Change in Inspection Plan Whenever MIC is deleted or added, there is need of changing the inspection plan. Changing Inspection plan is an engineering change. Hence any change in inspection plan must be done with an ECR (Engineering Change Request) Procedure of change in inspection plan Step 1 Create an ECR T Code: CC01 Run T Code CC01 to get the below shown screen Select ECR Select “Without Release Key” In function section Select 310 Change Type and then press enter to get the next screen. Select ECR Click On F4 Help Icon and select 310 change type Select without Release key

Upload: pawandubey9

Post on 28-Nov-2015

75 views

Category:

Documents


0 download

DESCRIPTION

engineering change note

TRANSCRIPT

Change in Inspection Plan

Whenever MIC is deleted or added, there is need of changing the inspection plan. Changing Inspection plan is an engineering change. Hence any change in inspection plan must be done with an ECR (Engineering Change Request)

Procedure of change in inspection plan

Step 1

Create an ECR

T Code: CC01

Run T Code CC01 to get the below shown screen

Select ECR Select “Without Release Key” In function section Select 310 Change Type and then press enter to get the next screen.

Select ECR

Click On F4 Help Icon and select 310 change type

Select without Release key

Change in Inspection Plan

Enter the description of ECR Enter valid from date Enter reason for change Set status as active i.e. 01

After filling the above data click on object Types to get the next screen.

Enter description for engineering change

Enter Valid From date

Enter reason for change

Set status as Active

Change in Inspection Plan

Click on checkbox of task list in ACTV and object columns

After clicking the checkbox select Objects to get the next screen

Select task list

Click on objects

Change in Inspection Plan

Enter task List type “Q” for change in inspection plan Write the inspection plan number in group section Add description in description column Enter change type as 001

After filling all the required fields click on Header to get the initial screen.

Enter Task list type

Enter the Group which is to be

changed Write Description

Enter Change type

Header

Change in Inspection Plan

1. Click on SET STATUS icon to get the POP UP2. Then click on the CHECK ECR icon and save the page to get the change number. Note down the

change number for future reference

Now it is needed to change the object status for further proceedings

Now we have to change ECR

1. Click on Set status to get the pop up

2. Click on Check

Change in Inspection Plan

Run T code CC02 to get the below given screen

Enter change number and press enter to get the next screen

Click on Objects to get the next screen

Enter Change Number

Click on Objects

Select the Row and click on DETAILS to get a pop up

Change in Inspection Plan

After clicking on Set Status, a pop up will emerge. Now click on Change possible icon and click on Continue.

After completing this page, go to header by clicking on Header icon to get the next screen.

1. Click on Set Status

2. Click on Header

2. Click on Change Possible

Change in Inspection Plan

Click on ECR Checked Icon to get the change in the pop up as shown below.

Click on SET STATUS Icon to get the pop up

Click on ECR Checked Icon in Pop up

Change in Inspection Plan

After Clicking on Convert ECR, click on Continue and save the file and Note down the Change Number.

Now this change number is to be mentioned in the Master Inspection characteristics template whenever there is any change in the existing inspection plan.

Click on APPROVE ECR

Click On Convert ECR

Change in Inspection Plan

Change in Inspection Plan