East West Interconnector Background

• Security Of Supply

• Promote Competition in The Electricity Sector

• Accommodate Growth Of Renewable Energy

• Reduce Dependence on Imported Fuels

• Downward Pressure on Price

• Achievement of National and European Objectives

Page 3: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

East West Interconnector Background

• Key Strategic Project• Priority Interconnector Project - DG TREN January 2007• ‘Critical National Strategic Importance..’ – NDP 2007-2013

• CER to arrange for design of competition for construction of a 500MW interconnector at earliest possible date (2012 or earlier)

• Upon completion, I/C to be owned and operated by EirGrid

• Work on selection of sub sea route and sites and associated grid reinforcement to proceed in parallel with selection of developer process

Page 4: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

The Route•Connects To Irish Grid At Woodland 400kv Substation

•Irish Land Cable Route – Approx 45km

•Connects To UK Grid At Deeside 400kv Substation

•Welsh Land Cable Route – Approx 30km

Page 5: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

Marine Survey

Page 6: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

Recent Milestones

Government Approval / Contract Award March 2009

Planning Permission in Britain Sep 2009

Planning Approval Granted in Ireland Sep 2009

European Investment Bank funding secured Sep 2009

Granted Foreshore Licence in Britain Oct 2009

Commencement of Works in Wales Nov 2009

EU Grant secured March 2010

Full Notice to Proceed March 2010

Page 7: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

North Ocean 102 Cable Laying VesselABB HVC Karlskrona

Page 8: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

RA’s SEM Regional

Integration Consultation

High level timeline of activities

Q42012

EWIC commercially operational

Q32011

Q12012

Q42010

Q32010

Q22011

Q42011

Q12011

Q32012

Q22010

Q12010

Q42009

RA Approval access rules

Start CustomerRegistration

Go-live explicit System

Customer Training

Q22012

Regulatory interface

Mods Approval from RAs

Mods submitted to Mods panel

April 2012Release

Review of EU and UK legal requirements (including

telecoms)

Registration in BETTA/SEM

Explicit auction system tender

AS Contract Agreed

Final Notice to Proceed

Auction Platform workshop

Customer workshop

Customer workshop

Page 9: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

Auction Process

• An auction platform will be procured over the next few months

• Coordination underway with Moyle so as to offer 1 platform but 2 separate auctions

• Explicit Auctions will be held on annual, monthly, weekly and daily basis

• Implicit auctions being considered for within day auctions

• Secondary trading will be facilitated

• The auctions and the rules of the interconnector will be compliant with the Congestion Management Guidelines

• UIOLI and UIOSI will be operated

Page 10: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

Facts & Figures

• 500MW Continuous Rated Power

• Overload Capacity Up To 550MW

• DC Cable Voltage ±200kV

• Reactive Power Capability

• Total Estimated Losses At Rated Power – 30MW

• Completion Date Q3 2012

Page 11: East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence

End of Presentation

Questions?

EirGrid website: www.eirgrid.com Project website: www.interconnector.ie Planning websit www.eirgrideastwestinterconnector.ie ABB HVDC: www.abb.com/hvdc