat � Not at all

    HVAC/control efficiency * � Very � Somewhat � Not at all

    Daylighting controls * � Very � Somewhat � Not at all

    Load responsive equipment * � Very � Somewhat � Not at all

    Wall insulation * � Very � Somewhat � Not at all

    Outside air control systems * � Very � Somewhat � Not at all

  • Page 7 Application Form

    Lighting controls * � Very � Somewhat � Not at all

    Energy management system * � Very � Somewhat � Not at all

    Roof insulation * � Very � Somewhat � Not at all

    Other energy-design alternatives

    Special considerations and other comments

    Where did you hear about the Energy Design Assistance program?

    Project Name: Daylighting analysis: OffMassingOrientation analysis: OffHVAC analysis: OffLighting analysis: OffSchematic Design Date: Design Development Date: Construction Documents Date: Construction Completion Date: New: OffAddition: OffRenovation: OffTotal Building Sq Ft: Parking Garage Sq Ft: Data Center Sq Ft: Above Grade Stories: Below Grade Stories: Percent Cooled: Onsite cooling systems: OffDistrict cooling: OffOnsite heating systems: OffDistrict heating: OffOther: OffGroup2: Offgas customer: Offdistrict heating: Offdistrict cooling: Offcertification: Offcertification type: OffBuilding Type: OffDesign Process: Offorientation: Offlighting: Offglazing: Offhvac: Offdaylighting controls: Offload responsive: Offwall insulation: Offoutside air: Offlighting controls: Offenergy management: Offroof: OffOther Energy-design Alternatives: Where did you hear about the Energy Design Assistance program?: Company Name: Customer Contace Name: Energy Consultant: Text23: Text24: Text25: Text26: Text27: Text28: Text29: Text30: Text31: Text32: Text33: Text34: Text35: Text36: Text37: Text38: Text39: Text40: Text41: Text42: Special Considerations: Energy Consultant Email: Energy Consultant Phone: Contact Name 1: Role 1: Phone 1: Email 1: Company 1: Project Address: Project City: Project State: Project ZIP Code: Company Address: Company Address 2: Company City: Company State: Company Zip Code: Customer Contact Phone: Customer Contact Fax: Customer Contact Email: Project Address 2: