Eastern Wind Integration and
Transmission Study
NPCC Governmental/Regulatory Affairs
Advisory Group
February 23rd, 2010
Dave Corbus
National Renewable
Energy Lab
![Page 2: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/2.jpg)
What is Needed to Integrate 20% Wind in the
Eastern Interconnect?• Evaluate the power system
operating impacts and
transmission associated with
increasing wind energy to 20% and
30%
• Impacts include operating with
the variability and uncertainty
of wind
• Build upon prior wind integration
studies and related technical work;
• Coordinate with current regional
power system study work;
• Produce meaningful, broadly
supported results
• Technical Review Committee
![Page 3: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/3.jpg)
EWITS Study Organization
DOE
Sponsor
NREL
Project
Manager
Technical
Review
Committee
Stakeholders
AWS True wind
Wind Modeling
Project Team – Analysis
EnerNex/MISO/Ventyx
![Page 4: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/4.jpg)
Technical Review Committee• Includes representation from the following
organizations
New York Independent System
Operator (NYISO)
Xcel Energy
Southern Company
PJM Interconnection
Southwest Power Pool(SPP)
U.S. Department of Energy
Midwest ISO (MISO)
Michigan Public Service
Commission
Area Power Pool (MAPP)
American Wind Energy
Association (AWEA)
Federal Energy Regulatory Commission
(FERC) – observer status
North American Electric Reliability
Corporation (NERC)
CapX 2020 (Great River Energy)
Windlogics
National Renewable Energy Lab
General Electric (GE)
Regulatory Assistance Project
University College Dublin
Organization of MISO States (Wisconsin
Public Service Commission)
![Page 5: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/5.jpg)
EWITS Analysis Provides Detailed Information on
• Wind generation required to produce 20% and 30% of
the projected electric energy demand over the U.S.
portion of the Eastern Interconnection in 2024
• Transmission concepts for delivering energy
economically for each scenario
• Economic sensitivity simulations of the hourly
operation of the power system with wind generation,
future market structures and transmission overlay
• The contribution made by wind generation to resource
adequacy and planning capacity margin
![Page 6: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/6.jpg)
Why 20% and 30% Wind?
![Page 7: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/7.jpg)
Key Tasks- Eastern Wind Integration &
Transmission Study• Wind plant modeling, data development, and Siting
– Develop high quality wind resource data sets for the
wind integration study area
– Develop wind power plant outputs
– Identify wind sites and develop siting scenarios
• Transmission study – Develop transmission concepts for
different wind scenarios
• Wind integration study
– Evaluate operating impacts
– Evaluate resource adequacy
– Compare scenario costs
![Page 8: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/8.jpg)
Key Tasks–Wind Plant Modeling & Siting
– Develop high quality wind resource
data sets for the wind integration study
area
• Mesoscale modeling
• 3 years of time series data (2004-2006)
• 10-minute data at 2 km spatial resolution
– Develop wind power plant outputs
– Identify wind sites
![Page 9: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/9.jpg)
Wind Plant Modeling Approach:
“Re-creating” the Weather
Mesoscale model grids Wind plant siting
![Page 10: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/10.jpg)
Offshore Wind
•Great resource
•Well correlated with load and close to load centers
•More expensive!
![Page 11: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/11.jpg)
Scenario Development and Siting• Reference Case and Four Different Scenarios
– Three 20% and one 30% wind scenarios
• Scenario 1 – Focus on higher wind speed sites in the Midwest with larger transmission component
• Scenario 3 – Focus on local wind near cities with lower capacity onshore wind and offshore wind
• Up to 4 GW Canadian hydro and wind scheduled
•All of the four scenarios require a lot of wind and transmission!
![Page 12: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/12.jpg)
20% Wind Requires Some Regions to Supply
More Based on Resource Availability• Areas that meet 20% wind
energy on a regional basis, by
scenario
– Scenario 1: Midwest ISO,
MAPP, SPP
– Scenario 2: Midwest ISO,
MAPP, SPP, New England
ISO (ISO-NE), New York
ISO (NYISO)
– Scenario 3: MAPP, SPP,
PJM, ISO-NE, NYISO
– Scenario 4: Midwest ISO,
MAPP, SPP, PJM, ISO-
NE, NYISO
![Page 13: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/13.jpg)
Scenario 1 – 20%
“High Capacity Factor, On shore”
![Page 14: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/14.jpg)
Scenario 2 - 20%
“Hybrid with Offshore”
![Page 15: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/15.jpg)
Scenario 3 - 20%
“Local, with Aggressive Offshore”
April 30, 2009
![Page 16: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/16.jpg)
Scenario 4 - 30%
“Aggressive On- and Off-Shore”
![Page 17: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/17.jpg)
Wind Capacities by Scenario and
Regional Entity
![Page 18: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/18.jpg)
The Power of Aggregation and Geographic Diversity
![Page 19: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/19.jpg)
Geographic Diversity – 10-Minute
Variability for Five Regions
![Page 20: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/20.jpg)
EWITS Methods & Assumptions
• 2024 wind scenario development
• Power system models for 2024
• Conventional generation expansion
• Develop conceptual transmission overlays
• Evaluate operating impacts
• Evaluate resource adequacy
• Estimate annualized costs
October 2, 2009 EWITS Technical Review Committee Webinar
![Page 21: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/21.jpg)
Key Task - Transmission• High levels of new transmission are needed across the 4
scenarios
– Some transmission elements are common to all
overlays
• Reference case, 20% and 30% wind scenarios all require
a significant transmission build out, otherwise they are not
feasible
• Transmission reduces variability and provides capacity
benefits in its own right, and enhances the reliability
contribution of wind generation
• The conceptual transmission overlays consist of multiple
800kV HVDC and EHV AC lines
October 2, 2009 EWITS Technical Review Committee Webinar
![Page 22: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/22.jpg)
Key Tasks- Develop Transmission Plan
– Reference future and 20% wind and 30% wind scenarios
• Builds on JCSP work
• SPP EHV Conceptual Transmission Overlay
• Regional Generation Outlet Study – Scenario T 765kV Conceptual Overlay
– Analyze different transmission alternatives for different wind scenarios
• 765 AC and HVDC
![Page 23: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/23.jpg)
Scenario 2 Generation Difference: Copper Sheet Minus Constrained
Cases
![Page 24: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/24.jpg)
Scenario 2 Interface Contour: Annual Energy
Difference
Copper Sheet Minus Constrained Case
![Page 25: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/25.jpg)
Transmission Overlay for Scenario 3
![Page 26: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/26.jpg)
Conceptual Transmission Overlays
![Page 27: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/27.jpg)
Key Task - Wind Integration Study
•Evaluate operating impacts- Four scenarios plus
two sensitivity studies
– Regulation
– Load Following
– Unit Commitment
•Evaluate reliability impacts (ELCC/LOLP)
•EWITS is first and foremost a wind integration
study
– What are the integration costs and issues for 20 and
30% wind?
– How is other generation affected?
![Page 28: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/28.jpg)
Hourly Modeling Objective
– Chronological simulation of operational planning and power system operation using PROMOD hourly model
– Mimic
• Day-ahead unit commitment and scheduling based on load and wind generation forecasts
• Real-time operation with actual wind and load
How do we simulate the Eastern Interconnection in 2024?
– Period-ahead planning (e.g. day-ahead unit commitment)
– Real-time operations (at minimum of hourly granularity)
– Operational structures
• 11 regions
![Page 29: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/29.jpg)
Assumed operational structure for the
Eastern Interconnection in 2024 (white circles
represent balancing authorities)
![Page 30: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/30.jpg)
Additional Reserve Requirements
by Region and Scenario
0
1000
2000
3000
4000
5000
6000
7000
MISO ISO-NE NYISO PJM SERC SPP TVA
Ave
rage
Ho
url
y R
egu
lati
on
Re
qu
irem
en
t (M
W)
Operating Region
Load Only
Reference Case
Scenario 1
Scenario 2
Scenario 3
Scenario 4
![Page 31: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/31.jpg)
Wind Integration Costs
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
2004 2005 2006
Inte
grat
ion
Co
st $
/MW
H o
f W
ind
En
erg
y (2
00
9 U
SD)
Year
Reference
Scenario 1
Scenario 2
Scenario 3
Scenario 4
![Page 32: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/32.jpg)
Wind Curtailment by Scenario
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
Region
Win
d C
urt
ailm
en
t (%
)
Reference
Scenario 1
Scenario 2
Scenario 3
Scenario 4
Reference 1.87% 1.80% 1.98% 1.25% 1.48% 1.06% 1.93% 1.73%
Scenario 1 4.51% 11.57% 3.07% 0.02% 3.63% 0.07% 8.37% 7.02%
Scenario 2 2.69% 12.64% 1.73% 0.56% 10.25% 7.84% 4.34% 6.79%
Scenario 3 2.41% 2.70% 1.81% 7.67% 9.43% 0.47% 0.32% 3.39%
Scenario 4 8.69% 12.46% 8.37% 11.45% 9.56% 6.91% 9.53% 9.77%
MISO/MAPP SPP PJM ISONE NYISO SERCNI TVASUB Total Footprint
![Page 33: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/33.jpg)
Flexibility Supply Curve
Sources of Flexibility
Low
Cost
High
Cost
Study needed to determine shape of
Flexibility Supply Curve and Quantify Costs
![Page 34: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/34.jpg)
LOLP and ELCC Analysis Objective
– Determine contribution of wind generation to Eastern
Interconnection resource adequacy
– Assess resource adequacy value of transmission only
Issues
– Transmission overlay could have significant impact on existing
LOLE zones
– Transmission will serve as capacity resources for some zones;
Predecessor tasks
– Requires PROMOD to determine new area import limits
– GE MARS model developed from PowerBase
– Resource constraints may necessitate staging
![Page 35: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/35.jpg)
Resource Adequacy Analysis
GE MARS
– Monte-Carlo based chronological reliability simulation
– Now in use at MISO
Objectives
– Calculate ELCC for wind generation based on
comparative LOLE cases
– Zone-by-zone basis
Input data
– Network, resource, and load data input developed from
PowerBase
– Wind as load modifier
![Page 36: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/36.jpg)
An Energy Resource in an Capacity World
27.7 27.326.6
25.4
28.0 28.1
24.8
27.0
32.8
29.8
28.3
24.1
20.4
22.7
18.8
16.0
20.6
26.4
24.2
20.2
24.6
30.5
23.8
19.9
0
5
10
15
20
25
30
35
40
Scenario 1 Scenario 2 Scenario 3 Scenario 4
Percentage
2004 Profile 2005 Profile 2006 Profile
Overlay
Existing
LOLE/ELCC results for high penetration scenarios, with and without
transmission overlays
![Page 37: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/37.jpg)
Total Annualized Scenario Costs
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
Reference Scenario 1 Scenario 2 Scenario 3 Scenario 4
An
nu
aliz
ed
Sce
na
rio
Co
st (2
00
9 U
SD
M$
)
Wind Capital Cost
New Generation Capital Cost
Transmission Cost
Integration Cost
Wind Operational Cost
Production cost
![Page 38: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/38.jpg)
Sensitivity Studies
• Carbon Price sensitivity using PROMOD
– Run EGEAS generation expansion model to
determine carbon price sensitivities
– Re-run PROMOD for scenario 2
![Page 39: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/39.jpg)
Carbon Sensitivity Case
Change in Energy Generation by Fuel Type
![Page 40: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/40.jpg)
The results of this study pose some interesting
policy and technology development questions
• Could the levels of transmission, including the Reference Case, be
permitted and built and what is a realistic time frame?
• Could the level of offshore wind energy infrastructure be ramped up
fast enough to meet the aggressive offshore wind assumption in
scenario 3
• Would a different renewable profile or transmission overlay arise from
a bottom-up planning process?
• How can states and the federal government best work together on
regional transmission expansion and the massive development of
onshore and offshore wind infrastructure?
• What is the best way for regional entities to collaborate to make sure
wind is integrated into the bulk electrical grid optimally and reliably ?
• What is the difference between applying a carbon price versus
mandating and giving incentives for additional wind and renewables
![Page 41: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/41.jpg)
EWITS – Not an End All Catch All but a Link
in the Chain • The scenarios developed do not constitute a plan but
an initial perspective on a top-down, high-level view of
four different 2024 futures.
• The study assumptions were developed in close
coordination with the TRC
– Changes in the assumptions, such as the cost of various
fuels, the impact of regulation and policy would have a major
influence
• A complete evaluation of any of the scenarios would
require additional technical analysis including
– An AC analysis that includes power flows that look at voltage and
reactive compensation issues, dynamic and transient stability, and
HVDC terminal control.
![Page 42: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/42.jpg)
EWITS Conclusions• 20 and 30% wind penetrations are technically feasible
with significant expansion of the transmission
infrastructure.
– New transmission will be required for all the future
wind scenarios in the Eastern Interconnection,
• Without transmission enhancements, substantial
curtailment of wind generation will occur
• Interconnection-wide costs for integrating large
amounts of wind generation are manageable with large
regional operating pools, where benefits of load and
wind diversity can be exploited and large numbers of
supply resources are efficiently committed and
dispatched.
![Page 43: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/43.jpg)
EWITS Conclusions• Transmission helps reduce the impacts of the
variability of the wind and….
– Reduces wind integration costs
– Increases reliability of the electrical grid
– Helps make more efficient use of the available
generation resources
• Costs for aggressive expansions of the existing grid
are significant, but they make up a relatively small
piece of the total annualized costs in any of the
scenarios studied
• Wind generation displaces carbon-based fuels, directly
reducing carbon dioxide (CO2) emissions
![Page 44: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/44.jpg)
and the conclusion is…
• There are no fundamental technical barriers to the integration of 20% and 30% wind energy into the electrical system, but…
• There needs to be a continuing evolution of transmission planning and system operation policy and market development for this to be achieved
![Page 45: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/45.jpg)
Future Work
• Further analysis of regional results
• Demand response and smart grid load sensitivities
• Fuel sensitivity, unit commitment/optimization
• Plug in electric vehicle charging
• Sequencing of transmission
• Include more detailed representation from Canada
• Curtailment under transmission constrained
scenarios and storage analysis
![Page 46: Eastern Wind Integration and Transmission Study...• Build upon prior wind integration studies and related technical work; ... PJM, ISO-NE, NYISO –Scenario 4: Midwest ISO, ... •](https://reader035.vdocuments.us/reader035/viewer/2022070218/6124757914d0950705645560/html5/thumbnails/46.jpg)
EWITS Schedule & Contacts
• http://www.nrel.gov/ewits
• Development of Phase II of EWITS in first
quarter 2010
• Roll out January 20th, Washington DC.
• Contact: Dave Corbus at